36C24619R0051-001.xlsx

XLSX spreadsheet 38 KB Posted

Attached to
Upgrade Roofs and Tuckpoints (VA-19-00015851)
Solicitation number
36C24619R0051
Issued by

About this file

36C24619R0051 Itemized Cost Breakdown 658-16-101.xlsx

View the file

Other files

File Type Posted
36C24619R0051-0005001.pdf PDF
36C24619R0051-0005000.docx DOCX document
36C24619R0051-0004001.txt TXT text file
36C24619R0051-0004000.docx DOCX document
36C24619R0051-0003000.docx DOCX document
36C24619R0051-0003001.pdf PDF
36C24619R0051-0002000.docx DOCX document
36C24619R0051-0001001.pdf PDF
36C24619R0051-0001000.docx DOCX document
36C24619R0051-003.pdf PDF
36C24619R0051-002.pdf PDF
36C24619R0051-004.pdf PDF
36C24619R0051-000.docx DOCX document
36C24619R0051_2.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COVER Bldg 5 BUILDING ESTIMATE SUMMARY Project Number: 658-16-101 Date

ProjectReplace Roof and Tuck-point, Building 5Final Design SubmittalEstimator
LocationSalem VA Medical CenterReviewer
Salem, VirginiaQuantityMaterialLaborEquipment
#UOMUnit PriceCostUnit PriceCostUnit PriceCostTotal
A10 FOUNDATION SYSTEM0.000.000.000.00

B10 SUPERSTRUCTURE 0.00 0.00 0.00 0.00

B20 EXTERIOR CLOSURE 0 0 0 0

B30 ROOFING 0 0 0.00 0

C10 INTERIOR CONSTRUCTION 0.00 0.00 0.00 0.00

C30 INTERIOR FINISHES 0.00 0.00 0.00 0.00

D20 PLUMBING 0.00 0.00 0.00 0.00

D30 HVAC 0.00 0.00 0.00 0.00

D40 FIRE PROTECTION 0.00 0.00 0.00 0.00

D50 ELECTRIC POWER & LIGHTING 0.00 0.00 0.00 0.00

E10 EQUIPMENT 0.00 0.00 0.00 0.00

E20 FURNISHINGS 0.00 0.00 0.00 0.00

F10 SPECIAL CONSTRUCTION 0.00 0.00 0.00 0.00

DIRECT COSTS - 0 - 0 - 0 - 0

SALES TAX 5.3% - 0

SUBTOTALS - 0 - 0 - 0 - 0

GC FIELD OVERHEAD8%- 0
GC HOME OFFICE4%- 0
GC PROFIT10%- 0

SUBTOTAL - 0

ESCALATION 4% - 0

BOND (1% AVERAGE) - 0

DESIGN PHASE CONTINGENCY 0%

TOTAL BUILDING CONSTRUCTION COST - 0

Estimate Bldg 5 COST ESTIMATE WORKSHEET Project Number: 658-16-101 Date

ProjectReplace Roof and Tuck-point, Building 5Final Design SubmittalEstimator
LocationSalem VA Medical CenterReviewer
Salem, VirginiaQuantityMaterialLaborEquipment
#UOMUnit PriceCostUnit PriceCostUnit PriceCostTotal

A10 FOUNDATION SYSTEM 0.00 0.00 0.00 0.00 0

0.000.000.000.00
B10 SUPERSTRUCTURE0.000.000.000.000
0.000.000.000.00
0.000.000.000.00
B20 EXTERIOR CLOSURE0.000.000.000.00
Exterior Wall Demo0.000.000.000.00
Demo Dormer LouversSF0.000.000.000.00
Demo Wood CorniceLF0.000.000.000.00
Demo Solid CrownLF0.000.000.000.00
Demo 1x4 TrimLF0.000.000.000.00
Prep Gable Surface for Refinishing/PaintSF0.000.000.000.00
Demo Slate Tile on Dormer Side WallsSF0.000.000.000.000.00
Load, Hauling and DisposalCY0.000.000.000.00
Exterior Walls0.000.000.000.00
Slate,1/2" Ply,Ice&Water at Dormer WallsSF0.000.000.000.00
Rake Wood Framing MembersLF0.000.000.000.00
20 oz. Copper FlashingSF0.000.000.000.00
Eave CorniceLF0.000.000.000.00
Gable CorniceLF0.000.000.000.00
Solid Crown at DormersLF0.000.000.000.00
1x4 Trim w/ matching Moulding at DormersLF0.000.000.000.00
Paint GablesSF0.000.000.000.00
Scrape/Prime/Paint CorniceLFT0.000.000.000.00
Reinstall Bldg SignageLS0.000.000.000.00
Repair & Tuck Masonry ChimneySF0.000.000.000.00
Exit ProtectionSF0.000.000.000.00
Scaffolding, erect and dismantleSF0.000.000.000.00
Rent Scaffolding, 2 monthsSF0.000.000.000.00
Exterior Louvers0.000.000.000.00
Aluminum LouversSF0.000.000.000.00
0.000.000.000.00
B30 ROOFING0.000.000.000.000
Roof Demo0.000.000.000.00
Demo Mtl Awning save for reinstallationSF0.000.000.000.00
Demo Built Up RoofSF0.000.000.000.00
Demo Gable FasciaLF0.000.000.000.000.00
Demo Eave Cornice & GutterLF0.000.000.000.000.00
Demo Window FlashingLF0.000.000.000.000.00
Demo Hip/Valley FlashingLF0.000.000.000.000.00
Demo Solid Crown at DormersLF0.000.000.000.000.00
Demo DownspoutsLF0.000.000.000.000.00
Demo Slate RoofSF0.000.000.000.000.00
Demo Deteriorated Roof SubstrateSF0.000.000.000.000.00
Demo Mtl LouversSF0.000.000.000.000.00
Demo Chimney CapSF0.000.000.000.000.00
Demo Lightning Protection SystemEA0.000.000.000.000.00
Load, Hauling and DisposalCY0.000.000.000.00
Roof Finishes0.000.000.000.00
1/2" Ply, Ice & Water, #30 feltSF0.000.000.000.00
Slate Roof TileSF0.000.000.000.00
20 oz. Copper FlashingSF0.000.000.000.00
Pedestrian Traffic CoatingSF0.000.000.000.00
EPDM Roof w/ Tapered Insul.SF0.000.000.000.00
RegletLF0.000.000.000.00
EPDM Wall FlashingSF0.000.000.000.00
Patch and Repair Roof DeckingSF0.000.000.000.00
Gable FasciaLF0.000.000.000.00
Reinstall Mtl AwningSF0.000.000.000.00
Roof Accessories0.000.000.000.00
Copper Downspout StrainerEA0.000.000.000.00
Copper DownspoutsLF0.000.000.000.00
Lightning Protection SystemSF0.000.000.000.00
Copper Snow GuardsEA0.000.000.000.00
1x4 Roofing NailersLF0.000.000.000.00
Recap Existing ChimneySF0.000.000.000.00
0.000.000.000.00
C10 INTERIOR CONSTRUCTION0.000.000.000.00
0.000.000.000.00
0.000.000.000.00
C30 INTERIOR FINISHES0.000.000.000.00
0.000.000.000.00
D20 PLUMBING0.000.000.000.00
0.000.000.000.00
0.000.000.000.00
0.000.000.000.00
D30 HVAC0.000.000.000.00
0.000.000.000.00
0.000.000.000.00
D40 FIRE PROTECTION0.000.000.000.00
0.000.000.000.00
D50 ELECTRIC POWER & LIGHTING0.000.000.000.00
0.000.000.00
E10 EQUIPMENT0.000.000.000.00
0.000.000.000.00
0.000.000.000.00
0.000.000.000.00
E20 FURNISHINGS0.000.000.000.00
0.000.000.000.00
F10 SPECIAL CONSTRUCTION0.000.000.000.00
0.000.000.000.00
0.000.000.000.00
direct costs brought forward0.000.000.000.00

File details come from the government source that posted it.