Follow Up to RFI Questions.pdf

PDF 662 KB Posted

Attached to
N045--Replace Fire and Smoke Dampers Federal contract opportunity
Solicitation number
36C24625B0002
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This file is a Follow Up to RFI (Request for Information) document for a VA Medical Center project involving fire and smoke damper replacements in Asheville, NC. The document addresses multiple clarification questions from potential contractors, including key details about project staffing, work hours, and site conditions. Significant clarifications include: one superintendent and safety officer per project/construction site, after-hours work required on the first floor and 2 south wings (specific rooms A274 and A272), and confirmation that no walls will be removed during the project. Additional technical details involve contact information for Building Management Systems (BMS) and Fire Alarm integration contractors, and guidance on accessing facility drawings for review, which are located in Building 15's 3rd floor plans room and require prior notice during business hours.

View the file

Other files for this federal contract opportunity

Other files attached to N045--Replace Fire and Smoke Dampers, newest first.
File Type Posted
36C24625C0029 Award Notice .docx DOCX document
36C24625B0002 Amendment 0009.pdf PDF
Block 14 Cont. - VAAR 852.222-71.pdf PDF
36C24625B0002 Amendment 0008.pdf PDF
Block 14 Continuation II.pdf PDF
36C24625B0002 - Amendment 0007.pdf PDF
Block 14 Continuation I.pdf PDF
Attachment I - Revised Drawing Set 3 Apr 2025.pdf PDF
Attachment III - Drawing Changes Narrative 01 Apr 2025.pdf PDF
Attachment IV - Additional Questions and Responses rev.pdf PDF
Attachment II - Drawing Set Addendum I 01 Apr 2025.pdf PDF
Asbestos Abatement Report 12.06.2024.pdf PDF
36C24625B0002 0006.docx DOCX document
36C24625B0002 0005.docx DOCX document
DSBS SBA Profile Instructions.docx DOCX document
Phasing Amendment Drawings.pdf PDF
Map - Dumpster - Mobile Office - Storage and Temp Power.pdf PDF
Additional Questions 3.06.2025.pdf PDF
36C24625B0002 0004.docx DOCX document
Phasing Amendment Narrative.pdf PDF
36C24625B0002 0003.docx DOCX document
Questions and Answers - Dampers 2.10.2025.pdf PDF
36C24625B0002 0002.docx DOCX document
36C24625B0002 0001.docx DOCX document
Site Visit Attendance Sheets.pdf PDF
Spec - Final.pdf PDF
Map of Campus - Employee Entrance.pdf PDF
NC Wage Determination 1.03.2025.pdf PDF
Bid Item Cost Breakdown.xlsx XLSX spreadsheet
SOW - 637-21-102 rev.pdf PDF
36C24625B0002_1 Solicitation.pdf PDF
Drawings - Final.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Follow Up Questions - Dampers

RFI Question #3 Not Answered In Specification 01 45 00 3.1 A

In the case where a Prime Contractor is awarded multiple projects at the same VA Medical Center location, can one (1) Superintendent be assigned to oversee all awarded projects at the site? Since the word “site” could be defined as the property, this would also apply to the SSHO.

No. One super and one SSHO per project/construction site. Superintendent is expected to be on the construction site at all times.

RFI Question #16 Not Answered Until Question #48

RFI answer for question #48 states:

As the surgical suite was not mentioned in the SOW, please confirm that there is no other scope of work that needs to be performed outside of regular hours besides the fire dampers in the surgical suite, or alternatively, please provide all locations of work that will need to be performed outside of regular work hours.

Work on first floor and 2 south (A274, and A272) should be planned for after hours.

RFI Question #19 Not Answered

Should bond premium overruns be included with each individual modification? We ask because there is a particular clause that states bond premium overruns are to be invoiced at the end of the project for all modifications.

Terms of the Clause shall govern.

RFI Question #20 PDF Link Not Accessible In File

Please upload the PDF of the site map to Sam.gov.

Please see attached map.

RFI Question #33 & 34 Information Intended Not Provided

Please provide the contact information for the BMS Integration Contractor.

David DeBusk, ddebusk@asiinc.us mailto:ddebusk@asiinc.us

Please provide the contact information for the Fire Alarm Integration Contractor.

Jeff.kilpatrick@JCI.com

RFI Question #58 & 59 Not Answered Sufficiently

58) ACT in most areas. Hard ceiling in 5th floor A571(18” access), B527, 5E525(Multiple 18” or smaller accesses). Penthouse no ceiling.

The mechanical general note B on 47-M001 states:

General note B is moot and is not enforceable as the contractor does not have access and has not been given access to all piping, fixtures, ductwork, and outlets as stated. As such please provide a reflective ceiling plan as this is not only need for mechanical but also for the electrical work. Please also provide notes on the reflective ceiling plan showing where ceilings will need to be replaced or repaired as this is not the role of a contractor to determine, but rather that of an AE.

No, RCP exists. Please refer to Answer to 58.

mailto:Jeff.kilpatrick@JCI.com

Electrical Demolition General Note C states:

Where are the Facility Drawings available for us to review?

Building 15 3rd floor. Prior notice must be given (between 8:00 am and 4:30 pm, excluding federal holidays), and the plans room is in no particular order. We do not have a true as built condition of the facility.

Electrical Demolition General Note E states “where existing walls are to be removed” yet the drawings don’t show any walls to be removed. Please confirm that no walls are being removed.

Correct, no walls are being removed.