S05 081113 Hollow Metal Frames Specifications.pdf

PDF 127 KB Posted

Attached to
Z2DA--Correct Building 1 Trash Chutes Federal contract opportunity
Solicitation number
36C24623B0003
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This document provides specifications for hollow metal doors and frames for construction projects. It outlines requirements for fire rated and smoke control rated doors and frames to meet standards for fire resistance, air leakage, and sound transmission. Acceptable materials include steel sheet and aluminum alloys. The document specifies fabrication details for hollow metal frames and doors to ensure proper hardware preparation, tolerances, and installation requirements. It also requires recycled material content and includes delivery, storage, warranty and quality assurance provisions.

The related federal contract opportunity is to correct deficiencies in Building 1 trash chutes at the Veterans Affairs Medical Center in Albany, New York. The solicitation number is provided along with a brief description of the project scope and the contracting agency within the Veterans Health Administration.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Correct Building 1 Trash Chutes, newest first.
File Type Posted
36C24623B0003 0005.pdf PDF
36C24623B0003 0005_1.docx DOCX document
S07 OF 1419 Bid Abstract - Trash Chute - CO Signed.pdf PDF
36C24623B0003 0004_1.docx DOCX document
S05 RFI 2.pdf PDF
36C24623B0003 0004.pdf PDF
S05 RFI 2 Ground Floor Response.pdf PDF
S05 RFI 2 3rd 6th 9th 10th Floor Response.pdf PDF
S05 Questions Trash Chutes.pdf PDF
36C24623B0003 0003.pdf PDF
S05 Photos PDF.pdf PDF
36C24623B0003 0002_1.docx DOCX document
36C24623B0003 0002.pdf PDF
S04 Trash Chute Site Visit 11162022.pdf PDF
36C24623B0003 0001.pdf PDF
Attachment 5 NC Wage Rates Durham Building.pdf PDF
Attachment 2 Combined Specifications.pdf PDF
Attachment 1 Scope of Work.pdf PDF
36C24623B0003_2.docx DOCX document
Attachment 4 Dimension and Layout.pdf PDF
Attachment 3 Life Safety Drawings.pdf PDF
S02 36C24623B0003.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01-01-21

08 11 13 - 1

SECTION 08 11 13

HOLLOW METAL DOORS AND FRAMES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. .

2. Hollow metal door frames for wood doors and borrowed lights at interior locations.

1.2 APPLICABLE PUBLICATIONS

A. Comply with references to extent specified in this section.

B. American National Standard Institute (ANSI):

A250.8-2014.............Standard Steel Doors and Frames

C. ASTM International (ASTM):

A240/A240M-15b..........Chromium and Chromium-Nickel Stainless Steel

Plate, Sheet, and Strip for Pressure Vessels and for General Applications

A653/A653M-15...........Steel Sheet, Zinc-Coated (Galvanized) or

Zinc-Iron Alloy-Coated (Galvannealed) by the

Hot-Dip

A1008/A1008M-15.........Steel, Sheet, Cold-Rolled, Carbon, Structural, High Strength Low Alloy and High Strength Low

Alloy with Improved Formability, Solution

Hardened, and Bake Hardenable

B209-14.................Aluminum and Aluminum-Alloy Sheet and Plate

B209M-14................Aluminum and Aluminum-Alloy Sheet and Plate

(Metric)

B221-14.................Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes

B221M-13................Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric)

D3656/D3656M-13.........Insect Screening and Louver Cloth Woven from

Vinyl Coated Glass Yarns

E90-09..................Laboratory Measurement of Airborne Sound

Transmission Loss of Building Partitions and

Elements

D. Federal Specifications (Fed. Spec.):

L-S-125B................Screening, Insect, Nonmetallic

08 11 13 - 2

E. Master Painters Institute (MPI):

No. 18..................Primer, Zinc Rich, Organic

F. National Association of Architectural Metal Manufacturers (NAAMM):

AMP 500-06..............Metal Finishes Manual

G. National Fire Protection Association (NFPA):

80-16...................Fire Doors and Other Opening Protectives

H. UL LLC (UL):

10C-09..................Positive Pressure Fire Tests of Door Assemblies

1784-15.................Air Leakage Tests of Door Assemblies and Other

Opening Protectives

I. Department of Veterans Affairs VA Physical Security and Resiliency Design Manual October 1, 2020

1.3 SUBMITTALS

A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B. Submittal Drawings:

