Card Cath Lab Prep Dwgs ED100 ED10 EL200 EP-201.pdf

PDF 543 KB Posted

Attached to
CATH LAB Federal contract opportunity
Solicitation number
36C24720B0024
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 7

About this file

This package includes construction drawings and specifications for a Cath Lab renovation project at a Veterans Affairs medical center. The project scope involves removing existing Cath Lab equipment and replacing it with a new GE system, Stryker boom, and CleanSuite ceiling system. Drawings show demolition of existing infrastructure and installation details for new electrical, lighting and medical equipment. Specifications identify general contractor requirements for coordinating work with equipment vendors and medical staff. The solicitation is for a firm fixed price contract awarded through full and open competition to replace aging Cath Lab facilities.

View the file

Other files for this federal contract opportunity

Other files attached to CATH LAB, newest first.
File Type Posted
Project 534-CSI-555 Cardiac Lab Prep Pre-Bid Sign-In.pdf PDF
Project No. 534-CSI-555 Card Cath Lab Questions from 8-26-2020.docx DOCX document
PreBid Site Visit Sign In sheet.doc DOC document
36C24720B0024 A00003.pdf PDF
28 13 00 Physical Access Control System.pdf PDF
26 08 00 Commissioning of Electrical Systems.pdf PDF
Project 534-CSI-555 Answers to Questions.pdf PDF
EP-201 - ELECTRICAL - SECOND FLOOR - POWER SYSTEMS.pdf PDF
280800 Commissioning of Electronic Safety and Security Systems.pdf PDF
M-004 - MECHANICAL - SCHEDULES.pdf PDF
Addendum 2 - Project No. 534-CSI-555.pdf PDF
MD-100 - MECHANICAL - SECOND FLOOR - DEMOLITION - DUCTWORK.pdf PDF
MH-200 - SECOND FLOOR - NEW WORK - DUCTWORK.pdf PDF
S02 36C24720B0024 A00002.pdf PDF
MD-101 - MECHANICAL - SECOND FLOOR - DEMOLITION - PIPING.pdf PDF
230711 HVAC INSULATION.pdf PDF
000110 Specifications.pdf PDF
MP-201 - SECOND FLOOR - NEW WORK - PIPING.pdf PDF
M-005 - MECHANICAL - SCHEDULES.pdf PDF
ED-100 - ELECTRICAL - SECOND FLOOR - DEMOLITION.pdf PDF
270800 Commissioning of Communications Systems.pdf PDF
01 91 00 Commissioning.pdf PDF
226300 - GAS SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES.pdf PDF
36C24720B0024 Drawing Bid Documents.pdf PDF
20200511 - VAMC CHSSC - CLSP - Project Manual SPECS - BID DOCUMENTS - Combined - REV 3.zip ZIP file
Addendum 1.pdf PDF
20200508-VAMCCHSSC-CLSP-DRAWINGS-BIDDOCUMENTS-COMPLETE.pdf PDF
36C24720B0024 A00001.pdf PDF
20200511 - VAMC CHSSC - CLSP - Project Manual SPECS - BID DOCUMENTS - Combined - REV 3.pdf PDF
S02 36C24720B0024 Solicitation.pdf PDF
S02 36C24720B0024 CATH Lab Solicitation.pdf PDF
Bid Drawings Document.pdf PDF
SC Wage Determination SC20190023.pdf PDF
Specs Bid Documents.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S

S S

EP

O S

N B

WAP

EP

O

NS

NCL

PS

PS

PS

A. THE DRAWINGS SHALL NOT BE SCALED FOR CONSTRUCTION

PURPOSES. THE SCALE, WHEN INDICATED IS INTENDED FOR

GENERAL REFERENCE ONLY.

B. CONSTRUCTION DEBRIS SHALL BE REMOVED DAILY.

C. OPERATION OF CATH LAB 1 NOT TO BE INTERRUPTED BY

DEMOLITION. ANY ELECTRICAL CONDUIT OR WIRE SERVING

CATH LAB 2 EXISTING ABOVE CATH LAB 1 SHALL BE EXISTING

TO REMAIN.

D. ALL DEMOLITION WORK ASSOCIATED WITH EQUIPMENT

OUTSIDE OF CATH LAB 2 TO BE A PART OF PHASES 1-3.

DEMO WORK INSITE CATH LAB 2 AND DEMO OF EXISTING

ISOLATED POWER PANEL TO BE A PART OF PHASE 4

GENERAL NOTES

EXISTING FLOOR PEDESTAL TO REMAIN.

ALL LIGHTING AND CEILING DEVICES TO BE REMOVED UNLESS OTHERWISE

NOTED AS BEING RELOCATED. DEMO WIRING AS REQUIRED BACK TO

SOURCE. EXISTING WALL DEVICES TO REMAIN.

ALL EXISTING ELECTRICAL AND MECHANICAL EQUIPMENT TO BE REMOVED.

ALL ASSOCIATED WIRE AND CONDUIT IS TO BE REMOVED TO THE EXTENT

POSSIBLE. EXISTING CEILING DEVICES TO REMAIN. RELOCATED INTO NEW

CEILING AS REQUIRED. COORDINATE WITH ARCHITECTURAL DRAWINGS.

EXISTING ISO PANEL TO BE REMOVED. PULL ALL WIRES AND CONDUIT

BACK TO SOURCE AND LABEL SOURCE BREAKER AS SPARE. ALL

ASSOCIATE WIRING AND CONDUIT TO LOADS AND RECEPTACLES IN CATH

LAB TO BE DEMOLISHED. EXISTING RECEPTACLE BOXES AND JUNCTION

BOXES TO REMAIN FOR RE-USE.

EXISTING EQUIPMENT IN CONTROL ROOM TO REMAIN UNLESS OTHERWISE

NOTED.

EXISTING RECEPTACLE COVERS TO BE REPLACED WITH GFI TYPE.

NO WORK IN THIS AREA UNLESS OTHERWISE NOTED. SEE PANEL

SCHEDULES AND RISER DIAGRAM FOR ADDITIONAL INFORMATION.

ALL CONDUIT IN CATH LAB WALL TO REMAIN. REUSE AS NEEDED TO

SERVE NEW LOADS. REPLACE RECEPTACLE COVERS WITH NEW.

CONDUIT THAT EXTENDS OVER EXISTING CATH LAB 1 THAT WOULD

INTERFERE WITH FUNCTION OF THIS AREA IS TO BE ABANDONED RATHER

THAN DEMOLISHED.

EXISTING LEIBERT UNIT TO BE REMOVED, INCLUDING ALL WIRE AND

CONDUIT TO CONDENSOR UNIT ON ROOF ABOVE. COORDINATE WITH

MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.

EXISTING VAV ABOVE CEILING TO BE REMOVED. MAINTAIN WIRE AND

CONDUIT FOR RE-USE ON NEW AIR TERMINAL UNIT. CONSTRUCTION

CONTRACTOR SHALL COORDINATE WITH COR FOR TRACING CIRCUITS.

CONTRACTOR SHALL TRACE CIRCUITS WHILE VA IS PRESENT.

EXISTING CONDUITS IN WALLS AND ABOVE CEILINGS IN THESE AREAS ARE

TO BE RELOCATED AS REQUIRED TO ACCOMODATE NEW WORK.

DEMOLITION KEYED NOTES

DRAWINGS. SEE SCHEDULE FOR TYPE (*).

CEILING OR WALL MOUNTED EXIT SIGN. PROVIDE NUMBER OF FACES AND CHEVRONS AS INDICATED ON

LED LIGHTING FIXTURE, CEILING OR WALL MOUNTED,

LED LIGHTING WALLWASH FIXTURE, CEILING MOUNTED.

CONNECTED TO NORMAL POWER. SEE SCHEDULE FOR TYPE (*). SEE ARCHITECTURAL RCP FOR EXACT*

LOCATION AND CEILING TYPE. SLASH INDICATES CONNECTED TO THE CRITICAL BRANCH.

SEE SCHEDULE FOR TYPE (*).*

HALF-SHADED INDICATES CONNECTED TO LIFE SAFETY BRANCH.* * *

LUMINAIRE, CEILING MOUNTED, CONNECTED TO THE NORMAL POWER SYSTEM (UNLESS OTHERWISE NOTED).

SEE SCHEDULE FOR TYPE (*). SEE ARCHITECTURAL RCP FOR EXACT LOCATION AND CEILING TYPE.

SLASH INDICATES CONNECTED TO THE CRITICAL BRANCH. HALF-SHADED INDICATES CONNECTED TO THE EMERGENCY OR LIFE SAFETY BRANCH; VIA EMERGENCY GENERATOR SET OR BATTERY BALLAST, SEE PLANS.

LED LIGHTING FIXTURE, WALL MOUNTED OR UNDER CABINET, CONNECTED TO NORMAL POWER.

SLASH INDICATES CONNECTED TO THE CRITICAL BRANCH. SEE SCHEDULE FOR TYPE (*).

SINGLE POLE SWITCH, MOUNTED 42" AFF TO CENTER OF DEVICE.S

EMERGENCY LIGHTING FIXTURE, CEILING-MOUNTED OR WALL-MOUNTED AT 7'-6" AFF UNLESS NOTED

OTHERWISE. CONNECT UNSWITCHED.

DUPLEX RECEPTACLE, MOUNTED 18" AFF TO CENTER OF DEVICE. NEMA 5-20R UNLESS OTHERWISE

TWO DUPLEX RECEPTACLES IN 2-GANG BOX, MOUNTED 42" AFF TO CENTER OF OUTLET

OR 2" FROM BOTTOM OF OUTLET TO TOP OF BACKSPLASH OR COUNTERTOP. SLASH INDICATES

OUTLET TO TOP OF BACKSPLASH OR COUNTERTOP. SLASH INDICATES CONNECTED TO THE EMERGENCY

DUPLEX RECEPTACLE, MOUNTED 42" AFF TO CENTER OF OUTLET OR 2" FROM BOTTOM OF

TWO DUPLEX RECEPTACLES IN 2-GANG BOX, MOUNTED 18" AFF TO CENTER OF DEVICE. SLASH

INDICATED. SLASH INDICATES CONNECTED TO THE EMERGENCY POWER SYSTEM.

INDICATES CONNECTED TO THE EMERGENCY POWER SYSTEM.

POWER SYSTEM.

CONNECTED TO THE EMERGENCY POWER SYSTEM.

JUNCTION OR PULL BOX. W = WEATHERPROOF.J

FUSED SAFETY SWITCH. NUMERAL INDICATES FUSE RATING.15

PANELBOARD SURFACE MOUNTED.

PANELBOARD FLUSH MOUNTED.

PUSHPAD. PROVIDE BOX AND CONDUIT AS REQUIRED. COORDINATE WITH HARDWARE VENDOR.PP

CARD READER. PROVIDE BOX AND CONDUIT AS REQUIRED. COORDINATE WITH HARDWARE VENDOR.CR

EMERGENCY SYSTEM OFF PUSH BUTTONEPO

DD FIRE ALARM DUCT MOUNTED SMOKE DETECTOR.

SYMBOLS LEGEND

RL = EXISTING DEVICE TO BE RELOCATED.

DASHED SYMBOLS INDICATE EXISTING DEVICES.

RLD = RELOCATED DEVICE SHOWN IN FINAL LOCATION.

RM = EXISTING DEVICE TO REMAIN.

RM

RM

RV = EXISTING DEVICE TO BE REMOVED.

RP = EXISTING DEVICE TO BE REPLACED WITH NEW DEVICE.

EX = EXISTING DEVICE

PROJECT LOCATION:

CARDIAC CATH LAB (2ND FLOOR)

BEE STREET

MAIN HOSPITAL ENTRANCE

BEE STREET/BRAVO STREET

MENTAL HEALTH CLINIC ENTRANCE

N

KEY PLAN

14.513.512.511.510.59.57.46.1

AA

BB

CC

A

A.8

B.8

C

B

ATS LS

ATS LL

SWBD HDCC

SWBD HDLS

MDP

CRIT ISO PANEL #1

POWER LINE FILTER

SWBD 2HEDP1

ATS EE

RM

RM

RM RM

RMRM RM

RM

RM

RV

RM

RM

RM

RM

RM

RP RP RM

RMRP

RL

RL

RL

RL

RL

RL

RV RV

RV RV

RV RV

RV

RV RV

RV

RV

RV

RV

RV

RV RV

RV RV

RV

RV

RM

RM

PANEL A PANEL CCB

PANEL HA

PANEL LSA

PANEL HCCC

PANEL 2LE-AA231PANEL 2HE-AA231

CRIT ISO PANEL #2

RM

7 7

RM

SMOKE TIGHT WALL (EXISTING)

1-HR FIRE RATED WALL (EXISTING)

2-HR FIRE RATED WALL (EXISTING)

WALL RATING LEGEND

LEAD-LINED WALL (EXISTING - MAINTAIN & PATCH AS NEEDED IN RENOVATION)

5838 Monroe Road, Suite 100 Charlotte, NC 28212

704 531 3000 Firm License Number: F-0674

Project No. 4415

Charlotte Engineers, LLP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% - CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT GMK Associates, Inc.

1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Megan C. Day, AIA

STAMPPROGRAM MANAGER

321 4 5 6 7 8 9 10

Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA

CONSULTANT

Charlotte Engineers 5838 Monroe Road Charlotte, NC 28212 704-531-3000 Michael Eaves

E:

\L oc al

R ev it Fi le \2

9\

C

E C en tra l M od el .rv t 5/

8/

1:

:3

AM

ED-100

ELECTRICAL - SECOND FLOOR - DEMOLITION CATH LAB SITE PREP at

RALPH JOHNSON VAMC

109 BEE STREET CHARLESTON, SC

534-CSI-555

MAY 08, 2020 CLH JCE

1/8" = 1'-0"1 ELECTRICAL - FIRST FLOOR - DEMOLITION

Revisions: Date:

12.511.510.59.57.46.1

AA

BB

CC

A

A.8

B.8

C

B

EXISTING SECOND FLOOR ROOF EXISTING SECOND FLOOR ROOF

EXISTING THIRD FLOOR ROOF

EXISTING FOURTH FLOOR ROOF

APPROXIMATE LOCATION OF CARDIAC CATH LAB

NO. 2 BELOW

EXISTING FIRST FLOOR ROOF

A. THE DRAWINGS SHALL NOT BE SCALED FOR CONSTRUCTION

PURPOSES. THE SCALE, WHEN INDICATED IS INTENDED FOR

GENERAL REFERENCE ONLY.

B. CONSTRUCTION DEBRIS SHALL BE REMOVED DAILY.

C. OPERATION OF CATH LAB 1 NOT TO BE INTERRUPTED BY

DEMOLITION. ANY ELECTRICAL CONDUIT OR WIRE SERVING

CATH LAB 2 EXISTING ABOVE CATH LAB 1 SHALL BE EXISTING

TO REMAIN.

D. ALL DEMOLITION WORK ASSOCIATED WITH EQUIPMENT

OUTSIDE OF CATH LAB 2 TO BE A PART OF PHASES 1-3.

DEMO WORK INSITE CATH LAB 2 AND DEMO OF EXISTING

ISOLATED POWER PANEL TO BE A PART OF PHASE 4

GENERAL NOTES

EXISTING CONDENSER TO BE REMOVED. DEMOLISH WIRE AND CONDUIT

BACK TO SOURCE AND LABEL BREAKER AS SPARE. COORDINATE WITH

MECHANICAL DRAWINGS. CONSTRUCTION CONTRACTOR SHALL

COORDINATE WITH COR FOR TRACING CIRCUITS. CONTRACTOR SHALL

TRACE CIRCUITS WHILE VA IS PRESENT.

DEMOLITION KEYED NOTES

PROJECT LOCATION:

CARDIAC CATH LAB (2ND FLOOR)

BEE STREET

MAIN HOSPITAL ENTRANCE

BEE STREET/BRAVO STREET

MENTAL HEALTH CLINIC ENTRANCE

N

KEY PLAN

5838 Monroe Road, Suite 100 Charlotte, NC 28212

704 531 3000 Firm License Number: F-0674

Project No. 4415

Charlotte Engineers, LLP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% - CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT GMK Associates, Inc.

1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Megan C. Day, AIA

STAMPPROGRAM MANAGER

321 4 5 6 7 8 9 10

Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA

CONSULTANT

Charlotte Engineers 5838 Monroe Road Charlotte, NC 28212 704-531-3000 Michael Eaves

E:

\L oc al

R ev it Fi le \2

9\

C

E C en tra l M od el .rv t 5/

8/

1:

:4

AM

ED-102

ELECTRICAL - PARTIAL ROOF PLAN -

DEMOLITION

CATH LAB SITE PREP at

RALPH JOHNSON VAMC

109 BEE STREET CHARLESTON, SC

534-CSI-555

MAY 08, 2020 Checker Designer

1/8" = 1'-0"1 ELECTRICAL - ROOF PLAN - DEMOLITION

S S

S S

GENERAL NOTES

A. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR

LOCATION OF CEILING FIXTURES.

B. THE DRAWINGS SHALL NOT BE SCALED FOR CONSTRUCTION

PURPOSES. THE SCALE, WHEN INDICATED IS INTENDED FOR

GENERAL REFERENCE ONLY.

C. CONSTRUCTION DEBRIS SHALL BE REMOVED DAILY.

D. COORDINATE LIGHT FIXTURE LOCATIONS WITH

ARCHITECTURAL REFLECTED CEILING PLANS PRIOR TO

INSTALLATION.

E. CONNECT ALL UNSWITCHED LIGHT FIXTURES AND EXIT

SIGNS AHEAD OF ANY LOCAL SWITCHING AND/OR DIMMERS.

F. CONNECT ALL NEW EXIT SIGNS TO EXISTING LIFE-SAFETY

LIGHTING CIRCUIT HLSA-1.

J. WORK RELATED TO NEW AND REPLACED CORRIDOR DOORS

TO BE A PART OF PHASES 1, 2, AND 3 AS SHOWN. ALL WIRE,

CONDUIT, AND POWER CONNECTIONS OUTSIDE OF CATH

LAB 2 INCLUDING AHU CONNECTIONS AND INSTALLATION OF

NEW ISOLATED POWER PANELS TO BE COMPLETED DURING

PHASES 1-3. WORK INSIDE THE CATH LAB TO BE A PART OF

PHASE 4.

ALL NEW CEILING DEVICES INCLUDING BOOMS TO BE WIRED TO NEW CRITICAL ISOLATION PANEL #2.

CONNECT TO EXISTING NORMAL LIGHTING CIRCUIT MADE AVAILABLE AS A RESULT OF DEMOLITION.

RECONNECT UNSWITCHED TO EMERGENCY LIGHTING CIRCUIT.

NO WORK IN THIS AREA UNLESS OTHERWISE NOTED.

PROVIDE CONNECTION TO PRICE CEILING SYSTEM FROM EXISTING CRITICAL LIGHTING CIRCUIT PREVIOUSLY

SERVING THIS AREA.

RECONNECT EXISTING WARNING LIGHT TO NEW EQUIPMENT TO MAKE WHOLE AND FUNCTIONAL.

PROVIDE LIGHT FIXTURE APPROPRIATE TO BE HUNG FROM DECK ABOVE.

NEW WORK KEYED NOTES

14.513.512.511.510.59.57.46.1

AA

BB

CC

A

A.8

B.8

C

B

WL

EXEX

EX

EX

EX

EX

UC

EX

EX

EX

E6

E6

E6

E6

PHASE 4 LIMITS

PHASE 4

LIMITS

PHASE 1-3

PHASE 1

PHASE 2

PHASE 3

EX D6

D6

D6 D6

D6

D6

D6

D6

D6D6

D6

D

D

EX

E6

DRAWINGS. SEE SCHEDULE FOR TYPE (*).

CEILING OR WALL MOUNTED EXIT SIGN. PROVIDE NUMBER OF FACES AND CHEVRONS AS INDICATED ON

LED LIGHTING FIXTURE, CEILING OR WALL MOUNTED,

LED LIGHTING WALLWASH FIXTURE, CEILING MOUNTED.

CONNECTED TO NORMAL POWER. SEE SCHEDULE FOR TYPE (*). SEE ARCHITECTURAL RCP FOR EXACT*

LOCATION AND CEILING TYPE. SLASH INDICATES CONNECTED TO THE CRITICAL BRANCH.

SEE SCHEDULE FOR TYPE (*).*

HALF-SHADED INDICATES CONNECTED TO LIFE SAFETY BRANCH.* * *

LUMINAIRE, CEILING MOUNTED, CONNECTED TO THE NORMAL POWER SYSTEM (UNLESS OTHERWISE NOTED).

SEE SCHEDULE FOR TYPE (*). SEE ARCHITECTURAL RCP FOR EXACT LOCATION AND CEILING TYPE.

SLASH INDICATES CONNECTED TO THE CRITICAL BRANCH. HALF-SHADED INDICATES CONNECTED TO THE EMERGENCY OR LIFE SAFETY BRANCH; VIA EMERGENCY GENERATOR SET OR BATTERY BALLAST, SEE PLANS.

LED LIGHTING FIXTURE, WALL MOUNTED OR UNDER CABINET, CONNECTED TO NORMAL POWER.

SLASH INDICATES CONNECTED TO THE CRITICAL BRANCH. SEE SCHEDULE FOR TYPE (*).

SINGLE POLE SWITCH, MOUNTED 42" AFF TO CENTER OF DEVICE.S

EMERGENCY LIGHTING FIXTURE, CEILING-MOUNTED OR WALL-MOUNTED AT 7'-6" AFF UNLESS NOTED

OTHERWISE. CONNECT UNSWITCHED.

DUPLEX RECEPTACLE, MOUNTED 18" AFF TO CENTER OF DEVICE. NEMA 5-20R UNLESS OTHERWISE

TWO DUPLEX RECEPTACLES IN 2-GANG BOX, MOUNTED 42" AFF TO CENTER OF OUTLET

OR 2" FROM BOTTOM OF OUTLET TO TOP OF BACKSPLASH OR COUNTERTOP. SLASH INDICATES

OUTLET TO TOP OF BACKSPLASH OR COUNTERTOP. SLASH INDICATES CONNECTED TO THE EMERGENCY

DUPLEX RECEPTACLE, MOUNTED 42" AFF TO CENTER OF OUTLET OR 2" FROM BOTTOM OF

TWO DUPLEX RECEPTACLES IN 2-GANG BOX, MOUNTED 18" AFF TO CENTER OF DEVICE. SLASH

INDICATED. SLASH INDICATES CONNECTED TO THE EMERGENCY POWER SYSTEM.

INDICATES CONNECTED TO THE EMERGENCY POWER SYSTEM.

POWER SYSTEM.

CONNECTED TO THE EMERGENCY POWER SYSTEM.

JUNCTION OR PULL BOX. W = WEATHERPROOF.J

FUSED SAFETY SWITCH. NUMERAL INDICATES FUSE RATING.15

PANELBOARD SURFACE MOUNTED.

PANELBOARD FLUSH MOUNTED.

PUSHPAD. PROVIDE BOX AND CONDUIT AS REQUIRED. COORDINATE WITH HARDWARE VENDOR.PP

CARD READER. PROVIDE BOX AND CONDUIT AS REQUIRED. COORDINATE WITH HARDWARE VENDOR.CR

EMERGENCY SYSTEM OFF PUSH BUTTONEPO

DD FIRE ALARM DUCT MOUNTED SMOKE DETECTOR.

SYMBOLS LEGEND

RL = EXISTING DEVICE TO BE RELOCATED.

DASHED SYMBOLS INDICATE EXISTING DEVICES.

RLD = RELOCATED DEVICE SHOWN IN FINAL LOCATION.

RM = EXISTING DEVICE TO REMAIN.

RM

RM

RV = EXISTING DEVICE TO BE REMOVED.

RP = EXISTING DEVICE TO BE REPLACED WITH NEW DEVICE.

EX = EXISTING DEVICE

PROJECT LOCATION:

CARDIAC CATH LAB (2ND FLOOR)

BEE STREET

MAIN HOSPITAL ENTRANCE

BEE STREET/BRAVO STREET

MENTAL HEALTH CLINIC ENTRANCE

N

KEY PLAN

SMOKE TIGHT WALL (EXISTING)

1-HR FIRE RATED WALL (EXISTING)

2-HR FIRE RATED WALL (EXISTING)

WALL RATING LEGEND

LEAD-LINED WALL (EXISTING - MAINTAIN & PATCH AS NEEDED IN RENOVATION)

5838 Monroe Road, Suite 100 Charlotte, NC 28212

704 531 3000 Firm License Number: F-0674

Project No. 4415

Charlotte Engineers, LLP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% - CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT GMK Associates, Inc.

1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Megan C. Day, AIA

STAMPPROGRAM MANAGER

321 4 5 6 7 8 9 10

Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA

CONSULTANT

Charlotte Engineers 5838 Monroe Road Charlotte, NC 28212 704-531-3000 Michael Eaves

E:

\L oc al

R ev it Fi le \2

9\

C

E C en tra l M od el .rv t 5/

8/

1:

:5

AM

EL-200

ELECTRICAL - SECOND FLOOR - NEW WORK -

LIGHTING

CATH LAB SITE PREP at

RALPH JOHNSON VAMC

109 BEE STREET CHARLESTON, SC

534-CSI-555

MAY 08, 2020 CLH JCE

1/8" = 1'-0"1 ELECTRICAL - SECOND FLOOR - NEW WORK - LIGHTING

EP

O

EP

O

J

J

J

CR

CR

CR

PP

PP

PP

J

J

J

CR

CR

CR

J

J

J

J

J

ATS LL

ATS LS

SWBD HDCC

SWBD HDLS SWBD 2HEDP1

NEW NORMAL ISO PANEL

2INP1

NEW CRITICAL ISO PANEL

2ICP2

NEW CRITICAL ISO PANEL

2ICP1

ATS EE

PANEL A PANEL CCB

PANEL HA

PANEL LSA

PANEL HCCC

PANEL 2LE-AA231 PANEL 2HE-AA231

EX

EX

EX

EX

EX

EX

7 8

CRITICAL ISO PANEL #2

MCC-EA SEC.1-4

NEW AHU-16

480V, 3P

MCA: 25A

MOCP: 30A

30A, 3P, FPN, NEMA 1

30A, 3P, FPN, NEMA 1

2HEDP1-26

NEW AHU-15

480V, 3P, 4.1HP

MCA: 5A

MOCP: 15A

EXEX

EX

H-1 480V, 3P

MCA: 14A

MOCP: 20A

30A, 3P, FPN, NEMA 1

MCC-EA SEC.2-2

CAV-2

120V, 1P

CAV-1

120V, 1P

PHASE 3

PHASE 1-3

PHASE 4 LIMITS

PHASE 4

LIMITS

PHASE 1

PHASE 2

2INP1-1

2INP1-2

2ICP1-1

2ICP1-22ICP1-3

2ICP1-4

2ICP2-1

2ICP2-2,3 2INP1-4

2INP1-3

MCC-EA

MCC-NA

175A FED

FROM

2HEDP1

APPROXIMATE LOCATION OF JOHNSON CONTROLS PANEL IN ICU ROOM A247

CONDUIT PROPOSED CONDUIT RUN IS APPROXIMATELY 250'.

EX

2INP1-5

2L12-23

2LE9CC-16

2LE9CC-11

2L12-29

2ICP1-5

EX

EX

EX

EX

EX

EX

EX

EX

STRYKER ITEM E

ANESTHESIA BOOM

STRYKER

ITEM B

SURGICAL

LIGHT

STRYKER ITEM D

TANDEM EQUIPMENT/

MONITOR BOOM

2ICP2-4,5,6,7,8,9

2ICP2-10,11,12,13,14,15

2INP1-6

2ICP1-6 2ICP1-7

GENERAL NOTES

A. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR

LOCATION OF CEILING FIXTURES.

B. THE DRAWINGS SHALL NOT BE SCALED FOR CONSTRUCTION

PURPOSES. THE SCALE, WHEN INDICATED IS INTENDED FOR

GENERAL REFERENCE ONLY.

C. CONSTRUCTION DEBRIS SHALL BE REMOVED DAILY.

D. COORDINATE LIGHT FIXTURE LOCATIONS WITH

ARCHITECTURAL REFLECTED CEILING PLANS PRIOR TO

INSTALLATION.

E. CONNECT ALL UNSWITCHED LIGHT FIXTURES AND EXIT

SIGNS AHEAD OF ANY LOCAL SWITCHING AND/OR DIMMERS.

F. CONNECT ALL NEW EXIT SIGNS TO EXISTING LIFE-SAFETY

LIGHTING CIRCUIT HLSA-1.

J. WORK RELATED TO NEW AND REPLACED CORRIDOR DOORS

TO BE A PART OF PHASES 1, 2, AND 3 AS SHOWN. ALL WIRE,

CONDUIT, AND POWER CONNECTIONS OUTSIDE OF CATH

LAB 2 INCLUDING AHU CONNECTIONS AND INSTALLATION OF

NEW ISOLATED POWER PANELS TO BE COMPLETED DURING

PHASES 1-3. WORK INSIDE THE CATH LAB TO BE A PART OF

PHASE 4.

PROVIDE NEW 480V, 150A, 3P ENCLOSED CIRCUIT BREAKER WITH LOCK-OUT/TAG-OUT CAPABILITY.

NEW CEILING MOUNTED LIGHT AND HVAC COMBINATION SYSTEM. COORDINATE WITH VENDOR

DRAWINGS FOR EXACT REQUIREMENTS. COORDINATE WITH UNISTRUT LAYOUT AND STRUCTURAL

STEEL. CONTRACTOR TO PROVIDE NEW 480V CRITICAL CIRCUIT FROM PANEL HCCC.

PROVIDE JUNCTION BOX IN CEILING FOR STRYKER BOOM. COORDINATE WITH FINAL VENDOR

DRAWINGS FOR EXACT CIRCUIT REQUIREMENTS. SEE PROJECT COVER SHEET, REF 3, 4, 5, & 6.

ALL WALL AND CEILING DEVICES IN THIS AREA ARE EXISTING UNLESS OTHERWISE NOTED.

NO WORK IN THIS AREA UNLESS OTHERWISE NOTED.

PROVIDE NEW FUSED DISCONNECT SWITCH SERVING NEW AHU. REFER TO MECHANICAL

DRAWINGS FOR ADDITIONAL INFORMATION.

PROVIDE NEW 100A, 3P SHUNT TRIP CIRCUIT BREAKER WITH INTEGRAL 120V SHUNT TRIP CIRCUIT.

WIRE TO EXISTING EPOS TO MAKE SYSTEM COMPLETE AND FUNCTIONAL.

PROVIDE NEW DISCONNECT SWITCH TO SERVE NEW CHILLED WATER SYSTEM. SEE MECHANICAL

DRAWINGS FOR ADDITIONAL INFORMATION.

ALL EXISTING CRITICAL (RED) RECEPTACLES AND IN WALL DEVICES TO BE RE-WIRED TO NEW CRITICAL ISOLATION PANEL 1ICP1. EXISTING CONDUIT AND WALL BOX TO BE RE-USED. WIRING TO

BE REPLACED ENTIRELY.

ALL NEW CEILING DEVICES INCLUDING BOOMS TO BE WIRED TO NEW CRITICAL ISOLATION PANEL

2ICP1.

PROVIDE JUNCTION BOX ABOVE ACCESSIBLE CEILING FOR 24V CONNECTION TO PACS SYSTEM.

PROVIDE NEW DISCONNECT SWITCH TO SERVE HUMIDIFER. REFER TO MECHANICAL DRAWINGS

FOR ADDITIONAL INFORMATION.

CONNECT NEW AIR TERMINAL UNIT TO EXISTING 120VAC CIRCUIT FED FROM PANEL 2LE AA231-1 IN

ROOM AA231. PROVIDE NEW JUNCTION BOX AND EXTEND WIRE AND CONDUIT AS REQUIRED.

ABOVE COUNTER DUPLEX RECEPTACLES TO BE REPLACED WITH QUAD RECEPTACLES.

PROVIDE 2#10, 1#10G IN 3/4"C FOR NEW LIGHT SIGNALING BOX. COORDINATE JUNCTION BOX

LOCATION WITH EQUIPMENT VENDOR.

CONTRACTOR TO COORDINATE WITH MECHANICAL INSTALLER IN THIS AREA TO RELOCATE

EXISTING ELECTRICAL CONDUIT AND DEVICES THAT ARE REQUIRED TO BE RELOCATED FOR

MECHANICAL EQUIPMENT INSTALLATION.

LOCATION OF RELOCATED MEDGAS ZONE VALVE BOX. COORDINATE WITH MEDGAS INSTALLER TO

RECONNECT LOCAL MEDGAS ALARM STATION CIRCUIT FOR NEW MED GAS VALVE BOX.

LOCATION SHOWN FOR AHU IS APPROXIMATE. COORDINATE WITH COR AND GE EQUIPMENT

INSTALLER TO ENSURE CORRECT SPACING AND CLEARANCE FOR ALL EQUIPMENT TO BE

INSTALLED IN THIS LOCATION.

PROVIDE NEW DEDICATED RECEPTACLE TO POWER NEW EQUIPMENT. COORDINATE CIRCUIT

SELECTION AND LOCATION WITH COR PRIOR TO INSTALLATION. CONNECT WITH 2#12AWG, 1#12G IN 3/4"C.

NEW WORK KEYED NOTES

DRAWINGS. SEE SCHEDULE FOR TYPE (*).

CEILING OR WALL MOUNTED EXIT SIGN. PROVIDE NUMBER OF FACES AND CHEVRONS AS INDICATED ON

LED LIGHTING FIXTURE, CEILING OR WALL MOUNTED,

LED LIGHTING WALLWASH FIXTURE, CEILING MOUNTED.

CONNECTED TO NORMAL POWER. SEE SCHEDULE FOR TYPE (*). SEE ARCHITECTURAL RCP FOR EXACT*

LOCATION AND CEILING TYPE. SLASH INDICATES CONNECTED TO THE CRITICAL BRANCH.

SEE SCHEDULE FOR TYPE (*).*

HALF-SHADED INDICATES CONNECTED TO LIFE SAFETY BRANCH.* * *

LUMINAIRE, CEILING MOUNTED, CONNECTED TO THE NORMAL POWER SYSTEM (UNLESS OTHERWISE NOTED).

SEE SCHEDULE FOR TYPE (*). SEE ARCHITECTURAL RCP FOR EXACT LOCATION AND CEILING TYPE.

SLASH INDICATES CONNECTED TO THE CRITICAL BRANCH. HALF-SHADED INDICATES CONNECTED TO THE EMERGENCY OR LIFE SAFETY BRANCH; VIA EMERGENCY GENERATOR SET OR BATTERY BALLAST, SEE PLANS.

LED LIGHTING FIXTURE, WALL MOUNTED OR UNDER CABINET, CONNECTED TO NORMAL POWER.

SLASH INDICATES CONNECTED TO THE CRITICAL BRANCH. SEE SCHEDULE FOR TYPE (*).

SINGLE POLE SWITCH, MOUNTED 42" AFF TO CENTER OF DEVICE.S

EMERGENCY LIGHTING FIXTURE, CEILING-MOUNTED OR WALL-MOUNTED AT 7'-6" AFF UNLESS NOTED

OTHERWISE. CONNECT UNSWITCHED.

DUPLEX RECEPTACLE, MOUNTED 18" AFF TO CENTER OF DEVICE. NEMA 5-20R UNLESS OTHERWISE

TWO DUPLEX RECEPTACLES IN 2-GANG BOX, MOUNTED 42" AFF TO CENTER OF OUTLET

OR 2" FROM BOTTOM OF OUTLET TO TOP OF BACKSPLASH OR COUNTERTOP. SLASH INDICATES

OUTLET TO TOP OF BACKSPLASH OR COUNTERTOP. SLASH INDICATES CONNECTED TO THE EMERGENCY

DUPLEX RECEPTACLE, MOUNTED 42" AFF TO CENTER OF OUTLET OR 2" FROM BOTTOM OF

TWO DUPLEX RECEPTACLES IN 2-GANG BOX, MOUNTED 18" AFF TO CENTER OF DEVICE. SLASH

INDICATED. SLASH INDICATES CONNECTED TO THE EMERGENCY POWER SYSTEM.

INDICATES CONNECTED TO THE EMERGENCY POWER SYSTEM.

POWER SYSTEM.

CONNECTED TO THE EMERGENCY POWER SYSTEM.

JUNCTION OR PULL BOX. W = WEATHERPROOF.J

FUSED SAFETY SWITCH. NUMERAL INDICATES FUSE RATING.15

PANELBOARD SURFACE MOUNTED.

PANELBOARD FLUSH MOUNTED.

PUSHPAD. PROVIDE BOX AND CONDUIT AS REQUIRED. COORDINATE WITH HARDWARE VENDOR.PP

CARD READER. PROVIDE BOX AND CONDUIT AS REQUIRED. COORDINATE WITH HARDWARE VENDOR.CR

EMERGENCY SYSTEM OFF PUSH BUTTONEPO

DD FIRE ALARM DUCT MOUNTED SMOKE DETECTOR.

SYMBOLS LEGEND

RL = EXISTING DEVICE TO BE RELOCATED.

DASHED SYMBOLS INDICATE EXISTING DEVICES.

RLD = RELOCATED DEVICE SHOWN IN FINAL LOCATION.

RM = EXISTING DEVICE TO REMAIN.

RM

RM

RV = EXISTING DEVICE TO BE REMOVED.

RP = EXISTING DEVICE TO BE REPLACED WITH NEW DEVICE.

EX = EXISTING DEVICE

PROJECT LOCATION:

CARDIAC CATH LAB (2ND FLOOR)

BEE STREET

MAIN HOSPITAL ENTRANCE

BEE STREET/BRAVO STREET

MENTAL HEALTH CLINIC ENTRANCE

N

KEY PLAN

SMOKE TIGHT WALL (EXISTING)

1-HR FIRE RATED WALL (EXISTING)

2-HR FIRE RATED WALL (EXISTING)

WALL RATING LEGEND

LEAD-LINED WALL (EXISTING - MAINTAIN & PATCH AS NEEDED IN RENOVATION)

5838 Monroe Road, Suite 100 Charlotte, NC 28212

704 531 3000 Firm License Number: F-0674

Project No. 4415

Charlotte Engineers, LLP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% - CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT GMK Associates, Inc.

1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Megan C. Day, AIA

STAMPPROGRAM MANAGER

321 4 5 6 7 8 9 10

Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA

CONSULTANT

Charlotte Engineers 5838 Monroe Road Charlotte, NC 28212 704-531-3000 Michael Eaves

E:

\L oc al

R ev it Fi le \2

9\

C

E C en tra l M od el .rv t 5/

8/

1:

:3

AM

EP-201

ELECTRICAL - SECOND FLOOR - POWER &

SYSTEMS

CATH LAB SITE PREP at

RALPH JOHNSON VAMC

109 BEE STREET CHARLESTON, SC

534-CSI-555

MAY 08, 2020 CLH JCE

1/8" = 1'-0"1 ELECTRICAL - FIRST FLOOR - NEW WORK - POWER & SYSTEMS

File details come from the government source that posted it. Updated .