This document is Addendum No. 1 to the Clarksburg VA Medical Center Renovate Pharmacy for USP 800 Compliance project, issued April 20, 2026, for VA Project No. 540-18-020. The addendum provides clarifications and modifications to contract documents through specification revisions and drawing updates, all effective immediately upon incorporation into bidders' proposals.

The specification modifications include replacement of Section 08 56 59 (Service and Teller Window Units) with revised language highlighted in red, and addition of Section 22 40 00 (Plumbing Fixtures). Drawing revisions are indicated by clouded work on multiple sheets dated 04-20-2026, including general notes and legends (GI002), enlarged floor plans and equipment schedules (AE401), interior elevations (AE451), miscellaneous details (AE501), and plumbing plans and schedules (P001, P-101, P-102). Additional electrical drawing updates are referenced for basement plans (EE101) and electrical schedules (EE612). The addendum also incorporates VA-supplied supplementary bid documents including erosion and sediment control narrative and data (Drawing GC100) and Section 32 90 00 (Planting) specifications as a bid alternate/deduction referenced in RFI #61. All revisions must be incorporated into contractor bid documents per VA requirements.

View the file

Other files

File Type Posted
540-18-020 Addendum No. 2 .pdf PDF
36C24526B0001 0008.docx DOCX document
36C24526B0001 0007.docx DOCX document
36C24526B0001 0006.docx DOCX document
36C24526B0001 0005.docx DOCX document
Record of Attendance - 2nd Site Visit - 5-13-2026 Pharmacy USP 800.pdf PDF
36C24526B0001 0004.docx DOCX document
REVISED BID SCHEDULE.docx DOCX document
540-18-020 Asbestos and Hazmat Testing Report.pdf PDF
36C24526B0001 0003.docx DOCX document
540 05 401 As-Builts.pdf PDF
36C24526B0001 0002.docx DOCX document
36C24526B0001 0001.docx DOCX document
Record of Attendance - Site Visit- Pharmacy USP 800 Upgrade - 4-1-2026.pdf PDF
PCRA USP800 - AD signed.pdf PDF
Bid Doc Specs Vol 2.pdf PDF
SAM Wage Determination WV20260011 1-2-2026.pdf PDF
2026-03-13 Revised Reconciled Bid Documents.pdf PDF
LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION.pdf PDF
Bid Doc Specs Vol 1.pdf PDF
36C24526B0001_1.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

512 Means St NW, Suite 400 Atlanta, GA 30318

(404) 214-9774

April 20, 2026

Addendum No. 1

CLARKSBURG VA MEDICAL CENTER RENOVATE PHARMACY FOR USP 800 COMPLIANCE

CLARKSBURG, WV

VA Project No.: 540-18-020

This addendum is issued for the purpose of clarifying the intent of the Contract Documents for making necessary corrections, deletions, and/or deletions to the contract documents on all items of discrepancy identified up to the time of the issuance of this addendum.

Each bidder is hereby instructed and authorized to incorporate into their proposal the instructions contained in this addendum.

TO ALL BIDDERS

A. SPECIFICATIONS

Section 08 56 59 SERVICE AND TELLER WINDOW UNITS

1. Replace section with revised section included. Changes are reflected in “red” font.

Section 22 40 00 PLUMBING FIXTURES

1. Add section.

B. DRAWINGS

Drawing GI002 – GENERAL NOTES, DETAILS, ABBREVIATIONS AND LEGENDS.

1. Refer to clouded work indicated on attached Drawing dated 04-20-2026.

Drawing AE401 – ENLARGED FLOOR PLANS, EQUIPMENT AND SIGNAGE SCHEDULE

1. Refer to clouded work indicated on attached Drawing dated 04-20-2026.

Drawing AE451 – INTERIOR ELEVATIONS

1. Refer to work indicated by clouded areas on attached Drawing dated 04-20-2026.

Drawing AE501 – MISCELLANEOUS DETAILS

1. Refer to work indicated by clouded areas on attached Drawing dated 04-20-2026.

Drawing P001 – PLUMBING ABBREVIAIONS, LEGENDS, SCHEULES & NOTES

1. Refer to work indicated by clouded areas on attached Drawing dated 04-20-2026.

Drawing P-101 – PLUMBING PARTIAL BASEMENT FLOOR PLAN – NEW WORK

1. Refer to work indicated by clouded areas on attached Drawing dated 04-20-2026.

Drawing P-102 – PLUMBING PARTIAL SIXTH FLOOR PLAN – NEW WORK

1. Refer to work indicated by clouded areas on attached Drawing dated 04-20-2026.

Drawing EE101 – ELECTRICAL PARTIAL BASEMENT PLANS

1. Refer to work indicated by clouded areas on attached Drawing dated 04-20-2026.

Drawing EE612 – ELECTRICAL SCHEDULES

1. Refer to work indicated by clouded areas on attached Drawing dated 04-20-2026.

This addendum is issued in accordance with VA requirements and shall be incorporated into the Contractor’s bid documents.

END OF DOCUMENT

Toland-Mizell-Molnar, LLC

Scott Jeffries, Project Manager

VA Supplied Supplementary Bid Documents - Addendum No. 1

*For Bid Alternate/Deduction as referenced in RFI #61

Page 23: Erosion and Sediment Control Narrative and Data - Drawing GC100 Pages 24 - 47: Specification 32 90 00 Planting

540-18-2021 - Renovate Pharmacy for USP 800 Compliance 01-01-21

Louis A. Johnson VAMC, Clarksburg WV

08 56 59 - 1

SECTION 08 56 59

SERVICE AND TELLER WINDOW UNITS

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Service window units within concrete partitions, framed partitions at Pharmacy and other locations indicated on Drawings .

1.2 RELATED WORK

A. Section 11 17 36, PACKAGE TRANSFER UNITS: Package Transfers.

1.3 APPLICABLE PUBLICATIONS

A. Comply with references to extent specified in this section.

B. ASTM International (ASTM):

A240/A240M-2025.........Chromium and Chromium-Nickel Stainless Steel

Plate, Sheet, and Strip for Pressure Vessels and for General Applications.

F593-2024...............Stainless Steel Bolts, Hex Cap Screws, and

Studs.

F594-2024...............Stainless Steel Nuts.

F1233-2021..............Security Glazing Materials and Systems.

C. National Association of Architectural Metal Manufacturers (NAAMM):

AMP 500-2006............Metal Finishes Manual.

D. UL LLC (UL):

752-2023................Bullet-Resisting Equipment (12th edition).

1.4 SUBMITTALS

A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B. Submittal Drawings: Service windows, showing design, construction and installation.

1. Indicate size, configuration, and fabrication and installation details.

2. Indicate bullet resistant reinforcing for metal components.

C. Manufacturer's Literature and Data: Service windows.

1. Description of each product.

D. Test reports: Report bullet resistance level.

E. Certificates: Certify products comply with specified bullet resistance rating.

08 56 59 - 2

1.5 WARRANTY

A. Construction Warranty: FAR clause 52.246-21, "Warranty of

Construction."

PART 2 - PRODUCTS

2.1 SYSTEM DESCRIPTION

A. Service Window Units: Factory fabricated, assembled, and glazed unit type.

1. Frame: Stainless steel with integral counter, oversized deal tray, and jamb openings to permit voice communication through window.

2. Pharmacy Oversized Deal Tray: Size indicated on Drawings Permit passage of package measuring 38 by 75 by 375 mm (1-1/2 by 3 by

15 inches) .

2.2 SYSTEM PERFORMANCE

A. Design service and teller window units complying with specified performance:

2.3 MATERIALS

A. Stainless Steel: ASTM A240/A240M; Type 304, 3 mm (0.12 inch) thick, minimum.

2.4 PRODUCTS – GENERAL

A. Basis of Design or equal:

Manufacturer: Atmos-Tech Industries

Recirculating HEPA filtered material Pass-through

Model: PT2424-24 SS/EI/RHC

2.5 FABRICATION

A. Form stainless steel fabrications to sizes, profiles, and configurations indicated on Drawings.

B. Frames: Stainless steel.

1. Provide clamp-on frames at new partitions.

2. Jambs and Heads: Continuous with integral glazing stop on corridor side of window unit.

3. Removable Glazing Stops: Applied to room side of window unit.

a. Miter and weld removable stops at corners.

b. Secure removable stops to frames with countersunk screws, spaced as required for specified performance requirements.

4. Voice Communication: Frame profile and jamb spacers or manufacturer provided compliant openings to provide two-way natural voice communication.

08 56 59 - 3

C. Frame Anchors: Stainless steel; masonry and framed partition type, compatible with partition construction.

1. Provide minimum three frame anchors for each jamb.

D. Sill: Stainless steel.

1. Fabricate sill full opening width to receive both jambs.

2. Fabricate sill with extended writing shelf on both sides of window unit.

E. Deal Tray: Stainless steel.

1. Incorporate deal tray into sill, without visible seams.

F. Double wall construction

G. Doors provided with stainless pin hinges, stainless latching handle with mechanical door interlock system

H. Glazing:

1. Glazing Channel: Stainless steel; configuration as required to accommodate glass installation, and expansion and contraction.

