This file is a Request for Information (RFI) tracker documenting 85 questions and responses related to a campus-wide security camera installation project at a VA medical facility. The solicitation (36C24626B0024) is an Invitation for Bid (IFB) issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6, with amendment 0002 extending all submission deadlines. Questions were submitted by five organizations (Starboard Industries, TRECIG, Allied Federal Solutions LLC, Walker Federal Services, and Phillips C&C) between May 7-20, 2026, with responses provided by June 1, 2026, and the tracker closed on June 3, 2026.

The project involves designing and installing a comprehensive IP-based CCTV system with multiple camera types (fixed, PTZ, 180/270/360-degree, and fish-eye models) across a multi-building hospital campus. Key technical requirements include: ONVIF-compliant cameras acceptable from multiple manufacturers (not vendor-specific); a cloud-based or hybrid solution without on-site NVR/DVR; 60 days of video retention; hybrid POE cabling for power and data; 5-year maintenance agreements with annual labor and materials NTE pricing; FedRAMP compliance for any cloud platforms; and HIPAA and NDAA compliance. The installation spans 12 months from award with four optional 12-month periods of SaaS support; work includes cable installation in existing conduit where feasible, fiber runs between buildings with potential underground ductwork, network switch installations in telecommunications rooms, and compliance with infection control requirements in healthcare areas. Contractors must provide resumes for project managers and superintendents with three years of similar experience, handle all trenching permits and utility locates, supply conex boxes for material storage, comply with prevailing wage rates, and deliver as-built drawings and O&M manuals. The project is funded for FY26, and specifications take precedence over drawings in case of conflicts.

View the file

Other files for this federal contract opportunity

Other files attached to Y1BG--652-23-105 Campus Wide Camera (Construction), newest first.
File Type Posted
MARKET SURVEY CONSTRUCTION MATERIALS TEMPLATE.xlsx XLSX spreadsheet
S02 - 36C24626B0024-Campus_02.pdf PDF
SITE VISIT ATTENDANCE LOG OF_05-14-2026-CAMPUS CAMERA_Redacted.pdf PDF
ATTACHMENT D - WAGE DETERMINATION_revised.pdf PDF
36C24626B0024 0002.docx DOCX document
36C24626B0024 0001.docx DOCX document
36C24626B0024_2.docx DOCX document
ATTACHMENT D - WAGE DETERMINATION.pdf PDF
ATTACHMENT C - BID ITEMS COST BREAKDOWN.xlsx XLSX spreadsheet
ATTACHMENT B - DRAWINGS.pdf PDF
ATTACHMENT A - SPECIFICATIONS.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet2

Sheet1

RFI#OriginatorOrigination DateQuestionDue DateRespondentResponseClosedAmend #
1Starboard Industries5/7/26Upon review, it appears that this project is requiring or proposing the use of a solution manufactured by Verkada and may be a cloud based solution for recording features. I cannot ind specifically where Verkada is identified as the solution required, however, there are part numbers lited as required which are Verkada items, please see below: 2.2 LICENSING

A. Provide all required licenses for the specified system components.

B. All system component licenses shall be 5-year licenses.

C. All system monitoring licenses shall be LIC-BV Premium Alarm License.6/1/26This is not a sole source procurement, no specific vendor has been mandated. Please reference the Specifications document, Section 28 05 01 5.1 for the System Scope of Work and requirements.6/3/260002
2Starboard Industries5/7/26Is Verkada a required solution for this project in part or in whole?6/1/26Please refer to the answer from the first question.6/3/260002
3Starboard Industries5/7/26Is the VA providing the Verkada management software for recording, playback, storage, etc. of what would traditionally be an onsite server-based solution?6/1/26No. Please reference the Specifications document, Section 28 05 01 5.1 for the System Scope of Work and requirements.6/3/260002
4Starboard Industries5/7/26In the CCTV symbols and abbreviations section there is a symbol “SVR” for servers, however, we cannot locate any servers within the drawings. Is the new solution completely cloud-based or will the VA be providing any onsite server hardware for recording, playback, and video storage?6/1/26Per the Specifications Document, Section 28 05 01 -04, the system does not require a NVR or DVR.6/3/260002
5Starboard Industries5/7/26Are the cameras required to be manufactured by Verkada or are industry standard ONVIF compliant cameras acceptable?6/1/26Any camera compliant with the Camera Specifications outlined in the Specifications document, Section 28 05 01 - 05 is acceptable.6/3/260002
6Starboard Industries5/7/26The information from the specifications above (2.2.B) states 5-year licenses, it is our understanding that the VA was trying to eliminate the need for renewable licenses and move to manufacturers that provide perpetual licenses to reduce future maintenance and upgrade costs, can you confirm that fixed license periods are required?6/1/26The VA is requiring a "5 Year Maintenance Agreement" to included in the project bid to properly maintain the new system in place. (this should be a separate line item) This agreement shall include a NTE maximum for labor and materials annually.6/3/260002
7Starboard Industries5/7/26If Verkada is the required manufacturer for any component of the solution, will a Single/Sole Source J&A be issued?6/1/26Please refer to the answer from the first question.6/3/260002
8TRECIG5/18/26Will all electrical be provided and installed by others for any necessary power requirements for the cameras/pole cameras?6/1/26No, the contractor willneed to install hybrid POE cables per the scope of work; most indoor routed cable work is powered by the network switches, cameras that are using the hybrid cable will have supplementary power supplies that are installed in the LAN Rack.6/3/260002
9TRECIG5/18/26The email address provided in the solicitation under instructions to offerors reads as moses.deng@va.gov. Please confirm this is the correct email address for offerors.6/1/26CONThe correct email for offerrors is moses.deng2@va.gov6/3/260002
10TRECIG5/18/26Please clarify the due date and time. a. On Block 13 of the SF1442, it lists the due date and time as 5 June, 2026 at 1:00 PM EDT.
b. Under Instructions to offerors, (a) General, 7. It states “All bids submitted electronically are due no later than 2:00 PM EDT on June 4, 2026. “6/1/26CONALL Dates extended. See amendment 00026/3/260002
11TRECIG5/18/26The SF1442 has text overlaying the top of the pages and the form is not fillable. Can the government provide a clean, editable version?6/1/26CONSee the attched pdf copy6/3/260002
12TRECIG5/18/26Is there room in the existing conduit for new cabling?6/1/26The intent is to reuse the existing conduit where indicated on the drawings. See spec section 012200 for unit proce credits.6/3/260002
13TRECIG5/18/26Will all ceiling hatches (if necessary) be provided and installed by others?6/1/26Existing ceiling hatches will be accessed in most cases. Please refer to the drawings where ceiling hatches are required to be installed by the contractor.6/3/260002
14TRECIG5/18/26What is the anticipated period of performance or required completion timeline from date of award?6/1/26The Installation process will be from the date of award of FedRAMP ATO Approval and VA ATO Approval base 12 months plus four (4) optional 12 months of the SaaS product support and 5 years total for the Licenses for Government use.6/3/260002
15TRECIG5/18/26Are any installation areas within the hospital restricted to after-hours or weekend work? If so, please identify the applicable areas and provide the authorized work windows. Additionally, please clarify these locations on the drawings to support accurate pricing.6/1/26Please reference Attachement B - Drawings, ICRA Plans6/3/260002
