This document provides details on a federal contract opportunity from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 5. The solicitation number is 36C24524B0004 for the Z1DA--Construction -Repair Villa Water Damage Project Number 540-24-101. The opportunity type is a solicitation to provide construction and repair services to address water damage at a veterans facility. The solicitation is seeking bids and proposals for repair work at a specific villa on the campus. The combined asbuilt drawings file provides technical specifications and site plans to inform bids. Responses are due based on the standard solicitation timeline and procedures set forth by the VA.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 28_31_00-0002_-_Fire_Detection_Alarm_and_Mass_Notification__.pdf | ||
| 09_30_13-0001_-_Ceramic-Porcelain_Tiling__.pdf | ||
| 36C24524B0004 0002.docx | DOCX document | |
| 26_51_00-0001_-_Interior_Lighting_-_CAN__.pdf | ||
| 22_40_00-0003_R4_-_Plumbing_Fixtures_Guidon_response___.pdf | ||
| Submittal Log.xlsx | XLSX spreadsheet | |
| 09_51_00-0001 Acoustical Ceiling__.pdf | ||
| 36C24524B0004 0001.docx | DOCX document | |
| Record of Attendance - Site Visit - 12-5-2023 - Repair Villa Water Damage.pdf | ||
| 36C24524B0004_1.docx | DOCX document | |
| Wage Determination.pdf | ||
| Combined Specs_R1 - 11-2-2023.pdf | ||
| Dimension Plan.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
http://www.urscorp.com
(614) 464-4500 fax (614) 464-0588 columbus, ohio 43215-2566 277 west nationwide boulevard architects engineers planners
CONSTRUCT BEHAVORIAL
HEALTH VILLA
LOUIS A. JOHNSON VAMC
CLARKSBURG, WV 26301
SEPTEMBER 24, 2019
#540-345
$$$ Support Value Engineering - It Pays $$$
CONSTRUCT BEHAVIORAL HEALTH VILLA
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Bldg #22
Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FULLY SPRINKLERED
Department of Veterans Affairs98
AS BUILT
DRAWINGS
RECORD DRAWINGS
THIS DRAWING WAS PREPARED BASED SOLELY
ON INFORMATION FURNISHED BY THE
CONTRACTOR TO INCORPORATE CONSTRUCTION
CHANGES AND HAS NOT BEEN VERIFIED BY
AECOM. CARE SHALL BE TAKEN IN ANY FURTHER
USE OF THIS DRAWING. THIS DRAWING MAY NOT
BE USED FOR EXTENSIONS OF THIS PROJECT OR
FOR ANY OTHER PROJECT.
GI001
COVER SHEET
JPSTW
AS-BUILT DRAWINGS
SEPTEMBER 24, 2019
Drawing Index
ES001
ES002
ES003
ES100
ES101
ES110
ES111
ES130
ES501
ES502
ES503
ES601
ES602
ES603
ES604
FA110
FA600
ELECTRICAL SYMBOLS & NOTES
COMMS & ELECTRONIC SAFETY & SECURITY SYMBOLS
ELECT, COMMS, & ELECTRONIC SAFETY & SECURITY ABBREVS
SITE PLANS - ELECTRICAL DEMO & NEW CONSTRUCTION
ELECTRICAL ROOF LIGHTNING PROTECTION & GROUNDING PLAN
VILLA BASEMENT ELECTRICAL & SYSTEMS FLOOR PLANS
VILLA 1ST & 2ND FLOOR ELECTRICAL & SYSTEMS PLANS
COMMUNITY BUILDING ENLARGED PLAN
ELECTRICAL DETAILS SHEET 1
ELECTRICAL DETAILS SHEET 2
TELEPHONE AND CATV DETAILS
ELECTRICAL ONE LINE DIAGRAM NEW VILLA DISTRIBUTION PLANS
LIGHTING FIXTURE SCHEDULE
LIGHTING FIXTURE SCHEDULE GUIDE PLATES
ELECTRICAL PANEL SCHEDULES
VILLA BASEMENT, 1ST, & 2ND FLR FIRE ALARM PLANS
FIRE ALARM RISER AND OPERATIONS MATRIX
Electrical
SS001
SS002
SS003
SS004
SS100
SS101
SS102
SS103
SS200
SS201
SS300
SS301
SS302
SS303
STRUCTURAL ABBREVIATIONS, LEGENDS & GENERAL NOTES
STRUCTURAL GENERAL NOTES
TYPICAL SECTIONS & DETAILS
TYPICAL SECTIONS & DETAILS
BASEMENT FOUNDATION PLAN
FIRST FLOOR FRAMING PLAN
SECOND FLOOR FRAMING PLAN
ROOF FRAMING PLAN
TRUSS ELEVATIONS
FOUNDATION SCHEDULES AND DETAILS
SECTIONS & DETAILS
SECTIONS & DETAILS
SECTIONS & DETAILS
SECTIONS & DETAILS
Structural
AS001 ARCHITECTURAL NOTES & LEGENDS
AS101 DIMENSION PLANS
AS111 DIMENSION PLANS - CLERESTORY
AS121 CALLOUT PLANS
AS151 REFLECTED CEILING PLANS
AS191 EQUIPMENT PLANS
AS201 EXTERIOR ELEVATIONS
AS301 BUILDING SECTIONS
AS302 STAIR PLANS AND SECTIONS
AS400 ENLARGED KEY PLANS
AS401 WALL SECTIONS
AS402 WALL SECTIONS
AS403 WALL SECTIONS
AS404 WALL SECTIONS
AS501 DETAILS
AS502 DETAILS
AS503 INTERIOR ELEVATIONS
AS504 INTERIOR ELEVATIONS
AS505 CASEWORK DETAILS
AS600 WALL DETAILS
AS601 DOOR SCHEDULE & DETAILS
AS602 WINDOW SCHEDULE
AF101 FINISH PLANS
AF111 FLOOR FINISH PLANS
AF121 SIGNAGE PLANS
AF601 FINISH SCHEDULES
AF602 SIGNAGE TYPES
Civil
PI001
FX101
FX102
PL101
PL102
PL103
PL201
PL301
PL401
PL501
PL601
VILLA PLUMBING & FIRE PROTECTION LEGEND
VILLA BASEMENT FIRE PROTECTION PLAN
VILLA FIRST & SECOND FLOOR FIRE PROTECTION PLAN
VILLA BASEMENT PLUMBING PLAN
VILLA FIRST FLOOR PLUMBING PLAN
VILLA SECOND FLOOR PLUMBING PLAN
COMMUNITY BUILDING PLUMBING PLAN
VILLA SANITARY STACK DIAGRAM
VILLA PLUMBING DETAILS
VILLA DOMESTIC WATER RISER DIAGRAM
VILLA PLUMBING SCHEDULES
Plumbing
MH001
MH120
MH121
MH122
MH131
MH220
MH221
MH222
MH301
MH401
MH501
MH601
MH701
MH801
GENERAL INFO - HVAC
BASEMENT FLOOR PLAN - HVAC
FIRST FLOOR PLAN - HVAC
SECOND FLOOR PLAN - HVAC
COMMUNITY BLDG - HVAC
BASEMENT FLOOR PLAN - HVAC PIPING
FIRST FLOOR PLAN - HVAC PIPING
SECOND FLOOR PLAN - HVAC PIPING
MECHANICAL ZONING PLANS
SYSTEM DIAGRAMS
MECHANICAL DETAILS
MECHANICAL SCHEDULES
SEQUENCE OF OPERATIONS
CONTROLS
Mechanical
Architectural
Contact:Contact:Contact:Contact: Contact:
URS GROUP INC.
Rudy Herzog Project Manager
277 West Nationwide Boulevard Columbus, OH 43215 p: 614.600.5856 e: rudy.herzog@aecom.com
MECHANICAL,
ELECTRICAL &
PLUMBING
URS GROUP INC.
Bill Huckleberry Structural Engineer
277 West Nationwide Boulevard Columbus, OH 43215 p: 614.464.4500 e:bill.huckleberry@aecom.com
STRUCTURAL
ENGINEER
URS GROUP INC.
Mark Lomonico Civil Engineer
277 West Nationwide Boulevard Columbus, OH 43215 p: 614.464.4500 e: mark.lomonico@aecom.com
CIVIL
ENGINEER
LOUIS A. JOHNSON VA
MEDICAL CENTER
Rebecca Besten Contract Specialist
1 Medical Center Drive Clarksburg, WV 26301 p: 304.623.3461 x 3982 e: Rebecca.besten@va.gov
OWNER
GUIDON DESIGN INC.
