This notice announces an upcoming solicitation for inpatient privacy renovation services at the Durham VA Medical Center. The solicitation will be issued on or around November 7, 2019 and will include requirements for gutting and renovating approximately 8,000 square feet of space on the fifth floor into twelve private patient rooms and ancillary spaces. The estimated construction value is between $1,000,000 to $5,000,000. This opportunity is anticipated to be set aside for total service-disabled veteran owned small businesses. Interested parties should monitor the website for solicitation materials and any amendments. Proposals will be due approximately 45 days after issuance. The notice provides a point of contact for any questions.
36C24620R0007 0006 06-Mech_100_BD.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24620R0007-0011001.pdf | ||
| 36C24620R0007-0011002.pdf | ||
| 36C24620R0007-0011000.docx | DOCX document | |
| 36C24620R0007-0010000.docx | DOCX document | |
| 36C24620R0007-0009000.docx | DOCX document | |
| 36C24620R0007-0008001.pdf | ||
| 36C24620R0007-0008000.docx | DOCX document | |
| 36C24620R0007-0007000.docx | DOCX document | |
| 36C24620R0007-0006006.pdf | ||
| 36C24620R0007-0006000.docx | DOCX document | |
| 36C24620R0007-0006003.pdf | ||
| 36C24620R0007-0006005.pdf | ||
| 36C24620R0007-0006001.pdf | ||
| 36C24620R0007-0006002.pdf | ||
| 36C24620R0007-0005000.docx | DOCX document | |
| 36C24620R0007-0005001.pdf | ||
| 36C24620R0007-0005005.pdf | ||
| 36C24620R0007-0005004.pdf | ||
| 36C24620R0007-0005002.pdf | ||
| 36C24620R0007-0005003.pdf | ||
| 36C24620R0007-0004000.docx | DOCX document | |
| 36C24620R0007-0003000.docx | DOCX document | |
| 36C24620R0007-0003001.pdf | ||
| 36C24620R0007-0002002.pdf | ||
| 36C24620R0007-0002001.docx | DOCX document | |
| 36C24620R0007-0001001.pdf | ||
| 36C24620R0007-023.pdf | ||
| 36C24620R0007-022.docx | DOCX document |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR-COOLED CONDENSER
ACCH AIR-COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,TWO
POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND REFRIGERATION
INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BSC BIOLOGICAL SAFETY CABINETS
BT BUFFER TANK
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELCIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CH CHILLER
CHWP CHILLED WATER PUMP
CHW CHILLER WATER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXODE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CHWCC CHILLED WATER COOLING COIL
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
D-4 ECONOMIZER OUTDOOR AIR DAMPER
dB DECIBELS Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EX. EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
H HUMIDIFER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HHW HEATING HOT WATER
HHWC HEATING HOT WATER COIL
HHWP HEATING HOT WATER PUMP
HHWR HEATING HOT WATER RETURN
HHWS HEATING HOT WATER SUPPLY
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM
CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
Hz HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTERGRATED PART LOAD VALUE
IRH INTRARED HEATER
IS INSECT SCREEN
IV INLET VANES
kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
L LITER
L/s LITERS PER SECOND
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPS LOW PRESSURE SUPPLY (STEAM)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL
PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/s METERS PER SECOND (OR
METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM
CONDENSATE)
MPS MEDIUM PRESSURE SUPPLY (STEAM)
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OR OPERATING ROOM
OSA OUTSIDE SUPPLY AIR (CONDITIONED)
P PUMP
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PHCP PREHEAT COIL PUMP
PPM PARTS PER MILLION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
R/E RETURN OR EXHAUST
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSR SOLID SEPARATOR
ST STEAM TRAP
SV STEAM SAFETY VALVE
SVS STEAM VENT SILENCER
T & PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TP TRAP
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
UC UNDER CUT
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED
BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE)
RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
Wb WET-BULB (TEMPERATURE)
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
XT EXPANSION TANK
YR YEAR
MECHANICAL ABBREVIATIONS
1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.
2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.
4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED.
5. WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR PERFORMANCE FEATURES ARE
REQUIRED.
6. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.
7. PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).
8. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.
9. INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND APPLICABLE CODES AND STANDARDS.
10. COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.
11. PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO INSTALLATION.
12. PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.
13. PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 23.
14. DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE EXACT ROUTING OF DUCTWORK AND
PIPING IN THE FIELD.
15. FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING OR EQUIPMENT.
16. NOTIFY COR REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF THE WORK.
17. SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF CEILING INSTALLED EQUIPMENT.
18. INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM CLEAR SPACE TO BUILDING SURFACES AT NO ADDITIONAL COST.
19. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.
20. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.
21. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
22. MAKE A COMPLETE REVIEW OF DRAWINGS, INCLUDING SCHEDULES AND DETAILS, PRIOR TO BEGINNING MECHANICAL SYSTEM INSTALLATION. RESOLVE CONFLICTS WITH
COR.
23. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING SYSTEMS.
24. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS
ARE NOT ACCEPTABLE UNLESS SPECIFICALLY INDICATED OTHERWISE.
25. INSTALL PIPING FREE OF SAGS AND BENDS.
26. INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.
27. PIPING SHALL NOT BE ROUTED OVER TELECOM OR ELECTRICAL CLOSETS/ROOMS.
28. PREPARE DRAWINGS SHOWING MECHANICAL SYSTEMS AND EQUIPMENT FOR COORDINATION WITH WORK OF OTHER DIVISIONS AND WORK BY THE GOVERNMENT.
A. INCLUDE PLAN VIEWS, SECTIONS, AND ELEVATIONS, AS REQUIRED, TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND EXISTING CONDITIONS.
B. DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO, ALL DUCTWORK, AIR DISTRIBUTION, MECHANICAL EQUIPMENT, MECHANICAL PIPING, FIRE PROTECTION PIPING, PLUMBING PIPING, CABLE TRAYS, LIGHTING FIXTURES, CEILING GRID AND HEIGHT, BEAMS AND JOISTS (WITH ELEVATIONS MARKED), ELECTRICAL CONDUIT LARGER THAN 2 INCHES IN DIAMETER AND OTHER CEILING MOUNT DEVICES OR EQUIPMENT THAT PROTRUDE INTO THE CEILING CAVITY.
C. IF THERE ARE OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH COR FOR GUIDANCE AND MAKE CORRECTIONS IN ACCORDANCE WITH DIRECTIONS
GIVEN.
