About this file

This federal solicitation calls for the replacement of an obsolete police security camera system at a Veterans Affairs medical center. The contractor will replace up to 1000 feet of cabling, 200 feet of new conduit and 20 junction boxes, and offer at least two viable replacement system alternatives that meet VA requirements. The replacement system must include a rack-mounted UPS to support the system for a minimum of one hour. The existing system consists of 156 interior and exterior cameras, 3 network video recorders, 27 PoE switches, and other components. The selected contractor must develop a complete plan to replace all existing system components with the new VA-approved system and dispose of or turn over all old equipment to the VA.

View the file

Other files

File Type Posted
36C24622B0035 0002.docx DOCX document
Combined Specifications for 565-22-303 Replace Security Camera System (1).pdf PDF
Current Camera Locations 04-07-21.ppt PPT presentation
Bldg 21 Floor Plan.pdf PDF
Bldg 11 2nd Floor Plan.pdf PDF
Bldg 3 Basement Floor Plan.pdf PDF
Bldg 1 Penthouse Floor Plan.pdf PDF
Bldg 1 3rd Floor Plan.pdf PDF
Bldg 3 4th Floor Plan.pdf PDF
Bldg 8 1st Floor Plan.pdf PDF
36C24622B0035 Replace Camera System Questions and Answers.pdf PDF
Bldg 4 Basement Floor Plan.pdf PDF
Bldg 50 1st Floor Plan.pdf PDF
List of existing Cameras.pdf PDF
Bldg 11 Basement Floor Plan.pdf PDF
Bldg 46 Floor Plan.pdf PDF
Bldg 4 2nd Floor Plan.pdf PDF
Bldg 16 Floor Plan.pdf PDF
Bldg 57 2nd Floor Plan.pdf PDF
Bldg 4 1st Floor Plan.pdf PDF
Bldg 47 Floor Plan.pdf PDF
Bldg 3 1st Floor Plan.pdf PDF
Bldg 1 Basement Floor Plan.pdf PDF
Bldg 11 1st Floor Plan.pdf PDF
36C24622B0035 0001.docx DOCX document
Bldg 70 Floor Plan.pdf PDF
Bldg 45 Floor Plan.pdf PDF
Bldg 18 Floor Plan.pdf PDF
Bldg 3 2nd Floor Plan.pdf PDF
Bldg 15 Floor Plan.pdf PDF
Bldg 1 2nd Floor Plan.pdf PDF
Bldg 1 1st Floor Plan.pdf PDF
Bldg 50 2nd Floor Plan.pdf PDF
Bldg 10 Basement Floor Plan.pdf PDF
Bldg 8 2nd Floor Plan.pdf PDF
Bldg 22 Floor Plan.pdf PDF
Bldg 48 Floor Plan.pdf PDF
Bldg 1 4th Floor Plan.pdf PDF
Bldg 1 5th Floor Plan.pdf PDF
Bldg 73 Floor Plan.pdf PDF
Bldg 3 3rd Floor Plan.pdf PDF
FNCVAMC Site Plan 2300 Ramsey Street.pdf PDF
Bldg 57 1st Floor Plan.pdf PDF
Bldg 71 Floor Plan.pdf PDF
Bldg 35 Floor Plan.pdf PDF
Bldg 34 Floor Plan.pdf PDF
Bldg 72 Floor Plan.pdf PDF
Bldg 10 1st Floor Plan.pdf PDF
Combined Specifications for 565-22-303 Replace Security Camera System.pdf PDF
36C24622B0035.docx DOCX document
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

'-1

0"

'-1 1"

'-5

3 4"

4'-51 2"

4'- 41 4"

16'-2"

17'-01 4"

'-3

3 4"

6'-8"

5'-23 4"

4'-11 2"

8'

12'-33 4" 12'

'-9

3 4"

'-3

11'-31 2"

16'-2"

7'- 11 4"

'-0

1 4"

12'-3"10'13'-21 4"

'-1

1"

'-0

1 4"

12'-93 4"

153'-21 2"

'-5

6'-01 8"

5'-43 8"

OVER HEAD DOOROVER HEAD DOOR

12'-6"

'-3

7 8"

4'- 8"

3'- 2"

28'

6'- 21 8"

BOILER PLANT

4'

5'

27'-8"

'-6

2'-4" 9'

4'-7" 8'-11

2"4' 32'-1"

'-6

2'

18'-4"

3' 16'

2'-11"

20'-71 2"

3'

10" 5" 5"

10"

'-6

1 2"

3'- 2"

4'- 91 2"

4'- 91 2"

PAINT SHOP

12'-6"

4'-3"

9'-

3 4"

6'-23 4"

4'- 81 2"

6"

10" 5"

'-3

3 4"

10'-8" 5"

6'-4"

10'-8"2'-1" 2'-1"5" 2'-1"5" 10" 5"

2" 1'-31

2"

6'- 5"

3'- 91 2"

9'-41 2"

5"

1'-9" 10"

4'

5'4'

7'- 4"

4'-81 2"

7'

3'-13 8" 4'-7"

2'

'-6

'-1

0"

32'-9"

18'-10"

METAL FRAMES

STAFF

WOMEN'S

TOILET

WATER

HEATER RM

PAINT STORAGE

SHOWER

108-A

MECH

112-A

MAINTENANCE

OFFICE

103-D

GARAGE WELDING AND PIPE

FITTING

GARAGE USING AS

STORAGE

SHOP AREA

LOCKSMITH

SHOP

103-B

LOCKSMITH

103-A

CARPENTER SHOP

ELECTRICAL

RM

OFFICE

101SHOP FOREMAN

MAINTENANCE

PLUMBING

OFFICE

103-C

LOUNGE

PROJECTS

MGR OFFICE

PROJECTS OFFICE

CUBICLES

ELECTRIC SHOP

ELECTRIC SHOP

AC SHOP

109-A

File details come from the government source that posted it. Updated .