Stewart Whitcomb Architect
905 North Capitol Avenue Suite 100 Indianapolis, IN 46204 p: 317.800.6388 x 102 e: swhitcomb@guidondesign.com
ARCHITECT
PROJECT
BOUNDARY
LOUIS A. JOHNSON
VA MEDICAL CENTER
General
REGION PLAN, CLARKSBURG WV. LOCATION PLAN
GI001 COVER SHEET
GI002 LIFE SAFETY PLANS
GI003 CODE REVIEW NOTES
VF101 FIELD SURVEY/MAPPING
CD101 DEMOLITION PLAN
CE101 EROSION AND SEDIMENT CONTROL PLAN
CE501 EROSION AND SEDIMENT CONTROL NOTES
CE502 EROSION AND SEDIMENT CONTROL DETAILS
CS101 SITE DIMENSION CONTROL PLAN
CS501 SITE DETAILS
CG101 GRADING AND DRAINAGE PLAN
CU101 SITE UTILITY PLAN
CU501 UTILITY DETAILS
LP101 LANDSCAPE PLANTING PLAN
LP501 LANDSCAPE DETAILS
S.R. 98
C.R. 25
T O
S .R
. 19
I-79
LOUIS A. JOHNSON VAMC
CONSTRUCT BEHAVIORAL HEALTH VILLA
UP
UP
UP
UP
UP
UP
BATT INSULATION
GWB
FIRE-RATED PLYWOOD
BLOCKING
WOOD STUD @ 16" O.C.
BATT INSULATION
SEMI RECESSED F.E.C.
SEE PLAN FOR PARTITION TYPES
WOOD STUD SILL
WOOD STUD HEADER
GENERAL REQUIREMENTS
1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL
CONTRACTORS, SUB CONTRACTORS, MANUFACTURERS,
SUPPLIERS: CAREFULLY AND THOROUGHLY REVIEW THESE
GENERAL NOTES. IT IS YOUR RESPONSIBILITY TO KNOW AND
ADHERE TO THESE REQUIREMENTS.
2. EVERY EFFORT HAS BEEN MADE TO MAKE THESE
DOCUMENTS CONCISE AND COORDINATED, TO DEFINE WORK
IN THE MOST LOGICAL PLACE AND TO ELIMINATE
REDUNDANCY. KEEP IN MIND HOWEVER THAT YOUR SCOPE OF
WORK CAN BE CONTAINED IN VARIOUS PLACES, WITH VARYING
DESCRIPTIONS. DO NOT PRESUME THAT THERE IS ONE
CUSTOMARY PLACE TO LOCATE YOUR WORK. THERE IS A
DANGER OF OMITTING WORK FROM YOUR SCOPE BECAUSE
THE ENTIRE SET OF DOCUMENTS WAS NOT REVIEWED.
3. MECHANICAL AND ELECTRICAL DRAWINGS SHOW
INFORMATION IN A DIAGRAMMATIC FASHION WITHOUT
DIMENSIONING. THE GENERAL CONTRACTOR IS TO
COORDINATE THE LOCATIONS OF ALL MECHANICAL AND
ELECTRICAL EQUIPMENT WITH RESPECT TO THE
ARCHITECTURAL AND STRUCTURAL DETAILING OF SHAFTS,
CHASES, AND SUCH.
4. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME
FAMILIAR WITH SITE CONDITIONS AS THEY MAY AFFECT
CARRYING OUT THE WORK AS DESCRIBED IN THESE
CONTRACT DOCUMENTS. THE CONTRACTOR SHALL
INVESTIGATE, VERIFY, AND BE RESPONSIBLE FOR ALL
CONDITIONS OF THE PROJECT, AND NOTIFY THE ARCHITECT OF
ANY CONDITIONS THAT REQUIRE MODIFICATION BEFORE
PROCEEDING WITH THE WORK.
GENERAL NOTES:
5. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS,
EQUIPMENT, LABOR, AND SERVICES NECESSARY TO COMPLETE
THE WORK.
6. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH
THE PROJECT SHALL BE FAMILIAR WITH THE RULES AND
REGULATIONS OF THE OCCUPATIONAL SAFETY AND HEALTH
ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS
PROJECT.
7. ALL WORK PERFORMED SHALL BE IN ACCORDANCE WITH
THE BUILDING CODES AS NOTED ON CODE SHEETS.
8. CONTRACTOR SHALL SUBMIT CONFIRMATION OF ORDERED
MATERIALS OR ITEMS NECESSARY TO COMPLETE THE PROJECT
WITH PROJECTED DELIVERY DATE GREATER THAN FOUR
WEEKS.
9. ALL SUBCONTRACTORS SHALL SUBMIT SHOP DRAWINGS AS
REQUIRED FOR APPROVAL PRIOR TO COMMENCING ANY WORK.
10. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
THE COORDINATION OF ALL TRADES AND THE PREVENTION OF
CONFLICT BETWEEN ALL TRADES.
11. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
LOCATING AND PROTECTING ALL UTILITY LINES. LOCATIONS
SHOWN ARE APPROXIMATE. REPAIR ALL DAMAGE TO UTILITY
LINES CAUSED BY CONSTRUCTION OPERATIONS AT NO COST
TO THE OWNER.
CONSTRUCTION NOTES
1. PROVIDE SEALANT AT ALL JOINTS OR CRACKS WHICH OCCUR
WHERE DISSIMILAR MATERIALS INTERSECT PERPENDICULAR TO
EACH OTHER, AND THE INTERSECTION IS EXPOSED TO VIEW,
UNLESS INDICATED OTHERWISE ON THE DRAWINGS.
2. ALL NEW MATERIALS SHALL BE PAINTED OR PRE-FINISHED
UNLESS NOTED OTHERWISE. PAINT ALL EXPOSED STEEL UNLESS
NOTED OTHERWISE.
3. WHERE DOORS IN PARTITIONS ARE NOT DIMENSIONALLY
LOCATED ON THE PLANS, PROVIDE A MINIMUM HINGE SIDE JAMB
DIMENSION OF 6" FROM DOOR OPENING TO ADJACENT
PERPENDICULAR WALL.
4. SHOULD DIMENSIONS BE MISSING OR CONFLICTING, NOTIFY
ARCHITECT PRIOR TO PROCEEDING WITH RELATED WORK. DO NOT
SCALE DRAWINGS.
5. SECURITY AND SAFETY ARE THE CONTRACTOR'S
RESPONSIBILITY. COORDINATE WITH OWNER.
MANUFACTURER'S TRADE NAMES AND NUMBERS USED HEREIN
ARE ONLY TO IDENTIFY COLORS, FINISHES, TEXTURES AND
PATTERNS AND COORDINATE DIMENSIONS OR SIZES AS THE
BASIS OF DESIGN. PRODUCTS OF AUTHORIZED EQUAL
MANUFACTURER'S EQUIVALENT TO COLORS, FINISHES,
TEXTURES AND PATTERNS OF MANUFACTURERS LISTED THAT
MEET THE REQUIREMENTS OF TECHNICAL SPECIFICATIONS IN
EVERY RESPECT MAY BE ACCEPTABLE WITH SUBMITTAL OF A
COMPLETED SUBSTITUTION REQUEST CONTAINING ALL
PRODUCT DATA, TESTING AND ACTUAL SAMPLES AND UPON
APPROVAL IN WRITING BY ARCHITECT/ENGINEER &
CONTRACTING OFFICER. APPROVAL OF SUBSTITUTIONS DOES
NOT EXEMPT CONTRACTOR FROM COORDINATION OF THE
WORK OR VERIFICATION OF FIELD CONDITIONS.
Entry
Common Space
Stair
Mech
W/D
Shared Work Area
JC
Mech
Passage
Bed Room
Lav
Bath
Bedroom
Lav
Bath
Quiet Space
ADA/BariatricADA Bath
Bed Room
LavBath
Quite Space
EMERGENCY TRAVEL DISTANCE = 74'-5"
FEC
E M
E R
G E
N C
Y T
R A
V E
L D
IS
TA
N
C E
= 87'-8"
119' FRONTAGE
R4 OCCUPANCY
Stair
S to ra g e S to ra g e
Basement
Storage
IT
F E
C
NOTE: BASEMENT AND FIRST
FLOOR SEPARATED WITH 1-HOUR
RATED CEILING CONSTRUCTION,
RE.: UL DESIGN FM FC-172
STRUCTURAL STEEL
COLUMNS ENCLOSED IN
1-HOUR RATED WALL
CONSTRUCTION
STRUCTURAL STEEL
COLUMNS ENCLOSED IN
1-HOUR RATED WALL
CONSTRUCTION
1-HOUR RATED WALL
ABOVE SEE AS151
1-HOUR RATED WALL
ABOVE SEE AS151
NOTE: BASEMENT AND FIRST
FLOOR SEPARATED WITH 1-HOUR
RATED CEILING CONSTRUCTION,
RE.: UL DESIGN FM FC-172
S1 OCCUPANCY
Stair
Mech
W/D
Shared Work Area
JCMech
Passage
Quite Space
Bed Room
Lav
Bath
Bed Room
Lav
Bath
Quite Space
Bed Room Lav
Bath
Bed Room
LavBath
FEC
110 EMERGENCY TRAVEL DISTANCE = 74'-5"
R4 OCCUPANCY
NORTH
PLAN
http://www.urscorp.com
(614) 464-4500 fax (614) 464-0588 columbus, ohio 43215-2566 277 west nationwide boulevard architects engineers planners
CONSTRUCT BEHAVORIAL
HEALTH VILLA
LOUIS A. JOHNSON VAMC
CLARKSBURG, WV 26301
SEPTEMBER 24, 2019
#540-345
$$$ Support Value Engineering - It Pays $$$
CONSTRUCT BEHAVIORAL HEALTH VILLA
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Bldg #22
Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FULLY SPRINKLERED
Department of Veterans Affairs
TRUE NORTH 99 DEGRESS
WEST OF PLAN NORTH.
AS BUILT
DRAWINGS
RECORD DRAWINGS
THIS DRAWING WAS PREPARED BASED SOLELY
ON INFORMATION FURNISHED BY THE
CONTRACTOR TO INCORPORATE CONSTRUCTION
CHANGES AND HAS NOT BEEN VERIFIED BY
AECOM. CARE SHALL BE TAKEN IN ANY FURTHER
USE OF THIS DRAWING. THIS DRAWING MAY NOT
BE USED FOR EXTENSIONS OF THIS PROJECT OR
FOR ANY OTHER PROJECT.
GI002
LIFE SAFETY PLANS
JPSTW
30-MIN CONSTRUCTION
1-HR FIRE BARRIER
LEGEND
EXIT NUMBER
OCCUPANT LOAD (BELOW EXIT NUMBER)
• VA Engineering Regulations, Manuals, Technical Letters and Pamphlets (current editions), include:
• VA TIL - Design Manuals (PG-18-10)
• VA Barrier Free Design Guide - A Supplement to the Uniform Federal Accessibility Standards (PG-18-13)
• VA Sustainable Design & Energy Reduction Manual - April 2010
• VA Mission Critical Facilities Design Manual
• Physical Security Design Manual for VA Facilities
• Department of Veterans Affairs Office of Facilities Management Lease Based Outpatient Building Design Guide July 2005
• Department of Veterans Affairs Office of Facilities Management Mental Health Facilities Design Guide July 2005
• American National Standards Institute (ANSI)
• American Society for Testing and Materials (ASTM)
• American Society of Heating, Refrigerating, and Air-conditioning Engineers (ASHRAE)
• American Society of Mechanical Engineers (ASME)
• American Society of Sanitary Engineering
• American Water Works Association
• American Welding Society, Inc.
• Americans with Disabilities Act Accessibility Guidelines (ADAAG) for Buildings and Facilities
• Federal energy and water conservation criteria
• International Building Code (IBC), 2012
• International Energy Code, 2009
• International Fire Code, 2009
• International Mechanical Code, 2009
• International Plumbing Code, most recent
• J-STD-607-A Commercial Building Grounding (Earthing) and Bonding Requirements for Telecommunications
• National Electrical Code (NEC), (NFPA 70)
• National Electrical Safety Code (NESC)
• National Fire Protection Association (NFPA) 10
• National Fire Protection Association (NFPA) 101
• National Fire Protection Association (NFPA) 13
• National Fire Protection Association (NFPA) 110
• National Fire Protection Association (NFPA) 45
• National Fire Protection Association (NFPA) 72
• National Fire Protection Association (NFPA) 80
• National Fire Protection Association (NFPA) 220
• National Fire Protection Association (NFPA) 256
• National Fire Protection Association (NFPA) 780
• National Fire Protection Association (NFPA) 90A/B
• National Fire Protection Association (NFPA) 91
• National Institute of Occupational Safety and Health (NIOSH) Standards (latest editions)
• National Standard Plumbing Code, most recent
• Occupational Safety and Health Administration (OSHA) Standards (latest editions)
• Architectural Barriers Act Accessibility Standard (ABAAS) for Federal Facilities
APPLICABLE CODES, REFERENCES, AND DESIGN CRITERIA
(110 IS MINIMUM CALCULATED FOR THE MINIMUM 44" EGRESS
PATH, AND DOES NOT REFLECT ACTUAL OCCUPANCIES.)
Scale: 1 1/2" = 1'-0"
3 FIRE EXTINGUISHER CABINET DETAIL
EGRESS PATH (FURTHEST POINT TO EXIT)
FIRE EXTINGUISHER CABINET
FEC
Scale: 1/8" = 1'-0"
1 FIRST FLOOR LIFE SAFETY PLAN
Scale: 1/8" = 1'-0"
1b BASEMENT LIFE SAFETY PLAN
Scale: 1/8" = 1'-0"
2 SECOND FLOOR LIFE SAFETY PLAN
GENERAL REQUIREMENTS
1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL
CONTRACTORS, SUB CONTRACTORS, MANUFACTURERS,
SUPPLIERS: CAREFULLY AND THOROUGHLY REVIEW THESE
GENERAL NOTES. IT IS YOUR RESPONSIBILITY TO KNOW AND
ADHERE TO THESE REQUIREMENTS.
2. EVERY EFFORT HAS BEEN MADE TO MAKE THESE
DOCUMENTS CONCISE AND COORDINATED, TO DEFINE WORK
IN THE MOST LOGICAL PLACE AND TO ELIMINATE
REDUNDANCY. KEEP IN MIND HOWEVER THAT YOUR SCOPE OF
WORK CAN BE CONTAINED IN VARIOUS PLACES, WITH VARYING
DESCRIPTIONS. DO NOT PRESUME THAT THERE IS ONE
CUSTOMARY PLACE TO LOCATE YOUR WORK. THERE IS A
DANGER OF OMITTING WORK FROM YOUR SCOPE BECAUSE
THE ENTIRE SET OF DOCUMENTS WAS NOT REVIEWED.
3. MECHANICAL AND ELECTRICAL DRAWINGS SHOW
INFORMATION IN A DIAGRAMMATIC FASHION WITHOUT
DIMENSIONING. THE GENERAL CONTRACTOR IS TO
COORDINATE THE LOCATIONS OF ALL MECHANICAL AND
ELECTRICAL EQUIPMENT WITH RESPECT TO THE
ARCHITECTURAL AND STRUCTURAL DETAILING OF SHAFTS,
CHASES, AND SUCH.
4. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME
FAMILIAR WITH SITE CONDITIONS AS THEY MAY AFFECT
CARRYING OUT THE WORK AS DESCRIBED IN THESE
CONTRACT DOCUMENTS. THE CONTRACTOR SHALL
INVESTIGATE, VERIFY, AND BE RESPONSIBLE FOR ALL
CONDITIONS OF THE PROJECT, AND NOTIFY THE ARCHITECT OF
ANY CONDITIONS THAT REQUIRE MODIFICATION BEFORE
PROCEEDING WITH THE WORK.
GENERAL NOTES:
5. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS,
EQUIPMENT, LABOR, AND SERVICES NECESSARY TO COMPLETE
THE WORK.
6. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH
THE PROJECT SHALL BE FAMILIAR WITH THE RULES AND
REGULATIONS OF THE OCCUPATIONAL SAFETY AND HEALTH
ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS
PROJECT.
7. ALL WORK PERFORMED SHALL BE IN ACCORDANCE WITH
THE BUILDING CODES AS NOTED ON CODE SHEETS.
8. CONTRACTOR SHALL SUBMIT CONFIRMATION OF ORDERED
MATERIALS OR ITEMS NECESSARY TO COMPLETE THE PROJECT
WITH PROJECTED DELIVERY DATE GREATER THAN FOUR
WEEKS.
9. ALL SUBCONTRACTORS SHALL SUBMIT SHOP DRAWINGS AS
REQUIRED FOR APPROVAL PRIOR TO COMMENCING ANY WORK.
10. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
THE COORDINATION OF ALL TRADES AND THE PREVENTION OF
CONFLICT BETWEEN ALL TRADES.
11. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
LOCATING AND PROTECTING ALL UTILITY LINES. LOCATIONS
SHOWN ARE APPROXIMATE. REPAIR ALL DAMAGE TO UTILITY
LINES CAUSED BY CONSTRUCTION OPERATIONS AT NO COST
TO THE OWNER.
CONSTRUCTION NOTES
1. PROVIDE SEALANT AT ALL JOINTS OR CRACKS WHICH OCCUR
WHERE DISSIMILAR MATERIALS INTERSECT PERPENDICULAR TO
EACH OTHER, AND THE INTERSECTION IS EXPOSED TO VIEW,
UNLESS INDICATED OTHERWISE ON THE DRAWINGS.
2. ALL NEW MATERIALS SHALL BE PAINTED OR PRE-FINISHED
UNLESS NOTED OTHERWISE. PAINT ALL EXPOSED STEEL UNLESS
NOTED OTHERWISE.
3. WHERE DOORS IN PARTITIONS ARE NOT DIMENSIONALLY
LOCATED ON THE PLANS, PROVIDE A MINIMUM HINGE SIDE JAMB
DIMENSION OF 6" FROM DOOR OPENING TO ADJACENT
PERPENDICULAR WALL.
4. SHOULD DIMENSIONS BE MISSING OR CONFLICTING, NOTIFY
ARCHITECT PRIOR TO PROCEEDING WITH RELATED WORK. DO NOT
SCALE DRAWINGS.
5. SECURITY AND SAFETY ARE THE CONTRACTOR'S
RESPONSIBILITY. COORDINATE WITH OWNER.
MANUFACTURER'S TRADE NAMES AND NUMBERS USED HEREIN
ARE ONLY TO IDENTIFY COLORS, FINISHES, TEXTURES AND
PATTERNS AND COORDINATE DIMENSIONS OR SIZES AS THE
BASIS OF DESIGN. PRODUCTS OF AUTHORIZED EQUAL
MANUFACTURER'S EQUIVALENT TO COLORS, FINISHES,
TEXTURES AND PATTERNS OF MANUFACTURERS LISTED THAT
MEET THE REQUIREMENTS OF TECHNICAL SPECIFICATIONS IN
EVERY RESPECT MAY BE ACCEPTABLE WITH SUBMITTAL OF A
COMPLETED SUBSTITUTION REQUEST CONTAINING ALL
PRODUCT DATA, TESTING AND ACTUAL SAMPLES AND UPON
APPROVAL IN WRITING BY ARCHITECT/ENGINEER &
CONTRACTING OFFICER. APPROVAL OF SUBSTITUTIONS DOES
NOT EXEMPT CONTRACTOR FROM COORDINATION OF THE
WORK OR VERIFICATION OF FIELD CONDITIONS.
http://www.urscorp.com
(614) 464-4500 fax (614) 464-0588 columbus, ohio 43215-2566 277 west nationwide boulevard architects engineers planners
CONSTRUCT BEHAVORIAL
HEALTH VILLA
LOUIS A. JOHNSON VAMC
CLARKSBURG, WV 26301
SEPTEMBER 24, 2019
#540-345
$$$ Support Value Engineering - It Pays $$$
CONSTRUCT BEHAVIORAL HEALTH VILLA
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Bldg #22
Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FULLY SPRINKLERED
Department of Veterans Affairs98
AS BUILT
DRAWINGS
RECORD DRAWINGS
THIS DRAWING WAS PREPARED BASED SOLELY
ON INFORMATION FURNISHED BY THE
CONTRACTOR TO INCORPORATE CONSTRUCTION
CHANGES AND HAS NOT BEEN VERIFIED BY
AECOM. CARE SHALL BE TAKEN IN ANY FURTHER
USE OF THIS DRAWING. THIS DRAWING MAY NOT
BE USED FOR EXTENSIONS OF THIS PROJECT OR
FOR ANY OTHER PROJECT.
GI003
CODE REVIEW NOTES
JPSTW
WV HIGHWAY 98
MEDICAL CENTER DR.
ASP
HALT
E
NTR
ANCE
EN
TR
A
N C
E
P A
R K
IN
G
TO
H
O
SP
IT
A
L
WV HIGHWAY 98
M
ED
IC
A
L
CE
N
TE
R D
R.
VILLAS FOR RESIDENT
REHAB/TREATMENT PROGRAM
LOUIS A. JOHNSON VAMC
http://www.urscorp.com
(614) 464-4500 fax (614) 464-0588 columbus, ohio 43215-2566
277 west nationwide boulevard architects engineers planners
FULLY SPRINKLERED
CLARKSBURG, WV 26301
SEPTEMBER 24, 2019
#540-345
$$$ Support Value Engineering - It Pays $$$
AS BUILT DRAWINGSBEHAVIORAL HEALTH RESIDENTIAL HOMES
FIELD SURVEY/MAPPING
VF101
BAVJRO
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
LOUIS A. JOHNSON VETERANS AFFAIRS MEDICAL CENTER "MAIN BUILDING" FFE=1002.07'
AutoCAD SHX Text
CONC. SIDEWALK
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
EXISTING BUILDING #5 FFE=1001.10'
AutoCAD SHX Text
BLDG.
AutoCAD SHX Text
BLDG.
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
(WIDTH VARIES)
AutoCAD SHX Text
(WIDTH VARIES)
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
18'±ASPHALTPARKING AREA
AutoCAD SHX Text
20'± ASPHALTACCESSWAY
AutoCAD SHX Text
20'± ASPHALTACCESSWAY
AutoCAD SHX Text
20'± ASPHALTACCESSWAY
AutoCAD SHX Text
BRICK PAVERS
AutoCAD SHX Text
ASPHALT PAVEMENT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text (80' R/W)
AutoCAD SHX Text (90' R/W)
AutoCAD SHX Text
2' CURB & GUTTER
AutoCAD SHX Text
BROKEN CURB
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
2' CURB & GUTTER
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
STEPS W/ RAILING
AutoCAD SHX Text
STEPS W/ RAILING
AutoCAD SHX Text
A/C PAD
AutoCAD SHX Text
6" CONC CURB
AutoCAD SHX Text
5' CONCRETE RAMP W/ RAILING
AutoCAD SHX Text
8" WATER LINE (SEE NOTE)
AutoCAD SHX Text
6" WATER LINE (SEE NOTE)
AutoCAD SHX Text
ELECTRIC MANHOLE
AutoCAD SHX Text
BROKEN CURB
AutoCAD SHX Text
2' CURB & GUTTER
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
2' CURB & GUTTER
AutoCAD SHX Text
PLANTER
AutoCAD SHX Text
PLANTER
AutoCAD SHX Text
TIMBERS
AutoCAD SHX Text
RETAINING WALL (HEIGHT VARIES)
AutoCAD SHX Text
RAISED PLANTER
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
6' CHAIN LINK FENCE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
CONC A/C PAD
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
RETAINING WALL (HEIGHT VARIES)
AutoCAD SHX Text
GRAVEL W/ ELECTRIC TRANSFORMER AND SWITCHBOX
AutoCAD SHX Text
EX 10" SAN (CLAY TILE)
AutoCAD SHX Text
EX 10" SAN (CLAY TILE)
AutoCAD SHX Text
EX UNGD ELEC
AutoCAD SHX Text
EX UNGD ELEC
AutoCAD SHX Text
EX ELEC
AutoCAD SHX Text
EX 18" STM
AutoCAD SHX Text
HEADWALL
AutoCAD SHX Text
EX 18" STM
AutoCAD SHX Text
HEADWALL
AutoCAD SHX Text
EX STM
AutoCAD SHX Text
EX 6" STM
AutoCAD SHX Text
EX 18" STM
AutoCAD SHX Text
EX 8" STM
AutoCAD SHX Text
EX 10" STM (CLAY TILE)
AutoCAD SHX Text
EX 10" STM
AutoCAD SHX Text SEWER MANHOLE STORM (DRAINAGE) MANHOLE ELECTRIC MANHOLE TELEPHONE MANHOLE WATER VALVE FIRE HYDRANT LIGHT POLE SIGN BOLLARD EX TREE EX PINE TREE MONUMENT FOUND (AS NOTED) BENCHMARK CHAIN LINK FENCE RETAINING WALL CENTERLINE RIGHT-OF-WAY ELECTRIC LINE SEWER LINE STORM LINE WATER LINE
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
EN
TR
A N
C E
P
A R
K
IN
G T
O H
O
SP
IT
A
L
VILLAS FOR RESIDENT
REHAB/TREATMENT PROGRAM
LOUIS A. JOHNSON VAMC
http://www.urscorp.com
(614) 464-4500 fax (614) 464-0588 columbus, ohio 43215-2566
277 west nationwide boulevard architects engineers planners
FULLY SPRINKLERED
CLARKSBURG, WV 26301
SEPTEMBER 24, 2019
#540-345
$$$ Support Value Engineering - It Pays $$$
AS BUILT DRAWINGSBEHAVIORAL HEALTH RESIDENTIAL HOMES
DEMOLITION PLAN
CD101
BAVJRO
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
WV HIGHWAY 98
AutoCAD SHX Text
LOUIS A. JOHNSON VETERANS AFFAIRS MEDICAL CENTER "MAIN BUILDING" FFE=1002.07'
AutoCAD SHX Text
CONC. SIDEWALK
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
BLDG 20 COMMUNITY BUILDING FFE=1001.56'
AutoCAD SHX Text
EXISTING BUILDING #5 FFE=1001.10'
AutoCAD SHX Text
BASKETBALL COURT (CONCRETE)
AutoCAD SHX Text
CONC. SIDEWALK
AutoCAD SHX Text
BLDG.
AutoCAD SHX Text
BLDG.
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
MEDICAL CENTER DR.
AutoCAD SHX Text
ASPHALT ENTRANCE
AutoCAD SHX Text
(WIDTH VARIES)
AutoCAD SHX Text
(WIDTH VARIES)
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
18'± ASPHALTPARKING AREA
AutoCAD SHX Text
20'± ASPHALTACCESSWAY
AutoCAD SHX Text
20'± ASPHALTACCESSWAY
AutoCAD SHX Text
20'± ASPHALTACCESSWAY
AutoCAD SHX Text
WV HIGHWAY 98
AutoCAD SHX Text
MEDICAL CENTER DR.
AutoCAD SHX Text
BRICK PAVERS
AutoCAD SHX Text
ASPHALT PAVEMENT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
CONC SIDEWALK
AutoCAD SHX Text
KEEP VALVE AND 3' OF WATERLINE BEYOND VALVE
AutoCAD SHX Text SEWER MANHOLE STORM (DRAINAGE) MANHOLE ELECTRIC MANHOLE TELEPHONE MANHOLE WATER VALVE FIRE HYDRANT LIGHT POLE SIGN BOLLARD EX TREE EX PINE TREE MONUMENT FOUND (AS NOTED) BENCHMARK CHAIN LINK FENCE RETAINING WALL CENTERLINE RIGHT-OF-WAY ELECTRIC LINE SEWER LINE STORM LINE STORM DRAIN WATER LINE
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
REMOVE ASPHALT PAVEMENT AND ASSOCIATED SUBBASE
AutoCAD SHX Text
1. THE IDENTITY AND LOCATION OF THE EXISTING UNDERGROUND UTILITY FACILITIES KNOWN TO THE IDENTITY AND LOCATION OF THE EXISTING UNDERGROUND UTILITY FACILITIES KNOWN TO BE LOCATED IN THE CONSTRUCTION AREA HAVE BEEN SHOWN ON THE PLANS AS ACCURATELY AS PROVIDED BY THE SURVEYOR . THE ENGINEER ASSUMES NO RESPONSIBILITY AS TO THE ACCURACY OR THE DEPTHS OF THE UNDERGROUND FACILITY SHOWN ON THE PLANS. THE CONTRACTOR IS RESPONSIBLE FOR THE INVESTIGATION, LOCATION, SUPPORT, PROTECTION, AND RESTORATION OF ALL EXISTING UTILITIES AND APPURTENANCES WHETHER SHOWN ON THESE PLANS OR NOT. THE CONTRACTOR SHALL EXPOSE ALL UTILITIES OR STRUCTURES PRIOR TO CONSTRUCTION TO VERIFY THE VERTICAL AND HORIZONTAL EFFECT ON THE PROPOSED CONSTRUCTION. 2. WHERE EXISTING UTILITIES AND STRUCTURES ARE INDICATED AS BEING IN THE LINE OF THE WHERE EXISTING UTILITIES AND STRUCTURES ARE INDICATED AS BEING IN THE LINE OF THE PROPOSED IMPROVEMENT, THE CONTRACTOR SHALL EXPOSE THEM, AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER. THIS WORK IS TO BE DONE SUFFICIENTLY IN ADVANCE OF THE CONSTRUCTION OPERATIONS TO PERMIT ADJUSTMENTS IN LINE OR GRADE, IF REQUIRED, TO ELIMINATE INTERFERENCES. EXISTING PIPES OR CONDUITS CROSSING THE TRENCH, OR OTHERWISE EXPOSED SHALL BE ADEQUATELY BRACED AND SUPPORTED TO PREVENT DAMAGE. UTILITY SERVICES BROKEN OR DAMAGED SHALL BE REPAIRED AT ONCE TO AVOID INCONVENIENCE TO CUSTOMERS. STORM SEWERS SHALL NOT BE INTERRUPTED OVERNIGHT. 3. TREES SHOWN TO BE REMOVED ARE AN ESTIMATION. THE ACTUAL NUMBER OF TREES TO BE TREES SHOWN TO BE REMOVED ARE AN ESTIMATION. THE ACTUAL NUMBER OF TREES TO BE REMOVED MAY BE INCREASED OR DECREASED DUE TO CONSTRUCTION ACTIVITIES. COORDINATE THE REMOVAL OF ALL TREES WITH THE VA PRIOR TO REMOVING THE TREE. ALL TREES WITH THE VA PRIOR TO REMOVING THE TREE. TREES WITH THE VA PRIOR TO REMOVING THE TREE. PRIOR TO REMOVING THE TREE. TO REMOVING THE TREE. TREES TO REMAIN SHALL BE PROTECTED WITH TREE PROTECTION FENCE INSTALLED AT THE DRIP LINE PRIOR TO CONSTRUCTION ACTIVITIES. 4. ALL UTILITIES TO BE REMOVED SHALL BE REMOVED AND NOT ABANDONED IN PLACE PER THE ALL UTILITIES TO BE REMOVED SHALL BE REMOVED AND NOT ABANDONED IN PLACE PER THE VA REQUIREMENTS. 5. SEE SHEET ES100 FOR ADDITIONAL SITE ELECTRIC AND COMMUNICATION LINE REMOVAL SEE SHEET ES100 FOR ADDITIONAL SITE ELECTRIC AND COMMUNICATION LINE REMOVAL AND/OR RELOCATION. 6. CONTRACTOR SHALL CONTACT AND COORDINATE ALL UTILITY LINE REMOVAL AND RELOCATION CONTRACTOR SHALL CONTACT AND COORDINATE ALL UTILITY LINE REMOVAL AND RELOCATION WITH THE VA AT LEAST 2 WEEKS PRIOR TO REMOVAL. 7. ACCESSWAY SHALL REMAIN OPEN TO TRAFFIC DURING CONSTRUCTION.ACCESSWAY SHALL REMAIN OPEN TO TRAFFIC DURING CONSTRUCTION.
AutoCAD SHX Text
DEMOLITION NOTES
AutoCAD SHX Text
CODED NOTES:
AutoCAD SHX Text DEMOLISH WATERLINE DEMOLISH WATER VALVE DEMOLISH EXISTING SIDEWALK. A TEMPORARY SIDEWALK TO ALLOW ACCESS TO BUILDING 20 SHALL BE PROVIDED AND MAINTAINED DURING CONSTRUCTION CONTRACTOR TO TAKE CARE NOT TO DAMAGE EXISTING DOWNSPOUT CONNECTIONS. CONSIDER EXPOSING ALL LINES IN PATH OF CONSTRUCTION EXISTING CURB TO BE REMOVED AREA OF ASPHALT PAVEMENT REMOVAL
AutoCAD SHX Text
REMOVE EXISTING SIDEWALK
AutoCAD SHX Text
REMOVE EXISTING UTILITY LINE
REMOVE EXISTING CURB
A N
C E
P
A R
K
IN
G T
O H
O
SP
IT
A
L
EROSION AND SEDIMENT
CONTROL PLAN
CE101
BAVJRO
VILLAS FOR RESIDENT
REHAB/TREATMENT PROGRAM
LOUIS A. JOHNSON VAMC
http://www.urscorp.com
(614) 464-4500 fax (614) 464-0588 columbus, ohio 43215-2566
277 west nationwide boulevard architects engineers planners
FULLY SPRINKLERED
CLARKSBURG, WV 26301
SEPTEMBER 24, 2019
#540-345
$$$ Support Value Engineering - It Pays $$$
AS BUILT DRAWINGSBEHAVIORAL HEALTH RESIDENTIAL HOMES
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
CW
AutoCAD SHX Text
WV HIGHWAY 98
AutoCAD SHX Text
LOUIS A. JOHNSON VETERANS AFFAIRS MEDICAL CENTER "MAIN BUILDING" FFE=1002.07'
AutoCAD SHX Text
CONC. SIDEWALK
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
COMMUNITY BUILDING FFE=1001.56'
AutoCAD SHX Text
EXISTING BUILDING #5 FFE=1001.10'
AutoCAD SHX Text
BASKETBALL COURT (CONCRETE)
AutoCAD SHX Text
CONC. SIDEWALK
AutoCAD SHX Text
BLDG.
AutoCAD SHX Text
BLDG.
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
MEDICAL CENTER DR.
AutoCAD SHX Text
ASPHALT ENTRANCE
AutoCAD SHX Text
(WIDTH VARIES)
AutoCAD SHX Text
(WIDTH VARIES)
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
18'± ASPHALTPARKING AREA
AutoCAD SHX Text
20'± ASPHALTACCESSWAY
AutoCAD SHX Text
20'± ASPHALTACCESSWAY
AutoCAD SHX Text
20'± ASPHALTACCESSWAY
AutoCAD SHX Text
WV HIGHWAY 98
AutoCAD SHX Text
MEDICAL CENTER DR.
AutoCAD SHX Text
BRICK PAVERS
AutoCAD SHX Text
ASPHALT PAVEMENT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
CONC SIDEWALK
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LIMITS OF CONSTRUCTION AND LAYDOWN AREA
AutoCAD SHX Text SEWER MANHOLE STORM (DRAINAGE) MANHOLE ELECTRIC MANHOLE TELEPHONE MANHOLE WATER VALVE FIRE HYDRANT LIGHT POLE SIGN BOLLARD EX TREE EX PINE TREE MONUMENT FOUND (AS NOTED) BENCHMARK CHAIN LINK FENCE RETAINING WALL CENTERLINE RIGHT-OF-WAY ELECTRIC LINE SEWER LINE STORM LINE STORM DRAIN WATER LINE TEMPORARY CONSTRUCTION FENCING
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
CATCH BASIN W/INLET PROTECTION
AutoCAD SHX Text
SILT FENCE
AutoCAD SHX Text CONCRETE WASHOUT PIT (FINAL LOCATION TO BE DETERMINED BY CONTRACTOR TO BEST SERVE THE CONSTRUCTION ACTIVITIES)
AutoCAD SHX Text
1. ALL EROSION AND SEDIMENT CONTROL WORK SHALL COMPLY WITH THE CURRENT EDITION OF THE ALL EROSION AND SEDIMENT CONTROL WORK SHALL COMPLY WITH THE CURRENT EDITION OF THE WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION (WVDEP) "EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICE MANUAL". 2. BEST MANAGEMENT PRACTICES (BMP) SHOWN ON THE DRAWING ARE THE MINIMUM REQUIREMENTS BEST MANAGEMENT PRACTICES (BMP) SHOWN ON THE DRAWING ARE THE MINIMUM REQUIREMENTS FOR THIS PROJECT. ADDITIONAL BMP MAY BE REQUIRED DURING CONSTRUCTION. CONTACT THE ENGINEER WITH ANY QUESTIONS. 3. SEE SHEETS CE501 AND CE502 FOR ADDITIONAL EROSION AND SEDIMENT CONTROL NOTES AND SEE SHEETS CE501 AND CE502 FOR ADDITIONAL EROSION AND SEDIMENT CONTROL NOTES AND DETAILS. 4. STABILIZED CONSTRUCTION ENTRANCE TO BE LOCATED BY THE CONTRACTORSTABILIZED CONSTRUCTION ENTRANCE TO BE LOCATED BY THE CONTRACTOR
AutoCAD SHX Text
EROSION AND SEDIMENT CONTROL NOTES
AutoCAD SHX Text
CW
AutoCAD SHX Text
SEE SHEETS CE501 AND CE502 FOR ADDITIONAL NOTES AND DETAILS.
CURB INLET W/INLET PROTECTION
EROSION AND SEDIMENT
CONTROL NOTES
CE501
BAVJRO
VILLAS FOR RESIDENT
REHAB/TREATMENT PROGRAM
LOUIS A. JOHNSON VAMC
http://www.urscorp.com
(614) 464-4500 fax (614) 464-0588 columbus, ohio 43215-2566
277 west nationwide boulevard architects engineers planners
FULLY SPRINKLERED
CLARKSBURG, WV 26301
SEPTEMBER 24, 2019
#540-345
$$$ Support Value Engineering - It Pays $$$
AS BUILT DRAWINGSBEHAVIORAL HEALTH RESIDENTIAL HOMES
AutoCAD SHX Text
OFFSITE VEHICLE TRACKING
AutoCAD SHX Text
HAZARDOUS MATERIALS
AutoCAD SHX Text
STORM WATER MANAGEMENT
AutoCAD SHX Text
STRUCTURAL CONTROLS
AutoCAD SHX Text
PERMANENT STABILIZATION
AutoCAD SHX Text
TEMPORARY STABILIZATION
AutoCAD SHX Text
E. - EROSION AND SEDIMENT CONTROLS
AutoCAD SHX Text
D. - EROSION AND SEDIMENT CONTROL GENERAL NOTES
AutoCAD SHX Text
C. - NAME OF RECEIVING WATERS:
AutoCAD SHX Text
B. - SEQUENCE OF MAJOR ACTIVITIES:
AutoCAD SHX Text
A. - SITE INFORMATION
AutoCAD SHX Text DESCRIPTION OF PROJECT INCLUDING SOIL DISTURBING ACTIVITIES: THIS PROJECT WILL CONSIST OF THE CONSTRUCTION OF ONE RESIDENT VILLA, CONCRETE SIDEWALKS. PHASE I WORK SHALL CONSIST OF CLEARING THE SITE OF ALL TREES AND UNDERGROWTH IN DESIGNATED AREAS. SOIL DISTURBING ACTIVITIES DURING PHASE I WILL INCLUDE THE FOLLOWING: DEMOLISHING EXISTING BUILDING STRUCTURES; CLEARING AND GRUBBING; INSTALLING PERIMETER AND OTHER EROSION AND SEDIMENT CONTROLS; ROUGH GRADING; PLACEMENT OF AGGREGATE (COMBINATION OF NO.1 AND NO. 2 COARSE AGGREGATE) IN CONSTRUCTION PAVED AREAS; TEMPORARY SEEDING AND MULCHING. RUNOFF COEFFICIENT: THE EXISTING RUNOFF COEFFICIENT FOR THE SITE IS C = 0.44 THE EXISTING RUNOFF COEFFICIENT FOR THE SITE IS C = 0.44 THE FINAL RUNOFF COEFFICIENT FOR THE SITE WILL BE C = 0.56 SITE AREA: THE TOTAL LAND DISTURBANCE DUE TO CONSTRUCTION ACTIVITIES IS 0.46 ACRES.
AutoCAD SHX Text
1. INSTALL STABILIZED CONSTRUCTION ENTRANCE. INSTALL STABILIZED CONSTRUCTION ENTRANCE. 2. INSTALL TREE PROTECTION FENCE (IF NECESSARY). INSTALL TREE PROTECTION FENCE (IF NECESSARY). 3. CLEAR TREES AND VEGETATION IN AREAS DESIGNATED TO HAVE SILT FENCING INSTALLED. CLEAR TREES AND VEGETATION IN AREAS DESIGNATED TO HAVE SILT FENCING INSTALLED. 4. INSTALL SEDIMENT AND EROSION CONTROLS. INSTALL SEDIMENT AND EROSION CONTROLS. 5. CONTINUE CLEARING AND GRUBBING. CONTINUE CLEARING AND GRUBBING. 6. STOCKPILE TOPSOIL. STOCKPILE TOPSOIL. 7. INSTALL COARSE AGGREGATE TO PAVED AREAS. INSTALL COARSE AGGREGATE TO PAVED AREAS. 8. PROVIDE TEMPORARY SEEDING AND MULCHING.PROVIDE TEMPORARY SEEDING AND MULCHING.
AutoCAD SHX Text THE SITE WILL DRAIN INTO AN PROPOSED ON-SITE UNDERGROUND STORMWATER SYSTEM. THE RUNOFF WILL ULTIMATELY FLOW INTO THE WEST FORK RIVER.
AutoCAD SHX Text
1. ALL EROSION/SEDIMENT/DUST CONTROL PRACTICES SHALL BE PERFORMED AS DIRECTED BY THE WEST VIRGINIA DEPARTMENT ALL EROSION/SEDIMENT/DUST CONTROL PRACTICES SHALL BE PERFORMED AS DIRECTED BY THE WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION (WVDEP) "EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICE MANUAL", CURRENT EDITION. EROSION CONTROL DEVICES ARE TO BE MAINTAINED IN EFFECTIVE WORKING CONDITION DURING CONSTRUCTION AND UNTIL THE CONSTRUCTION AREA HAS BEEN PERMANENTLY STABILIZED. 2. THE CONTRACTOR SHALL BE RESPONSIBLE TO HAVE THE CURRENT PLAN IMMEDIATELY AVAILABLE OR POSTED ON THE SITE. THE CONTRACTOR SHALL BE RESPONSIBLE TO HAVE THE CURRENT PLAN IMMEDIATELY AVAILABLE OR POSTED ON THE SITE. THE CONTRACTOR SHALL BE RESPONSIBLE TO DELINEATE, ON THE PLAN, ALL EROSION AND SEDIMENTATION CONTROL WORK ACTUALLY PERFORMED; AND TO AMEND THE PLAN AS REQUIRED AS A RESULT OF HIS WORK. THE CONTRACTOR SHALL BE RESPONSIBLE TO PERFORM REQUIRED MAINTENANCE PROCEDURES AND DOCUMENT THEM AS REQUIRED BY THE GENERAL PERMIT AND THE PLAN. DETAILS HAVE BEEN SHOWN ON THE PLAN IN AN EFFORT TO HELP THE CONTRACTOR PROVIDE EROSION AND SEDIMENTATION CONTROL. THE DETAILS SHOWN ON THE PLAN SHALL BE CONSIDERED A MINIMUM. ADDITIONAL OR ALTERNATE DETAILS MAY BE FOUND IN THE WVDEP EROSION AND SEDIMENT CONTROL BEST MANAGMENT PRACTICE MANUAL, CURRENT EDITION. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR PROVIDING NECESSARY AND ADEQUATE MEASURES FOR PROPER CONTROL FOR EROSION AND SEDIMENT RUNOFF FROM THE CONSTRUCTION AREAS, SUBJECT TO APPROVAL FROM THE ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER MAINTENANCE AND INSPECTION IN COMPLIANCE WITH THE NPDES GENERAL PERMIT FOR STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES. 3. STOCKPILED TOPSOIL AND EXCAVATED MATERIAL IS TO BE PROTECTED THROUGH THE USE OF TEMPORARY SEEDING, OR STOCKPILED TOPSOIL AND EXCAVATED MATERIAL IS TO BE PROTECTED THROUGH THE USE OF TEMPORARY SEEDING, OR COVERED WITH ANCHORED STRAW MULCH. 4. FINAL GRADING WILL BE CONSISTENT WITH PRE-CONSTRUCTION TOPOGRAPHY TO MAINTAIN DRAINAGE AND AESTHETICS. FINAL GRADING WILL BE CONSISTENT WITH PRE-CONSTRUCTION TOPOGRAPHY TO MAINTAIN DRAINAGE AND AESTHETICS. 5. REMOVE ONLY THOSE TREES, SHRUBS, AND GRASSES THAT MUST BE REMOVED TO PERMIT ACTUAL CONSTRUCTION: REMOVE ONLY THOSE TREES, SHRUBS, AND GRASSES THAT MUST BE REMOVED TO PERMIT ACTUAL CONSTRUCTION: PROTECT THE REMAINING TO PRESERVE THEIR AESTHETIC AND EROSION CONTROL VALUE. 6. BACKFILL TRENCHES IMMEDIATELY AFTER COMPACTION. SEED AND MULCH TRENCHES WITHIN TWO WEEKS AFTER TRENCHES BACKFILL TRENCHES IMMEDIATELY AFTER COMPACTION. SEED AND MULCH TRENCHES WITHIN TWO WEEKS AFTER TRENCHES ARE OPENED. 7. SILT FROM CONSTRUCTION OPERATIONS SHALL NOT BE PERMITTED TO ENTER THE STORM DRAIN SYSTEM OR WATERWAYS SILT FROM CONSTRUCTION OPERATIONS SHALL NOT BE PERMITTED TO ENTER THE STORM DRAIN SYSTEM OR WATERWAYS (NATURAL OR MAN-MADE OR ADJACENT PRIVATE PROPERTY). CONSTRUCTION OCCURRING NEAR STORM DRAIN INLETS OR WATERWAYS (NATURAL OR MAN-MADE), SHALL REQUIRE EROSION CONTROL MEASURES, SUCH AS SILT FENCE AND INLET PROTECTION, TO PREVENT SILT FROM ENTERING THE STORM DRAIN AND WATERWAYS (NATURAL OR MAN-MADE OR ADJACENT PRIVATE PROPERTY). 8. TIMING OF SEDIMENT - TRAPPING PRACTICES: SEDIMENT CONTROL PRACTICES SHALL BE FUNCTIONAL THROUGHOUT EARTH TIMING OF SEDIMENT - TRAPPING PRACTICES: SEDIMENT CONTROL PRACTICES SHALL BE FUNCTIONAL THROUGHOUT EARTH - DISTURBING ACTIVITY. SETTLING FACILITIES, PERIMETER CONTROLS AND OTHER PRACTICES INTENDED TO TRAP SEDIMENT SHALL BE IMPLEMENTED AS THE FIRST STEP OF GRADING OR CONSTRUCTION AND WITHIN SEVEN DAYS FROM THE START OF GRUBBING. THEY SHALL CONTINUE TO FUNCTION UNTIL THE UPSLOPE DEVELOPMENT AREA IS STABILIZED. THESE CONTROLS SHALL BE SELECTED AND LOCATED AS DIRECTED BY THE ENGINEER. 9. STABILIZATION OF DENUDED AREAS: DENUDED AREAS SHALL HAVE SOIL STABILIZATION APPLIED WITHIN SEVEN DAYS OF STABILIZATION OF DENUDED AREAS: DENUDED AREAS SHALL HAVE SOIL STABILIZATION APPLIED WITHIN SEVEN DAYS OF DISTURBANCE IF THEY ARE TO REMAIN SUBSTANTIALLY UNWORKED FOR MORE THAN 14 DAYS. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE, AND SHALL ALSO BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS WHICH MAY NOT BE AT FINAL GRADE, BUT WHICH WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 14 DAYS. 10. SEDIMENT BARRIERS: SHEET FLOW RUNOFF FROM DENUDED AREAS SHALL BE FILTERED OR DIVERTED TO A SETTLING SEDIMENT BARRIERS: SHEET FLOW RUNOFF FROM DENUDED AREAS SHALL BE FILTERED OR DIVERTED TO A SETTLING FACILITY. THESE CONTROLS SHALL BE CONSTRUCTED AS INDICATED ON THE PLANS. ADDITIONAL CONTROLS MAY BE SELECTED AND INSTALLED AS DIRECTED BY THE ENGINEER. 11. STORM WATER INLET PROTECTION: ALL STORM SEWER INLETS WHICH ACCEPT WATER RUNOFF FROM THE PROJECT AREA, STORM WATER INLET PROTECTION: ALL STORM SEWER INLETS WHICH ACCEPT WATER RUNOFF FROM THE PROJECT AREA, WHETHER ON THE PROPERTY OR OFF THE PROPERTY, SHALL BE PROTECTED SO THAT SEDIMENT-LADEN WATER WILL NOT ENTER THE STORM SEWER SYSTEMS WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT, UNLESS THE STORM SEWER SYSTEM DRAINS TO A SETTLING FACILITY. THESE CONTROLS SHALL BE SELECTED AND LOCATED AS DIRECTED BY THE ENGINEER. 12. SLOUGHING AND DUMPING: NO SOIL, ROCK, DEBRIS OR ANY OTHER MATERIAL SHALL BE DUMPED OR PLACED INTO A SLOUGHING AND DUMPING: NO SOIL, ROCK, DEBRIS OR ANY OTHER MATERIAL SHALL BE DUMPED OR PLACED INTO A WATER RESOURCE OR INTO SUCH PROXIMITY THAT IT MAY READILY SLOUGH, SLIP, OR ERODE INTO A WATER RESOURCE UNLESS SUCH DUMPING OR PLACING IS AUTHORIZED BY THE ENGINEER, UNSTABLE SOILS PRONE TO SLIPPING OR LANDSLIDING SHALL NOT BE GRADED, EXCAVATED, FILLED OR HAVE LOADS IMPOSED UPON THEM UNLESS THE WORK IS AUTHORIZED BY THE ENGINEER. 13. ESTABLISHMENT OF PERMANENT VEGETATION: PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL ESTABLISHMENT OF PERMANENT VEGETATION: PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL GROUND COVER IS ACHIEVED WHICH, IN THE OPINION OF THE ENGINEER, PROVIDES ADEQUATE COVER AND IS MATURE ENOUGH TO CONTROL SOIL EROSION SATISFACTORILY AND TO SURVIVE ADVERSE WEATHER CONDITIONS. 14. MAINTENANCE: ALL SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED TO MINIMIZE MAINTENANCE REQUIREMENTS. MAINTENANCE: ALL SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED TO MINIMIZE MAINTENANCE REQUIREMENTS. THEY SHALL BE MAINTAINED AND REPAIRED AS NEEDED TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE CONTINUED MAINTENANCE OF ALL EROSION CONTROLS DURING THE LIFE OF THE PROJECT.
AutoCAD SHX Text TOP SOIL STOCKPILES AND DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY TEMPORARILY CEASES FOR AT LEAST 14 DAYS WILL BE STABILIZED WITH TEMPORARY SEED AND MULCH NO LATER THAN 7 DAYS FROM THE LAST CONSTRUCTION ACTIVITY IN THAT AREA. THE TEMPORARY SEED, AGRICULTURAL LIMESTONE AND FERTILIZER SHALL BE APPLIED ACCORDING TO THE RATES STATED IN THE "TEMPORARY SEDIMENT AND EROSION CONTROLS" SPECIFICATION SECTION.
AutoCAD SHX Text DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES PERMANENTLY CEASE SHALL BE STABILIZED WITH PERMANENT SEED NO LATER THAN 7 DAYS AFTER THE LAST CONSTRUCTION ACTIVITY. THE PERMANENT SEED MIX, AGRICULTURAL LIMESTONE AND FERTILIZER SHALL BE APPLIED ACCORDING TO THE RATES STATED IN THE "SEEDING AND MULCHING" SPECIFICATION SECTION. THE FOLLOWING SHALL APPLY IF WORK IS PERFORMED OUTSIDE OF NORMAL GROWING SEASON. BETWEEN OCTOBER 1 AND NOVEMBER 20 WHEN SOIL CONDITIONS PERMIT, PERMANENT SEEDING AREAS MAY BE PREPARED WITH LIME AND FERTILIZER BUT SHALL BE MULCHED AND ANCHORED WITHOUT SEEDING. AFTER NOVEMBER 20 AND BEFORE MARCH 15, BROADCAST RECOMMENDED SEED MIXTURE AT 150% OF RECOMMENDED RATES (CONSIDERED DORMANT SEEDING RATES).
AutoCAD SHX Text SILT FENCE SHALL BE CONSTRUCTED ALONG THE PERIMETER OF THE SITE AS INDICATED ON THE PHASE I STORM WATER POLLUTION PREVENTION PLAN. SILT FENCING SHALL BE OF A TYPE AS INDICATED IN THE SPECIFICATIONS AND SHALL BE INSTALLED AS SOON AS THE AREAS ARE CLEARED IN WHICH THE FENCE IS DESIGNATED TO BE INSTALLED. THE SILT FENCE SHALL BE CONSTRUCTED AROUND THE SITE PERIMETER AND AT THE TOP OF THE STREAM BANKS. SILT FENCE SHALL BE INSTALLED AT THE TOE OF ALL SLOPES AND SHALL BE PLACED SUCH THAT NO WATER CAN FLOW AS A CONCENTRATED STREAM. IF AFTER THE INSTALLATION OF THE SILT FENCE, CONCENTRATED FLOWS OCCUR OR WATER BYPASSES THE FENCE, ADDITIONAL MEASURES SHALL BE INSTALLED OR THE EXISTING MEASURES SHALL BE MODIFIED AT THE DIRECTION OF THE ENGINEER.
AutoCAD SHX Text STORM WATER DRAINAGE DURING PHASE I WILL BE PROVIDED BY THE NATURAL DRAINAGE PATTERNS OF THE SITE. SILT FENCING ALONG THE PERIMETER OF THE SITE WILL DIRECT AND DIFFUSE RUNOFF WHILE CAPTURING ANY SEDIMENT CONTAINED IN THE RUNOFF.
AutoCAD SHX Text ALL HAZARDOUS WASTE MATERIALS WILL BE DISPOSED OF IN THE MANNER SPECIFIED BY LOCAL OR STATE REGULATION OR BY THE MANUFACTURER. SITE PERSONNEL WILL BE INSTRUCTED IN THESE PRACTICES AND THE CONTRACTOR(S) WILL BE RESPONSIBLE FOR SEEING THAT THESE PRACTICES ARE FOLLOWED.
AutoCAD SHX Text A STABILIZED CONSTRUCTION ENTRANCE SHALL BE PROVIDED TO HELP REDUCE VEHICLE TRACKING OF SEDIMENTS ONTO PUBLIC ROADS. THE PAVED AREAS OF ALL ADJACENT PUBLIC ROADS SHALL BE SWEPT DAILY TO REMOVE ANY EXCESS MUD, DIRT OR ROCK TRACKED FROM THE SITE. DUMP TRUCKS HAULING MATERIAL FROM THE CONSTRUCTION SITE WILL BE COVERED IN A TARPAULIN. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT OFF-SITE TRACKING OF SEDIMENTS BY VEHICLES AND EQUIPMENT IS MINIMIZED. THE STABILIZED CONSTRUCTION ENTRANCE SHALL BE CONSTRUCTED USING NO. 1 & NO. 2 AGGREGATE OR RECYCLED CONCRETE EQUIVALENT. THE ENTRANCE SHALL BE AS LONG AS REQUIRED TO STABILIZE HIGH TRAFFIC AREAS BUT NOT LESS THAN 50 FEET IN LENGTH AND 20 FEET IN WIDTH WITH A MINIMUM THICKNESS OF 6 INCHES. A GEOTEXTILE MAY BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING ANY AGGREGATE TO PROVIDE GREATER STABILITY.
AutoCAD SHX Text
H. - CERTIFICATION OF COMPLIANCE WITH FEDERAL, STATE AND LOCAL REGULATIONS
AutoCAD SHX Text
I. - MAINTENANCE/INSPECTION PROCEDURES
AutoCAD SHX Text
G. - TIMING OF CONTROLS/MEASURES
AutoCAD SHX Text
INVENTORY FOR POLLUTION PREVENTION PLAN
AutoCAD SHX Text
J. - NON-STORM WATER DISCHARGES
AutoCAD SHX Text AS INDICATED IN THE SEQUENCE OF MAJOR ACTIVITIES, THE STABILIZED CONSTRUCTION ENTRANCE AND EROSION AND SEDIMENT CONTROLS WILL BE CONSTRUCTED PRIOR TO CLEARING OR GRADING OF THE SITE AND SHALL BE FUNCTIONAL THROUGHOUT ALL EARTH DISTURBING ACTIVITIES. AREAS WHERE CONSTRUCTION ACTIVITY TEMPORARILY CEASES FOR MORE THAN 14 DAYS WILL BE STABILIZED WITH A TEMPORARY SEED AND MULCH WITHIN 7 DAYS OF THE LAST DISTURBANCE. ONCE CONSTRUCTION ACTIVITY CEASES PERMANENTLY IN AN AREA, THAT AREA WILL BE STABILIZED WITH PERMANENT SEED AND MULCH. ONLY AFTER THE ENTIRE SITE IS STABILIZED WILL THE EROSION AND SEDIMENT CONTROLS BE REMOVED.
AutoCAD SHX Text THE PHASE I (SITE CLEARING) STORM WATER POLLUTION PREVENTION PLAN REFLECTS THE REQUIREMENTS FOR STORM WATER MANAGEMENT AND EROSION AND SEDIMENT CONTROL, AS ESTABLISHED BY THE WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION AGENCY. TO ENSURE COMPLIANCE, THIS PLAN WAS PREPARED IN ACCORDANCE WITH THE WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION "EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICE MANUAL", CURRENT EDITION. THERE ARE NO OTHER LOCAL, STATE OR FEDERAL REQUIREMENTS FOR SEDIMENT AND EROSION SITE PLANS (OR PERMITS), OR STORM WATER MANAGEMENT SITE PLANS (OR PERMITS).
AutoCAD SHX Text THESE ARE THE INSPECTION AND MAINTENANCE…
This is the start of the file's text. The full file is on GovTribe.