D. DO NOT BEGIN FABRICATION OR PLACE EQUIPMENT ORDERS UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED.
29. INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK. MODIFY, MOVE OR RECONFIGURE WORK LACKING
COORDINATION AT NO ADDITIONAL COST
MECHANICAL GENERAL NOTES
T
CO2 CARBON DIOXIDE
THERMOSTAT
SUPPLY DIFFUSER
RETURN DIFFUSER/GRILLE
EXHAUST GRILLE
ROUND FLEX DUCT
2000EG-10 DIFFUSER TAG | DIFFUSER CFM
LINEAR SLOT DIFFUSER
BALANCING DAMPER
(RECTANGULAR)
BALANCING DAMPER
(ROUND)
FIRE DAMPER
SMOKE DAMPER
D
R INCLINED RISE, IN
DIRECTION OF AIRFLOW
INCLINED DROP, IN DIRECTION
OF AIRFLOW
CONNECT NEW DUCT
TO EXISTING
LIMIT OF DEMOLITION
VANED ELBOW (PROVIDE ALL
SQUARE OR RECTANGULAR
ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
STANDARD RADIUS ELBOW
(LONG RADIUS)
10x8 NEW DUCT (INSIDE
DIMENSIONS: WIDTH X DEPTH)
EXISTING DUCT TO REMAIN
EXISTING DUCT TO BE
DEMOLISHED
DUCT TRANSITION
SIDE MOUNTED GRILLE
SUPPLY
RETURN45°
45°
DN
DN
UP
UP
DNUP
STANDARD BRANCH SUPPLY OR
RETURN, NO SPLITTER (45° TAP)
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN)
MECHANICAL LEGEND
HPS
LPS
LPR
CHS
CHR
HIGH PRESSURE STEAM
PIPING (60 PSI)
LOW PRESSURE STEAM PIPING
(15 PSI AND BELOW)
LOW PRESSURE STEAM
CONDENSATE RETURN
CHILLED WATER SUPPLY PIPING
CHILLED WATER RETURN PIPING
PIPE UP
PIPE DOWN
BOTTOM CONNECTION
TOP CONNECTION
CAPPED OUTLET
GLOBE VALVE
GATE VALVE
BALL VALVE
STEAM SAFETY VALVE
PRESSURE REGULATING VALVE
WYE STRAINER VALVE
BALANCING VALVE
MOTORIZED CONTROL VALVE
STEAM TRAPCOND CONDENSATE DRAIN LINE
HPR HIGH PRESSURE STEAM
CONDENSATE RETURN
HWS
HWR
HEATING HOT WATER SUPPLY
PIPING
HEATING HOT WATER RETURN PIPING
RLS REFRIGERANT LINE SET (LIQUID
AND SUCTION)
CONNECT TO EXISTING PIPE
LIMITS OF DEMOLITION
INLINE CENTRIFUGAL PUMP
TANGENTIAL AIR SEPARATOR
EXPANSION TANK
WALL-MOUNTED INDOOR
SPLIT-SYSTEM
SPLIT-SYSTEM CONDENSING UNIT
UTILITY SET EXHAUST FAN
STEAM PRESSURE
REDUCING STATION
DRAIN VALVE
TEST PLUG
SUPPLY
TERMINAL UNIT SUPPLY
DUCT BRANCH (CONICAL
TAP)
TERMINAL UNIT
CHECK VALVE
F
S
SENSOR (TEMPERATURE)S
HUMIDITY SENSORH
Revisions: Date
Drawing Title
Approved ANDREKA WATLINGTON
PROJECT ENGINEER
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #C-1848
/2
/2
:1
:0
P
M
M-001
MECHANICAL GENERAL INFORMATION
1 9SPG SMH
IMPROVE INPATIENT
PRIVACY (RENOVATE 5B)
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705 6/28/2019
BID DOCUMENTS
558-18-15018-048
N
RN
39777 E
ENIG
O
NA
TR F
SEAL
RP
OO ISS OE
H RCA
IL
AN
L
E
S
ALI
S GP. EO
E
RG
DocuSign Envelope ID: EBF6CC8A-3B51-4C44-8849-221026FB4D72
6/26/2019
C5012
HOUSE
KEEPING
ELEVATOR ELEVATOR
ELEVATOR ELEVATOR
SOCIAL WORK
OFFICE
NURSING
STORAGE
NURSING
KEEPING
OFFICE
ORTHOPEDIC
OFFICE
STORAGE
OFFICE
WOMENS
MALE KEEPING
HOUSE
HOUSE
STAIR-3
DUMB WAITER
SHAFT
FIRE PROTECTION CLOSET
TELEPHONE
C5001A-1
DIETETICS
OFFICE
CORRIDOR CORRIDOR
OFFICE
SOCIAL WORK
OFFICE
SOCIAL WORK
OFFICE
SOCIAL WORK
OFFICE
SOCIAL WORK
OFFICE
SOCIAL WORK
OFFICE
SOCIAL WORK
OFFICE
SOCIAL WORK
OFFICE
DIETETICS
SOCIAL WORK
OFFICE
SOCIAL WORK
OFFICE
SOCIAL WORK
OFFICE
SOCIAL WORK
OFFICE
CONF ROOM
SOCIAL WORK
OFFICE
OFFICE
CARE SERVICE
AMBULATORY
OFFICE
CARE SERVICE
AMBULATORY
OFFICE
CARE SERVICE
AMBULATORY
OFFICE
CARE SERVICE
OFFICE
CARE SERVICE
AMBULATORY
OFFICE
CARE SERVICE
AMBULATORY
OFFICE
CARE SERVICE
AMBULATORY
OFFICE
CARE SERVICE
AMBULATORY
OFFICE
CARE SERVICE
AMBULATORY
OFFICE
CARE SERVICE
AMBULATORY
TOILET TOILET TOILET
TOILET TOILET
TOILET
TOILET
FIRE EQUIP
VESTIBULE
TOILET
OFFICE
EQUIPMENT
BEDS &
OFFICE
OFFICE
B5007A
TOILET
GENERAL
STORAGE
GENERAL
GENERAL
STORAGE
GENERAL
B5029
B5020
B5018B5022
B5016
B5024
B5040 B5034 B5032
B5028
B5015
B5013
B5012
B5010A
B5002
A5002A
C5008
C5006
C5004 C5001
A5002
A5002B
B5027 B5025 B5023 B5021 B5019 B5017 B5009 B5007 B5005 B5003
B5038 B5036
B5030
B5008A B5006
B5004 B5000
B5025A B5021A B5017A
B5030A
B5038A
B5020B B5020A
B5009A
B5010B B5008B
B5026
B5011
A5001A
C5000
B5026A
7 10
13 14
14 15
15 16
5.1
5.1 9
L L
SS
TT
N N
Q Q
R R
M M
P P
R.1 R.1
1 1 1 1 1 1
1 1 1
1 1 1 1 1
1 1
5 5
STAIR TOWER
THIRD FLOOR F-WING ROOF
THIRD FLOOR ROOF
FOURTH FLOOR E-WING ROOF
6 6
71 1 1
B5001
# SHEET KEY NOTES:
Revisions: Date
Drawing Title
Approved ANDREKA WATLINGTON
PROJECT ENGINEER
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #C-1848
/2
/2
:1
:1
P
M
MD101
FIFTH FLOOR MECHANICAL
DEMOLITION PLAN
2 9SPG SMH
IMPROVE INPATIENT
PRIVACY (RENOVATE 5B)
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705 6/28/2019
BID DOCUMENTS
558-18-15018-048
0 4 8 16
NORTH
TRUE
1 DEMOLISH TERMINAL UNIT. TURN OVER
CONTROLLER TO VA.
2 DEMOLISH DUCTWORK BACK TO LIMITS OF
DEMOLITION AT EXISTING FIRE DAMPER.
3 DEMOLISH MECHANICAL PIPING BACK TO LIMITS
OF DEMOLITION.
4 BOOSTER FAN TO BE DEMOLISH.
5 CONTRACTOR TO PROVIDE TEMPORARY COOLING
IN THIS AREA. MAINTAIN TEMPERATURE WITH A
MAX OF 75ºF AND MIN OF 70ºF.
6 PERFORM A PRE-TAB ON TERMINAL UNIT FOR AIR
AND WATER.
7 PULL FLOOR LEVEL CONTROLS NETWORK OUT OF
CONDUIT PRIOR TO DEMOLITION AND MAINTAIN
BAS OPERATION FOR THE AREA NOT UNDER
CONSTRUCTION.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
FIFTH FLOOR MECHANICAL DEMOLITION PLAN
A VERIFY ALL EXISTING CONDITIONS PRIOR TO
BEGINNING WORK. NOTIFY COR OF
CONFLICTS PRIOR TO PROCEEDING WITH
DEMOLITION.
B ALL ITEMS BEING REMOVED SHALL REMAIN
THE PROPERTY OF THE VA MEDICAL CENTER
UNTIL CONFIRMATION HAS BEEN MADE BY
THE COR AS TO WHETHER THE VA WILL
RETAIN SUCH ITEMS. ALL ITEMS NOT BEING
RETAINED BY THE VA OR DESIGNATED ON
THE DRAWINGS TO BE RELOCATED OR
REINSTALLED SHALL BE REMOVED FROM
THE SITE BY THE CONTRACTOR.
C COORDINATE WORKING HOURS ALLOWED
WITH THE VA COR.
D ALL ITEMS NOT CALLED OUT FOR
DEMOLITION ARE TO REMAIN UNDISTURBED.
E REFER TO M-001 FOR ADDITIONAL
INFORMATION.
F REMOVE HANGERS AND SUPPORTS
ASSOCIATED WITH DEMOLISHED PIPES,
DUCTS, AND EQUIPMENT.
N
RN
39777 E
ENIG
O
NA
TR F
SEAL
RP
OO ISS OE
H RCA
IL
AN
L
E
S
ALI
S GP. EO
E
RG
F
F
F
F F
F F
PATIENT RM
B5008CARE STATION
B5009
PATIENT RM
B5010
PATIENT RM
B5011
PATIENT RM, BARIATRIC
B5012
LOCKER
B5014
PATIENT RM
B5016
SOILED UTILITY
B5018
STAFF LOUNGE
B5015
CLEAN SUPPLY
B5019
ALCOVE
B5020
PATIENT RM
B5021
PATIENT RM
B5022
PATIENT RM
B5024
PATIENT RM
B5025
PASSAGE
B5041
NOUR
B5026
MEDS
B5027
BATH
B5007A
CORRIDOR
B5040
BATH
B5008A
BATH
B5010A
BATH
B5011A
BATH
B5016A
BATH
B5024A
BATH
B5025A
BATH
B5021A
BATH
B5022A
STAIR
B5050
STAFF TLT
B5014A
PATIENT RM, ISOLATION
B5028
BATH
B5028A
ANTE
B5028B
PATIENT RM, ISOLATION
B5029
BATH
B5029A
ANTE
B5029B
PATIENT RM, BARIATRIC
B5007
CARE STATION
B5005
EQUIP
B5004
BATH
B5012A
CARE STATION
B5013
CARE STATION
B5023
NURSE MGR OFFICE
B5030
EQUIP
B5017
TEAM WORK ROOM
B5031
7 10
13 14 15 16
5.1
5.1 9
L
SS
TT
N
Q
R
M
P
R.1
OIT
B5003A
5B-TU-35B-TU-4
5B-TU-5
5B-TU-6
5B-TU-7
5B-TU-8
5B-TU-10
5B-TU-11
5B-TU-12
5B-TU-13
5B-TU-14 5B-TU-16
5B-TU-17
5B-TU-9
5B-TU-18
5B-TU-19
5B-TU-20
5B-TU-15
5B-TU-21
5B-TU-22
5B-TU-23
ELEC
B5017A
5B-TU-24
12x8 16x8 18x810x6
10"ø
"ø x
"ø x x x 8 6 x x
"ø x
"ø
8x8 12x6 14x8
30x8 26x8 20x8
8x8
8x8 8x8
8x8
8x6
8x8
6"ø
6x8
6"ø x x
14x1212x12 8"ø
10"ø 10"ø
8x8 8x6
10x8
8x10
8x108x10 x x x
"ø x x x x x x
"ø
12x1210x8 8x86x6 x
6"ø x
"ø
10x8 8x66x6 x
"ø
"ø
"ø
20x6 18x10
"ø x x x
(TYP.)