2. ¼” clear acrylic glazing and EPDM gasket

3. Secure glazing channel to window unit frame.

4. Factory glaze window unit.

2.6 FINISHES

A. Stainless Steel: NAAMM AMP 500; Constructed of 16 & 20 ga type 304 stainless steel with a No. 4 polished finish.

B. Blend welds to match adjacent finish.

2.7 ACCESSORIES

A. Fasteners: ASTM F593 and ASTM F594, stainless steel.

PART 3 - EXECUTION

3.1 PREPARATION

A. Examine and verify substrate suitability for product installation.

1. Verify opening is correctly sized and located.

2. Verify partition is prepared to receive frame anchors.

B. Protect existing construction and completed work from damage.

3.2 INSTALLATION

A. Install products according to manufacturer's instructions and approved submittal drawings .

B. Install service and teller window units according to manufacturer's installation instructions.

C. Set units accurately, plumb, and level.

08 56 59 - 4

D. Securely anchor to masonry and partition framing as shown on submittal drawings.

E. Coordinate with window intrusion detection system specified in Section

28 16 00, INTRUSION DETECTION SYSTEM.

3.3 CLEANING

A. Clean exposed window unit surfaces. Remove temporary labels, contaminants, and stains.

B. Polish stainless steel surfaces for uniform appearance.

3.4 PROTECTION

A. Protect window units from construction operations.

B. Remove protective materials immediately before acceptance.

C. Repair damage.

- - E N D - -

540-18-2021 - Renovate Pharmacy for USP Compliance 05-01-24

Louis A. Johnson VAMC Clarksburg WV

22 40 00 - 1

SECTION 22 40 00

PLUMBING FIXTURES

PART 1 – GENERAL

1.1 DESCRIPTION

A. Plumbing fixtures, associated trim and fittings necessary to make a complete installation from wall or floor connections to rough piping, and certain accessories.

B. A complete listing of all acronyms and abbreviations are included in

Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING.

1.2 RELATED WORK

A. Section 01 00 00, GENERAL REQUIREMENTS.

B. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

C. Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS.

D. Section 07 92 00, JOINT SEALANTS: Sealing between fixtures and other finish surfaces.

E. Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING.

F. Section 22 08 00, COMMISSIONING OF PLUMBING SYSTEMS: Requirements for commissioning, systems readiness checklist, and training.

G. Section 22 13 00, FACILITY SANITARY AND VENT PIPING.

1.3 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B. The American Society of Mechanical Engineers (ASME):

A112.6.1M-1997 (R2017)..Supports for Off-the-Floor Plumbing Fixtures for Public Use

A112.19.1-2018..........Enameled Cast Iron and Enameled Steel Plumbing

Fixtures

A112.19.2-2018..........Ceramic Plumbing Fixtures

A112.19.3-2022..........Stainless Steel Plumbing Fixtures

C. American Society for Testing and Materials (ASTM):

A276-2017...............Standard Specification for Stainless Steel Bars and Shapes

B584-2022...............Standard Specification for Copper Alloy Sand

Castings for General Applications

D. CSA Group:

B45.4-2022..............Stainless Steel Plumbing Fixtures

22 40 00 - 2

E. National Association of Architectural Metal Manufacturers (NAAMM):

AMP 500-2006............Metal Finishes Manual

F. American Society of Sanitary Engineering (ASSE):

1016-2017...............Automatic Compensating Valves for Individual

Showers and Tub/Shower Combinations

G. NSF International (NSF):

14-2022.................Plastics Piping System Components and Related

Materials

61-2022.................Drinking Water System Components – Health

Effects

372-2022................Drinking Water System Components – Lead Content

H. American with Disabilities Act (A.D.A)

I. International Code Council (ICC):

IPC-2021................International Plumbing Code

1.4 SUBMITTALS

A. Submittals, including number of required copies, will be submitted in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND

SAMPLES.

B. Information and material submitted under this section will be marked

“SUBMITTED UNDER SECTION 22 40 00, PLUMBING FIXTURES”, with applicable paragraph identification.

C. Manufacturer's Literature and Data including: Full item description and optional features and accessories. Include dimensions, weights, materials, applications, standard compliance, model numbers, size, connections, and capacity.

D. Operating Instructions: Comply with requirements in Section 01 00 00, GENERAL REQUIREMENTS.

E. Completed System Readiness Checklist provided by the CxA and completed by the Contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 22

08 00, COMMISSIONING OF PLUMBING SYSTEMS.

F. Submit training plans and instructor qualifications in accordance with the requirements of Section 22 08 00, COMMISSIONING OF PLUMBING

SYSTEMS.

1.5 QUALITY ASSURANCE

A. Bio-Based Materials: For products designated by the USDA’s Bio-

Preferred Program, provide products that meet or exceed USDA recommendations for bio-based content, so long as products meet all

22 40 00 - 3 performance requirements in this specifications section. For more information regarding the product categories covered by the Bio-

Preferred Program, visit http://www.biopreferred.gov.

1.6 AS-BUILT DOCUMENTATION

A. Comply with requirements in Paragraph “AS-BUILT DOCUMENTATION” of

Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Material or equipment containing a weighted average of greater than

0.25 percent lead is prohibited in any potable water system intended for human consumption, and will be certified in accordance with NSF 61 or NSF 372. Endpoint devices used to dispense water for drinking will meet the requirements of NSF 61.

B. Plastic pipe, fittings, and solvent cement will meet NSF 14 and will be

NSF listed for the service intended.

2.2 STAINLESS STEEL

A. Corrosion-resistant Steel (CRS):

1. Plate, Sheet and Strip: CRS flat products will conform to chemical composition requirements of any 300 series steel specified in ASTM

A276.

2. Finish: Exposed surfaces will have standard polish (ground and polished) equal to NAAMM finish Number 4.

B. Die-cast zinc alloy products are prohibited.

2.3 STOPS

A. Provide lock-shield loose key or screw driver pattern angle stops, straight stops or stops integral with faucet, with each compression type faucet whether specifically called for or not, including sinks in solid-surface, wood and metal casework, laboratory furniture and pharmacy furniture. Locate stops centrally above or below fixture in accessible location.

B. Furnish keys for lock shield stops to the COR.

C. Supply from stops not integral with faucet will be chrome plated copper flexible tubing or flexible stainless steel with inner core of non-toxic polymer.

D. Supply pipe from wall to valve stop will be rigid threaded IPS copper alloy pipe, i.e. red brass pipe nipple, chrome plated where exposed.

E. Mental Health Area: Provide stainless steel drain guard for all lavatories not installed in casework.

22 40 00 - 4

2.4 ESCUTCHEONS

A. Heavy type, chrome plated, with set screws. Provide for piping serving plumbing fixtures and at each wall, ceiling and floor penetrations in exposed finished locations and within cabinets and millwork.

2.5 LAMINAR FLOW CONTROL DEVICE

A. Smooth, bright stainless steel or satin finish, chrome plated metal laminar flow device will provide non-aeration, clear, coherent laminar flow that will not splash in basin. Device will also have a flow control restrictor and have vandal resistant housing. Aerators are prohibited.

B. Flow Control Restrictor:

1. Capable of restricting flow from 32 ml/s to 95 ml/s (0.5 gpm to 1.5 gpm) for lavatories; 125 ml/s to 140 ml/s (2.0 gpm to 2.2 gpm) for sinks P-505 through P-520, P-524 and P-528; and 174 ml/s to 190 ml/s

(2.75 gpm to 3.0 gpm) for dietary food preparation and rinse sinks or as specified.

2. Compensates for pressure fluctuation maintaining flow rate specified above within 10 percent between 170 kPa and 550 kPa (25 psig and 80 psig).

3. Operates by expansion and contraction, eliminates mineral/sediment build-up with self-cleaning action, and is capable of easy manual cleaning.

2.6 SINKS AND LAUNDRY TUBS

A. Dimensions for sinks and laundry tubs are specified, length by width

(distance from wall) and depth.

B. (P-516) Sink (CRS, Single Compartment, Wall mounted ASME A112.19.2, Hand Sinks), back faucet ledge, approximately 483 mm by 559 mm (19 inches by 22 inches) with single compartment inside dimensions approximately 406 mm by 292 mm by 140 mm (16 inches by 11 1/2 inches by

9 inches) deep. Will be minimum of 1.3 mm thick (18 gauge) CRS. Corners and edges will be well rounded:

1. Faucet: Solid brass construction, 8.3 L/m (2.2 gpm) deck mounted combination faucet with Monel or ceramic seats, removable replacement unit containing all parts subject to ware, swivel gooseneck spout with approximately 203 mm (8 inches) reach with spout outlet 152 mm (6 inches above deck and 102 mm (4 inches) wrist blade handles with hose spray. Faucet will be polished chrome plated and equipped with ANSI/ISEA Z358.1 emergency eyewash unit.

22 40 00 - 5

2. Drain: Drain plug, stainless steel.

3. Trap: Cast copper alloy 38 mm (1 1/2 inches) P-trap with cleanout plug. Provide wall connection and escutcheon.

4. Provide cover for exposed piping, drain, stops and trap per A.D.A.

5. Mixing valve: Provide with thermostatic mixing valve to provide tepid water to eyewash unit, from 30 to 35 degrees C (85 to 95 degrees F). Flow rate will be 11.4 L/m (3 gpm).

PART 3 - EXECUTION

3.1 INSTALLATION

A. Fixture Setting: Opening between fixture and floor and wall finish will be sealed as specified under Section 07 92 00, JOINT SEALANTS. Bio-based materials will be utilized when possible.

B. Supports and Fastening: Secure all fixtures, equipment and trimmings to partitions, walls and related finish surfaces. Exposed heads of bolts and nuts in finished rooms will be hexagonal, polished chrome plated brass with rounded tops.

C. Through Bolts: For free standing marble and metal stud partitions refer to Section 10 21 13, TOILET COMPARTMENTS.

D. Toggle Bolts: For hollow masonry units, finished or unfinished.

E. Expansion Bolts: For brick or concrete or other solid masonry. Will be

6 mm (1/4 inch) diameter bolts, and to extend at least 76 mm (3 inches) into masonry and be fitted with loose tubing or sleeves extending into masonry. Wood plugs, fiber plugs, lead or other soft metal shields are prohibited.

F. Power Set Fasteners: May be used for concrete walls, will be 6 mm (1/4 inch) threaded studs, and will extend at least 32 mm (1 1/4 inches) into wall.

G. Tightly cover and protect fixtures and equipment against dirt, water and chemical or mechanical injury.

H.

I. Aerators are prohibited on lavatories and sinks.

J. If an installation is unsatisfactory to the COR, the Contractor will correct the installation at no cost or additional time to the

Government.

3.2 CLEANING

A. At completion of all work, fixtures, exposed materials and equipment will be thoroughly cleaned.

22 40 00 - 6

3.3 COMMISSIONING

A. Provide commissioning documentation in accordance with the requirements of Section 22 08 00, COMMISSIONING OF PLUMBING SYSTEMS.

B. Components provided under this section of the specification will be tested as part of a larger system.

3.4 DEMONSTRATION AND TRAINING

A. Provide services of manufacturer’s technical representative for four hours to instruct VA Personnel in operation and maintenance of the system.

B. Submit training plans and instructor qualifications in accordance with the requirements of Section 22 08 00, COMMISSIONING OF PLUMBING

SYSTEMS.

- - - E N D - - -

ARCHITECTURAL ABBREVIATIONSARCHITECTURAL LEGEND

GENERAL ARCHITECTURAL NOTES

GENERAL PROJECT NOTES

A

GA4

A301

A201

A401

ROOM

NAME

+ 0'-6"

F.E.C.

AIR CONDITIONING

ACOUSTICAL CEILING TILE

ABOVE FINISH FLOOR

ALUMINUM

BATT INSULATION

BOTTOM OF

CEMENTITIOUS BACKER BOARD

CEMENTITIOUS CRYSTALLINE WATERPROOFING

COLD-FORMED METAL FRAMING

CORNER GUARD

CENTERLINE

CONCRETE MASONRY UNIT

CASED OPENING

COMMUNICATION

CONCRETE

SEALED CONCRETE

CONTINUOUS

CONTRACTING OFFICER'S REPRESENTATIVE

CERAMIC TILE

CERAMIC TILE BASE

CARPET

DIAMETER

EXPANSION JOINT

ELECTRICAL

EPOXY FLOORING

EXPOSED STRUCTURE

ET CETERA

EXISTING

EXPOSED

FACTORY FINISH

FLOOR DRAIN

FIRE EXTINGUISHER CABINET

FIRE HOSE CABINET

FINISHED FLOOR

FINISH

FLOOR

FACE OF

FIELD VERIFY

FABRIC WALLCOVERING

GAGE

GRANITE

GYPSUM (WALL) BOARD

HANDICAPPED

HOLLOW METAL

HANDRAIL

HEATING VENTILATION AND AIR-CONDITIONING

MATERIAL

MAXIMUM

MECHANICAL

MANUFACTURER

MINIMUM

MASONRY OPENING

METAL

NOT IN CONTRACT

NOT TO SCALE

ON CENTER

OPPOSITE HAND

PLASTER

PLASTIC LAMINATE

PORCELAIN TILE

PAIR

PAINT

QUARRY TILE

RESILIENT BASE

REFRIGERATOR

REQUIRED

RESINOUS FLOORING

RESINOUS EPOXY WALL-CEILING

ROUGH OPENING

RUBBER FLOORING

RECESSED PAPER HOLDER

SEALED HIGH BUILD GLAZED COATING

SOLID CORE WOOD

SIMILAR

SPECIAL FACED

STAINLESS STEEL

STEEL

SUBSTRATE

SHEET VINYL

SOLID VINYL TILE

TELEPHONE

TOP OF

TYPICAL

UNLESS NOTED OTHERWISE

VINYL COMPOSITION TILE

VINYL WALL COVERING

WALL COVERING

WALL PROTECTION

WOOD

WELDED SEAM SHEET FLOORING

AC

AT

AFF

AL

BATT

BO

CBB

CCW

CFMF

CG

C

CMU

CO

COMM

CONC

SCONC

CONT

COR

CT

CTB

CP

DIA

EJ

ELEC

EPY

ES

ETC

EXIST

EXP

FAC FIN

FD

FEC

FHC

FF

FIN

FLR

FO

FV

FWC

GA

GRA

GYP BD/GWB

HC

HM

HR

HVAC

MATL

MAX

MECH

MFR

MIN

MO

MTL

NIC

NTS

OC

OH

PLS

PL

PT

PR

P

QT

RB

REF

REQ'D

RES

RES-W

RO

RF

RPH

SC

SCW

SIM

SP

SS

STL

SUBS

SV

SVT

TELE

TO

TYP

UNO

VCT

VWC

WC

WP

WD

WSF

L

FIRE EXTINGUISHER CABINET

ROOM NAME AND NUMBER

DOOR NUMBER

KEY NOTE

WINDOW TYPE

PARTITION TYPE

DETAIL CALLOUT

DETAIL NUMBER

SHEET WHERE DETAIL IS DRAWN

SECTION CALLOUT

VERTICAL ELEVATION

COLUMN CENTERLINE DESIGNATION

DEMOLITION KEY NOTE

DETAIL NUMBER

SHEET WHERE DETAIL IS DRAWN

INTERIOR ELEVATION CALLOUT

DETAIL NUMBER

SHEET WHERE DETAIL IS DRAWN

CARD READERCR

HIGH-PRESSURE LAMINATEHPL

LUXURY VINYL TILELVT

EDGE OF DECKEOD

DOWNSPOUTDS

CONTROL JOINTCJ

DRINKING FOUNTAINDF

FIRE RETARDANT TREATEDFRT

EXTERIOR INSULATION FINISHING SYSTEMEIFS

WATER RESISTANTWR

EQUALEQ

CARPET TILECPT

REFLECTED CEILING PLANRCP

SOLID SURFACE MATERIALSSM

X1045 EQUIPMENT AND ACCESSORY TAG

ALUMINUM COMPOSITE METAL PANELSACMP

A. DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO:

• FACE OF EXISTING WALL SURFACE

• FACE OF MASONRY

• FACE OF WALL STUDS

• TOP OF SLAB

• TOP OF MASONRY

• ALIGN WALLS WITH EXISTING WHERE NOT OTHERWISE INDICATED.

B. COORDINATE WITH ALL DISCIPLINES DRAWINGS FOR ADDITIONAL REQUIREMENTS.

COORDINATE OPENINGS IN SLABS, ROOF, AND WALLS. WHERE NEW HOLES IN EXISTING

WALLS AND SLABS ARE CREATED FOR PENETRATIONS, COORDINATE SIZE AND LOCATION.

PATCH HOLES CAUSED BY THE REMOVAL OF EQUIPMENT, PIPING, CONDUIT, DUCT,

GRILLES, ETC. WITH MATERIALS MATCHING EXISTING SLAB OR WALL IN STRUCTURE,

MATERIAL, THICKNESS, ALIGNMENT, GRADES, AND QUALITY.

C. COORDINATE AND PROVIDE GALVANIZED METAL BACKER PLATE OR SOLID FIRE

RETARDANT TREATED WOOD BLOCKING FOR WALL-MOUNTED ITEMS. COORDINATE

LOCATIONS WITH COR FOR GOVERNMENT PROVIDED/CONTRACTOR INSTALLED

EQUIPMENT.

