This presolicitation notice is for an inpatient privacy renovation project at the Durham VA Medical Center in North Carolina. The Department of Veterans Affairs is seeking a contractor to gut and renovate approximately 8,000 square feet of space on the fifth floor into twelve new private patient rooms and ancillary spaces. The estimated construction value is between $1,000,000 to $5,000,000. The solicitation is anticipated to be a total service-disabled veteran owned small business set-aside. The solicitation material will be available on November 7, 2019, with proposals due approximately 45 days later. Questions regarding this announcement must be emailed to the specified point of contact.
36C24620R0007 0005 01-Gen_100_BD.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24620R0007-0011001.pdf | ||
| 36C24620R0007-0011002.pdf | ||
| 36C24620R0007-0011000.docx | DOCX document | |
| 36C24620R0007-0010000.docx | DOCX document | |
| 36C24620R0007-0009000.docx | DOCX document | |
| 36C24620R0007-0008001.pdf | ||
| 36C24620R0007-0008000.docx | DOCX document | |
| 36C24620R0007-0007000.docx | DOCX document | |
| 36C24620R0007-0006004.pdf | ||
| 36C24620R0007-0006006.pdf | ||
| 36C24620R0007-0006000.docx | DOCX document | |
| 36C24620R0007-0006003.pdf | ||
| 36C24620R0007-0006005.pdf | ||
| 36C24620R0007-0006001.pdf | ||
| 36C24620R0007-0006002.pdf | ||
| 36C24620R0007-0005000.docx | DOCX document | |
| 36C24620R0007-0005005.pdf | ||
| 36C24620R0007-0005004.pdf | ||
| 36C24620R0007-0005002.pdf | ||
| 36C24620R0007-0005003.pdf | ||
| 36C24620R0007-0004000.docx | DOCX document | |
| 36C24620R0007-0003000.docx | DOCX document | |
| 36C24620R0007-0003001.pdf | ||
| 36C24620R0007-0002002.pdf | ||
| 36C24620R0007-0002001.docx | DOCX document | |
| 36C24620R0007-0001001.pdf | ||
| 36C24620R0007-023.pdf | ||
| 36C24620R0007-022.docx | DOCX document |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F U
L T
O N
S T
R E
E T
ERWIN ROAD
A
D
C
B
E
F
MRI
I.C.U.
U N
D E
R C
O N
S T
R U
C T
IO
N
BOOTH
IMPROVE INPATIENT PRIVACY
(RENOVATE 5B)
DURHAM VA MEDICAL
CENTER
508 FULTON STREET
DURHAM, NC 27705
BID DOCUMENTS
VA PROJECT NO. 558-18-150
508 FULTON ST.
VA APPROVAL
MEDICAL CENTER DIRECTOR
MEDICAL CENTER ASSOC. DIRECTOR
CHIEF OF STAFF
ASSOC. DIRECTOR OF PATIENT CARE
CHIEF FES
PROJECT SECTION SUPERVISOR
PROJECT MANAGER
GENERAL UTILITIES FOREMAN
PATIENT CARE FORMAN
GENERAL PROPERTIES FOREMAN
FIRE CHIEF
SUPERVISOR BIO-MED SERVICE
CHIEF LOGISTICS
PATIENT SAFETY MANAGER
SAFETY OFFICER
CIO OFFICER
INFECTION PROVENTION
CONTRACTING OFFICER
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
R
EG
IS
TE
RED ARCH
ITEC
T
N O R
T H
CA RO
L
I N A
11389
C
UL
LEN
S . KEEN
C H A R
LOTTE , NORTH
CA
RO
L
IN
A
Revisions: Date
Drawing Title
Approved ANDREKA WATLINGTON
PROJECT ENGINEER
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS PROJECT
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
/2
/2
:5
:2
P
M
G-000
COVER SHEET
1 4RP/CK CK/AB
IMPROVE INPATIENT
PRIVACY (RENOVATE 5B)
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705 6/28/2019
BID DOCUMENTS
558-18-150
12" = 1'-0"2
VICINITY MAP
DRAWING LIST
# Description
GENERAL
G-000 COVER SHEET