(TYP.)
5B-CU-1
5B-SS-1
24x7 x
5B-EF-HEPA-1
5B-TU-EF-1
"ø
"ø
"ø
"ø
5"ø
"ø 5
"ø
5"ø
5"ø
5"ø x
"ø 5 "ø
"ø
"ø
"ø
"ø
6"ø
"ø
"ø x
6x6 x x
0 OFFICE
B5002
OFFICE
B5000
OFFICE
A5002B
OFFICE
A5002A x x
14x8
7 7
BIO
B5003
COIL ACCESS
COIL ACCESS
"ø
"ø x
5B-EF-1
STAIR TOWER
THIRD FLOOR F-WING ROOF
THIRD FLOOR ROOF
SERVICE ACCESS
FOURTH FLOOR E-WING ROOF
"ø
"ø
5B-TU-25
10"ø
"ø
20x8
20x6
24x16 x x
10x10
16 16
7 10
105.1
5.1 9
SS
TT
R
R.1
SOILED UTILITY
B5018
NOUR
B5026
MEDS
B5027
5B-TU-15
"ø
10x8 14x8 x
10x10
20x8
20x6 x
# SHEET KEY NOTES:
Revisions: Date
Drawing Title
Approved ANDREKA WATLINGTON
PROJECT ENGINEER
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #C-1848
/2
/2
:1
:2
P
M
MH101
FIFTH FLOOR HVAC PLAN
3 9SPG SMH
IMPROVE INPATIENT
PRIVACY (RENOVATE 5B)
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705 6/28/2019
BID DOCUMENTS
558-18-15018-048
Scale: 1/8" = 1'-0"
FIFTH FLOOR HVAC PLAN 0 4 8 16
NORTH
TRUE
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
1 REFER TO MH102 FOR THERMOSTAT
CONTROLLING THE TERMINAL UNIT SERVING
THE ASSOCIATED AREA. TYPICAL FOR ALL
TERMINAL UNITS.
2 REFER TO MH102 FOR DIFFUSER/GRILLES
AIR FLOWS.
3 ADD FILTER BOX AT UNIT.
4 ADD METAL SCREEN AT END OF DUCT.
5 CONDENSING UNIT LOCATED ON ROOF OF
BUILDING 3E. LOCATE CONDENSING UNIT
BETWEEN ACCESS COILS. CORDINATE
EXACT LOCATION WITH COR.
6 PROVIDE ACESS DOOR TO PERMIT
RE-SETTING OF EXISTING FIRE DAMPER AT
CHASE. NEW CONNECTION TO DAMPER TO
BE PROVIDE WITH BREAKAWAY
CONNECTION, RETAINING ANGLES AND
OTHER REQUIREMENTS PER SMACNA FIRE
DAMPER INSTALLATION GUIDE.
7 CONTRACTOR TO PROVIDE TEMPORARY
COOLING IN THIS AREA. MAINTAIN
TEMPERATURE WITH A MAX OF 75ºF AND MIN
OF 70ºF.
8 CAP END OF DUCT.
9 EXISTING FAN TO REMAIN.
10 24x10 GRILLE ONE ON EACH SIDE OF WALL
WITH DUCTED TOGETHER FOR TRANSFER
AIR. MOUNTED 8'-0" ABOVE FINISHED FLOOR.
11 SEE SHEET GC001 FOR WORK SCOPE
RELATED TO ALTERNATE DEDUCT 1.
12 BALANCE TO 185 CFM AND ADD METAL
SCREEN AT END OF DUCT.
13 FAN LOCATED ON THIRD FLOOR F-WING
ROOF. REFER TO DETAIL 4/M-502. STACK TO
DISCHARGE 10' MINIMUM ABOVE THIRD
FLOOR F-WING ROOF.
14 ROUTE DUCT ALONG FOURTH FLOOR
E-WING WALL APPROX. 6'-0" ABOVE ROOF ON
BRACKETS. REFER TO ARCHITECTURAL FOR
WALL BRACKETS.
15 PROVIDE BAG-IN BAG-OUT HEPA FILTER
HOUSING WITH PREFILTER AND BAS
PRESSURE SENSOR AND ALARM.
16 REBALANCE TERMINAL UNIT TO RECORDED
PRE-TAB VALUES.
Scale: 1/8" = 1'-0"
FIFTH FLOOR HVAC PLAN ALTERNATE DEDUCT 1 0 4 8 16
NORTH
TRUE
A. COORDINATE ALL WORK WITH THE GENERAL
CONTRACTOR, OTHER TRADES AND THE
COR TO MINIMIZE DISRUPTION OF AREAS
OUTSIDE OF THE PROJECT LIMITS OF WORK.
N
RN
39777 E
ENIG
O
NA
TR F
SEAL
RP
OO ISS OE
H RCA
IL
AN
L
E
S
ALI
S GP. EO
E
RG
7 10
5.1
5.1 9
L
SS
TT
N
Q
R
M
P
R.1
PATIENT RM
B5008CARE STATION
B5009
PATIENT RM
B5010
PATIENT RM
B5011PATIENT RM, BARIATRIC
B5012
LOCKER
B5014
PATIENT RM
B5016
SOILED UTILITY
B5018
STAFF LOUNGE
B5015
CLEAN SUPPLY
B5019
ALCOVE
B5020
PATIENT RM
B5021
PATIENT RM
B5022 PATIENT RM
B5024
PATIENT RM
B5025
PASSAGE
B5041
NOUR
B5026 MEDS
B5027
BATH
B5007A
CORRIDOR
B5040
BATH
B5008A
BATH
B5010A
BATH
B5011A
BATH
B5016A
BATH
B5024A
BATH
B5025A
BATH
B5021A
BATH
B5022A
STAIR
B5050
STAFF TLT
B5014A
PATIENT RM, ISOLATION
B5028
BATH
B5028A
ANTE
B5028B PATIENT RM, ISOLATION
B5029
BATH
B5029A
ANTE
B5029B
PATIENT RM, BARIATRIC
B5007
CARE STATION
B5005
EQUIP
B5004
BATH
B5012A
CARE STATION
B5013
CARE STATION
B5023
NURSE MGR OFFICE
B5030
EQUIP
B5017
TEAM WORK ROOM
B5031
OIT
B5003A
110SD-A 125SD-A 115SD-A 110SD-A
100RA-A
135EG-F95SD-A
100SD-A
100RA-A
90EG-E
130SD-A 130SD-A90SD-A95SD-A
100RA-A
90EG-E
95SD-A95SD-A
100RA-A
90EG-E
100RA-A
120SD-B
145SD-B
145SD-B
130RA-A
90EG-E
100SD-A
115SD-A
115SD-A
140RA-B
90EG-E
115SD-A
115SD-A
140RA-B
90EG-E
115SD-A
115SD-A
140RA-B
90EG-E
115SD-A
115SD-A
140RA-B
90EG-E
175SD-B
175SD-B
120EG-F
180SD-B
175SD-B
120EG-F
80SD-A 80SD-A
160RA-B
120SD-A
120RA-B
5B-TU-35B-TU-4
5B-TU-5
5B-TU-65B-TU-75B-TU-8
5B-TU-10 5B-TU-11
5B-TU-12
5B-TU-13
5B-TU-14 5B-TU-16
5B-TU-17
5B-TU-9
5B-TU-18
5B-TU-19 5B-TU-20
5B-TU-15
5B-TU-21 5B-TU-22
5B-TU-23
60SD-A
135EG-F
240RA-B
250SD-C
75EG-E
70RA-A
100SD-A
185SD-B
60EG-E 60EG-E
240RA-B
260SD-B
ELEC
B5017A
50EG-E
125EG-B 400EG-C
5B-TU-24
400EG-C
250SD-C
65SD-A
50SD-A
100RA-A
150RA-B
185RA-B
T
T T
T
T
T
T
TT
TT
T
T
TT
T
T
T
T
T
T
DPS
DPS
DPS
5B-SS-1
5B-CU-1
RG-E
RG-E
RG-E
RG-E
T
5 5
5 5
T
RG-F
BIO
B5003
RG-F
5B-TU-25
S
T H
STAIR TOWER
THIRD FLOOR F-WING ROOF
THIRD FLOOR ROOF
# SHEET KEY NOTES:
Revisions: Date
Drawing Title
Approved ANDREKA WATLINGTON
PROJECT ENGINEER
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #C-1848
/2
/2
:1
:2
P
M
MH102
FIFTH FLOOR AIR TERMINAL PLAN
4 9SPG SMH
IMPROVE INPATIENT
PRIVACY (RENOVATE 5B)
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705 6/28/2019
BID DOCUMENTS
558-18-15018-048
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
FIFTH FLOOR HVAC PLAN 0 4 8 16
NORTH
TRUE
1 PROVIDE DDC ROOM -TO-CORRIDOR
PRESSURE DIFFERENTIAL SENSOR WIRED
BACK TO ECC WITH ALARM WHEN ISOLATION
ROOM BECOMES NEUTRAL OR POSITIVE TO
CORRIDOR.
2 PROVIDE VISUAL PRESSURE INDICATOR FOR
ISOLATION ROOM-TO-CORRIDOR PRESSURE
RELATIONSHIP WITH LOCAL ALARM.
3 CONDENSING UNIT LOCATED ON ROOF OF
BUILDING 3E.
5 DOOR TO BE UNDERCUT FOR TRANSFER AIR.
6 SEE SHEET GC001 FOR WORK SCOPE
RELATED TO ALTERNATE 1.
7 PROVIDE COMBINATION THERMOSTAT/
HUMIDISTAT WITH BAS ALARM.
8 PROVIDE 5B-SS-1 WITH MANUFACTURER'S
THERMOSTAT IN B5003 AND PROVIDE
TEMPERATURE SENSOR TO BAS WITH ALARM
IN B5003A.
A INSTALL THERMSTATS AT 4'-0" ABOVE
FINISHED FLOOR. NO TEMPERATURE
DISPLAY ON THERMOSTATS.
N
RN
39777 E
ENIG
O
NA
TR F
SEAL
RP
OO ISS OE
H RCA
IL
AN
L
E
S
ALI
S GP. EO
E
RG
PATIENT RM
B5008
CARE STATION
B5009
PATIENT RM
B5010
PATIENT RM
B5011
PATIENT RM, BARIATRIC
B5012
LOCKER
B5014
PATIENT RM
B5016
SOILED UTILITY
B5018
STAFF LOUNGE
B5015
CLEAN SUPPLY
B5019
ALCOVE
B5020
PATIENT RM
B5021
PATIENT RM
B5022
PATIENT RM
B5024
PATIENT RM
B5025
PASSAGE
B5041
NOUR
B5026
MEDS
B5027
BATH
B5007A
CORRIDOR
B5040
BATH
B5008A
BATH
B5010A
BATH
B5011A
BATH
B5016A
BATH
B5024A
BATH
B5025A
BATH
B5021A
BATH
B5022A
STAIR
B5050
STAFF TLT
B5014A
PATIENT RM, ISOLATION
B5028
BATH
B5028A
ANTE
B5028B
PATIENT RM, ISOLATION
B5029
BATH
B5029A
ANTE
B5029B
PATIENT RM, BARIATRIC
B5007
CARE STATION
B5005
EQUIP
B5004
BATH
B5012A
CARE STATION
B5013
CARE STATION
B5023
NURSE MGR OFFICE
B5030
EQUIP
B5017
TEAM WORK ROOM
B5031
7 10
13 14
15 16
5.1
5.1 9
L L
SS
TT
N N
Q Q
R R
M M
P P
R.1 R.1
PATIENT RM
B5024
5B-TU-3
0.98 GPM
5B-TU-4
0.85 GPM
5B-TU-5
1.13 GPM
5B-TU-6
0.80 GPM
5B-TU-7
0.82 GPM
5B-TU-8
1.02 GPM
5B-TU-10
0.52 GPM
5B-TU-11
1.26 GPM
5B-TU-12
0.43 GPM
5B-TU-13
1.00 GPM
5B-TU-14
1.00 GPM
5B-TU-16
1.00 GPM
5B-TU-17
1.00 GPM
5B-TU-9
1.09 GPM
5B-TU-18
0.50 GPM
5B-TU-19
1.52 GPM 5B-TU-20
1.54 GPM
5B-TU-15
0.80 GPM
5B-TU-21
0.52 GPM
5B-TU-22
0.69 GPM
5B-TU-23
1.39 GPM
5B-TU-24
1.09 GPM
V-TU-9
1.09 GPM
V-TU-10
0.52 GPM
V-TU-11
1.26 GPM
V-TU-8
1.02 GPM
V-TU-12
0.43 GPM
V-TU-7
0.82 GPM
V-TU-6
0.80 GPM
V-TU-5
1.13 GPM
V-TU-4
0.85 GPM
V-TU-18
0.50 GPM
V-TU-3
0.98 GPM V-TU-23
1.39 GPM
V-TU-21
0.52 GPM
V-TU-20
1.54 GPM
V-TU-19
1.52 GPM
V-TU-22
0.69 GPM
V-TU-13
1.00 GPM
V-TU-17
1.00 GPM
V-TU-16
1.00 GPM
V-TU-14
1.00 GPM
V-TU-24
1.09 GPM
5B-SS-1
5B-CU-1
OIT
B5003A
COIL ACCESS
COIL ACCESS
BIO
B5003
5B-TU-25
0.43 GPM
V-TU-25
0.43 GPM
V-TU-15
0.80 GPM
1"øHHWS 1"øHHWR
3/4"øHHWS 3/4"øHHWR
1"øHHWS 1"øHHWR
1 1/4"øHHWS 1 1/4"øHHWR
3/4"øHHWR 3/4"øHHWS
1"øHHWR
1"øHHWS
1 1/2"øHHWR
1 1/2"øHHWS
STAIR TOWER
THIRD FLOOR F-WING ROOF
THIRD FLOOR ROOF
FOURTH FLOOR E-WING ROOF
7 10
105.1
5.1 9
SS
TT
R R
R.1 R.1
SOILED UTILITY
B5018
CLEAN SUPPLY
B5019
NOUR
B5026
BATH
B5028A
5B-TU-15
0.80 GPM
V-TU-15
0.80 GPM
# SHEET KEY NOTES:
Revisions: Date
Drawing Title
Approved ANDREKA WATLINGTON
PROJECT ENGINEER
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #C-1848
/2
/2
:1
:3
P
M
MP101
FIFTH FLOOR PIPING PLAN
5 9SPG SMH
IMPROVE INPATIENT
PRIVACY (RENOVATE 5B)
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705 6/28/2019
BID DOCUMENTS
558-18-15018-048
Scale: 1/8" = 1'-0"
FIFTH FLOOR PIPING PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
0 4 8 16
NORTH
TRUE
1 1-1/2" BUTTERFLY ISOLATION VALVES
LOCATED HERE.
2 CONDENSING UNIT LOCATED ON ROOF OF
BUILDING 3E. LOCATE CONDENSING UNIT
BETWEEN ACCESS COILS. CORDINATE
EXACT LOCATION WITH COR.
3 SEE SHEET GC001 FOR WORK SCOPE
RELATED TO ALTERNATE DEDUCT 1.
4 ROUTE 3/4" CONDENSATE DRAIN TO OPEN
HUB FITTING AT SANITARY PIPE AT 24" AFF.
COORDINATE WITH DIVISION 22.
5 REBALANCE TERMINAL UNIT TO RECORDED
PRE-TAB VALUES.
6 PROVIDE UNIT WITH CUT OFF SWITCH FOR
OVERFLOW OF CONDENSATE.
Scale: 1/8" = 1'-0"
FIFTH FLOOR PIPING PLAN ALTERNATE DEDUCT 1 0 4 8 16
NORTH
TRUE
A COORDINATE ALL WORK WITH THE GENERAL
CONTRACTOR, OTHER TRADES AND THE COR TO
MINIMIZE DISRUPTION OF AREAS OUTSIDE OF THE
PROJECT LIMITS OF WORK.
B MAIN PIPE SIZES SHALL STAY THE SAME UNTIL A
NEW SIZE IS INDICATED. RUNNOUT SIZES ARE
INDICATED IN SCHEDULES.
N
RN
39777 E
ENIG
O
NA
TR F
SEAL
RP
OO ISS OE
H RCA
IL
AN
L
E
S
ALI
S GP. EO
E
RG
DRAIN LINE SHALL BE AT LEAST THE SAME SIZE AS THE
NIPPLE ON THE DRAIN PAN. PIPING SHALL BE RIGIND
COPPER TYPE L OR TYPE M UNLESS NOTE BELOW IS
MET
PITCH DOWN TOWARD DRAIN
CLAEANOUT
FLOOR SINK
DRAIN PAN
DIALECTRIC FITTING
NOTES:
1. CPVC PIPE MAY BE USED ONLY IF APPROVED BY LOCAL VA AND IS INDOORS AND DOES
NOT PASS THROUHG RATED BARRIERS.
2. DIALECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR METALS ARE TO BE CONNECTED.
UNIT TYPE A B
WHERE X = STATIC PRESSURE IN PAN
DRAW THRU
BLOW THRU
2" PLUS X
1" MINIMUM
X
2X
B A
ABOVE 2" [50mm] DIA. PIPE 2" [50mm] DIA. & SMALLER
VERTICAL
2 1/2" [65mm] DIA.
ABOVE 2" [50mm] DIA. PIPE 2" [50mm] DIA. & SMALLER
HORIZONTAL
2 1/2" [65mm] DIA.
3-WAY MODULATING
CONTROL VALVE
COIL
3-WAY COIL PIPING
RETURN
SUPPLY
COIL
2-WAY COIL PIPING
DRAIN VALVE WITH
HOSE CONNECTION
MANUAL AIR VENT
UNION (TYPICAL)
2-WAY MODULATING
CONTROL VALVE
STRAINER WITH
DRAIN VALVE AND
HOSE CONNECTION
TEMPERATURE/PRESSURE TEST PORT
SHUT-OFF
VALVE (TYP.)
RETURN
SUPPLY
UNION (TYPICAL)
MANUAL AIR VENT
DRAIN VALVE WITH
HOSE CONNECTION
STRAINER WITH
DRAIN VALVE AND
HOSE CONNECTION
CONCENTRIC REDUCERS,
IF REQUIRED (TYP.)
CONCENTRIC REDUCERS,
IF REQUIRED (TYP.)
TEMPERATURE/PRESSURE TEST PORT
BALANCING VALVE
SHUT-OFF
VALVE (TYP.)
BALANCING VALVE
ACCESS DOOR
FILTER
FAN
DRAIN PAN & PIPE
CONNECTION
HANGER ROD SUPPORTS
SECURE TO STRUCTURE ABOVE
WITH SPRING ISOLATORS, TYP.
S A
COIL
OA DUCT
RA DUCT
FLEXIBLE CONNECTOR
DUCT COLLAR
EXISTING DUCT
SUPPORTS
DRAIN PIPING
WITH TRAP
FINISHED CEILING
C L G
DISCHARGE AIR
TEMPERATURE
T
POINT NAME:
ZONE TEMPERATURE
ZONE TEMPERATURE SETPOINT
AIRFLOW
DISCHARGE AIR TEMPERATURE
ZONE DAMPER
REHEATING VALVE
MAXIMUM OCCUPIED AIRFLOW SETPOINT
HEATING MODE
HEATING SETPOINT
COOLING SETPOINT
HIGH ZONE TEMPERATURE
LOW ZONE TEMPERATURE
HIGH DISCHARGE TEMPERATURE
LOW DISCHARGE TEMPERATURE
HARDWARE POINTS
AI AO
X
X
X
X
BI BO
SOFTWARE POINTS
AV BV LOOP SCHED TREND ALARM SHOW ON GRAPHIC
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
TOTAL HARDWARE (6) TOTAL SOFTWARE (19)
4 2 3
X
X
X
X
10 5 11
X
X
X
X
X
X
HIGH ZONE HUMIDITY
MINIMUM OCCUPIED AIR FLOW SETPOINT
MINIMUM UNOCCUPIED AIRFLOW SETPOINT
X
X
X
X
X
X
X
DA
AO - REHEATING VALVE
HW
M
HWS HWR
T
AI - DISCHARGE AIR TEMP
AI - AIRFLOW
M
AO - ZONE DAMPER
SA
T AI - ZONE TEMP
AI - ZONE SETPOINT ADJUST
F
VAV TERMINAL UNIT
VARIABLE AIR VOLUME - TERMINAL UNIT
RUN CONDITIONS - CONTINUOUS:
THE UNIT SHALL RUN CONTINUOUSLY AND SHALL MAINTAIN:
• A 75°F (ADJ.) COOLING SETPOINT. ORS WILL BE SET AT 66°F WITH OCCUPANT OVERRIDE.
• A 70°F (ADJ.) HEATING SETPOINT. ORS WILL BE SET AT 75°F WITH OCCUPANT OVERRIDE.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH ZONE TEMP: IF THE ZONE TEMPERATURE IS GREATER THAN THE COOLING SETPOINT BY A USER DEFINABLE AMOUNT (ADJ.).
• LOW ZONE TEMP: IF THE ZONE TEMPERATURE IS LESS THAN THE HEATING SETPOINT BY A USER DEFINABLE MOUNT (ADJ.).
ZONE SETPOINT ADJUST:
THE OCCUPANT SHALL BE ABLE TO ADJUST THE ZONE TEMPERATURE HEATING AND COOLING SETPOINTS AT THE ZONE SENSOR.
REVERSING VARIABLE VOLUME TERMINAL UNIT - FLOW CONTROL:
THE UNIT SHALL MAINTAIN ZONE SETPOINTS BY CONTROLLING THE AIRFLOW THROUGH ONE OF THE FOLLOWING:
OCCUPIED:
• WHEN ZONE TEMPERATURE IS GREATER THAN ITS COOLING SETPOINT, THE ZONE DAMPER SHALL MODULATE BETWEEN THE
MINIMUM OCCUPIED AIRFLOW (ADJ.) AND THE MAXIMUM COOLING AIRFLOW (ADJ.) UNTIL THE ZONE IS SATISFIED.
• WHEN THE ZONE TEMPERATURE IS BETWEEN THE COOLING SETPOINT AND THE HEATING SETPOINT, THE ZONE DAMPER SHALL
MAINTAIN THE MINIMUM REQUIRED ZONE AIRFLOW (ADJ.).
• WHEN ZONE TEMPERATURE IS LESS THAN ITS HEATING SETPOINT, THE CONTROLLER SHALL MODULATE THE HEATING VALVE OPEN
TO MAINTAIN THE ZONE TEMPERATURE AT ITS HEATING SETPOINT. ADDITIONALLY, IF WARM AIR IS AVAILABLE FROM THE AHU, THE ZONE DAMPER SHALL MODULATE BETWEEN THE MINIMUM OCCUPIED AIRFLOW (ADJ.) AND THE MAXIMUM HEATING AIRFLOW (ADJ.)
UNTIL THE ZONE IS SATISFIED.
UNOCCUPIED:
• WHEN THE ZONE IS UNOCCUPIED THE ZONE DAMPER SHALL CONTROL TO ITS MINIMUM UNOCCUPIED AIRFLOW (ADJ.).
• WHEN THE ZONE TEMPERATURE IS GREATER THAN ITS COOLING SETPOINT, THE ZONE DAMPER SHALL MODULATE BETWEEN THE
MINIMUM UNOCCUPIED AIRFLOW (ADJ.) AND THE MAXIMUM COOLING AIRFLOW (ADJ.) UNTIL THE ZONE IS SATISFIED.
• WHEN ZONE TEMPERATURE IS LESS THAN ITS UNOCCUPIED HEATING SETPOINT, THE CONTROLLER SHALL MODULATE THE HEATING
VALVE OPEN TO MAINTAIN THE ZONE TEMPERATURE AT THE SETPOINT. ADDITIONALLY, IF WARM AIR IS AVAILABLE FROM THE AHU, HE ZONE DAMPER SHALL MODULATE BETWEEN THE MINIMUM UNOCCUPIED AIRFLOW (ADJ.) AND THE AUXILIARY HEATING AIRFLOW
ADJ.) UNTIL THE ZONE IS SATISFIED.
REHEATING COIL VALVE:
THE CONTROLLER SHALL MEASURE THE ZONE TEMPERATURE AND MODULATE THE REHEATING COIL VALVE OPEN ON DROPPING ZONE
TEMPERATURE TO MAINTAIN ITS HEATING SETPOINT.
REHEATING - HIGH DISCHARGE AIR TEMPERATURE LIMIT:
THE CONTROLLER SHALL MEASURE THE DISCHARGE AIR TEMPERATURE AND LIMIT HOT WATER VALVE POSITION IF THE DISCHARGE AIR
TEMPERATURE IS MORE THAN 15°F (ADJ.) ABOVE THE ZONE TEMPERATURE.
DISCHARGE AIR TEMPERATURE:
THE CONTROLLER SHALL MONITOR THE DISCHARGE AIR TEMPERATURE.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH DISCHARGE AIR TEMP: IF THE DISCHARGE AIR TEMPERATURE IS GREATER THAN 100°F (ADJ.).
• LOW DISCHARGE AIR TEMP: IF THE DISCHARGE AIR TEMPERATURE IS LESS THAN 50°F (ADJ.).
Revisions: Date
Drawing Title
Approved ANDREKA WATLINGTON
PROJECT ENGINEER
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #C-1848
/2
/2
:1
:0
P
M
M-501
MECHANICAL DETAILS
6 9SPG SMH
IMPROVE INPATIENT
PRIVACY (RENOVATE 5B)
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705 6/28/2019
BID DOCUMENTS
558-18-15018-048
SCALE: N.T.S.6
FAN COIL UNIT DRAIN TRAP DETAIL
SCALE: N.T.S.5
INSTALLATION OF THERMOMETER WELLS
Scale: N.T.S.
FAN COIL UNIT PIPING DETAILS
Scale: N.T.S.
FAN COIL UNIT INSTALLATION DETAIL
Scale: N.T.S.
VAV TERMINAL UNIT CONTROLS
Scale: N.T.S.
VAV TERMINAL SCHEMATIC
Scale: N.T.S.
VAV TERMINAL SEQUENCE OF OPERATION
N
RN
39777 E
ENIG
O
NA
TR F
SEAL
RP
OO ISS OE
H RCA
IL
AN
L
E
S
ALI
S GP. EO
E
RG
NOTES:
1. ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA.
2. WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE
REGARDLESS OF W DIMENSION.
3. ALL SINGLE THICKNESS VANES SHALL HAVE A 2" RADIUS, 1-1/2" MAXIMUM SPACE BETWEEN
VANES AND A 3/4" TRAILING EDGE.
4. WHEN W EQUAL W2 AND W1 IS GREATER THAN 20" VANES SHALL BE DOUBLE VANE TYPE.
W1
W
MAIN SUPPLY
DUCT
PROVIDE VOLUME
DAMPER
PROVIDE
VOLUME
DAMPER
1/4 W OR
4" MIN.
SUPPLY REGISTER OR
BRANCH DUCT
MAIN
SUPPLY
DUCT
SEE FLOOR PLAN
FOR SPLIT
DIMENSION
TURNING VANES
AIR FLOW
AIR FLOW
A
IR
F L O
W
AIR SPLIT DUCT TAKE-
OFF PLAN VIEW
BRANCH DUCT TAKE-OFF
PLAN VIEW
AIR FLOW
A
IR
F
LO
W
W
MAIN SUPPLY
DUCT
CONICAL TAP
TERMINAL UNIT DUCT TAKE-
OFF PLAN VIEW
AIR FLOW
A
IR
F
LO
W
W
NOTES:
1. LATCHES SHALL BE OF THE WEDGE TYPE TO CLOSE DOORS THIGHTLY.
2. HINGES ON THE ACCESS DOORS SHALL HAVE NON-CORROSIVE PINS.
3. SEE SMACNA 2005, FIGURE 9-16
INSULATION
DUCT
GASKET
INSULATION
SECTION "A-A"
ACCESS PANEL
CASING
GASKET HANDLE INSIDE
FLEXIBLE WASHER
FACTORY
FABRICATED LATCH
SECTION "B-B"
ACCESS DOOR
INSULATION
"B" "B"
"A"
"A"
NOTES:
1. THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.
2. ALL STANDARD ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS ELBOWS.
ALL SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE
CONSTRUCTED , SUPPORTED AND FASTENED AS RECOMMENDED BY SMACNA.
STANDARD RADIUS OR
LONG RADIUS ELBOW
SHORT RADIUS ELBOW
WITH ONE VANE
SHORT RADIUS ELBOW
WITH TWO VANES
R
SHALL
EQUAL OR
BE
GREATER
THAN 1/6 W
R
SHALL
EQUAL OR
BE
GREATER
THAN 1/3 W
R
SHALL
EQUAL OR
BE
GREATER
THAN W
R
W
W
2/3W
R
/3
W
/3
W
1/2W
VAN
E
VAN
E R
W
1/6W
SHEET METAL AS
SPECIFIED FOR
DUCTWORK
1-1/2" POCKET SLIP
DUCT
1-1/2" MIN. TO 3" MAX.
INSTALLED. 6" NOMINAL
WITH MATERIAL TAUT
1" FLANGE & HEM
BOLT ON 4" CENTERALTERNATE
POSITION OF
BOLT 1" x 1/8" BAND IRON
WASHER
FLANGED
CONNECTION ON FAN
SIDE
FLEXIBLE MATERIAL
AS SPECIFIED
5/16" FLANGE
BOLT ON 4" CENTERS
1" x 1/8" BAND IRON
WASHER
FALNGED
CONNECTION ON FAN
SIDE
1" x 1/8" DRAW BAND
FLEXIBLE
MATERIAL AS
SPECIFIED
SHEET
METAL
SCREWS ON
12" CENTERS
RIVET ON 4" CENTERS
DUCT
1-1/2" MIN. TO 3" MAX.
INSTALLED. 6" NOMINAL
WITH MATERIAL TAUT
RECTANGULAR FLEXIBLE CONNECTION
ROUND FLEXIBLE CONNECTION
1-1/2"1/2" 1/2"
SHEET METAL AS
SPECIFIED FOR
DUCTWORK
NOTES:
1. DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.
2. DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR
FOR MULTI-BLADE DAMPERS & ROUND DAMPERS.
SECTIONSIDE ELEVATION
1/2" ROUND ROD PIN
1/8" CLEARANCE
ALL AROUND
INSIDE END
BEARING
INSULATION
STAND-OFF
DAMPER BLADE
HANDLE
WITH
LOCKING
QUADRANT
STIFFEN BLADE
AS REQUIRED
INSULATION SEE
SPECIFICATION
DUCT
OUTSIDE END BEARING
SIZE TO MAINTAIN 3500
FPM OUTLET VELOCITY
WELDED STAINLESS
STEEL EXHAUST STACK
1" GALVANIZED STEEL
STRAP SECURED TO
EXHAUST STACK
GUY WIRE (4 REQUIRED)
DRIP LIP
TRANSITION (AS REQUIRED)
F.C.
EXHAUST FAN
ROOF
SECURE STACK ON ROOF
SECURE GUY
WIRE TO ROOF
(TYP.)
BLANK PLATE
DRAIN, 1/2"
WELDED
COUPLING
WELDED JOINT
A S
R E
Q U
IR
E
D
M
IN
A
B O
V E
R O
O F
W
IT
H
IN
15.00°
SEE NOTE 3
SEE NOTE 2
SEE NOTE 1
NOTES:
1. EQUIPMENT ROOF CURB TO MEET ROOF WARRANTY REQUIREMENTS.
2. SECURE TO ROOF REAMING STRUCTURE. SEAL ALL ROOF PENETRATIONS AS REQUIRED TO
PRESERVE WARRANTY.
3. 3/4" EYEBOLT, SECURE TO ROOF REAMING STRUCTURE. SEAL ALL ROOF PENETRATIONS AS
REQUIRED TO PRESERVE WARRANTY.
NOTES:
1. RIGID STRAIGHT TERMINAL UNIT INLET LENGTH SHALL BE A MINIMUM OF 3
TIMES THE DIAMETER OF INLET.
2. A FLEXIBLE AIR DUCT CONNECTOR IS NOT MANDATORY FOR INLET TO THIS BOX,
BUT ALLOWED TO ACCOMODATE MINOR OFFSETS. MAXIMUM LENGTH 3'-0".
3. A BRANCH DUCT SERVING AN INDIVIDUAL BOX MAY BE THE SAME SIZE AS THE
BOX INLET, PROVIDED THE EQUIVALENT LENGTH OF THE BRANCH DUCT, AS
SHOWN, DOES NOT EXCEED 10 FEET. FOR LONGER LENGTHS, INCREASE THE
DUCT SIZE AND PROVIDE A DUCT TRANSITION TO MAINTAIN THE DUCT STATIC
PRESSURE DROP AT OR BELOW 0.2"/100'.
4. FLEXIBLE AIR DUCT CONNECTORS, WHEN USED FROM TERMINAL UNIT SUPPLY
AIR DUCT TO DIFFUSER, SHALL NOT EXCEED 5'-0". USE RIGID ELBOWS FOR
CHANGE OF DIRECTION GREATER THAN 45°.
5. COMPONENT ARRANGEMENT MAY VARY BY MANUFACTURER. PROVIDE
INSULATION WITH VAPOR BARRIER FOR CONNECTING DUCT SECTIONS.
6. USE OF THE FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED FOR THE
DEDICATED AHU SERVING THE SURGICAL SUITE.
AIR TERMINAL UNIT
(CV OR VAV)
SEE NOTE 5SEE SPECIFICATIONS FOR
CLAMPS AND SEALANT (TYP.)
AIR DISTRIBUTION VARIES
WITH ROOM LAYOUT
FLEXIBLE AIR DUCT
CONNECTOR. SEE DETAIL
REHEAT COIL
SEE NOTE 1
SEE NOTE 2
SEE NOTE 3S
U
P P
L Y
A
IR
D U
C T
S E
E N
O T
E
NOTE
HEPA FILTER. SEE
SCHEDULES FOR SIZE
AIR DISTRIBUTION VARIES
WITH ROOM LAYOUT
dPS
E X
H A
U S
T A
IR
D
U C
T
VENTURI TERMINAL
UNIT (CV OR 2
POSITION)
SEE NOTE 2
NOTES:
1. RIGID STRAIGHT TERMINAL UNIT LENGTH SHALL BE A MINIMUM OF 3 TIMES THE DIA. OF THE INLET.
2. ALL DUCTWORK UPSTREAM AND DOWNSTREAM OF THE HEPA FILTER SHALL BE GALVANIZED
STEEL.
3. PROVIDE SIDE ACCESS FOR FILTER SERVICE. SEE MANUFACTURER’S SPECIFICATION FOR
CLEARANCE REQUIREMENT.
NOTE 1
SEE NOTE 2
GENERAL NOTES:
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
PATIENT ROOM WITH RESPECT TO THE CORRIDOR (BALL-IN-WALL OR STROBE).
2. MAINTAIN THE ATTACHED TOILET, IF ANY, AT NEGATIVE AIR PRESSURE WITH RESPECT TO THE AII ROOM. HOWEVER, THE
DESIGN NEED NOT INCLUDE A PRESSURE DIFFERENTIAL SENSOR FOR VERIFICATION.
3. LOCATE THE EXHAUST AIR INLET OVER OR NEAR THE PATIENT BED TO ENSURE THAT AIR FLOWS INTO THE ROOM AND AWAY
FROM THE PATIENT ROOM DOOR.
LEGEND:
V1 VENTURI AIR FLOW CONTROL VALVE - PRESSURE INDEPENDENT TYPE
SA
FROM
AHU
TOILET ROOMEXHAUSTBED
1CORRIDOR
ANTE ROOM
TOTAL
EXHAUST
VSMC
HS
VARIABLE SPEED
MOTOR
CONTROLLER
DISCHARGE
NOZZLE AT
3500 FPM
M
IN
V-1
PDS
ECC
HEPA
FILTER
ROOF
CV TERMINAL
UNIT W/
REHEAT COIL
PATIENT
ROOM
HINGED ACCESS DOOR FOR FIRE
DAMPER ACCESS
FIRE RATED CHASE WALL, VERIFY EXACT FIRE RATING
AND CONSTRUCTION ON ARCHITECTURAL DRAWINGS
SOLID CEILING
CONSTRUCTION ACCESS
DOOR/PANEL
SOLID CEILING CONSTRUCTION,
VERIFY TYPE AND
CONSTRUCTION ON
ARCHITECTURAL DRAWINGS
DUCTWORK
TYPE "B" FIRE DAMPER
FIRE DAMPER INSTALLATION SHALL BE IN STRICT ACCORDANCE
WITH THE MANUFACTURER'S WRITTEN INSTRUCTIONS AND ALL
UNDERWRITER'S LABORATORY (UL), FEDERAL, STATE AND
LOCAL CODE REQUIREMENTS.
FIRE DAMPER RATING SHALL MATCH FIRE RATING OF CHASE
CONSTRUCTION. REFER TO ARCHITECTURAL DRAWINGS FOR
RATING.
DIVISION 23 CONTRACTOR SHALL FURNISH AND INSTALL A
HINGED ACCESS DOOR IN THE DUCTWORK SIZED IN
ACCORDANCE WITH THE SCHEDULE AND LOCATED TO PERMIT
REPLACEMENT OF FUSIBLE LINK. LABEL FIRE DAMPER ACCESS
DOOR WITH "FIRE DAMPER ACCESS."
DIVISION 23 CONTRACTOR SHALL FURNISH ACCESS
DOOR/PANEL FOR SOLID CEILING CONSTRUCTION IN
ACCORDANCE WITH DIVISION 8 SPECIFICATION SECTION
"ACCESS DOORS AND PANELS". ACCESS DOOR/PANEL LOCATED
IN SOLID CEILING CONSTRUCTION SHALL BE NO SMALLER IN SIZE
THAN THE ACCESS DOOR LOCATED IN THE DUCTWORK.
NOTES:
1.
2.
3.
4.
ACCESS DOOR / PANEL SCHEDULE
DUCTWORK WIDTH
6" 8" - 12" 13" - 18" 19" - 36"
37" - UP
6" x 6" 8" x 8"
12" x 12" 18" x 18" 24" x 24"
FIRE DAMPER (WALL) DETAIL
ACCESS DOOR
Revisions: Date
Drawing Title
Approved ANDREKA WATLINGTON
PROJECT ENGINEER
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #C-1848
/2
/2
:1
:1
P
M
M-502
MECHANICAL DETAILS
7 9SPG SMH
IMPROVE INPATIENT
PRIVACY (RENOVATE 5B)
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705 6/28/2019
BID DOCUMENTS
558-18-15018-048
SCALE: N.T.S.5 DUCTWORK SQUARE VANE ELBOWS
SCALE: N.T.S.3 SUPPLY DUCT TAKE-OFFS
SCALE: N.T.S.1 ACCESS PANEL AND DOOR DETAIL
SCALE: N.T.S.8 DUCTWORK RADIUS ELBOW
SCALE: N.T.S.6 FLEXIBLE DUCT CONNECTIONS
SCALE: N.T.S.2 VOLUME DAMPER DETAIL
SCALE: N.T.S.4 EXHAUST STACK DETAIL
Scale: N.T.S.
DUCT CONNECTIONS AIR TERMINAL UNITS
Scale: N.T.S.
VENTURI TERMINAL UNITS WITH HEPA FILTER
Scale: N.T.S.
AIR SYSTEM FOR AIRBORNE INFECTION ISOLATION (ALL)
ROOM WITH ANTEROOM
Scale: N.T.S.
FIRE DAMPER (WALL) DETAIL
N
RN
39777 E
ENIG
O
NA
TR F
SEAL
RP
OO ISS OE
H RCA
IL
AN
L
E
S
ALI
S GP. EO
E
RG
Revisions: Date
Drawing Title
Approved ANDREKA WATLINGTON
PROJECT ENGINEER
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #C-1848
/2
/2
:1
:1
P
M
M-601
MECHANICAL SCHEDULES
8 9SPG SMH
IMPROVE INPATIENT
PRIVACY (RENOVATE 5B)
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705 6/28/2019
BID DOCUMENTS
558-18-15018-048
FAN SCHEDULE
MARK LOCATION BUILDING/AREA SERVED SERVICE AIRFLOW TYPE ESP TSP
MIN %
EFF DRIVE FAN MAX RPM BHP HP (W) PHASE VOLT R.P.M.
SPEED
CONTROL REMARKS
5B-EF-1 3E-ROOF B5028 B5029 ISOLATION ROOMS ISOLATION ROOM EXHAUST 1160 CFM UTILITY SET - UPBLAST 3.25 in-wg 3.25 in-wg 86.5 BELT 2455 .912 1-1/2 208 1725 CONSTANT 1,2,3,4,5
AIR FILTER SCHEDULE
MARK LOCATION AREA AND/OR BLDG SERVED
SYSTEM AND/OR
SERVICE
MERV
RATING
APD
HOUSING TYPE # - CARTRIDGES
CARTRIDGES
REMARKSINITIAL CHANGEOVER SIZE ARRANGEMENT
5B-EF-HEPA-1 THIRD FLOOR F-WING ROOF 5B PATIENT RM ISOLATION B5028 B5029 5B-TU-EF-1 HEPA 1.00 in-wg 2.50 in-wg BAG-IN / BAG-OUT 1 27" x 30" x 24" 1 WIDE BY 1 HIGH 1
NOTES:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. COORDINATE WITH ELECTRICAL CONTRACTOR FOR DISCONNECT MEANS ON ROOF.
3. PROVIDE WITH OSHA BELT GUARD / WEATHER COVER WITH ACCESS DOOR, SPARE BELT SET, INLET PIEZOMETRIC RING WITH FLOW MONITOR, STEEL DRAIN, INLET AND OUTLET FLEX DUCT CONNECTION, AND SPRING ISOLATORS.
4. PROVIDE CONTROLLER TO INTEGRATE INTO EXISTING SIEMENS CONTROLS BUILDING AUTOMATION SYSTEM.
5. PROVIDE CLASS II FAN WITH CCW ROTATION AND BOTTOM ANGLE UP DISCHARGE.
NOTES:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
AIR DEVICE SCHEDULE (SUPPLY)
Type Mark TYPE
AIRFLOW
MAX. APD MOUNTING
PANEL/FRAME
SIZE
NECK SIZE
DAMPER FINISH MATERIALMIN. MAX. ROUND RECT.
SD-A SQUARE CONE 0 135 0.08 in-wg CEILING 24x24 6" -- No WHITE STEEL
SD-B SQUARE CONE 136 230 0.07 in-wg CEILING 24x24 8" -- No WHITE STEEL
SD-C SQUARE CONE 231 355 0.07 in-wg CEILING 24x24 10" -- No WHITE STEEL
AIR DEVICE SCHEDULE (RETURN)
Type Mark TYPE
AIRFLOW
MAX. APD MOUNTING
PANEL/FRAME
SIZE NECK SIZE MAX NC
DAMPER
DIFFUSER FINISH MATERIALMIN. MAX.
RA-A EGG CRATE 131 270 0.09 in-wg CEILING 24x24 6X6 20 No WHITE STEEL
RA-B EGG CRATE 131 270 0.09 in-wg CEILING 24x24 8x8 20 No WHITE STEEL
RG-E EGG CRATE 131 270 0.09 in-wg CEILING 12x12 6x6 20 No WHITE STEEL
RG-F SIDEWALL 45º FIXED 0 650 0.05 in-wg WALL 26x12 24x10 20 No WHITE STEEL
AIR DEVICE SCHEDULE (EXHAUST)
Type Mark TYPE
AIRFLOW
MAX. APD MOUNTING
PANEL/FRAME
SIZE NECK SIZE MAX NC DAMPER MATERIAL FINISHMIN. MAX.
EG-B EEG CRATE 40 110 0.09 in-wg CEILING 24x24 8"Ø 20 No STEEL WHITE
EG-C EEG CRATE 40 110 0.09 in-wg CEILING 24x24 10"Ø 20 No STEEL WHITE
EG-E EEG CRATE 40 110 0.09 in-wg CEILING 12x12 6"Ø 20 No STEEL WHITE
EG-F EEG CRATE 40 110 0.09 in-wg CEILING 12x12 8"Ø 20 No STEEL WHITE
DUCTLESS SPLIT CONDENSING UNIT SCHEDULE
MARK LOCATION
AREA AND/OR ROOM
SERVED
COOLING CAPACITY
RANGE (BTU) COMPRESSOR TYPE POWER MCA MOCP REMARKS
5B-CU-1 ROOF EQUIP B5004 12000 DC INVERTER-DRIVEN TWIN ROTARY 208/230, 1, 60 12 15 1,2,3
DUCTLESS SPLIT INDOOR UNIT SCHEDULE
TAG LOCATION
AREA AND/OR ROOM
SERVED TYPE AIRFLOW CAPACITY EAT DB ELECTRICAL DATA REMARKS
5B-SS-1 EQUIP B5004 EQUIP B5004 HORIZONAL DUCTED 635 24,000.0 Btu/h 115 °F 208/230V 1-PHASE 60HZ 1,2,3
NOTES:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. PROVIDE WITH STANDARD WALL THERMOSTAT AND FILTER BOX.
3. INDOOR UNIT POWERED THROUGH CONDENSING UNIT.
NOTES:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. INDOOR UNIT POWERED THROUGH CONDENSING UNIT.
3. PROVIDE WITH CONDENSING UNIT PAD FOR MOUNTING ON ROOF. COORIDNATE WITH ROOFING CONTRACTOR TO MEET ROOF WARRANTY REQUIREMENTS.
NOTES:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. PROVIDE DAMPER IN BRANCH DUCT AS SHOWN ON PLANS.
NOTES:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. PROVIDE DAMPER IN BRANCH DUCT AS SHOWN ON PLANS.
NOTES:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. PROVIDE DAMPER IN BRANCH DUCT AS SHOWN ON PLANS.
N
RN
39777 E
ENIG
O
NA
TR F
SEAL
RP
OO ISS OE
H RCA
IL
AN
L
E
S
ALI
S GP. EO
E
RG
Revisions: Date
Drawing Title
Approved ANDREKA WATLINGTON
PROJECT ENGINEER
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #C-1848
/2
/2
:1
:1
P
M
M-602
MECHANICAL SCHEDULES
9 9SPG SMH
IMPROVE INPATIENT
PRIVACY (RENOVATE 5B)
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705 6/28/2019
BID DOCUMENTS
558-18-15018-048
SINGLE DUCT AIR TERMINAL SCHEDULE
MARK LOCATION ROOM SERVED
SYSTEM AIR
HANDLING VAV SIZE
AIRFLOW CONTROL
TYPE
CONTROL
SEQUENCE
REHEAT
ELEC
REHEAT
HW
HEATING COIL
REMARKSAIRFLOW MIN REHEAT ROWS EAT LAT EWT LWT FLOW
5B-TU-3 B5007 B5007 PATIENT ROOM 1-AHU-2 6 in 225 225 225 CAV 5°F DEADBAND No Yes 2 55 °F 95 °F 180 °F 160 °F 0.98 GPM 1,2, 3
5B-TU-4 B5008 B5008 PATIENT ROOM 1-AHU-2 5 in 195 195 195 CAV 5°F DEADBAND No Yes 2 55 °F 95 °F 180 °F 160 °F 0.85 GPM 1,2, 3
5B-TU-5 B5009 B5009 CARE STATION 1-AHU-2 6 in 260 260 260 CAV 5°F DEADBAND No Yes 2 55 °F 95 °F 180 °F 160 °F 1.13 GPM 1,2, 3
5B-TU-6 B5010 B5010 PATIENT ROOM 1-AHU-2 5 in 185 185 185 CAV 5°F DEADBAND No Yes 2 55 °F 95 °F 180 °F 160 °F 0.80 GPM 1,2, 3
5B-TU-7 B5011 B5011 PATIENT ROOM 1-AHU-2 5 in 190 190 190 CAV 5°F DEADBAND No Yes 2 55 °F 95 °F 180 °F 160 °F 0.82 GPM 1,2, 3
5B-TU-8 B5012 B5012 PATIENT ROOM 1-AHU-2 5 in 235 235 235 CAV 5°F DEADBAND No Yes 2 55 °F 95 °F 180 °F 160 °F 1.02 GPM 1,2, 3
5B-TU-9 B5040 B5040 CORRIDOR B5014 CARE STATION 1-AHU-2 5 in 250 250 250 CAV 5°F DEADBAND No Yes 2 55 °F 95 °F 180 °F 160 °F 1.09 GPM 1,2, 3
5B-TU-10 B5015 B5015 STAFF LOUNGE B5015A LOCKER 1-AHU-2 4 in 120 120 120 CAV 5°F DEADBAND No Yes 2 55 °F 95 °F 180 °F 160 °F 0.52 GPM 1,2, 3
5B-TU-11 B5016 B5016 PATIENT ROOM 1-AHU-2 5 in 290 290 290 CAV 5°F DEADBAND No Yes 2 55 °F 95 °F 180 °F 160 °F 1.26 GPM 1,2, 3
5B-TU-12 B5017 B5017 EQUIP 1-AHU-2 4 in 100 100 100 CAV 5°F DEADBAND No Yes 2 55 °F 95 °F 180 °F 160 °F 0.43 GPM 1,2, 3
5B-TU-13 B5021 B5021 PATIENT ROOM 1-AHU-2 5 in 230 230 230 CAV 5°F DEADBAND No Yes 2 55 °F 95 °F 180 °F 160 °F 1.00 GPM 1,2, 3
5B-TU-14 B5022 B5022 PATIENT ROOM 1-AHU-2 5 in 230 230 230 CAV 5°F DEADBAND No Yes 2 55 °F 95 °F 180 °F 160 °F 1.00 GPM 1,2, 3
5B-TU-15 B5041 B5041 PASSAGE B5023 CARE STATION 5-AHU-1 6 in 185 185 185 CAV 5°F DEADBAND No Yes 2 55 °F 95 °F 180 °F 160 °F 0.80 GPM 1,2, 3
5B-TU-16 B5024 B5024 PATIENT ROOM 1-AHU-2 5 in 230 230 230 CAV 5°F DEADBAND No Yes 2 55 °F 95 °F 180 °F 160 °F 1.00 GPM 1,2, 3
5B-TU-17 B5025 B5025 PATIENT ROOM 1-AHU-2 5 in 230 230 230 CAV 5°F DEADBAND No Yes 2 55 °F 95 °F 180 °F 160 °F 1.00 GPM 1,2, 3
5B-TU-18 B5040 B5040 CORRIDOR B5027 MEDS B5020 ALCOVE B5026 NOUR 1-AHU-2 4 in 115 115 115 CAV 5°F DEADBAND No Yes 2 55 °F 95 °F 180 °F 160 °F 0.50 GPM 1,2, 3
5B-TU-19 B5028 B5028 PATIENT B5028A ANTE 1-AHU-2 6 in 350 350 350 CAV 5°F DEADBAND No Yes 2 55 °F 95 °F 180 °F 160 °F 1.52 GPM 1,2, 3
5B-TU-20 B5029 B5029 PATIENT…