5thFlr_Electrical.pdf

PDF 4 MB Posted

Attached to
6515--OR LIGHT-EQUIPMENT AND ANESTHESIA BOOM Federal contract opportunity
Solicitation number
36C24626Q0418
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This document is a set of architectural and electrical construction drawings for the VA Charlotte Health Care Center facility in Charlotte, North Carolina. The drawings were prepared by RPA Design and issued for construction on July 21, 2014.

The document includes multiple detailed floor plans and electrical schematics across several levels of the facility. The primary electrical fifth floor overall plan shows the complete layout of electrical infrastructure, including electrical rooms (ELEC2 5B28E and 5D14E), and various distribution systems throughout the floor. Additional sheets provide enlarged views of specific electrical rooms on the fourth and fifth floors, as well as penthouse levels (6B01E, 6C001, 6D03E), detailing equipment locations, circuit distributions, and technical specifications for each space. The drawings also contain an enlarged general operating room plan (room 5B12) showing operating equipment placement, boom light systems, anesthesia gas delivery systems, and electrical outlet locations at varying heights (+42", +48", +86", +96"). Supporting technical details include typical telecommunications room configurations for floors one through five, ladder rack and junction box mounting specifications, and telecommunications grounding busbar details. The construction drawings specify equipment scheduling, general notes for electrical installation, and coordination requirements between multiple trades. All drawings are marked "Issued for Construction" and include standard VA form notations (VA Form 08-6231) with architect contact information for three office locations.

View the file

Other files for this federal contract opportunity

Other files attached to 6515--OR LIGHT-EQUIPMENT AND ANESTHESIA BOOM, newest first.
File Type Posted
5-6thFlr_Structural.pdf PDF
AllPanelSch_Electrical.pdf PDF
5thFlrMG_Mechanical_Plumbing_FireProtection.pdf PDF
5thFlrArch Vol2 Binder1.pdf PDF
36C24626Q0418 0002.pdf PDF
36C24626Q0418 0001.pdf PDF
FP_KHCC_3rd_Floor_11-01-2024.pdf PDF
FP_CHCC_5th_Floor_01-15-2025.pdf PDF
36C24626Q0418_1 - OR Lights and Booms.pdf PDF
Attachment A - Line-Item Spreadsheet.xlsx XLSX spreadsheet
36C24626Q0418_2.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

876543

E

F

G

H

I

J

K

L

10 11 12 13 14

B

C

D

M

14.59

E.5

F.5

9.4

8.7

A

F.2

4.5 5.7

5.2

AA

D.6

14.313.89.3

K.4

H.6

G.1 A'

B'

X'

Y'

5.5

13.7

A.3

F.1

G.7

3.5

E405

E405

E405

E414

E415

E417

ELECTRICAL

ELEC2

5B28ESTAIR 3

5S03

TELECOM

TETR1

5B45T

TELECOM

TETR1

5D04T

STAIR 5

5S05

ELECTRICAL

ELEC2

5D14E

STAIR 7

5S07

STAIR 6

5S06

TELECOM

TETR1

5E49T

ELECTRICAL

ELEC2

5E36E

POLICE

XXYYC.2

5D15

TRAIN

CRA01

5E46

REC. ROOM

RECP1.1

5E47

GROUP

CRA02

5E04

CORRIDOR

5ECOR07

TOILET F

TLTU1

5E22R

TOILET M

TLTU1

5E23R

RECEPTION

RECP1

5E02

STAFF LOUNGE

SL001.2

5E31

TOILET, STAFF

TLTU1

5E35R

HAC

JANC1

5E11

STORAGE

SRS01.3

5E43

TOILET, STAFF

TLTU1

5E32R

EXAM

EXRG3A

5E29

OFFICE

OFA01

5E38

OFFICE

OFA01

5E39

COPY RM

RPR01

5E03

SURG / STAFF LOUNGE

SL001.2

5B23

CONFERENCE

CRA03

5E45

GENERAL OP RM

ORGS1

5B12

GENERAL OP RM

ORGS1

5B15

GENERAL OP RM

ORGS1

5B03

GENERAL OP RM

ORGS1

5B06

SCRUB

ORSA1

5B05

SUBSTERILE AREA

ORSR1.1

5B04

SCRUB

ORSA1

5B14

SUBSTERILE AREA

ORSR1

5B13

CLEAN CORE

ORCW1

5B07

COMM CENTER

NSTA4

5B19

STO EQ/APP

SRE01.5

5B02

STO EQ/APP

SRE01

5B17

ANESTH WORK/ EQ STO

ANCW1

5B21

HAC, LARGE

JANC1

5B44

NERVE BLOCK

TRGS1

5B16

CLEAN CART

CHC01

5B10

STO GURNEY

SRLW1.2

5B01

STO GURNEY

SRLW1.2

5B20

PATHOLOGIST OFFICE

OFD03

5B33

LOCKERS, F

LR002

5B22

TLT/SHOWER, F STAFF

TLTS1

5B22R

TLT/SHOWER, M STAFF

TLTS1

5B24R

LOCKERS, M

LR002

5B24

CONFERENCE/CLASSROOM

CRA01

5B43

RECOVERY

RROP1

5C49

NURSE STATION

NSTA1

5C41MED PREP

MEDP1

5C38 CRASH CART

RCA01

5C15

TOILET, PATIENT

TLTU1

5C40R

TOILET, PATIENT

TLTU1

5C33R

SURG/ PA WORK

WRCH1

5B29

OFFICE, CHIEF

OFC01

5B31

ADMIN

OFA02

5B32

EGD PROC.

TREE1

5C12

EGD PROC.

TREE1

5C11

EGD PROC.

TREE1

5C14

EGD PROC.