GI001 FIFTH FLOOR PHASING AND ICRA PLAN
GL101 FIFTH FLOOR LIFE SAFETY PLAN
GC101 ALTERNATE SCOPE PLANS
INDUSTRIAL HYGIENE
HA101 ASBESTOS CONTAINING MATERIALS TO BE ABATED
HA102 ASBESTOS ABATEMENT NOTES
ARCHITECTURAL
A-001 PARTITION TYPES AND DETAILS
AD101 FIFTH FLOOR DEMOLITION PLAN
AI101 FIFTH FLOOR PLAN
AI102 FIFTH FLOOR DIMENSION PLAN
AI121 FIFTH FLOOR REFLECTED CEILING PLAN
AI301 ARCHITECTURAL SECTIONS
AI401 ENLARGED FLOOR SLOPE PLANS
AI431 INTERIOR ELEVATIONS
AI432 INTERIOR ELEVATIONS
AI501 INTERIOR DETAILS
AI541 CASEWORK DETAILS
AI601 DOOR SCHEDULE AND DETAILS
IF101 FIFTH FLOOR FINISH PLAN
IF102 FIFTH FLOOR WALL PROTECTION PLAN
IG101 FIFTH FLOOR SIGNAGE PLAN
QH101 FIFTH FLOOR EQUIP PLAN - AREA A
QH102 FIFTH FLOOR EQUIP PLAN - AREA B
FIRE PROTECTION
F-001 FIRE PROTECTION GENERAL INFORMATION
FD101 FIFTH FLOOR FIRE PROTECTION DEMOLITION PLAN
FP101 FIFTH FLOOR FIRE PROTECTION PLAN
PLUMBING
P-001 PLUMBING LEGEND, ABBREVIATIONS, AND GENERAL NOTES
PD101 FOURTH FLOOR PLUMBING DEMOLITION PLAN
PD102 FIFTH FLOOR PLUMBING DEMOLITION PLAN
PD103 FIFTH FLOOR MEDICAL GAS DEMOLITION PLAN
PP101 FIFTH FLOOR WASTE AND VENT PLAN
PP102 FIFTH FLOOR DOMESTIC WATER PLAN
PG101 FIFTH FLOOR MEDICAL GAS PLAN
P-401 ENLARGED PLUMBING PLANS
P-501 PLUMBING DETAILS
PP901 RISERS WASTE AND VENT
PP902 RISERS WASTE AND VENT
PP903 RISERS DOMESTIC WATER
PP904 RISERS DOMESTIC WATER
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION
MD101 FIFTH FLOOR MECHANICAL DEMOLITION PLAN
MH101 FIFTH FLOOR HVAC PLAN
MH102 FIFTH FLOOR AIR TERMINAL PLAN
MP101 FIFTH FLOOR PIPING PLAN
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-602 MECHANICAL SCHEDULES
ELECTRICAL
E-001 ELECTRICAL GENERAL INFORMATION
ED101 FIFTH FLOOR ELECTRICAL DEMOLITION PLAN
EP101 FIFTH FLOOR POWER PLAN
EP102 PARTIAL GROUND FLOOR ELECTRICAL ROUTING PLANS
EP103 PARTIAL FIRST FLOOR ELECTRICAL ROUTING PLANS
EP104 PARTIAL SECOND FLOOR ELECTRICAL ROUTING PLANS
EP105 PARTIAL THIRD FLOOR ELECTRICAL ROUTING PLANS
EP106 PARTIAL FOURTH FLOOR ELECTRICAL ROUTING PLANS
EP107 PARTIAL FIFTH FLOOR ELECTRICAL ROUTING PLANS
EL101 FIFTH FLOOR LIGHTING PLAN
EM101 FIFTH FLOOR MECHANICAL POWER PLAN
E-401 ENLARGED ELECTRICAL PLANS
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-601 ONE-LINE DIAGRAM
E-602 ELECTRICAL SCHEDULES
TECHNOLOGY
TK001 TECHNOLOGY GENERAL INFORMATION
TD101 FIFTH FLOOR TECHNOLOGY DEMOLITION PLAN
TK101 FIFTH FLOOR TECHNOLOGY PLAN
TK102 FIFTH FLOOR SYSTEMS PLAN
TK103 FIFTH FLOOR OVERALL SYSTEMS PLAN
TK104 GROUND FLOOR TECHNOLOGY ROUTING PLAN
TK501 TECHNOLOGY DETAILS
TK502 TECHNOLOGY DETAILS
TK503 TECHNOLOGY DETAILS
FIRE ALARM
FA001 FIRE ALARM GENERAL INFORMATION
FA100 FIFTH FLOOR FIRE ALARM DEMOLITION PLAN
FA101 FIFTH FLOOR FIRE ALARM PLAN
1" = 160'-0"3
CAMPUS MAP
DocuSign Envelope ID: 80B92A2A-987E-4838-852A-3067C97F4F07
6/26/2019
1 3 4 5 7 10 11 12
13 14 15 16
5.1 96 8
L
S
T
N
Q
R
M
P
R.1
E
LE
V A
TO
R
A C
C E
S S
ANTEROOM
LI
M
IT
O
F P
R
IM
A R
Y S
C O
P E
1. PERFORM WORK REQUIRED BY VA INFECTION CONTROL PERSONNEL
REGARDING ICRA FORM. REFER TO VA'S ICRA FORM FOR REQUIREMENTS. ALL ICRA AND
ILSM WORK ITEMS MUST BE COMPLETED PRIOR TO BEGINNING ANY NEW CONSTRUCITON
WORK OR DEMOLITION.
