36C24718R0653-004.pdf
PDF 11 MB Posted
- Solicitation number
- 36C24718R0653
About this file
36C24718R0653 FINAL SEALED DRAWINGS 1 of 4.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24718R0653-0002001.pdf | ||
| 36C24718R0653-0002002.pdf | ||
| 36C24718R0653-0002000.docx | DOCX document | |
| 36C24718R0653-0001000.docx | DOCX document | |
| 36C24718R0653-007.pdf | ||
| 36C24718R0653-009.pdf | ||
| 36C24718R0653-002.pdf | ||
| 36C24718R0653-008.pdf | ||
| 36C24718R0653-006.pdf | ||
| 36C24718R0653-010.pdf | ||
| 36C24718R0653-001.docx | DOCX document | |
| 36C24718R0653-003.pdf | ||
| 36C24718R0653-005.pdf | ||
| 36C24718R0653-011.pdf | ||
| 36C24718R0653-000.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1/16/2016
REVISED 10.04.2017 FA
A205 FAMILY LOUNGE CONSULTATION ROOM 72 SF
34,550 SF
PROJECT TEAM
V et er an s A ff ai rs D ep ar tm en t of
Architect/Engineer
Seal Architect/Engineer AddressRevisions Date
Project No.
DRAWING NO.
Project Title
Building Number Checked Drawn
Location Dwg. Of
Drawing Title
Approved: Chief Engineering Service
JEFFERY A. SAGE
Approved: Project Manager
AVIS R. THOMAS
Date CONSULTANTS
DESIGN/BUILD
1 3/64" = 1'-0"
LEGEND
EX
UP
UP
UP
UP
A
B
C
D
E
F
G
H
J
K
L
2 5 6 7 9 10 11 12 13 14 15 16 17 18 19 20 21 23 24 25 26 27 28 29 304.3.1
LIQUID
NITROGEN
STORAGE
WC-01
WC-02
NIC
WC-03
WC-04
NIC
WC-08
NIC
WC-09
NIC
WC-07
NIC
WC-06
NIC
WC-05
LC LC
EX
EX
EX EX EX EX
EX
EX
EX
EX
EP
EX
EP
et er an s A ff ai rs D ep ar tm en t of
Architect/Engineer
Seal Architect/Engineer AddressRevisions Date
Project No.
DRAWING NO.
Project Title
Building Number Checked Drawn
Location Dwg. Of
Drawing Title
Approved: Chief Engineering Service
JEFFERY A. SAGE
Approved: Project Manager
AVIS R. THOMAS
Date CONSULTANTS
DESIGN/BUILD
1 3/64" = 1'-0"
LEGEND
EX
UP
DN
DN
DN
4 4 4
4 4
WC-23
WC-22
WC-21
WC-20
WC-19
WC-17
WC-15
WC-16
WC-18
WC-14WC-13
WC-12
WC-11
WC-10
WC-11 NEW
LOCATION
et er an s A ff ai rs D ep ar tm en t of
Architect/Engineer
Seal Architect/Engineer AddressRevisions Date
Project No.
DRAWING NO.
Project Title
Building Number Checked Drawn
Location Dwg. Of
Drawing Title
Approved: Chief Engineering Service
JEFFERY A. SAGE
Approved: Project Manager
AVIS R. THOMAS
Date CONSULTANTS
DESIGN/BUILD
1 3/64" = 1'-0"
LEGEND
EX
2 5 6 7 9 10 11 12 13 14 15 16 17 18 19 20 21 23 24 25 26 27 28 29 304.3.1
WC-24
WC-25
WC-26
et er an s A ff ai rs D ep ar tm en t of
Architect/Engineer
Seal Architect/Engineer AddressRevisions Date
Project No.
DRAWING NO.
Project Title
Building Number Checked Drawn
Location Dwg. Of
Drawing Title
Approved: Chief Engineering Service
JEFFERY A. SAGE
Approved: Project Manager
AVIS R. THOMAS
Date CONSULTANTS
DESIGN/BUILD
1 3/64" = 1'-0"
LEGEND
EX
2 5 6 7 9 10 11 12 13 14 15 16 17 18 19 20 21 23 24 25 26 27 28 29 304.3.1
WC-31
NIC
WC-27
NIC
WC-28
NIC
WC-29
NIC
WC-30
NIC
et er an s A ff ai rs D ep ar tm en t of
Architect/Engineer
Seal Architect/Engineer AddressRevisions Date
Project No.
DRAWING NO.
Project Title
Building Number Checked Drawn
Location Dwg. Of
Drawing Title
Approved: Chief Engineering Service
JEFFERY A. SAGE
Approved: Project Manager
AVIS R. THOMAS
Date CONSULTANTS
DESIGN/BUILD
1 3/64" = 1'-0"
LEGEND
EX
2 5 6 7 9 10 11 12 13 14 15 16 17 18 19 20 21 23 24 25 26 27 28 29 304.3.1
WC-32
NIC
WC-33
NIC
MIV AEJ
MIV AEJ
ACM MASTIC (REDDISH-BROWN)
PLIABLE APPLIED TO SEAM OF METAL
DUCT.
PIPE INSULATION (FIBERGLASS) WITH
BLACK ACM MASTIC AT ELBOWS,
FITTINGS AND HANGERS.
LEGEND
HA101.0JF DjH
22615
3/32"=1'-0"1 PARTIAL FIRST FLOOR PLAN
N
KEY PLAN
SCALE: 3/32" = 1'-0"
0 5'-4" 10'-8" 21'-4"
ACM BLACK MASITC,
TO BE ABATED AS
SHOWN SHADED,
ON PIPE INSULATION
ELBOW FITTINGS (2 EA)
3/32"=1'-0"2 PARTIAL FIRST FLOOR PLAN
VA-36-03 (+)
VA-36-02 (+)
VA-36-01 (+)
SURFACING MATERIAL
(WHITE) SKIMCOAT
ON CEILING PLASTER,
TO BE ABATED AS
SHOWN SHADED
VA-179-03 (+)
VA-179-02 (+)
VA-179-01 (+)
VA-154-03 (+)
VA-96-06 (+)
ACM PIPE ELBOW
INSULATION (FRIABLE),
TO BE ABATED AS
SHOWN SHADED
PIPE INSULATION (FIBERGLASS)
WITH BLACK ACM MASTIC AT
ELBOWS, FITTINGS AND HANGERS,
TO BE ABATED AS SHOWN SHADED
3/32"=1'-0"3 PARTIAL FIRST FLOOR PLAN
LARGE HVAC DUCT WITH
ACM INSULATION (FRIABLE),
TO BE ABATED AS SHOWN
SHADED
CONSTRUCTION DOCUMENTS SUBMISSION
RENOVATION OF COMMON
AND SUPPORT AREAS IN
BUILDING 1
534-15-105
06-30-2016
PROJECT TEAM
V et er an s A ff ai rs D ep ar tm en t of
CHARLESTON, S.C.
Architect/Engineer
Seal Architect/Engineer AddressRevisions Date
Project No.
DRAWING NO.
Project Title
Building Number Checked Drawn
Location Dwg. Of
Drawing Title
Approved: Chief Engineering Service
JEFFERY A. SAGE
Approved: Project Manager
AVIS R. THOMAS
Date CONSULTANTS
FULLY SPRINKLERED
DESIGN/BUILD
GENERAL NOTES:
1. REFER TO THE SPECIFICATION SECTION 02.82.11 FOR TRADITIONAL
ASBESTOS ABATEMENT INFORMATION.
2. THIS DRAWING INDICATES AREAS OF ASBESTOS ABATEMENT.
OTHER ABATEMENT REQUIRED INCLUDING MODIFICATIONS THAT
MAY EXTEND BEYOND THE AREAS SHOWN SHALL INCLUDE ANY
NECESSARY DEMOLITION OF SPACES ADJACENT TO, ABOVE AND/
OR BELOW REQUIRED FOR THE INSTALLATION OF WORK IN THIS
PROJECT.
3. DRAWINGS ARE DIAGRAMMATIC AND SINCE EXISTING CONDITIONS,
INCLUDING AREA ABOVE ACCESSIBLE CEILING MAY AFFECT
ABATEMENT WORK, THE CONTRACTOR SHALL COORDINATE ALL
ABATEMENT WORK WITH DEMOLITION CONTRACTOR.
4. CONTRACTOR SHALL DELIVER TO CONSTRUCTION MANAGER
COPIES OF ALL ENVIRONMENTAL PERMITS AND ALL WASTE
MANIFESTS. WASTE MAY NOT BE STORED AND MUST BE DISPOSED
OF IMMEDIATELY FOLLOWING ABATEMENT.
5. THE ASBESTOS ABATEMENT CONTRACTOR SHALL
DECONTAMINATE ALL BUILDING MATERIALS, WHICH BECOME
CONTAMINATED OR ARE DISTURBED FROM ASBESTOS REMOVAL.
6. ASBESTOS ABATEMENT CONTRACTOR IS TO ADHERE TO THE OSHA
STANDARD 29CFR 1926.62 LEAD EXPOSURE IN CONSTRUCTION
WHEN PERFORMING SELECTIVE DEMOLITION WORK PRACTICE,
IMPACTING, OR DISTURBING ANY BUILDING MATERIALS. THE
HAZARDOUS MATERIAL ABATEMENT CONTRACTOR MUST CONDUCT
DAILY EXPOSURE MONITORING FOR LEAD-IN-THE-AIR AND COMPLY
WITH ALL APPLICABLE REGULATIONS.
7. ASBESTOS ABATEMENT CONTRACTOR SHALL COORDINATE ON
SITE WORK WITH THE VAMC,AE,ENVIRONMENTAL ENGINEER,
CONSTRUCTION MANAGER, AND GENERAL AND
SUB-CONTRACTORS TO FACILITATE THE PROMPT COMPLETION OF
ALL ASPECTS OF THE DEMOLITION RENOVATION PROJECTS.
8. SPECIAL CARE SHOULD BE TAKEN WHEN WORKING NEAR
ELECTRIC, WATER, STEAM AND GAS SUPPLY LINES.
9. ASBESTOS ABATEMENT CONTRACTOR MAY BE RESPONSIBLE FOR
REMOVING NON-ASBESTOS MATERIALS TO ACCESS ASBESTOS
CONTAINING AND OTHER HAZARDOUS MATERIALS INCLUDING BUT
NOT LIMITED TO, DROP CEILINGS, DRYWALL ENCLOSURES, ECT.
COORDINATE SELECTIVE DEMOLITION WITH THE DEMOLITION
CONTRACTOR.
10. ASBESTOS ABATEMENT CONTRACTOR SHALL COMPLY WITH THE
REQUIREMENTS OF OSHA REGARDING CONFINED SPACE
INCLUDING ASSOCIATED PROGRAMS, PERMITS, TRAINING AND
TESTING.
11. DEPICTION OF EXISTING CONDITIONS BASED ON
OWNER-FURNISHED DOCUMENTS AND LIMITED FIELD
OBSERVATIONS. EXISTING ELEMENTS AND CONDITIONS
CONCEALED BY IN-PLACE EQUIPMENT AND FINISHES WERE NOT
OBSERVED OR INVESTIGATED. ONCE CUTTING AND SELECTIVE
DEMOLITION WORK IS COMPLETE, REPORT ANY CONFLICTS TO
DESIGNER. THE CONTRACTOR SHALL MAKE ADJUSTMENTS
AND/OR ALTERATIONS AS NECESSARY TO INSTALL COMPLETE AND
OPERABLE SYSTEMS IN ACCORDANCE WITH THE CODES HAVING
JURISDICTION AT NO ADDITIONAL COST TO THE GOVERNMENT.
12. ABATEMENT CONTRACTOR TO COORDINATE, WITH GENERAL
CONTRACTOR, DEVELOPMENT OF INFECTION CONTROL PLAN AND
SAFETY PLAN FOR APPROVAL BY COR PRIOR TO BEGINNING THEIR
WORK. PLAN TO INCLUDE MEANS AND METHODS OF DEBRIS
STAGING AND REMOVAL, BOTH INTERNALLY AND EXTERNALLY.
SEE GI002.
13. PROTECT AND MAINTAIN EXISTING FIRE PARTITIONS AND
BARRIERS; PENETRATION AND JOINT FIRE STOPPING AND APPLIED
FIREPROOFING. RESTORE TO EXISTING RATING WHERE DAMAGED
OR REMOVED AS PART OF WORK.
14. COORDINATE ALL WORK AS SPECIFIED IN SECTION 02 82 11 & 02 82
13.19.
RAMP UP
TO RAISED
FLOOR
D276
D276
AA215
C O
R 2A
A
ACM MASTIC (REDDISH-BROWN)
PLIABLE APPLIED TO SEAM OF METAL
DUCT.
PIPE INSULATION (FIBERGLASS) WITH
BLACK ACM MASTIC AT ELBOWS,
FITTINGS AND HANGERS.
LEGEND
3/32"=1'-0"1 PARTIAL SECOND FLOOR PLAN
N
KEY PLAN
SCALE: 3/32" = 1'-0"
0 5'-4" 10'-8" 21'-4"
PIPE INSULATION (FIBERGLASS) WITH
BLACK ACM MASTIC AT ELBOWS,
FITTINGS AND HANGERS,
TO BE ABATED AS SHOWN SHADED
ACM MASTIC
(REDDISH-BROWN) PLIABLE
APPLIED TO SEAM OF METAL
DUCT, TO BE ABATED AS
SHOWN SHADED
PIPE INSULATION (FIBERGLASS)
WITH BLACK ACM MASTIC AT ELBOWS,
FITTINGS AND HANGERS, TO BE
ABATED AS SHOWN SHADED
ACM PIPE
INSULATION
(2 ELBOWS)
(FRIABLE),
TO BE ABATED AS
SHOWN SHADED
PIPE INSULATION (FIBERGLASS) WITH
BLACK ACM MASTIC AT ELBOWS,
FITTINGS AND HANGERS
TO BE ABATED AS SHOWN SHADED
HA102.0JF DjH
22616
RENOVATION OF COMMON
AND SUPPORT AREAS IN
BUILDING 1
534-15-105
06-30-2016
PROJECT TEAM
V et er an s A ff ai rs D ep ar tm en t of
CHARLESTON, S.C.
Architect/Engineer
Seal Architect/Engineer AddressRevisions Date
Project No.
DRAWING NO.
Project Title
Building Number Checked Drawn
Location Dwg. Of
Drawing Title
Approved: Chief Engineering Service
JEFFERY A. SAGE
Approved: Project Manager
AVIS R. THOMAS
Date CONSULTANTS
CONSTRUCTION DOCUMENTS SUBMISSION
FULLY SPRINKLERED
DESIGN/BUILD
ACM BLACK MASITC
BELOW NON-ACM RUBBER
TILES AT STAIR LANDING,
TO BE ABATED AS SHOWN SHADED
GENERAL NOTES:
1. REFER TO THE SPECIFICATION SECTION 02.82.11 FOR TRADITIONAL
ASBESTOS ABATEMENT INFORMATION.
2. THIS DRAWING INDICATES AREAS OF ASBESTOS ABATEMENT.
OTHER ABATEMENT REQUIRED INCLUDING MODIFICATIONS THAT
MAY EXTEND BEYOND THE AREAS SHOWN SHALL INCLUDE ANY
NECESSARY DEMOLITION OF SPACES ADJACENT TO, ABOVE AND/
OR BELOW REQUIRED FOR THE INSTALLATION OF WORK IN THIS
PROJECT.
3. DRAWINGS ARE DIAGRAMMATIC AND SINCE EXISTING CONDITIONS,
INCLUDING AREA ABOVE ACCESSIBLE CEILING MAY AFFECT
ABATEMENT WORK, THE CONTRACTOR SHALL COORDINATE ALL
ABATEMENT WORK WITH DEMOLITION CONTRACTOR.
4. CONTRACTOR SHALL DELIVER TO CONSTRUCTION MANAGER
COPIES OF ALL ENVIRONMENTAL PERMITS AND ALL WASTE
MANIFESTS. WASTE MAY NOT BE STORED AND MUST BE DISPOSED
OF IMMEDIATELY FOLLOWING ABATEMENT.
5. THE ASBESTOS ABATEMENT CONTRACTOR SHALL
DECONTAMINATE ALL BUILDING MATERIALS, WHICH BECOME
CONTAMINATED OR ARE DISTURBED FROM ASBESTOS REMOVAL.
6. ASBESTOS ABATEMENT CONTRACTOR IS TO ADHERE TO THE OSHA
STANDARD 29CFR 1926.62 LEAD EXPOSURE IN CONSTRUCTION
WHEN PERFORMING SELECTIVE DEMOLITION WORK PRACTICE,
IMPACTING, OR DISTURBING ANY BUILDING MATERIALS. THE
HAZARDOUS MATERIAL ABATEMENT CONTRACTOR MUST CONDUCT
DAILY EXPOSURE MONITORING FOR LEAD-IN-THE-AIR AND COMPLY
WITH ALL APPLICABLE REGULATIONS.
7. ASBESTOS ABATEMENT CONTRACTOR SHALL COORDINATE ON
SITE WORK WITH THE VAMC,AE,ENVIRONMENTAL ENGINEER,
CONSTRUCTION MANAGER, AND GENERAL AND
SUB-CONTRACTORS TO FACILITATE THE PROMPT COMPLETION OF
ALL ASPECTS OF THE DEMOLITION RENOVATION PROJECTS.
8. SPECIAL CARE SHOULD BE TAKEN WHEN WORKING NEAR
ELECTRIC, WATER, STEAM AND GAS SUPPLY LINES.
9. ASBESTOS ABATEMENT CONTRACTOR MAY BE RESPONSIBLE FOR
REMOVING NON-ASBESTOS MATERIALS TO ACCESS ASBESTOS
CONTAINING AND OTHER HAZARDOUS MATERIALS INCLUDING BUT
NOT LIMITED TO, DROP CEILINGS, DRYWALL ENCLOSURES, ECT.
COORDINATE SELECTIVE DEMOLITION WITH THE DEMOLITION
CONTRACTOR.
10. ASBESTOS ABATEMENT CONTRACTOR SHALL COMPLY WITH THE
REQUIREMENTS OF OSHA REGARDING CONFINED SPACE
INCLUDING ASSOCIATED PROGRAMS, PERMITS, TRAINING AND
TESTING.
11. DEPICTION OF EXISTING CONDITIONS BASED ON
OWNER-FURNISHED DOCUMENTS AND LIMITED FIELD
OBSERVATIONS. EXISTING ELEMENTS AND CONDITIONS
CONCEALED BY IN-PLACE EQUIPMENT AND FINISHES WERE NOT
OBSERVED OR INVESTIGATED. ONCE CUTTING AND SELECTIVE
DEMOLITION WORK IS COMPLETE, REPORT ANY CONFLICTS TO
DESIGNER. THE CONTRACTOR SHALL MAKE ADJUSTMENTS
AND/OR ALTERATIONS AS NECESSARY TO INSTALL COMPLETE AND
OPERABLE SYSTEMS IN ACCORDANCE WITH THE CODES HAVING
JURISDICTION AT NO ADDITIONAL COST TO THE GOVERNMENT.
12. ABATEMENT CONTRACTOR TO COORDINATE, WITH GENERAL
CONTRACTOR, DEVELOPMENT OF INFECTION CONTROL PLAN AND
SAFETY PLAN FOR APPROVAL BY COR PRIOR TO BEGINNING THEIR
WORK. PLAN TO INCLUDE MEANS AND METHODS OF DEBRIS
STAGING AND REMOVAL, BOTH INTERNALLY AND EXTERNALLY.
SEE GI002.
13. PROTECT AND MAINTAIN EXISTING FIRE PARTITIONS AND
BARRIERS; PENETRATION AND JOINT FIRE STOPPING AND APPLIED
FIREPROOFING. RESTORE TO EXISTING RATING WHERE DAMAGED
OR REMOVED AS PART OF WORK.
14. COORDINATE ALL WORK AS SPECIFIED IN SECTION 02 82 11 & 02 82
13.19.
SEE STATEMENT OF WORK THIS DWG 20 OF 223
A205 FAMILY LOUNGE
PF
PF
P F
A
B
C
D
E
F
G
H
J
K
L
6 7 9 10 11 12 13 14 15 16 17 18 19 20 21 23 24 25 26 27 28 29 304.3.1
AD105.0
3 WC-24
WC-25
WC-26
PROJECT TEAM
V et er an s A ff ai rs D ep ar tm en t of
CHARLESTON, S.C.
Architect/Engineer
Seal Architect/Engineer AddressRevisions Date
Project No.
DRAWING NO.
Project Title
Building Number Checked Drawn
Location Dwg. Of
Drawing Title
Approved: Chief Engineering Service
JEFFERY A. SAGE
Approved: Project Manager
AVIS R. THOMAS
THESE DRAWINGS ARE
NOT TO BE USED FOR
CONSTRUCTION,
BIDDING, RECORDATION,
CONVEYANCE, SALES,
OR AS THE BASIS FOR
THE ISSUANCE OF A
PERMIT
Date CONSULTANTS
FULLY SPRINKLERED
DESIGN/BUILD
6/
/2
6:
:3
P
M
CONSTRUCTION DOCUMENTS SUBMISSION
RENOVATION OF COMMON
AND SUPPORT AREAS IN
BUILDING 1
534-15-105
AD103.0
06-30-2016
AEJMIV
22324
LEVEL 3 - OVERALL DEMOLITION
PLAN
1" = 20'-0"1 DEMOLITION FLOOR PLAN - 3RD FLOOR
SCALE: 1" = 20'-0"
0 10'-0" 20'-0" 40'-0"
1 ALL ITEMS SHOWN DASHED INDICATE ITEMS TO BE DEMOLISHED OR SALVAGED.
SEE SPECIFIC NOTES BELOW FOR ADDITIONAL INFORMATION. REFER TO
MECHANICAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL DRAWINGS FOR
ADDITIONAL DEMOLITION NOTES.
2 ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF
MATERIALS SHALL BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT FINISH.
PREPARE SURFACES TO RECEIVE NEW FINISH(ES).
3 CONTRACTOR TO DEVELOP AND PUBLISH INFECTION CONTROL PLAN AND SAFETY
PLAN FOR APPROVAL BY COR PRIOR TO BEGINNING THEIR WORK. PLAN TO
INCLUDE MEANS AND METHODS OF DEBRIS STAGING AND REMOVAL, BOTH
INTERNALLY AND EXTERNALLY.
4 INSTALL TEMPORARY DUST AND DEBRIS BARRIERS AND VESTIBULES AROUND
PROJECT LIMITS IN ACCORDANCE WITH THE VA'S INFECTON CONTROL PLAN.
TEMPORARY BARRIERS ARE NOT TO RESTRICT REQUIRED MEANS OF EGRESS
PATHS AND WIDTHS.
5 HAZARDOUS MATERIAL ABATEMENT IS REQUIRED IN PROJECT SCOPE. REF.
HA-SERIES DRAWINGS FOR ADDITIONAL INFORMATION.
6 REMOVE ALL INDICATED ACOUSTICAL CEILING TILE, OVERHEAD MECHANICAL
EQUIPMENT, A/C DUCTS AND RETURNS, LIGHT FIXTURES.
7 EXISTING TO REMAIN: ANY FIRE SPRINKLER HEADS, RISERS, VALVES, OF ANY
OTHER RELATED FIRE PROTECTION EQUIPMENT, UNLESS OTHERWISE NOTED.
8 FIELD VERIFY ALL EXISTING DIMENSIONS PRIOR TO ANY CONSTRUCTION OR
EQUIPMENT INSTALLATION. IMMEDIATELY NOTIFY COR OF ANY DISCREPANCY.
9 ALL EQUIPMENT IN HISTOLOGY LAB TO BE RELOCATED DURING DEMOLITION
10 ALL EXISTING DOORS, UNLESS OTHERWISE NOTED, ARE TO REMAIN. PROTECT
DURING DEMOLITION AND NEW CONSTRUCTION, AND ARE TO RECEIVE PAINT
WHERE NECESSARY.
11 CONTRACTOR TO SALVAGE AND PROPERLY STORE ALL TOILET ACCESSORIES,
FEMININE PRODUCT DISPENSERS AND BABY CHANGING STATIONS FOR RE-USE BY
VA. IF NOT REUSED IN THIS PROJECT TURN OVER ITEM TO VA.
12 THE EXTENT OF DEMOLITION WORK IS SHOWN ON DRAWINGS AND
SPECIFICATIONS.
13 THE USE OF EXPLOSIVES WILL NOT BE PERMITTED.
14 BURNING OF REMOVED MATERIALS FROM DEMOLISHED STRUCTURES WILL NOT BE
PERMITTED IN THE SITE.
15 CONDUCT DEMOLITION OPERATIONS AND THE REMOVAL OF DEBRIS TO ENSURE
MINIMUM INTERFERENCE WITH ANOTHER ADJACENT OCCUPIED OR USED SPACE.
16 PROVIDE COVERED PASSAGEWAY TO ENSURE THE SAVE PASSAGE OF PEOPLE
AROUND THE AREA OF DEMOLITION. CONDUCT OPERATIONS TO PREVENT DAMAGE
TO FALLING DEBRIS OR OTHER CAUSE TO ADJACENT SPACES. PROVIDE PHASING
PLAN FOR MATERIAL, WORK PERFORMED FOR APPROVAL.
17 DO NOT CLOSE OR OBSTRUCT CORRIDOR OR OCCUPIED SPACES WITHOUT
PERMISSION FROM THE COR. PROVIDE ALTERNATE ROUTES AROUND CLOSED OR
OBSTRUCTED TRAFFIC.
18 PROVIDE INTERIOR BRACING OR SUPPORTS AS REQUIRED TO PREVENT MOVEMENT
OR COLLAPSE OF ITEMS TO BE REMOVED OR DEMOLISHED DURING DEMOLITION
PHASE.
19 PROMPTLY REPAIR DAMAGE CAUSED TO ADJACENT SPACES BY DEMOLITION
OPERATIONS, AT NO COST TO THE VA.
20 MAINTAIN EXISTING UTILITIES, KEEP IN SERVICE AND PROTECT AGAINST DAMAGE
DURING DEMOLITION AND OPERATIONS.
21 DO NOT INTERRUPT EXISTING UTILITIES SERVING OCCUPIED SPACES, EXCEPT
WHEN AUTHORIZED BY COR.
22 PROVIDE TEMPORARY ENCLOSURES, AND OTHER SUITABLE METHODS AS
NECESSARY TO LIMIT THE AMOUNT OF DUST AND DIRT RISING AND SCATTERING IN
THE AIR TO THE LOWEST LEVELS OF AIR POLLUTION PRACTICAL FOR THE
CONDITION OF WORK. WRAP EITHER DUCT OPENING OR THE OUTLET WITH BLUE
CELLOPHANE TO PREVENT DUST FROM ENTERING OR REMOVE OUTLET OR GRILLE
AND INSTALL A CARD CAP TO PREVENT DUST FROM ENTERING. REMOVE AFTER
DEMO AND REPLACE WITH OUTLET. COMPLY WITH GOVERNMENT REGULATIONS.
23 CLEAN ADJACENT STRUCTURES AND IMPROVEMENTS FROM DUST, DIRT AND
DEBRIS CAUSED BY THE DEMOLITION WORK.
24 REMOVE FROM THE SITE ALL DEBRIS, RUBBLE AND OTHER MATERIALS RESULTING
FROM DEMOLITION WORK.
25 ALL DEBRIS PRODUCED BY THE DEMOLITION DUE TO REMOVAL OF CONSTRUCTION
MATERIAL OR EQUIPMENT, SHALL BE DISPOSED OFF SITE LEGALLY AND IN A TIMELY
MANNER.
26 ALL EXISTING EQUIPMENT NOT SHOWN ON THE DEMOLITION PLANS BUT FOUND ON
THE HOSPITAL, SHALL BE NOTIFIED TO THE COR PRIOR TO ANY ACTION TAKEN BY
THE CONTRACTOR.
27 ALL DEMOLITION WORK WILL BE COORDINATED WITH THE COR PRIOR TO
COMMENCING OF WORK.
28 REMOVE ALL EXISTING TACKBOARDS, BULLETIN BOARDS, PEGBOARDS, AND WALL
MOUNTED EQUIPMENT AND STORE FOR LATER RE-INSTALLATION
GENERAL DEMOLITION NOTES
PLAN
NORTH
? DEMOLITION KEY NOTES
1 EXISTING FLOORING AND BASE TO BE REMOVED. SEE SPECIFICATIONS FOR
FLOOR PREPARATION.
2 EXISTING STAIR RAILING TO BE REMOVED/ REPLACED. SEE STAIR DETAILS SHEET
AE504.
3 EXISTING WALL PROTECTION TO BE REMOVED.
4 EXISTING APPLIED WALL FINISH TO BE REMOVED.
5 EXISTING FLOOR TILE TO BE REMOVED.
6 EXISTING DOOR AND FRAME TO BE REMOVED.
7 EXISTING PLUMBING FIXTURE TO BE REMOVED. REFER TO PLUMBING DEMO
SHEETS.
8 EXISTING INTERIOR WALL TO REMAIN, PROTECT DURING DEMOLITION AND NEW
CONSTRUCTION.
9 EXISTING WATER FOUNTAIN TO BE REMOVED, LINES CAPPED, WALLS REPAIRED.
REFER TO PLUMBING DEMOLITION DRAWING FOR EXTENT OF WORK.
10 EXISTING FLOOR EXPANSION JOINT COVER. REFER TO DWG AE505 FOR
LOCATION AND DETAILS.
11 FIRE DOOR/ FRAME TO BE REMOVED/ REPLACED. TO BE DETERMINED BY FPC
12 EXISTING WALL MOUNTED RETURN AIR GRILL TO BE REMOVED.
13 EXISTING CIPHER LOCK AND HARDWARE TO BE REMOVED.
14 REMOVE AND STORE EXISTING WALL MOUNTED FIXTURES, EQUIPMENT,
ACCESSORIES, AND SIGNAGE FOR REUSE.
15 INTERIOR WALL TO BE REMOVED.
16 EXISTING STRUCTURE TO REMAIN. PROTECT DURING CONSTRUCTION.
17 EXISTING TOILET PARTITIONS TO BE REMOVED.
18 EXISTING FIRE RISER PIPES TO REMAIN. PROTECT DURING CONSTRUCTION.
19 EXISTING MARBLE SLAB DIRECTORY SIGN TO BE REMOVED, STORED FOR REUSE
E.J. NIC
A304
E.J. NIC
A303
E.J. NIC
B303
E.J. NIC
B304
E.J. NIC
A301
E.J. NIC
A302
E.J. NIC
B302
E.J. NIC
B301
P F
P F
P F
PF
P
F
A
B
C
D
E
F
G
H
J
K
L
6 7 9 10 11 12 13 14 15 16 17 18 19 20 21 23 24 25 26 27 28 29 304.3.1
AD105.0
AE705
WC-27
NIC
WC-28
NIC
WC-29
NIC
WC-30
NIC
WC-31
NIC
P F
P F
A
B
C
D
E
F
G
H
J
K
L
6 7 9 10 11 12 13 14 15 16 17 18 19 20 21 23 24 25 26 27 28 29 304.3.1
AD105.0
WC-32
NIC
WC-33
NIC
PROJECT TEAM
V et er an s A ff ai rs D ep ar tm en t of
CHARLESTON, S.C.
Architect/Engineer
Seal Architect/Engineer AddressRevisions Date
Project No.
DRAWING NO.
Project Title
Building Number Checked Drawn
Location Dwg. Of
Drawing Title
Approved: Chief Engineering Service
JEFFERY A. SAGE
Approved: Project Manager
AVIS R. THOMAS
THESE DRAWINGS ARE
NOT TO BE USED FOR
CONSTRUCTION,
BIDDING, RECORDATION,
CONVEYANCE, SALES,
OR AS THE BASIS FOR
THE ISSUANCE OF A
PERMIT
Date CONSULTANTS
FULLY SPRINKLERED
DESIGN/BUILD
6/
/2
6:
:1
P
M
CONSTRUCTION DOCUMENTS SUBMISSION
RENOVATION OF COMMON
AND SUPPORT AREAS IN
BUILDING 1
534-15-105
AD104.0
06-30-2016
AEJMIV
22325
LEVEL 4/5 - OVERALL DEMOLITION
PLAN
1" = 20'-0"1 DEMOLITION FLOOR PLAN - 4TH FLOOR
SCALE: 1" = 20'-0"
0 10'-0" 20'-0" 40'-0"
1 ALL ITEMS SHOWN DASHED INDICATE ITEMS TO BE DEMOLISHED OR SALVAGED.
SEE SPECIFIC NOTES BELOW FOR ADDITIONAL INFORMATION. REFER TO
MECHANICAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL DRAWINGS FOR
ADDITIONAL DEMOLITION NOTES.
2 ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF
MATERIALS SHALL BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT FINISH.
PREPARE SURFACES TO RECEIVE NEW FINISH(ES).
3 CONTRACTOR TO DEVELOP AND PUBLISH INFECTION CONTROL PLAN AND SAFETY
PLAN FOR APPROVAL BY COR PRIOR TO BEGINNING THEIR WORK. PLAN TO
INCLUDE MEANS AND METHODS OF DEBRIS STAGING AND REMOVAL, BOTH
INTERNALLY AND EXTERNALLY.
4 INSTALL TEMPORARY DUST AND DEBRIS BARRIERS AND VESTIBULES AROUND
PROJECT LIMITS IN ACCORDANCE WITH THE VA'S INFECTON CONTROL PLAN.
TEMPORARY BARRIERS ARE NOT TO RESTRICT REQUIRED MEANS OF EGRESS
PATHS AND WIDTHS.
5 HAZARDOUS MATERIAL ABATEMENT IS REQUIRED IN PROJECT SCOPE. REF.
HA-SERIES DRAWINGS FOR ADDITIONAL INFORMATION.
6 REMOVE ALL INDICATED ACOUSTICAL CEILING TILE, OVERHEAD MECHANICAL
EQUIPMENT, A/C DUCTS AND RETURNS, LIGHT FIXTURES.
7 EXISTING TO REMAIN: ANY FIRE SPRINKLER HEADS, RISERS, VALVES, OF ANY
OTHER RELATED FIRE PROTECTION EQUIPMENT, UNLESS OTHERWISE NOTED.
8 FIELD VERIFY ALL EXISTING DIMENSIONS PRIOR TO ANY CONSTRUCTION OR
EQUIPMENT INSTALLATION. IMMEDIATELY NOTIFY COR OF ANY DISCREPANCY.
9 ALL EQUIPMENT IN HISTOLOGY LAB TO BE RELOCATED DURING DEMOLITION
10 ALL EXISTING DOORS, UNLESS OTHERWISE NOTED, ARE TO REMAIN. PROTECT
DURING DEMOLITION AND NEW CONSTRUCTION, AND ARE TO RECEIVE PAINT
WHERE NECESSARY.
11 CONTRACTOR TO SALVAGE AND PROPERLY STORE ALL TOILET ACCESSORIES,
FEMININE PRODUCT DISPENSERS AND BABY CHANGING STATIONS FOR RE-USE BY
VA. IF NOT REUSED IN THIS PROJECT TURN OVER ITEM TO VA.
12 THE EXTENT OF DEMOLITION WORK IS SHOWN ON DRAWINGS AND
SPECIFICATIONS.
13 THE USE OF EXPLOSIVES WILL NOT BE PERMITTED.
14 BURNING OF REMOVED MATERIALS FROM DEMOLISHED STRUCTURES WILL NOT BE
PERMITTED IN THE SITE.
15 CONDUCT DEMOLITION OPERATIONS AND THE REMOVAL OF DEBRIS TO ENSURE
MINIMUM INTERFERENCE WITH ANOTHER ADJACENT OCCUPIED OR USED SPACE.
16 PROVIDE COVERED PASSAGEWAY TO ENSURE THE SAVE PASSAGE OF PEOPLE
AROUND THE AREA OF DEMOLITION. CONDUCT OPERATIONS TO PREVENT DAMAGE
TO FALLING DEBRIS OR OTHER CAUSE TO ADJACENT SPACES. PROVIDE PHASING
PLAN FOR MATERIAL, WORK PERFORMED FOR APPROVAL.
17 DO NOT CLOSE OR OBSTRUCT CORRIDOR OR OCCUPIED SPACES WITHOUT
PERMISSION FROM THE COR. PROVIDE ALTERNATE ROUTES AROUND CLOSED OR
OBSTRUCTED TRAFFIC.
18 PROVIDE INTERIOR BRACING OR SUPPORTS AS REQUIRED TO PREVENT MOVEMENT
OR COLLAPSE OF ITEMS TO BE REMOVED OR DEMOLISHED DURING DEMOLITION
PHASE.
19 PROMPTLY REPAIR DAMAGE CAUSED TO ADJACENT SPACES BY DEMOLITION
OPERATIONS, AT NO COST TO THE VA.
20 MAINTAIN EXISTING UTILITIES, KEEP IN SERVICE AND PROTECT AGAINST DAMAGE
DURING DEMOLITION AND OPERATIONS.
21 DO NOT INTERRUPT EXISTING UTILITIES SERVING OCCUPIED SPACES, EXCEPT
WHEN AUTHORIZED BY COR.
22 PROVIDE TEMPORARY ENCLOSURES, AND OTHER SUITABLE METHODS AS
NECESSARY TO LIMIT THE AMOUNT OF DUST AND DIRT RISING AND SCATTERING IN
THE AIR TO THE LOWEST LEVELS OF AIR POLLUTION PRACTICAL FOR THE
CONDITION OF WORK. WRAP EITHER DUCT OPENING OR THE OUTLET WITH BLUE
CELLOPHANE TO PREVENT DUST FROM ENTERING OR REMOVE OUTLET OR GRILLE
AND INSTALL A CARD CAP TO PREVENT DUST FROM ENTERING. REMOVE AFTER
DEMO AND REPLACE WITH OUTLET. COMPLY WITH GOVERNMENT REGULATIONS.
23 CLEAN ADJACENT STRUCTURES AND IMPROVEMENTS FROM DUST, DIRT AND
DEBRIS CAUSED BY THE DEMOLITION WORK.
24 REMOVE FROM THE SITE ALL DEBRIS, RUBBLE AND OTHER MATERIALS RESULTING
FROM DEMOLITION WORK.
25 ALL DEBRIS PRODUCED BY THE DEMOLITION DUE TO REMOVAL OF CONSTRUCTION
MATERIAL OR EQUIPMENT, SHALL BE DISPOSED OFF SITE LEGALLY AND IN A TIMELY
MANNER.
26 ALL EXISTING EQUIPMENT NOT SHOWN ON THE DEMOLITION PLANS BUT FOUND ON
THE HOSPITAL, SHALL BE NOTIFIED TO THE COR PRIOR TO ANY ACTION TAKEN BY
THE CONTRACTOR.
27 ALL DEMOLITION WORK WILL BE COORDINATED WITH THE COR PRIOR TO
COMMENCING OF WORK.
28 REMOVE ALL EXISTING TACKBOARDS, BULLETIN BOARDS, PEGBOARDS, AND WALL
MOUNTED EQUIPMENT AND STORE FOR LATER RE-INSTALLATION
PLAN
NORTH
1" = 20'-0"2 DEMOLITION FLOOR PLAN - 5TH FLOOR
GENERAL DEMOLITION NOTES
? DEMOLITION KEY NOTES
1 EXISTING FLOORING AND BASE TO BE REMOVED. SEE SPECIFICATIONS FOR
FLOOR PREPARATION.
2 EXISTING STAIR RAILING TO BE REMOVED/ REPLACED. SEE STAIR DETAILS SHEET
AE504.
3 EXISTING WALL PROTECTION TO BE REMOVED.
4 EXISTING APPLIED WALL FINISH TO BE REMOVED.
5 EXISTING FLOOR TILE TO BE REMOVED.
6 EXISTING DOOR AND FRAME TO BE REMOVED.
7 EXISTING PLUMBING FIXTURE TO BE REMOVED. REFER TO PLUMBING DEMO
SHEETS.
8 EXISTING INTERIOR WALL TO REMAIN, PROTECT DURING DEMOLITION AND NEW
CONSTRUCTION.
9 EXISTING WATER FOUNTAIN TO BE REMOVED, LINES CAPPED, WALLS REPAIRED.
REFER TO PLUMBING DEMOLITION DRAWING FOR EXTENT OF WORK.
10 EXISTING FLOOR EXPANSION JOINT COVER. REFER TO DWG AE505 FOR
LOCATION AND DETAILS.
11 FIRE DOOR/ FRAME TO BE REMOVED/ REPLACED. TO BE DETERMINED BY FPC
12 EXISTING WALL MOUNTED RETURN AIR GRILL TO BE REMOVED.
13 EXISTING CIPHER LOCK AND HARDWARE TO BE REMOVED.
14 REMOVE AND STORE EXISTING WALL MOUNTED FIXTURES, EQUIPMENT,
ACCESSORIES, AND SIGNAGE FOR REUSE.
15 INTERIOR WALL TO BE REMOVED.
16 EXISTING STRUCTURE TO REMAIN. PROTECT DURING CONSTRUCTION.
17 EXISTING TOILET PARTITIONS TO BE REMOVED.
18 EXISTING FIRE RISER PIPES TO REMAIN. PROTECT DURING CONSTRUCTION.
19 EXISTING MARBLE SLAB DIRECTORY SIGN TO BE REMOVED, STORED FOR REUSE
E.J. NIC
A401
E.J. NIC
A402
E.J. NIC
B401
E.J. NIC
B402
E.J. NIC
A501
E.J. NIC
A502
E.J. NIC
B501
E.J. NIC
B502
P
FF
G
H
14 15 16
ELEVATOR
LOBBY
ELEVLOB3
STAIR #3
3-3
ELEV.
P-2
ELEV.
P-3
ELEV.
P-1
ELEV.
S-1
ELEV.
S-2
AE504.0
P F
F
G
H
14 15 16
ELEVATOR
LOBBY
ELEVLOB4
STAIR #3
3-4
ELEV.
P-2
ELEV.
P-3
ELEV.
P-1
ELEV.
S-1
ELEV.
S-2
AE504.0
P F
F
G
H
14 15 16
ELEVATOR
LOBBY
ELEVLOB5
STAIR #3
3-5
CORRIDOR
COR5C1
ELEV.
P-2
ELEV.
P-3
ELEV.
P-1
ELEV.
S-1
ELEV.
S-2
AE504.0
PF
UP
F
G
H
14 15 16
1ST FLOOR
ELEVATOR
LOBBY
ELEVLOB1
3-1
AE504.0
ELEV.
P-2
ELEV.
P-3
ELEV.
P-1
ELEV.
S-1
ELEV.
S-2
ATM
DN
P F
F
G
H
J
K
14 15 16
ELEVATOR
LOBBY
ELEVLOB2
COR2AB1
STAIR #3
3-2
1 3
AE504.0
ELEV.
P-2
ELEV.
P-3
ELEV.
P-1
ELEV.
S-1
ELEV.
S-2
PROJECT TEAM
V et er an s A ff ai rs D ep ar tm en t of
CHARLESTON, S.C.
Architect/Engineer
Seal Architect/Engineer AddressRevisions Date
Project No.
DRAWING NO.
Project Title
Building Number Checked Drawn
Location Dwg. Of
Drawing Title
Approved: Chief Engineering Service
JEFFERY A. SAGE
Approved: Project Manager
AVIS R. THOMAS
THESE DRAWINGS ARE
NOT TO BE USED FOR
CONSTRUCTION,
BIDDING, RECORDATION,
CONVEYANCE, SALES,
OR AS THE BASIS FOR
THE ISSUANCE OF A
PERMIT
Date CONSULTANTS
FULLY SPRINKLERED
DESIGN/BUILD
6/
/2
6:
:5
P
M
CONSTRUCTION DOCUMENTS SUBMISSION
RENOVATION OF COMMON
AND SUPPORT AREAS IN
BUILDING 1
534-15-105
AD105.0
06-30-2016
AEJMIV
22326
ENLARGED - ELEVATOR LOBBIES -
DEMOLITION PLANS
? DEMOLITION KEY NOTES
1 EXISTING FLOORING AND BASE TO BE REMOVED. SEE SPECIFICATIONS FOR
FLOOR PREPARATION.
2 EXISTING STAIR RAILING TO BE REMOVED/ REPLACED. SEE STAIR DETAILS SHEET
AE504.
3 EXISTING WALL PROTECTION TO BE REMOVED.
4 EXISTING APPLIED WALL FINISH TO BE REMOVED.
5 EXISTING FLOOR TILE TO BE REMOVED.
6 EXISTING DOOR AND FRAME TO BE REMOVED.
7 EXISTING PLUMBING FIXTURE TO BE REMOVED. REFER TO PLUMBING DEMO
SHEETS.
8 EXISTING INTERIOR WALL TO REMAIN, PROTECT DURING DEMOLITION AND NEW
CONSTRUCTION.
9 EXISTING WATER FOUNTAIN TO BE REMOVED, LINES CAPPED, WALLS REPAIRED.
REFER TO PLUMBING DEMOLITION DRAWING FOR EXTENT OF WORK.
10 EXISTING FLOOR EXPANSION JOINT COVER. REFER TO DWG AE505 FOR
LOCATION AND DETAILS.
11 FIRE DOOR/ FRAME TO BE REMOVED/ REPLACED. TO BE DETERMINED BY FPC
12 EXISTING WALL MOUNTED RETURN AIR GRILL TO BE REMOVED.
13 EXISTING CIPHER LOCK AND HARDWARE TO BE REMOVED.
14 REMOVE AND STORE EXISTING WALL MOUNTED FIXTURES, EQUIPMENT,
ACCESSORIES, AND SIGNAGE FOR REUSE.
15 INTERIOR WALL TO BE REMOVED.
16 EXISTING STRUCTURE TO REMAIN. PROTECT DURING CONSTRUCTION.
17 EXISTING TOILET PARTITIONS TO BE REMOVED.
18 EXISTING FIRE RISER PIPES TO REMAIN. PROTECT DURING CONSTRUCTION.
19 EXISTING MARBLE SLAB DIRECTORY SIGN TO BE REMOVED, STORED FOR REUSE
1/8" = 1'-0"3 DEMOLITION PLAN - 3RD FLOOR LOBBY
1/8" = 1'-0"4 DEMOLITION PLAN - 4TH FLOOR LOBBY
1/8" = 1'-0"5 DEMOLITION PLAN - 5TH FLOOR LOBBY
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
1/8" = 1'-0"1 DEMOLITION PLAN - 1ST FLOOR LOBBY
1/8" = 1'-0"2 DEMOLITION PLAN - 2ND FLOOR LOBBY
KEY PLAN
LEVEL 3 FFE: 025.56'
PLAN
NORTH KEY PLAN
LEVEL 4 FFE: 037.34'
PLAN
NORTH
KEY PLAN
PLAN
NORTH
LEVEL 5 FFE: 049.13'KEY PLAN
LEVEL 2 FFE: 013.78'
PLAN
NORTH
KEY PLAN
LEVEL 1 FFE: 000.00'
PLAN
NORTH
21 Should the Contractor encounter any existing equipment, piping, ductwork, electrical, data, supports that interfere with new work installation, they should remove/relocate same at no cost to the Government. REVISED FA 06.09.2017
File details come from the government source that posted it.