TREE1

5C13

CLEAN UTILITY

UCCL1.1

5C10

SOILED HOLD - SCOPE

USCL2.2

5C08

SOILED UTILITY

USCL1

5C09

DICT / VIEW

XVC01

5D11

COPY RM

RPR01

5D20

PRE-OP

RRSS3

5C67

PRE-OP

RRSS3

5C53

NURSE

NSTA4

5C56

MED PREP

MEDP1.1

5C55

TOILET, STAFF

TLTU1

5C35R

TOILET, STAFF

TLTU1

5C65R

STRCHR/WC

SRLW1.3

5C62

HAC

JANC1

5C24

CONSENT

OFDC2.1

5D10

WAITING AREA, FAMILY

WRF01

5D07

WAITING AREA

WRC01

5D36

TOILET

TLTU1

5D34R

WAITING

WRC01

5D16

CORRIDOR

5DCOR02

TOILET

TLTU1

5D37R

GI INFUSION

OPCT1

5D47

MED

MEDP1.1

5D49

LINEN / EQ

SRS01

5D29

CLEAN UTILITY

UCCL1.1

5D28

SOILED HOLD

USCL1.1

5D27

HAC

JANC1

5C01

MP EXAM

EXRG3

5D22

MP EXAM

EXRG3

5D21

MP EXAM

EXRG3

5D24

MP EXAM

EXRG3

5D25

STRETCHER

SRLW1

5D50

LPN / PA

OFA02

5D52

LPN / PA

OFA02

5D51

OFFICE, PHYSICIAN

OFD03

5D42 OFFICE, PHYSICIAN

OFD03

5D44

CONF/WORK

CRA01

5D12

STAFF WORK

WRCH1

5D31

SP EXAM

EXRG3

5D43

SP EXAM

EXRG3

5D39

SP EXAM

EXRG3

5D41

CYSTO OP

ORCS1

5C18

HAC, CYSTO

JANC1

5C17

LINEN / EQ

SRS01

5C22

SCRUB

ORSA1.1

5C16

CONTROL

XDCY1

5C19

BRONCH. PROCEDURE

TRPE2

5C06

CONTROL

OFA03.1

5C07

TOILET, PATIENT

TLTU1

5C06R

STAFF LOUNGE

SL001

5C02

STAFF WORK AREA

WRCH1

5D32

STO GAS CYL

SRGC1

5B26

SOIL HOLD

SRHM1

5B34

DICTATION

OFA03.3

5B41

CLEAN UTILITY

UCCL1

5C39

SOILED UTILITY

USCL1

5C37

TOILET, STAFF

TLTU1

5C04R

EQ STORAGE

SRSE1

5C28

FRZN SECT LAB

LBEM2

5B35

STAIR 1

5S01

ELEVATOR LOBBY

ELEV1

5B27

ELEVATOR LOBBY

ELEV1

5D13

LINEN

LCCL1.1

5D26

PRE-OP

RRSS3

5C68

PRE-OP

RRSS3

5C64

PRE-OP

RRSS3

5C63

PRE-OP

RRSS3

5C54

PRE-OP

RRSS3

5C57

PRE-OP

RRSS3

5C52

CONSENT

OFDC2.1

5D09

TOILET, PATIENT

TLTU1

5D47R

TOILET, PATIENT

TLTU1

5C51R

RECOVERY

RROP1

5C48

RECOVERY, ISO

RROP1.1

5C43

RECOVERY

RROP1

5C45

RECOVERY

RROP1

5C44

RECOVERY

RROP1

5C27

RECOVERY

RROP1

5C50

RECOVERY

RROP1

5C29

RECOVERY

RROP1

5C26

RECOVERY

RROP1

5C31

RECOVERY

RROP1

5C32

RECOVERY

RROP1

5C25

INSTR PREP

ORCW1.1

5C21

LOCKERS

LR001

5C04

NURSE/TECH WORK

WRCH1

5B39

INSTR. STAGE

ORCW1.1

5B09

HAC, STERILE

JANC1

5B11

LINEN

LCCL1.2

5C66

BLIND VENDING

BX001

5D01

HEAD NURSE

OFA02

5B42

LINEN

SRS01

5B08

HAC

JANC1

5C61

HISTOL.

LMHS2

5B36

CYTOL

LMCY3

5B37

NURSE/TECH WORK

WRCH1

5B40

TOILET, PATIENT

TLTU1

5C59R

STAIR 2

5S02

TOILET, STAFF

TLTU1

5C42R

SP PROCEDURE

TRGM1

5C23

PRE-OP, ISO

RRSS3.1

5C58

NURSE STATION

NSTA1

5C34

OFFICE / EXAM

OFD03.1

5D23

RECEPTION

RECP1

5D17

TOILET, STAFF

TLTU1

5C03R

LOCKERS

LR001

5C03

SURG/ PA WORK

WRCH1

5B38

STO GURNEY

SRLW1.2

5B25

STERILE SUPPLIES

ORSS1.1

5B18

TOILET, PT

TLTU1

5C23R

NURSE STATION

NSTA1.2

5D48

TOILET F

TLTF2

5D05R

TOILET M

TLTM2

5D06R

OFFICE, RN(MH)

OFD03

5D46

OFFICE, RN(MH)

OFD03

5D45

ELEVATOR LOBBY

ELEV1

5D02

CORRIDOR

5ECOR09

CORRIDOR

5DCOR01

CORRIDOR

5BCOR06

CORRIDOR

5BCOR01

CORRIDOR

5BCOR08

CORRIDOR

5BCOR03

CORRIDOR

5BCOR04

CORRIDOR

5CCOR04

CORRIDOR

5CCOR05

CORRIDOR

5CCOR01

CORRIDOR

5DCOR04

CORRIDOR

5DCOR03

CORRIDOR

5CCOR14

CORRIDOR

5CCOR12

CORRIDOR

5CCOR10

CORRIDOR

5CCOR06

CORRIDOR

5CCOR03

CORRIDOR

5CCOR08

CORRIDOR

5DCOR06

CORRIDOR

5DCOR07

CORRIDOR

5DCOR14

CORRIDOR

5DCOR08

CORRIDOR

5DCOR09

CORRIDOR

5DCOR16

CORRIDOR

5DCOR18

CORRIDOR

5ECOR03

CORRIDOR

5ECOR02

CORRIDOR

5ECOR05

CORRIDOR

5ECOR11

CORRIDOR

5ECOR14

CORRIDOR

5ECOR01

CORRIDOR

5CCOR02

SPEC. RECV.

LBSP1.1

5D19

CORRIDOR

5BCOR05

SOILED HOLD

USCL1.1

5E14

CORRIDOR

5ECOR12

CRASH CART

RCA01

5E06

EXAM

EXRG3A

5E28

EXAM

EXRG3A

5E26

EXAM

EXRG3A

5E25

EXAM

EXRG3

5E41

EXAM

EXRG3

5E42

EXAM

EXRG3A

5E19

EXAM

EXRG3A

5E18

EXAM

EXRG3A

5E17

EXAM

EXRG3A

5E07

EXAM

EXRG3A

5E08

EXAM

EXRG3A

5E09

EXAM

EXRG3A

5E10

TOILET, PATIENT

TLTU1

5E21R

TOILET, PATIENT

TLTU1

5E16R

TRAIN

CRA01

5E44

CRASH CART

RCA01.1

5E24

CRASH CART

RCA01.1

5E33

CRASH CART

RCA01.1

5E34

OFFICE

OFA01

5E40

TREATMENT / PROC

TRGM1.1

5E27

TREATMENT / PROC

TRGM1.1

5E05

CORRIDOR

5DCOR05

CORRIDOR

5ECOR04

LAB

LMCH1.1

5E30

LINEN

LCCL1.1

5C42D

NOUR

NCWD1

5C42E

E419

Sim

E419

Sim

E419

Sim

E413

CORRIDOR

5BCOR02

TOILET

TLTU1

5D38R

WAITING AREA

WRC01

5E01

CORRIDOR

5ECOR06

CORRIDOR

5ECOR06

TEAMLET

NSTA4

5E13

CORRIDOR

5ECOR10

MED.

MEDP1.2

5E20

CORRIDOR

5ECOR16

TOILET

TLTU1

5D33R

CART CTRL

5B29A

COPY RM

RPR01

5D18

CLEAN UTILITY

UCCL1.1

5E15

CART CTRL

5B37A

CART CTRL

5D19A

ELEV. P3-P4

P3-P4

ELEV. P1-P2

P1-P2

CARTLIFT CL1

CL1

CARTLIFT CL2

CL2

ELEV. S3-S4

S3-S4

ELEV. S1-S2

S1-S2

DUMBWAITER D1-D2

D1-D2

EXAM/OFFICE

OFD03

0B42

Revisions:

2 3 4 5 6 7 8 9

Date

Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

VA FORM 08-6231

on e eig hth in ch o ne f oo t on e qu art er inc h on e foo t thr ee e igh ths in ch o ne fo ot on e ha lf inc h on e foo t thr ee q ua rte rs inc h on e foo t

6" on e inc h on e foo t

6" on e an d on e ha lf inc he s on e foo t

6" thr ee in ch es o ne fo ot

6"

5960 Fairview Road Suite 500 Charlotte, NC 28210 704.887.3500

704.887.3507 fax

1201 Peachtree St., NE 400 Colony Square Suite 1600 Atlanta, GA 30361 Voice: 404.898.9620 Fax: 404.898.9659

1821 Cumberland Ave Suite #100 Charlotte, North Carolina 28203

(704) 348-3097

500-K Clanton Road Charlotte, NC 28217

(704) 525-2003

VA Charlotte Health Care Center

SFO# VA-101-10-RP-0081

Charlotte, NC

This document is the property of RPA Design (including consultants) and RPA Design retains all rights therein, including copyrights.

It may only be used in a manner consistent with RPA Design's rights while RPA Design is providing services for the specific project identified or referred to herein or extensions thereto.

It may not be used for any other purpose ecept with the express written agreement of, and compensation to, RPA Design.

8/3 /20

9:

:06

AM

BCERJA

E105

ELECTRICAL FIFTH FLOOR

OVERALL PLAN

07/21/2014

ISSUED FOR CONSTRUCTION

016' 16' 32'

1/16" = 1'-0"

1 ELECTRICAL FIFTH FLOOR OVERALL PLAN

F P

F P

F P

CR

F P

F P

F P

J

F P

B

A.3

ALS5

AHS5

T-ALS5

T-AL5A

AL5A

T-AL5B AL5B

T-ALC5

ALC5

AH5

ELECTRICAL

ELEC2

5B28E

ABOVE

AHC5

AL5A

ALC5

ALC5-26,28ALC5-26,28

FCU-5A02 FCU-5A03

ABOVE

E.5

T-BL5A

T-BL5B

BL5A

BH5 BL5B

ELECTRICAL

ELEC2

5D14E

ABOVE

BLC5

BL5B

BLC5

FCU-5B03

FCU-5B02

BLC5-25,27

BLC5-25,27

T-BLC5

ABOVE

14.313.8

K.4

13.7

T-CL5B

T-CL5A

CL5B

CL5A

CH5

T-CLS5

CLS5CHS5

ELECTRICAL

ELEC2

5E36E

ABOVE

7 31

CL5B

CLQP

CLQP-8,10

FCU-5C02

ABOVE

A.3

ALQP

T-ALP T-ALQP

AHP

AHQP

ELECTRICAL

ELEC2

6B02E

ALP

FCU-6A01

ALQP-17,19

W 2

ALP

ALQP

3 14.5

E.5

BLP

T-BLP

BHP

ELECTRICAL

ELEC2

6D03E

BHQP

BLP

BLQP

FCU-6B01

BLQP-9,11

W

T-BLQP BLQP

14.313.8

K.4

13.7

CLP

T-CLP

CHP

ELECTRICAL

ELEC2

6E02E

CHQP

CLP

CLQP

CLQP-8,10

FCU-6C01

CLQP-1

VAV-X

W

CLQP

T-CLQP

E.5

T-BL4A

T-BL4B

BL4A

BH4 BL4B

ELECTRICAL

ELEC2

4D21E

ABOVE

BL4B

BLC5

BLC5-25,27

FCU-4B02

TAP-BH4

Revisions:

2 3 4 5 6 7 8 9

Date

Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

VA FORM 08-6231

on e eig hth in ch o ne f oo t on e qu art er inc h on e foo t thr ee e igh ths in ch o ne fo ot on e ha lf inc h on e foo t thr ee q ua rte rs inc h on e foo t

6" on e inc h on e foo t

6" on e an d on e ha lf inc he s on e foo t

6" thr ee in ch es o ne fo ot

6"

5960 Fairview Road Suite 500 Charlotte, NC 28210 704.887.3500

704.887.3507 fax

1201 Peachtree St., NE 400 Colony Square Suite 1600 Atlanta, GA 30361 Voice: 404.898.9620 Fax: 404.898.9659

1821 Cumberland Ave Suite #100 Charlotte, North Carolina 28203

(704) 348-3097

500-K Clanton Road Charlotte, NC 28217

(704) 525-2003

VA Charlotte Health Care Center

SFO# VA-101-10-RP-0081

Charlotte, NC

This document is the property of RPA Design (including consultants) and RPA Design retains all rights therein, including copyrights.

It may only be used in a manner consistent with RPA Design's rights while RPA Design is providing services for the specific project identified or referred to herein or extensions thereto.

It may not be used for any other purpose ecept with the express written agreement of, and compensation to, RPA Design.

8/1 /20

4:

:23

PM

BCERJA

E405

ENLARGED ELECTRICAL ROOMS

07/21/2014

ISSUED FOR CONSTRUCTION

04' 4' 8'

1/4" = 1'-0"

2 FIFTH FLOOR ENLARGED ELECTRICAL ROOM 5B28E

04' 4' 8'

1/4" = 1'-0"

3 FIFTH FLOOR ENLARGED ELECTRICAL ROOM 5D14E

04' 4' 8'

1/4" = 1'-0"

4 FIFTH FLOOR ENLARGED ELECTRICAL ROOM 5E36E

04' 4' 8'

1/4" = 1'-0"

5 PENTHOUSE ENLARGED ELECTRICAL ROOM 6B01E

04' 4' 8'

1/4" = 1'-0"

7 PENTHOUSE ENLARGED ELECTRICAL ROOM 6D03E

04' 4' 8'

1/4" = 1'-0"

6 PENTHOUSE ENLARGED ELECTRICAL ROOM 6C001

04' 4' 8'

1/4" = 1'-0"

1 FOURTH FLOOR ENLARGED ELECTRICAL ROOM 4D21E

GENERAL NOTES:

1. REFER TO E508 FOR TRANSFORMER MOUNTING

DETAIL FOR CEILING HUNG TRANSFORMERS.

J

J

J

J

J

J

J

WP

WP

J

J J

P

TW

AD

F P

F P

C

GENERAL OP RM

ORGS1

5B12

+42"

+42"

+42"

+42"

+42"

+48"

N-ISO-5B12 C-ISO-5B12

5 5

ALS5-6

AAP-2

BOOM LIGHT

C-ISO-5B12-11

W

ANESTHESIA 3 GAS

+86"

+42"

+42" +42"+42" +42"

+42"

+42"

+42"

ANESTHESIA MED

TABLE

C-ISO-5B12-16

+96"

CART

SURGE.

CASE

EQUIPMENT BOOM

N-ISO-5B12-6

C-ISO-5B12-14

+86"

C-ISO-5B12-12

ALC5-15

SD-5

SD-5

SD-5 SD-5

ALC5-45

ALC5-30 ALC5-2

2 2

A

B

C

D

E

F

G

H

J

N-ISO-5B12

C-ISO-5B12

CLOCK

+86"

Revisions:

2 3 4 5 6 7 8 9

Date

Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

VA FORM 08-6231

on e eig hth in ch o ne f oo t on e qu art er inc h on e foo t thr ee e igh ths in ch o ne fo ot on e ha lf inc h on e foo t thr ee q ua rte rs inc h on e foo t

6" on e inc h on e foo t

6" on e an d on e ha lf inc he s on e foo t

6" thr ee in ch es o ne fo ot

6"

5960 Fairview Road Suite 500 Charlotte, NC 28210 704.887.3500

704.887.3507 fax

1201 Peachtree St., NE 400 Colony Square Suite 1600 Atlanta, GA 30361 Voice: 404.898.9620 Fax: 404.898.9659

1821 Cumberland Ave Suite #100 Charlotte, North Carolina 28203

(704) 348-3097

500-K Clanton Road Charlotte, NC 28217

(704) 525-2003

VA Charlotte Health Care Center

SFO# VA-101-10-RP-0081

Charlotte, NC

This document is the property of RPA Design (including consultants) and RPA Design retains all rights therein, including copyrights.

It may only be used in a manner consistent with RPA Design's rights while RPA Design is providing services for the specific project identified or referred to herein or extensions thereto.

It may not be used for any other purpose ecept with the express written agreement of, and compensation to, RPA Design.

8/1 /20

4:

:11

PM

BCERJA

E414

ENLARGED GENERAL

OPERATING ROOM

07/21/2014

ISSUED FOR CONSTRUCTION

02' 2' 4'

1/2" = 1'-0"

1 ENLARGED GENERAL OPERATING ROOM

1. ALL LIGHTING, BOOMS, HVAC AND MED GAS SUPPLIES SHALL BE COORDINATED

WITH EQUIPMENT MANUFACTURER. VERIFY EXACT LOCATION PRIOR TO ROUGH-

IN.

2. VERIFY BOOM LIGHT CONTROL WITH MANUFACTURER. LOCATION OF

CONTROLLER WILL BE SET BY OWNER/USER.

3. VERIFY RACEWAY REQUIREMENTS WITH USERS AND EQUIPMENT VENDOR.

GENERAL NOTES:

F P

J

CR

CR

J

PB

ID

D

F P

CR

J

O

PB

ID

D

C R

F P

C R

J

J

ID

C R

P B

D

TWO DEDICATED DUPLEX MOUNTED TO

SIDE OF LADDER RACK ABOVE

VERTICAL WIRE MANAGER BY EC,

TYPICAL. MOUNT WITH BOTTOM OF

BOX FLUSH WITH BOTTOM OF RAIL.

ELECTRICAL CONDUIT

USE B-LINE #SB1154 OR EQUIVALENT TO MOUNT J-BOX

TO SIDE OF LADDER RACK. DRILL SIDE RAIL AND

ATTACH STANDOFF WITH SUPPLIED HEX HEAD CAP

SCREWS AND LOCK WASHERS. ATTACH J-BOX IN

SIMILAR FASHION.

B-LINE #SB1154

OR EQUIVALENT

ISOLATOR

HEX HEAD CAP

SCREW

LOCK

WASHER

2"

1'-31/2"

5/8" 1"

9"

11/8"

TYP.

SECTION VIEWFRONT VIEW

5/16"Ø

7/16"Ø

LOCK

WASHER

HEX HEAD CAP

SCREW

ISOLATOR

WALL

MOUNTING

BRACKET

F.2

5.2

T8 T5

TYP.

TYP.

FMS

SPACE

OIT

SPACE

T16

TYP.

T17

T15

T4 T4

T4 T4

E517

E517

T10

T9

T10

T9

T14 T14

T15

T15 T14 T15 T14

SPACE RESERVED FOR

TIME WARNER CATV

EQUIPMENT

WALL MOUNTED

SECURITY PANELS

TEMPERATURE

CONTROL PANEL

"FAJB" - FOR FIRE

ALARM SYSTEM

PANEL

ALC1T

T8

T5

TYP.

TYP.

FMS

SPACE

OIT

SPACE

3' - 0"

T16

T17

T4

T4

T4

T4

TYP.

T10

T9

T9

T10

T15

T14

T15

T14

T15

T14

T15

T14

SPACE RESERVED FOR

WALL MOUNT PAGING

EQUIPMENT

WALL MOUNTED

SECURITY PANELS

SPACE RESERVED FOR

TIME WARNER CATV

EQUIPMENT

"FAJB" - FOR FIRE

ALARM SYSTEM

PANEL

BLC1T

109.4

9.3

K.4

T8

T5

TYP.

TYP.

FMS

SPACE

OIT

SPACE

3' - 0"

T16

TYP.T17

T4

T4

T4

T4

T9

T10 T9

T10

T14

T15

T14

T15

T14

T14

T15

SPACE RESERVED FOR

TIME WARNER CATV

EQUIPMENT

WALL MOUNTED

SECURITY PANELS

TEMPERATURE

CONTROL PANEL

CLC1T

"FAJB" - FOR FIRE

ALARM SYSTEM

PANEL

Revisions:

2222 3333 4444 5555 6666 7777 8888 9999

Date

Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

1111 2222 3333 4444 5555 6666 7777 8888 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

5960 Fairview Road

Suite 500

Charlotte, NC 28210

704.887.3500

704.887.3507 fax

1201 Peachtree St., NE 400 Colony Square

Suite 1600

Atlanta, GA 30361

Voice: 404.898.9620

Fax: 404.898.9659

1821 Cumberland Ave

Suite #100

Charlotte, North Carolina 28203

(704) 348-3097

500-K Clanton Road

Charlotte, NC 28217

(704) 525-2003

VA Charlotte Health Care Center

SFO# VA-101-10-RP-0081

Charlotte, NC

BCSW07/21/2014

E419

ISSUED FOR CONSTRUCTION

TYPICAL ENLARGED TELECOMM

ROOMS FLOORS 1-5

02' 2' 4'

1/2" = 1'-0"

1 FIRST FLOOR ENLARGED TELECOMM ROOM 1B01T

02' 2' 4'

1/2" = 1'-0"

2 FIRST FLOOR ENLARGED TELECOMM ROOM 1D17T

02' 2' 4'

1/2" = 1'-0"

3 FIRST FLOOR ENLARGED TELECOMM ROOM 1E55T

SHEET KEY NOTES:

GENERAL SHEET NOTES - PLAN

1 FOR CIRCUITING DETAILS, REFER TO ELECTRICAL

POWER EP SHEETS.

T4 19" X 84" 2-POST EQUIPMENT RACK BY SCC.

TYPICAL

T5 12" LADDER RACK AT +90" AFF.

T8 3/4" X 4' X 8' AC GRADE PLYWOOD MOUNTED

WITH TOP OF PLYWOOD AT 102" AND

BOTTOM AT 6". PAINT PLYWOOD WITH TWO

COATS OF FIRE RETARDANT WHITE PAINT.

FIRE STAMP TO REMAIN VISIBLE.

T9 (4) 4" RISER SLEEVES TO FLOOR BELOW

T10 (4) 4" RISER SLEEVES TO FLOOR ABOVE

T14 220V 30A RECEPTACLE MOUNTED TO SIDE

OF LADDER RACK BY EC. PLUG TYPE NEMA

L6-30. EACH CIRCUIT SHALL BE A

DEDICATED CIRCUIT. REFER TO

ELECTRICAL DRAWINGS FOR CIRCUITING

INFORMATION.

T15 120V 20A DOUBLE DUPLEX OUTLET

MOUNTED TO SIDE OF LADDER RACK BY EC.

TYPICAL.

T16 120V 15A CONVENIENCE OUTLET.

T17 CHAINLINK DIVIDER BETWEEN FMS AND OIT

SPACES BY GC. GENERAL CONTRACTOR TO

COORDINATE INSTALLATION WITH SCC.

NOT TO SCALE

4 Ladder Rack Double Duplex J-box (Isolator) Mounting Detail

NOT TO SCALE

5 Typical Telecommunications Grounding Busbar (TGB)

File details come from the government source that posted it. Updated .