16TRECIG5/18/26Will all the existing racks be removed and replaced with new racks identified in the requirement?6/1/26Patch panels, horizontal wire managers, and associated blanking panels shall be installed within existing spaces within existing racks in the telecommunication rooms as directed by OIT.6/3/260002
17TRECIG5/18/26May we use existing coaxial cable as pull string for all the new cabling?6/1/26Yes6/3/260002
18TRECIG5/18/26How many days of video retention are required?6/1/2660 Days6/3/260002
19TRECIG5/18/26Are there any healthcare-specific installation, infection control, environmental, or operational requirements that contractors must comply with during performance?6/1/26Please reference the Specifications document Section 01 35 266/3/260002
20TRECIG5/18/26How much upkeep time is required per UPS?6/1/2610 Minutes6/3/260002
21TRECIG5/18/26Is fiber connectivity currently available between all campus buildings and locations where new cameras, switches, or associated equipment will be installed?6/1/26No, a variety of conditions exist. There is new work between buildings for per ty-1-s01 note 1. Confirm with existing conditions in the field. Existing underground site utility vaults and fiber pedestal locations per VA staff direction. Per note 3. Provide tier 8 telecommunications handhole without bottom, 12"x18" dimensions, cover with "communications" nomenclature and tamperproof screws as indicated, coordinate route of new site utilities and handholes with existing conditions prior to digging. Per note 8. Contractor to verify existing underground telecommunications conduit routing in the field. Routing as built has not been identified. If no viable pathway exists provide 1-1/2" sch 40 pvc direct-buried telecommunications pathways with 3-cell, 1" textile innerduct for camera cabling and handholes as needed to complete the run back to building penetration.6/3/260002
22TRECIG5/18/26Does all system programming have to be onsite, or will remote access be available?6/1/26System programming will need to be onsite. Any remote programming will need to be coordinated with the VA OIT team.6/3/260002
23TRECIG5/18/26Please identify the room numbers where owner-furnished switches will be located and provide the number of ports available in each room to support determination of camera quantities and cable lengths.6/1/26Please reference Attachment B - Drawings. On each Security Sheet there is a TR Requirements Table with room numbers and ports.6/3/260002
24TRECIG5/18/26Will a 20FT+ lift be required for any exterior cameras?6/1/26There are cameras to be demoed and mounted above 20ft. It is up to the contractor to determine the means and methods of reaching them. The government will not provide lifts.6/3/260002
25TRECIG5/19/26Is Motorola Alta Cloud Avigilon Hardware acceptable as a solution with the US-manufactured and HIPAA requirements? They are NDAA-compliant; manufactured in North America, Europe, and Taiwan.6/1/26Please refer to the answer from the first question.6/3/260002
26TRECIG5/19/26Do all products require data sheets?6/1/26The submittals shall include the following: Information that confirms compliance with contract requirements. Include the manufacturer's name, model or catalog numbers, catalog information, technical data sheets, shop drawings, pictures, nameplate data and test reports as required.6/3/260002
27TRECIG5/19/26Is there any specific equipment that requires additional documentation, besides the data sheets?6/1/26The submittals shall include the following: Information that confirms compliance with contract requirements. Include the manufacturer's name, model or catalog numbers, catalog information, technical data sheets, shop drawings, pictures, nameplate data and test reports as required.6/3/260002
28TRECIG5/19/26Instructions to Offerors, Tab B., vii states “52.225-9 Buy American-Construction Materials (Nov 2021) complete sections (d) IAW 52.225-10 and 52.225-9, complete Market Survey spreadsheet attached for all construction materials called for in Basis of Design using brand name and included in your bid.” a.There is no market survey document available. Please clarify what is required from offerors to satisfy the requirement.6/1/26CONSee the attached - MARKET SURVEY CONSTRUCTION MATERIALS TEMPLATE6/3/260002
29TRECIG5/19/26Will this project be priced in phases, if so, will a spreadsheet be required with the phase break down? Labor, parts, programming per section?6/1/26The phasing shall be planned and scheduled in a coordination meeting of the VA, Commissioning Agent, and the Contractor. Results will be added to the master construction schedule and the commissioning schedule. See ICRA phasing, as each TR room represents a phase. ICRA is indicated on the drawings.6/3/260002
30TRECIG5/19/26Are there any special check-in processes during installation periods for technicians, if so what is the estimated waiting time?6/1/26Please reference the Specification Document Section 01 00 00 1.2. The contractors shall coordinate with the safety office for training and badges will require minimal delays.6/3/260002
31TRECIG5/19/26Do we need to supply a copy of our security licenses and certified reseller certificate with the bid package?6/1/26No6/3/260002
32Allied Federal Solutions, LLC5/20/26Will the government extend the due date to 5 working days after answers to these RFIs are posted?6/1/26CONYes6/3/260002
33Allied Federal Solutions, LLC5/20/26Will the government confirm if the project is funded at this time? Are there FY26 funds?6/1/26CONYes6/3/260002
34Allied Federal Solutions, LLC5/20/26The solicitation references OIT VA Directive 6008 (Cloud Computing Services) and mandates FedRAMP compliance. To ensure the integrity of the VA's cloud posture, will the Government confirm that any proposed Video Surveillance as a Service (VSaaS), cloud-managed, or hybrid-cloud Video Management System (VMS) platform must possess an active FedRAMP Moderate or High Authorization to Operate (ATO) listed explicitly on the official FedRAMP Marketplace at the time of proposal submission? Will a solution relying on a third-party hosted cloud infrastructure (e.g., a non-authorized application running inside AWS GovCloud) be deemed non-compliant and disqualified?6/1/26Please reference the Specifications document, Section 28 05 01 5.1 for the System Scope of Work and requirements.6/3/260002
35Allied Federal Solutions, LLC5/20/26Per VA Directive 6500 (6500.6 and 6500.11 Contract Security), all cryptographic modules protecting VA data-in-transit and at-rest must be validated by NIST. As the federal government transitions to the stricter FIPS 140-3 standard, will the Government mandate that all edge IP cameras utilize a discrete, hardware-embedded cryptographic module actively validated to the FIPS 140-3 standard to execute all encrypted device operations (including HTTPS, SRTP, and 802.1X) by Oct 1, 2026? Will proposals offering cameras that utilize unvalidated software-based “FIPS-compliant” algorithms or legacy FIPS 140-2 modules without a transition date be excluded from technical acceptability?6/1/26Please reference the Specifications document, Section 28 05 01 5.1 for the System Scope of Work and requirements.6/3/260002
36Allied Federal Solutions, LLC5/20/26If there are deviations between the Attachment A Specifications and the Attachment B drawings, which should take precedence?6/1/26Specifications6/3/260002
37Allied Federal Solutions, LLC5/20/26Is power accessible on the outside poles and if so, what is the voltage? Is it continuous?6/1/26No, the intent is to install hybrid POE cables per the scope of work6/3/260002
38Allied Federal Solutions, LLC5/20/26The government has Cellular Gateways listed in Section 28 23 00. These components could be leveraged at the exterior non-building mount locations to provide LTE to eliminate the potential for repair, reconstruction, replacement of underground ducts and fiber runs. If the overall goal of the project is for Security cameras, why is the government only interested in deducts that require fewer cameras to be installed? As an alternative, would the government be interested in the following: DEDUCT Alternate 3: Keeping all required cameras, leverage Cellular Communication or WiFi Gateway connection at the exterior non-building mount location to eliminate the potential for repair, reconstruction, replacement of underground ducts and the fiber runs. DEDUCT proposed underground ducts and fiber runs, removing all requirements for earthworks excavation, asphalt paving, pavement marking and planting.6/1/26The government reserves the right to maintain the Cellular Gateways specification, should the cameras' ductwork become infeasible.6/3/260002
39Allied Federal Solutions, LLC5/20/26Do the new fiber runs need to qualify for Buy American and or any other compliances?6/1/26CONPlease reference document 36C24626B0024_2.docx Section 2.3 Notice of Buy American Requirement - Construction Materials6/3/260002
40Allied Federal Solutions, LLC5/20/26Have existing Duct banks being reused been tested to ensure that they are feasible to use to run new wire as per spec- If issues are found with existing duct banks will this be treated with a rider to fix/repair?6/1/26Existing ductbanks have not been verified. Per TY-1-S01 the Contractor will need to confirm with existing conditions. Unit pricing is to be identified per specification section 012200, unit price 3,4,5.6/3/260002
41Allied Federal Solutions, LLC5/20/26Are all Conduit and fittings and J hooks required to be Buy American BAA Compliant?6/1/26See item 376/3/260002
42Allied Federal Solutions, LLC5/20/26Are Hepa Carts required for all interior work or only specified areas?6/1/26Please reference Attachement B - Drawings, ICRA Plans6/3/260002
43Allied Federal Solutions, LLC5/20/26How much of the building must be tested for Asbestos, is full remediation of all Asbestos required as part of the base project scope?6/1/26No, we do not anticipate Asbestos Remediation for this project. However, the contractor shall budget 1% of their overall bid price to cover potential costs. Please reference the Specifications document, Section 02 82 13.136/3/260002
44Allied Federal Solutions, LLC5/20/26Construction Sign- Please provide examples of the construction sign and the Safety sign and the purpose for such signage. Once again, these have not been required for previous large security replacement projects and we would like to understand the purpose for this project.6/1/26Signage will only be required in Abatement Areas if necessary.6/3/260002
45Allied Federal Solutions, LLC5/20/26Is temporary exterior fencing required as part of this project?6/1/26B.Provide safeguards, including warning signs, barricades, temporary fences, warning lights, and other similar items that are required for protection of all personnel during demolition and removal operations. Comply with requirements of Section 01 00 02, GENERAL
C.Maintain fences, barricades, lights, and other similar items around exposed excavations until such excavations have been completely filled.6/3/260002
46Allied Federal Solutions, LLC5/20/26Is a full time superintendent required for this project? If so, what experience and certifications are deemed necessary to qualify for this role?6/1/26Contractor shall furnish resumes with all personnel involved in the project including Project Manager, Superintendent, and on-site Engineer. Project Manager and Superintendent should have at least 3 years of experience on projects of similar size.6/3/260002
47Allied Federal Solutions, LLC5/20/26COR/Resident Engineer’s Field Office- We have done many large facility Security Camera replacement projects and have never required onsite Field offices. Is this a steadfast requirement? This will add significant cost coming and going along with ongoing maintenance and use costs.6/1/26A Field Office will not be required however a conex boxes for storing new and existing materials to be saved will be required.6/3/260002
48Allied Federal Solutions, LLC5/20/26What is required for bonding capacity for this project?6/1/26CONPlease reference document 36C24626B0024_2.docx Section 2.4 52.228-1 Bid Guarantee for instructions6/3/260002
49Allied Federal Solutions, LLC5/20/26If the system is able to be viewed on existing VA workstations with an internet connection, are separate, new VA workstations required?6/1/26Yes6/3/260002
50Allied Federal Solutions, LLC5/20/26What prevailing wage rate is required to be followed for this project?6/1/26CONRefer to ATTACHMENT D - WAGE DETERMINATION_revised6/3/260002
51Allied Federal Solutions, LLC5/20/26Photographic documentation- Given this project is for security cameras and not the construction of a new building is this extent of photographic proof truly necessary or could this be scaled back to any cabling and camera installation or bore documentation?6/1/26Please reference the Specifications document, Section 01 00 00 -336/3/260002
52Walker Federal Services5/20/26Can the existing fiber backbone infrastructure be reused for this project?6/1/26Please refer to the answer from question 38.6/3/260002
53Walker Federal Services5/20/26What camera manufacturers are approved for use, and what products will be considered acceptable equals?6/1/26Please reference the Specifications document, Section 28 05 01 - 01 for camera specifications.6/3/260002
54Walker Federal Services5/20/26What cybersecurity, RMF, and ATO requirements apply to this project?6/1/26Please reference the Specifications document, Section 28 05 016/3/260002
55Walker Federal Services5/20/26Are temporary camera coverage measures required during system cutover, and if so, what are the requirements?6/1/26No, temporary camera coverage measureas are not required at cutover. However, some areas will require the new cameras to be installed prior to turning off the old camera. These areas are identified in the notes on the drawings.6/3/260002
56Walker Federal Services5/20/26What work hours are permitted within occupied healthcare areas?6/1/26Please reference Attachement B - Drawings, ICRA Plans6/3/260002
57Walker Federal Services5/20/26Are after-hours and weekend work activities required for this project?6/1/26Yes6/3/260002
58Walker Federal Services5/20/26Are there any known locations containing asbestos-containing materials or lead-based paint within the project area?6/1/26Yes, it is our understanding that there will be very minimal asbestos abatement in buildings other than the main bldg 500.6/3/260002
59Walker Federal Services5/20/26Who is responsible for patching and painting restoration associated with the work?6/1/26Please reference the Specification Document, Section 27 05 11 - 326/3/260002
60Walker Federal Services5/20/26Is reuse of the existing conduit infrastructure permitted or required?6/1/26Yes6/3/260002
61Walker Federal Services5/20/26What are the project requirements for testing, commissioning, and owner training?6/1/26Please reference the Specification document Section 01 for testing, commissioning and training requirements.6/3/260002
62Walker Federal Services5/20/26What firestopping requirements apply to penetrations through rated walls, ceilings, or assemblies?6/1/26Please reference the Specification document Section 076/3/260002
63Walker Federal Services5/20/26Are there any ceiling access restrictions within clinical or occupied healthcare areas?6/1/26Please reference Attachement B - Drawings, ICRA Plans6/3/260002
64Walker Federal Services5/20/26What are the escorting, badging, and background check requirements for contractor personnel?6/1/26Please reference the Specification document Section 01 General Conditions6/3/260002
65Walker Federal Services5/20/26What are the required camera ID numbering and labeling standards for this project?6/1/26Labeling and identification of equipment, components, and telecommunications cabling shall be based on ANSI/TIA- 606-C, Administration Standard for Telecommunications Infrastructure, and NFPA 70, National Electrical Code, as modified by guidance in the VA Infrastructure Standard for Telecommunications Spaces.6/3/260002
66Walker Federal Services5/20/26Who is responsible for providing switch ports and network drops required for the camera system?6/1/26Patch cords for installation within the TR rooms for CCTV and data outlet connections to the OIT active network switches shall be furnished by the CCTV system installation contractor; installed at the patch panel and into the active switch network port(s) by OIT.6/3/260002
67Walker Federal Services5/20/26Is owner witnessing required during testing and commissioning activities, and if so, what tests require witnessing?6/1/26Please reference the Specification Document, Section 28 05 00 - 556/3/260002
68Walker Federal Services5/20/26Who is responsible for obtaining trenching permits and utility locates associated with the project work?6/1/26The Contractor6/3/260002
69Walker Federal Services5/20/26What closeout deliverables are required, including as-built drawings and O&M manuals?6/1/26Please reference the Specification Document, Section 01 33 23, including as-builts and O&M Manuals.6/3/260002
70Walker Federal Services5/20/26What are the required retention periods and storage capacities for recorded video footage?6/1/2660 days6/3/260002
71Walker Federal Services5/20/26Are there any infection control or ICRA requirements that must be implemented during installation activities?6/1/26Please reference Attachment B - Drawings, GI0036/3/260002
72Walker Federal Services5/20/26Will the owner provide access to existing network configurations and IP addressing information required for system integration?6/1/26Yes6/3/260002
73Walker Federal Services5/20/26Are dedicated electrical circuits required for new security equipment and associated network hardware?6/1/26Yes, Please reference the Specification Document, Sectio 28 05 00.6/3/260002
74Walker Federal Services5/20/26What are the mounting height and field-of-view requirements for the proposed camera locations?6/1/26Where mounting heights are not detailed or dimensioned, install systems, materials, and equipment to provide maximum headroom and access for service and maintenance as possible.6/3/260002
75Walker Federal Services5/20/26Are there any restrictions on shutdowns or interruptions to existing security systems during construction activities?6/1/26Please reference the Specifications Document, Section 01 00 00 -6, Phasing6/3/260002
76Walker Federal Services5/20/26Will the owner provide access to existing drawings and device schedules for field verification purposes?6/1/26The government will provide access any existing drawings and device schedules it may have6/3/260002
77Walker Federal Services5/20/26What are the environmental requirements for equipment rooms housing servers, switches, or storage devices?6/1/26All electrical work shall comply with NFPA 70 (NEC), NFPA 70B, NFPA 70E, 29 CFR Part 1910 Subpart J – General Environmental Controls, 29 CFR Part 1910 Subpart S – Electrical, and 29 CFR 1926 Subpart K in addition to other references required by contract.6/3/260002
78Walker Federal Services5/20/26Are all camera locations shown on the drawings considered final, or should the contractor anticipate field adjustments based on existing conditions?6/1/26The contractor should anticipate field adjustments6/3/260002
79Walker Federal Services5/20/26What warranty period and service response requirements apply to the completed security camera system?6/1/26Please reference the Specifications document, Section 28 05 00 - 30, 1.9 - Maintenance and Service6/3/260002
80Phillips C&C5/20/26The "Attachment B - Drawings" bid document identifies camera locations by functional type (FIX, PTZ, 180, 270, 360, F), while the "Attachment A - Specifications" bid document lists multiple approved camera models including: CD42-F, CD52-F, CD42-E-F, CD52-E-F, CF83-E-F, CH52-E-F, CP52-E-F, and CP63-E-F. Please confirm whether:

Camera model selection at each designated camera location is intended to be determined by the contractor based on coverage and operational requirements, or specific camera models are intended for each camera location/type and should be identified by the engineer/owner.

If contractor-selected, please confirm that bidders may determine the appropriate approved model at each location provided the specified functional coverage and performance requirements are achieved.

B. If identified by the engineer/owner, please provide the models in place of the functional types shown in Attachment B - Drawings.6/1/26Camera model selection at each designated camera location is intended to be determined by the contractor based on coverage and operational requirements. Bidders may determine the appropriate approved model at each location provided the specified functional coverage and performance requirements are achieved.6/3/260002
81Phillips C&C5/20/26Please confirm if 180 degree, 270 degree, and 360 degree cameras are calling for the CH52-E-F multisensor camera or another type.6/1/26The government is not prescribing camera models, only the camera specifications as outlined in the Specifications document, Section 28 05 01 - 56/3/260002
82Phillips C&C5/20/26"F" is listed under the Security Abbreviations on TY-0-01 in the "Attachment B - Drawings" bid document. In the drawings themselves "F" and "FE" are used and in the schedules "F" and "FE" are used. Are the abbreviations "F" and "FE" the same camera type?6/1/26Yes, F and FE are the same camera type. The abbreviation for Fish Eye will be updated to match the camera schedule6/3/260002
83Phillips C&C5/20/26"DH" is not listed on the Security Abbreviations on TY-0-01 in the "Attachment B - Drawings" bid document but it is referenced in several of the drawings in the document. Is this supposed to be a Dual Head 180-degree camera?
If it is a Dual Head 180-degree camera, is it the CY53-E specifically?6/1/26Yes, DH referes to Dual Head. The abbreviation will be added to the list. The governemnt is not prescribing camera models, only the camera specifications as outlined in the Specifications document, Section 28 05 01 - 56/3/260002
84Phillips C&C5/20/26Some of the cameras called out have been replaced by next-gen models. For instance, the CD42-E-F is being replaced by the CD43-E-F, and the CD52-E-F is being replaced by the CD53-E-F. Do you want us to quote the latest equivalent model to what is requested in the "Attachment A - Specifications" bid document?6/1/26The government is not prescribing camera models, only the camera specifications as outlined in the Specifications document, Section 28 05 01 - 56/3/260002
85Phillips C&C5/20/26Can the roles of Superintendent, SSHO, and QCM be filled with one or two individuals?6/1/26Yes, as long as the individual or individulas meet all the necessary requirements6/3/260002