About this file

This document contains details regarding a federal contract opportunity to replace an obsolete police security camera system at a Veterans Affairs medical center. The contractor will be responsible for developing a complete plan to replace all existing system components with a new VA-approved system, including removing and disposing of the current rack and components. The replacement system is expected to have its own four-post mounting rack installed beside the existing rack. The project includes replacing up to 1,000 feet of CAT6 cable, installing up to 200 feet of new A conduit and 20 new 4x4 junction boxes. The contractor must offer at least two viable replacement system alternatives and provide descriptions of each that address positive and negative aspects, availability of components, warranty and overall functions. The replacement system must include a rack-mounted UPS to support the system for a minimum of one hour. The existing system consists of 156 interior and exterior cameras, 3 network video recorders, 27 PoE switches, 2 core switches and various other components across multiple buildings at the site. The opportunity is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6.

View the file

Other files

File Type Posted
36C24622B0035 0002.docx DOCX document
Combined Specifications for 565-22-303 Replace Security Camera System (1).pdf PDF
Current Camera Locations 04-07-21.ppt PPT presentation
Bldg 21 Floor Plan.pdf PDF
Bldg 11 2nd Floor Plan.pdf PDF
Bldg 3 Basement Floor Plan.pdf PDF
Bldg 1 Penthouse Floor Plan.pdf PDF
Bldg 1 3rd Floor Plan.pdf PDF
Bldg 3 4th Floor Plan.pdf PDF
Bldg 8 1st Floor Plan.pdf PDF
36C24622B0035 Replace Camera System Questions and Answers.pdf PDF
Bldg 4 Basement Floor Plan.pdf PDF
Bldg 50 1st Floor Plan.pdf PDF
List of existing Cameras.pdf PDF
Bldg 11 Basement Floor Plan.pdf PDF
Bldg 46 Floor Plan.pdf PDF
Bldg 4 2nd Floor Plan.pdf PDF
Bldg 16 Floor Plan.pdf PDF
Bldg 57 2nd Floor Plan.pdf PDF
Bldg 4 1st Floor Plan.pdf PDF
Bldg 47 Floor Plan.pdf PDF
Bldg 3 1st Floor Plan.pdf PDF
Bldg 1 Basement Floor Plan.pdf PDF
Bldg 11 1st Floor Plan.pdf PDF
36C24622B0035 0001.docx DOCX document
Bldg 70 Floor Plan.pdf PDF
Bldg 45 Floor Plan.pdf PDF
Bldg 18 Floor Plan.pdf PDF
Bldg 3 2nd Floor Plan.pdf PDF
Bldg 15 Floor Plan.pdf PDF
Bldg 9 Floor Plan.pdf PDF
Bldg 1 2nd Floor Plan.pdf PDF
Bldg 1 1st Floor Plan.pdf PDF
Bldg 50 2nd Floor Plan.pdf PDF
Bldg 10 Basement Floor Plan.pdf PDF
Bldg 8 2nd Floor Plan.pdf PDF
Bldg 22 Floor Plan.pdf PDF
Bldg 1 4th Floor Plan.pdf PDF
Bldg 1 5th Floor Plan.pdf PDF
Bldg 73 Floor Plan.pdf PDF
Bldg 3 3rd Floor Plan.pdf PDF
FNCVAMC Site Plan 2300 Ramsey Street.pdf PDF
Bldg 57 1st Floor Plan.pdf PDF
Bldg 71 Floor Plan.pdf PDF
Bldg 35 Floor Plan.pdf PDF
Bldg 34 Floor Plan.pdf PDF
Bldg 72 Floor Plan.pdf PDF
Bldg 10 1st Floor Plan.pdf PDF
Combined Specifications for 565-22-303 Replace Security Camera System.pdf PDF
36C24622B0035.docx DOCX document
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

1 2 3 4

B

C

D

B

A

C

D

1 2 3 4

8'- 6"

14'-2"

'-5

3 8"

9'-7"

7'

2'

9'- 51 2"

9'- 51 2"

'-1

1"

9'-7"

'-4

11'-1"

4'- 61 4"

5'- 2"

4'-27 8"

4'-27 8"

12' 12' 12' 12' 12'

'-4

'-4

'-4

'-4

'-4

6"6" 6" 6" 6" 6"

6'

5'

1'-7"

3'-113 4"

6'

6'

8'- 6"

13'-81 2"

'-1

1"

5'-01 4"

8'

5'-01 4"

6'

8'-03 4"

'-1

0"

8'-03 4"

1'-71 2"

'-7

13'-4"

'-2

10'-3" 10'-81 4"

'-1

3 4"

7'- 9"

7'-10"

8'

7'- 21 2"

13'

'-1

1 2"

5'- 57 8"

27'-3"

'-1

07 8"

5'- 6"

9'-6" 5'

80'

5'

5'- 91 4"

5'

5'- 4"

80'

5'- 4"

5'

5'

5'

6'

5'

'-5

6'- 2"

8'

7'-5"

11'-103 8"

11'-103 8"

7'-7"

CORRIDOR

CORRIDOR

ELECTRICAL

RM

FEC

PSYCHOLOGIST OFFICE

RECEPTIONIST

WOMEN'S

RESTROOM

WAITING

OFFICE

SOCIAL WORKER (SUICIDE

PREVENTION) OFFICE

MSA SUPERVISOR OFFICE

SOCIAL WORKER (SUICIDE

PREVENTION) OFFICE

RN OFFICE / EXAM

SUPERVISORY

PSYCHOLOGIST OFFICE

106 STORAGE

HAC

IT

CLOSET

STAFF BREAK RM

STAFF UNISEX

TOILET

120 NURSE OFFICE

MEN'S

RESTROOM

GROUP RM

SECRETARY

CHIEF OF MH

OFFICE

ADMIN OFFICE

OFFICE

OFFICE

PSYCHOLOGIST OFFICE

File details come from the government source that posted it. Updated .