This document is Addendum No. 1 to the Clarksburg VA Medical Center Renovate Pharmacy for USP 800 Compliance project, issued April 20, 2026, for VA Project No. 540-18-020. The addendum provides clarifications and modifications to contract documents through specification revisions and drawing updates, all effective immediately upon incorporation into bidders' proposals.
The specification modifications include replacement of Section 08 56 59 (Service and Teller Window Units) with revised language highlighted in red, and addition of Section 22 40 00 (Plumbing Fixtures). Drawing revisions are indicated by clouded work on multiple sheets dated 04-20-2026, including general notes and legends (GI002), enlarged floor plans and equipment schedules (AE401), interior elevations (AE451), miscellaneous details (AE501), and plumbing plans and schedules (P001, P-101, P-102). Additional electrical drawing updates are referenced for basement plans (EE101) and electrical schedules (EE612). The addendum also incorporates VA-supplied supplementary bid documents including erosion and sediment control narrative and data (Drawing GC100) and Section 32 90 00 (Planting) specifications as a bid alternate/deduction referenced in RFI #61. All revisions must be incorporated into contractor bid documents per VA requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 540-18-020 Addendum No. 2 .pdf | ||
| 36C24526B0001 0008.docx | DOCX document | |
| 36C24526B0001 0007.docx | DOCX document | |
| 36C24526B0001 0006.docx | DOCX document | |
| 36C24526B0001 0005.docx | DOCX document | |
| Record of Attendance - 2nd Site Visit - 5-13-2026 Pharmacy USP 800.pdf | ||
| 36C24526B0001 0004.docx | DOCX document | |
| REVISED BID SCHEDULE.docx | DOCX document | |
| 540-18-020 Asbestos and Hazmat Testing Report.pdf | ||
| 36C24526B0001 0003.docx | DOCX document | |
| 540 05 401 As-Builts.pdf | ||
| 36C24526B0001 0002.docx | DOCX document | |
| 36C24526B0001 0001.docx | DOCX document | |
| Record of Attendance - Site Visit- Pharmacy USP 800 Upgrade - 4-1-2026.pdf | ||
| PCRA USP800 - AD signed.pdf | ||
| Bid Doc Specs Vol 2.pdf | ||
| SAM Wage Determination WV20260011 1-2-2026.pdf | ||
| 2026-03-13 Revised Reconciled Bid Documents.pdf | ||
| LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION.pdf | ||
| Bid Doc Specs Vol 1.pdf | ||
| 36C24526B0001_1.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
512 Means St NW, Suite 400 Atlanta, GA 30318
(404) 214-9774
April 20, 2026
Addendum No. 1
CLARKSBURG VA MEDICAL CENTER RENOVATE PHARMACY FOR USP 800 COMPLIANCE
CLARKSBURG, WV
VA Project No.: 540-18-020
This addendum is issued for the purpose of clarifying the intent of the Contract Documents for making necessary corrections, deletions, and/or deletions to the contract documents on all items of discrepancy identified up to the time of the issuance of this addendum.
Each bidder is hereby instructed and authorized to incorporate into their proposal the instructions contained in this addendum.
TO ALL BIDDERS
A. SPECIFICATIONS
Section 08 56 59 SERVICE AND TELLER WINDOW UNITS
1. Replace section with revised section included. Changes are reflected in “red” font.
Section 22 40 00 PLUMBING FIXTURES
1. Add section.
B. DRAWINGS
Drawing GI002 – GENERAL NOTES, DETAILS, ABBREVIATIONS AND LEGENDS.
1. Refer to clouded work indicated on attached Drawing dated 04-20-2026.
Drawing AE401 – ENLARGED FLOOR PLANS, EQUIPMENT AND SIGNAGE SCHEDULE
1. Refer to clouded work indicated on attached Drawing dated 04-20-2026.
Drawing AE451 – INTERIOR ELEVATIONS
1. Refer to work indicated by clouded areas on attached Drawing dated 04-20-2026.
Drawing AE501 – MISCELLANEOUS DETAILS
1. Refer to work indicated by clouded areas on attached Drawing dated 04-20-2026.
Drawing P001 – PLUMBING ABBREVIAIONS, LEGENDS, SCHEULES & NOTES
1. Refer to work indicated by clouded areas on attached Drawing dated 04-20-2026.
Drawing P-101 – PLUMBING PARTIAL BASEMENT FLOOR PLAN – NEW WORK
1. Refer to work indicated by clouded areas on attached Drawing dated 04-20-2026.
Drawing P-102 – PLUMBING PARTIAL SIXTH FLOOR PLAN – NEW WORK
1. Refer to work indicated by clouded areas on attached Drawing dated 04-20-2026.
Drawing EE101 – ELECTRICAL PARTIAL BASEMENT PLANS
1. Refer to work indicated by clouded areas on attached Drawing dated 04-20-2026.
Drawing EE612 – ELECTRICAL SCHEDULES
1. Refer to work indicated by clouded areas on attached Drawing dated 04-20-2026.
This addendum is issued in accordance with VA requirements and shall be incorporated into the Contractor’s bid documents.
END OF DOCUMENT
Toland-Mizell-Molnar, LLC
Scott Jeffries, Project Manager
VA Supplied Supplementary Bid Documents - Addendum No. 1
*For Bid Alternate/Deduction as referenced in RFI #61
Page 23: Erosion and Sediment Control Narrative and Data - Drawing GC100 Pages 24 - 47: Specification 32 90 00 Planting
540-18-2021 - Renovate Pharmacy for USP 800 Compliance 01-01-21
Louis A. Johnson VAMC, Clarksburg WV
08 56 59 - 1
SECTION 08 56 59
SERVICE AND TELLER WINDOW UNITS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Service window units within concrete partitions, framed partitions at Pharmacy and other locations indicated on Drawings .
1.2 RELATED WORK
A. Section 11 17 36, PACKAGE TRANSFER UNITS: Package Transfers.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. ASTM International (ASTM):
A240/A240M-2025.........Chromium and Chromium-Nickel Stainless Steel
Plate, Sheet, and Strip for Pressure Vessels and for General Applications.
F593-2024...............Stainless Steel Bolts, Hex Cap Screws, and
Studs.
F594-2024...............Stainless Steel Nuts.
F1233-2021..............Security Glazing Materials and Systems.
C. National Association of Architectural Metal Manufacturers (NAAMM):
AMP 500-2006............Metal Finishes Manual.
D. UL LLC (UL):
752-2023................Bullet-Resisting Equipment (12th edition).
1.4 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Submittal Drawings: Service windows, showing design, construction and installation.
1. Indicate size, configuration, and fabrication and installation details.
2. Indicate bullet resistant reinforcing for metal components.
C. Manufacturer's Literature and Data: Service windows.
1. Description of each product.
D. Test reports: Report bullet resistance level.
E. Certificates: Certify products comply with specified bullet resistance rating.
08 56 59 - 2
1.5 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
PART 2 - PRODUCTS
2.1 SYSTEM DESCRIPTION
A. Service Window Units: Factory fabricated, assembled, and glazed unit type.
1. Frame: Stainless steel with integral counter, oversized deal tray, and jamb openings to permit voice communication through window.
2. Pharmacy Oversized Deal Tray: Size indicated on Drawings Permit passage of package measuring 38 by 75 by 375 mm (1-1/2 by 3 by
15 inches) .
2.2 SYSTEM PERFORMANCE
A. Design service and teller window units complying with specified performance:
2.3 MATERIALS
A. Stainless Steel: ASTM A240/A240M; Type 304, 3 mm (0.12 inch) thick, minimum.
2.4 PRODUCTS – GENERAL
A. Basis of Design or equal:
Manufacturer: Atmos-Tech Industries
Recirculating HEPA filtered material Pass-through
Model: PT2424-24 SS/EI/RHC
2.5 FABRICATION
A. Form stainless steel fabrications to sizes, profiles, and configurations indicated on Drawings.
B. Frames: Stainless steel.
1. Provide clamp-on frames at new partitions.
2. Jambs and Heads: Continuous with integral glazing stop on corridor side of window unit.
3. Removable Glazing Stops: Applied to room side of window unit.
a. Miter and weld removable stops at corners.
b. Secure removable stops to frames with countersunk screws, spaced as required for specified performance requirements.
4. Voice Communication: Frame profile and jamb spacers or manufacturer provided compliant openings to provide two-way natural voice communication.
08 56 59 - 3
C. Frame Anchors: Stainless steel; masonry and framed partition type, compatible with partition construction.
1. Provide minimum three frame anchors for each jamb.
D. Sill: Stainless steel.
1. Fabricate sill full opening width to receive both jambs.
2. Fabricate sill with extended writing shelf on both sides of window unit.
E. Deal Tray: Stainless steel.
1. Incorporate deal tray into sill, without visible seams.
F. Double wall construction
G. Doors provided with stainless pin hinges, stainless latching handle with mechanical door interlock system
H. Glazing:
1. Glazing Channel: Stainless steel; configuration as required to accommodate glass installation, and expansion and contraction.
2. ¼” clear acrylic glazing and EPDM gasket
3. Secure glazing channel to window unit frame.
4. Factory glaze window unit.
2.6 FINISHES
A. Stainless Steel: NAAMM AMP 500; Constructed of 16 & 20 ga type 304 stainless steel with a No. 4 polished finish.
B. Blend welds to match adjacent finish.
2.7 ACCESSORIES
A. Fasteners: ASTM F593 and ASTM F594, stainless steel.
PART 3 - EXECUTION
3.1 PREPARATION
A. Examine and verify substrate suitability for product installation.
1. Verify opening is correctly sized and located.
2. Verify partition is prepared to receive frame anchors.
B. Protect existing construction and completed work from damage.
3.2 INSTALLATION
A. Install products according to manufacturer's instructions and approved submittal drawings .
B. Install service and teller window units according to manufacturer's installation instructions.
C. Set units accurately, plumb, and level.
08 56 59 - 4
D. Securely anchor to masonry and partition framing as shown on submittal drawings.
E. Coordinate with window intrusion detection system specified in Section
28 16 00, INTRUSION DETECTION SYSTEM.
3.3 CLEANING
A. Clean exposed window unit surfaces. Remove temporary labels, contaminants, and stains.
B. Polish stainless steel surfaces for uniform appearance.
3.4 PROTECTION
A. Protect window units from construction operations.
B. Remove protective materials immediately before acceptance.
C. Repair damage.
- - E N D - -
540-18-2021 - Renovate Pharmacy for USP Compliance 05-01-24
Louis A. Johnson VAMC Clarksburg WV
22 40 00 - 1
SECTION 22 40 00
PLUMBING FIXTURES
PART 1 – GENERAL
1.1 DESCRIPTION
A. Plumbing fixtures, associated trim and fittings necessary to make a complete installation from wall or floor connections to rough piping, and certain accessories.
B. A complete listing of all acronyms and abbreviations are included in
Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING.
1.2 RELATED WORK
A. Section 01 00 00, GENERAL REQUIREMENTS.
B. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
C. Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS.
D. Section 07 92 00, JOINT SEALANTS: Sealing between fixtures and other finish surfaces.
E. Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING.
F. Section 22 08 00, COMMISSIONING OF PLUMBING SYSTEMS: Requirements for commissioning, systems readiness checklist, and training.
G. Section 22 13 00, FACILITY SANITARY AND VENT PIPING.
1.3 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. The American Society of Mechanical Engineers (ASME):
A112.6.1M-1997 (R2017)..Supports for Off-the-Floor Plumbing Fixtures for Public Use
A112.19.1-2018..........Enameled Cast Iron and Enameled Steel Plumbing
Fixtures
A112.19.2-2018..........Ceramic Plumbing Fixtures
A112.19.3-2022..........Stainless Steel Plumbing Fixtures
C. American Society for Testing and Materials (ASTM):
A276-2017...............Standard Specification for Stainless Steel Bars and Shapes
B584-2022...............Standard Specification for Copper Alloy Sand
Castings for General Applications
D. CSA Group:
B45.4-2022..............Stainless Steel Plumbing Fixtures
22 40 00 - 2
E. National Association of Architectural Metal Manufacturers (NAAMM):
AMP 500-2006............Metal Finishes Manual
F. American Society of Sanitary Engineering (ASSE):
1016-2017...............Automatic Compensating Valves for Individual
Showers and Tub/Shower Combinations
G. NSF International (NSF):
14-2022.................Plastics Piping System Components and Related
Materials
61-2022.................Drinking Water System Components – Health
Effects
372-2022................Drinking Water System Components – Lead Content
H. American with Disabilities Act (A.D.A)
I. International Code Council (ICC):
IPC-2021................International Plumbing Code
1.4 SUBMITTALS
A. Submittals, including number of required copies, will be submitted in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND
SAMPLES.
B. Information and material submitted under this section will be marked
“SUBMITTED UNDER SECTION 22 40 00, PLUMBING FIXTURES”, with applicable paragraph identification.
C. Manufacturer's Literature and Data including: Full item description and optional features and accessories. Include dimensions, weights, materials, applications, standard compliance, model numbers, size, connections, and capacity.
D. Operating Instructions: Comply with requirements in Section 01 00 00, GENERAL REQUIREMENTS.
E. Completed System Readiness Checklist provided by the CxA and completed by the Contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 22
08 00, COMMISSIONING OF PLUMBING SYSTEMS.
F. Submit training plans and instructor qualifications in accordance with the requirements of Section 22 08 00, COMMISSIONING OF PLUMBING
SYSTEMS.
1.5 QUALITY ASSURANCE
A. Bio-Based Materials: For products designated by the USDA’s Bio-
Preferred Program, provide products that meet or exceed USDA recommendations for bio-based content, so long as products meet all
22 40 00 - 3 performance requirements in this specifications section. For more information regarding the product categories covered by the Bio-
Preferred Program, visit http://www.biopreferred.gov.
1.6 AS-BUILT DOCUMENTATION
A. Comply with requirements in Paragraph “AS-BUILT DOCUMENTATION” of
Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Material or equipment containing a weighted average of greater than
0.25 percent lead is prohibited in any potable water system intended for human consumption, and will be certified in accordance with NSF 61 or NSF 372. Endpoint devices used to dispense water for drinking will meet the requirements of NSF 61.
B. Plastic pipe, fittings, and solvent cement will meet NSF 14 and will be
NSF listed for the service intended.
2.2 STAINLESS STEEL
A. Corrosion-resistant Steel (CRS):
1. Plate, Sheet and Strip: CRS flat products will conform to chemical composition requirements of any 300 series steel specified in ASTM
A276.
2. Finish: Exposed surfaces will have standard polish (ground and polished) equal to NAAMM finish Number 4.
B. Die-cast zinc alloy products are prohibited.
2.3 STOPS
A. Provide lock-shield loose key or screw driver pattern angle stops, straight stops or stops integral with faucet, with each compression type faucet whether specifically called for or not, including sinks in solid-surface, wood and metal casework, laboratory furniture and pharmacy furniture. Locate stops centrally above or below fixture in accessible location.
B. Furnish keys for lock shield stops to the COR.
C. Supply from stops not integral with faucet will be chrome plated copper flexible tubing or flexible stainless steel with inner core of non-toxic polymer.
D. Supply pipe from wall to valve stop will be rigid threaded IPS copper alloy pipe, i.e. red brass pipe nipple, chrome plated where exposed.
E. Mental Health Area: Provide stainless steel drain guard for all lavatories not installed in casework.
22 40 00 - 4
2.4 ESCUTCHEONS
A. Heavy type, chrome plated, with set screws. Provide for piping serving plumbing fixtures and at each wall, ceiling and floor penetrations in exposed finished locations and within cabinets and millwork.
2.5 LAMINAR FLOW CONTROL DEVICE
A. Smooth, bright stainless steel or satin finish, chrome plated metal laminar flow device will provide non-aeration, clear, coherent laminar flow that will not splash in basin. Device will also have a flow control restrictor and have vandal resistant housing. Aerators are prohibited.
B. Flow Control Restrictor:
1. Capable of restricting flow from 32 ml/s to 95 ml/s (0.5 gpm to 1.5 gpm) for lavatories; 125 ml/s to 140 ml/s (2.0 gpm to 2.2 gpm) for sinks P-505 through P-520, P-524 and P-528; and 174 ml/s to 190 ml/s
(2.75 gpm to 3.0 gpm) for dietary food preparation and rinse sinks or as specified.
2. Compensates for pressure fluctuation maintaining flow rate specified above within 10 percent between 170 kPa and 550 kPa (25 psig and 80 psig).
3. Operates by expansion and contraction, eliminates mineral/sediment build-up with self-cleaning action, and is capable of easy manual cleaning.
2.6 SINKS AND LAUNDRY TUBS
A. Dimensions for sinks and laundry tubs are specified, length by width
(distance from wall) and depth.
B. (P-516) Sink (CRS, Single Compartment, Wall mounted ASME A112.19.2, Hand Sinks), back faucet ledge, approximately 483 mm by 559 mm (19 inches by 22 inches) with single compartment inside dimensions approximately 406 mm by 292 mm by 140 mm (16 inches by 11 1/2 inches by
9 inches) deep. Will be minimum of 1.3 mm thick (18 gauge) CRS. Corners and edges will be well rounded:
1. Faucet: Solid brass construction, 8.3 L/m (2.2 gpm) deck mounted combination faucet with Monel or ceramic seats, removable replacement unit containing all parts subject to ware, swivel gooseneck spout with approximately 203 mm (8 inches) reach with spout outlet 152 mm (6 inches above deck and 102 mm (4 inches) wrist blade handles with hose spray. Faucet will be polished chrome plated and equipped with ANSI/ISEA Z358.1 emergency eyewash unit.
22 40 00 - 5
2. Drain: Drain plug, stainless steel.
3. Trap: Cast copper alloy 38 mm (1 1/2 inches) P-trap with cleanout plug. Provide wall connection and escutcheon.
4. Provide cover for exposed piping, drain, stops and trap per A.D.A.
5. Mixing valve: Provide with thermostatic mixing valve to provide tepid water to eyewash unit, from 30 to 35 degrees C (85 to 95 degrees F). Flow rate will be 11.4 L/m (3 gpm).
PART 3 - EXECUTION
3.1 INSTALLATION
A. Fixture Setting: Opening between fixture and floor and wall finish will be sealed as specified under Section 07 92 00, JOINT SEALANTS. Bio-based materials will be utilized when possible.
B. Supports and Fastening: Secure all fixtures, equipment and trimmings to partitions, walls and related finish surfaces. Exposed heads of bolts and nuts in finished rooms will be hexagonal, polished chrome plated brass with rounded tops.
C. Through Bolts: For free standing marble and metal stud partitions refer to Section 10 21 13, TOILET COMPARTMENTS.
D. Toggle Bolts: For hollow masonry units, finished or unfinished.
E. Expansion Bolts: For brick or concrete or other solid masonry. Will be
6 mm (1/4 inch) diameter bolts, and to extend at least 76 mm (3 inches) into masonry and be fitted with loose tubing or sleeves extending into masonry. Wood plugs, fiber plugs, lead or other soft metal shields are prohibited.
F. Power Set Fasteners: May be used for concrete walls, will be 6 mm (1/4 inch) threaded studs, and will extend at least 32 mm (1 1/4 inches) into wall.
G. Tightly cover and protect fixtures and equipment against dirt, water and chemical or mechanical injury.
H.
I. Aerators are prohibited on lavatories and sinks.
J. If an installation is unsatisfactory to the COR, the Contractor will correct the installation at no cost or additional time to the
Government.
3.2 CLEANING
A. At completion of all work, fixtures, exposed materials and equipment will be thoroughly cleaned.
22 40 00 - 6
3.3 COMMISSIONING
A. Provide commissioning documentation in accordance with the requirements of Section 22 08 00, COMMISSIONING OF PLUMBING SYSTEMS.
B. Components provided under this section of the specification will be tested as part of a larger system.
3.4 DEMONSTRATION AND TRAINING
A. Provide services of manufacturer’s technical representative for four hours to instruct VA Personnel in operation and maintenance of the system.
B. Submit training plans and instructor qualifications in accordance with the requirements of Section 22 08 00, COMMISSIONING OF PLUMBING
SYSTEMS.
- - - E N D - - -
ARCHITECTURAL ABBREVIATIONSARCHITECTURAL LEGEND
GENERAL ARCHITECTURAL NOTES
GENERAL PROJECT NOTES
A
GA4
A301
A201
A401
ROOM
NAME
+ 0'-6"
F.E.C.
AIR CONDITIONING
ACOUSTICAL CEILING TILE
ABOVE FINISH FLOOR
ALUMINUM
BATT INSULATION
BOTTOM OF
CEMENTITIOUS BACKER BOARD
CEMENTITIOUS CRYSTALLINE WATERPROOFING
COLD-FORMED METAL FRAMING
CORNER GUARD
CENTERLINE
CONCRETE MASONRY UNIT
CASED OPENING
COMMUNICATION
CONCRETE
SEALED CONCRETE
CONTINUOUS
CONTRACTING OFFICER'S REPRESENTATIVE
CERAMIC TILE
CERAMIC TILE BASE
CARPET
DIAMETER
EXPANSION JOINT
ELECTRICAL
EPOXY FLOORING
EXPOSED STRUCTURE
ET CETERA
EXISTING
EXPOSED
FACTORY FINISH
FLOOR DRAIN
FIRE EXTINGUISHER CABINET
FIRE HOSE CABINET
FINISHED FLOOR
FINISH
FLOOR
FACE OF
FIELD VERIFY
FABRIC WALLCOVERING
GAGE
GRANITE
GYPSUM (WALL) BOARD
HANDICAPPED
HOLLOW METAL
HANDRAIL
HEATING VENTILATION AND AIR-CONDITIONING
MATERIAL
MAXIMUM
MECHANICAL
MANUFACTURER
MINIMUM
MASONRY OPENING
METAL
NOT IN CONTRACT
NOT TO SCALE
ON CENTER
OPPOSITE HAND
PLASTER
PLASTIC LAMINATE
PORCELAIN TILE
PAIR
PAINT
QUARRY TILE
RESILIENT BASE
REFRIGERATOR
REQUIRED
RESINOUS FLOORING
RESINOUS EPOXY WALL-CEILING
ROUGH OPENING
RUBBER FLOORING
RECESSED PAPER HOLDER
SEALED HIGH BUILD GLAZED COATING
SOLID CORE WOOD
SIMILAR
SPECIAL FACED
STAINLESS STEEL
STEEL
SUBSTRATE
SHEET VINYL
SOLID VINYL TILE
TELEPHONE
TOP OF
TYPICAL
UNLESS NOTED OTHERWISE
VINYL COMPOSITION TILE
VINYL WALL COVERING
WALL COVERING
WALL PROTECTION
WOOD
WELDED SEAM SHEET FLOORING
AC
AT
AFF
AL
BATT
BO
CBB
CCW
CFMF
CG
C
CMU
CO
COMM
CONC
SCONC
CONT
COR
CT
CTB
CP
DIA
EJ
ELEC
EPY
ES
ETC
EXIST
EXP
FAC FIN
FD
FEC
FHC
FF
FIN
FLR
FO
FV
FWC
GA
GRA
GYP BD/GWB
HC
HM
HR
HVAC
MATL
MAX
MECH
MFR
MIN
MO
MTL
NIC
NTS
OC
OH
PLS
PL
PT
PR
P
QT
RB
REF
REQ'D
RES
RES-W
RO
RF
RPH
SC
SCW
SIM
SP
SS
STL
SUBS
SV
SVT
TELE
TO
TYP
UNO
VCT
VWC
WC
WP
WD
WSF
L
FIRE EXTINGUISHER CABINET
ROOM NAME AND NUMBER
DOOR NUMBER
KEY NOTE
WINDOW TYPE
PARTITION TYPE
DETAIL CALLOUT
DETAIL NUMBER
SHEET WHERE DETAIL IS DRAWN
SECTION CALLOUT
VERTICAL ELEVATION
COLUMN CENTERLINE DESIGNATION
DEMOLITION KEY NOTE
DETAIL NUMBER
SHEET WHERE DETAIL IS DRAWN
INTERIOR ELEVATION CALLOUT
DETAIL NUMBER
SHEET WHERE DETAIL IS DRAWN
CARD READERCR
HIGH-PRESSURE LAMINATEHPL
LUXURY VINYL TILELVT
EDGE OF DECKEOD
DOWNSPOUTDS
CONTROL JOINTCJ
DRINKING FOUNTAINDF
FIRE RETARDANT TREATEDFRT
EXTERIOR INSULATION FINISHING SYSTEMEIFS
WATER RESISTANTWR
EQUALEQ
CARPET TILECPT
REFLECTED CEILING PLANRCP
SOLID SURFACE MATERIALSSM
X1045 EQUIPMENT AND ACCESSORY TAG
ALUMINUM COMPOSITE METAL PANELSACMP
A. DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO:
• FACE OF EXISTING WALL SURFACE
• FACE OF MASONRY
• FACE OF WALL STUDS
• TOP OF SLAB
• TOP OF MASONRY
• ALIGN WALLS WITH EXISTING WHERE NOT OTHERWISE INDICATED.
B. COORDINATE WITH ALL DISCIPLINES DRAWINGS FOR ADDITIONAL REQUIREMENTS.
COORDINATE OPENINGS IN SLABS, ROOF, AND WALLS. WHERE NEW HOLES IN EXISTING
WALLS AND SLABS ARE CREATED FOR PENETRATIONS, COORDINATE SIZE AND LOCATION.
PATCH HOLES CAUSED BY THE REMOVAL OF EQUIPMENT, PIPING, CONDUIT, DUCT,
GRILLES, ETC. WITH MATERIALS MATCHING EXISTING SLAB OR WALL IN STRUCTURE,
MATERIAL, THICKNESS, ALIGNMENT, GRADES, AND QUALITY.
C. COORDINATE AND PROVIDE GALVANIZED METAL BACKER PLATE OR SOLID FIRE
RETARDANT TREATED WOOD BLOCKING FOR WALL-MOUNTED ITEMS. COORDINATE
LOCATIONS WITH COR FOR GOVERNMENT PROVIDED/CONTRACTOR INSTALLED
EQUIPMENT.
D. `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE, HANDLING,
INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEM INDICATED.
E. SEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, SMOKE RATED PARTITIONS AND
FIRE-RATED PARTITIONS WITH THE APPROPRIATE FIRESTOP TO MAINTAIN THE RATING OF
THE WALL OR SLAB. SUBMIT CUT SHEETS AND SPECIFICATIONS TO THE COR FOR
APPROVAL PRIOR TO INSTALLATION. PROVIDE UL LISTED ASSEMBLIES.
F. SKIM COAT ALL DAMAGED EXISTING WALL SURFACES THAT REQUIRE PAINTING.
G. REMOVED MATERIALS WHICH ARE INDICATED TO BE TURNED OVER TO THE COR SHALL BE
DELIVERED BY THE CONTRACTOR TO A PLACE INDICATED BY THE COR .
H. REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS AND AS
REQUIRED FOR NEW CONSTRUCTION. EDGES AND FACES OF REMOVED AREAS SHALL BE
REPAIRED TO ACCEPT NEAT INSTALLATION OF NEW CONSTRUCTION OR FINISHES. WHERE
EXISTING MATERIALS ARE TO BE REPLACED (WALLS, INSULATION, FLOORING, ETC.)
EXISTING MATERIALS, ADHESIVES, ETC. SHALL BE REMOVED AND EXPOSED SURFACES
SHALL BE PREPARED AS INDICATED OR SPECIFIED PRIOR TO INSTALLATION OF
MATERIALS.
I. PREVENT DAMAGE TO MATERIALS AND FINISHES TO REMAIN. REPAIR DAMAGES FROM
CONSTRUCTION ACTIVITIES TO EXISTING ITEMS TO REMAIN, AT NO ADDITIONAL COST
WHERE SUCH EXPOSED MATERIALS OR FINISHES TO REMAIN ARE DAMAGED.
J. SEAL ALL PLATES, COVERS, DEVICES; AND GENERAL FLOOR, WALL AND CEILING
PENETRATIONS IN ALL SPACES, TYPICAL.
A. THE CONTRACTOR SHALL BE PREPARED TO STOP ANY WORK AND CLEAN UP THE WORK AREA
AS DIRECTED IN MEDICAL SITUATIONS REQUIRING SUCH ACTION.
B. THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS OR EQUIPMENT UNTIL
SUBMITTALS FOR SUCH HAVE BEEN APPROVED.
C. ALL TOOLS AND MATERIALS USED IN THIS PROJECT SHALL BE PROPERLY SECURED AT ALL
TIMES BY THE CONTRACTOR TO REDUCE THE POSSIBILITY OF ANY OF THESE TOOLS BEING A
HAZARD TO PATIENTS, VISITORS AND STAFF.
D. THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH MEMBER OF
HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIRED TO RECEIVE BADGES. COORDINATE
WITH COR.
E. THE CONTRACTOR, AT HIS EXPENSE, WILL BE RESPONSIBLE FOR TRAINING EACH MEMBER OF
HIS WORK FORCE ON VA POLICIES FOR ON-SITE WORK BEFORE ANY MEMBER WILL BE
ALLOWED TO PERFORM WORK ON VA PREMISES.
F. ABSOLUTELY NO VA TOOLS, MATERIALS OR EQUIPMENT WILL BE LOANED OR GIVEN BY THE VA
TO ANY MEMBER OF THE CONTRACTOR'S WORK FORCE AT ANY TIME.
G. ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TO CONSTRUCTION SMOKE,
DUST AND DEBRIS SHALL BE SUITABLY PROTECTED TO PREVENT ACCIDENTAL ALARM DURING
CONSTRUCTION. ALL SUCH ACTION MUST BE FIRST COORDINATED AN CLEARED WITH THE COR
AND THE VA SAFETY OFFICER. ALL FUNCTIONAL FIRE ALARM DEVICES SHALL BE ACTIVE
WHENEVER THE CONTRACTOR'S FORCES ARE NOT PRESENT IN THE WORK AREA.
H. THE CONTRACTOR MUST PROVIDE WRITTEN FIRE SAFETY CHECKLIST AT THE END OF EVERY
WORK DAY TO THE COR CERTIFYING THAT ALL WORK AREAS HAVE BEEN SURVEYED AND
FOUND TO BE SECURE, SAFE AND FREE OF ANY FLAMMABLE LIQUIDS.
I. CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTING OFFICER.
J. SEE SPECIFICATIONS SECTIONS 01 00 00 AND 01 35 26 FOR INTERIM LIFE SAFETY MEASURES.
K. ALL FINISH COLORS TO BE SELECTED BY COR/ VA INTERIOR DESIGNER WHERE NOT
OTHERWISE INDICATED. CONTRACTOR SHALL SUBMIT COLORS FROM THE MANUFACTURER'S
FULL RANGE OF COLORS.
L. PROVIDE 24"X24" ACCESS PANELS IN HARD CEILINGS WHERE DUCTS AND DAMPERS OR OTHER
PIPES REQUIRE ACCESS AS REQUIRED. COORDINATE EXACT LOCATIONS WITH THE COR.
M. THE CONTRACTOR SHALL NOT OPERATE ANY EXISTING VA EQUIPMENT WITHOUT
AUTHORIZATION FROM VAMC ENGINEERING SERVICE UNLESS AN EMERGENCY SITUATION
OCCURS.
N. CONTRACTOR SHALL MAINTAIN ALL FIRE-RATED ASSEMBLIES WITHIN THE PROJECT AREA
DURING PERFORMANCE OF THE WORK.
O. CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL REQUIRED EXIT LIGHTING AND SIGNAGE
REQUIRED FOR EGRESS WITHIN AND ADJACENT TO THE PROJECT AREA DURING
PERFORMANCE OF THE WORK.
P. INDICATED EXISTING CONDITIONS ARE BASED UPON LIMITED FIELD INVESTIGATION AND DID
NOT INCLUDE DESTRUCTIVE INVESTIGATION OR TESTING. CONTRACTOR SHALL VERIFY ALL
EXISTING CONDITIONS INCLUDING DIMENSIONS OF THE INSTALLED CONSTRUCTION PRIOR TO
COMMENCING WITH THE WORK. IF DISCREPANCIES ARE DISCOVERED, THE CONTRACTOR
SHALL NOTIFY THE COR FOR INTERPRETATION AND DIRECTION PRIOR TO PROCEEDING WITH
THE WORK.
Q. COORDINATE WORK WITH EQUIPMENT SUPPLIER/ INSTALLER CONTRACTED SEPARATELY WITH
THE GOVERNMENT.
CODE SUMMARY
1. VA DESIGN GUIDES – TECHNICAL INFORMATION LIBRARY
2. PG 18-3 VA DESIGN AND CONSTRUCTION PROCEDURES, TOPIC 1
3. 2018 NPFA 1 FIRE CODE
4. 2018 NFPA 10 STANDARD FOR PORTABLE FIRE EXTINGUISHERS
5. 2018 NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
6. 2018 NFPA 70 NATIONAL ELECTRIC CODE (NEC)
7. 2018 NFPA 72 NATIONAL FIRE ALARM SIGNALING CODE
8. 2018 NFPA 90A INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS
9. 2018 NFPA 90B INSTALLATION OF WARM AIR HEATING AND AIR-CONDITIONING SYSTEMS
10. 2018 NFPA 101 LIFE SAFETY CODE (LSC)
11. 2018 NFPA 220 STANDARD ON TYPES OF BUILDING CONSTRUCTION
12. 2018 INTERNATIONAL BUILDING CODE (IBC)
13. 2018 INTERNATIONAL PLUMBING CODE (IPC)
14. 2018 INTERNATIONAL MECHANICAL CODE (IMC) AND ASHRAE 90.1
15. 2015 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
16. ARCHITECTURAL BARRIES ACT ACCESSIBILITY STANDARDS (ABAAS)
17. VA BARRIER FREE DESIGN GUIDE (PG-18-13)
18. RESOURCE CONSERVATION AND RECOVERY ACT (RCRA) (42 U.S.C.6901, ET SEQ)
19. THE NATIONAL ENERGY CONSERVATION POLICY ACT
20. EXECUTIVE ORDER 131468 PF APRIL 21, 2000, GREENING THE GOVERNMENT THROUGH
LEADERSHIP IN ENVIRONMENTAL MANAGEMENT.
21. EXECUTIVE ORDER 13101 OF SEPTEMBER 14, 1998, GREENING THE GOVERNMENT THROUGH
WASTE PREVENTION, RECYCLING, AND FEDERAL ACQUISITION; AND EXECUTIVE ORDER 13123
OF JUNE 1999, GREENING THE GOVERNMENT THROUGH EFFICIENT ENERGY MANAGEMENT.
SIGNAGE TYPE1
ACCESSIBILITY REQUIREMENTS
FRONT APPROACHES
HINGE-SIDE APPROACHES
LATCH-SIDE APPROACHES
USE EITHER
OPTION 1 OR
OPTION 2
ALL DOOR ASSEMBLIES SHALL BE CONSTRUCTED TO MEET THE
INDICATED MINIMUM CLEARANCES AS APPLICABLE.
1'-0" IF DOOR HAS BOTH
A CLOSER AND A
LATCH
5' -0
1'-6"
3' -6
4'-6"
4' -0
O P
TI
O
N
5' -0
OPTION 1
3'-0"
O P
TI
O
N
4' -6
OPTION 2
3'-6"
2'-0"
4' -0
2'-0"
3' -6
4' -0
4' -6
W / C
LO
S
E R
4' -0
W / C
LO
S
E R
W /C
LO
S
E R
A N
D L
A
TC
H
ALL WORK SHALL COMPLY WITH FEDERAL ABA,
LOCAL, AND STATE ACCESSIBILITY CODES AND
REQUIREMENTS.
DOOR LOCATIONS
TYPICAL DETAILS
TYP DOOR LOCATION
SEE DOOR SCHEDULE
4"
TYP
TYPICAL SIGNAGE MOUNTING HEIGHTS
A A
5' -0
4' -9
EQ EQ
MOUNTING HEIGHTS
PROVIDE BLOCKING AT ALL WALL MOUNTED EQUIPMENT AND ACCESSORIES
3' -4
3' -8
CL
CL
FEC GARMENT
HOOK
TYPICAL SCRUB SINK
PAPER
TOWEL
DISPENSER
3' -5
3' -6
SOAP
DISPENSER
3' -6
APRON/GLOVE
RACK
2' -1
0"
TOILET
ROOM SHELF
ELECTRIC
HAND DRYER
3' -7
3' -6
PASS-THROUGH
CABINET
2' -1
0"
1'-6"
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS STREET NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
JH SJ/KB
540-18-020
03-13-2026REVISIONS:
A
B
C
D
E
F
RENOVATE PHARMACY FOR USP 800
COMPLIANCE
CLARKSBURG, WEST VIRGINIA
ADDENDUM NO.1 04-20-2026
GENERAL NOTES, DETAILS, ABBREVIATIONS
AND LEGENDS
GI002
sjeffries Snapshot
AF AE AD
A8
17 18 19
F
IV BUFFER
B215H
MECH
B248
AHU
HAZ STOR
B215D CHEMO BUFFER
B215E
ANTE ROOM
B215F
LAMINAR
WORKSTATION
4' -0
BREAK DOWN
B215C
REF
TABLETABLE
2'-11 7/8"
1' -6
6"
2' -0
BSC
BSC
BSC
LAMINAR
WORKSTATION
AE451 AE451
AE451
AE451
AE451
GK4
GF4
GL4
GK0
GK4
GF4
GK0
GK4
GL4
B248
B215H
B215E
B215F
B215DB215C
CORRIDOR
B215G
6"
GM4
1'-6"
GK0
GK4
GK4
AE451
1'-0"
'-6
/1
6"
26'-11 3/8"
11'-0" 11'-3"
ALIGN
ALIGN
8' -0
3 3
1'-6" 6"
ALIGN
AE501
AE501
GK0
GL4 GC4
GL4
GL4
GK0 GL4
GK4
GK0
1 1
3'-0"
NU-543-600NU-543-400
K1910
M0001
K1910
M2050 M2050
M2050 M2050
NU-543-400
M2050
F2000 A5108
K1910
M0001
A5100
F2010
K1910
NU-543-600-1NU-543-600-1
M2050
M2050
M2050
A5108
R6060
F2020
A5145
A5145
19'-2 7/16"
6'-7 13/16"
A5145
A5145
GM4
6"
AE501
17.
18.
CE
17.5
VESTIBULE
C-SCA
645B
TLT
645A
TLT
PIPE CHASE
601A
645B645
645A
AE451
AE451
6"
F2010
A5100
1 1
NU-543-400-1
M2050
EQ EQ
A5145A5145
EQUIPMENT SCHEDULE GENERAL NOTES:
A. REFER TO INTERIOR ELEVATIONS FOR ADDITONAL INFORMATION.
B. REFER TO DRAWING GI002 FOR MOUNTING HEIGHTS.
C. SEE OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.
FLOOR PLAN KEY NOTES: #
NEW LAMINAR FLOW BIOSAFETY CABINET, 6'-0".
BASIS OF DESIGN: LABGARD® ES ENERGY SAVER CLASS II, TYPE A2
LAMINAR FLOW BIOSAFETY CABINET, MODEL # NU-543-600 NOMINAL 6
FOOT.
BIOSAFETY CABINET EXHAUST FLOW CANOPIES, 4'-0".
BASIS OF DESIGN: NUAIRE NU-543 SERIES CLASS II, TYPE A2, BIOSAFETY
CABINET WITH EXHAUST FLOW CANOPY, NUAIRE BSC MODEL: NU-543-400.
LOCATE AND REINSTALL EXISTING STORED BIO SAFETY CABINET.
BIOSAFETY CABINET EXHAUST FLOW CANOPIES, 6'-0".
BASIS OF DESIGN: NUAIRE NU-543 SERIES CLASS II, TYPE A2, BIOSAFETY
CABINET WITH EXHAUST FLOW CANOPY, NUAIRE BSC MODEL: NU-543-600.
LOCATE AND REINSTALL EXISTING STORED GX PROFESSIONAL, MEDICAL-
GRADE LABRATORY REFRIGERATOR - UPRIGHT. MODEL#: HLR125-GX
HORIZON SERIES.
PROVIDE 5/8" GYPSUM BOARD ON THIS SIDE OF THE PARTITION AS
INDICATED.
NOT TO SCALE
BASIS OF DESIGN: INPRO "140 PHOENIX III 9"H x 9"W
PROVIDE (9) TYPE 1 SIGN.
.060" ROOM NUMBER PANEL FIRST SURFACE PAINTED
WITH RAISED NUMBERS AND BRAILLE 3/16" ACRYLIC
BACKER (CLEAR)
MAGNET TAPE BACKING FOR MOUNTING.
SIMPLY PREMIER FRAME BEVELED EDGE
STANDARD DEPTH METAL INSIDE.
.060" GLOSSY PETG FACE
FIRST SURFACE PAINTED WITH VINYL MASKED
WINDOW
.118" CLEAR PETG WINDOW SPACER
.060" WINDOW BACK
BACK PAINTED WITH MAGNET TAPE FOR MOUNTING
XXXX
9" I
N S
ID
E
F R
A M
E D
IM
E
N S
IO
N
9" INSIDE FRAME DIMENSION
NAME
NOT TO SCALE
BASIS OF DESIGN: CREATIVE SIGNAGE SYSTEMS.
PROVIDE (1) TYPE 2 SIGN.
ADA TACTILE LETTERS AND
GRADE II BRAILLE
BLACK (GEMINI DUETS)
ACRYLIC FOR EXTERIOR
APPILCATION
OFF WHITE BACKGROUND
BLACK GRAPHICS
9"
9"
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS STREET NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
JH SJ/KB
540-18-020
03-13-2026REVISIONS:
A
B
C
D
E
F
RENOVATE PHARMACY FOR USP 800
COMPLIANCE
CLARKSBURG, WEST VIRGINIA
ADDENDUM NO.1 04-20-2026
ENLARGED FLOOR PLANS, EQUIPMENT AND
SIGNAGE SCHEDULE
AE401
1/4" = 1'-0"AE401
1 ENLARGED PARTIAL BASEMENT EQUIPMENT PLAN
1/4" = 1'-0"AE401
2 PARTIAL SIXTH FLOOR EQUIPMENT PLAN
0' 2' 4' 8' 12'
SCALE: 1/4" = 1' - 0"
EQUIPMENT SCHEDULE AND ACCESSORY SCHEDULE
JSN DESCRIPTION PROVIDED BY INSTALLED BY
A5100 A SHOE COVER DISPENSER DESIGNED FOR LOW TO MODERATE USAGE AND HOLDS 55 PAIRS OF SHOE COVERS. GOVERNMENT GOVERNMENT
A5108 SHARPS WASTE DISPOSAL UNIT GOVERNMENT GOVERNMENT
A5145 A SURFACE MOUNTED, SATIN FINISH STAINLESS STEEL, DOUBLE GARMENT HOOK. EQUIPPED WITH A CONCEALED MOUNTING BRACKET THAT IS SECURED TO A CONCEALED WALL PLATE. FOR GENERAL PURPOSE USE THROUGHOUT THE FACILITY TO HANG VARIOUS ITEMS OF APPAREL.
GOVERNMENT CONTRACTOR
F2000 ROUND WASTEPAPER BASKET. GOVERNMENT GOVERNMENT
F2010 STEP-ON WASTEPAPER BASKET WITH INNER LINER AND FOOT PETAL ACTIVATED FLIP TOP. GOVERNMENT GOVERNMENT
F2020 FORTY-FOUR (44) GALLON TRASH CAN, 32" HIGH X 24" DIAMETER, WITH LID. GOVERNMENT GOVERNMENT
K1910 36” HEIGHT X 120” LENGH X 30” DEPTH HEAVY-DUTY STAINLESS STEEL WORKTABLE WITH ALL EDGES ROLLED DOWN AT 90 DEGREES. THE EDGES ARE 2" HIGH AND HAVE ROUNDED CORNERS. THE TABLE HAS STAINLESS STEEL LEGS AND A STAINLESS STEEL UNDER-SHELF.
GOVERNMENT GOVERNMENT
M0001 24" X 24" STAINLESS STEEL PASS THROUGH CABINET. BASIS OF DESIGN: ATMOS-TECH INDUSTRIES, MODEL NUMBER PT2424-24/SS/EI/RHC. CONTRACTOR CONTRACTOR
M2050 75” HEIGHT X 36” HEIGHT X 14” DEPTH STORAGE SHELVING UNIT. UNIT SHALL BE CORROSION RESISTANT STAINLESS STEEL, GALVANIZED STEEL OR BAKED ENAMEL ON
STEEL CONTAINIG 5 ADJUSTABLE SHELVES WITH 400 POUND LOAD CAPACITY.
GOVERNMENT GOVERNMENT
R6060 EXISTING GX PROFESSIONAL, MEDICAL-GRADE LABRATORY REFRIGERATOR - UPRIGHT. MODEL#: HLR125-GX HORIZON SERIES. GOVERNMENT CONTRACTOR
BIOSAFETY CABINET EQUIPMENT SCHEDULE
MODEL NO. DESCRIPTION PROVIDED BY: INSTALLED BY:
NU-543-400 BIOSAFETY CABINET EXHAUST FLOW CANOPIES, 4'-0". BASIS OF DESIGN: NUAIRE NU-543 SERIES CLASS II, TYPE A2, BIOSAFETY CABINET WITH EXHAUST FLOW CANOPY, NUAIRE BSC MODEL: NU-543-400
GOVERNMENT GOVERNMENT
NU-543-400-1 EXISTING BIOSAFETY CABINET TO BE REINSTALL GOVERNMENT GOVERNMENT
NU-543-600 BIOSAFETY CABINET EXHAUST FLOW CANOPIES, 6'-0". BASIS OF DESIGN: NUAIRE NU-543 SERIES CLASS II, TYPE A2, BIOSAFETY CABINET WITH EXHAUST FLOW CANOPY, NUAIRE BSC MODEL: NU-543-600
GOVERNMENT GOVERNMENT
NU-543-600-1 LAMINAR FLOW BIOSAFETY CABINET, 6'-0". BASIS OF DESIGN: LABGARD® ES ENERGY SAVER CLASS II, TYPE A2, LAMINAR FLOW BIOSAFETY CABINET, MODEL#: NU-543-600 NOMINAL 6 FOOT
GOVERNMENT GOVERNMENT
BIOSAFETY CABINET EQUIPMENT SCHEDULE GENERAL NOTES:
A. REFER TO INTERIOR ELEVATIONS FOR ADDITONAL INFORMATION.
B. SEE OTHER DISCIPLINES FOR ADDITIONAL INFORMATION AND UTILITY CONNECTIONS.
SIGNAGE SCHEDULE
SIGN TYPE ROOM NO. ROOM NAME CONTENT REMARK
1 B248 MECH MECHANICAL ROOM WALL MOUNTED
1 B215H IV BUFFER IV BUFFER WALL MOUNTED
1 B215G CORRIDOR -- WALL MOUNTED
1 B215F ANTE ROOM ANTE ROOM WALL MOUNTED
1 B215E CHEMO BUFFER CHEMO BUFFER WALL MOUNTED
1 B215D HAZ STOR HAZARD STORAGE WALL MOUNTED
1 B215C BREAK DOWN BREAK DOWN WALL MOUNTED
1 645B C-SCA C-CSA WALL MOUNTED
2 645A TLT RESTROOM DOOR MOUNTED
1 645 VESTIBULE -- WALL MOUNTED
GENERAL SIGNAGE NOTES:
A. PROVIDE AND INSTALL SIGNAGE IN ACCORDANCE WITH VA FACILITY GUIDELINES, STANDARDS AND REQUIREMENTS. SIGNAGE TYPE, CONTENT, LOCATION AND QUANTITY TO BE COORDINATED WITH VENDOR, VA STAFF, AND COR FOR ACCEPTANCE AND APPROVAL. SUBMIT A SHOP DRAWING WITH COORDINATION RESULTS
FOR REVIEW.
B. SEE DRAWING GI002 FOR SIGNAGE MOUNTING HEIGHTS.
C. REFER TO 1/AE401 FOR SIGNAGE LOCATIONS.
AE401
3 SIGN TYPE 1
AE401
4 SIGN TYPE 2
A5108
NU-543-600-1 NU-543-600-1
M2050
F2020
M0001
F2020
A5100
M0001
A5145
F2010
M2050
M0001
K1910
K1910
M0001
F2000
A5108
K1910
NU-543-400 NU-543-600
M2050 R6060
K1910
M0001
NU-543-400
F2010
A5100
M2050
NU-543-400-1
M2050
K1910 K1910
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS STREET NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
JH SJ/KB
540-18-020
06-20-2025REVISIONS:
A
B
C
D
E
F
RENOVATE PHARMACY FOR USP 800
COMPLIANCE
CLARKSBURG, WEST VIRGINIA
ADDENDUM NO. 1 04-20-2026
INTERIOR ELEVATIONS
AE451
3/8" = 1'-0"AE451
1 IV BUFFER RM B215H - SOUTH
3/8" = 1'-0"AE451
2 IV BUFFER RM B215H - WEST
3/8" = 1'-0"AE451
3 IV BUFFER B215H - NORTH
3/8" = 1'-0"AE451
4 ANTE ROOM B215F - SOUTH
3/8" = 1'-0"AE451
5 ANTE ROOM B215F - NORTH
3/8" = 1'-0"AE451
7 CHEMO BUFFER RM. B215E - SOUTH
3/8" = 1'-0"AE451
8 CHEMO BUFFER RM. B215E - WEST
3/8" = 1'-0"AE451
9 CHEMO BUFFER RM. B215E - NORTH
3/8" = 1'-0"AE451
10 HAZARD STORAGE RM. B215D - SOUTH
3/8" = 1'-0"AE451
11 HAZARD STORAGE RM. B215D - EAST
3/8" = 1'-0"AE451
13 BREAK DOWN RM. B215C - SOUTH
3/8" = 1'-0"AE451
14 VESTIBULE RM. 645 - NORTH
3/8" = 1'-0"AE451
15 C-SCA RM. 645B - EAST
3/8" = 1'-0"AE451
16 C-SCA RM. 645B - NORTH
SCALE:
8'2'0' 4' 6'
3/8" = 1' - 0"
1'
3/8" = 1'-0"AE451
12 HAZARD STORAGE RM.B215D - NORTH
3/8" = 1'-0"AE451
6 CORRIDOR ROOM B215G - SOUTH
J
F
OPENING
5'-0"
STEEL TUBE -
SEE STRUCTURAL
EXISTING CONCRETE WALL
5/8" GYPSUM BOARD
7/8" FURRING CHANNEL
4" METAL STUD
EXISTING COLUMN
AE501
HM DOOR AND FRAME
(SEE SCHEDULE)
F
OPENING
3'-5"
AE501
2'-7 1/2"
1' -1
3/
4"
2' -0
4" METAL STUD
STEEL TUBE -
SEE STRUCTURAL
EXISTING CONCRETE WALL
7/8" FURRING CHANNEL
PASS-THROUGH
CABINET
5/8" GYPSUM BOARD
BASEMENT FLOOR
15'-6 7/8"
FIRST FLOOR
27'-1 1/4"
F
3' -7
EXISTING CONCRETE WALL
PASS-THROUGH
CABINET
4" METAL STUD
5/8" GYPSUM BOARD
GWB CEILING
DUCTWORK -
SEE MECHANICAL
3' -0
O
P E
N
IN
G 7'
-4 " F
.V
STEEL TUBE -
SEE STRUCTURAL
STEEL TUBE -
SEE STRUCTURAL
7/8" FURRING CHANNEL
SEE SCHEDULE
CEILING
2' -0
1'
-6
3" M
IN
BASEMENT FLOOR
15'-6 7/8"
FIRST FLOOR
27'-1 1/4"
F
O P
E N
IN
G
7' -8
GWB CEILING
7/8" FURRING CHANNEL
5/8" GYPSUM BOARD
STEEL TUBE - SEE STRUCTURAL
EXISTING CONCRETE WALL
HM DOOR AND FRAME
(SEE SCHEDULE)
4" METAL STUD
SEE SCHEDULE
CEILING
AE501
PASS-THROUGH CABINET
4" METAL STUD
5/8" GYPSUM BOARD
BASEMENT FLOOR
15'-6 7/8"
FIRST FLOOR
27'-1 1/4"
3' -6
2' -0
3' -7
1' -6
5/8" GYPSUM BOARD
PASS-THROUGH
CABINET
DUCTWORK -
SEE MECHANICAL
4" METAL STUD
GWB CEILING
SEE SCHEDULE
CEILING
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS STREET NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
JH SJ/KB
540-18-020
06-20-2025REVISIONS:
A
B
C
D
E
F
RENOVATE PHARMACY FOR USP 800
COMPLIANCE
CLARKSBURG, WEST VIRGINIA
ADDENDUM NO. 1 04-20-2026
MISCELLANEOUS DETAILS
AE501
1 1/2" = 1'-0"AE501
2 DOOR OPENING - PLAN DETAIL
1 1/2" = 1'-0"AE501
1 PASS-THROUGH CABINET OPENING - PLAN DETAIL
3/4" = 1'-0"AE501
3 PASS-THROUGH CABINET OPENING - WALL SECTION
3/4" = 1'-0"AE501
4 DOOR OPENING - WALL SECTION
1 1/2" = 1'-0"AE501
5 PASS-THROUGH CABINET OPENING - PLAN DETAIL 2
3/4" = 1'-0"AE501
6 PASS-THROUGH CABINET OPENING - WALL SECTION 2
VA FORM 08-6231 1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS STREET NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
BS DK
540-18-020
06-20-2025REVISIONS:
A
B
C
D
E
F
RENOVATE PHARMACY FOR USP 800
COMPLIANCE
CLARKSBURG, WEST VIRGINIA
ADDENDUM NO. 1 04-20-2026
PLUMBING ABBREVIATIONS, LEGENDS,
SCHEDULES & NOTES
P-001
PLUMBING ABBREVIATIONS
3-WAY CONTROL VALVE
ANGLE GATE VALVE
ANGLE GLOBE VALVE
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
CONTROL VALVE
GATE VALVE
GLOBE VALVE
SAFETY RELIEF VALVE
TWO POSITION CONTROL VALVE
BACKFLOW PREVENTER
ECCENTRIC REDUCER
CONCENTRIC REDUCER
FLOW ARROW
HOSE BIBB / SILLCOCK
PLUG VALVE
PLUMBING 2D SYMBOLS
PRESSURE REDUCING VALVE (WATER)
PRESSURE REGULATOR (GAS)
PIPE ANCHOR
PIPE GUIDES
WALL CLEANOUT
SUSPENDED CLEANOUT
WCO
WYE STRAINER
WYE STRAINER W/DRAIN VALVE
FLOOR DRAIN - ROUND OR SQUARE
FLOOR CLEANOUT - ROUND OR SQUARE
PIPE CAP
PIPE TURNING DOWN
PIPE TURNING UP
TEE UP
TEE DOWN
DROP AND RUN
DROP AND TURN
TEE OFF TOP
TEE OFF BOTTOM
CROSS AND RISER
PLAN 90° ELBOW
PIPE TEE
PIPE UNION
FLEXIBLE PIPE CONNECTOR
WATER METER
PUMP
AUTOMATIC AIR VENT
PRESSURE SWITCH
PRESSURE GAUGE
THERMOMETER
FLOW SWITCH
TEMPERATURE SWITCH
OR
OR
CO
PIPE SLOPE ARROW MEDICAL
PLUMBING PIPING SYSTEMS
ANNOTATION SYMBOLS
(E)EXISTING
NEW KEYNOTE
DEMO KEYNOTE
NEW BOLD TEXT INDICATES NEW ITEM
TEXT INDICATES EXISTING ITEM
EQUIPMENT OR FIXTURE DESIGNATION
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
POINT OF CONNECT TO EXISTING
X-X
PLUMBING GENERAL NOTES
PLUMBING DEMOLITION GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE
PROCEEDING WITH WORK.
REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY GOVERNMENT OR REINSTALLED AS PART OF
THIS WORK.
DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.
VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND
ADJUST MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO COORDINATE WITH NEW WORK.
AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.
COORDINATE DEMOLITION WITH COR. SUBMIT SHUDTOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND
APPROVAL.
PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES
DAMAGED AT NO ADDITIONAL COST.
TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.
SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW
PLUMBING AND WORK OF OTHER TRADES.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA
STANDARDS.
INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.
PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE
GRADE FOR THE PURPOSES INTENDED.
EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY
AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.
INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR
EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.
AT EACH PLUMBING FIXTURE, PROVIDE A PISTON TYPE WATER HAMMER ARRESTOR SIZED ACCORDING TO
MANUFACTURER'S RECOMMENDATIONS.
SANITARY DRAINAGE PIPING INDICATED IS LOCATED BELOW FLOOR SLAB OR WITHIN WALLS UNLESS NOTED OTHERWISE. SANITARY VENT PIPING INDICATED IS ABOVE THE CEILING OR WITHIN WALLS UNLESS NOTED
OTHERWISE.
SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL CODES ALONG WITH
SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.
FIRESTOP AND SEAL PIPING PENETRATIONS THROUGH WALLS AND FLOORS EQUAL TO THE RATING OF
WALLS AND FLOORS.
TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND
APPLICABLE VA STANDARDS.
COORDINATE PLUMBING PIPING WITH WORK OF OTHER DISCIPLINES.
DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND NATIONAL
CODES AND APPLICABLE VA STANDARDS.
PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.
COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING
OF PIPING WITH EXISTING CONDITIONS.
PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE AND COORDINATED WORKING PLUMBING SYSTEM. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND
ARRANGEMENT OF PIPING SYSTEMS.
CONTRACTOR SHALL COORDINATE ANY PLUMBING SYSTEM REQUIRED SHUTDOWN WITH THE OWNER 1
WEEK IN ADVANCE.
PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS
CONTRACT, UNLESS NOTED OTHERWISE.
SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF
PROJECT.
INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.
A/E ARCHITECT/ENGINEER
AC ABOVE CEILING
AD AREA DRAIN
AFF ABOVE FINISHED FLOOR
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
AFG ABOVE FINISHED GRADE
ASD ADJUSTABLE SPEED DRIVE
ASHRAE AMERICAN SOCIETY HEATING,
REGRIGERATING, AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY PLUMBING
ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
BAS BUILDING AUTOMATION SYSTEM
BF BELOW FLOOR
BFP BACKFLOW PREVENTER
BG BELOW GRADE
BH BOOSTER HEATER
BHP BREAK HORSEPOWER
BJ BETWEEN JOISTS
BOP BOTTOM OF PIPE
BSP BLACK STEEL PIPE
BT BATHTUB
BTUH BRITISH THERMAL UNITS PER HOUR
C CELSIUS
CF COMBINATION FIXTURE
CGA COMPRESSED GAS ASSOCIATION
CI CAST IRON
CO CLEANOUT
COND CONDENSATE
CP CONDENSATE PUMP
CS CLINICAL SINK
CV CONTROL VALVE
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DF DRINKING FOUNTAIN
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
EC ELECTRICAL CONTRACTOR
EL ELEVATION
EMCS ENERGY MONOSERRAT AND CENTRAL
SYSTEM
EPA ENVIRONMENTAL PROTECTION
AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWS EYEWASH STATION
EX EXISTING
F FAHRENHEIT
FA FROM ABOVE
FB FROM BELOW
FBO FURNISHED BY OTHERS
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE)
CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FU FIXTURE UNITS
G GALLON
GC GENERAL CONTRACTOR
GCO GRADE CLEANOUTS
GD GARBAGE DISPOSAL
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
H&CW HOT AND COLD WATER
HB HOSE BIBB (INTERIOR)
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK
(DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
ICW INDUSTRIAL COLD WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
KW KILOWATT
KWHR KILOWATT-HOUR
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH THOUSANDS OF BTU PER HOUR
MC MECHANICAL CONTRACTOR
MED MEDICAL
MER MECHANICAL EQUIPMENT ROOM
MH MANHOLE
MOU MEMORANDUM OF UNDERSTANDING
MSB MOP SINK BASIN
MV MEDICAL VACUUM
N2 NITROGEN
N2O NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW
PA PACAL
PC PLUMBING CONTRACTOR
PD PRESSURE DROP
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAUGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH
ATMOSPHERE
PSIG POUNDS PER SQUARE INCH GAUGE
PTRV PRESSURE TEMPERATURE RELIEF
VALVE
PW POTABLE WATER
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RO REVERSE OSMOSIS
RWL RAIN WATER LEADER
SAN SANITARY SEWER
SCFM STANDARD CUBIC FOOT/MIN
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT SQUARE FOOT
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
TCV TEMPERATURE CONTROL VALVE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TDL TEMPERATURE DIFFERENTIAL
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
UPC UNIFORM PLUMBING CODE
V SANITARY VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAUGE
WH WATER HEATER
WHA WATER HAMMER ARRESTOR
WHD WALL HYDRANT
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
YCO YARD CLEANOUT
YH YARD HYDRANT
AV
M
F
P
T
CO2
DA
DV
LA
LO
LV
MA
MO
MV
N
RO
WAGD
CARBON DIOXIDE
DENTAL AIR
DENTAL VACUUM
LABORATORY AIR
LABORATORY OXYGEN
LABORATORY VACUUM
MEDICAL AIR
MEDICAL OXYGEN
MEDICAL VACUUM
NITROGEN
REVERSE OSMOSIS
WASTE ANESTHETIC GAS DISPOSAL
CA
CW
FD
FOS
FOR
GW
HW
HWR
NG
P
SAN
ST
SV
COLD WATER
COLD WATER RETURN
FLOOR DRAIN
FUEL OIL SUPPLY
FUEL OIL RETURN
GREASE WASTE
HOT WATER
HOT WATER RETURN
NATURAL GAS
PROPANE
SANITARY
STORM
SANITARY VENT
DOMESTIC
FITXURES
PLUMBING FIXTURE TYPES
DF
EWC
LAV
WC
SK
SH
DRINKING FOUNTAIN
ELECTRIC WATER COOLER
LAVATORY
WATER CLOSET
SINK
SHOWER
DRAINS
PLUMBING DRAIN TYPES
FD
FS
HD
TD
RD
RR
FLOOR DRAIN
FLOOR SINK
HUB DRAIN
TRENCH DRAIN
ROOF DRAIN
ROOF RECEPTOR
MEDICAL
PLUMBING EQUIPMENT
LAC
LAST
LVU
MAC
MAST
MZVC
MVU
LABORATORY AIR COMPRESSOR
LABORATORYAIR STORAGE TANK
LABORATORY VACUUM UNIT
MEDICAL AIR COMPRESSOR
MEDICAL AIR STORAGE TANK
MEDICAL ZONE VALVE CABINET
MEDICAL VACUUM UNIT
DOMESTIC
CP
DWBP
ET
GD
HWST
RWC
WH
WM
CIRCULATOR PUMP
DOMESTIC WATER BOOSTER PUMP
EXPANSION TANK
GARBAGE DISPOSAL
HOT WATER STORAGE TANK
REMOTE WATER CHILLER
WATER HEATER
WATER METER
VALVES
PLUMBING VALVES
AAV
BALV
BFP
BFV
BPV
BV
BWV
CV
GV
MBV
MGV
NRS
OSY
PV
PRV
AIR ADMITTANCE VALVE
BALANCING VALVE
BACKFLOW PREVENTOR
BUTTERFLY VALVE
BACK PRESSURE VALVE
BALL VALVE
BACK WATER VALVE
CHECH VALVE
GATE VALVE
MOTORIZED BALL VALVE
MOTORIZED GATE VALVE
NON-RISING STEM
OUTSIDE STEM & YOKE
PILOT VALVE
PRESSURE REDUCING VALVE
1'-9" SPOT ELEVATION
PLUMBING/ELECTRICAL COORDINATION
THE PLUMBING CONTRACTOR SHALL COORDINATE THE ELECTRICAL CHARACTERISTICS OF ALL PLUMBING EQUIPMENT (VOLTAGE, PHASE, MCA, MOCP, ETC.) WITH THE ELECTRICAL CONTRACTOR AND THE ELECTRICAL PLANS PRIOR TO SUBMITTING OR ORDERING ANY PLUMBING EQUIPMENT. ANY SUBSEQUENT MISMATCH BETWEEN THE PLUMBING EQUIPMENT ELECTRICAL REQUIREMENTS AND THE ELECTRICAL SERVICE, AS DESIGNED AND PROVIDED, SHALL BE THE
RESPONSIBILITY OF THE PLUMBING CONTRACTOR WITH NO ADDITIONS TO THE CONTRACT.
PLUMBING/ELECTRICAL COORDINATION STATEMENTS REQUIRED BY PLUMBING GENERAL NOTES AND SPECIFICATION
SHALL BE INCLUDED WITH PLUMBING EQUIPMENT SUBMITTALS/SHOP DRAWINGS.
PLUMBING FIXTURE SCHEDULE
Mark Type Mark Manufacturer Model Description CW Connection HW Connection Vent
Connection Drain Comments
P-516 Hand Sink www.justmfg.com A33338-T-J Just Mfg Stainless Steel_22 inch x 19 inch x 10 inch Chicago faucet 8452-ABCP dual-handle emergency eywash with faucet
A8
A7
A7.9
L
J
F
AF AE
AAABACAD
15 16 17 18 19 20 21 22
OFFICE
B235
INPATIENT
PHARMACY
B215
HSKP
B236
OFFICE
B235B
OFFICE
B235C
HAC
B216
B215A
TLT
B215B
OFFICE
B 308
TOI
B237
ELE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .