36C24718R0653-007.pdf

PDF 12 MB Posted

Attached to
534-15-105 Renovation of Common and Supporting Areas in Building 1
Solicitation number
36C24718R0653
Issued by

About this file

36C24718R0653 FINAL SEALED DRAWINGS 4 of 4.pdf

View the file

Other files

File Type Posted
36C24718R0653-0002001.pdf PDF
36C24718R0653-0002002.pdf PDF
36C24718R0653-0002000.docx DOCX document
36C24718R0653-0001000.docx DOCX document
36C24718R0653-009.pdf PDF
36C24718R0653-002.pdf PDF
36C24718R0653-008.pdf PDF
36C24718R0653-006.pdf PDF
36C24718R0653-004.pdf PDF
36C24718R0653-010.pdf PDF
36C24718R0653-001.docx DOCX document
36C24718R0653-003.pdf PDF
36C24718R0653-005.pdf PDF
36C24718R0653-011.pdf PDF
36C24718R0653-000.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CORRIDOR

COR2BB3

STAFF TOILET

BB201

PATIENT TOILET

MALE

BB211B

PATIENT TOILET

FEMALE

BB211C

CORRIDOR

COR2BB4

VESTIBULE

VEST19 CORRIDOR

COR2BB1

CORRIDOR

COR2BB2

SPECIAL

CHEMISTRY

LABORATORY

BB211E

(E)12x12 SA

(E)10x12(E)24x14 RA

(E )2

4x

(E )2

2x

(E)8"Ø SA

(E)9"Ø SA

(E)CR

(E)CD

(E)CD (E)CD

(E)CD

(E)CD

(E)CD

(E)CR

(E)LS

(E)CD

(E)CD

(E)CD

(E)CD (E)CD

CD

1 1

A

B

C

15 16 17 18 19 20 21 23

1/8"=1'-0"1 SECOND FLOOR PLAN - BB SECTION

MECHANICAL PLAN

AH

MH123

KL

2ND FLOOR - BB SECTION

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

KEY PLAN

LEVEL 2 FFE: 013.78'

PLAN

NORTH

A B

D

G

E/F

C

CCBBAA

1. PROVIDE VOLUME DAMPERS ON ALL NEW

BRANCH DUCTWORK.

1. ALL AIR OUTLETS ARE TO BE INSTALLED IN NEW

SEISMIC CEILING GRID. REFER TO

ARCHITECTURAL DRAWINGS FOR LOCATION.

6/30/2016

PATIENT TOILET

MALE

CC214

PATIENT TOILET

FEMALE

CC213

CORRIDOR

COR2CC1

CORRIDOR

COR2CC2

CORRIDOR

COR2CC3

CORRIDOR

COR2CC4

(E)CD (E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)EX

(E)EX

A

B

C

25 26 27 28 29 30

1/8"=1'-0"1 SECOND FLOOR PLAN - CC SECTION

MECHANICAL PLAN

AH

MH124

KL

2ND FLOOR - CC SECTION

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

KEY PLAN

LEVEL 2 FFE: 013.78'

PLAN

NORTH

A B

D

G

E/F

C

CCBBAA

1. PROVIDE VOLUME DAMPERS ON ALL NEW

BRANCH DUCTWORK.

1. ALL AIR OUTLETS ARE TO BE INSTALLED IN NEW

SEISMIC CEILING GRID. REFER TO

DN

UP

PATIENT TOILET

MALE

D235

PATIENT TOILET

FEMALE

D234

CORRIDOR

COR2D3

PATIENT

DRESSING RM

D239

PATIENT TOILET

D239B

PATIENT TOILET

D239A

CORRIDOR

COR2D4

STAFF TOILET

D201A

PATIENT TOILET

D202

CORRIDOR

COR2D7

CORRIDOR

COR2D6

PATIENT TOILET

D242C

CORRIDOR

COR2D1

MRI WAITING

D266

CORRIDOR

COR2D8

CORRIDOR

COR2D9

LE

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD(E)EX

(E) EX

(E)CR

(E)CR

(E)CR

(E)CR

(E)CR

(E)CD

(E)CR

(E)CR

(E)EX

(E)EX

(E)EX

(E)EX

(E)CR

(E)CR

(E)CR

R

R

(E)EX

R

(E)CD

R

(E)CD

(E)CR

J

K

L

15 16 17 18 19 20 21 23 24 25 26

1/8"=1'-0"1 SECOND FLOOR PLAN - D SECTION

MECHANICAL PLAN

AH MH125

KL

2ND FLOOR - D SECTION

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

KEY PLAN

LEVEL 2 FFE: 013.78'

PLAN

NORTH

A B

D

G

E/F

C

CCBBAA

1. PROVIDE VOLUME DAMPERS ON ALL NEW

BRANCH DUCTWORK.

1. ALL AIR OUTLETS ARE TO BE INSTALLED IN NEW

SEISMIC CEILING GRID. REFER TO

CORRIDOR

COR2E5

CORRIDOR

COR2E3

CORRIDOR

COR2E4

STAFF TOILET

MALE

E209

CORRIDOR

COR2E2

CORRIDOR

COR2F1

PATIENT TOILET

FEMALE

F223

PATIENT TOILET

MALE

F222

CORRIDOR

COR2F3

CORRIDOR

COR2F4

CORRIDOR

COR2F2

VESTIBULE

VEST23

CORRIDOR

COR2E1

STAFF TOILET

F220

CORRIDOR

COR2F5

VESTIBULE

VEST22

VESTIBULE

VEST21

STAFF TOILET

FEMALE

E213

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)EX

(E)CD (E)CD

(E)EX

(E)EX

(E)CR

(E)EX

(E)EX

(E)CR

1 1

5 6 7 9 10 11 12 13 14 154.3.

1/8"=1'-0"1 SECOND FLOOR PLAN - EF SECTION

MECHANICAL PLAN

AH

MH126

KL

2ND FLOOR - EF SECTION

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

KEY PLAN

LEVEL 2 FFE: 013.78'

PLAN

NORTH

A B

D

G

E/F

C

CCBBAA

1. PROVIDE VOLUME DAMPERS ON ALL NEW

BRANCH DUCTWORK.

1. ALL AIR OUTLETS ARE TO BE INSTALLED IN NEW

SEISMIC CEILING GRID. REFER TO

DN

STAFF TOILET

FEMALE

G204

STAFF TOILET

MALE

G203

CORRIDOR

COR2G2

CORRIDOR

COR2G1

(E)CD

(E)CD(E)CD (E)CD

(E)EX(E)CD (E)CD

(E)EX

1 1 1

2 5 6 74.3.1

1/8"=1'-0"1 SECOND FLOOR PLAN - G SECTION

MECHANICAL PLAN

AH

MH127

KL

2ND FLOOR - G SECTION

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

KEY PLAN

LEVEL 2 FFE: 013.78'

PLAN

NORTH

A B

D

G

E/F

C

CCBBAA

1. PROVIDE VOLUME DAMPERS ON ALL NEW

BRANCH DUCTWORK.

1. ALL AIR OUTLETS ARE TO BE INSTALLED IN NEW

SEISMIC CEILING GRID. REFER TO

STAIRS #3

14 15 16

ELEVATOR

LOBBY

ELEVLOB3

STAIR #3

3-3

(E)CD

(E)CD

F

G

H

J

K

L

1/8"=1'-0"1 THIRD FLOOR PLAN - C SECTION

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

MECHANICAL PLAN

AH

MH130

KL

3RD FLOOR - C SECTION

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

1 ALL AIR OUTLETS ARE TO BE INSTALLED IN NEW

SEISMIC CEILING GRID. REFER TO

14 15 16

ELEVATOR

LOBBY

ELEVLOB4

STAIR #3

3-4

(E)CD

(E)CD

F

G

H

J

K

L

1/8"=1'-0"6F FOURTH FLOOR PLAN - C SECTION

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

MECHANICAL PLAN

AH

MH140

KL

4TH FLOOR - C SECTION

1 ALL AIR OUTLETS ARE TO BE INSTALLED IN NEW

SEISMIC CEILING GRID. REFER TO

ARCHITECTURAL DRAWINGS FOR LOCATION.

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

ELEVATOR

LOBBY

ELEVLOB5

(E)CD

(E)CD

ELEVATOR

LOBBY

ELEVLOB5

F

G

F

G

14 15 1614 15 16

J

K

L

J

K

L

HH

1/8"=1'-0"6F FIFTH FLOOR - C SECTION

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

MECHANICAL PLAN

AH MH150

KL

5TH FLOOR - C SECTION

1 ALL AIR OUTLETS ARE TO BE INSTALLED IN NEW

SEISMIC CEILING GRID. REFER TO

ARCHITECTURAL DRAWINGS FOR LOCATION.

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

MECHANICAL DETAILS AND

AH

MH501

KL

SCHEDULES

NTS

EXHAUST OR RETURN BRANCH DUCTWORK

MAIN EXHAUST OR RETURN

PLAN VIEW

AIR

FLOW AIR

FLOW

PROVIDE VOLUME DAMPER

AT EACH BRANCH DUCT

1/4W OR 4" [100mm]

MIN.

BRANCH DUCT

VD

MODEL, OR EQUAL

DESIGN BASE MFG. &AREA SERVED

EF-1-1

SYMB.

SP-B110

EXHAUST FAN SCHEDULE

H2O

0.125

CFM SP IN.

V/Ø/HZMAX.

950 115/1/60

RPM ELECT CONTROL

CEILING1.5

MOUNTSONES

GREENHECK 1,2,3

NOTES

NOTES:

LIGHT0.11

HP

WEIGHT

(LBS)

1. BASIS OF DESIGN IS NOT INTENDED TO LIMIT SELECTION. PROVIDE INDICATED EQUIPMENT OR EQUIPMENT OF EQUAL PERFORMANCE AND

QUALITY.

2. PROVIDE ALUMINUM INSECT SCREEN.

3. PROVIDE LOCAL DISCONNECT.

LOCKER ROOM

D103A

NTS

NOTE:

NOT REQUIRED FOR

AIR TERMINAL UNITS.

EQUIPMENT WEIGHT 250

LBS. [114KG] OR LESS

SEISMIC BRACING FOR LIGHT

SUSPENDED EQUIPMENT

FLOOR MOUNT EQUIPMENT

RESTRAINED BY RESILIENT PADS

(TYPE DS)

FLOOR

EQUIPMENT

BASE

ANCHOR BOLT

NEOPRENE WASHER

& SLEEVE

BONDED STEEL

PLATE

RESILIENT PAD

HANGER

ROD (TYP)

CROSS BRACING

RODS ALL FOUR

SIDES

LOCK NUTS

(TYP)

CLAMP

SEISMIC BRACING FOR EQUIPMENT

NTS

SUPPLY DUCTWORK TAKE-OFFS

AIR SPLIT DUCT TAKE-OFF PLAN

VIEW

BRANCH DUCT TAKE-OFF PLAN VIEW

SUPPLY REGISTER TAKE-OFF

PLAN VIEW

AIR

FLOW

AIR

FLOW

A

IR

FL

O

W

SUPPLY REGISTER

OR BRANCH DUCT

TURNING VANES

MAIN

SUPPLY

DUCT

SEE FLOOR PLAN FOR

SPLIT DIMENSION

PROVIDE VOLUME

DAMPER

PROVIDE VOLUME

DAMPER

ADJUSTABLE

METAL ROD

OR LINKAGE

TOP REGISTER

MAIN

SUPPLY

DUCT

VOLUME EXTRACTOR; ADJUSTABLE

FROM FULLY CLOSED POSITION TO

CFM NOTED ON FLOOR PLANS

AIR

FLOW

AIR

FLOW

1/4 W OR 4"

[100mm] MIN.

AIR

FLOW

MAIN SUPPLY

DUCT

A

IR

FL

O

W

NTS

DUCT CONNECTIONS - AIR TERMINAL UNITS

NOTE:

1.

2.

3.

4.

5.

6.

RIGID STRAIGHT TERMINAL UNIT INLET LENGTH SHALL BE A

MINIMUM OF 3 TIMES THE DIAMETER OF INLET

A FLEXIBLE AIR DUCT CONNECTOR IS NOT MANDATORY FOR INLET TO THIS

BOX, BUT ALLOWED TO ACCOMMODATE MINOR OFFSETS. MAXIMUM LENGTH

3'-0" [900mm].

A BRANCH DUCT SERVING AN INDIVIDUAL BOX MAY BE THE SAME SIZE AS THE

BOX INLET, PROVIDED THE EQUIVALENT LENGTH OF THE BRANCH DUCT, AS

SHOWN, DOES NOT EXCEED 10 FEET (3 METERS). FOR LONGER LENGTHS,

INCREASE THE DUCT SIZE AND PROVIDE A DUCT TRANSITION TO MAINTAIN THE

DUCT STATIC PRESSURE DROP AT OR BELOW 0.2"/100' [1.64Pa/m].

FLEXIBLE AIR DUCT CONNECTORS, WHEN USED FROM TERMINAL UNIT SUPPLY

AIR DUCT TO DIFFUSER, SHALL NOT EXCEED 5'-0" [1500mm]. USE RIGID ELBOWS

FOR CHANGE OF DIRECTION GREATER THAN 45°.

COMPONENT ARRANGEMENT MAY VARY BY MANUFACTURER. PROVIDE

INSULATION W/VAPOR BARRIER FOR CONNECTING DUCT SECTIONS.

USE OF THE FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED FOR THE

DEDICATED AHU SERVING THE SURGICAL SUITE.

AIR TERMINAL UNIT

(CV OR VAV)

REHEAT COIL

SOUND ATTENUATOR

SEE EQUIPMENT

SCHEDULE

FLEXIBLE AIR DUCT

CONNECTOR. SEE DETAIL

DIFFUSER (TYP.)

SEE SPECIFICATIONS FOR

CLAMPS AND SEALANT (TYP.)

SEE NOTE 5

SYMB.

AIR DISTRIBUTION SCHEDULE

NOTES:

1. SEE ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT LOCATIONS OF ALL AIR DISTRIBUTION DEVICES.

2. RUN OUT SIZE SHOWN ON DRAWINGS. PROVIDE NECESSARY CONNECTION AND TRANSITION TO MANUFACTURER'S LISTED NECK SIZE.

3. REFER TO THE MECHANICAL SPECIFICATIONS FOR ADDITIONAL INFORMATION.

4. ALL TAPS TO MAIN DUCTS SHALL BE PROVIDED WITH BALANCING DAMPERS.

5. SEE ARCHITECTURAL DRAWINGS FOR CEILING/WALL TYPES FOR PROPER SELECTION OF MOUNTING ACCESSORIES.

6. CONTRACTOR TO FIELD VERIFY BRANCH AND NECK SIZE OF ALL DIFFUSERS AND REGISTERS BEFORE INSTALLATION.

NECK SIZE DESCRIPTION MANUFACTURER MODELMAX CFM FACE SIZE FACE SIZE

LS-1 220 - 0' - 4" 2' - 0" LINEAR SLOT DIFFUSER, TWO 1/2" SLOTS PRICE

EX 110 1' - 0" 1' - 0" 80PRICE

CD 295 0' - 8" 2' - 0" 2' - 0"

T-BAR LAY-IN, EXHAUST GRILLE

PRICE

48/SDS50/2/2/XX/B12

W L

0' - 6"

T-BAR LAY-IN, CEILING DIFFUSER ASPD

NO. 12 GAUGE

HANGER WIRE

TYPICAL OF 2

CEILING GRID CLIPS

AND/OR METAL CLIPS

FASTENED WITH

MECHANICAL FASTENERS

TO GRILLES, TERMINAL

DEVICES AND CEILING

GRID MAIN RUNNERS CEILING GRID

MAIN RUNNER

(TYPICAL)

LAY-IN CEILING

GRILLE OR TERMINAL

1. CEILING MOUNTED AIR TERMINAL OR SERVICES WEIGHING 20

LBS. OR LESS SHALL BE POSITIVELY ATTACHED TO THE

CEILING SUSPENSION MAIN RUNNERS OR CROSS RUNNERS.

2. AIR TERMINALS OR SERVICES WEIGHING MORE THAN 20 LBS

AND LESS THAN 56 LBS SHALL HAVE, IN ADDITION TO

THE ATTACHMENTS NOTED ABOVE, TWO NO. 12 GAUGE

HANGERS CONNECTED TO THE CEILING SYSTEM HANGERS

OR TO THE STRUCTURE ABOVE. WIRES MAY BE BLACK.

3. AIR TERMINALS OR SERVICES WEIGHING MORE THAN 56 LBS

SHALL BE SUPPORTED DIRECTLY FROM THE STRUCTURE

ABOVE BY APPROVED ANCHORS.

NOTES:

NTS

AIR DEVICE SEISMIC RESTRAINT

LR-1 220 - 0' - 4" 2' - 0" LINEAR SLOT RETURN, TWO 1/2" SLOTS PRICE 48/SDR50/2/2/XX/B12

File details come from the government source that posted it.