- Q301--Legionella Testing VISN 6
- Solicitation number
- 36C24626Q0491
About this file
This is a contract totals spreadsheet for VISN 6 water sampling requirements under Directive 1061, detailing quarterly sample collection activities across multiple VA facilities for fiscal year 2026 and option years. The document tracks water sampling operations for seven VA Medical Centers: Asheville (47 buildings), Durham (1 building), Fayetteville (1 building), Hampton (110 buildings), Richmond (500 buildings), Salem (12 buildings), and Salisbury (14 buildings), with a combined total of 3,674 base samples per year across all facilities.
The spreadsheet documents sample collection broken down by quarter, facility, and sample type—including base samples, resamples, and discretionary samples—with tracking columns for samples taken versus samples billed. Key contract requirements specify that samples must be collected from both hot and cold water systems at the distal point of delivery in rooms mutually identified by VA facility staff and contractor personnel. Option Year 3 encompasses four quarters running from July 2024 through June 2026, while the base year covered January through June 2022. The data indicates contract sample balances and carryover resamples between quarters, demonstrating ongoing tracking of the VA's legionella testing and water quality monitoring obligations across VISN 6 facilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24626Q0491 0004_1.docx | DOCX document | |
| S01 Solicitation 36C24626Q0491.pdf | ||
| 36C24626Q0491 0003.docx | DOCX document | |
| REVISED VISN 6 Legionella Testing Questions and Answers.xlsx | XLSX spreadsheet | |
| VISN 6 1061 Water Sampling Totals.xlsx | XLSX spreadsheet | |
| 36C24626Q0491 0002_1.docx | DOCX document | |
| Copy of VISN 6 1061 Water Sampling Totals by contract.xlsx | XLSX spreadsheet | |
| VISN 6 1061 Water Sampling Totals 02.xlsx | XLSX spreadsheet | |
| FY 2026 Contract Totals 2.xlsx | XLSX spreadsheet | |
| Copy of VISN 6 1061 Water Sampling Totals by contract Q2Q3 Agreed Upon.xlsx | XLSX spreadsheet | |
| VISN 6 1061 Water Sampling Totals by contract Q3Q4 Final.xlsx | XLSX spreadsheet | |
| Performance Work Statement WMP monitoring and Legionella Testing.docx | DOCX document | |
| VISN 6 Legionella Testing Questions and Answers.xlsx | XLSX spreadsheet | |
| 36C24626Q0491 0001_1.docx | DOCX document | |
| 36C24626Q0491_1.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VISN 6 Option Year 3
| VISN 6 Directive 1061 Water Sampling Requirements (Option Years) | Option Year 4: | Quarter 1 July 24 - Sept 24 | Quarter 2 October 25 - December 25 | Quarter 3 January 26 - March 26 | Quarter 4 April 26 - June 26 | ||||||||||||||||||||||||||||||||||||||||||||
