This is an Amendment to Solicitation/Modification of Contract issued by the Department of Veterans Affairs, Network Contracting Office 6 (Hampton, VA) for solicitation number 36C24626Q0418. The amendment extends the response due date to July 10, 2026, at 15:00 EST and provides answers to twenty-three questions posed by offerors during the solicitation process.
The project involves the installation of surgical lighting and boom systems in operating rooms at VA facilities. Key clarifications from the Q&A include: two Steris Harmony LED lights per operating room require removal; one PTZ camera kit is required per operating room suite with HD (not 4K) cameras acceptable; three 32-inch 4K monitors are requested as part of the surgical field display; all operating rooms should have consistent ceiling heights per VA Technical Information Letter (TIL) requirements; medical gas connections must be Chemetron type (correcting an error in the solicitation specifications); anesthesia booms require 9 medical gas outlets and 4 duplex electrical outlets; and the heavy-duty monitor arm should not be mounted off the equipment boom drop tube. The contractor is responsible for ensuring proper arm mounting, providing connection punch-outs, and making cable channels available, while integration connections will be handled under a separate project scope. Certification for PG-LifeLink LIM panels may be completed by any authorized entity, not exclusively by PG-LifeLink. Installation will occur at two operating rooms per site sequentially rather than simultaneously. CAD drawings have been provided, and offerors were granted a one-week extension to account for scope impacts from the clarifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 5-6thFlr_Structural.pdf | ||
| AllPanelSch_Electrical.pdf | ||
| 5thFlrMG_Mechanical_Plumbing_FireProtection.pdf | ||
| 5thFlr_Electrical.pdf | ||
| 5thFlrArch Vol2 Binder1.pdf | ||
| 36C24626Q0418 0002.pdf | ||
| FP_KHCC_3rd_Floor_11-01-2024.pdf | ||
| FP_CHCC_5th_Floor_01-15-2025.pdf | ||
| 36C24626Q0418_1 - OR Lights and Booms.pdf | ||
| Attachment A - Line-Item Spreadsheet.xlsx | XLSX spreadsheet | |
| 36C24626Q0418_2.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
0001 0
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667
To all Offerors/Bidders 36C24626Q0418
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 07-08-2026 15:00 EDT
The purpose of this amendment is to answer question addressed during solicitation and to extend the response due date.
A. Questions and answers are included below with this amendment.
B. Response due date is hereby extended to 15:00 EST, July 10,2026.
Jamie Sullivan Contracting Officer
Questions Answers Can you please provide the quantity, make and model numbers of the lights that are to be removed? There are (2) Steris Harmony LED lights per OR room
When is the expected delivery date?
Please review the Performance Work Statement, shipping cooridination will be determined after award.
Do all of the lights/booms require cameras?
Please review the Salient Characteristics, ONE PTZ camera kit is requested per OR suite
If cameras are required, do you want HD or 4K cameras? HD cameras are acceptable.
Do you need us to quote monitors to connect on the monitor arms?
Please review the Salient Characteristics and Performance Work Statement, we are requesting (3) 32in 4K monitors as part of the surgical field display
If you want monitors, do you want HD or 4K and do you want 27" or 32"?
Please review the Salient Characteristics and Performance Work Statement, we are requesting (3) 32in 4K monitors as part of the surgical field display
Will we be able to see above the ceilings?
There are access panels to above ceiling however they are sealed and require tools to unbolt.
Are there existing CAD drawings we could possibly have today? Attached are the CAD drawings Will offerors be provided an opportunity to obtain above-ceiling access to verify structural and utility requirements above the finished ceiling?
There are access panels to above ceiling however they are sealed and require tools to unbolt.
Can the Government provide CAD drawings for the four (4) operating rooms at each location? Attached are the CAD drawings
11. Can you confirm the finished ceiling heights for the four (4) operating rooms at each location? During the site visit, we measured a finished ceiling height of approximately 119 inches;
however, one room appeared to be documented as 112 inches, which may be a typographical error
All rooms should have the same ceiling height across both sites in accordance with VA TIL requirements.
The solicitation specifies DISS-type medical gas connections. During the site visit, both facilities appeared to have Chemetron medical gas outlets installed. Can you clarify the required connection type?
Solicitation has the incorrect specs, will be will requiring Chemetron connection type.
The existing anesthesia boom is equipped with six (6) duplex electrical outlets, while the solicitation specifies four (4) duplex outlets. Can you confirm that the requirement is to reduce the quantity of duplex outlets from six (6) to four (4)? Requirement is 4 for the anesthesia boom.
Are vendors to match the quantities of electrical outlets, data provisions, medical gas outlets currently on site or are they to follow the quantities listed in the bid ? (They are different and what is in the SOW is excessive to a hammerhead boom [12 gases and 16 electrical duplex] /cant be supported).
There was a mistake on the solicitation, Anesthesia booms are to have 9 med/gas and 4 duplex
Given the above and also inconsistencies regarding quantity, can the SOW be adjusted to reflect the correct/current electrical outlets, data provisions, med gas outlets etc. ?
Please refer to section 8 of the performance work statmement to a more accurate list of data provisions, electrical outlets, and med gas outlets
Is the expectation for the “heavy-duty monitor arm” to be mounted off the equipment boom drop tube?
It is not expected to be mounted off the equipment boom drop tube.
Two (2) operating rooms will be closed at a time to undergo deinstallation of old equipment and installation of new integration system equipment/hardware. Would these be at the same site, or would these be at 2 sites simultaneously ?
This is well further cooridnated after award but currently the idea is 2 at each site not simultaneously.
Regarding the PG-LifeLink LIM panels, would these require a new certification from PG LifeLink, or could this be done by a local electrical company?
Certification must be completed by an authorized entity, does not have to be PG LifeLink
Should a CLIN Line be added to the Price cost schedule for ICRA considerations?
ICRA considerations are include in project scope as stated in the Performance Work Statement. They can be included in your quote.
Given the questions may impact scope of work/ the quote, can we kindly request an extension for 1 week once the answers are posted? Yes
Would the lights/boom vendor be responsible for reinstalling or providing the integration connections back to the monitors, or would that fall under a separate integration upgrade scope?
Intergration will be under a differenent project scope, lights/boom vendor will be resonsible for ensuring arms are properly mounted, punches for connects are avaiable, and cable channels are available.