36C24718R0653-006.pdf

PDF 14 MB Posted

Attached to
534-15-105 Renovation of Common and Supporting Areas in Building 1
Solicitation number
36C24718R0653
Issued by

About this file

36C24718R0653 FINAL SEALED DRAWINGS 3 of 4.pdf

View the file

Other files

File Type Posted
36C24718R0653-0002001.pdf PDF
36C24718R0653-0002002.pdf PDF
36C24718R0653-0002000.docx DOCX document
36C24718R0653-0001000.docx DOCX document
36C24718R0653-007.pdf PDF
36C24718R0653-009.pdf PDF
36C24718R0653-002.pdf PDF
36C24718R0653-008.pdf PDF
36C24718R0653-004.pdf PDF
36C24718R0653-010.pdf PDF
36C24718R0653-001.docx DOCX document
36C24718R0653-003.pdf PDF
36C24718R0653-005.pdf PDF
36C24718R0653-011.pdf PDF
36C24718R0653-000.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

DESIGN/BUILD

1 3/64" = 1'-0"

LEGEND

FIRE SUPPRESSION SCOPE OF WORK

KEYED NOTES

KEY PLAN

LEVEL 3

PLAN

NORTH

2 5 6 7 9 10 11 12 13 14 15 16 17 18 19 20 21 23 24 25 26 27 28 29 304.3.1

WC-24

WC-25

WC-26

SPRINKLER HEAD

FLEXIBLE SPRINKLER HOSE FITTING

CEILING PLANE

EXISTING CPVC

SPRINKLER LINE

ADJUSTABLE HUB

MANUFACTURER APPROVED

BRACKET ATTACHMENT

REMOVE A MINIMUM OF 6 INCHES

OF HORIZONTAL CPVC PIPE.NEW U.L. LISTED UNION

EXISTING CPVC

ARM-OVER

MINIMUM 6 INCHES

et er an s A ff ai rs D ep ar tm en t of

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

DESIGN/BUILD

1 3/64" = 1'-0"

FIRE SUPPRESSION SCOPE OF WORK

LEGEND

KEYED NOTES

KEY PLAN

LEVEL 4

PLAN

NORTH

2 5 6 7 9 10 11 12 13 14 15 16 17 18 19 20 21 23 24 25 26 27 28 29 304.3.1

WC-31

NIC

WC-27

NIC

WC-28

NIC

WC-29

NIC

WC-30

NIC

SPRINKLER HEAD

FLEXIBLE SPRINKLER HOSE FITTING

CEILING PLANE

EXISTING CPVC

SPRINKLER LINE

ADJUSTABLE HUB

MANUFACTURER APPROVED

BRACKET ATTACHMENT

REMOVE A MINIMUM OF 6 INCHES

OF HORIZONTAL CPVC PIPE.NEW U.L. LISTED UNION

EXISTING CPVC

et er an s A ff ai rs D ep ar tm en t of

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

DESIGN/BUILD

1 3/64" = 1'-0"

LEGEND

FIRE SUPPRESSION SCOPE OF WORK

KEY PLAN

LEVEL 5

PLAN

NORTH

2 5 6 7 9 10 11 12 13 14 15 16 17 18 19 20 21 23 24 25 26 27 28 29 304.3.1

WC-32

NIC

WC-33

NIC

SPRINKLER HEAD

FLEXIBLE SPRINKLER HOSE FITTING

CEILING PLANE

EXISTING CPVC

SPRINKLER LINE

ADJUSTABLE HUB

MANUFACTURER APPROVED

BRACKET ATTACHMENT

REMOVE A MINIMUM OF 6 INCHES

OF HORIZONTAL CPVC PIPE.NEW U.L. LISTED UNION

EXISTING CPVC

et er an s A ff ai rs D ep ar tm en t of

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

DESIGN/BUILD

FIRE SUPPRESSION SCOPE OF WORK

1/8" = 1'-0"1

1/8" = 1'-0"2

1/8" = 1'-0"3

1/8" = 1'-0"5

KEY PLAN

LEVEL 1 FFE: 000.00'

PLAN

NORTH

1/8" = 1'-0"6 1/8" = 1'-0"7

1/8" = 1'-0"8

LEGEND

1/8" = 1'-0"9

SPRINKLER HEAD

FLEXIBLE SPRINKLER HOSE FITTING

CEILING PLANE

EXISTING CPVC

SPRINKLER LINE

ADJUSTABLE HUB

MANUFACTURER APPROVED

BRACKET ATTACHMENT

REMOVE A MINIMUM OF 6 INCHES

OF HORIZONTAL CPVC PIPE.NEW U.L. LISTED UNION

EXISTING CPVC

et er an s A ff ai rs D ep ar tm en t of

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

DESIGN/BUILD

1/8" = 1'-0"1

1/8" = 1'-0"2 1/8" = 1'-0"3

KEY PLAN

LEVEL 2 FFE: 013.78'

PLAN

NORTH

LEGEND

FIRE SUPPRESSION SCOPE OF WORK

SPRINKLER HEAD

FLEXIBLE SPRINKLER HOSE FITTING

CEILING PLANE

EXISTING CPVC

SPRINKLER LINE

ADJUSTABLE HUB

MANUFACTURER APPROVED

BRACKET ATTACHMENT

REMOVE A MINIMUM OF 6 INCHES

OF HORIZONTAL CPVC PIPE.NEW U.L. LISTED UNION

EXISTING CPVC

et er an s A ff ai rs D ep ar tm en t of

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

DESIGN/BUILD

1/8" = 1'-0"1 1/8" = 1'-0"2

KEY PLAN

LEVEL 2 FFE: 013.78'

PLAN

NORTH

LEGEND

FIRE SUPPRESSION SCOPE OF WORK

SPRINKLER HEAD

FLEXIBLE SPRINKLER HOSE FITTING

CEILING PLANE

EXISTING CPVC

SPRINKLER LINE

ADJUSTABLE HUB

MANUFACTURER APPROVED

BRACKET ATTACHMENT

REMOVE A MINIMUM OF 6 INCHES

OF HORIZONTAL CPVC PIPE.NEW U.L. LISTED UNION

EXISTING CPVC

et er an s A ff ai rs D ep ar tm en t of

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

DESIGN/BUILD

1/8" = 1'-0"1

KEY PLAN

LEVEL 2 FFE: 013.78'

PLAN

NORTH

LEGEND

FIRE SUPPRESSION SCOPE OF WORK

SPRINKLER HEAD

FLEXIBLE SPRINKLER HOSE FITTING

CEILING PLANE

EXISTING CPVC

SPRINKLER LINE

ADJUSTABLE HUB

MANUFACTURER APPROVED

BRACKET ATTACHMENT

REMOVE A MINIMUM OF 6 INCHES

OF HORIZONTAL CPVC PIPE.NEW U.L. LISTED UNION

EXISTING CPVC

et er an s A ff ai rs D ep ar tm en t of

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

DESIGN/BUILD

1/8" = 1'-0"1

KEY PLAN

LEVEL 2 FFE: 013.78'

PLAN

NORTH

LEGEND

FIRE SUPPRESSION SCOPE OF WORK

SPRINKLER HEAD

FLEXIBLE SPRINKLER HOSE FITTING

CEILING PLANE

EXISTING CPVC

SPRINKLER LINE

ADJUSTABLE HUB

MANUFACTURER APPROVED

BRACKET ATTACHMENT

REMOVE A MINIMUM OF 6 INCHES

OF HORIZONTAL CPVC PIPE.NEW U.L. LISTED UNION

EXISTING CPVC

et er an s A ff ai rs D ep ar tm en t of

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

DESIGN/BUILD

1 1/8" = 1'-0"

KEY PLAN

LEVEL 3

PLAN

NORTH

2 1/8" = 1'-0"

FIRE SUPPRESSION SCOPE OF WORK

LEGEND

G

FI

SPRINKLER HEAD

FLEXIBLE SPRINKLER HOSE FITTING

CEILING PLANE

EXISTING CPVC

SPRINKLER LINE

ADJUSTABLE HUB

MANUFACTURER APPROVED

BRACKET ATTACHMENT

REMOVE A MINIMUM OF 6 INCHES

OF HORIZONTAL CPVC PIPE.NEW U.L. LISTED UNION

EXISTING CPVC

et er an s A ff ai rs D ep ar tm en t of

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

DESIGN/BUILD

1 1/8" = 1'-0" 1 1/8" = 1'-0"

KEY PLAN

LEVEL 4

PLAN

NORTH

FIRE SUPPRESSION SCOPE OF WORK

LEGEND

SPRINKLER HEAD

FLEXIBLE SPRINKLER HOSE FITTING

CEILING PLANE

EXISTING CPVC

SPRINKLER LINE

ADJUSTABLE HUB

MANUFACTURER APPROVED

BRACKET ATTACHMENT

REMOVE A MINIMUM OF 6 INCHES

OF HORIZONTAL CPVC PIPE.NEW U.L. LISTED UNION

EXISTING CPVC

et er an s A ff ai rs D ep ar tm en t of

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

DESIGN/BUILD

1 1/8" = 1'-0"

KEY PLAN

LEVEL 5

PLAN

NORTH

FIRE SUPPRESSION SCOPE OF WORK

LEGEND

SPRINKLER HEAD

FLEXIBLE SPRINKLER HOSE FITTING

CEILING PLANE

EXISTING CPVC

SPRINKLER LINE

ADJUSTABLE HUB

MANUFACTURER APPROVED

BRACKET ATTACHMENT

REMOVE A MINIMUM OF 6 INCHES

OF HORIZONTAL CPVC PIPE.NEW U.L. LISTED UNION

EXISTING CPVC

6/30/2016

8. Remove all dead end plumbing encountered or created by this project. REVISED FA 06.09.2017

C

D

E

F

G

H

2 5 6 7 9 10 11 12 13 14 154.3.1

PRIMARY CARE

WAITING AREA

A131

CORRIDOR

COR1A2

CORRIDOR

COR1A6

FIRST FLOOR

ELEVATOR

LOBBY

P-4

AISLE

ELVLOB7

STAIR #2

(E)12x12 10x10

(E)14x10

(E)10x6

(E)10x6

(E)CR

(E)CR

(E)CR

(E)CR

(E)CR

(E)CR

(E)CR

(E)CR

(E)CR

(E)CR

(E)CR

(E)CR

(E)CR

(E)CR

(E)CR

(E)CR

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)CR

(E)VAV

(E)CD

(E)CD

(E)CR

1 1

1 1

(E)CD

1/8"=1'-0"1 FIRST FLOOR DEMOLITION PLAN - A SECTION

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

MECHANICAL DEMOLITION PLAN

AH

MD110

KL

1ST FLOOR - A SECTION

1. ALL EXISTING AIR OUTLETS ARE TO BE REMOVED

FROM EXISTING REFLECTED CEILING PLAN AND

PROTECTED DURING CONSTRUCTION PHASE.

WRAP DUCT OPENINGS TO PREVENT DUST

MITIGATION. REFER TO COR FOR ALL APPLICABLE

INFECTIOUS CONTROL REGULATIONS.

2. REMOVE EXISTING DIFFUSER AND REPLACE WITH

NEW LINEAR SLOT SUPPLY DIFFUSER. SEE AIR

DISTRIBTUION SCHEDULE ON MH501.

CONTRACTOR TO FIELD VERIFY BRANCH SIZES

BEFORE INSTALLATION.

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

KEY PLAN

LEVEL 1 FFE: 000.00'

PLAN

NORTH

A B

AAJ BB CC

C

G

D

S

MALE STAFF TLT

B136

PATIENT TLT

B137

WAITING AREA

C119

PATIENT

TOILET MALE

B152

PATIENT

TOILET MALE

CC118

STAIR #4

(E)CD

(E)CD

(E)EX

(E)EX

(E)CD

(E)EX

(E)CD

C

D

E

F

15 16 17 18 19 20 21 23 24 25 26 27 28 29 30

1/8"=1'-0"1 FIRST FLOOR DEMOLITION PLAN - B SECTION

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

MECHANICAL DEMOLITION PLAN

AH

MD111

KL

1ST FLOOR - B SECTION

1. ALL EXISTING AIR OUTLETS ARE TO BE REMOVED

FROM EXISTING REFLECTED CEILING PLAN AND

PROTECTED DURING CONSTRUCTION PHASE.

