S05 RFI 2 3rd 6th 9th 10th Floor Response.pdf
PDF 20 MB Posted
- Attached to
- Z2DA--Correct Building 1 Trash Chutes Federal contract opportunity
- Solicitation number
- 36C24623B0003
About this file
This solicitation requests proposals to correct building trash chutes for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. Solicitation number 36C24623B0003 calls for responses by June 3rd, 2023 to replace faulty trash chutes in Building 1. Proposals should address repairing or replacing all trash chutes to ensure proper operation and sanitation. The award date is set for July 15th, 2023, with work to be completed by September 30th, 2023. Pricing should be quoted as firm fixed price for the full scope of work. No set asides or incumbent are specified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24623B0003 0005.pdf | ||
| 36C24623B0003 0005_1.docx | DOCX document | |
| S07 OF 1419 Bid Abstract - Trash Chute - CO Signed.pdf | ||
| S05 RFI 2.pdf | ||
| 36C24623B0003 0004.pdf | ||
| 36C24623B0003 0004_1.docx | DOCX document | |
| S05 RFI 2 Ground Floor Response.pdf | ||
| S05 081113 Hollow Metal Frames Specifications.pdf | ||
| S05 Questions Trash Chutes.pdf | ||
| 36C24623B0003 0003.pdf | ||
| S05 Photos PDF.pdf | ||
| 36C24623B0003 0002.pdf | ||
| 36C24623B0003 0002_1.docx | DOCX document | |
| S04 Trash Chute Site Visit 11162022.pdf | ||
| 36C24623B0003 0001.pdf | ||
| Attachment 4 Dimension and Layout.pdf | ||
| Attachment 2 Combined Specifications.pdf | ||
| Attachment 1 Scope of Work.pdf | ||
| 36C24623B0003_2.docx | DOCX document | |
| Attachment 5 NC Wage Rates Durham Building.pdf | ||
| Attachment 3 Life Safety Drawings.pdf | ||
| S02 36C24623B0003.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3rd Floor
| 3rd Floor Electrical Panel |
| 3rd Floor Electrical Panel Schedule |
| 3rd Floor Trash Chute Ceiling |
| 3rd Floor Trash Chute |
| 6th Floor Electrical Panel |
| 6th Floor Electrical Panel Schedule |
| 9th Floor Electrical Panel |
| 9th Floor Electrical Panel Schedule |
| 10th Floor Trash Chute Ceiling |
| 10th Floor Trash Chute |
| 10th Floor |
File details come from the government source that posted it. Updated .