2. VA REQUIRES THAT ALL APPLICABLE PERMITS BE COMPLETED AND APPROVED
PRIOR TO BEGINNING ANY WORK ON STATION. PERMITS INCLUDE: ICRA, ILSM, ABOVE
CEILING, FIRE/SMOKE WALL, UTILITY, FIRE SPRINKLER, FIRE ALARM SYSTEM, MEDICAL
GASES, AND CONFINED SPACE.
3. THIS PROJECT NEEDS AN ENTRY ANTEROOM FOR CLOTHING CHANGES.
PROVIDE STAGING AREA FOR PPE (PERSONAL PROTECTIVE EQUIMENT AND HAZMAT
SUITS) AND TOOL STORAGE. TIGHT SEALS SHALL BE MAINTAINED AT THE FULL PERIMETER
OF WALLS AND WALL PENETRATIONS. ANY DUST SHALL BE IMMEDIATELY CLEANED IF
TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON COMPLETION OF THE
CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED CARFULLY TO MINIMIZE
SPREADING OF DUST, AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST
PROTECTION IN PLACE BEFORE REMOVING A CONSTRUCTION BARRIER. LOCATION OF
ANTEROOM CANNOT INTERFERE WITH EGRESS OUTSIDE THE CONSTRUCTION ZONE.
4. INSTALL TEMPORARY EXHAUST SYSTEM, ROUTED THROUGH EXISTING WINDOW
UNITS, TO MAINTAIN NEGATIVE PRESSURE IN CONSTRUCTION AREA. CONTRACTOR TO
DETERMINE NUMBER OF EXHAUST FANS REQUIRED TO MAINTAIN NEGATIVE PRESSURE
INSIDE CONSTRUCTION AREA.
5. PROVIDE STICKY MATS AND BLANKET AT THE CONSTRUCTION ANTEROOM.
CHANGE DAILY OR MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND
DEBRIS INTO ADJACENT CLEAN SPACE.
1 PROVIDE TEMPORARY 2-HOUR RATED SLAB-TO-SLAB BARRIER
CONSISTING OF 3 5/8" METAL STUD FRAMING W/ 2 LAYERS 5/8"
GYP BD ON BOTH SIDES. BARRIER SHALL BE INSPECTED BY
VA ICRA STAFF PRIOR TO START OF CONSTRUCTION IN SPACE.
MAINTAIN NEGATIVE PRESSURE VENTILATION IN THE
CONSTRUCTION SPACE.
2 PROVIDE 90-MIN RATED HOLLOW METAL DOOR W/ CLOSER FOR
ANTEROOM FOR CONSTRUCTION ACCESS.
3 CONSTRUCTION ACCESS ROUTE.
4 USE ISOLATION CART FOR ALL WORK IN THIS AREA.
5 PROVIDE TWO STICKY MATS AT CONSTRUCTION ANTEROOM.
6 ONE ELEVATOR WILL BE AVAILABLE FOR CONTRACTOR USE.
7 PROVIDE TEMPORARY SLAB-TO-SLAB PARTITION CONSISTING
OF 3 5/8" METAL STUD FRAMING W/ 5/8" GYP BD ON BOTH
SIDES. PARTITION SHALL BE INSPECTED BY VA ICRA STAFF
PRIOR TO START OF CONSTRUCTION IN SPACE. MAINTAIN
NEGATIVE PRESSURE VENTILATION IN THE CONSTRUCTION
SPACE.
8 PROVIDE HOLLOW METAL DOOR FOR ANTEROOM FOR
CONSTRUCTION ACCESS.
9 EXISTING PARTITION SERVES AS PART OF CONSTRUCTION
BARRIER. CONTRACTOR TO VERIFY THAT WALL SEALS TO
STRUCTURE AND THAT PENETRATIONS ARE FIRESTOPPED.
CONTRACTOR SHALL PERFORM ANY PATCHING OF WALLS AND
FIRESTOPPING REQUIRED TO MAINTAIN SEPARATION.
10 HATCH INDICATES AREA OF SITE THAT MAY BE AVAILABLE FOR
TRASH CHUTE AND/OR CONSTRUCTION LIFT. CONTRACTOR TO
COORDINATE EXACT LOCATION WITH COR.
PROJECT PHASING
THE PROJECT SHALL CONSIST OF ONE PRIMARY PHASE. THE W ORK OF
THIS PHASE SHALL BE ORGANIZED AS FOLLOWS:
PHASE 1A:
IMPLEMENT ICRA AND ILSM PLAN.
PHASE 1B:
PRIMARY DEMOLITION WORK. REMOVE WALLS, FINISHES,
FIXTURES, AND UTILITIES AS OUTLINED ON CONSTRUCTION
DOCUMENTS.
PHASE 1C:
COORDINATION OF PLUMBING STACKS TO REMAIN. DESIGN
TEAM HAS VERIFIED EXISTING PLUMBING STACK LOCATIONS
WHERE POSSIBLE. STACKS SERVING OTHER FLOORS MUST BE
MAINTAINED OR REROUTED.
PHASE 1D:
NEW CONSTRUCTION WORK.
ICRA NOTES
DUST CONTROL:
1a. THIS PROJECT NEEDS AN ENTRY ANTEROOM FOR CLOTHING
CHANGES. PROVIDE STAGING AREA FOR PPE (PERSONAL PROTECTIVE
EQUIMENT AND HAZMAT SUITS) AND TOOL STORAGE. TIGHT SEALS SHALL
BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL
PENETRATIONS. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED
OUTSIDE OF THE CONSTRUCTION BARRIER. UPON COMPLETION OF THE
CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED CARFULLY
TO MINIMIZE SPREADING OF DUST, AND THE CONTRACTOR SHALL HAVE
TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVING A
CONSTRUCTION BARRIER.
1b. INSTALL TEMPORARY EXHAUST SYSTEM, ROUTED THROUGH
EXISTING WINDOW UNITS, TO MAINTAIN NEGATIVE PRESSURE IN
CONSTRUCTION AREA. CONTRACTOR TO DETERMINE NUMBER OF
EXHAUST FANS REQUIRED TO MAINTAIN NEGATIVE PRESSURE INSIDE
CONSTRUCTION AREA.
1c. PROVIDE STICKY MATS AT THE CONSTRUCTION ANTEROOM.
CHANGE DAILY OR MORE OFTEN AS NEEDED TO PREVENT THE SPREAD
OF DUST AND DEBRIS INTO ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES:
2a. USE CONSTRUCTION ACCESS ROUTE NOTED ON DRAWINGS OR AS
DETERMINED BY COR.
2b. TRAFFIC CONTROL: DESIGNATEED ENTRY AND EXIT PROCEDURES
SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS.
DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED TIMES,
AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE
CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC
AW AY FROM THE CONSTRUCTION AREA AND MATERIALS.
2c. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER
CONSTRUCTION MATERIAL IN AND OUT OF THE PROJECT, WITH A CLEAN
CART USED IN THE AREAS OUTSIDE THE CONSTRUCTION AREA.
2d. DEMOLITION DEBRIS: USE OF TRASH CHUTES IS PREFERRED.
HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR
MACHINES SHALL BE USED WITH CHUTES, AND THE CHUTE OPENING
SHALL BE SEALED W HEN NOT IN USE. FILTERS SHALL BE BAGGED AND
SEALED BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION
AREA. ANY DEBRIS THAT CANNOT BE SENT DOWN THE CHUTE SHALL BE
REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING DESIGNATED
TRAFFIC ROUTE. EFFORTS SHALL BE MADE TO MINIMIZE USE OF
ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST
PERIOD OF HOSPITAL ACTIVITY. DEBRIS SHALL BE REMOVED DAILY AND
AT TIMES SPECIFIED BY THE VAMC. THE CONTRACTOR SHALL NOT HAUL
DEBRIS THROUGH PATIENT CARE AREAS WITHOUT PRIOR APPROVAL OF
THE COR.
VENTILATION AND ENVIRONMENTAL CONTROLS:
3a. AIR SYSTEM FLOW : THE COR W ILL ADVISE THE CONTRACTOR
WHETHER THE SYSTEM USES OUTSIDE OR RE-CIRCULATED AIR. FILTERS
SHALL BE ADDED OR RETURN VENTS COVERED AS NEEDED W ITH FILTER
MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN TO DIRTY AREAS.
3b. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION
AREA SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND
WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF
THE NEGATIVE AIR PRESSURE SYSTEM W ITHIN THE ENCLOSURE TO
REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE
PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300 TO 800
CFM, OR EXHAUST AIR DIRECTOLY TO THE OUTSIDE IF APPROVED BY THE
VAMC. IF EXHAUST SHAL BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A
PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST TO
PREVENT CONTAMINATION OF THE DUCTS.
3c. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND
INTACT CEILINGS SHALL BE VERIFIED DAILY.
3d. AIR EXHCANGE RATES AND PRESSURE RELATIONSHIPS: VAMC
AND CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN
CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT
BEING RE-CIRCULATED FROM THE CONSTRUCTION AREA WITHOUT
FILTRATION. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE
PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.
CONTAMINATION:
4a. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING
SHALL BE FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE
CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G.
COVERALLS, FOOTGEAR, AND HEADGEAR), A HEPA FILTERED VACUUM
SHALL BE USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING THE
CONSTRUCTION BARRIER. IF PROTECTIVE APPAREL IS UTILIZED,
CONTRACTOR SHALL CONSTRUCTION AN ANTEROOM FOR CHANGING AND
STORING EQUIPMENT. ALL EQUIPMENT, TOOLS, MATERIALS, AND CARTS
TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE OF
DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR
REMOVAL FROM TEH CONSTRUCTION ZONE.
4b. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL
HVAC ISOLATION UNTIL CONTRACTOR HAS CLEANED CONSTRCTION ZONE,
VA EMS STAFF HAS DONE A TERMINAL CLEANING, AND VA INFECTION
CONTROL HAS INSPECTED AND APPROVED THE CLEANING.
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
R
EG
IS
TE
RED ARCH
ITEC
T
N O R
T H
CA RO
L
I N A
11389
C
UL
LEN
S . KEEN
C H A R
LOTTE , NORTH
CA
RO
L
IN
A
# SHEET KEY NOTES:
Revisions: Date
Drawing Title
Approved ANDREKA WATLINGTON
PROJECT ENGINEER
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS PROJECT
SHEET NOTES:
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
/2
/2
:5
:3
P
M
GI001
FIFTH FLOOR PHASING AND ICRA PLAN
2 4RP/CK CK/AB
IMPROVE INPATIENT
PRIVACY (RENOVATE 5B)
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705 6/28/2019
BID DOCUMENTS
558-18-150
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
1/8" = 1'-0"1
FIFTH FLOOR PHASING AND ICRA PLAN
0' 8'4' 16'
LIFE SAFETY
1 Hour Fire Rated Barrier
Travel Distance
25'-0"
Exit W idth
Fire Extinguisher Cabinet FEC
Exit Sign
0 1
0"
Egress Width
Actual Occupant Load
Max. Occupant Load
Fire Extinguisher FE
1Key Note
LSTD: Life Safety Suite Travel Distance (50 or 100 ft depending on number of intervening rooms)
EATD: Exit Access Travel Distance (150 ft)
SBTD: Smoke Barrier Travel Distance (200 ft limit)
2 Hour Fire Rated Barrier
1 Hour Smoke Barrier
2 Hour Smoke Barrier
Smoke Partition
Suite Area
1. ALL PENETRATIONS THROUGH FIRE RATED WALLS SHALL COMPLY WITH
NFPA 101 AND RELATED NFPA CODES.
2. PENETRATIONS SHALL BE FIRE STOPPED WITH FIRE BARRIER PRODUCTS
AS REQUIRED TO MAINTAIN FIRE RATINGS. INSTALL IN ACCORDANCE WITH
UL ASSEMBLIES AND MANUFACTURER'S INSTRUCTIONS FOR THEIR USE.
PRODUCTS MUST BE APPROVED BY COR PRIOR TO INSTALLATION.
3. SUBMIT SHOP DRAWINGS FOR APPROVAL SHOWING PENETRATIONS,
MATERIALS USED FOR FIRE RATING AND UL ASSEMBLY NO.
4. PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF
FURNISHED AND NON-FURNISHED WALL-MOUNTED ITEMS.
5. VERIFY THAT CARRIERS TO BE USED FOR WALL MOUNTED SINKS AND
LAVATORIES ARE THE TYPE THAT W ILL FIT WITHIN STUD WALLS SHOWN.
CONTACT ARCHITECT IF THERE IS A CONFLICT.
6. PROVIDE SUPPLEMENTAL FRAMING, INSULATION, AND FINISH MATERIALS
AS REQUIRED TO MAINTAIN PARTITION FIRE-RESISTANCE RATING AT
RECESSED ITEMS.
7. CONTRACTOR SHALL ARRANGE AN INSPECTION OF RATED PARTITIONS
WITH THE COR PRIOR TO INSTALLING CEILING.
8. ALL CURRENT APPLICABLE CODES SHALL BE APPLIED TO THIS PROJECT,
INCLUDING:
a. 2018 NFPA 101
b. 2018 NFPA 99
c. 2016 NFPA 13
d. 2016 NFPA 72
1 3 4 5 7 10 11 12
13 14 15 16
5.1 96 8
L
S
T
N
Q
R
M
P
R.1
223 SF
PATIENT RM
B5008
302 SF
CARE
STATION
B5009
218 SF
PATIENT RM
B5010
223 SF
PATIENT RM
B5011
277 SF
PATIENT RM,
BARIATRIC
B5012
62 SF
LOCKER
B5014
189 SF
PATIENT RM
B5016
94 SF
SOILED
UTILITY
B5018
124 SF
CLEAN
SUPPLY
B5019
58 SF
ALCOVE
B5020
203 SF
PATIENT RM
B5021
193 SF
PATIENT RM
B5022
194 SF
PATIENT RM
B5024
196 SF
PATIENT RM
B5025
155 SF
PASSAGE
B5041
57 SF
NOUR
B5026 117 SF
MEDS
B5027
85 SF
BATH
B5007A
1620 SF
CORRIDOR
B5040
49 SF
BATH
B5008A
49 SF
BATH
B5010A49 SF
BATH
B5011A
49 SF
BATH
B5016A
50 SF
BATH
B5024A
50 SF
BATH
B5025A
49 SF
BATH
B5021A
50 SF
BATH
B5022A
147 SF
STAIR
B5050
51 SF
STAFF TLT
B5014A 217 SF
PATIENT RM,
ISOLATION
B5028
47 SF
BATH
B5028A
42 SF
ANTE
B5028B
212 SF
PATIENT RM,
ISOLATION
B5029
52 SF
BATH
B5029A
41 SF
ANTE
B5029B
274 SF
PATIENT RM,
BARIATRIC
B5007
54 SF
CARE
STATION
B5005
120 SF
EQUIP
B5004
69 SF
BATH
B5012A
63 SF
CARE
STATION
B5013
46 SF
CARE
STATION
B5023
121 SF
NURSE MGR
OFFICE
B5030
123 SF
EQUIP
B5017
239 SF
TEAM WORK
ROOM
B5031124 SF
STAFF
LOUNGE
B5015
46 SF
OIT
B5003A
27 SF
ELEC
B5017A
SUITE S-5C
775 SF
7 OCCUPANTS
S U
IT
E
T R
A V
E L:
1'
-1 1"
TR
A
V E
L D
IS
TA
N C
E : 1
'-3
TRAVEL DISTANCE: 181'-0"
425 36
85"
SMOKE COMPARTMENT 5-01
FULLY-SPRINKLERED
8,569 SQ.FT.
72 OCCUPANTS
SMOKE COMPARTMENT 5-02
FULLY-SPRINKLERED
7,932 SQ.FT.LI
M
IT
O F
P R
IM
A
R Y
S C
O P
E
TRAVEL DISTANCE: 149'-0"
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
R
EG
IS
TE
RED ARCH
ITEC
T
N O R
T H
CA RO
L
I N A
11389
C
UL
LEN
S . KEEN
C H A R
LOTTE , NORTH
CA
RO
L
IN
A
Revisions: Date
Drawing Title
Approved ANDREKA WATLINGTON
PROJECT ENGINEER
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS PROJECT
SHEET NOTES:
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
/2
/2
:5
:3
P
M
GL101
FIFTH FLOOR LIFE SAFETY PLAN
3 4RP/CK CK/AB
IMPROVE INPATIENT
PRIVACY (RENOVATE 5B)
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705 6/28/2019
BID DOCUMENTS
558-18-150
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
1/8" = 1'-0"1
FIFTH FLOOR LIFE SAFETY PLAN
0' 8'4' 16'
1 3 4 5 7 10 11 12
13 14 15 16
5.1 96 8
L
S
T
N
Q
R
M
P
R.1
ALTERNATE NO. 1: REMOVE ROOMS B5021, B5021A,B5022, B5022A, B5023, B5024, B5024A,
B5025, B5025A, AND B5041 FROM NEW WORK. ALL DEMOLITION FOR THIS AREA SHOULD
BE IMPLEMENTED AS DESIGNED, LEAVING THE AREA AS UNFINISHED SPACE. STUB
MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS INTO THE AREA FOR FUTURE
CONNECTIONS. MECHANICAL SYSTEMS SHALL PROVIDE AIRFLOW INTO THE AREA FOR
GENERAL CONDITIONING OF THE SPACE. FIRE PROTECTION (SPRINKLER SYSTEM) MUST
BE INSTALLED TO PROVIDE COVERAGE THROUGHOUT UNFINISHED SPACE.
1 ALTERNATE NO. 1
DOOR TAG
ROOM TAG
1 REVISION TAG
FIRE EXTINGUISHER CABINETFEC
FIRE EXTINGUISHERFE
KEYNOTE TAG
SECTION TAG
WALL TAG
A101
SIM
1 DETAIL TAG
INTERIOR ELEVATION TAG
REFERENCE
CARD READER
G3.0
A101 1
EXISTING WALL
DEMOLISHED
WALL
NEW WALL
EXISTING DOOR
DEMOLISHED
DOOR
NEW DOOR
A101
CR
Room name
PUSH PLATE DOOR ACTUATORPP
2'x4' Acoustical Tile
REFLECTED CEILING PLAN
LEGEND
Access Panel
Lay-in Light
EXP
Indirect Lay-in Light
2'x2' Acoustical Tile
Gypsum Board Ceiling
Recessed Downlight
Wall Mounted Light
Exit Sign
Strip Light
Supply
Return
Exhaust Air Grill
Elevation Marker
Under Cabinet Light
Recessed Heat Lamp
Exposed to Structure
Cubicle Curtain Track
Lift Track
Ceiling Mounted Equipment
8'-0" Spot Elevation Tag
9'-0"
Sprinkler Head
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
R
EG
IS
TE
RED ARCH
ITEC
T
N O R
T H
CA RO
L
I N A
11389
C
UL
LEN
S . KEEN
C H A R
LOTTE , NORTH
CA
RO
L
IN
A
# SHEET KEY NOTES:
Revisions: Date
Drawing Title
Approved ANDREKA WATLINGTON
PROJECT ENGINEER
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS PROJECT
SHEET NOTES:
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
/2
/2
:5
:3
P
M
GC101
ALTERNATE SCOPE PLANS
4 4RP/CK CK/AB
IMPROVE INPATIENT
PRIVACY (RENOVATE 5B)
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705 6/28/2019
BID DOCUMENTS
558-18-150
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
1/8" = 1'-0"1
FIFTH FLOOR ALTERNATE SCOPE PLAN - ALTERNATE NO. 1
0' 8'4' 16'
| Sheets |
| G-000 - COVER SHEET |
| GI001 - FIFTH FLOOR PHASING AND ICRA PLAN |
| GL101 - FIFTH FLOOR LIFE SAFETY PLAN |
| GC101 - ALTERNATE SCOPE PLANS |
| 2019-06-27T06:04:36-0700 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .