36C24619R0051 Itemized Cost Breakdown 658-16-101.xlsx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24619R0051-0005001.pdf | ||
| 36C24619R0051-0005000.docx | DOCX document | |
| 36C24619R0051-0004001.txt | TXT text file | |
| 36C24619R0051-0004000.docx | DOCX document | |
| 36C24619R0051-0003000.docx | DOCX document | |
| 36C24619R0051-0003001.pdf | ||
| 36C24619R0051-0002000.docx | DOCX document | |
| 36C24619R0051-0001001.pdf | ||
| 36C24619R0051-0001000.docx | DOCX document | |
| 36C24619R0051-003.pdf | ||
| 36C24619R0051-002.pdf | ||
| 36C24619R0051-004.pdf | ||
| 36C24619R0051-000.docx | DOCX document | |
| 36C24619R0051_2.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER Bldg 5 BUILDING ESTIMATE SUMMARY Project Number: 658-16-101 Date
| Project | Replace Roof and Tuck-point, Building 5 | Final Design Submittal | Estimator | |||||||
| Location | Salem VA Medical Center | Reviewer | ||||||||
| Salem, Virginia | Quantity | Material | Labor | Equipment | ||||||
| # | UOM | Unit Price | Cost | Unit Price | Cost | Unit Price | Cost | Total | ||
| A10 FOUNDATION SYSTEM | 0.00 | 0.00 | 0.00 | 0.00 |
B10 SUPERSTRUCTURE 0.00 0.00 0.00 0.00
B20 EXTERIOR CLOSURE 0 0 0 0
B30 ROOFING 0 0 0.00 0
C10 INTERIOR CONSTRUCTION 0.00 0.00 0.00 0.00
C30 INTERIOR FINISHES 0.00 0.00 0.00 0.00
D20 PLUMBING 0.00 0.00 0.00 0.00
D30 HVAC 0.00 0.00 0.00 0.00
D40 FIRE PROTECTION 0.00 0.00 0.00 0.00
D50 ELECTRIC POWER & LIGHTING 0.00 0.00 0.00 0.00
E10 EQUIPMENT 0.00 0.00 0.00 0.00
E20 FURNISHINGS 0.00 0.00 0.00 0.00
F10 SPECIAL CONSTRUCTION 0.00 0.00 0.00 0.00
DIRECT COSTS - 0 - 0 - 0 - 0
SALES TAX 5.3% - 0
SUBTOTALS - 0 - 0 - 0 - 0
| GC FIELD OVERHEAD | 8% | - 0 |
| GC HOME OFFICE | 4% | - 0 |
| GC PROFIT | 10% | - 0 |
SUBTOTAL - 0
ESCALATION 4% - 0
BOND (1% AVERAGE) - 0
DESIGN PHASE CONTINGENCY 0%
TOTAL BUILDING CONSTRUCTION COST - 0
Estimate Bldg 5 COST ESTIMATE WORKSHEET Project Number: 658-16-101 Date
| Project | Replace Roof and Tuck-point, Building 5 | Final Design Submittal | Estimator | |||||||
| Location | Salem VA Medical Center | Reviewer | ||||||||
| Salem, Virginia | Quantity | Material | Labor | Equipment | ||||||
| # | UOM | Unit Price | Cost | Unit Price | Cost | Unit Price | Cost | Total |
A10 FOUNDATION SYSTEM 0.00 0.00 0.00 0.00 0
| 0.00 | 0.00 | 0.00 | 0.00 | ||||
| B10 SUPERSTRUCTURE | 0.00 | 0.00 | 0.00 | 0.00 | 0 | ||
| 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 0.00 | 0.00 | 0.00 | 0.00 | ||||
| B20 EXTERIOR CLOSURE | 0.00 | 0.00 | 0.00 | 0.00 | |||
| Exterior Wall Demo | 0.00 | 0.00 | 0.00 | 0.00 | |||
| Demo Dormer Louvers | SF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Demo Wood Cornice | LF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Demo Solid Crown | LF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Demo 1x4 Trim | LF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Prep Gable Surface for Refinishing/Paint | SF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Demo Slate Tile on Dormer Side Walls | SF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Load, Hauling and Disposal | CY | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Exterior Walls | 0.00 | 0.00 | 0.00 | 0.00 | |||
| Slate,1/2" Ply,Ice&Water at Dormer Walls | SF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Rake Wood Framing Members | LF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| 20 oz. Copper Flashing | SF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Eave Cornice | LF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Gable Cornice | LF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Solid Crown at Dormers | LF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| 1x4 Trim w/ matching Moulding at Dormers | LF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Paint Gables | SF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Scrape/Prime/Paint Cornice | LFT | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Reinstall Bldg Signage | LS | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Repair & Tuck Masonry Chimney | SF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Exit Protection | SF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Scaffolding, erect and dismantle | SF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Rent Scaffolding, 2 months | SF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Exterior Louvers | 0.00 | 0.00 | 0.00 | 0.00 | |||
| Aluminum Louvers | SF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| 0.00 | 0.00 | 0.00 | 0.00 | ||||
| B30 ROOFING | 0.00 | 0.00 | 0.00 | 0.00 | 0 | ||
| Roof Demo | 0.00 | 0.00 | 0.00 | 0.00 | |||
| Demo Mtl Awning save for reinstallation | SF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Demo Built Up Roof | SF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Demo Gable Fascia | LF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Demo Eave Cornice & Gutter | LF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Demo Window Flashing | LF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Demo Hip/Valley Flashing | LF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Demo Solid Crown at Dormers | LF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Demo Downspouts | LF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Demo Slate Roof | SF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Demo Deteriorated Roof Substrate | SF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Demo Mtl Louvers | SF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Demo Chimney Cap | SF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Demo Lightning Protection System | EA | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Load, Hauling and Disposal | CY | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Roof Finishes | 0.00 | 0.00 | 0.00 | 0.00 | |||
| 1/2" Ply, Ice & Water, #30 felt | SF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Slate Roof Tile | SF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| 20 oz. Copper Flashing | SF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Pedestrian Traffic Coating | SF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| EPDM Roof w/ Tapered Insul. | SF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Reglet | LF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| EPDM Wall Flashing | SF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Patch and Repair Roof Decking | SF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Gable Fascia | LF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Reinstall Mtl Awning | SF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Roof Accessories | 0.00 | 0.00 | 0.00 | 0.00 | |||
| Copper Downspout Strainer | EA | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Copper Downspouts | LF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Lightning Protection System | SF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Copper Snow Guards | EA | 0.00 | 0.00 | 0.00 | 0.00 | ||
| 1x4 Roofing Nailers | LF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Recap Existing Chimney | SF | 0.00 | 0.00 | 0.00 | 0.00 | ||
| 0.00 | 0.00 | 0.00 | 0.00 | ||||
| C10 INTERIOR CONSTRUCTION | 0.00 | 0.00 | 0.00 | 0.00 | |||
| 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 0.00 | 0.00 | 0.00 | 0.00 | ||||
| C30 INTERIOR FINISHES | 0.00 | 0.00 | 0.00 | 0.00 |
| 0.00 | 0.00 | 0.00 | 0.00 | |
| D20 PLUMBING | 0.00 | 0.00 | 0.00 | 0.00 |
| 0.00 | 0.00 | 0.00 | 0.00 | |
| 0.00 | 0.00 | 0.00 | 0.00 | |
| 0.00 | 0.00 | 0.00 | 0.00 | |
| D30 HVAC | 0.00 | 0.00 | 0.00 | 0.00 |
| 0.00 | 0.00 | 0.00 | 0.00 | |
| 0.00 | 0.00 | 0.00 | 0.00 | |
| D40 FIRE PROTECTION | 0.00 | 0.00 | 0.00 | 0.00 |
| 0.00 | 0.00 | 0.00 | 0.00 | |
| D50 ELECTRIC POWER & LIGHTING | 0.00 | 0.00 | 0.00 | 0.00 |
| 0.00 | 0.00 | 0.00 | ||
| E10 EQUIPMENT | 0.00 | 0.00 | 0.00 | 0.00 |
| 0.00 | 0.00 | 0.00 | 0.00 | |
| 0.00 | 0.00 | 0.00 | 0.00 | |
| 0.00 | 0.00 | 0.00 | 0.00 | |
| E20 FURNISHINGS | 0.00 | 0.00 | 0.00 | 0.00 |
| 0.00 | 0.00 | 0.00 | 0.00 | |
| F10 SPECIAL CONSTRUCTION | 0.00 | 0.00 | 0.00 | 0.00 |
| 0.00 | 0.00 | 0.00 | 0.00 | |
| 0.00 | 0.00 | 0.00 | 0.00 | |
| direct costs brought forward | 0.00 | 0.00 | 0.00 | 0.00 |