D. `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE, HANDLING,

INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEM INDICATED.

E. SEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, SMOKE RATED PARTITIONS AND

FIRE-RATED PARTITIONS WITH THE APPROPRIATE FIRESTOP TO MAINTAIN THE RATING OF

THE WALL OR SLAB. SUBMIT CUT SHEETS AND SPECIFICATIONS TO THE COR FOR

APPROVAL PRIOR TO INSTALLATION. PROVIDE UL LISTED ASSEMBLIES.

F. SKIM COAT ALL DAMAGED EXISTING WALL SURFACES THAT REQUIRE PAINTING.

G. REMOVED MATERIALS WHICH ARE INDICATED TO BE TURNED OVER TO THE COR SHALL BE

DELIVERED BY THE CONTRACTOR TO A PLACE INDICATED BY THE COR .

H. REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS AND AS

REQUIRED FOR NEW CONSTRUCTION. EDGES AND FACES OF REMOVED AREAS SHALL BE

REPAIRED TO ACCEPT NEAT INSTALLATION OF NEW CONSTRUCTION OR FINISHES. WHERE

EXISTING MATERIALS ARE TO BE REPLACED (WALLS, INSULATION, FLOORING, ETC.)

EXISTING MATERIALS, ADHESIVES, ETC. SHALL BE REMOVED AND EXPOSED SURFACES

SHALL BE PREPARED AS INDICATED OR SPECIFIED PRIOR TO INSTALLATION OF

MATERIALS.

I. PREVENT DAMAGE TO MATERIALS AND FINISHES TO REMAIN. REPAIR DAMAGES FROM

CONSTRUCTION ACTIVITIES TO EXISTING ITEMS TO REMAIN, AT NO ADDITIONAL COST

WHERE SUCH EXPOSED MATERIALS OR FINISHES TO REMAIN ARE DAMAGED.

J. SEAL ALL PLATES, COVERS, DEVICES; AND GENERAL FLOOR, WALL AND CEILING

PENETRATIONS IN ALL SPACES, TYPICAL.

A. THE CONTRACTOR SHALL BE PREPARED TO STOP ANY WORK AND CLEAN UP THE WORK AREA

AS DIRECTED IN MEDICAL SITUATIONS REQUIRING SUCH ACTION.

B. THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS OR EQUIPMENT UNTIL

SUBMITTALS FOR SUCH HAVE BEEN APPROVED.

C. ALL TOOLS AND MATERIALS USED IN THIS PROJECT SHALL BE PROPERLY SECURED AT ALL

TIMES BY THE CONTRACTOR TO REDUCE THE POSSIBILITY OF ANY OF THESE TOOLS BEING A

HAZARD TO PATIENTS, VISITORS AND STAFF.

D. THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH MEMBER OF

HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIRED TO RECEIVE BADGES. COORDINATE

WITH COR.

E. THE CONTRACTOR, AT HIS EXPENSE, WILL BE RESPONSIBLE FOR TRAINING EACH MEMBER OF

HIS WORK FORCE ON VA POLICIES FOR ON-SITE WORK BEFORE ANY MEMBER WILL BE

ALLOWED TO PERFORM WORK ON VA PREMISES.

F. ABSOLUTELY NO VA TOOLS, MATERIALS OR EQUIPMENT WILL BE LOANED OR GIVEN BY THE VA

TO ANY MEMBER OF THE CONTRACTOR'S WORK FORCE AT ANY TIME.

G. ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TO CONSTRUCTION SMOKE,

DUST AND DEBRIS SHALL BE SUITABLY PROTECTED TO PREVENT ACCIDENTAL ALARM DURING

CONSTRUCTION. ALL SUCH ACTION MUST BE FIRST COORDINATED AN CLEARED WITH THE COR

AND THE VA SAFETY OFFICER. ALL FUNCTIONAL FIRE ALARM DEVICES SHALL BE ACTIVE

WHENEVER THE CONTRACTOR'S FORCES ARE NOT PRESENT IN THE WORK AREA.

H. THE CONTRACTOR MUST PROVIDE WRITTEN FIRE SAFETY CHECKLIST AT THE END OF EVERY

WORK DAY TO THE COR CERTIFYING THAT ALL WORK AREAS HAVE BEEN SURVEYED AND

FOUND TO BE SECURE, SAFE AND FREE OF ANY FLAMMABLE LIQUIDS.

I. CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTING OFFICER.

J. SEE SPECIFICATIONS SECTIONS 01 00 00 AND 01 35 26 FOR INTERIM LIFE SAFETY MEASURES.

K. ALL FINISH COLORS TO BE SELECTED BY COR/ VA INTERIOR DESIGNER WHERE NOT

OTHERWISE INDICATED. CONTRACTOR SHALL SUBMIT COLORS FROM THE MANUFACTURER'S

FULL RANGE OF COLORS.

L. PROVIDE 24"X24" ACCESS PANELS IN HARD CEILINGS WHERE DUCTS AND DAMPERS OR OTHER

PIPES REQUIRE ACCESS AS REQUIRED. COORDINATE EXACT LOCATIONS WITH THE COR.

M. THE CONTRACTOR SHALL NOT OPERATE ANY EXISTING VA EQUIPMENT WITHOUT

AUTHORIZATION FROM VAMC ENGINEERING SERVICE UNLESS AN EMERGENCY SITUATION

OCCURS.

N. CONTRACTOR SHALL MAINTAIN ALL FIRE-RATED ASSEMBLIES WITHIN THE PROJECT AREA

DURING PERFORMANCE OF THE WORK.

O. CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL REQUIRED EXIT LIGHTING AND SIGNAGE

REQUIRED FOR EGRESS WITHIN AND ADJACENT TO THE PROJECT AREA DURING

PERFORMANCE OF THE WORK.

P. INDICATED EXISTING CONDITIONS ARE BASED UPON LIMITED FIELD INVESTIGATION AND DID

NOT INCLUDE DESTRUCTIVE INVESTIGATION OR TESTING. CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS INCLUDING DIMENSIONS OF THE INSTALLED CONSTRUCTION PRIOR TO

COMMENCING WITH THE WORK. IF DISCREPANCIES ARE DISCOVERED, THE CONTRACTOR

SHALL NOTIFY THE COR FOR INTERPRETATION AND DIRECTION PRIOR TO PROCEEDING WITH

THE WORK.

Q. COORDINATE WORK WITH EQUIPMENT SUPPLIER/ INSTALLER CONTRACTED SEPARATELY WITH

THE GOVERNMENT.

CODE SUMMARY

1. VA DESIGN GUIDES – TECHNICAL INFORMATION LIBRARY

2. PG 18-3 VA DESIGN AND CONSTRUCTION PROCEDURES, TOPIC 1

3. 2018 NPFA 1 FIRE CODE

4. 2018 NFPA 10 STANDARD FOR PORTABLE FIRE EXTINGUISHERS

5. 2018 NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS

6. 2018 NFPA 70 NATIONAL ELECTRIC CODE (NEC)

7. 2018 NFPA 72 NATIONAL FIRE ALARM SIGNALING CODE

8. 2018 NFPA 90A INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS

9. 2018 NFPA 90B INSTALLATION OF WARM AIR HEATING AND AIR-CONDITIONING SYSTEMS

10. 2018 NFPA 101 LIFE SAFETY CODE (LSC)

11. 2018 NFPA 220 STANDARD ON TYPES OF BUILDING CONSTRUCTION

12. 2018 INTERNATIONAL BUILDING CODE (IBC)

13. 2018 INTERNATIONAL PLUMBING CODE (IPC)

14. 2018 INTERNATIONAL MECHANICAL CODE (IMC) AND ASHRAE 90.1

15. 2015 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)

16. ARCHITECTURAL BARRIES ACT ACCESSIBILITY STANDARDS (ABAAS)

17. VA BARRIER FREE DESIGN GUIDE (PG-18-13)

18. RESOURCE CONSERVATION AND RECOVERY ACT (RCRA) (42 U.S.C.6901, ET SEQ)

19. THE NATIONAL ENERGY CONSERVATION POLICY ACT

20. EXECUTIVE ORDER 131468 PF APRIL 21, 2000, GREENING THE GOVERNMENT THROUGH

LEADERSHIP IN ENVIRONMENTAL MANAGEMENT.

21. EXECUTIVE ORDER 13101 OF SEPTEMBER 14, 1998, GREENING THE GOVERNMENT THROUGH

WASTE PREVENTION, RECYCLING, AND FEDERAL ACQUISITION; AND EXECUTIVE ORDER 13123

OF JUNE 1999, GREENING THE GOVERNMENT THROUGH EFFICIENT ENERGY MANAGEMENT.

SIGNAGE TYPE1

ACCESSIBILITY REQUIREMENTS

FRONT APPROACHES

HINGE-SIDE APPROACHES

LATCH-SIDE APPROACHES

USE EITHER

OPTION 1 OR

OPTION 2

ALL DOOR ASSEMBLIES SHALL BE CONSTRUCTED TO MEET THE

INDICATED MINIMUM CLEARANCES AS APPLICABLE.

1'-0" IF DOOR HAS BOTH

A CLOSER AND A

LATCH

5' -0

1'-6"

3' -6

4'-6"

4' -0

O P

TI

O

N

5' -0

OPTION 1

3'-0"

O P

TI

O

N

4' -6

OPTION 2

3'-6"

2'-0"

4' -0

2'-0"

3' -6

4' -0

4' -6

W / C

LO

S

E R

4' -0

W / C

LO

S

E R

W /C

LO

S

E R

A N

D L

A

TC

H

ALL WORK SHALL COMPLY WITH FEDERAL ABA,

LOCAL, AND STATE ACCESSIBILITY CODES AND

REQUIREMENTS.

DOOR LOCATIONS

TYPICAL DETAILS

TYP DOOR LOCATION

SEE DOOR SCHEDULE

4"

TYP

TYPICAL SIGNAGE MOUNTING HEIGHTS

A A

5' -0

4' -9

EQ EQ

MOUNTING HEIGHTS

PROVIDE BLOCKING AT ALL WALL MOUNTED EQUIPMENT AND ACCESSORIES

3' -4

3' -8

CL

CL

FEC GARMENT

HOOK

TYPICAL SCRUB SINK

PAPER

TOWEL

DISPENSER

3' -5

3' -6

SOAP

DISPENSER

3' -6

APRON/GLOVE

RACK

2' -1

0"

TOILET

ROOM SHELF

ELECTRIC

HAND DRYER

3' -7

3' -6

PASS-THROUGH

CABINET

2' -1

0"

1'-6"

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

BID DOCUMENTS

512 MEANS STREET NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

JH SJ/KB

540-18-020

03-13-2026REVISIONS:

A

B

C

D

E

F

RENOVATE PHARMACY FOR USP 800

COMPLIANCE

CLARKSBURG, WEST VIRGINIA

ADDENDUM NO.1 04-20-2026

GENERAL NOTES, DETAILS, ABBREVIATIONS

AND LEGENDS

GI002

sjeffries Snapshot

AF AE AD

A8

17 18 19

F

IV BUFFER

B215H

MECH

B248

AHU

HAZ STOR

B215D CHEMO BUFFER

B215E

ANTE ROOM

B215F

LAMINAR

WORKSTATION

4' -0

BREAK DOWN

B215C

REF

TABLETABLE

2'-11 7/8"

1' -6

6"

2' -0

BSC

BSC

BSC

LAMINAR

WORKSTATION

AE451 AE451

AE451

AE451

AE451

GK4

GF4

GL4

GK0

GK4

GF4

GK0

GK4

GL4

B248

B215H

B215E

B215F

B215DB215C

CORRIDOR

B215G

6"

GM4

1'-6"

GK0

GK4

GK4

AE451

1'-0"

'-6

/1

6"

26'-11 3/8"

11'-0" 11'-3"

ALIGN

ALIGN

8' -0

3 3

1'-6" 6"

ALIGN

AE501

AE501

GK0

GL4 GC4

GL4

GL4

GK0 GL4

GK4

GK0

1 1

3'-0"

NU-543-600NU-543-400

K1910

M0001

K1910

M2050 M2050

M2050 M2050

NU-543-400

M2050

F2000 A5108

K1910

M0001

A5100

F2010

K1910

NU-543-600-1NU-543-600-1

M2050

M2050

M2050

A5108

R6060

F2020

A5145

A5145

19'-2 7/16"

6'-7 13/16"

A5145

A5145

GM4

6"

AE501

17.

18.

CE

17.5

VESTIBULE

C-SCA

645B

TLT

645A

TLT

PIPE CHASE

601A

645B645

645A

AE451

AE451

6"

F2010

A5100

1 1

NU-543-400-1

M2050

EQ EQ

A5145A5145

EQUIPMENT SCHEDULE GENERAL NOTES:

A. REFER TO INTERIOR ELEVATIONS FOR ADDITONAL INFORMATION.

B. REFER TO DRAWING GI002 FOR MOUNTING HEIGHTS.

C. SEE OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

FLOOR PLAN KEY NOTES: #

NEW LAMINAR FLOW BIOSAFETY CABINET, 6'-0".

BASIS OF DESIGN: LABGARD® ES ENERGY SAVER CLASS II, TYPE A2

LAMINAR FLOW BIOSAFETY CABINET, MODEL # NU-543-600 NOMINAL 6

FOOT.

BIOSAFETY CABINET EXHAUST FLOW CANOPIES, 4'-0".

BASIS OF DESIGN: NUAIRE NU-543 SERIES CLASS II, TYPE A2, BIOSAFETY

CABINET WITH EXHAUST FLOW CANOPY, NUAIRE BSC MODEL: NU-543-400.

LOCATE AND REINSTALL EXISTING STORED BIO SAFETY CABINET.

BIOSAFETY CABINET EXHAUST FLOW CANOPIES, 6'-0".

BASIS OF DESIGN: NUAIRE NU-543 SERIES CLASS II, TYPE A2, BIOSAFETY

CABINET WITH EXHAUST FLOW CANOPY, NUAIRE BSC MODEL: NU-543-600.

LOCATE AND REINSTALL EXISTING STORED GX PROFESSIONAL, MEDICAL-

GRADE LABRATORY REFRIGERATOR - UPRIGHT. MODEL#: HLR125-GX

HORIZON SERIES.

PROVIDE 5/8" GYPSUM BOARD ON THIS SIDE OF THE PARTITION AS

INDICATED.

NOT TO SCALE

BASIS OF DESIGN: INPRO "140 PHOENIX III 9"H x 9"W

PROVIDE (9) TYPE 1 SIGN.

.060" ROOM NUMBER PANEL FIRST SURFACE PAINTED

WITH RAISED NUMBERS AND BRAILLE 3/16" ACRYLIC

BACKER (CLEAR)

MAGNET TAPE BACKING FOR MOUNTING.

SIMPLY PREMIER FRAME BEVELED EDGE

STANDARD DEPTH METAL INSIDE.

.060" GLOSSY PETG FACE

FIRST SURFACE PAINTED WITH VINYL MASKED

WINDOW

.118" CLEAR PETG WINDOW SPACER

.060" WINDOW BACK

BACK PAINTED WITH MAGNET TAPE FOR MOUNTING

XXXX

9" I

N S

ID

E

F R

A M

E D

IM

E

N S

IO

N

9" INSIDE FRAME DIMENSION

NAME

NOT TO SCALE

BASIS OF DESIGN: CREATIVE SIGNAGE SYSTEMS.

PROVIDE (1) TYPE 2 SIGN.

ADA TACTILE LETTERS AND

GRADE II BRAILLE

BLACK (GEMINI DUETS)

ACRYLIC FOR EXTERIOR

APPILCATION

OFF WHITE BACKGROUND

BLACK GRAPHICS

9"

9"

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

BID DOCUMENTS

512 MEANS STREET NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

JH SJ/KB

540-18-020

03-13-2026REVISIONS:

A

B

C

D

E

F

RENOVATE PHARMACY FOR USP 800

COMPLIANCE

CLARKSBURG, WEST VIRGINIA

ADDENDUM NO.1 04-20-2026

ENLARGED FLOOR PLANS, EQUIPMENT AND

SIGNAGE SCHEDULE

AE401

1/4" = 1'-0"AE401

1 ENLARGED PARTIAL BASEMENT EQUIPMENT PLAN

1/4" = 1'-0"AE401

2 PARTIAL SIXTH FLOOR EQUIPMENT PLAN

0' 2' 4' 8' 12'

SCALE: 1/4" = 1' - 0"

EQUIPMENT SCHEDULE AND ACCESSORY SCHEDULE

JSN DESCRIPTION PROVIDED BY INSTALLED BY

A5100 A SHOE COVER DISPENSER DESIGNED FOR LOW TO MODERATE USAGE AND HOLDS 55 PAIRS OF SHOE COVERS. GOVERNMENT GOVERNMENT

A5108 SHARPS WASTE DISPOSAL UNIT GOVERNMENT GOVERNMENT

A5145 A SURFACE MOUNTED, SATIN FINISH STAINLESS STEEL, DOUBLE GARMENT HOOK. EQUIPPED WITH A CONCEALED MOUNTING BRACKET THAT IS SECURED TO A CONCEALED WALL PLATE. FOR GENERAL PURPOSE USE THROUGHOUT THE FACILITY TO HANG VARIOUS ITEMS OF APPAREL.

GOVERNMENT CONTRACTOR

F2000 ROUND WASTEPAPER BASKET. GOVERNMENT GOVERNMENT

F2010 STEP-ON WASTEPAPER BASKET WITH INNER LINER AND FOOT PETAL ACTIVATED FLIP TOP. GOVERNMENT GOVERNMENT

F2020 FORTY-FOUR (44) GALLON TRASH CAN, 32" HIGH X 24" DIAMETER, WITH LID. GOVERNMENT GOVERNMENT

K1910 36” HEIGHT X 120” LENGH X 30” DEPTH HEAVY-DUTY STAINLESS STEEL WORKTABLE WITH ALL EDGES ROLLED DOWN AT 90 DEGREES. THE EDGES ARE 2" HIGH AND HAVE ROUNDED CORNERS. THE TABLE HAS STAINLESS STEEL LEGS AND A STAINLESS STEEL UNDER-SHELF.

GOVERNMENT GOVERNMENT

M0001 24" X 24" STAINLESS STEEL PASS THROUGH CABINET. BASIS OF DESIGN: ATMOS-TECH INDUSTRIES, MODEL NUMBER PT2424-24/SS/EI/RHC. CONTRACTOR CONTRACTOR

M2050 75” HEIGHT X 36” HEIGHT X 14” DEPTH STORAGE SHELVING UNIT. UNIT SHALL BE CORROSION RESISTANT STAINLESS STEEL, GALVANIZED STEEL OR BAKED ENAMEL ON

STEEL CONTAINIG 5 ADJUSTABLE SHELVES WITH 400 POUND LOAD CAPACITY.

GOVERNMENT GOVERNMENT

R6060 EXISTING GX PROFESSIONAL, MEDICAL-GRADE LABRATORY REFRIGERATOR - UPRIGHT. MODEL#: HLR125-GX HORIZON SERIES. GOVERNMENT CONTRACTOR

BIOSAFETY CABINET EQUIPMENT SCHEDULE

MODEL NO. DESCRIPTION PROVIDED BY: INSTALLED BY:

NU-543-400 BIOSAFETY CABINET EXHAUST FLOW CANOPIES, 4'-0". BASIS OF DESIGN: NUAIRE NU-543 SERIES CLASS II, TYPE A2, BIOSAFETY CABINET WITH EXHAUST FLOW CANOPY, NUAIRE BSC MODEL: NU-543-400

GOVERNMENT GOVERNMENT

NU-543-400-1 EXISTING BIOSAFETY CABINET TO BE REINSTALL GOVERNMENT GOVERNMENT

NU-543-600 BIOSAFETY CABINET EXHAUST FLOW CANOPIES, 6'-0". BASIS OF DESIGN: NUAIRE NU-543 SERIES CLASS II, TYPE A2, BIOSAFETY CABINET WITH EXHAUST FLOW CANOPY, NUAIRE BSC MODEL: NU-543-600

GOVERNMENT GOVERNMENT

NU-543-600-1 LAMINAR FLOW BIOSAFETY CABINET, 6'-0". BASIS OF DESIGN: LABGARD® ES ENERGY SAVER CLASS II, TYPE A2, LAMINAR FLOW BIOSAFETY CABINET, MODEL#: NU-543-600 NOMINAL 6 FOOT

GOVERNMENT GOVERNMENT

BIOSAFETY CABINET EQUIPMENT SCHEDULE GENERAL NOTES:

A. REFER TO INTERIOR ELEVATIONS FOR ADDITONAL INFORMATION.

B. SEE OTHER DISCIPLINES FOR ADDITIONAL INFORMATION AND UTILITY CONNECTIONS.

SIGNAGE SCHEDULE

SIGN TYPE ROOM NO. ROOM NAME CONTENT REMARK

1 B248 MECH MECHANICAL ROOM WALL MOUNTED

1 B215H IV BUFFER IV BUFFER WALL MOUNTED

1 B215G CORRIDOR -- WALL MOUNTED

1 B215F ANTE ROOM ANTE ROOM WALL MOUNTED

1 B215E CHEMO BUFFER CHEMO BUFFER WALL MOUNTED

1 B215D HAZ STOR HAZARD STORAGE WALL MOUNTED

1 B215C BREAK DOWN BREAK DOWN WALL MOUNTED

1 645B C-SCA C-CSA WALL MOUNTED

2 645A TLT RESTROOM DOOR MOUNTED

1 645 VESTIBULE -- WALL MOUNTED

GENERAL SIGNAGE NOTES:

A. PROVIDE AND INSTALL SIGNAGE IN ACCORDANCE WITH VA FACILITY GUIDELINES, STANDARDS AND REQUIREMENTS. SIGNAGE TYPE, CONTENT, LOCATION AND QUANTITY TO BE COORDINATED WITH VENDOR, VA STAFF, AND COR FOR ACCEPTANCE AND APPROVAL. SUBMIT A SHOP DRAWING WITH COORDINATION RESULTS

FOR REVIEW.

B. SEE DRAWING GI002 FOR SIGNAGE MOUNTING HEIGHTS.

C. REFER TO 1/AE401 FOR SIGNAGE LOCATIONS.

AE401

3 SIGN TYPE 1

AE401

4 SIGN TYPE 2

A5108

NU-543-600-1 NU-543-600-1

M2050

F2020

M0001

F2020

A5100

M0001

A5145

F2010

M2050

M0001

K1910

K1910

M0001

F2000

A5108

K1910

NU-543-400 NU-543-600

M2050 R6060

K1910

M0001

NU-543-400

F2010

A5100

M2050

NU-543-400-1

M2050

K1910 K1910

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

BID DOCUMENTS

512 MEANS STREET NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

JH SJ/KB

540-18-020

06-20-2025REVISIONS:

A

B

C

D

E

F

RENOVATE PHARMACY FOR USP 800

COMPLIANCE

CLARKSBURG, WEST VIRGINIA

ADDENDUM NO. 1 04-20-2026

INTERIOR ELEVATIONS

AE451

3/8" = 1'-0"AE451

1 IV BUFFER RM B215H - SOUTH

3/8" = 1'-0"AE451

2 IV BUFFER RM B215H - WEST

3/8" = 1'-0"AE451

3 IV BUFFER B215H - NORTH

3/8" = 1'-0"AE451

4 ANTE ROOM B215F - SOUTH

3/8" = 1'-0"AE451

5 ANTE ROOM B215F - NORTH

3/8" = 1'-0"AE451

7 CHEMO BUFFER RM. B215E - SOUTH

3/8" = 1'-0"AE451

8 CHEMO BUFFER RM. B215E - WEST

3/8" = 1'-0"AE451

9 CHEMO BUFFER RM. B215E - NORTH

3/8" = 1'-0"AE451

10 HAZARD STORAGE RM. B215D - SOUTH

3/8" = 1'-0"AE451

11 HAZARD STORAGE RM. B215D - EAST

3/8" = 1'-0"AE451

13 BREAK DOWN RM. B215C - SOUTH

3/8" = 1'-0"AE451

14 VESTIBULE RM. 645 - NORTH

3/8" = 1'-0"AE451

15 C-SCA RM. 645B - EAST

3/8" = 1'-0"AE451

16 C-SCA RM. 645B - NORTH

SCALE:

8'2'0' 4' 6'

3/8" = 1' - 0"

1'

3/8" = 1'-0"AE451

12 HAZARD STORAGE RM.B215D - NORTH

3/8" = 1'-0"AE451

6 CORRIDOR ROOM B215G - SOUTH

J

F

OPENING

5'-0"

STEEL TUBE -

SEE STRUCTURAL

EXISTING CONCRETE WALL

5/8" GYPSUM BOARD

7/8" FURRING CHANNEL

4" METAL STUD

EXISTING COLUMN

AE501

HM DOOR AND FRAME

(SEE SCHEDULE)

F

OPENING

3'-5"

AE501

2'-7 1/2"

1' -1

3/

4"

2' -0

4" METAL STUD

STEEL TUBE -

SEE STRUCTURAL

EXISTING CONCRETE WALL

7/8" FURRING CHANNEL

PASS-THROUGH

CABINET

5/8" GYPSUM BOARD

BASEMENT FLOOR

15'-6 7/8"

FIRST FLOOR

27'-1 1/4"

F

3' -7

EXISTING CONCRETE WALL

PASS-THROUGH

CABINET

4" METAL STUD

5/8" GYPSUM BOARD

GWB CEILING

DUCTWORK -

SEE MECHANICAL

3' -0

O

P E

N

IN

G 7'

-4 " F

.V

STEEL TUBE -

SEE STRUCTURAL

STEEL TUBE -

SEE STRUCTURAL

7/8" FURRING CHANNEL

SEE SCHEDULE

CEILING

2' -0

1'

-6

3" M

IN

BASEMENT FLOOR

15'-6 7/8"

FIRST FLOOR

27'-1 1/4"

F

O P

E N

IN

G

7' -8

GWB CEILING

7/8" FURRING CHANNEL

5/8" GYPSUM BOARD

STEEL TUBE - SEE STRUCTURAL

EXISTING CONCRETE WALL

HM DOOR AND FRAME

(SEE SCHEDULE)

4" METAL STUD

SEE SCHEDULE

CEILING

AE501

PASS-THROUGH CABINET

4" METAL STUD

5/8" GYPSUM BOARD

BASEMENT FLOOR

15'-6 7/8"

FIRST FLOOR

27'-1 1/4"

3' -6

2' -0

3' -7

1' -6

5/8" GYPSUM BOARD

PASS-THROUGH

CABINET

DUCTWORK -

SEE MECHANICAL

4" METAL STUD

GWB CEILING

SEE SCHEDULE

CEILING

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

BID DOCUMENTS

512 MEANS STREET NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

JH SJ/KB

540-18-020

06-20-2025REVISIONS:

A

B

C

D

E

F

RENOVATE PHARMACY FOR USP 800

COMPLIANCE

CLARKSBURG, WEST VIRGINIA

ADDENDUM NO. 1 04-20-2026

MISCELLANEOUS DETAILS

AE501

1 1/2" = 1'-0"AE501

2 DOOR OPENING - PLAN DETAIL

1 1/2" = 1'-0"AE501

1 PASS-THROUGH CABINET OPENING - PLAN DETAIL

3/4" = 1'-0"AE501

3 PASS-THROUGH CABINET OPENING - WALL SECTION

3/4" = 1'-0"AE501

4 DOOR OPENING - WALL SECTION

1 1/2" = 1'-0"AE501

5 PASS-THROUGH CABINET OPENING - PLAN DETAIL 2

3/4" = 1'-0"AE501

6 PASS-THROUGH CABINET OPENING - WALL SECTION 2

VA FORM 08-6231 1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

BID DOCUMENTS

512 MEANS STREET NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

BS DK

540-18-020

06-20-2025REVISIONS:

A

B

C

D

E

F

RENOVATE PHARMACY FOR USP 800

COMPLIANCE

CLARKSBURG, WEST VIRGINIA

ADDENDUM NO. 1 04-20-2026

PLUMBING ABBREVIATIONS, LEGENDS,

SCHEDULES & NOTES

P-001

PLUMBING ABBREVIATIONS

3-WAY CONTROL VALVE

ANGLE GATE VALVE

ANGLE GLOBE VALVE

BALL VALVE

BUTTERFLY VALVE

CHECK VALVE

CONTROL VALVE

GATE VALVE

GLOBE VALVE

SAFETY RELIEF VALVE

TWO POSITION CONTROL VALVE

BACKFLOW PREVENTER

ECCENTRIC REDUCER

CONCENTRIC REDUCER

FLOW ARROW

HOSE BIBB / SILLCOCK

PLUG VALVE

PLUMBING 2D SYMBOLS

PRESSURE REDUCING VALVE (WATER)

PRESSURE REGULATOR (GAS)

PIPE ANCHOR

PIPE GUIDES

WALL CLEANOUT

SUSPENDED CLEANOUT

WCO

WYE STRAINER

WYE STRAINER W/DRAIN VALVE

FLOOR DRAIN - ROUND OR SQUARE

FLOOR CLEANOUT - ROUND OR SQUARE

PIPE CAP

PIPE TURNING DOWN

PIPE TURNING UP

TEE UP

TEE DOWN

DROP AND RUN

DROP AND TURN

TEE OFF TOP

TEE OFF BOTTOM

CROSS AND RISER

PLAN 90° ELBOW

PIPE TEE

PIPE UNION

FLEXIBLE PIPE CONNECTOR

WATER METER

PUMP

AUTOMATIC AIR VENT

PRESSURE SWITCH

PRESSURE GAUGE

THERMOMETER

FLOW SWITCH

TEMPERATURE SWITCH

OR

OR

CO

PIPE SLOPE ARROW MEDICAL

PLUMBING PIPING SYSTEMS

ANNOTATION SYMBOLS

(E)EXISTING

NEW KEYNOTE

DEMO KEYNOTE

NEW BOLD TEXT INDICATES NEW ITEM

TEXT INDICATES EXISTING ITEM

EQUIPMENT OR FIXTURE DESIGNATION

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

POINT OF CONNECT TO EXISTING

X-X

PLUMBING GENERAL NOTES

PLUMBING DEMOLITION GENERAL NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE

PROCEEDING WITH WORK.

REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY GOVERNMENT OR REINSTALLED AS PART OF

THIS WORK.

DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.

VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND

ADJUST MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO COORDINATE WITH NEW WORK.

AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.

COORDINATE DEMOLITION WITH COR. SUBMIT SHUDTOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND

APPROVAL.

PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES

DAMAGED AT NO ADDITIONAL COST.

TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.

SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW

PLUMBING AND WORK OF OTHER TRADES.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA

STANDARDS.

INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.

PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE

GRADE FOR THE PURPOSES INTENDED.

EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY

AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.

INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR

EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.

AT EACH PLUMBING FIXTURE, PROVIDE A PISTON TYPE WATER HAMMER ARRESTOR SIZED ACCORDING TO

MANUFACTURER'S RECOMMENDATIONS.

SANITARY DRAINAGE PIPING INDICATED IS LOCATED BELOW FLOOR SLAB OR WITHIN WALLS UNLESS NOTED OTHERWISE. SANITARY VENT PIPING INDICATED IS ABOVE THE CEILING OR WITHIN WALLS UNLESS NOTED

OTHERWISE.

SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL CODES ALONG WITH

SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.

FIRESTOP AND SEAL PIPING PENETRATIONS THROUGH WALLS AND FLOORS EQUAL TO THE RATING OF

WALLS AND FLOORS.

TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND

APPLICABLE VA STANDARDS.

COORDINATE PLUMBING PIPING WITH WORK OF OTHER DISCIPLINES.

DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND NATIONAL

CODES AND APPLICABLE VA STANDARDS.

PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.

COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING

OF PIPING WITH EXISTING CONDITIONS.

PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE AND COORDINATED WORKING PLUMBING SYSTEM. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND

ARRANGEMENT OF PIPING SYSTEMS.

CONTRACTOR SHALL COORDINATE ANY PLUMBING SYSTEM REQUIRED SHUTDOWN WITH THE OWNER 1

WEEK IN ADVANCE.

PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS

CONTRACT, UNLESS NOTED OTHERWISE.

SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF

PROJECT.

INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.

DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.

A/E ARCHITECT/ENGINEER

AC ABOVE CEILING

AD AREA DRAIN

AFF ABOVE FINISHED FLOOR

AG AIR GAP

AP ACCESS PANEL

AS AUTOMATIC SPRINKLER

AFG ABOVE FINISHED GRADE

ASD ADJUSTABLE SPEED DRIVE

ASHRAE AMERICAN SOCIETY HEATING,

REGRIGERATING, AIR CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

ASPE AMERICAN SOCIETY PLUMBING

ENGINEERS

ASR AUTOMATIC SPRINKLER RISER

AV ACID VENT

AW ACID WASTE

BAS BUILDING AUTOMATION SYSTEM

BF BELOW FLOOR

BFP BACKFLOW PREVENTER

BG BELOW GRADE

BH BOOSTER HEATER

BHP BREAK HORSEPOWER

BJ BETWEEN JOISTS

BOP BOTTOM OF PIPE

BSP BLACK STEEL PIPE

BT BATHTUB

BTUH BRITISH THERMAL UNITS PER HOUR

C CELSIUS

CF COMBINATION FIXTURE

CGA COMPRESSED GAS ASSOCIATION

CI CAST IRON

CO CLEANOUT

COND CONDENSATE

CP CONDENSATE PUMP

CS CLINICAL SINK

CV CONTROL VALVE

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DHWS DOMESTIC HOT WATER SUPPLY

DF DRINKING FOUNTAIN

DI DEIONIZED WATER

DN DOWN

DOE DEPARTMENT OF ENERGY

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

DWH DOMESTIC WATER HEATER

DWR DRINKING WATER RETURN

DWS DRINKING WATER SUPPLY

DWV DRAIN WASTE VENT

EC ELECTRICAL CONTRACTOR

EL ELEVATION

EMCS ENERGY MONOSERRAT AND CENTRAL

SYSTEM

EPA ENVIRONMENTAL PROTECTION

AGENCY

EPACT ENERGY POLICY ACT

ESC ESCUTCHEON

ESH EMERGENCY SHOWER

ET EXPANSION TANK

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EWS EYEWASH STATION

EX EXISTING

F FAHRENHEIT

FA FROM ABOVE

FB FROM BELOW

FBO FURNISHED BY OTHERS

FCO FLOOR CLEANOUT

FCW FILTERED COLD WATER

FD FLOOR DRAIN

FDC FIRE DEPARTMENT (HOSE)

CONNECTION

FM FLOW METER

FOP FUEL OIL PUMP

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FS FLOOR SINK

FU FIXTURE UNITS

G GALLON

GC GENERAL CONTRACTOR

GCO GRADE CLEANOUTS

GD GARBAGE DISPOSAL

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GRS GAS REGULATOR STATION

GT GREASE TRAP

GVTR GAS VENT THROUGH ROOF

GWH GAS FIRED WATER HEATER

H&CW HOT AND COLD WATER

HB HOSE BIBB (INTERIOR)

HD HUB DRAIN

HEX HEAT EXCHANGER

HP HORSEPOWER

HS HAND SINK

HST HOT WATER STORAGE TANK

(DOMESTIC)

HWB HOT WATER BOILER

HWCP HOT WATER CIRCULATING PUMP

HWP HOT WATER PUMP

HYD HYDRANT

ICW INDUSTRIAL COLD WATER

INV INVERT

IPC INTERNATIONAL PLUMBING CODE

IRW IRRIGATION WATER

IW INDIRECT WASTE

IWH INSTANTANEOUS WATER HEATER

IWR INDUSTRIAL WATER RETURN

IWS INDUSTRIAL WATER SUPPLY

KW KILOWATT

KWHR KILOWATT-HOUR

L/S LITER PER SECOND

LA LABORATORY AIR

LAV LAVATORY

LBS/HR POUNDS PER HOUR

LCW LABORATORY COLD WATER

LHW LABORATORY HOT WATER

LNG LIQUID NATURAL GAS

LOX LIQUID OXYGEN

LV LABORATORY VACUUM

LW LOW WATER

M METER

MA MEDICAL AIR

MAV MANUAL AIR VENT

MBH THOUSANDS OF BTU PER HOUR

MC MECHANICAL CONTRACTOR

MED MEDICAL

MER MECHANICAL EQUIPMENT ROOM

MH MANHOLE

MOU MEMORANDUM OF UNDERSTANDING

MSB MOP SINK BASIN

MV MEDICAL VACUUM

N2 NITROGEN

N2O NITROUS OXIDE

NC NORMALLY CLOSED

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM NOMINAL

NPW NON POTABLE WATER

NTS NOT TO SCALE

O2 OXYGEN

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OR OPERATING ROOM

OVFL OVERFLOW

PA PACAL

PC PLUMBING CONTRACTOR

PD PRESSURE DROP

PDI PLUMBING AND DRAINAGE INSTITUTE

PG PRESSURE GAUGE

PP PLUMBING PUMP

PPM PARTS PER MILLION

PRS PRESSURE REDUCING STATION

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH

ATMOSPHERE

PSIG POUNDS PER SQUARE INCH GAUGE

PTRV PRESSURE TEMPERATURE RELIEF

VALVE

PW POTABLE WATER

RD ROOF DRAIN

RDL ROOF DRAIN LEADER

RL ROOF LEADER

RO REVERSE OSMOSIS

RWL RAIN WATER LEADER

SAN SANITARY SEWER

SCFM STANDARD CUBIC FOOT/MIN

SCW SOFTENED COLD WATER

SDMH STORM DRAIN MANHOLE

SP SUMP PUMP

SPR SPRINKLER LINE

SQFT SQUARE FOOT

SS STAINLESS STEEL

ST STORAGE TANK

SW STORM WATER

TCV TEMPERATURE CONTROL VALVE

TD TRENCH DRAIN

TDH TOTAL DYNAMIC HEAD

TDL TEMPERATURE DIFFERENTIAL

TEMP TEMPERATURE

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TSTAT THERMOSTAT

TWR TEMPERED WATER RETURN

TWS TEMPERED WATER SUPPLY

TYP TYPICAL

UPC UNIFORM PLUMBING CODE

V SANITARY VENT

VAC VACUUM

VB VACUUM BREAKER

VCO VACUUM CLEANER OUTLET

VP VACUUM PUMP

VS VENT STACK

VTR VENT THROUGH ROOF

W WASTE

WC WATER CLOSET

WCO WALL CLEANOUT

WG WATER GAUGE

WH WATER HEATER

WHA WATER HAMMER ARRESTOR

WHD WALL HYDRANT

WL WATER LINE

WM WATER METER

WPD WATER PRESSURE DROP

WS WASTE STACK

YCO YARD CLEANOUT

YH YARD HYDRANT

AV

M

F

P

T

CO2

DA

DV

LA

LO

LV

MA

MO

MV

N

RO

WAGD

CARBON DIOXIDE

DENTAL AIR

DENTAL VACUUM

LABORATORY AIR

LABORATORY OXYGEN

LABORATORY VACUUM

MEDICAL AIR

MEDICAL OXYGEN

MEDICAL VACUUM

NITROGEN

REVERSE OSMOSIS

WASTE ANESTHETIC GAS DISPOSAL

CA

CW

FD

FOS

FOR

GW

HW

HWR

NG

P

SAN

ST

SV

COLD WATER

COLD WATER RETURN

FLOOR DRAIN

FUEL OIL SUPPLY

FUEL OIL RETURN

GREASE WASTE

HOT WATER

HOT WATER RETURN

NATURAL GAS

PROPANE

SANITARY

STORM

SANITARY VENT

DOMESTIC

FITXURES

PLUMBING FIXTURE TYPES

DF

EWC

LAV

WC

SK

SH

DRINKING FOUNTAIN

ELECTRIC WATER COOLER

LAVATORY

WATER CLOSET

SINK

SHOWER

DRAINS

PLUMBING DRAIN TYPES

FD

FS

HD

TD

RD

RR

FLOOR DRAIN

FLOOR SINK

HUB DRAIN

TRENCH DRAIN

ROOF DRAIN

ROOF RECEPTOR

MEDICAL

PLUMBING EQUIPMENT

LAC

LAST

LVU

MAC

MAST

MZVC

MVU

LABORATORY AIR COMPRESSOR

LABORATORYAIR STORAGE TANK

LABORATORY VACUUM UNIT

MEDICAL AIR COMPRESSOR

MEDICAL AIR STORAGE TANK

MEDICAL ZONE VALVE CABINET

MEDICAL VACUUM UNIT

DOMESTIC

CP

DWBP

ET

GD

HWST

RWC

WH

WM

CIRCULATOR PUMP

DOMESTIC WATER BOOSTER PUMP

EXPANSION TANK

GARBAGE DISPOSAL

HOT WATER STORAGE TANK

REMOTE WATER CHILLER

WATER HEATER

WATER METER

VALVES

PLUMBING VALVES

AAV

BALV

BFP

BFV

BPV

BV

BWV

CV

GV

MBV

MGV

NRS

OSY

PV

PRV

AIR ADMITTANCE VALVE

BALANCING VALVE

BACKFLOW PREVENTOR

BUTTERFLY VALVE

BACK PRESSURE VALVE

BALL VALVE

BACK WATER VALVE

CHECH VALVE

GATE VALVE

MOTORIZED BALL VALVE

MOTORIZED GATE VALVE

NON-RISING STEM

OUTSIDE STEM & YOKE

PILOT VALVE

PRESSURE REDUCING VALVE

1'-9" SPOT ELEVATION

PLUMBING/ELECTRICAL COORDINATION

THE PLUMBING CONTRACTOR SHALL COORDINATE THE ELECTRICAL CHARACTERISTICS OF ALL PLUMBING EQUIPMENT (VOLTAGE, PHASE, MCA, MOCP, ETC.) WITH THE ELECTRICAL CONTRACTOR AND THE ELECTRICAL PLANS PRIOR TO SUBMITTING OR ORDERING ANY PLUMBING EQUIPMENT. ANY SUBSEQUENT MISMATCH BETWEEN THE PLUMBING EQUIPMENT ELECTRICAL REQUIREMENTS AND THE ELECTRICAL SERVICE, AS DESIGNED AND PROVIDED, SHALL BE THE

RESPONSIBILITY OF THE PLUMBING CONTRACTOR WITH NO ADDITIONS TO THE CONTRACT.

PLUMBING/ELECTRICAL COORDINATION STATEMENTS REQUIRED BY PLUMBING GENERAL NOTES AND SPECIFICATION

SHALL BE INCLUDED WITH PLUMBING EQUIPMENT SUBMITTALS/SHOP DRAWINGS.

PLUMBING FIXTURE SCHEDULE

Mark Type Mark Manufacturer Model Description CW Connection HW Connection Vent

Connection Drain Comments

P-516 Hand Sink www.justmfg.com A33338-T-J Just Mfg Stainless Steel_22 inch x 19 inch x 10 inch Chicago faucet 8452-ABCP dual-handle emergency eywash with faucet

A8

A7

A7.9

L

J

F

AF AE

AAABACAD

15 16 17 18 19 20 21 22

OFFICE

B235

INPATIENT

PHARMACY

B215

HSKP

B236

OFFICE

B235B

OFFICE

B235C

HAC

B216

B215A

TLT

B215B

OFFICE

B 308

TOI

B237

ELE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .