This document package includes mechanical demolition drawings and specifications for a Cath Lab renovation project at a Veterans Affairs medical center, as well as the related federal contract opportunity. The drawings outline demolition and relocation of existing piping and ductwork to prepare for a new GE Cath Lab system, Stryker boom, and cleanroom ceiling. Key phases of work include external demolition before Cath Lab interior work. The solicitation is for the Department of Veterans Affairs to replace aging Cath Lab equipment at the Ralph H. Johnson VA Medical Center to improve veteran care.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12.511.510.59.57.46.1
AA
BB
CC
A
A.8
B
(E) AHU-19
(E) AHU-18
(E) AHU-17
(E )C
H W
S (E
)C H
W R
(E) VAV
BOX
(E) VAV
BOX
(E) VAV
BOX
(E) VAV
BOX
(E) VAV
BOX
(E) VAV
BOX
1 1/2"(E)HWS
1 1/2"(E)HWR
3/ 4"
(E )H
W R
3/ 4"
(E )H
W S
3/ 4"
(E )H
W R
3/ 4"
(E )H
W S
3/4"3/4"
3/4"3/4"
3/4"3/4" 3/4"3/4"
3/4"3/4"
2"2"
1"1"
1 1/4"1 1/4"
3"3"
3/4"3/4"
THIS PROJECT SHALL BE PHASED. ALL WORK
EXTERNAL TO THE CATH LAB TO BE
COMPLETED IN PHASES 1-3 . ALL WORK INSIDE
THE CATH LAB SHALL BE DONE IN PHASE 4.
CONTRACTOR TO COORDINATE WITH OWNER.
T
PHASE 4 LIMITS
PHASE 4
LIMITS
A. THE DRAWINGS SHALL NOT BE SCALED FOR CONSTRUCTION
PURPOSES. THE SCALE, WHEN INDICATED IS INTENDED FOR GENERAL
REFERENCE ONLY.
B. ALL SHUTDOWNS SHALL BE COORDINATED AND APPROVED THROUGH
THE OWNERS REPRESENTATIVE AND WILL REQUIRE ADVANCE NOTICE
OF TWO WEEKS. THIS TIME LENGTH MAY BE LONGER OR SHORTER
FOR SOME SHUTDOWNS AND SHALL BE AT THE OWNERS DISCRETION.
C. PROVIDE ESCUTCHEON PLATES WHERE DUCTS PENETRATE CEILINGS
OR WALLS IN AREAS EXPOSED TO VIEW. ESCUTCHEONS FOR DUCTS
SHALL BE CONSTRUCTED OF SAME MATERIAL AS DUCT. PIPE
ESCUTCHEONS SHALL BE CHROME-PLATED BRASS.
D. LEAVE A MINIMUM CLEARANCE OF 2 INCHES ABOVE DUCTS INSTALLED
IN RATED PARTITIONS TO ALLOW SPACE FOR THE GENERAL
CONTRACTOR TO SEAL THE WALL ABOVE THE DUCTS. DO NOT INSTALL
FLEXIBLE DUCT THROUGH RATED WALLS, BARRIERS OR PARTITIONS.
E. PROVIDE REMOVABLE ACCESS DOORS AT ALL MOTOR OPERATED
DAMPERS, FIRE DAMPERS, SMOKE DAMPERS, DUCT COILS, SMOKE
DETECTORS, AND SIMILAR ITEMS REQUIRING MAINTENANCE OR
ADJUSTMENT.
F. MECHANICAL CONTRACTOR SHALL REMOVE INSULATION, REPAIR DUCT
LEAKS, AND RE-INSULATE ALL EXISTING DUCT MAINS.
G. MECHANICAL CONTRACTOR SHALL INSTALL MANUAL VOLUME DAMPERS
ON ALL BRANCH DUCTWORK CONNECTIONS.
H. ANY EXISTING PIPE OR DUCT INSULATION THAT IS DAMAGED DURING
CONSTRUCTION SHALL BE REMOVED AND REPLACED WITH NEW
INSULATION TO MATCH ADJACENT INSULATION AND COVERING.
I. CONSTRUCTION DEBRIS SHALL BE REMOVED DAILY.
J. MECHANICAL CONTRACTOR SHALL RELOCATE EXISTING EQUIPMENT TO
REMAIN AS REQUIRED TO COORDINATE INSTALLATION OF NEW WORK.
K. PROVIDE A PRE-TAB OF ALL AREAS AFFECTED BY AHU 18 BEFORE
REMOVAL OF ANY DUCTWORK AND HYDRONIC SYSTEMS. ONCE DEMO
HAS BEEN ACCOMPLISHED AND DUCTWORK, HWH, ETC. IS BLANKED
OFF, PERFORM A TAB AFTER DEMO TO ENSURE FLOW RATES OF CATH
LAB #1 AND EVERY OTHER SUPPLY/RETURN IS WITHIN RANGE. AT END
OF INSTALLATION OF NEW WORK FOR THIS AREA, PERFORM A TAB ON
THIS INSTALLATION FOR THE CARDIAC CATH LAB.
GENERAL NOTES
REMOVE EXISTING TERMINAL BOX 18-CV-19. CAP PIPING AT MAIN.
REMOVE EXISTING TERMINAL BOX AND ALL ASSOCATED PIPING
CONNECTIONS AND CAP AT MAIN.
RELOCATE ALL PIPING, CONDUIT, DUCTWORK, ETC. ABOVE CEILING
IN SHADED AREA TO ACCOMODATE FOR NEW AHU SERVING CATH
LAB 2. CONTRACTOR MAY FIELD VERIFY PRIOR TO PRE-BID.
RELOCATE ALL PIPING, CONDUIT, DUCTWORK, ETC. ABOVE CEILING
IN SHADED AREA TO ACCOMODATE FOR NEW OA DUCT.
CONTRACTOR MAY FIELD VERIFY PRIOR TO PRE-BID.
REMOVE AND/OR RELOCATE ALL CONDUITS, PIPING, ETC FROM
ABOVE CEILING IN THIS AREA TO ACCOMODATE NEW DUCTS AND
CEILING SYSTEM.
DEMOLITION KEYED NOTES
EXISTING 4" CHWS/R UP/DN (CA LOOP).
EXISTING PIPE CONTINUES OUTSIDE SCOPE OF WORK. NO WORK EXCEPT FOR
TAB MENTIONED IN PARAGRAPH K ABOVE.
EXISTING KEYED NOTES
EXISTING PIPING TO REMAIN
NEW PIPE
EXISTING PIPING TO BE REMOVED
PIPE UP
FLOW ARROW
HOT WATER SUPPLY
HOT WATER RETURN
ISOLATION VALVE
NEW EQUIPMENT
EXISTING EQUIPMENT TO REMAIN
THERMOSTAT
HWS
HWR
T
SYMBOLS LEGEND
PROJECT LOCATION:
CARDIAC CATH LAB (2ND FLOOR)
BEE STREET
MAIN HOSPITAL ENTRANCE
BEE STREET/BRAVO STREET
MENTAL HEALTH CLINIC ENTRANCE
N
KEY PLAN
SMOKE TIGHT WALL (EXISTING)
1-HR FIRE RATED WALL (EXISTING)
2-HR FIRE RATED WALL (EXISTING)
WALL RATING LEGEND
LEAD-LINED WALL (EXISTING - MAINTAIN & PATCH AS NEEDED IN RENOVATION)
5838 Monroe Road, Suite 100 Charlotte, NC 28212
704 531 3000 Firm License Number: F-0674
Project No. 4415
Charlotte Engineers, LLP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% - CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT GMK Associates, Inc.
1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Megan C. Day, AIA
STAMPPROGRAM MANAGER
321 4 5 6 7 8 9 10
Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA
CONSULTANT
Charlotte Engineers 5838 Monroe Road Charlotte, NC 28212 704-531-3000 Michael Eaves
E:
\L oc al
R ev it\
\4
- C E
C en tra l M od el
.rv t
8/
/2
:5 4:
P
M
MD-101
MECHANICAL - SECOND FLOOR - DEMOLITION -
PIPING
CATH LAB SITE PREP at
RALPH JOHNSON VAMC
109 BEE STREET CHARLESTON, SC
534-CSI-555
MAY 08, 2020 GAT ESM
1/8" = 1'-0"1 MECHANICAL - SECOND FLOOR - DEMOLITION - PIPING
Revisions: Date:
ADDENDUM 2 08/12/2020
| Sheets |
| M-004 - MECHANICAL - SCHEDULES |
| M-005 - MECHANICAL - SCHEDULES |
| MD-100 - MECHANICAL - SECOND FLOOR - DEMOLITION - DUCTWORK |
| MD-101 - MECHANICAL - SECOND FLOOR - DEMOLITION - PIPING |
| MH-200 - SECOND FLOOR - NEW WORK - DUCTWORK |
| MP-201 - SECOND FLOOR - NEW WORK - PIPING |
File details come from the government source that posted it. Updated .