S02 - 36C24626B0024-Campus_02.pdf
PDF 989 KB Posted
- Attached to
- Y1BG--652-23-105 Campus Wide Camera (Construction) Federal contract opportunity
- Solicitation number
- 36C24626B0024
About this file
This is an Invitation for Bid (IFB) for a construction project to install a Campus Wide Camera System at Richmond VA Medical Center located at 1201 Broad Rock Boulevard, Richmond, Virginia 23249. The solicitation number is 36C24626B0024, with project number 652-23-105, issued by the Department of Veterans Affairs Network Contracting Office 6 on May 5, 2026.
The work includes demolition and removal of existing cameras, installation of new security cameras and cabling throughout multiple buildings (500, 501, 507, 509, 511, 512, 513, 514, 515, 518, 519, 520, and 521) and site work as indicated on contract drawings. The project encompasses multiple construction trades including carpentry, electrical work, painting, firestopping, concrete work, and site restoration. The estimated magnitude of construction is between $2,000,000 and $5,000,000. This is a 100% Total Service-Disabled Veteran Owned Small Business (SDVOSB) set-aside with NAICS code 236220 and a size standard of $45.0 million. Contractors must be registered in the System for Award Management (SAM) and verified in the Small Business Administration's VetCert database at the time of offer and award. A pre-bid site visit is scheduled for May 14, 2026 at 10:00 AM EDT. Request for Information (RFI) questions are due by May 20, 2026 at 3:00 PM EDT. Sealed bids are due June 5, 2026 by 1:00 PM EDT and must be submitted electronically via email to the Contract Specialist, Moses Deng (moses.deng2@va.gov), and copied to Contract Officer, Vangie Miller (vangie.miller@va.gov). Bid opening will occur online via Microsoft Teams. The contractor must begin performance within 15 calendar days of award and complete all work within 365 calendar days. Performance and payment bonds are required within 15 calendar days after award. Offers must remain valid for 120 calendar days after the bid due date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MARKET SURVEY CONSTRUCTION MATERIALS TEMPLATE.xlsx | XLSX spreadsheet | |
| SITE VISIT ATTENDANCE LOG OF_05-14-2026-CAMPUS CAMERA_Redacted.pdf | ||
| ATTACHMENT D - WAGE DETERMINATION_revised.pdf | ||
| Response to Solicitation RFIs Tracker-Campus Wide-0002.xlsx | XLSX spreadsheet | |
| 36C24626B0024 0002.docx | DOCX document | |
| 36C24626B0024 0001.docx | DOCX document | |
| 36C24626B0024_2.docx | DOCX document | |
| ATTACHMENT B - DRAWINGS.pdf | ||
| ATTACHMENT D - WAGE DETERMINATION.pdf | ||
| ATTACHMENT C - BID ITEMS COST BREAKDOWN.xlsx | XLSX spreadsheet | |
| ATTACHMENT A - SPECIFICATIONS.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES NO
a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
1 92
36C24626B0024 X
05-05-2026
652-23-105
36C246
Email: vangie.miller@va.gov Department of Veterans Affairs Network Contracting Office 6 201 Hay Street, Suite 305 Fayetteville NC 28301
Contract Specialist, Moses Deng Email: moses.deng2@va.gov Contract Officer, Vangie Miller
Moses Deng 910-475-6807
Invitation for Bid for Project: Campus Wide Camera System (Construction)Project# 652-23-105.
Location: Richmond V.A. Medical Center 1201 Broad Rock Blvd. Richmond, Virginia 23249 See Statement of Work (SOW), Specifications and Drawings attached for details of this requirement.
Pursuant to VAAR 836-204 (f) (2), the estimated magnitude of construction is between $2,000,000 and $5,000,000.
This is a 100% Total Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside The North American Industry Classification System (NAICS) code for this action is 236220 with a size standard of $45.0M
Contractors must be registered in the System for Award Management (SAM) at https://www.sam.gov and verified in the Small Business Administration’s (VetCert) database at https://veterans.certify.sba.gov/ to be eligible for award.
A Pre-Bid Site Visit will be conducted on May 14, 2026 at 10:00 AM EDT.
Location: Meet outside of the Engineering Suite, 2K-137, on the catwalk of the Richmond VA Medical Center Campus.
Request for Information (Questions) are due no later than: May 20, 2026 by 3:00 PM EDT.
The Government affords no guarantee that questions (RFI's) submitted after the aforementioned date and time will be answered.
Bids are due the day prior to the date and time indicated on Block 13 below.
Bid Opening Location: Microsoft Teams (online): https://teams.microsoft.com/meet/288727272735232?p=arvNtEsqv873fRRlaR Bids will NOT be accepted in paper form. See General Instructions beginning on page 6 for details.
All bids shall be submitted by the prime contractor. Bids must be submitted by electronics means through email to the Contract Specialist, Moses Deng at moses.deng2@va.gov and Cc Contract Officer, Vangie Miller at vangie.miller@va.gov.
15 365
X X
X 15 see page 26 1:00 PM EDT
06-05-2026
X
14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
PHONE: FAX:
28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code)
(Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
(Type or print)
(4 copies unless otherwise specified)
(Type or print) (Type or print)
(Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror)
(To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
BID ITEM (BASE BID): $
BID ITEM I (DEDUCT NO. 1): $
BID ITEM II (DEDUCT NO. 2): $
Department of Veterans Affairs Network Contracting Office 6 201 Hay Street, Suite 305 Fayetteville NC 28301 http://www.fsc.va.gov/einvoice.asp Department of Veterans Affairs Financial Services Center P.O. Box 149971 Austin TX 78714-9971 512-460-5049 512-460-5221
Table of Contents
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,
ALTERATION, OR REPAIR)– BACK
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
A.4 DELIVERY SCHEDULE
A.5 SCOPE OF WORK
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.1 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE
OF THE WORK (NOV 2025) (DEVIATION)
2.3 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION
MATERIALS (MAY 2014)
2.4 52.228-1 BID GUARANTEE (SEP 1996)
2.5 52.233-2 SERVICE OF PROTEST (SEP 2006)
2.6 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS
AND CERTIFICATIONS (NOV 2025) (DEVIATION)
2.7 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB
1998)
REPRESENTATIONS AND CERTIFICATIONS
3.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
3.2 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—
CERTIFICATION (NOV 2021)
GENERAL CONDITIONS
4.1 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)
4.2 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION
(NOV 2025) (DEVIATION)
4.3 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL
LABOR RELATIONS ACT (NOV 2025) (DEVIATION)
4.4 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY
2014)
4.5 52.225-2 BUY AMERICAN CERTIFICATE (OCT 2022)
4.6 52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014)
4.7 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (DEVIATION) (NOV
2025)
4.8 SUPPLEMENTAL INSURANCE REQUIREMENTS
4.9 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025)
(DEVIATION)
4.10 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
4.11 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED
SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023)
(DEVIATION)
4.12 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—
CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023)
(DEVIATION)
4.13 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
(APR 2019)
4.14 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT
ADMINISTRATION (OCT 2020)
4.15 VAAR 852.204-72, PERSONNEL VETTING AND CREDENTIALING (MAR 2026)
(DEVIATION)
4.16 IT CONTRACT SECURITY
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBE
R
DESCRIPTION OF
SUPPLIES/SERVIC
ES
QUANTIT
Y
UNI
T UNIT PRICE AMOUNT
1.00 JB ________________
Base Bid - All work in accordance with this scope of work, design drawings and specifications.