| Facility | Bldgs | Qtr Samples | Base ST/Qtr | Base ST/Yr | Resamples/Yr | Discretionary Sample | Total/Yr3 | Facility | Bldgs | Qtr Samples | Base Samples Taken | Base Samples Billed | Resamples Taken | Resamples Billed | Discretionary Samples Taken | Discretionary Samples Billed | Total Samples Taken | Total Samples Billed | Remaining Samples Taken | Remaining Samples Billed | Base Samples Taken | Base Samples Billed | Resamples Taken | Resamples Billed | Discretionary Samples Taken | Discretionary Samples Billed | Total Samples Taken | Total Samples Billed | Remaining Samples Taken | Remaining Samples Billed | Facility | Bldgs | Qtr Samples | Base Samples Taken | Base Samples Billed | Resamples Taken | Resamples Billed | Discretionary Samples Taken | Discretionary Samples Billed | Total Samples Taken | Total Samples Billed | Remaining Samples Taken | Remaining Samples Billed | Facility | Bldgs | Qtr Samples | Base Samples Taken | Base Samples Billed | Resamples Taken |
| Asheville | 47 | 20 | 46 | 184 | 16 | 2 | 202 | Asheville | 47 | 20 | 42 | 42 | 0 | 0 | 0 | 0 | 42 | 42 | 8.5 | 8.5 | 39 | 39 | 39 | 39 | 11.5 | 11.5 | Asheville | 47 | 20 | 21 | 21 | 46 | 46 | 4.5 | 4.5 | Asheville | 47 | 20 | 20 | ||||||||||
| 62 | 20 | 62 | 20 | 62 | 20 | 19 | 19 | 5 | 5 | 62 | 20 | 20 | |||||||||||||||||||||||||||||||||||||
| CTs | 6 | CTs | 6 | CTs | 6 | 1 | 1 | CTs | 6 | 2 | |||||||||||||||||||||||||||||||||||||||
| Durham | 1 | 20 | 48 | 192 | 18 | 2 | 212 | Durham | 1 | 20 | 44 | 44 | 12 | 12 | 0 | 0 | 56 | 56 | -3 | -3 | 48 | 44 | 0 | 4 | 48 | 48 | 5 | 5 | Durham | 1 | 20 | 20 | 20 | 44 | 44 | 9 | 9 | Durham | 1 | 20 | 20 | ||||||||
| 23 | 20 | 23 | 20 | 23 | 20 | 20 | 20 | 23 | 20 | 20 | |||||||||||||||||||||||||||||||||||||||
| CTs | 8 | CTs | 8 | CTs | 8 | 4 | 4 | CTs | 8 | 4 | |||||||||||||||||||||||||||||||||||||||
| Fayetteville | 1 | 20 | 72 | 288 | 12 | 10 | 310 | Fayetteville | 1 | 20 | 62 | 79 | 4 | 4 | 17 | 0 | 83 | 83 | -5.5 | -5.5 | 62 | 62 | 10 | 10 | 72 | 72 | 5.5 | 5.5 | Fayetteville | 1 | 20 | 20 | 20 | 71 | 71 | 6.5 | 6.5 | Fayetteville | 1 | 20 | 20 | ||||||||
| 71 | 20 | 71 | 20 | 71 | 20 | 20 | 20 | 71 | 20 | 20 | |||||||||||||||||||||||||||||||||||||||
| 73 | 20 | 73 | 20 | 73 | 20 | 20 | 20 | 9 | 9 | 73 | 20 | 20 | |||||||||||||||||||||||||||||||||||||
| CTs | 12 | CTs | 12 | CTs | 12 | 2 | 2 | CTs | 12 | 2 | |||||||||||||||||||||||||||||||||||||||
| Hampton | 110 | 20 | 174 | 696 | 208 | 40 | 944 | Hampton | 110 | 20 | 141 | 141 | 75 | 75 | 0 | 0 | 216 | 216 | 20 | 20 | 139 | 139 | 139 | 139 | 97 | 97 | Hampton | 110 | 20 | 20 | 20 | 2 | 2 | 149 | 149 | 87 | 87 | Hampton | 110 | 20 | 20 | ||||||||
| 114 | 20 | 114 | 20 | 114 | 20 | 20 | 20 | 7 | 7 | 114 | 20 | 20 | |||||||||||||||||||||||||||||||||||||
| 137 | 20 | 137 | 20 | 137 | 20 | 20 | 20 | 2 | 2 | 137 | 20 | 20 | |||||||||||||||||||||||||||||||||||||
| 146 | 20 | 146 | 20 | 146 | 20 | 20 | 20 | 146 | 20 | 20 | |||||||||||||||||||||||||||||||||||||||
| 148 | 20 | 148 | 20 | 148 | 20 | 20 | 20 | 148 | 20 | 20 | |||||||||||||||||||||||||||||||||||||||
| CT 110B | 8 | CT 110B | 8 | CT 110B | 8 | 8 | 8 | CT 110B | 8 | 8 | |||||||||||||||||||||||||||||||||||||||
| CT 137 | 4 | CT 137 | 4 | CT 137 | 4 | 2 | 2 | CT 137 | 4 | 2 | |||||||||||||||||||||||||||||||||||||||
| CT 135 | 2 | CT 135 | 2 | CT 135 | 2 | CT 135 | 2 | 1 | |||||||||||||||||||||||||||||||||||||||||
| TR-1 | 18 | TR-1 | 18 | TR-1 | 18 | 18 | 18 | TR-1 | 18 | 18 | |||||||||||||||||||||||||||||||||||||||
| TR-2 | 16 | TR-2 | 16 | TR-2 | 16 | TR-2 | 16 | ||||||||||||||||||||||||||||||||||||||||||
| TR-3 | 16 | TR-3 | 16 | TR-3 | 16 | TR-3 | 16 | ||||||||||||||||||||||||||||||||||||||||||
| TR-4 | 10 | TR-4 | 10 | TR-4 | 10 | 10 | 10 | TR-4 | 10 | 10 | |||||||||||||||||||||||||||||||||||||||
| Richmond | 500 | 20 | 106 | 424 | 26 | 2 | 452 | Richmond | 500 | 20 | 108 | 108 | 2 | 2 | 0 | 0 | 110 | 110 | 3 | 3 | 104 | 104 | 4 | 4 | 108 | 108 | 5 | 5 | Richmond | 500 | 20 | 22 | 22 | 109 | 110 | 4 | 3 | Richmond | 500 | 20 | 20 | ||||||||
| 507 | 20 | 507 | 20 | 507 | 20 | 20 | 20 | 507 | 20 | 20 | |||||||||||||||||||||||||||||||||||||||
| 512 | 20 | 512 | 20 | 512 | 20 | 21 | 21 | 512 | 20 | ||||||||||||||||||||||||||||||||||||||||
| 513 | 20 | 513 | 20 | 513 | 20 | 20 | 20 | 513 | 20 | 20 | |||||||||||||||||||||||||||||||||||||||
| 514 | 20 | 514 | 20 | 514 | 20 | 21 | 21 | 514 | 20 | 20 | |||||||||||||||||||||||||||||||||||||||
| CTs | 6 | CTs | 6 | CTs | 6 | 3 | 3 | 2 | 3 | CTs | 6 | 4 | |||||||||||||||||||||||||||||||||||||
| Salem | 12 | 20 | 188 | 752 | 46 | 40 | 838 | Salem | 12 | 20 | 188 | 190 | 0 | 0 | 2 | 0 | 190 | 190 | 19.5 | 19.5 | 188 | 190 | 2 | 0 | 190 | 190 | 19.5 | 19.5 | Salem | 12 | 20 | 20 | 20 | 190 | 190 | 19.5 | 19.5 | Salem | 12 | 20 | 20 | ||||||||
| 143 | 20 | 143 | 20 | 143 | 20 | 20 | 40 | 20 | 143 | 20 | 20 | ||||||||||||||||||||||||||||||||||||||
| 17 | 20 | 17 | 20 | 17 | 20 | 20 | 20 | 17 | 20 | 20 | |||||||||||||||||||||||||||||||||||||||
| 170 | 20 | 170 | 20 | 170 | 20 | 20 | 20 | 170 | 20 | 20 | |||||||||||||||||||||||||||||||||||||||
| 2 | 20 | 2 | 20 | 2 | 20 | 20 | 20 | 2 | 20 | 20 | |||||||||||||||||||||||||||||||||||||||
| 2A | 20 | 2A | 20 | 2A | 20 | 20 | 20 | 2A | 20 | 20 | |||||||||||||||||||||||||||||||||||||||
| 7 | 20 | 7 | 20 | 7 | 20 | 20 | 20 | 7 | 20 | 20 | |||||||||||||||||||||||||||||||||||||||
| 75 | 2 | 75 | 2 | 75 | 2 | 2 | 4 | 75 | 2 | 2 | |||||||||||||||||||||||||||||||||||||||
| 77 | 20 | 77 | 20 | 77 | 20 | 0 | 77 | 20 | |||||||||||||||||||||||||||||||||||||||||
| 9 | 20 | 9 | 20 | 9 | 20 | 20 | 20 | 9 | 20 | 20 | |||||||||||||||||||||||||||||||||||||||
| Mains | 2 | 2 | 0 | Mains | 2 | 2 | |||||||||||||||||||||||||||||||||||||||||||
| CTs | 6 | CTs | 6 | CTs | 6 | 6 | 6 | CTs | 6 | 6 | |||||||||||||||||||||||||||||||||||||||
| Salisbury | 14E | 20 | 144 | 576 | 108 | 32 | 716 | Salisbury | 14E | 20 | 127 | 127 | 80 | 80 | 0 | 0 | 207 | 207 | -28 | -28 | 164 | 164 | 103 | 103 | 267 | 267 | -88 | -88 | Salisbury | 14E | 20 | 20 | 20 | 174 | 174 | 5 | 5 | Salisbury | 14E | 20 | 20 | ||||||||
| 2 | 20 | 2 | 20 | 2 | 20 | 20 | 20 | 1 | 1 | 2 | 20 | 20 | |||||||||||||||||||||||||||||||||||||
| 21 | 20 | 21 | 20 | 21 | 20 | 20 | 20 | 7 | 7 | 21 | 20 | 14 | |||||||||||||||||||||||||||||||||||||
| 4 | 20 | 4 | 20 | 11 | 20 | 20 | 20 | 11 | 20 | 20 | |||||||||||||||||||||||||||||||||||||||
| 42 | 20 | 42 | 20 | 42 | 20 | 20 | 20 | 11 | 11 | 42 | 20 | 20 | 9 | ||||||||||||||||||||||||||||||||||||
| 43 | 20 | 43 | 20 | 43 | 20 | 20 | 20 | 11 | 11 | 43 | 20 | 20 | 9 | ||||||||||||||||||||||||||||||||||||
| 8 | 20 | 8 | 20 | 8 | 20 | 20 | 20 | 8 | 20 | 20 | 2 | ||||||||||||||||||||||||||||||||||||||
| CTs | 4 | CTs | 4 | CTs | 4 | 4 | 4 | CTs | 4 | 4 | |||||||||||||||||||||||||||||||||||||||
| ST | 3,674 | ST | 904 | 904 | 14.5 | 14.5 | 863 | 863 | 55.5 | 55.5 | 706 | 726 | 57 | 58 | 20 | 0 | 783 | 784 | 135.5 | 134.5 | |||||||||||||||||||||||||||||
| Notes: | Contract Samples Left | 2,770 | 2,770 | Contract Samples Left | 1,907 | 1,907 | Contract Samples Left | 1,124 | 1,123 | ||||||||||||||||||||||||||||||||||||||||
| 1 | Samples are to be taken from both hot and cold water systems from the distall point of delivery. Samples to be taken in rooms mutually identified by VA facility staff and the contractor. | Q1 75 Hampton Resamples were not added to Oct spreadsheet at the time of billing | Q2 Hampton 52 Resamples were billed in 1Q | ||||||||||||||||||||||||||||||||||||||||||||||
| Q2 Salisbury had 2 CT resamples carryover from Q1, taken Sept 30 |
VISN 6 Option Years
| VISN 6 Directive 1061 Water Sampling Requirements (Option Years) | |||||||
| Facility | Bldgs | Qtr Samples | Base ST/Qtr | Base ST/Yr | Resamples/Yr | Discretionary Sample | Total/Yr3 |
| Asheville | 47 | 20 | 46 | 184 | 16 | 2 | 202 |
| 62 | 20 | ||||||
| CTs | 6 | ||||||
| Durham | 1 | 20 | 48 | 192 | 18 | 2 | 212 |
| 23 | 20 | ||||||
| CTs | 8 | ||||||
| Fayetteville | 1 | 20 | 72 | 288 | 12 | 10 | 310 |
| 72 | 20 | ||||||
| 73 | 20 | ||||||
| CTs | 12 | ||||||
| Hampton | 110 | 20 | 174 | 696 | 208 | 40 | 944 |
| 114 | 20 | ||||||
| 137 | 20 | ||||||
| 146 | 20 | ||||||
| 148 | 20 | ||||||
| CT 110B | 8 | ||||||
| CT 137 | 4 | ||||||
| CT 135 | 2 | ||||||
| TR-1 | 18 | ||||||
| TR-2 | 16 | ||||||
| TR-3 | 16 | ||||||
| TR-4 | 10 | ||||||
| Richmond | 500 | 20 | 106 | 424 | 26 | 2 | 452 |
| 507 | 20 | ||||||
| 512 | 20 | ||||||
| 513 | 20 | ||||||
| 514 | 20 | ||||||
| CTs | 6 | ||||||
| Salem | 12 | 20 | 188 | 752 | 46 | 40 | 838 |
| 143 | 20 | ||||||
| 17 | 20 | ||||||
| 170 | 20 | ||||||
| 2 | 20 | ||||||
| 2A | 20 | ||||||
| 7 | 20 | ||||||
| 75 | 2 | ||||||
| 77 | 20 | ||||||
| 9 | 20 | ||||||
| CTs | 6 | ||||||
| Salisbury | 14E | 20 | 144 | 576 | 108 | 32 | 716 |
| 2 | 20 | ||||||
| 21 | 20 | ||||||
| 4 | 20 | ||||||
| 42 | 20 | ||||||
| 43 | 20 | ||||||
| 8 | 20 | ||||||
| CTs | 4 | ||||||
| ST | 3,674 | ||||||
| Notes: | |||||||
| 1 | Samples are to be taken from both hot and cold water systems from the distall point of delivery. Samples to be taken in rooms mutually identified by VA facility staff and the contractor. |
VISN 6 Base Year (Jan-June)
| VISN 6 Directive 1061 Water Sampling Requirements Base Year Jan 1-June 30, 2022 | |||||||
| Facility | Bldgs | Qtr Samples | Base ST/Qtr | Base ST/Yr | Resamples/Yr | Discretionary Sample | Total/Yr3 |
| Asheville | 47 | 20 | 46 | 92 | 8 | 1 | 101 |
| 62 | 20 | ||||||
| CTs | 6 | ||||||
| Durham | 1 | 20 | 48 | 96 | 9 | 1 | 106 |
| 23 | 20 | ||||||
| CTs | 8 | ||||||
| Fayetteville | 1 | 20 | 72 | 144 | 12 | 5 | 161 |
| 72 | 20 | ||||||
| 73 | 20 | ||||||
| CTs | 12 | ||||||
| Hampton | 110 | 20 | 174 | 348 | 104 | 20 | 472 |
| 114 | 20 | ||||||
| 137 | 20 | ||||||
| 146 | 20 | ||||||
| 148 | 20 | ||||||
| CT 110B | 8 | ||||||
| CT 137 | 4 | ||||||
| CT 135 | 2 | ||||||
| TR-1 | 18 | ||||||
| TR-2 | 16 | ||||||
| TR-3 | 16 | ||||||
| TR-4 | 10 | ||||||
| Richmond | 500 | 20 | 106 | 212 | 13 | 2 | 227 |
| 507 | 20 | ||||||
| 512 | 20 | ||||||
| 513 | 20 | ||||||
| 514 | 20 | ||||||
| CTs | 6 | ||||||
| Salem | 12 | 20 | 188 | 376 | 23 | 20 | 419 |
| 143 | 20 | ||||||
| 17 | 20 | ||||||
| 170 | 20 | ||||||
| 2 | 20 | ||||||
| 2A | 20 | ||||||
| 7 | 20 | ||||||
| 75 | 2 | ||||||
| 77 | 20 | ||||||
| 9 | 20 | ||||||
| CTs | 6 | ||||||
| Salisbury | 14E | 20 | 144 | 288 | 54 | 16 | 358 |
| 2 | 20 | ||||||
| 21 | 20 | ||||||
| 4 | 20 | ||||||
| 42 | 20 | ||||||
| 43 | 20 | ||||||
| 8 | 20 | ||||||
| CTs | 4 | ||||||
| ST | 1,844 | ||||||
| Notes: | |||||||
| 1 | Samples are to be taken from both hot and cold water systems from the distall point of delivery. Samples to be taken in rooms mutually identified by VA facility staff and the contractor. |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .