This document is a Request for Quotes (RFQ) for HVAC duct cleaning services at the Washington, DC VA Medical Center. The RFQ includes a detailed Statement of Work (SOW) for cleaning HVAC ducts, kitchen hoods, and dryer vents across multiple buildings and air handling systems. The contract will be a base year plus four one-year option periods. Key requirements include the contractor maintaining proper certifications, providing all labor and equipment, following NFPA and industry standards, and submitting detailed reports. Quotes are due by July 8, 2024 at 9:00 AM EST and should be emailed to the specified Contracting Officer and COR. The contract will be awarded to a Plumbing, Heating, and Air-Conditioning contractor with NAICS code 238220. The government will provide the air filters while the contractor provides the labor. Cleaning requirements vary by location, with some areas needing quarterly service and others annually.

View the file

Other files

File Type Posted
DC REGISTER OF WAGE DETERMINATIONS-2024.pdf PDF
VAAR 852.219-75-VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.pdf PDF
36C24523Q0180 0010_1.docx DOCX document
RFQ-36C24523Q0180-DC VAMC DUCT CLEANING-UPDATED 5-29-24.pdf PDF
Site Visit Outline DC VAMC - DUCT CLEANING.pdf PDF
VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING CERTIFICATE OF COMPLIANCE SERVICES.pdf PDF
WAGE DETERMINATIONS 2015-4281 rev. 4-11-2024.pdf PDF
36C24523Q0180 0009_1.docx DOCX document
36C24523Q0180 0008_1.docx DOCX document
36C24523Q0180 0008.pdf PDF
Q_A-WASHINGTON DC DUCT CLEANING FACILITY WIDE-UPDATED.pdf PDF
36C24523Q0180 0006.pdf PDF
36C24523Q0180 0006_1.docx DOCX document
36C24523Q0180 0005_1.docx DOCX document
Q_A-WASHINGTON DC DUCT CLEANING FACILITY WIDE.pdf PDF
36C24523Q0180 0005.pdf PDF
SITE VISIT OUTLINE.pdf PDF
36C24523Q0180 0004-DC VAMC DUCT CLEANING.pdf PDF
36C24523Q0180 0004_1.docx DOCX document
36C24523Q0180 0003.pdf PDF
P09-Sow Duct Cleaning Final-JR-1-26-23.pdf PDF
36C24523Q0180 0003_1.docx DOCX document
SITE VISIT ATTENDANCE SHEET.pdf PDF
DUCT CLEANING QUESTIONS ANSWERS.pdf PDF
Image(4).jpeg JPEG file
36C24523Q0180 0002_1.docx DOCX document
Image(9).jpeg JPEG file
Image(7).jpeg JPEG file
Image(1).jpeg JPEG file
Image(11).jpeg JPEG file
Image(6).jpeg JPEG file
36C24523Q0180 0002.pdf PDF
Image(10).jpeg JPEG file
Image(3).jpeg JPEG file
Image(5).jpeg JPEG file
Image.jpeg JPEG file
Image(8).jpeg JPEG file
Image(2).jpeg JPEG file
36C24523Q0180 0001_1.docx DOCX document
36C24523Q0180 0001.pdf PDF
Site Visit Outline - DUCT CLEANING DC VAMC.pdf PDF
D.1 WASHINGTON DC WAGE DETERMINATION ATTACHED.pdf PDF
RFQ-36C24523Q0180-WASHINGTON DC VAMC DUCT CLEANING-JR-BD.pdf PDF
36C24523Q0180_1.docx DOCX document
WASHINGTON DC Main Hospital Mechanical Set.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 44

688-23-1-478-0005

90C

Department of Veterans Affairs

VAMC

10 N Greene St Baltimore MD 21201

90c

Department of Veterans Affairs

VAMC

10 N Greene St Baltimore MD 21201

To all Offerors/Bidders

36C24523Q0180

06-25-2024

X

X X

7/8/24 9:00 AM EST

See CONTINUATION Page

X

AMENDMENT #10 TO PROVIDE RESPONDES TO QUESTIONS AND ADJUST STATEMENT OF WORK TO REFLECT THOSE ANWSERS.

NO MORE QUESTIONS WILL BE ACCEPTED AT THIS TIME UNLESS TO ADDRESS A CLARIFICATION OF LINE ITEM OR TYPO.

QUOTES MUST BE SUBMITTED VIA EMAIL TO:

Bradley.Davis3@va.gov and copy John.Ritter2@va.gov Due Date for quotes is Monday 7/8/2024 @ 9:00 AM EST

BRADLEY DAVIS

CONTRACTING OFFICER

VA-VHA-2020-8952A45B

mailto:Bradley.Davis3@va.gov mailto:John.Ritter2@va.gov

CONTINUATION PAGE

Site visit notes from June 5th, 2024.

Attendance:

1. Hyper Clean Duct Cleaning, LLC-SB

2. Blue Jacket-SDVOSB

3. T3W- Housen Health Services-SDVOSB

Questions and Answers

1. Please confirm that we will be required to clean 25 feet from each unit. YES

2. For the access panels we discussed cleaning the first 10 feet on each side can you confirm that distance .

Yes

3. The Kitchen manger and staff told us that the kitchen hoods have been cleaned with in the past few months, for scheduling purposes can you confirm when that was ? Hood was cleaned however the ductwork going to the exhaust was not.( Fan no. E21)

4. Kitchen Hood duct needs cleaned from the Hood all the way out to the exhaust? **this one I think is code but we are not clear on the SOW . Main Kitchen/Canteen/CLC hood as well. Yes clean all the way from Hood to exhaust.

5. Lastly can you confirm that the start time for work will need to be 2pm or later? I would say The start times are usually after 5:00PM. Kitchen is after 7:00PM. Critical procedure areas are always scheduled to accommodate the situation. In non-clinical areas then you can start earlier, just ask the COR if you are in doubt.

A.1 STATEMENT OF WORK (SOW) REVISED 6-24-24

STATEMENT OF WORK (SOW)

1. Project Location: Veterans Affairs Medical Center, Washington, D.C., Main Hospital-50 Irving St N.W., Washington, D.C., 20422.

2. Scope of Work: This Statement of Work includes all work necessary to support the required maintenance, equipment, and supplies needed (description below) to clean the systems., located at the Veterans Affairs Medical Center, 50 Irving Street NW, Washington DC, 20422.

3. Provide HVAC duct cleaning.

Scope of Service:

Services for Cleaning HVAC ducts.

Per the scope below, the vendor will provide all necessary labor, materials, and equipment to clean duct work distributions throughout the facility.

The following work is necessary to enable FMS to supply the proper air flow and control room temperatures.

DESCRIPTION OF SERVICES.

The Contractor shall provide all personnel, equipment, tools, materials, supervision, items and services necessary to perform HVAC duct cleaning, kitchen hood cleaning and dryer vent cleaning. Vender will be required to clean 25 feet from each unit and clean the first 10 feet on each side for access panels.

BASIC HVAC DUCT CLEANING SERVICES.

1. Services- The Contractor shall manage all aspects of this contract to for the cleaning and sanitizing of existing HVAC ductwork throughout the designated areas within the facility.

2. Specific Requirements Affecting Work- Prior to beginning any work the contractor shall coordinate with the building facility manager to arrange an approved schedule and sequence of work within the facility. This meeting shall be held prior to the start of work.

3. Safety and Health Requirements- The Contractor shall provide for protecting the health of his employees, building occupants, and protection from damage of property, materials, supplies, and equipment in accordance with the latest revision of the “ Safety and Health Requirements Act”.

4. Equipment/Tools- The Contractor shall furnish all tools and equipment, which are customary and reasonable for performing duct cleaning services, to include all hands tools and ladders.

5. Clean Up- The Contractor shall at all times keep the work area free from accumulation of waste materials. Before completing the work, the Contractor will remove from the facility all rubbish generated during the cleaning services, tools, scaffolding, equipment, and materials that belong to the Contractor.

6. Disposal- All existing materials, equipment, and construction debris shall be removed from the building property and disposed of in accordance with all local regulations at the Contractor’s expense, unless specified otherwise herein.

7. Minor Materials and Work- Minor materials and work not specifically mentioned herein, but necessary for the proper completion of work, will be furnished without additional cost to the Government.

8. Qualifications- Contractors must have 2 years or more of past performance equal to the level of difficulty and size of the facility.

CONTRACTOR WORK RESPONSIBILITES

All work will be performed without interruptions of the facility work activities. The Contractor will be responsible for returning all ceiling tiles and other equipment and materials, disturbed during the course of cleaning, to their original condition. The Contractor will be responsible for repairs to any equipment, or materials, damaged during the course of work within the designated facility locations.