Contract Period: Base (Period of Performance is 365 days from Notice to Proceed
(NTP)
Bid Deduct Alternate 1 – All work in Base Bid but remove 30% of the exterior fixtures. (300 calendar days to complete all work) – Reducing “Fish Eye” fixtures from a quantity of 252 to 170 & “Multisensor” fixtures from a quantity of 173 to 121.
(Period of Performance is 300 days from Notice to Proceed
Bid Deduct Alternate 2 – All work in Bid Deduct Alternate 1 but remove an additional 30% of the interior fixtures. (255 calendar days to complete all work) – Reducing “Dome Cameras” from 215 to 150.
(Period of Performance is 255 days from Notice to Proceed
GRAND TOTAL ________________
A.4 DELIVERY SCHEDULE
ITEM
NUMBER SHIPPING INFORMATION QUANTITY
DELIVERY
DATE
0001 SHIP TO: Department of Veterans Affairs Richmond VA Medical Center 1201 Broad Rock Boulevard Richmond, VA 23249 4915
USA
1.00 365 Days from
NTP
Richmond VAMC 1.00 300 Days from
0003 Richmond VAMC 1.00 255 Days from
A.5 SCOPE OF WORK
Central Virginia VA Health Care System
Richmond V.A. Medical Center 1201 Broad Rock Blvd.
Richmond, Virginia 23249
SCOPE OF WORK
Project: 652-23-105
Project Title: Campus Wide Camera System Replacement
1. Background The Department of Veterans Affairs (VA) Office of the Senior Security Office/Physical Security and Infrastructure Office, along with the Richmond VA Medical Center (VAMC) VA Police Department requires a modernized security camera system with analytics in order to comply with the VA 0730 Handbook, Security and Law Enforcement, and the Office of Information and Technology (OIT) VA Directive 6517, 6518, 6500 (6500.6 and 6500.11), 6008 along with the OIT Strategic Plan and Veterans Affairs Enterprise Architecture Principles, in addition to:
● Presidential Executive Order 14111, dated November 27, 2023, aims to enhance the quality and effectiveness of security measures and protections in Federal facilities while modernizing these programs and technologies to meet current industry standards.
In addition to security measures, the VA has been charged by the U.S. Office of Management and Budget and the White House with the following:
● Presidential Executive Order 14028, titled “Improving the Nation’s Cybersecurity,” was issued on May 12, 2021. This order focuses on advancing agencies toward a Zero Trust architecture and accelerating the transition to secure cloud services.
● Presidential Executive Order 12997/13286 established the Interagency Security Committee, which aims to enhance the security and protection of federal facilities across the United States.
● Presidential Executive Order 13800, titled "Strengthening the Cybersecurity of Federal Networks and Critical Infrastructure," was issued on May 11, 2017. The order aims to enhance the nation's cybersecurity posture and capabilities by focusing on the modernization of federal IT infrastructure and the protection of critical infrastructure.
● Guidance issued on February 26, 2025, aims to implement technological solutions that automate routine tasks, allowing staff to concentrate on higher-value activities. This guide also outlines plans to reduce costs and promote efficiency by adopting new software systems and eliminating duplicate systems.
Due to these orders, the Richmond VAMC requires a modernized security system that will enhance security, provide an easy-to-use system, minimize on-premises infrastructure, minimal network (Local Area Network (LAN)/Wide Area Network (WAN)) traffic, and increase the VA’s cybersecurity posture while meeting National Defense Authorization and Trade Agreements Act manufacturing rules according to current FAR clauses while complying with Federal Information Security Management Act (FISMA). The VA Police require that the new system to be able to integrate with the current VA Police’s Body Worn Camera Solution (Axon) and other VA Police Enterprise VA Police Solutions as a Service product with Camera’s and software itself. The solution will need to be outfitted for the Richmond VAMC located at 1201 Broad Rock Blvd, Richmond VA 23249.
APPLICABLE DOCUMENTS
In the performance of the tasks associated with this Statement of Work, the Contractor shall comply with the following:
1. “Federal Information Security Modernization Act of 2014”
2. Federal Information Processing Standards (FIPS) Publication 140-3, “Security
Requirements for Cryptographic Modules”, March 22, 2019
3. FIPS Pub 199. “Standards for Security Categorization of Federal Information and
Information Systems,” February 2004
4. FIPS Pub 200, “Minimum Security Requirements for Federal Information and
Information Systems,” March 2006
5. FIPS Pub 201-3, “Personal Identity Verification of Federal Employees and
Contractors,” January 2022
6. 10 U.S.C. § 2224, "Defense Information Assurance Program", as amended
7. 5 U.S.C. § 552a, as amended, “The Privacy Act of 1974”
8. Public Law 109-461 (P.L. 109-461), Veterans Benefits, Health Care, and Information
Technology Act of 2006, as amended, Title IX, Information Security Matters
9. 42 U.S.C. § 2000d “Title VI of the Civil Rights Act of 1964”, as amended
10. VA Directive 0710, “Personnel Security and Suitability Program,” June 4, 2010, https://www.va.gov/vapubs/index.cfm
11. VA Handbook 0710, “Personnel Security and Suitability Program,” May 2, 2016, https://www.va.gov/vapubs/index.cfm
12. VA Directive 6102, “Internet/Intranet Services,” August 5, 2019
13. 36 C.F.R. Part 1194 “Information and Communication Technology Standards and
Guidelines,” as amended
14. Office of Management and Budget (OMB) Circular A-130, “Managing Federal
Information as a Strategic Resource,” July 28, 2016
15. 32 C.F.R. Part 199, “Civilian Health and Medical Program of the Uniformed Services
(CHAMPUS)”, as amended
16. NIST SP 800-66 Rev. 2, “Implementing the Health Insurance Portability and
Accountability Act (HIPAA) Security Rule: A Cybersecurity Resource Guide,” February 2024
17. 45 C.F.R Parts 160 and 164, Subparts A and E, the Standards for Privacy of Individually Identifiable Health Information (“Privacy Rule”); and 45 C.F.R. Parts 160 and 164, Subparts A and C, the Security Standard (“Security Rule”); as amended
18. Sections 504 and 508 of the Rehabilitation Act (29 U.S.C. § 794d), as amended
19. Homeland Security Presidential Directive (12) (HSPD-12), August 27, 2004
20. VA Directive 6500, “VA Cybersecurity Program,” February 24, 2021 (see VA NOTICE
24-18, dated September 27, 2024, “Update to VA Directive 6500 Cybersecurity Program”, and VA Notice 25-07, dated 3/18/25, “Amending VA Directive 6500 to incorporate M-24-15”) https://www.va.gov/vapubs/index.cfm https://www.va.gov/vapubs/index.cfm http://www.va.gov/vapubs http://www.va.gov/vapubs
21. VA Handbook 6500, “Risk Management Framework for VA Information Systems VA Information Security Program,” February 24, 2021 (see VA Notice 25-01, dated October 15, 2024, “Update to VA Handbook 6500 Risk Management Framework for VA Information Systems VA Information Security Program”, and VA Notice 25-06, dated 3/18/25, “Amending VA Directive 6500 to incorporate M-24-15”)
22. VA Handbook 6500.2, “Management of Breaches Involving Sensitive Personal Information (SPI),” June 30, 2023
23. VA Handbook 6500.6, “Contract Security,” March 12, 2010 (see VA Notice 24-12, dated April 22, 2024, “Update to VA Handbook 6500.6, Contract Security, Appendix C VA Information and Information System Security/Privacy Language For Inclusion Into Contracts, As Appropriate”)
24. VA Handbook 6500.8, “Information System Contingency Planning,” March 25, 2025
25. VA Handbook 6500.10, “Mobile Device Security Policy,” February 15, 2018
26. VA Handbook 6500.11, “VA Firewall Configuration,” August 22, 2017
27. OIT Process Asset Library (PAL), OIT Process Asset Library.
28. One-VA Technical Reference Model (TRM) (reference at https://www.va.gov/trm/TRMHomePage.aspx)
29. VA Directive 6508, “Implementation of Privacy Threshold Analysis and Privacy Impact
Assessment,” October 15, 2014
30. VA Directive 6510, “VA Identity, Credential and Access Management,” September 3,
31. VA Handbook 6510, “VA Identity, Credential and Access Management,” September
27, 2024
32. VA Directive and Handbook 6513, “Secure External Connections,” October 12, 2017
33. VA Directive 6300, “Records and Information Management,” September 21, 2018
34. VA Handbook, 6300.1, “Records Management Procedures,“ March 24, 2010
35. NIST SP 800-37 Rev 2, “Risk Management Framework for Information Systems and
Organizations: A System Life Cycle Approach for Security and Privacy,” December
36. NIST SP 800-53 Rev. 5, “Security and Privacy Controls for Federal Information Systems and Organizations,” September 23, 2020 (includes updates as of 12/10/2020)
37. VA Directive 0735, “Homeland Security Presidential Directive 12 (HSPD-12) Program,” October 26, 2015
38. VA Handbook 0735, “Homeland Security Presidential Directive 12 (HSPD-12) Program,” March 24, 2014
39. OMB Memorandum 05-24, “Implementation of Homeland Security Presidential Directive (HSPD) 12 – Policy for a Common Identification Standard for Federal Employees and Contractors,” August 5, 2005
40. OMB Memorandum M-19-17, “Enabling Mission Delivery Through Improved Identity, Credential, and Access Management,” May 21, 2019
41. OMB Memorandum, “Guidance for Homeland Security Presidential Directive (HSPD) 12 Implementation,” May 23, 2008
42. Federal Identity, Credential, and Access Management (FICAM) Architecture, June 30, 2023 (FICAM Architecture (idmanagement.gov))
43. NIST SP 800-116 Rev 1, “Guidelines for the Use of Personal Identity Verification (PIV) Credentials in Facility Access,“ June 2018 https://digital.va.gov/process-asset-library/ https://www.va.gov/trm/TRMHomePage.aspx https://www.idmanagement.gov/arch/#:%7E:text=FICAM%20is%20the%20federal%20government%E2%80%99s%20enterprise%20approach%20to,identity%20processes%2C%20practices%2C%20policies%2C%20and%20information%20security%20disciplines.
44. NIST SP 800-63-3, 800-63A, 800-63B, 800-63C, “Digital Identity Guidelines,” updated March 02, 2020
45. NIST SP 800-157, “Guidelines for Derived PIV Credentials,” December 2014
46. VA Memorandum, VAIQ #7100147, “Continued Implementation of Homeland
Security Presidential Directive 12 (HSPD-12),” April 29, 2011 (reference https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514)
47. IAM Identity Management Business Requirements Guidance document, May 2013, (reference Enterprise Architecture Section, PIV/IAM (reference https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514)
48. VA Memorandum “Personal Identity Verification (PIV) Logical Access Policy Clarification,” July 17, 2019, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4896
49. Trusted Internet Connections (TIC) 3.0 Core Guidance Documents, https://www.cisa.gov/publication/tic-30-core-guidance-documents
50. OMB Memorandum M-19-26, “Update to the Trusted Internet Connections (TIC) Initiative,” September 12, 2019
51. OMB Memorandum M-08-23, “Securing the Federal Government’s Domain Name System Infrastructure,” August 22, 2008
52. Sections 524 and 525 of the Energy Independence and Security Act of 2007, (P.L.
110–140), December 19, 2007
53. Section 104 of the Energy Policy Act of 2005, (P.L. 109–58), August 8, 2005
54. Executive Order 13221, “Energy-Efficient Standby Power Devices,” August 2, 2001
55. VA Directive 0057, “VA Environmental Management Program,” October 25, 2022
56. Office of Information Security (OIS) VAIQ #7424808 Memorandum, “Remote
Access,” January 15, 2014, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28
57. Clinger-Cohen Act of 1996, 40 U.S.C. §11101 and §11103
58. “Veteran Focused Integration Process (VIP) Guide 4.0,” March 2021, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4371
59. VA Memorandum “Proper Use of Email and Other Messaging Services,” January 2, 2018, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28
60. “Product Line Management Transformation Playbook” version 3.1, August 2023, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4946
61. NIST SP 500-267B Revision 1, “USGv6 Profile,” November 2020
62. OMB Memorandum M-21-07, “Completing the Transition to Internet Protocol Version
6 (IPv6),” November 19, 2020
63. Social Security Number (SSN) Fraud Prevention Act of 2017
64. Section 240 of the Consolidated Appropriations Act (CAA) 2018, March 23, 2018
65. C.F.R Title 15 Part 7, “Securing the Information and Communications Technology and Services (ICTS) Supply Chain”, as amended
66. Executive Order 14028, “Executive Order on Improving the Nation's Cybersecurity,”
May 12, 2021, https://bidenwhitehouse.archives.gov/briefing-room/presidential-actions/2025/01/16/executive-order-on-strengthening-and-promoting-innovation-in-the-nations-cybersecurity/
67. OMB Memorandum M-22-09, “Moving the U.S. Government Toward Zero Trust Cybersecurity Principles”, January 26, 2022, https://www.whitehouse.gov/wp-content/uploads/2022/01/M-22-09.pdf.
https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514 https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514 https://www.voa.va.gov/DocumentView.aspx?DocumentID=4896 https://www.cisa.gov/publication/tic-30-core-guidance-documents https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28 https://www.voa.va.gov/DocumentView.aspx?DocumentID=4371 https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28 https://www.voa.va.gov/DocumentView.aspx?DocumentID=4946 https://bidenwhitehouse.archives.gov/briefing-room/presidential-actions/2025/01/16/executive-order-on-strengthening-and-promoting-innovation-in-the-nations-cybersecurity/ https://bidenwhitehouse.archives.gov/briefing-room/presidential-actions/2025/01/16/executive-order-on-strengthening-and-promoting-innovation-in-the-nations-cybersecurity/ https://bidenwhitehouse.archives.gov/briefing-room/presidential-actions/2025/01/16/executive-order-on-strengthening-and-promoting-innovation-in-the-nations-cybersecurity/ https://www.whitehouse.gov/wp-content/uploads/2022/01/M-22-09.pdf https://www.whitehouse.gov/wp-content/uploads/2022/01/M-22-09.pdf
68. NIST SP 800-52 Revision 2, “Guidelines for the Selection, Configuration, and Use of Transport Layer Security (TLS) Implementations
69. OMB M-22-18, “Enhancing the Security of the Software Supply Chain through Secure Software Development Practices,” September 14, 2022
70. OMB M-23-16, “Update to Memorandum M-22-18,” June 9, 2023
71. OMB M-21-31, “Improving the Federal Government’s Investigative and Remediation
Capabilities Related to Cybersecurity Incidents,” August 27, 2021
72. NIST SP 800-88 Revision 1 “Guidelines for Media Sanitization,” December 2014
73. CISA Binding Operational Directive (BOD) 19-02: “Vulnerability Remediation
Requirements of Internet-Accessible Systems,” April 29, 2019, BOD 19-02:
Vulnerability Remediation Requirements for Internet-Accessible Systems | CISA
74. CISA BOD 22-01: “Reducing the Significant Risk of Known Exploited Vulnerabilities,” November 3, 2021, BOD 22-01: Reducing the Significant Risk of Known Exploited Vulnerabilities | CISA
75. CISA BOD 23-01: Improving Asset Visibility and Vulnerability Detection on Federal Networks.” Cybersecurity & Infrastructure Security Agency (CISA), BOD 23-01:
Improving Asset Visibility and Vulnerability Detection on Federal Networks | CISA
76. VA Directive 6550, Pre-Procurement Assessment and Implementation of Medical Devices/Systems, June 03, 2019
77. VA Memorandum, “VA Security Controls,” January 17, 2025, https://www.voa.va.gov/DocumentView.aspx?DocumentID=5010
WORK STATEMENT
The Contractor shall completely prepare the site for building operations, including demolition and removal of existing cameras, and furnish labor and materials and perform work for Campus Wide Security Camera Replacement as required by drawings and specifications.
Work required is for the installation and performance of cameras and cabling, however additional construction trades are required to facilitate the installation of the cameras. These trades are largely limited to performing cutting and patching required to remove and replace cameras and install new cameras, cabling, and new conduit work, and provide a complete passive camera system as delineated in the project construction documents.
The following construction Divisions/Trades will be required:
Division 2 – Existing Conditions (Trades: General Laborers, Carpenters)
Division 7 – Thermal and Moisture Protection (Trades: Carpenters)
Division 9 – Finishes (Trades: Carpenters, Painters, Drywall Installers)
Division 27 – Communications (Trades: Electricians)
Division 28 – Electronic Safety and Security (Trades: Electricians, Communication Technicians)
Division 31 – Earthwork (Trades: Surveyors, Heavy Equipment Operators, Concrete Masons)
Division 32 – Site Improvements (Trades: Landscapers) https://www.cisa.gov/news-events/directives/bod-19-02-vulnerability-remediation-requirements-internet-accessible-systems https://www.cisa.gov/news-events/directives/bod-19-02-vulnerability-remediation-requirements-internet-accessible-systems https://www.cisa.gov/news-events/directives/bod-22-01-reducing-significant-risk-known-exploited-vulnerabilities https://www.cisa.gov/news-events/directives/bod-22-01-reducing-significant-risk-known-exploited-vulnerabilities https://www.cisa.gov/news-events/directives/bod-23-01-improving-asset-visibility-and-vulnerability-detection-federal-networks https://www.cisa.gov/news-events/directives/bod-23-01-improving-asset-visibility-and-vulnerability-detection-federal-networks https://www.voa.va.gov/DocumentView.aspx?DocumentID=5010
Work performed occurs both indoors and outdoors. Buildings included in the scope of work are as follows: Buildings 500, 501, 507, 509, 511, 512, 513, 514, 515, 518, 519, 520, and 521 and additional site work indicated on contract drawings. To perform the camera replacement work inside the buildings requires information technology systems work and camera testing, selective demolition, general carpentry, painting, electrical work, firestopping and fireproofing. Work for an abatement contractor is required. (See Bid Drawings)
Work being performed outside the buildings to install cameras and cabling requires site survey engineers to conduct underground site investigations. The contractor and site subcontractors will also be required to install new underground cabling, create handholes, and perform earthwork removal, including the removal of concrete sidewalks, asphalt paving, as well as repair of the same and reseeding and new markings.
Additionally, camerawork outside buildings is required to patch and repair existing buildings in such a way as to leave no trace of construction or repair. This includes roof repair, which requires warranted roof work, repair of existing metal panels, brick repair, caulking, concrete foundation coring, and waterproofing.
2. Contract Specification/Drawings The following contract drawings are included in their entirety by reference in this Scope of Work:
SHEET # TITLE
GI001 COVER SHEET
GI002 DEMOLITION INFORMATION AND SHEET INDEX
GI003 GENERAL - ICRA GUIDLINES
GI004 FIRE/SMOKE BARRIER LEGEND
GI-1-500-00A INFECTION CONTROL PLAN LEVEL 00 - OVERALL
GI-1-500-00B INFECTION CONTROL PLAN LEVEL 01 - OVERALL- BG-107
GI-1-500-01A INFECTION CONTROL PLAN LEVEL 01 - OVERALL
GI-1-500-01B INFECTION CONTROL PLAN LEVEL 01 - OVERALL CONT.
GI-1-500-02A INFECTION CONTROL PLAN LEVEL 02 - OVERALL
GI-1-500-02B INFECTION CONTROL PLAN LEVEL 02 - OVERALL CONT.
GI-1-500-03A INFECTION CONTROL PLAN LEVEL 03 - PART A
GI-1-500-03D INFECTION CONTROL PLAN LEVEL 03 - PART D
GI-1-500-04 INFECTION CONTROL PLAN LEVEL 04
GI-1-500-05 INFECTION CONTROL PLAN LEVEL 05
GI-1-501-00 INFECTION CONTROL PLAN LEVEL 00 - OVERALL
GI-1-507-00 GENERAL - INFECTION CONTROL PLAN
GI-1-509-00 INFECTION CONTROL PLAN LEVEL 00 - OVERALL
GI-1-509-01 INFECTION CONTROL PLAN LEVEL 01 - OVERALL
GI-1-511-00 INFECTION CONTROL PLAN LEVEL 00 - OVERALL
GI-1-512-00 INFECTION CONTROL PLAN LEVEL 00 - OVERALL
GI-1-512-01 INFECTION CONTROL PLAN LEVEL 01 - OVERALL
GI-1-513-00 INFECTION CONTROL PLAN LEVEL 00 - OVERALL
GI-1-514-00 INFECTION CONTROL PLAN LEVEL 00 - OVERALL
GI-1-515-00 INFECTION CONTROL PLAN LEVEL 00 - OVERALL
GI-1-515-01 INFECTION CONTROL PLAN LEVEL 01 - OVERALL
AE-1-518-00 OVERALL FLOOR PLAN - LICENSE PLATE CAMERA MOUNTDETAILS
GI-1-518-00 INFECTION CONTROL PLAN LEVEL 00 - OVERALL
GI-1-519-00 INFECTION CONTROL PLAN LEVEL 00 - OVERALL
GI-1-519-00 INFECTION CONTROL PLAN LEVEL 00 - OVERALL
GI-1-520-00 INFECTION CONTROL PLAN LEVEL 00 - OVERALL
GI-1-521-00 INFECTION CONTROL PLAN LEVEL 00 - OVERALL
GI-1-521-01 INFECTION CONTROL PLAN LEVEL 01 - OVERALL
CD-1-S01 CAMPUS SITE PLAN - DEMOLITION
CU-1-S01 CAMPUS SITE PLAN - NEW WORK
TD-1-500-00 SECURITY FLOOR PLAN - DEMOLITION LEVEL 00 - OVERALL
TD-1-500-00A SECURITY FLOOR PLAN - DEMOLITION LEVEL 00 - PART A
TD-1-500-00B SECURITY FLOOR PLAN - DEMOLITION LEVEL 00 - PART B
TD-1-500-00C SECURITY FLOOR PLAN - DEMOLITION LEVEL 00 - PART C
TD-1-500-00D SECURITY FLOOR PLAN - DEMOLITION LEVEL 00 - PART D
TD-1-500-00E SECURITY FLOOR PLAN - DEMOLITION LEVEL 00 - PART E
TD-1-500-01 SECURITY FLOOR PLAN - DEMOLITION LEVEL 01 - OVERALL
TD-1-500-01A SECURITY FLOOR PLAN - DEMOLITION LEVEL 01 - PART A
TD-1-500-01B SECURITY FLOOR PLAN - DEMOLITION LEVEL 01 - PART B
TD-1-500-01C SECURITY FLOOR PLAN - DEMOLITION LEVEL 01 - PART C
TD-1-500-01D SECURITY FLOOR PLAN - DEMOLITION LEVEL 01 - PART D
TD-1-500-01E SECURITY FLOOR PLAN - DEMOLITION LEVEL 01 - PART E
TD-1-500-02 SECURITY FLOOR PLAN - DEMOLITION LEVEL 02 - OVERALL
TD-1-500-02A SECURITY FLOOR PLAN - DEMOLITION LEVEL 02 - PART A
TD-1-500-02B SECURITY FLOOR PLAN - DEMOLITION LEVEL 02 - PART B
TD-1-500-02C SECURITY FLOOR PLAN - DEMOLITION LEVEL 02 - PART C
TD-1-500-02D SECURITY FLOOR PLAN - DEMOLITION LEVEL 02 - PART D
TD-1-500-03A SECURITY FLOOR PLAN - DEMOLITION LEVEL 03 - PART A
TD-1-500-03D SECURITY FLOOR PLAN - DEMOLITION LEVEL 03 - PART D
TD-1-500-04A SECURITY FLOOR PLAN - DEMOLITION LEVEL 04 - PART A
TD-1-500-04D SECURITY FLOOR PLAN - DEMOLITION LEVEL 04 - PART D
TD-1-500-05A SECURITY FLOOR PLAN - DEMOLITION LEVEL 05 - PART A
TD-1-500-05D SECURITY FLOOR PLAN - DEMOLITION LEVEL 05 - PART D
TY-0-01 SECURITY COVER SHEET
TY-1-500-00 SECURITY FLOOR PLAN LEVEL 00 - OVERALL
TY-1-500-00A SECURITY FLOOR PLAN LEVEL 00 - PART A
TY-1-500-00B SECURITY FLOOR PLAN LEVEL 00 - PART B
TY-1-500-00C SECURITY FLOOR PLAN LEVEL 00 - PART C
TY-1-500-00D SECURITY FLOOR PLAN LEVEL 00 - PART D
TY-1-500-00E SECURITY FLOOR PLAN LEVEL 00 - PART E
TY-1-500-01 SECURITY FLOOR PLAN LEVEL 01 - OVERALL
TY-1-500-01A SECURITY FLOOR PLAN LEVEL 01 - PART A
TY-1-500-01B SECURITY FLOOR PLAN LEVEL 01 - PART B
TY-1-500-01C SECURITY FLOOR PLAN LEVEL 01 - PART C
TY-1-500-01D SECURITY FLOOR PLAN LEVEL 01 - PART D
TY-1-500-01E SECURITY FLOOR PLAN LEVEL 01 - PART E
TY-1-500-02 SECURITY FLOOR PLAN LEVEL 02 - OVERALL
TY-1-500-02A SECURITY FLOOR PLAN LEVEL 02 - PART A
TY-1-500-02B SECURITY FLOOR PLAN LEVEL 02 - PART B
TY-1-500-02C SECURITY FLOOR PLAN LEVEL 02 - PART C
TY-1-500-02D SECURITY FLOOR PLAN LEVEL 02 - PART D
TY-1-500-03A SECURITY FLOOR PLAN LEVEL 03 - PART A
TY-1-500-03D SECURITY FLOOR PLAN LEVEL 03 - PART D
TY-1-500-04 SECURITY FLOOR PLAN LEVEL 04
TY-1-500-05 SECURITY FLOOR PLAN LEVEL 05
TY-1-S01 SECURITY SITE PLAN - DEMOLITION
TY-1-S02 SECURITY SITE PLAN - NEW WORK
TY-5-01 SECURITY DETAILS
TY-5-02 SECURITY DETAILS
TY-5-03 SECURITY DETAILS
TY-5-04 SECURITY DETAILS
TY-6-500-01 SECURITY CCTV RISER DIAGRAM
TY-6-500-02 SECURITY CCTV RISER DIAGRAM
TY-6-500-03 SECURITY CCTV RISER DIAGRAM
TY-6-500-04 SECURITY CCTV RISER DIAGRAM
TY-7-01 CAMERA SCHEDULE
TY-7-02 CAMERA SCHEDULE
TD-1-501-01 SECURITY FLOOR PLAN - DEMOLITION LEVEL 01
TY-1-501-01 SECURITY FLOOR PLAN LEVEL 01
TY-6-501-01 SECURITY CCTV RISER DIAGRAM
TD-1-507-00 SECURITY FLOOR PLAN - DEMOLITION LEVEL 00
TY-1-507-00 SECURITY FLOOR PLAN LEVEL 00
TY-6-507-00 SECURITY CCTV RISER DIAGRAM
TD-1-509-00 SECURITY FLOOR PLAN - DEMOLITION LEVEL 00
TD-1-509-01 SECURITY FLOOR PLAN - DEMOLITION LEVEL 01
TY-1-509-00 SECURITY FLOOR PLAN LEVEL 00
TY-1-509-01 SECURITY FLOOR PLAN LEVEL 01
TY-6-509-01 SECURITY CCTV RISER DIAGRAM
TD-1-511-00 SECURITY FLOOR PLAN - DEMOLITION LEVEL 00
TY-1-511-00 SECURITY FLOOR PLAN LEVEL 00
TY-6-511-00 SECURITY CCTV RISER DIAGRAM
TD-1-512-00 SECURITY FLOOR PLAN - DEMOLITION LEVEL 00
TD-1-512-01 SECURITY FLOOR PLAN - DEMOLITION LEVEL 01
TY-1-512-00 SECURITY FLOOR PLAN LEVEL 00
TY-1-512-01 SECURITY FLOOR PLAN LEVEL 01
TY-6-512-01 SECURITY CCTV RISER DIAGRAM
TD-1-513-00 SECURITY FLOOR PLAN - DEMOLITION LEVEL 00
TY-1-513-00 SECURITY FLOOR PLAN LEVEL 00
TY-6-513-00 SECURITY CCTV RISER DIAGRAM
TD-1-514-00 SECURITY FLOOR PLAN - DEMOLITION LEVEL 00
TY-1-514-00 SECURITY FLOOR PLAN LEVEL 00
TY-6-514-00 SECURITY CCTV RISER DIAGRAM
TD-1-515-00 SECURITY FLOOR PLAN - DEMOLITION LEVEL 00
TD-1-515-01 SECURITY FLOOR PLAN - DEMOLITION LEVEL 01
TY-1-515-00 SECURITY FLOOR PLAN LEVEL 00
TY-1-515-01 SECURITY FLOOR PLAN LEVEL 01
TY-6-515-00 SECURITY CCTV RISER DIAGRAM
TD-1-518-01 SECURITY FLOOR PLAN - DEMOLITION LEVEL 01
TD-1-518-02 SECURITY FLOOR PLAN - DEMOLITION LEVEL 02
TD-1-518-03 SECURITY FLOOR PLAN - DEMOLITION LEVEL 03
TD-1-518-04 SECURITY FLOOR PLAN - DEMOLITION LEVEL 04
TY-1-518-01 SECURITY FLOOR PLAN LEVEL 01
TY-1-518-02 SECURITY FLOOR PLAN LEVEL 02
TY-1-518-03 SECURITY FLOOR PLAN LEVEL 03
TY-1-518-04 SECURITY FLOOR PLAN LEVEL 04
TY-6-518-00 SECURITY CCTV RISER DIAGRAM
TD-1-519-00 SECURITY FLOOR PLAN - DEMOLITION LEVEL 00
TY-1-519-01 SECURITY FLOOR PLAN LEVEL 00
TY-6-519-00 SECURITY CCTV RISER DIAGRAM
TD-1-520-00 SECURITY FLOOR PLAN - DEMOLITION LEVEL 00
TY-1-520-00 SECURITY FLOOR PLAN LEVEL 00
TY-6-520-00 SECURITY CCTV RISER DIAGRAM
TD-1-521-00 SECURITY FLOOR PLAN - DEMOLITION LEVEL 00
TD-1-521-01 SECURITY FLOOR PLAN - DEMOLITION LEVEL 01
TY-1-521-00 SECURITY FLOOR PLAN LEVEL 00
TY-1-521-01 SECURITY FLOOR PLAN LEVEL 01
TY-6-521-00 SECURITY CCTV RISER DIAGRAM
The following contract specifications are included in their entirety by reference in this Scope of Work:
SECTION # TITLE
00 01 00 TABLE OF CONTENTS
01 00 00 GENERAL REQUIRMENTS
01 10 00 SUMMARY OF WORK
01 22 00 UNIT PRICES
01 32 16.15 PROJECT SCHEDULES
01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
01 35 26 SAFETY REQUIREMENTS
01 42 19 REFERENCE STANDARDS
01 45 00 QUALITY CONTROL
01 45 29 TESTING LABORATORY SERVICES
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 16 TEMPORARY INTERIOR SIGNAGE
01 73 29 CUTTING AND PATCHING
01 74 19 CONSTRUCTION WASTE MANAGEMENT
01 91 00 GENERAL COMMISSIONING REQUIREMENTS
02 21 13 SITE SURVEYS
02 41 10 DEMOLITION AND SITE CLEANING
02 82 13.13 GLOVEBAG ASBESTOS ABATEMENT
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
09 91 00 PAINTING
27 05 11 REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS
27 05 26 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS
27 05 33 CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS
27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 05 53 IDENTIFICATION FOR COMMUNICATIONS SYSTEMS
27 10 00 STRUCTURED CABLING
27 11 19 COMMUNICATIONS TERMINATION BLICKS AND PATCH PANELS
27 13 13.13 COMMUNICATIONS COPPER CABLE SPLICING AND TERMINATIONS
27 15 13 COMMUNICATIONS COPPER HORIZONTAL CABLING
27 16 19 COMMUNICATIONS PATCH CORDS, STATION CORDS, AND CROSS
CONNECT WIRE
28 05 00 COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY
28 05 01 STATEMENT OF WORK FOR ELECTRONIC SAFETY AND SECURITY
CAMPUS VIDEO SURVEILLANCE SYSTEM REPLACEMENT
28 05 13 CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY
28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
28 23 00 VIDEO SURVEILLANCE
31 20 00 EARTHWORK
32 12 16 ASPHALT PAVING
32 17 23 PAVEMENT MARKINGS
32 90 00 PLANTING
In the instance that information on the contract drawings should conflict with the information in the specification, the specifications shall always take precedence over the drawings.
3. Bid Schedule
• Base Bid - All work in accordance with this scope of work, design drawings and specifications.
• Bid Deduct Alternate 1 – All work in Base Bid but remove 30% of the exterior fixtures. (300 calendar days to complete all work) – Reducing “Fish Eye” fixtures from a quantity of 252 to 170 & “Multisensor” fixtures from a quantity of 173 to 121.
• Bid Deduct Alternate 2 – All work in Bid Deduct Alternate 1 but remove an additional 30% of the interior fixtures. (255 calendar days to complete all work) – Reducing “Dome Cameras” from 215 to 150.
• Most of the work shall be performed during the hours of 7:00 am to 4:00 pm, unless otherwise approved by the VA. Work provided after hours is listed in the ICRA drawings as required to minimize interruptions in the main building. (14 days’ notice required)
The contractor shall have 365 days from the Notice to Proceed to complete all work associated with the Base Bid Scope of Work.
4. VA Information Security Requirements
5.1 GENERAL
Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security. The contractor shall have the proper “Authority to Operate” credentials to be awarded this contract.
Work performed will require coordination with the VA IT department in order ensure compliance with VA guidelines.
5.2 ACCESS TO VA INFORMATION AND VA INFORMATION SYSTEMS
a. A contractor/subcontractor shall request logical (technical) or physical access to VA information and VA information systems for their employees, subcontractors, and affiliates only to the extent necessary to perform the services specified in the contract, agreement, or task order.
b. All contractors, subcontractors, and third-party servicers and associates working with VA information are subject to the same investigative requirements as those of VA appointees or employees who have access to the same types of information. The level and process of background security investigations for contractors must be in accordance with VA Directive and Handbook 0710, Personnel Suitability and Security Program. The Office for Operations, Security, and Preparedness is responsible for these policies and procedures.
c. Contract personnel who require access to national security programs must have a valid security clearance. National Industrial Security Program (NISP) was established by Executive Order 12829 to ensure that cleared U.S. defense industry contract personnel safeguard the classified information in their possession while performing work on contracts, programs, bids, or research and development efforts. The Department of Veterans Affairs does not have a Memorandum of Agreement with Defense Security Service (DSS).
Verification of a Security Clearance must be processed through the Special Security Officer located in the Planning and National Security Service within the Office of Operations, Security, and Preparedness.
d. Custom software development and outsourced operations must be located in the U.S.
to the maximum extent practical. If such services are proposed to be performed abroad and are not disallowed by other VA policy or mandates, the contractor/subcontractor must state where all non-U.S. services are provided and detail a security plan, deemed to be acceptable by VA, specifically to address mitigation of the resulting problems of communication, control, data protection, and so forth. Location within the U.S. may be an evaluation factor.
e. The contractor or subcontractor must notify the Contracting Officer immediately when an employee working on a VA system or with access to VA information is reassigned or leaves the contractor or subcontractor’s employment. The Contracting Officer must also be notified immediately by the contractor or subcontractor prior to an unfriendly termination.
5.3 VA INFORMATION CUSTODIAL LANGUAGE
a. Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the contractor/subcontractor's rights to use data as described in Rights in Data - General, FAR 52.227-14(d) (1).
b. VA information should not be co-mingled, if possible, with any other data on the contractors/subcontractor’s information systems or media storage systems in order to ensure VA requirements related to data protection and media sanitization can be met. If co-mingling must be allowed to meet the requirements of the business need, the contractor must ensure that VA’s information is returned to the VA or destroyed in accordance with
VA’s sanitization requirements. VA reserves the right to conduct onsite inspections of contractor and subcontractor IT resources to ensure data security controls, separation of data and job duties, and destruction/media sanitization procedures are in compliance with VA directive requirements.
c. Prior to termination or completion of this contract, contractor/subcontractor must not destroy information received from VA, or gathered/created by the contractor in the course of performing this contract without prior written approval by the VA. Any data destruction done on behalf of VA by a contractor/subcontractor must be done in accordance with National Archives and Records Administration (NARA) requirements as outlined in VA Directive 6300, Records and Information Management and its Handbook 6300.1 Records Management Procedures, applicable VA Records Control Schedules, and VA Handbook 6500.1, Electronic Media Sanitization. Self-certification by the contractor that the data destruction requirements above have been met must be sent to the VA Contracting Officer within 30 days of termination of the contract.
d. The contractor/subcontractor must receive, gather, store, back up, maintain, use, disclose and dispose of VA information only in compliance with the terms of the contract and applicable Federal and VA information confidentiality and security laws, regulations and policies. If Federal or VA information confidentiality and security laws, regulations and policies become applicable to the VA information or information systems after execution of the contract, or if NIST issues or updates applicable FIPS or Special Publications (SP) after execution of this contract, the parties agree to negotiate in good faith to implement the information confidentiality and security laws, regulations and policies in this contract.
e. The contractor/subcontractor shall not make copies of VA information except as authorized and necessary to perform the terms of the agreement or to preserve electronic information stored on contractor/subcontractor electronic storage media for restoration in case any electronic equipment or data used by the contractor/subcontractor needs to be restored to an operating state. If copies are made for restoration purposes, after the restoration is complete, the copies must be appropriately destroyed.
f. If VA determines that the contractor has violated any of the information confidentiality, privacy, and security provisions of the contract, it shall be sufficient grounds for VA to withhold payment to the contractor or third party or terminate the contract for default or terminate for cause under Federal Acquisition Regulation (FAR) part 12.
g. If a VHA contract is terminated for cause, the associated BAA must also be terminated and appropriate actions taken in accordance with VHA Handbook 1600.01, Business Associate Agreements. Absent an agreement to use or disclose protected health information, there is no business associate relationship.
h. The contractor/subcontractor must store, transport, or transmit VA sensitive information in an encrypted form, using VA-approved encryption tools that are, at a minimum, FIPS 140-2 validated.
i. The contractor/subcontractor’s firewall and Web services security controls, if applicable, shall meet or exceed VA’s minimum requirements. VA Configuration Guidelines are available upon request.
j. Except for uses and disclosures of VA information authorized by this contract for performance of the contract, the contractor/subcontractor may use and disclose VA information only in two other situations: (i) in response to a qualifying order of a court of competent jurisdiction, or (ii) with VA’s prior written approval. The contractor/subcontractor must refer all requests for, demands for production of, or inquiries about, VA information and information systems to the VA contracting officer for response.
k. Notwithstanding the provision above, the contractor/subcontractor shall not release VA records protected by Title 38 U.S.C. 5705, confidentiality of medical quality assurance records and/or Title 38 U.S.C. 7332, confidentiality of certain health records pertaining to drug addiction, sickle cell anemia, alcoholism or alcohol abuse, or infection with human immunodeficiency virus. If the contractor/subcontractor is in receipt of a court order or other requests for the above-mentioned information, that contractor/subcontractor shall immediately refer such court orders or other requests to the VA contracting officer for response.
l. For service that involves the storage, generating, transmitting, or exchanging of VA sensitive information but does not require C&A or an MOU-ISA for system interconnection, the contractor/subcontractor must complete a Contractor Security Control Assessment (CSCA) on a yearly basis and provide it to the COTR.
5.4 NOT USED
5.5 INFORMATION SYSTEM HOSTING, OPERATION, MAINTENANCE, OR USE
a. For information systems that are hosted, operated, maintained, or used on behalf of VA at non-VA facilities, contractors/subcontractors are fully responsible and accountable for ensuring compliance with all HIPAA, Privacy Act, FISMA, NIST, FIPS, and VA security and privacy directives and handbooks. This includes conducting compliant risk assessments, routine vulnerablity scanning, system patching and change management procedures, and the completion of an acceptable contingency plan for each system. The contractor’s security control procedures must be equivalent, to those procedures used to secure VA systems. A Privacy Impact Assessment (PIA) must also be provided to the COTR and approved by VA Privacy Service prior to operational approval. All external Internet connections to VA’s network involving VA information must be reviewed and approved by VA prior to implementation.
b. Adequate security controls for collecting, processing, transmitting, and storing of Personally Identifiable Information (PII), as determined by the VA Privacy Service, must be in place, tested, and approved by VA prior to hosting, operation, maintenance, or use of the information system, or systems by or on behalf of VA. These security controls are to be assessed and stated within the PIA and if these controls are determined not to be in place, or inadequate, a Plan of Action and Milestones (POA&M) must be submitted and approved prior to the collection of PII.
c. Outsourcing (contractor facility, contractor equipment or contractor staff) of systems or network operations, telecommunications services, or other managed services requires certification and accreditation (authorization) (C&A) of the contractor’s systems in accordance with VA Handbook 6500.3, Certification and Accreditation and/or the VA OCS Certification Program Office. Government-owned (government facility or government equipment) contractor-operated systems, third party or business partner networks require memorandums of understanding and interconnection agreements (MOU-ISA) which detail what data types are shared, who has access, and the appropriate level of security controls for all systems connected to VA networks.
d. The contractor/subcontractor’s system must adhere to all FISMA, FIPS, and NIST standards related to the annual FISMA security controls assessment and review and update the PIA. Any deficiencies noted during this assessment must be provided to the VA contracting officer and the ISO for entry into VA’s POA&M management process. The contractor/subcontractor must use VA’s POA&M process to document planned remedial actions to address any deficiencies in information security policies, procedures, and practices, and the completion of those activities. Security deficiencies must be corrected within the timeframes approved by the government. Contractor/subcontractor procedures are subject to periodic, unannounced assessments by VA officials, including the VA Office of Inspector General. The physical security aspects associated with contractor/subcontractor activities must also be subject to such assessments.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .