Phasing Amendment Narrative.pdf

PDF 682 KB Posted

Attached to
N045--Replace Fire and Smoke Dampers Federal contract opportunity
Solicitation number
36C24625B0002
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This document is a phasing amendment narrative for the VA Asheville Replace Fire/Smoke Dampers Project (Project #21121). The project involves replacing fire and smoke dampers across multiple levels of a VA medical facility, with work strategically divided into four distinct phases (A, B, C, and D) based on specific building wing and chase configurations. Each phase will focus on different mechanical systems and duct work, with ground floor work designated as Phase A, and subsequent phases targeting south, east, and west wing chases.

Critical project details include specific requirements for work timing and location, with first-floor and Staff Room A272 work mandated to occur after hours. Mechanical sheets (47-M-200 through 47-M-206) have been updated to reflect phasing notes for levels 0-5 and the roof, detailing the precise scope and timing for each area. The project is part of VA solicitation 36C24625B0002 for the Asheville, NC VA Medical Center, overseen by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6, with a proposal request date of 03/06/2025.

View the file

Other files for this federal contract opportunity

Other files attached to N045--Replace Fire and Smoke Dampers, newest first.
File Type Posted
36C24625C0029 Award Notice .docx DOCX document
36C24625B0002 Amendment 0009.pdf PDF
Block 14 Cont. - VAAR 852.222-71.pdf PDF
36C24625B0002 Amendment 0008.pdf PDF
Attachment II - Drawing Set Addendum I 01 Apr 2025.pdf PDF
Block 14 Continuation II.pdf PDF
36C24625B0002 - Amendment 0007.pdf PDF
Block 14 Continuation I.pdf PDF
Attachment I - Revised Drawing Set 3 Apr 2025.pdf PDF
Attachment III - Drawing Changes Narrative 01 Apr 2025.pdf PDF
Attachment IV - Additional Questions and Responses rev.pdf PDF
36C24625B0002 0006.docx DOCX document
Asbestos Abatement Report 12.06.2024.pdf PDF
36C24625B0002 0005.docx DOCX document
DSBS SBA Profile Instructions.docx DOCX document
Phasing Amendment Drawings.pdf PDF
Map - Dumpster - Mobile Office - Storage and Temp Power.pdf PDF
Additional Questions 3.06.2025.pdf PDF
Follow Up to RFI Questions.pdf PDF
36C24625B0002 0004.docx DOCX document
36C24625B0002 0003.docx DOCX document
36C24625B0002 0002.docx DOCX document
Questions and Answers - Dampers 2.10.2025.pdf PDF
Site Visit Attendance Sheets.pdf PDF
36C24625B0002 0001.docx DOCX document
Drawings - Final.pdf PDF
Bid Item Cost Breakdown.xlsx XLSX spreadsheet
SOW - 637-21-102 rev.pdf PDF
36C24625B0002_1 Solicitation.pdf PDF
Spec - Final.pdf PDF
Map of Campus - Employee Entrance.pdf PDF
NC Wage Determination 1.03.2025.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Proposal Request

Date: 03/06/2025

Project Name: VA Asheville Replace Fire/Smoke Dampers Project #: 21121

CPR#: 1

Description: Phasing notes were added to the mechanical sheets

Items: The mechanical sheets we modified to add phasing notes for the project. The project will be completed in four phases. The phasing hierarchy will be determined at the time of construction kickoff. All work completed on the ground floor will be phase A. All work on ducts entering and leaving the south wing chase will be phase B. All work on ducts entering and leaving the east wing chase will be phase C. All work on ducts entering and leaving the west wing chase will be phase D. All work done on the first floor shall be performed after hours. Preparation and ICRA barriers can be installed during normal work hours, however demolition and installation of new dampers shall be done after hours. The work in Staff Room A272 shall have the same after hours requirements as the first floor.

1. Sheet 47-M-200 – Level 0 – Mechanical – New Floor Plan

A. Added notes for phase A on the ground floor.

2. Sheet 47-M-201 – Level 1 – Mechanical – New Floor Plan

A. Added notes for the phasing of each of the wings. Added notes regarding the after hours requirements for the work.

3. Sheet 47-M-202 – Level 2 – Mechanical – New Floor Plan

A. Added notes for the phasing of each of the wings. Added notes regarding the after hours requirements for the work in the staff room.

4. Sheet 47-M-203 – Level 3 – Mechanical – New Floor Plan

A. Added notes for the phasing of each of the wings.

5. Sheet 47-M-204 – Level 4 – Mechanical – New Floor Plan

A. Added notes for the phasing of each of the wings.

6. Sheet 47-M-205 – Level 5 – Mechanical – New Floor Plan

A. Added notes for the phasing of each of the wings.

7. Sheet 47-M-206 – Level Roof – Mechanical – New Floor Plan

A. Added notes for phase B in the penthouse.

If any portion of this instruction involves an increase or decrease in contract price, scope, and/or schedule do not proceed with work without submitting a written change order request and receiving written instruction to proceed.

Submitted By: Nick Cesmat www.specializedeng.com

Phasing Amendment

ADD#:

File details come from the government source that posted it. Updated .