WRAP DUCT OPENINGS TO PREVENT DUST

MITIGATION. REFER TO COR FOR ALL APPLICABLE

INFECTIOUS CONTROL REGULATIONS.

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

KEY PLAN

LEVEL 1 FFE: 000.00'

PLAN

NORTH

A B

AAJ BB CC

C

G

D

G

H

J

K

L

16 17 18 19 20 21 23 24 25 26

CORRIDOR

COR1D5

CORRIDOR

COR1D3

WAITING

D120

CORRIDOR

COR1D4

CORRIDOR

COR1D1

WAITING

D105

STAFF TOILET

D110A

LOCKER ROOM

A132

TOILET STAFF

A133

SPECIALITY

CLINICS

CLERK

D106

ADMINISTRATIVE/

CLERICAL

D120

STAIR #5

(E)CD

(E)CD (E)CD

(E)CD

(E)CD

(E)CR

(E)CR

(E)CR

(E)CR

(E)CR

(E)CR

(E)CR

(E)CR

(E)CD (E)CD

(E)CD

(E)CR

(E)EX

(E)CD

(E)CD

(E)CD

(E)CD(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)CR

(E)CR

(E)CR

(E)CR

(E)12"x6" BRICK VENT

(E)CD

(E)CD

(E)CD

6"Ø

(E)KIT EF-4

TO REMAIN

1/8"=1'-0"1 FIRST FLOOR DEMOLITION PLAN - D SECTION

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

MECHANICAL DEMOLITION PLAN

AH

MD112

KL

1ST FLOOR - D SECTION

1. ALL EXISTING AIR OUTLETS ARE TO BE REMOVED

FROM EXISTING REFLECTED CEILING PLAN AND

PROTECTED DURING CONSTRUCTION PHASE.

WRAP DUCT OPENINGS TO PREVENT DUST

MITIGATION. REFER TO COR FOR ALL APPLICABLE

INFECTIOUS CONTROL REGULATIONS.

2. REMOVE EXISTING DIFFUSER AND REPLACE WITH

NEW LINEAR SLOT SUPPLY DIFFUSER. SEE AIR

DISTRIBTUION SCHEDULE ON MH501.

CONTRACTOR TO FIELD VERIFY BRANCH SIZES

BEFORE INSTALLATION.

3. REMOVE EXISTING DIFFUSER AND REPLACE WITH

NEW LINEAR SLOT RETURN DIFFUSER. SEE AIR

DISTRIBTUION SCHEDULE ON MH501.

CONTRACTOR TO FIELD VERIFY BRANCH SIZES

BEFORE INSTALLATION.

KEY PLAN

LEVEL 1 FFE: 000.00'

PLAN

NORTH

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

A B

AAJ BB CC

C

G

D

MALE STAFF TLT

G108A

FEMALE STAFF

TLT

G111

(E)EX

(E)EX

2 54.3.1

1/8"=1'-0"1 FIRST FLOOR DEMOLITION PLAN - G SECTION

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

MECHANICAL DEMOLITION PLAN

AH

MD113

KL

1ST FLOOR - G SECTION

1. ALL EXISTING AIR OUTLETS ARE TO BE REMOVED

FROM EXISTING REFLECTED CEILING PLAN AND

PROTECTED DURING CONSTRUCTION PHASE.

WRAP DUCT OPENINGS TO PREVENT DUST

MITIGATION. REFER TO COR FOR ALL APPLICABLE

INFECTIOUS CONTROL REGULATIONS.

KEY PLAN

LEVEL 1 FFE: 000.00'

PLAN

NORTH

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

A B

AAJ BB CC

C

G

D

1/8"=1'-0"1 SECOND FLOOR DEMOLITION PLAN - A SECTION

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

MECHANICAL DEMOLITION PLAN

AH

MD120

KL

2ND FLOOR - A SECTION

KEY PLAN

LEVEL 2 FFE: 013.78'

PLAN

NORTH

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

A B

D

G

E/F

C

CCBBAA

1. ALL EXISTING AIR OUTLETS ARE TO BE REMOVED

FROM EXISTING REFLECTED CEILING PLAN AND

PROTECTED DURING CONSTRUCTION PHASE.

WRAP DUCT OPENINGS TO PREVENT DUST

MITIGATION. REFER TO COR FOR ALL APPLICABLE

INFECTIOUS CONTROL REGULATIONS.

2. EXISTING VAV TO REMAIN AND BE PROTECTED

DURING DEMOLITION. SEE NEW WORK PLAN FOR

NEW LOCATION.

3. REMOVE EXISTING DIFFUSER AND REPLACE WITH

NEW LINEAR SLOT SUPPLY DIFFUSER. SEE AIR

DISTRIBUTION SCHEDULE ON MH501.

CONTRACTOR TO FIELD VERIFY BRANCH SIZES

BEFORE INSTALLATION.

1/8"=1'-0"1 SECOND FLOOR DEMOLITION PLAN - AA SECTION

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

MECHANICAL DEMOLITION PLAN

AH

MD121

KL

2ND FLOOR - AA SECTION

1. ALL EXISTING AIR OUTLETS ARE TO BE REMOVED

FROM EXISTING REFLECTED CEILING PLAN AND

PROTECTED DURING CONSTRUCTION PHASE.

WRAP DUCT OPENINGS TO PREVENT DUST

MITIGATION. REFER TO COR FOR ALL APPLICABLE

INFECTIOUS CONTROL REGULATIONS.

KEY PLAN

LEVEL 2 FFE: 013.78'

PLAN

NORTH

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

A B

D

G

E/F

C

CCBBAA

E

F

G

H

C

D

E

F

G

H

15 16 17 18 19 20 21 23 24 25 26 27 28 29 3015 16 17 18 19 20 21 23 24 25 26 27 28 29 30

1/8"=1'-0"1 SECOND FLOOR DEMOLITION PLAN - B SECTION

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

MECHANICAL DEMOLITION PLAN

AH

MD122

KL

2ND FLOOR - B SECTION

1. ALL EXISTING AIR OUTLETS ARE TO BE REMOVED

FROM EXISTING REFLECTED CEILING PLAN AND

PROTECTED DURING CONSTRUCTION PHASE.

WRAP DUCT OPENINGS TO PREVENT DUST

MITIGATION. REFER TO COR FOR ALL APPLICABLE

INFECTIOUS CONTROL REGULATIONS.

KEY PLAN

LEVEL 2 FFE: 013.78'

PLAN

NORTH

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

A B

D

G

E/F

C

CCBBAA

2. EXISTING VAV TO REMAIN AND BE PROTECTED

DURING DEMOLITION. SEE NEW WORK PLAN FOR

NEW LOCATION.

PF

CORRIDOR

COR2BB3

STAFF TOILET

BB201

PATIENT TOILET

MALE

BB211B

PATIENT TOILET

FEMALE

BB211C

CORRIDOR

COR2BB4

VESTIBULE

VEST19 CORRIDOR

COR2BB1

CORRIDOR

COR2BB2

SPECIAL

CHEMISTRY

LABORATORY

BB211E

(E)12x12 SA

(E)10x12(E)24x14 RA

(E )2

4x

(E )2

2x 12(E)10"Ø

(E)9"Ø SA

(E)9"Ø SA

(E)LS

(E)CR

(E)CD

(E)CD

(E)CD (E)CD

(E)CD

(E)CD 1

(E)EX 1

(E)EX

(E)EX

1 1

(E)CD

1(E)CR

(E)CD 1

A

B

C

A

B

C

14 15 16 17 18 19 20 21 23 24 2514 15 16 17 18 19 20 21 23 24 25

1/8"=1'-0"1 SECOND FLOOR DEMOLITION PLAN - BB SECTION

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

MECHANICAL DEMOLITION PLAN

AH

MD123

KL

2ND FLOOR - BB SECTION

1. ALL EXISTING AIR OUTLETS ARE TO BE REMOVED

FROM EXISTING REFLECTED CEILING PLAN AND

PROTECTED DURING CONSTRUCTION PHASE.

WRAP DUCT OPENINGS TO PREVENT DUST

MITIGATION. REFER TO COR FOR ALL APPLICABLE

INFECTIOUS CONTROL REGULATIONS.

KEY PLAN

LEVEL 2 FFE: 013.78'

PLAN

NORTH

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

A B

D

G

E/F

C

1/8"=1'-0"1 SECOND FLOOR DEMOLITION PLAN - CC SECTION

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

MECHANICAL DEMOLITION PLAN

AH

MD124

KL

2ND FLOOR - CC SECTION

1. ALL EXISTING AIR OUTLETS ARE TO BE REMOVED

FROM EXISTING REFLECTED CEILING PLAN AND

PROTECTED DURING CONSTRUCTION PHASE.

WRAP DUCT OPENINGS TO PREVENT DUST

MITIGATION. REFER TO COR FOR ALL APPLICABLE

INFECTIOUS CONTROL REGULATIONS.

KEY PLAN

LEVEL 2 FFE: 013.78'

PLAN

NORTH

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

A B

D

G

E/F

C

UPUP

DN

PATIENT TOILET

MALE

D235

PATIENT TOILET

FEMALE

D234

CORRIDOR

COR2D3

PATIENT

DRESSING RM

D239

PATIENT TOILET

D239B

PATIENT TOILET

D239A

CORRIDOR

COR2D4

STAFF TOILET

D201A

PATIENT TOILET

D202

CORRIDOR

COR2D7

CORRIDOR

COR2D6

PATIENT TOILET

D242C

CORRIDOR

COR2D1

MRI WAITING

D266

CORRIDOR

COR2D8

CORRIDOR

COR2D9

LE

(E)EX

(E)EX

(E)EX

1(E)CR

(E)CR

(E)CR

(E)CR

(E)CR

(E)EX

(E)EX

(E)CD

(E)CD

(E)CD

(E)CR

(E)CR

(E)CD

(E)CD

(E)CD

(E)CD

(E)CR

(E)CR

(E)CR

(E)EX

(E)EX

(E)CD

(E)CR

J

K

L

J

K

L

15 16 17 18 19 20 21 23 24 25 2615 16 17 18 19 20 21 23 24 25 26

1/8"=1'-0"1 SECOND FLOOR DEMOLITION PLAN - D SECTION

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

MECHANICAL DEMOLITION PLAN

AH

MD125

KL

2ND FLOOR - D SECTION

1. ALL EXISTING AIR OUTLETS ARE TO BE REMOVED

FROM EXISTING REFLECTED CEILING PLAN AND

PROTECTED DURING CONSTRUCTION PHASE.

WRAP DUCT OPENINGS TO PREVENT DUST

MITIGATION. REFER TO COR FOR ALL APPLICABLE

INFECTIOUS CONTROL REGULATIONS.

KEY PLAN

LEVEL 2 FFE: 013.78'

PLAN

NORTH

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

A B

D

G

E/F

C

5 6 7 9 10 11 12 13 14 154.3. 5 6 7 9 10 11 12 13 14 154.3.

COR2E5

CORRIDOR

COR2E3

CORRIDOR

COR2E4

STAFF TOILET

MALE

E209

CORRIDOR

COR2E2

CORRIDOR

COR2F1

PATIENT TOILET

FEMALE

F223

PATIENT TOILET

MALE

F222

CORRIDOR

COR2F3

CORRIDOR

COR2F4

CORRIDOR

COR2F2

VESTIBULE

VEST23

CORRIDOR

COR2E1

STAFF TOILET

F220

CORRIDOR

COR2F5

VESTIBULE

VEST22

VESTIBULE

VEST21

STAFF TOILET

FEMALE

E213

(E)CR

(E)CR

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)EX

(E)EX

(E)CD

(E)CD

(E)EX (E)EX (E)EX

(E)CD (E)CD

1 1

1/8"=1'-0"1 SECOND FLOOR DEMOLITION PLAN - EF SECTION

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

MECHANICAL DEMOLITION PLAN

AH

MD126

KL

2ND FLOOR - EF SECTION

1. ALL EXISTING AIR OUTLETS ARE TO BE REMOVED

FROM EXISTING REFLECTED CEILING PLAN AND

PROTECTED DURING CONSTRUCTION PHASE.

WRAP DUCT OPENINGS TO PREVENT DUST

MITIGATION. REFER TO COR FOR ALL APPLICABLE

INFECTIOUS CONTROL REGULATIONS.

KEY PLAN

LEVEL 2 FFE: 013.78'

PLAN

NORTH

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

A B

D

G

E/F

C

STAFF TOILET

FEMALE

G204

STAFF TOILET

MALE

G203

CORRIDOR

COR2G2

CORRIDOR

COR2G1

(E)CD

(E)CD (E)CD

(E)CD

(E)CD

(E)EX

(E)CD (E)EX

1 1 1

2 5 64.3.1 2 5 64.3.1

1/8"=1'-0"1 SECOND FLOOR DEMOLITION PLAN - G SECTION

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

MECHANICAL DEMOLITION PLAN

AH

MD127

KL

2ND FLOOR - G SECTION

1. ALL EXISTING AIR OUTLETS ARE TO BE REMOVED

FROM EXISTING REFLECTED CEILING PLAN AND

PROTECTED DURING CONSTRUCTION PHASE.

WRAP DUCT OPENINGS TO PREVENT DUST

MITIGATION. REFER TO COR FOR ALL APPLICABLE

INFECTIOUS CONTROL REGULATIONS.

KEY PLAN

LEVEL 2 FFE: 013.78'

PLAN

NORTH

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

A B

D

G

E/F

C

STAIRS #3

14 15 16

ELEVATOR

LOBBY

ELEVLOB3

STAIR #3

3-3

(E)CD

(E)CD

F

G

H

J

K

L

1/8"=1'-0"6F THIRD FLOOR DEMOLITION PLAN - C SECTION

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

MECHANICAL DEMOLITION PLAN

AH

MD130

KL

3RD FLOOR - C SECTION

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

1. ALL EXISTING AIR OUTLETS ARE TO BE REMOVED

FROM EXISTING REFLECTED CEILING PLAN AND

PROTECTED DURING CONSTRUCTION PHASE.

WRAP DUCT OPENINGS TO PREVENT DUST

MITIGATION. REFER TO COR FOR ALL APPLICABLE

INFECTIOUS CONTROL REGULATIONS.

ELEVATOR

LOBBY

ELEVLOB4

STAIR #3

3-4

(E)CD

(E)CD

F

G

H

J

K

L

1/8"=1'-0"6F FOURTH FLOOR DEMOLITION PLAN - C SECTION

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

MECHANICAL DEMOLITION PLAN

AH

MD140

KL

4TH FLOOR - C SECTION

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

1. ALL EXISTING AIR OUTLETS ARE TO BE REMOVED

FROM EXISTING REFLECTED CEILING PLAN AND

PROTECTED DURING CONSTRUCTION PHASE.

WRAP DUCT OPENINGS TO PREVENT DUST

MITIGATION. REFER TO COR FOR ALL APPLICABLE

ELEVATOR

LOBBY

ELEVLOB5

(E)CD

(E)CD

F

G

H

J

K

L

1/8"=1'-0"6F FIFTH FLOOR DEMOLITION PLAN - C SECTION

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

MECHANICAL DEMOLITION PLAN

AH

MD150

KL

5TH FLOOR - C SECTION

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

1. ALL EXISTING AIR OUTLETS ARE TO BE REMOVED

FROM EXISTING REFLECTED CEILING PLAN AND

PROTECTED DURING CONSTRUCTION PHASE.

WRAP DUCT OPENINGS TO PREVENT DUST

MITIGATION. REFER TO COR FOR ALL APPLICABLE

1. NOTE PROJECT SCOPE OF WORK, DEFINED BY DASHED

BORDERS. ALL OTHER AREAS ARE SHOWN FOR REFRENCE

ONLY.

2. LOCATION OF EXISTING EQUIPMENT, DUCTWORK, AIR

OUTLETS, CONTROLS AND ALL CONCEALED WORKS, ETC.

ARE APPROXIMATE. THE CONTRACTOR SHALL EXAMINE

THE SITE AFTER DEMOLITION HAS EXPOSED "AS-BUILT"

CONDITIONS TO VERIFY EACH AIR OUTLET, AND

EQUIPMENT LOCATION. THE CONTRACTOR SHALL MAKE

ADJUSTMENTS AND/OR ALTERATIONS AS NECESSARY TO

INSTALL COMPLETE AND OPERABLE SYSTEMS IN

ACCORDANCE WITH THE CODES HAVING JURISDICTION AT

NO ADDITIONAL COST TO THE GOVERNMENT.

3. ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION

AND/OR REMOVAL OF AIR OUTLETS, EQUIPMENT,

CONTROLS, ETC. SHALL BE REPAIRED AND/OR PATCHED TO

MATCH ADJACENT FINISH. PREPARE SURFACES TO

RECEIVE NEW FINISH, SEE ARCHITECTURAL DRAWINGS

FOR NEW FINISH SCHEDULE. ALL REPAIRS AND NEW FINISH

SHALL BE BY TRADES SKILLED IN FINISH WORKS UNDER

EMPLOY OF THE GENERAL CONTRACTOR.

4. DURING THE LIFE OF THE CONTRACT (CONSTRUCTION AND

DEMOLITION TO POINT OF BENEFICIAL OCCUPANCY BY

OWNER), THE CONTRACTOR SHALL PROTECT ALL SYSTEMS

OR PORTIONS OF SYSTEMS TO REMAIN FOR REUSE FROM

DAMAGE. ALL SYSTEMS SHALL BE TESTED IN SERVICE

AFTER COMPLETION OF THE CONTRACT AND MADE

COMPLETE AND OPERABLE AT NO ADDITIONAL COST TO

THE GOVERNMENT.