1. Cleaning Preparation- Prior to the commencement of work in any area, all floor and desk areas immediately below the terminal or access panel areas will be covered with drop cloths to contain and control any fallen debris, dirt or other accumulations. All settings of the HVAC equipment will be recorded, and the damper settings will be marked prior to the shutdown of each system. The contractor will reset all of the controls, dampers, etc. to the original settings before placing the system back in service. All drop cloths will be removed at the completion of work in each area. Moreover, all areas will be cleaned to the original condition.

2. Mixing Boxes- The Contractor will remove the door to mixing boxes or cut openings if necessary to obtain access. The Contractor will vacuum out the interior of each box and remove all loose insulation and debris. After cleaning the Contractor will lock down and brush insulation with a heavy compound.

3. Duct Cleaning- All surfaces of the return and supply ducting will be power brushed to remove the dirt and duct deposits. Ducting will be power vacuumed using a HEPA vacuum cleaner with high efficiency filters to prevent the emission of particulates into the surroundings areas. Each duct will be cleaned until it is visibly free of all loose dirt, duct, and debris. The contractor will take all necessary precautions to prevent damage within the work area and replace flex duct if necessary.

4. Access Panels- Openings in the duct will be cut, if necessary, to insure that no area of the ductwork is greater than twenty(20) feet from the operator of the vacuum equipment when it is physically impossible to clean from the interior of the duct. Following the cleaning, all openings will be covered with panels of the same materials as the ductwork. Access covers will be cross-beveled and secured with sheet metal screws for an airtight fir using caulking and duct tape. First 10 feet must be cleaned on each side.

5. Cleaning Duct Terminals- The Contractor will remove flex ducting from the diffusers above the ceiling and vacuum the flex duct and interior of the diffuser.

The contractor will then replace the flex duct and clean the outside diffuser by washing the exterior of each with a disinfectant.

6. Duct Encapsulation- The Contractor will encapsulate each system following the cleaning with non-toxic biocide approved by EPA Regulation for PM post removal surface sealing. Encapsulation will be sprayed in through the installed ductwork inspection ports.

7. Quality Assurance- During the cleaning process the Contractor site supervisor will be responsible for Quality Control. Before each access opening is sealed, the contractor supervisor will inspect the cleaning of the ductwork and make sure all dust, debris, or mold has been eliminated. The site supervisor will coordinate with the building facility manager prior to requesting the HVAC system be restarted. At the end of each workday the site supervisor will inspect all work areas to ensure that they are left in their original condition.

Dryer vent cleaning services

A.3.1 Special Provisions/Qualifications

A. Membership: The duct work system cleaning Contractor shall be a certified member of the Chimney Safety Institute of America (CSIA).

B. Certification: The duct work system cleaning Contractor shall have a minimum of one (1) Certified Dryer Exhaust Technician (C-DET) certified by CSIA on a full-time basis.

C. Experience: The dryer duct work system cleaning Contractor shall submit records of experience in the field of duct work system cleaning as requested by the VA. Quotes shall only be considered from firms which are regularly engaged in duct work system cleaning/maintenance with an emphasis on duct work system cleaning and decontamination.

D. Equipment, Materials and Labor: The dryer duct work system cleaning Contractor shall possess and furnish all necessary equipment, materials and labor to adequately perform the specified services. The Contractor shall assure that its employees have received safety equipment training, medical surveillance programs, individual health protection measures, and manufacturer’s product and material safety data sheets (MSDS) as required for the work by the U.S. Occupational Safety and Health Administration (OSHA), and as described by this specification. The Contractor shall always maintain a copy of all current MSDS documentation and safety certifications at the site, as well as comply with all other site documentation requirements of applicable OSHA programs and this specification. The Contractor shall also submit to the VA, all Material Safety Data Sheets (MSDS) for all chemical products/cleaners proposed to be used in the cleaning process.

E. Licensing: The dryer duct work system cleaning Contractor shall provide proof of maintaining the proper license(s), if any, as required to do work in this state. The Contractor shall comply with all Federal, State and local rules, regulations, and licensing requirements.

F. Standards: The dryer duct work system cleaning Contractor shall perform the services specified here in accordance with the current published standards of the Chimney Safety Institute of America (CSIA). All terms in this specification shall have their meaning defined as stated in the CSIA standards. CSIA standards must be followed with no modifications or deviations.

A.3.3 REPORTS

A. At the conclusion of each cleaning, the Contractor shall provide an electronic report to the VA indicating the following:

i. Contractor shall complete and submit an electronic report of the work performed to the COR within seven (7) calendar days of visit. The report will include a list of all areas completed as well as identified problems and/or deficiencies. Service reports must be signed by both the Contractor and COR at completion of work.

ii. Areas of the system found to be damaged and/or in need of repair.

A.3.4 Requirements This section defines the minimum requirements necessary to render duct work components clean, and to verify the cleanliness through inspection and/or testing in accordance with items specified herein and shall comply with all applicable CSIA & NFPA standards.

A. The Contractor shall be responsible for the removal of visible surface contaminants and deposits from within the duct work system.

B. The Contractor shall provide all labor, materials and equipment necessary to clean all interior surfaces of, check general condition/operation of and perform semi-annual preventive maintenance to dryer ductwork.

C. Prior to the commencement of any cleaning work, the duct work system cleaning Contractor shall perform a visual inspection of the duct work system to determine appropriate methods, tools, and equipment required to satisfactorily complete this requirement. The cleanliness inspection shall include all components of the ductwork. The cleanliness inspection shall be conducted without negatively impacting the indoor environment through excessive disruption of settled dust, microbial amplification or other debris. In cases where contamination is suspected, and/or in sensitive environments where even small amounts of contaminant may be of concern, environmental engineering control measures should be implemented. Damaged system components found during the inspection shall be documented and brought to the attention of the COR. Contractors shall report deficiencies that are deemed critical or catastrophic immediately to the Contracting Officer (CO) and the COR for immediate actions.

i. Contractor shall conduct a site evaluation, and establish a specific, coordinated plan which details how each area of the building will be protected during the various phases of the project.

D. General Duct Work System Cleaning Requirements:

i. Containment: Debris removed during cleaning shall be collected and precautions must be taken to ensure that Debris is not otherwise dispersed outside the duct work system during the cleaning process.

ii. Controlling Odors: Measures shall be employed to control odors and/or mist vapors during the cleaning process if cleaning chemicals are used.

iii. Component Cleaning: Cleaning methods shall be employed such that all duct work system components must be Visibly Clean as defined in applicable CSIA standards.

iv. Upon completion, all components must be returned to those settings recorded just prior to cleaning operations.

v. Air-Volume Control Devices: Dampers and any air-directional mechanical devices inside the duct work system must have their position marked prior to cleaning and, upon completion, must be restored to their marked position.

vi. Service Openings/Access Points: The Contractor shall utilize service openings, as required for proper cleaning, at various points of the duct work system for physical and mechanical entry, and inspection. Contractor shall utilize the existing service openings already installed in the duct work system. Contractor shall ensure that all joints are taped with approved foil-backed tape for use with dryer vents.

vii. Ceiling sections (tile): The Contractor may remove and reinstall ceiling sections to gain access to duct work systems during the cleaning process.

E. Health and Safety

i. No processes or materials shall be employed in such a manner that they will introduce additional hazards into occupied spaces.

ii. Disposal of Debris: All Debris removed from the duct work System shall be disposed of in accordance with applicable federal, state and local requirements.

Kitchen exhaust cleaning services

1. The information provided is the government’s best estimate of the total quantity of service required. Exhaust hoods and ducts are located in various facilities. An exhaust hood system can have a number of different configurations according to the manufacturer’s specifications. A single system may have multiple ducts and/or fans. The contractor shall clean grease hoods (Exhaust hoods carrying grease laden vapors) and shall adhere to and comply with the provisions listed in National Fire Protection Association Code 96, Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations. http://www.nfpa.org . Steam hoods will not be cleaned under this contract. Contractor shall comply with all federal, state and local laws required in performance of this work. Kitchen Hood duct needs cleaned from the Hood all the way out to the exhaust.

1.1.1. CLEANING. The contractor shall clean and inspect all components of the exhaust hood and duct systems, to include the interior and exterior of hood, duct, exhaust fan, and any other components in accordance with industry and commercial standards, and NFPA Fire Code #96: 11.4, 11.6.1, 11.6.2. Contractor shall use a steam cleaning process or equivalent.

Upon completion of service, the entire exhaust systems shall be free from grease, dirt, dust, lint, oil residue, etc. After cleaning is completed, the contractor shall display a label within the kitchen area indicating the date cleaned and the name of the servicing company.

1.1.1.1. The contractor shall protect government property to the extent necessary to prevent damage to the property. The contractor shall use drop cloths, shields and other protective devices as necessary. Contractor may remove fixtures and equipment as necessary that may interfere with the work. Contractor shall reinstall fixtures or equipment removed and shall ensure they are operational prior to departing the work site. The contractor shall be responsible for making repairs to damages caused by the contractor at no additional cost to the Government. Contractor shall reimburse the Government for clearing grease clogged drains that occur due to improper disposal of grease laden run-off down kitchen drains.

1.2 SERVICE TICKET. The contractor shall provide a service ticket after completion of work to the COR. The ticket shall identify the building number, date/time work was performed and any repairs required for each individual system. The service format / details ticket will be approved prior to the start of the contract.

1.3. CLEAN-UP. Contractor generated hazardous chemicals used in the cleaning process will be captured and disposed of off base at a city or state approved disposal site. This includes all runoff from the hoods and ducts. Non-hazardous chemicals that have been preapproved by the Hazmat manager may be disposed of on site. The contractor shall clean up each work site after completion of services.

1.4. Special Qualifications. All contractor personnel performing exhaust hood cleaning on VADC Medical Center shall be certified and provide proof of certification prior to start of work.

Certification can be done through International Kitchen Exhaust Cleaning Association’s (IKECA’s) “Certified Exhaust Cleaning Specialist” (CECS) certification.

http://www.nfpa.org/

2.1. Quality Assurance. The Government shall inspect and evaluate the Contractor’s performance to ensure services are received in accordance with the requirements set forth in this contract. The Contracting Officer’s Representative (COR) shall inspect by validating actual work performance, physically checking an attribute of the completed task, checking a management information report, conferring with facility managers, or otherwise inspecting the task or its results to determine whether or not performance meets the standards contained in this SOW. Additional inspections will be performed jointly by JBSA fire inspectors and COR.

The COR is the approving authority for acceptance of performance.

2.2. Periodic Progress Meeting. The CO, COR, other Government personnel as appropriate, and contractor shall meet periodically to discuss the contractor’s performance. The following issues shall be discussed: opportunities to improve the contract, any modifications required of the contract, unsatisfactory inspections and valid customer complaints against each performance objective observed, and steps taken by the contractor to prevent occurrences in the future. The contractor shall provide a summation of unsatisfactory inspections and customer complaints and provide insight into any identified trends. Should the contractor not concur with the minutes, the contractor will provide a written notification to the CO within 2 calendar days of receipt identifying areas of non-concurrence for resolution.

2.3. GENERAL INFORMATION:

2.4. Hours and Days of Operation. The contractor shall perform services: Normal installation duty hours are 7:30 AM -4:15 PM, Monday thru Friday, except federal holidays. In food preparation and servicing areas the work shall be performed after the serving of the evening meal and be completed before the preparation of early morning meals. In case of an Emergency during off duty hours and weekends. *Note this is a working medical center therefore start times for this work are usually after 5:00 PM EST and for the Kitchen it is after 7:00 PM to accommodate the situation. In other areas where patients or internal working of the medical like the Kitchen do not apply then work can be completed earlier in the day. If in doubt, please check with the COR.

2.5. RECOGNIZED FEDERAL HOLIDAYS:

New Year’s Day - 1 January Martin Luther King Jr. Day - 3rd Monday in January President’s Day - 3rd Monday in February Memorial Day - Last Monday in May June 19th Independence Day - 4th July Labor Day - 1st Monday in September Columbus Day - 2nd Monday in October Veteran’s Day - 11 November Thanksgiving Day - 4th Thursday in November Christmas Day – 25th December

If these holidays fall on Saturday, the preceding Friday will be observed. If these holidays fall on Sunday, the following Monday will be observed. If a holiday falls on a scheduled service day, the Contractor shall be responsible for rescheduling services for the first day post the holiday observance. If the president grants VA employees an additional holiday/administrative leave day, it does not apply to the contractor.

2.6. Cleaning Frequency: THE REQUIREMENTS OF THE INSPECTION SHALL BE DONE

30 DAYS FROM THE AWARD AND EVERY YEAR OR QUARTLY FROM THAT AWARD PER

THE SCHEDULE.

A.2 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBER

DESCRIPTION OF

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

4.00 QTR __________________ __________________

MICU, SICU AIR HANDLER AND RELATED EXHAUST SYSTEMS

Contract Period: Base POP Begin: 08-01-2024 POP End: 07-31-2025 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment The requirements of the inspection shall be done 30 days from the award and every quarter from that award.

OR AIR HANDLER 1&2 AND RELATED EXHAUST SYSTEMS

Contract Period: Base POP Begin: 08-01-2024 POP End: 07-31-2025 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment award and every quarter that award.

RESEARCH AIR HANDLERS 1&2 AND RELATED EXHAUST

SYSTEMS

Contract Period: Base POP Begin: 08-01-2024 POP End: 07-31-2025 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

NURSING HOME AND GARAGE AIR HANDLERS 1&2, 6-F-1 AND

6-F-2 Contract Period: Base POP Begin: 08-01-2024 POP End: 07-31-2025 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

RETURNS- NURSING HOME AIR HANDLERS

Contract Period: Base POP Begin: 08-01-2024 POP End: 07-31-2025 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

CLOTHES DRYER VENTS

Contract Period: Base POP Begin: 08-01-2024 POP End: 07-31-2025 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

INDUCTION UNITS

Contract Period: Base POP Begin: 08-01-2024 POP End: 07-31-2025 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

LOCAL STOCK NUMBER: 450.00

CANTEEN AIR HANDLER

Contract Period: Base POP Begin: 08-01-2024 POP End: 07-31-2025 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

AIR HANDLER 9 AND RELATED RETURN AIR SYSTEMS

Contract Period: Base POP Begin: 08-01-2024 POP End: 07-31-2025 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

1.00 YR __________________ __________________

AIR HANDLER 1&2 AND RELATED EXHAUST MER 1

Contract Period: Base POP Begin: 08-01-2024 POP End: 07-31-2025 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment award and every year from that award.

FMS AND CONTRACTING AIR HANDLER

Contract Period: Base POP Begin: 08-01-2024

POP End: 07-31-2025 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

AIR HANDLER 11 AND RELATED EXHAUST SYSTEMS

Contract Period: Base POP Begin: 08-01-2024 POP End: 07-31-2025 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

AIR HANDLER 12 AND RELATED EXHAUST SYSTEMS

Contract Period: Base POP Begin: 08-01-2024 POP End: 07-31-2025 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

BUILDING SIX EXH 6-F11 BASEMENT

Contract Period: Base POP Begin: 08-01-2024 POP End: 07-31-2025 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

AIR HANDLER 16 MORGUE AND 6-F-8

Contract Period: Base POP Begin: 08-01-2024 POP End: 07-31-2025 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

AIR HANDLER 19 1E AREA AND ALL RELATED DUCT WORK

Contract Period: Base POP Begin: 08-01-2024 POP End: 07-31-2025 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

RECREATION HOOD SYSTEM

Contract Period: Base POP Begin: 08-01-2024 POP End: 07-31-2025 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

NFS KITCHEN HOOD SYSTEM

Contract Period: Base POP Begin: 08-01-2024 POP End: 07-31-2025 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and

CANTEEN HOOD SYSTEM

Contract Period: Base POP Begin: 08-01-2024 POP End: 07-31-2025 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

CLC HOOD SYSTEM

Contract Period: Base POP Begin: 08-01-2024 POP End: 07-31-2025 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

AIR HANDLER 3 AND RELATED EXHAUST MER 1

Contract Period: Base POP Begin: 08-01-2024 POP End: 07-31-2025 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Fisherhouse Duct Cleaning Contract Period: Base POP Begin: 08-01-2024

POP End: 07-31-2025

Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Filter Replace. Labor only Contract Period: Base POP Begin: 08-01-2024 POP End: 07-31-2025 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment This is an option line item. We intend to do this in house but want the ability add if needed.

Therefore, Labor on Filter Replace is considered in scope and the VA will provide the Filter.

Contract Period: Option 1 POP Begin: 08-01-2025 POP End: 07-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 1 POP Begin: 08-01-2025 POP End: 07-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

SYSTEMS

Contract Period: Option 1 POP Begin: 08-01-2025 POP End: 07-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

6-F-2 Contract Period: Option 1 POP Begin: 08-01-2025 POP End: 07-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 1 POP Begin: 08-01-2025 POP End: 07-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 1 POP Begin: 08-01-2025 POP End: 07-31-2026

Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 1 POP Begin: 08-01-2025 POP End: 07-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 1 POP Begin: 08-01-2025 POP End: 07-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 1 POP Begin: 08-01-2025 POP End: 07-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 1 POP Begin: 08-01-2025 POP End: 07-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 1 POP Begin: 08-01-2025 POP End: 07-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 1 POP Begin: 08-01-2025 POP End: 07-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 1 POP Begin: 08-01-2025 POP End: 07-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors

Contract Period: Option 1 POP Begin: 08-01-2025 POP End: 07-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 1 POP Begin: 08-01-2025 POP End: 07-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 1 POP Begin: 08-01-2025 POP End: 07-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 1 POP Begin: 08-01-2025

POP End: 07-31-2026

Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 1 POP Begin: 08-01-2025 POP End: 07-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 1 POP Begin: 08-01-2025 POP End: 07-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 1 POP Begin: 08-01-2025 POP End: 07-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 1 POP Begin: 08-01-2025 POP End: 07-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and

Contract Period: Option 1 POP Begin: 08-01-2025 POP End: 07-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 1 POP Begin: 08-01-2025 POP End: 07-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment This is an option line item. We intend to do this in house but want the ability add if needed.

Contract Period: Option 2 POP Begin: 08-01-2026 POP End: 07-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors

Contract Period: Option 2 POP Begin: 08-01-2026 POP End: 07-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

SYSTEMS

Contract Period: Option 2 POP Begin: 08-01-2026 POP End: 07-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

6-F-2 Contract Period: Option 2 POP Begin: 08-01-2026 POP End: 07-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 2 POP Begin: 08-01-2026 POP End: 07-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 2 POP Begin: 08-01-2026 POP End: 07-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 2 POP Begin: 08-01-2026 POP End: 07-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 2 POP Begin: 08-01-2026 POP End: 07-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal

Contract Period: Option 2 POP Begin: 08-01-2026 POP End: 07-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 2 POP Begin: 08-01-2026 POP End: 07-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 2 POP Begin: 08-01-2026 POP End: 07-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 2 POP Begin: 08-01-2026 POP End: 07-31-2027

Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 2 POP Begin: 08-01-2026 POP End: 07-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 2 POP Begin: 08-01-2026 POP End: 07-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 2 POP Begin: 08-01-2026 POP End: 07-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 2 POP Begin: 08-01-2026 POP End: 07-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 2 POP Begin: 08-01-2026 POP End: 07-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 2 POP Begin: 08-01-2026 POP End: 07-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 2 POP Begin: 08-01-2026 POP End: 07-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal

Contract Period: Option 2 POP Begin: 08-01-2026 POP End: 07-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 2 POP Begin: 08-01-2026 POP End: 07-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 2 POP Begin: 08-01-2026 POP End: 07-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 2 POP Begin: 08-01-2026 POP End: 07-31-2027

Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment This is an option line item. We intend to do this in house but want the ability add if needed.

Contract Period: Option 3 POP Begin: 08-01-2027 POP End: 07-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 3 POP Begin: 08-01-2027 POP End: 07-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

SYSTEMS

Contract Period: Option 3 POP Begin: 08-01-2027 POP End: 07-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

6-F-2 Contract Period: Option 3 POP Begin: 08-01-2027 POP End: 07-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 3 POP Begin: 08-01-2027 POP End: 07-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 3 POP Begin: 08-01-2027 POP End: 07-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 3 POP Begin: 08-01-2027 POP End: 07-31-2028

Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 3 POP Begin: 08-01-2027 POP End: 07-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 3 POP Begin: 08-01-2027 POP End: 07-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 3 POP Begin: 08-01-2027 POP End: 07-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 3 POP Begin: 08-01-2027 POP End: 07-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 3 POP Begin: 08-01-2027 POP End: 07-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 3 POP Begin: 08-01-2027 POP End: 07-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 3 POP Begin: 08-01-2027 POP End: 07-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal

Contract Period: Option 3 POP Begin: 08-01-2027 POP End: 07-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 3 POP Begin: 08-01-2027 POP End: 07-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 3 POP Begin: 08-01-2027 POP End: 07-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 3 POP Begin: 08-01-2027 POP End: 07-31-2028

Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 3 POP Begin: 08-01-2027 POP End: 07-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 3 POP Begin: 08-01-2027 POP End: 07-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 3 POP Begin: 08-01-2027 POP End: 07-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Contract Period: Option 3 POP Begin: 08-01-2027 POP End: 07-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning…