Current Camera Locations 04-07-21.ppt

PPT presentation 9 MB Posted

Attached to
Z1PZ--565-22-303 Replace Obsolete Police Security Camera System (VA-22-00059608)
Solicitation number
36C24622B0035
Issued by

About this file

This document outlines the requirements for a federal contract opportunity to replace an obsolete police security camera system at a Veterans Affairs Medical Center. The contractor will be responsible for replacing up to 1000 cameras, network video recorders, power over ethernet switches, and cabling across 40 buildings on the over 50 acre facility campus. The replacement system must support a minimum one hour run time on an installed rack mounted UPS. Bidders must propose at least two viable replacement system alternatives with details on positive and negative aspects, availability of replacement components, warranty coverage, functions and abilities. The replacement plan must meet all VA requirements. The contract will be awarded by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6.

View the file

Other files

File Type Posted
36C24622B0035 0002.docx DOCX document
Combined Specifications for 565-22-303 Replace Security Camera System (1).pdf PDF
Bldg 21 Floor Plan.pdf PDF
Bldg 11 2nd Floor Plan.pdf PDF
Bldg 3 Basement Floor Plan.pdf PDF
Bldg 1 Penthouse Floor Plan.pdf PDF
Bldg 1 3rd Floor Plan.pdf PDF
Bldg 3 4th Floor Plan.pdf PDF
Bldg 8 1st Floor Plan.pdf PDF
36C24622B0035 Replace Camera System Questions and Answers.pdf PDF
Bldg 4 Basement Floor Plan.pdf PDF
Bldg 50 1st Floor Plan.pdf PDF
List of existing Cameras.pdf PDF
Bldg 11 Basement Floor Plan.pdf PDF
Bldg 46 Floor Plan.pdf PDF
Bldg 4 2nd Floor Plan.pdf PDF
Bldg 16 Floor Plan.pdf PDF
Bldg 57 2nd Floor Plan.pdf PDF
Bldg 4 1st Floor Plan.pdf PDF
Bldg 47 Floor Plan.pdf PDF
Bldg 3 1st Floor Plan.pdf PDF
Bldg 1 Basement Floor Plan.pdf PDF
Bldg 11 1st Floor Plan.pdf PDF
36C24622B0035 0001.docx DOCX document
Bldg 70 Floor Plan.pdf PDF
Bldg 45 Floor Plan.pdf PDF
Bldg 18 Floor Plan.pdf PDF
Bldg 3 2nd Floor Plan.pdf PDF
Bldg 15 Floor Plan.pdf PDF
Bldg 9 Floor Plan.pdf PDF
Bldg 1 2nd Floor Plan.pdf PDF
Bldg 1 1st Floor Plan.pdf PDF
Bldg 50 2nd Floor Plan.pdf PDF
Bldg 10 Basement Floor Plan.pdf PDF
Bldg 8 2nd Floor Plan.pdf PDF
Bldg 22 Floor Plan.pdf PDF
Bldg 48 Floor Plan.pdf PDF
Bldg 1 4th Floor Plan.pdf PDF
Bldg 1 5th Floor Plan.pdf PDF
Bldg 73 Floor Plan.pdf PDF
Bldg 3 3rd Floor Plan.pdf PDF
FNCVAMC Site Plan 2300 Ramsey Street.pdf PDF
Bldg 57 1st Floor Plan.pdf PDF
Bldg 71 Floor Plan.pdf PDF
Bldg 35 Floor Plan.pdf PDF
Bldg 34 Floor Plan.pdf PDF
Bldg 72 Floor Plan.pdf PDF
Bldg 10 1st Floor Plan.pdf PDF
Combined Specifications for 565-22-303 Replace Security Camera System.pdf PDF
36C24622B0035.docx DOCX document
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cochran St In-Bound Lane Out-bound Lane Geriatric Park Bldg 4 NE Corner Bldg 48/45/47/46 Warehouse Dock Valet Parking Lot Smoking Shelter Decon Area/ Parking Lot 2 Pavillon/ Basketball Court Warehouse Phar Cache/ IT Storage Callbox 113 Parking Lot 5 Callbox Callbox 114 Parking Lot 3 Callbox 111/Parking Lot 1 Callbox 115/Fuel Point #1 Main Bldg #10 Laundry/IT Storage #20 Incinerator Bldg #40 Police Storage #50 MH Clinic #3 Warehouse/Mailroom/VCS #11 Boiler Plant #21 IRM #41 Gazebo/Pavillion/BB Ct #51T MH Clinic #4 Education #14 Main Flagpole #30 Storage #45 MHSL #52T MH Clinic #8 HAS #15 Garage Bldg #34 Generator Bldg #46 OEF/OIF #9 Maintenance Shop #16 Garage Bldg #35 Chiller Bldg #47 MHSL #18 Garage Bldg #36 Cooler Tower #48 MHSL Cameras Not Working Callbox Bldg 1 Bldg 50

Facility Dr Ramsey St

CLC

Bldg 4 SW Corner C42 C37 C43 C40 C39 C38 C86 C76 C72 C118 Boiler Plant C78

PTZ

C41 C35 C47 C34 C36 C120 C44 C119 C117 C64 C10

Basement-A Wing Main Elevator Basement Dental Clinic Cameras Not Working Stair B35 Stair B43 Stair B01 B44 B45 B46 B14 B13 B09 B08 B07 B06 B12 B14-A 79H 79F 79G 79E 79D 79K 79C 79B 79L B30 B72 B29 B28 B62K 79A Elevator B73 B27 B26 B63 B62J B62I B62E B62F B62A B62D B62C B62B B23 B22 B23 B36 B37 B36 54P B19 B42D B42C B42B B42A B42E B42G B42H B42I B42K B54N B54M B54L 54C B54D B54E B54H B54F B54G B42J North Entrance B14-B Camera Viewing Direction Bldg 3

C55 C65 Fixed

C73

C70 C81

C46

Basement D Wing

Pharmacy Back of UCC UCC Hallway UCC Entrance Performance Improvement

(PI)

UCC Waiting Area Specialty Clinic Coffee Shop Pharmacy Waiting

Voluntary Services Stair B06 Stair B05 Stair B10 B62A 74G 74E 74D 74C 74B 74A 74F 74I 0119B 0119A Outpatient Waiting Room 0063-A 0031-B 0031-A South Entrance

PM&R

Fixed

C14

C15

C116 C16 C17 C96

C48 C25 C53 C49 C79 C50 C95 C54 C27 C29 C52

C94 C60

C59 C61 C62

Cameras Not Working Stair B11 Mailroom Warehouse Stairs Freight Elevator Prosthetics

PM&R

Mailroom Warehouse Basement Freight Elevator Warehouse Camera Viewing

C115 C75

C82 C82

1st Floor A Wing 1st Flr A Wing Elevator Chapel / Z Room Main Lobby 1st Flr Main Elevator PIV Cards

(HR)

PIV Room Door Director Suite

VCS

Storage Stair Stair Stair 181-B 181-A Z Room 137-A Chapel

PIV

147-B 147-A

Bldg 3 C87

C90 C111

C112 C88 C57

1st Floor D Wing LAB / Radiology / ROI LAB Waiting Area Radiology

ROI

Stair 112-E 112-G 112-D 112-C 112-B 112-A 112-J 112-K 112-A 115-C 115-N 115-M 115-D 115-F 115-L 115-G 115-K 115-H 115-I 115-J Stair S-106

C32

C18

C19 C77

Bldg 3, 1st Floor

C61 C69 C68 C106 C62 Retail Store Entrance 1st Floor Freight Elevator Retail Store Stair Stair C39 VCS Cafeteria C54 C67

C66

Locking Device Siemens Door LockingSystem Prox/Pin Reader

2nd Floor A Wing

C75 C74 A Wing Elevator Stair Stair Stair Sleep LAB Call Center

C21

2nd Floor D Wing

C78 C77 C76

ICU

Surgical ICU Rooms 2301-2310 Elevator 2301-A 2310-A 2326-B 2326-A

Bldg 3, 2nd Floor

Computer Lab Stair Stair 211-B 211-B2 211-C1-3 Camera Viewing Direction

Outside Computer Lab Bldg 3

C13

C31

3rd Floor 3A

C82 3A Break Area C101 3A Nurse Station Rooms 372-379 Rooms 357-363 Rooms 367-370 Rooms 356-380 Rooms 338-343 Stair Stair 3A Elevator

3rd Floor 3C

C81 C80 Ward 3C 3rd Floor Main Elevator Rooms 321-328 Rooms 313-320 Nurse Station Stair Stair

Bldg 3, 3rd Floor

C96 Auditorium Navigation Room Auditorium

4th Floor 4A

C102 4A Nurse Station Rooms 464-468 Rooms 478-482 Rooms 456-462 Rooms 489-494 Rooms 469-475 Stair Stair B49-B 489-A 491-A 492-B 4A Elevator

4th Floor 4C

4C Main Elevator Stair Stair

5th Floor 5C South

C30 5C Main Elevator Stair 5C South Stair

5th Floor 5C North

5C North

Bldg 10 IRM/Pharmacy Cache

C15 IT Storage Pharmacy Drug Cache Laundry Drug Cache/IT Storage

Prox/Pin Reader (New)

Prox/Pin Reader (Existing)

Bldg 45

Bldg 45 Lobby C85

Bldg 46

C86 Bldg 46 Lobby

Bldg 47

C87 Bldg 47 Lobby

Bldg 48

C88 Bldg 48 Lobby

Bldg 50, 1st Floor

Bldg 50 1st Floor Lobby C89

Bldg 50, 2nd Floor

Bldg 50 2nd Floor Lobby C90

File details come from the government source that posted it. Updated .