5. COORDINATE ALL DEMOLITION WITH ALL TRADES

INVOLVED.

6. ALL WORK MUST BE ACCOMPLISHED IN PHASES AS

SPECIFIED AND/OR INDICATED. THE BUILDING WILL BE

OCCUPIED AND IN OPERATION DURING THE LIFE OF THE

CONTRACT. WORK SHALL BE ACCOMPLISHED IN AREAS

AND/OR PHASES SO AS TO PERMIT CONTINUOUS

OPERATION OF THE FACILITIES. THESE FACILITIES ARE IN

USE 24 HOURS PER DAY, 7 DAYS A WEEK. THE

CONTRACTOR SHALL PROVIDE TEMPORARY SERVICES AS

REQUIRED TO MAINTAIN SYSTEMS (INCLUDING FIRE

DETECTION/ALARM,LIFE SAFETY, FIRE PROTECTION

SYSTEMS, HVAC SYSTEMS, CONTROL SYSTEMS, ETC.)

7. THE CONTRACTOR SHALL COORDINATE WITH THE COR FOR

ACCESS TO AREAS OF THE BUILDING NOT IN CONTRACT

WHICH WILL REMAIN OPERATIONAL DURING

CONSTRUCTION. ANY BREAKS IN UTILITY OR HVAC SERVICE

SHALL BE COORDINATED WITH THE COR PRIOR TO WORK

COMMENCING.

1. THE DRAWINGS SHOW THE GENERAL ARRANGEMENT

AND LOCATION OF EQUIPMENT, DUCTWORK, PIPING,

ETC. THE CONTRACTOR SHALL BE RESPONSIBLE FOR

COORDINATING THE MECHANICAL INSTALLATION WITH

OTHER TRADES.

2. COORDINATE WORK WITH AUTHORITY HAVING

JURISDICTION AND OBTAIN ALL PERMITS AND

INSPECTIONS.

3. THE HEATING, VENTILATING AND AIR CONDITIONING

SYSTEMS SHALL COMPLY WITH THE 2012 EDITION OF

THE INTERNATIONAL MECHANICAL CODE, NFPA 90A, AND

LOCAL CODE OFFICIAL REQUIREMENTS. IN THE EVENT

OF A CONFLICT BETWEEN CODES, THE MOST

STRINGENT SHALL ALWAYS GOVERN.

4. DUCT DIMENSIONS ON DRAWINGS ARE CLEAR INSIDE

DIMENSIONS.

5. THE CONTRACTOR SHALL CHECK AND VERIFY ALL

CLEARANCES PRIOR TO FABRICATION OR INSTALLATION

OF EQUIPMENT, DUCTWORK, AND PIPING SYSTEMS.

WHERE CONDITIONS REQUIRE A CHANGE IN DUCT OR

PIPE ROUTING, NOTIFY THE COR FOR AN ACCEPTABLE

ALTERNATIVE METHOD. AVOID ROUTING DUCTWORK

DIRECTLY OVER LIGHT FIXTURES, DIFFUSERS, AND

OTHER CEILING MTD. DEVICES. LOCATE ALL

MECHANICAL EQUIPMENT SO THAT FILTERS AND

COMPONENTS REQUIRING ACCESS (SERVICE AND

MAINTENANCE) ARE FULLY ACCESSIBLE.

6. INSTALL ALL DUCT MOUNTED DEVICES (DAMPERS,

ACCESS DOORS, ETC.) AND PIPING SPECIALTIES IN

EASILY ACCESSIBLE LOCATIONS. ADVISE THE COR IN

ADVANCE OF INSTALLATION IF ACCESS WILL BE

HINDERED SO AN ALTERNATE LOCATION CAN BE

SELECTED.

7. THE CONTRACTOR SHALL FIRESTOP ALL PENETRATIONS

ON BOTH SIDES OF THE FIRE RATED

WALLS/FLOORS/CEILINGS BY DUCTWORK, PIPING, ETC.,

WITH U.L. LISTED FIRE STOPPING MATERIAL TO

MAINTAIN FIRE RATING OF THE BARRIER.

8. BALANCE ALL AIR DISTRIBUTION DEVICES, EXHAUST

FANS, AND OUTSIDE AIR QUANTITIES AS SCHEDULED OR

SHOWN ON THE DRAWINGS. PROVIDE MARKERS AT ALL

DAMPER LOCATIONS SHOWING FULL OPEN/CLOSED

POSITIONS AND DAMPER SETTING FOR REQUIRED

AIRFLOW. PROVIDE FINAL TEST AND BALANCE REPORT

ALONG W/ SCHEMATIC DRAWINGS SHOWING DIFFUSER

LOCATION W/ DESIGN AND ACTUAL CFM. THE DIFFUSER

TAGS ON THE DRAWINGS SHALL CORRESPOND TO THE

DIFFUSER TAGS ON THE REPORT. THIS REPORT SHALL

BE SUBMITTED BEFORE THE FINAL INSPECTION IS

PERFORMED. SEE THE SPECIFICATIONS FOR

ADDITIONAL INFORMATION.

9. ALL AIRFLOW QUANTITIES SHOWN AS EXISTING ARE FOR

REFERENCE ONLY AND WERE OBTAINED FROM EXISTING

DRAWINGS PROVIDED BY OWNER.

10. THE CONTRACTOR SHALL VERIFY THAT EXISTING

DAMPERS ARE IN GOOD OPERABLE CONDITION BEFORE

RE-USE.

GENERAL MECHANICAL DEMOLITION NOTES GENERAL MECHANICAL NEW WORK NOTES

DEMOLITION KEYED NOTE

NEW WORK

POINT OF RECONNECTION (P.O.C.)

HOT WATER SUPPLY

HOT WATER RETURN

END CAP

PIPE UP

PIPE DOWN

DIFFUSER, SUPPLY

RETURN AIR OUTLET

EXHAUST AIR OUTLET

SHUT-OFF VALVE

EXISTING WORK

DIFFUSER, LINEAR SLOT

ABBREVIATIONS

CHILLED WATER SUPPLY

CHILLED WATER RETURN

LEGEND

CWS

CWR

HWS

HWR

CONDENSATECOND

THERMOSTAT

HUMIDISTAT

T

H

MECHANICAL LEGEND,SYMBOLS,

AH

MH001

KL

AND ABBREVIATIONS

POINT OF DISCONNECTION (P.O.C.)

BACK DRAFT DAMPER

BDD

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

RELOCATE TERMINAL

TO NEW LOCATIONR

VAV UNIT

FIRE/SMOKE DAMPER

FSD

VOLUME DAMPER

DOWNDN

EXISTING(E)

EXHAUSTEXH

NOT IN CONTRACTNIC

RETURN AIRRA

SUPPLY AIRSA

EXHAUST AIREA

EXHAUST FANEF

BACK DRAFT DAMPERBDD

CEILING DIFFUSERCD

CEILING REGISTERCR

LINEAR SUPPLY DIFFUSERLS

LINEAR RETURN DIFFUSERLR

NEW WORK KEYED NOTE1

E

F

G

H

2 5 6 7 9 10 11 12 13 14 154.3.1

UP

CORRIDOR

COR1A6

1ST FLOOR

ELEVATOR

LOBBY

ELEVLOB1

VESTIBULE

VEST9

CORRIDOR

COR1A5

CORRIDOR

COR1A7A

CORRIDOR

COR1A7

CORRIDOR

COR1A8

STAIR #3

3-1

PRIMARY CARE

WAITING

A136

CORRIDOR

COR1A3

STAIR #2

(E)12x12 10x10

(E)14x10

(E)10x6

(E)10x6 LS - 1

(E)CR

(E)CD

(E)CR

(E)CR

(E)CD

(E)CR

(E)CR

(E)CD

(E)CR

(E)CR

(E)CD

(E)CR

(E)CR

(E)CR

(E)CR (E)CD

(E)CR

LS - 1

(E)CR

(E)CR

(E)CR

(E)CR

(E)CD

(E)CR

(E)CD

(E)CR

(E)VAV

R

R

R

(E)CD

(E)CD

1 1

1/8"=1'-0"1 FIRST FLOOR PLAN - A SECTION

MECHANICAL PLAN

AH MH110

KL

1ST FLOOR - A SECTION

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

KEY PLAN

LEVEL 1 FFE: 000.00'

PLAN

NORTH

A B

AAJ BB CC

C

G

D

S

1. PROVIDE VOLUME DAMPERS ON ALL NEW

BRANCH DUCTWORK.

1. ALL AIR OUTLETS ARE TO BE INSTALLED IN NEW

SEISMIC CEILING GRID. REFER TO

ARCHITECTURAL DRAWINGS FOR LOCATION.

WAITING AREA

CC119

PATIENT TOILET

MALE

B152

PATIENT TOILET

FEMALE

CC118

PATIENT TOILET

FEMALE

B137

STAFF TOILET

MALE

B136

STAIR #4

(E)10x8

(E)10x10

(E)12x8RA

(E)12x8RA

(E)6x4 (E)12x6EA

(E)12x4

6x4 EA

EX

(E)EX

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

FSD

C

D

E

F

15 16 17 18 19 20 21 23 24 25 26 27 28 29 30

1/8"=1'-0"1 FIRST FLOOR PLAN - B SECTION

MECHANICAL PLAN

AH

MH111

KL

1ST FLOOR - B SECTION

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

KEY PLAN

LEVEL 1 FFE: 000.00'

PLAN

NORTH

A B

AAJ BB CC

C

G

D

S

1. PROVIDE VOLUME DAMPERS ON ALL NEW

BRANCH DUCTWORK.

1. ALL AIR OUTLETS ARE TO BE INSTALLED IN NEW

SEISMIC CEILING GRID. REFER TO

COR1D5

CORRIDOR

COR1D3

WAITING

D120

CORRIDOR

COR1D4

CORRIDOR

COR1D1

WAITING

D105

STAFF TOILET

D110A

ADMINISTRATIVE/

CLERICAL

D113

SPECIALITY

CLINICS CLERKS

D106

CORRIDOR

COR1D2

LOCKER ROOM

D103A

BREAKROOM

D109E

(E)KIT EF-4

(E)12"x6" BRICK VENT

8" Ø

STAIR #5

EF-1-1

BDD

BDD

(E)CR

(E)CR

(E)CR

(E)CR

LR - 1

(E)CD

(E)CD

(E)CR

(E)CR

(E)CD

LS - 1

LS - 1

LS - 1

(E)CD

(E)CD

(E)CR

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)CR

(E)CD110

(E)CD

(E)EX

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E )6

"Ø

(E)CR

LR - 1

LS - 1

LS - 1

LS - 1

LR - 1 LR - 1

1 1

1 1

BDD

G

H

J

K

L

16 17 18 19 20 21 23 24 25 26

1/8"=1'-0"1 FIRST FLOOR PLAN - D SECTION

MECHANICAL PLAN

AH

MH112

KL

1ST FLOOR - D SECTION

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

KEY PLAN

LEVEL 1 FFE: 000.00'

PLAN

NORTH

A B

AAJ BB CC

C

G

D

S

1. PROVIDE VOLUME DAMPERS ON ALL NEW

BRANCH DUCTWORK.

1. PROVIDE VOLUME DAMPERS ON ALL NEW

BRANCH DUCTWORK.

2. PROVIDE TRANSITION FROM NEW 8" DIAMETER

DUCT TO EXISITNG 12"X6" BRICK VENT.

UP

STAFF TOILET

FEMALE

G111

STAFF TOILET

G107B

STAFF TOILET

MALE

G107A

EX

(E)EX

(E)EX

6"Ø

(E)12"x8" 1

2 5 64.3.1

1/8"=1'-0"1 FIRST FLOOR PLAN - G SECTION

MECHANICAL PLAN

AH

MH113

KL

1ST FLOOR - G SECTION

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

KEY PLAN

LEVEL 1 FFE: 000.00'

PLAN

NORTH

A B

AAJ BB CC

C

G

D

S

1. PROVIDE VOLUME DAMPERS ON ALL NEW

BRANCH DUCTWORK.

1. ALL AIR OUTLETS ARE TO BE INSTALLED IN NEW

SEISMIC CEILING GRID. REFER TO

1/8"=1'-0"1 SECOND FLOOR PLAN - A SECTION

MECHANICAL PLAN

AH

MH120

KL

2ND FLOOR - A SECTION

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

KEY PLAN

LEVEL 2 FFE: 013.78'

PLAN

NORTH

A B

D

G

E/F

C

CCBBAA

1. PROVIDE VOLUME DAMPERS ON ALL NEW

BRANCH DUCTWORK.

1. ALL AIR OUTLETS ARE TO BE INSTALLED IN NEW

SEISMIC CEILING GRID. REFER TO

A202A

COR2A3

CORRIDOR

COR2A5

CORRIDOR

COR2A6 (E)CD

(E)CD

(E)CD

(E)CD(E)CD

(E)CR

(E)CD (E)CD

(E)CR

(E)CD

R

1 1

A

B

C

6 7 9 10 11 12 13 14

1/8"=1'-0"1 SECOND FLOOR PLAN - AA SECTION

MECHANICAL PLAN

AH

MH121

KL

2ND FLOOR - AA SECTION

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

KEY PLAN

LEVEL 2 FFE: 013.78'

PLAN

NORTH

A B

D

G

E/F

C

CCBBAA

1. PROVIDE VOLUME DAMPERS ON ALL NEW

BRANCH DUCTWORK.

1. ALL AIR OUTLETS ARE TO BE INSTALLED IN NEW

SEISMIC CEILING GRID. REFER TO

ELEVATOR

LOBBY

ELEVLOB2

HISTOLOGY LAB

B240

CORRIDOR

COR2B2A

CORRIDOR

COR2B3

CORRIDOR

COR2B5

CHIEF TECH.

B233

P & LMS

ADMINISTRATION

B234

CHIEF

LABORATORY

SERVICE

B235

CONFERENCE

ROOM

B236

CORRIDOR

COR2B6

PATIENT TOILET

MALE

B207PATIENT TOILET

FEMALE

B205

CORRIDOR

COR2BB3

STAFF TOILET

BB201

PATIENT TOILET

MALE

BB211B

PATIENT TOILET

FEMALE

BB211C

PATIENT TOILET

MALE

CC214

PATIENT TOILET

FEMALE

CC213

DIALYSIS

WAITING AREA

B256

CORRIDOR

COR2BB4

STAFF TOILET

B257B

CORRIDOR

COR2B1

CORRIDOR

COR2CC1

CORRIDOR

COR2CC2

CORRIDOR

COR2CC4

ELEC. CLOSET

B207B

VESTIBULE

VEST15

LOUNGE/

BREAKROOM

B243

CORRIDOR

COR2BD1

CORRIDOR

COR2AB1

CORRIDOR

COR2AB2

CORRIDOR

COR2B2

H.A.C B207A

NUCLEAR MED

WAITING

B203

STAIR #3

3-2

CORRIDOR

COR2B4

"TISSUE

STORAGE"

OFFICE

B228A

CORRIDOR

COR2D9

PATIENT TOILET

FEMALE

B239

PATIENT TOILET

MALE

B238

(E)12x12 SAT (E)12x8 (E)6"

E)10x6

(E)20x12

(E)20x14 SA

(E )1

6x 14(E)14x12

10x12

(E)30x8

(E)22x10

(E)16x8

(E)12x10

(E)VAV

(E)VAV

(E)16x8

UP

8X5 SA

8X5 SA

8X5SA

8X8EA

8X8EA

8x6 TRANSFER

(E )8 x6

8X5 SA

16x8

STAIR #5

STAIR #4

(E)CD

(E)CD

(E)CR

(E)CD (E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)CR

(E)CD

(E)CD

(E)CR

(E)CR

(E)CR

(E)EX

(E)EX

(E)CR

(E)CR (E)CR

(E)CR

(E)CR

(E)CR (E)CR

(E)CR

(E)CR

(E)CR

(E)CR

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)LS

(E)LS

(E)LS

(E) LSD

(E) LS

(E) LS

(E) LS

(E) LS

(E)CR

(E)CR

(E)CR

(E)CR

(E)CR

(E)CR

(E)LS

(E) LS

(E)CR

(E)EX

(E)CD

(E)CD

(E)CR

(E)CR

(E)VAV

(E)CD (E)CR

(E)EX (E)EX

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD (E)CD

LS - 1

(E)CD

(E)CD

(E)EX

(E)EX(E)EX

(E)EX

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)CD

(E)CR

R

1 1

1 1

1 1

1 1

1 1

1 1

1 1

C

D

E

F

G

H

15 16 17 18 19 20 21 23 24 25 26 27 28 29 30

1/8"=1'-0"1 SECOND FLOOR PLAN - B SECTION

MECHANICAL PLAN

AH

MH122

KL

2ND FLOOR - B SECTION

PROJECT TEAM

V et er an s A ff ai rs D ep ar tm en t of

CHARLESTON, S.C.

Architect/Engineer

Seal Architect/Engineer AddressRevisions Date

Project No.

DRAWING NO.

Project Title

Building Number Checked Drawn

Location Dwg. Of

Drawing Title

Approved: Chief Engineering Service

JEFFERY A. SAGE

Approved: Project Manager

AVIS R. THOMAS

Date CONSULTANTS

FULLY SPRINKLERED

DESIGN/BUILD

CONSTRUCTION DOCUMENTS SUBMISSION

RENOVATION OF COMMON

AND SUPPORT AREAS IN

BUILDING 1

534-15-105

06-30-2016

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

KEY PLAN

LEVEL 2 FFE: 013.78'

PLAN

NORTH

A B

D

G

E/F

C

CCBBAA

1. PROVIDE VOLUME DAMPERS ON ALL NEW

BRANCH DUCTWORK.

1. ALL AIR OUTLETS ARE TO BE INSTALLED IN NEW

SEISMIC CEILING GRID. REFER TO

File details come from the government source that posted it.