1. Show size, configuration, and fabrication and installation details.

C. Manufacturer's Literature and Data:

1. Description of each product.

2. Include schedule showing each door and frame requirements fire label and smoke control label for openings.

3. Installation instructions.

D. Sustainable Construction Submittals:

1. Recycled Content: Identify post-consumer and pre-consumer recycled content percentage by weight.

E. Test reports: Certify each product complies with specifications.

1. Sound rated door.

F. Qualifications: Substantiate qualifications comply with specifications.

1. Manufacturer with project experience list.

1.4 QUALITY ASSURANCE

A. Manufacturer Qualifications:

1. Regularly manufactures specified products.

2. Manufactured specified products with satisfactory service on five similar installations for minimum five years.

1.5 DELIVERY

A. Fasten temporary steel spreaders across the bottom of each door frame before shipment.

B. Deliver products in manufacturer's original sealed packaging.

08 11 13 - 3

C. Mark packaging, legibly. Indicate manufacturer's name or brand, type, production run number, and manufacture date.

D. Before installation, return or dispose of products within distorted, damaged, or opened packaging.

1.6 STORAGE AND HANDLING

A. Store products indoors in dry, weathertight // conditioned // facility.

B. Protect products from damage during handling and construction operations.

1.7 WARRANTY

A. Construction Warranty: FAR clause 52.246-21, "Warranty of

Construction."

PART 2 - PRODUCTS

2.1 SYSTEM PERFORMANCE

A. Design hollow metal doors and frames complying with specified performance:

1. Fire Doors and Frames: UL 10C; NFPA 80 labeled.

a. Fire Ratings: See drawings.

2. Stair Doors: Temperature rise rated fire doors.

3. Smoke Control Doors and Frames: UL 1784; NFPA 80 labeled, maximum

0.15424 cubic meter/second/square meter (3.0 cubic feet/minute/square foot) at 24.9 Pa (0.10 inches water gauge) pressure differential.

2.2 MATERIALS

A. Sheet Steel: ASTM A1008/A1008M, cold-rolled.

2.3 PRODUCTS - GENERAL

A. Basis of Design: Steel craft or equal.

B. Provide hollow metal doors and frames from one manufacturer.

C. Sustainable Construction Requirements:

1. Steel Recycled Content: 30 percent total recycled content, minimum.

2.4 HOLLOW METAL FRAMES

A. Hollow Metal Frames: ANSI A250.8; face welded.

1. Interior Frames:

a. Interior Borrowed Light Frames: 1.3 mm (0.051 inch) thick.

B. Frame Materials:

1. Interior Frames: Sheet steel

2. Both directions.

2.5 FABRICATION

A. Hardware Preparation: ANSI A250.8.

08 11 13 - 4

B. Hollow Metal Door Fabrication:

1. Close top edge of exterior doors flush and seal to prevent water intrusion.

2. Fill spaces between vertical steel stiffeners with insulation.

C. Fire Doors:

1. Close top and vertical edges flush.

2. Apply steel astragal to active leaf at pair and double egress doors.

a. Exception: Where vertical rod exit devices are specified for both leaves swinging in same direction.

3. Fire Door Clearances: NFPA 80.

D. Transom Panel Fabrication:

1. Fabricate panels as specified for doors.

2. Fabricate bottom edge with rabbet stop where no transom bar occurs.

E. Hollow Metal Frame Fabrication:

1. Fasten mortar guards to back of hardware reinforcements, except on lead-lined frames.

2. Concealed Closers in Head Frame: Provide 1 mm (0.042 inch) thick steel removable stop sections for access to concealed face plates and control valves, except when cover plates are furnished with closer.

3. Terminated Stops: ANSI A250.8.

4. Frame Anchors:

a. Floor anchors:

1) Provide extension type floor anchors to compensate for depth of floor fills.

2) Provide 1.3 mm (0.053 inch) thick steel clip angles welded to jamb and drilled to receive floor fasteners.

3) Provide 50 mm by 50 mm by 9 mm (2 inch by 2 inch by 3/8 inch) clip angle for lead lined frames, drilled for floor fasteners.

4) Provide mullion 2.3 mm (0.093 inch) thick steel channel anchors, drilled for two floor fasteners and frame anchor screws.

5) Provide continuous 1 mm (0.042 inch) thick steel rough bucks drilled for floor fasteners and frame anchor screws for sill sections.

a) Space floor bolts50 mm (24 inches) on center.

b. Jamb anchors:

1) Place anchors on jambs:

08 11 13 - 5

a) Near top and bottom of each frame.

b) At intermediate points at maximum 600 mm (24 inches) spacing.

2) Form jamb anchors from steel minimum 1 mm (0.042 inch) thick.

3) Anchors set in masonry: Provide adjustable anchors designed for friction fit against frame and extended into masonry minimum 250 mm (10 inches). Provide one of following types:

a) Wire Loop Type: 5 mm (3/16 inch) diameter wire.

b) T-Shape type.

c) Strap and stirrup type: Corrugated or perforated sheet steel.

4) Anchors for stud partitions: Provide tabs for securing anchor to sides of studs. Provide one of the following:

a) Welded type.

b) Lock-in snap-in type.

5) Anchors for frames set in prepared openings:

a) Steel pipe spacers 6 mm (1/4 inch) inside diameter, welded to plate reinforcing at jamb stops, or hat shaped formed strap spacers 50 mm (2 inches) wide, welded to jamb near stop.

b) Drill jamb stop and strap spacers for 6 mm (1/4 inch) flat head bolts to pass through frame and spacers.

c) Two piece frames: Subframe or rough buck drilled for 6 mm (1/4 inch) bolts.

6) Anchors for observation windows and other continuous frames set in stud partitions.

a) Weld clip anchors to sills and heads of continuous frames over 1200 mm (4 feet) long.

b) Space maximum 600 mm (24 inches) on centers.

7) Modify frame anchors to fit special frame and wall construction.

8) Provide special anchors were shown on drawings and where required to suit application.

2.6 FINISHES

A. Steel: ANSI A250.8; shop primed.

2.7 ACCESSORIES

A. Primers: ANSI A250.8.

B. Barrier Coating: ASTM D1187/D1187M.

08 11 13 - 6

C. Welding Materials: AWS D1.1/D1.1M, type to suit application.

D. Clips Connecting Members and Sleeves: Match door faces.

E. Fasteners: stainless steel.

F. Metal Framing: Steel drill screws.

1. Masonry and Concrete: Expansion bolts and power actuated drive pins.

G. Anchors: stainless steel.

H. Galvanizing Repair Paint: MPI No. 18.

I. Insulation: Unfaced mineral wool.

PART 3 - EXECUTION

3.1 PREPARATION

A. Examine and verify substrate suitability for product installation.

B. Protect existing construction and completed work from damage.

C. Apply barrier coating to metal surfaces in contact with cementitious materials to minimum 0.7 mm (30 mils) dry film thickness.

3.2 INSTALLATION - GENERAL

A. Install products according to manufacturer's instructions and approved submittal drawings.

1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.

2. Install fire doors and frames according to NFPA 80.

3. Install smoke control doors and frames according to NFPA 105.

3.3 FRAME INSTALLATION

A. Apply barrier coating to concealed surfaces of frames built into masonry.

B. Plumb, align, and brace frames until permanent anchors are set.

1. Use triangular bracing near each corner on both sides of frames with temporary wood spreaders at midpoint.

2. Use wood spreaders at bottom of frame when shipping spreader is removed.

3. Where construction permits concealment, leave shipping spreaders in place after installation, otherwise remove spreaders when frames are set and anchored.

4. Remove wood spreaders and braces when walls are built, and jamb anchors are secured.

C. Floor Anchors:

1. Anchor frame jambs to floor with two expansion bolts.

a. Lead Lined Frames: Use 9 mm (3/8 inch) diameter bolts.

08 11 13 - 7

b. Other Frames: Use 6 mm (1/4 inch) diameter bolts.

2. Power actuated drive pins are acceptable to secure frame anchors to concrete floors.

D. Jamb Anchors:

1. Masonry Walls:

a. Embed anchors in mortar.

b. Fill space between frame and masonry with grout or mortar as walls are built.

2. Metal Framed Walls: Secure anchors to sides of studs with two fasteners through anchor tabs.

3. Prepared Masonry and Concrete Openings:

a. Direct Securement: 6 mm (1/4 inch) diameter expansion bolts through spacers.

b. Subframe or Rough Buck Securement:

1) 6 mm (1/4 inch) diameter expansion bolts on 600 mm (24 inch) centers.

2) Power activated drive pins on 600 mm (24 inches) centers.

c. Secure two-piece frames to subframe or rough buck with machine screws on both faces.

E. Touch up damaged factory finishes.

1. Repair galvanized surfaces with galvanized repair paint.

2. Repair painted surfaces with touch up primer.

3.4 DOOR INSTALLATION

A. Install doors plumb and level.

B. Adjust doors for smooth operation.

C. Touch up damaged factory finishes.

1. Repair galvanized surfaces with galvanized repair paint.

2. Repair painted surfaces with touch up primer.

3.5 CLEANING

A. Clean exposed door and frame surfaces. Remove contaminants and stains.

3.6 PROTECTION

A. Protect doors and frames from traffic and construction operations.

B. Remove protective materials immediately before acceptance.

C. Repair damage.

- - - E N D - - -

SECTION 08 11 13 HOLLOW METAL DOORS AND FRAMES
PART 1 - GENERAL
1.1 SUMMARY
1.2 APPLICABLE PUBLICATIONS
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.5 DELIVERY
1.6 STORAGE AND HANDLING
PART 2 - PRODUCTS
2.1 SYSTEM PERFORMANCE
2.2 MATERIALS
2.3 PRODUCTS - GENERAL
2.4 HOLLOW METAL FRAMES
2.5 FABRICATION
2.6 FINISHES
2.7 ACCESSORIES
PART 3 - EXECUTION
3.1 PREPARATION
3.2 INSTALLATION - GENERAL
3.3 FRAME INSTALLATION
3.4 DOOR INSTALLATION
3.5 CLEANING
3.6 PROTECTION