36C24522R0015 Warehouse RLP.pdf
PDF 504 KB Posted
- Solicitation number
- 36C24522R0015
About this file
This is a request for lease proposals (RLP) from the Department of Veterans Affairs for warehouse space in Clarksburg, West Virginia. The RLP seeks up to 10,529 rentable square feet of contiguous warehouse space on a single floor with a minimum clear ceiling height of 10 feet. Offerors must provide five parking spaces marked for government use and meet requirements for bay width, bay depth, column spacing, and loading docks. The lease term is for 10 years with five years firm and five years soft. The government may terminate after the firm term with 90 days' notice. Proposals are due by August 28, 2023. Pricing must be provided for shell rent, utilities, tenant improvements, security improvements, and overtime HVAC charges. The award will be made to the offer that provides the best value based on technical capability, past performance, and price factors.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RLP NO. 36C24522R0015, PAGE 1 GSA R101WH (10/22)
CLARKSBURG, VA WAREHOUSE
VA REQUEST FOR
LEASE
PROPOSALS
NO. 36C24522R0015
Clarksburg/WV
Offers due by 08/28/2023
In order to be considered for award, offers conforming to the requirements of the RLP shall be received no later than 4:00 PM EST. on the date above. See “Receipt Of Lease Proposals” herein for additional information.
This Request for Lease Proposals ("RLP") sets forth instructions and requirements for proposals for a Lease described in the RLP documents. Proposals conforming to the RLP requirements will be evaluated in accordance with the Method of Award set forth herein to select an Offeror for award. The Government will award the Lease to the selected Offeror, subject to the conditions herein.
The information collection requirements contained in this Solicitation/Contract, that are not required by regulation, have been approved by the Office of Management and Budget pursuant to the Paperwork Reduction Act and assigned the OMB Control No. 3090-0163.
Warehouse RLP
GSA R101WH (10/22)
RLP NO. 36C24522R0015, PAGE 2 GSA R101WH (10/22)
TABLE OF CONTENTS
WAREHOUSE RLP
SECTION 1 STATEMENT OF REQUIREMENTS
1.01 GENERAL INFORMATION (WAREHOUSE) (OCT 2020)
1.02 AMOUNT AND TYPE OF SPACE, LEASE TERM, AND OCCUPANCY DATE (WAREHOUSE) (OCT 2022)
1.03 UNIQUE REQUIREMENTS (OCT 2021)
1.04 AREA OF CONSIDERATION (OCT 2021)
1.05 PARKING (WAREHOUSE) (OCT 2021)
1.06 LIST OF RLP DOCUMENTS (WAREHOUSE) (OCT 2022)
1.07 AMENDMENTS TO THE RLP (JUN 2012)
1.08 LEASE DESCRIPTION (WAREHOUSE) (OCT 2021)
1.09 RELATIONSHIP OF RLP BUILDING MINIMUM REQUIREMENTS AND LEASE OBLIGATIONS (OCT 2016)
1.10 PRICING OF SECURITY REQUIREMENTS (OCT 2022)
1.11 SECURITY LEVEL DETERMINATION FOR FACILITY HOUSING OTHER FEDERAL TENANTS (APR 2011)
1.12 INSPECTION—RIGHT OF ENTRY (OCT 2021)
1.13 AUTHORIZED REPRESENTATIVES (OCT 2020)
1.14 BROKER COMMISSION AND COMMISSION CREDIT (OCT 2020) – INTENTIONALLY DELETED
1.15 PLANNED USE BY GOVERNMENT (WAREHOUSE) (MAY 2014)
1.16 NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS SIZE STANDARD (OCT 2020) 9
1.17 UNIQUE ENTITY IDENTIFIER (OCT 2021)
SECTION 2 ELIGIBILITY AND PREFERENCES FOR AWARD
2.01 EFFICIENCY OF LAYOUT (WAREHOUSE) (MAY 2014)
2.02 FLOOD PLAINS (OCT 2022)
2.03 SEISMIC SAFETY–—MODERATE SEISMICITY (OCT 2022) – INTENTIONALLY DELETED
2.04 SEISMIC SAFETY–—HIGH SEISMICITY (OCT 2022) – INTENTIONALLY DELETED
2.05 HISTORIC PREFERENCE (SEP 2013)
2.06 ASBESTOS (OCT 2021)
2.07 ACCESSIBILITY (SEP 2013)
2.08 FIRE PROTECTION AND LIFE SAFETY (SEP 2013)
2.09 ENERGY INDEPENDENCE AND SECURITY ACT (OCT 2022)
2.10 ENVIRONMENTAL CONSIDERATIONS (SEP 2013)
2.11 DUE DILIGENCE AND NATIONAL ENVIRONMENTAL POLICY ACT REQUIREMENTS - RLP (SEP 2014)
2.12 NATIONAL HISTORIC PRESERVATION ACT REQUIREMENTS - RLP (OCT 2020)
SECTION 3 HOW TO OFFER
3.01 GENERAL INSTRUCTIONS (JUN 2012)
3.02 RECEIPT OF LEASE PROPOSALS (OCT 2020)
3.03 PRICING TERMS (WAREHOUSE) (OCT 2022)
3.04 BUDGET SCOREKEEPING; OPERATING LEASE TREATMENT (APR 2011)
3.05 PROSPECTUS LEASE (OCT 2022) – INTENTIONALLY DELETED
3.06 ADDITIONAL SUBMITTALS (WAREHOUSE) (OCT 2022)
3.07 TENANT IMPROVEMENTS INCLUDED IN OFFER (WAREHOUSE) (OCT 2020)
RLP NO. 36C24522R0015, PAGE 3 GSA R101WH (10/22)
3.08 SECURITY IMPROVEMENTS INCLUDED IN OFFER (OCT 2022)
3.09 OPERATING COSTS REQUIREMENTS INCLUDED IN OFFER (JUN 2012)
3.10 OPERATING COSTS REQUIREMENTS INCLUDED IN OFFER–—MODIFIED NET (WAREHOUSE) (MAY 2014) – INTENTIONALLY
DELETED
3.11 UTILITIES SEPARATE FROM RENTAL / BUILDING OPERATING PLAN (WAREHOUSE) (MAY 2014) – INTENTIONALLY DELETED 19
SECTION 4 METHOD OF AWARD
4.01 NEGOTIATIONS (JUN 2012)
4.02 HUBZONE SMALL BUSINESS CONCERN ADDITIONAL PERFORMANCE REQUIREMENTS (SEP 2015)
4.03 AWARD BASED ON PRICE (JUN 2012) – INTENTIONALLY DELETED
4.04 OTHER AWARD FACTORS (OCT 2016)
4.05 FACTOR DESCRIPTIONS (OCT 2016)
4.06 FACTOR MINIMUM STANDARDS (OCT 2016) – INTENTIONALLY DELETED
4.07 FACTOR SUBMITTAL REQUIREMENTS (OCT 2016) - INTENTIONALLY DELETED
4.08 DOCUMENTATION REQUIREMENTS (OCT 2016)
4.09 PRESENT VALUE PRICE EVALUATION–—WAREHOUSE CUBIC FOOT METHOD (OCT 2022) – INTENTIONALLY DELETED 23
4.10 PRESENT VALUE PRICE EVALUATION—WAREHOUSE SQUARE FOOT METHOD (OCT 2022)
4.11 AWARD (OCT 2022)
SECTION 5 ADDITIONAL TERMS AND CONDITIONS
5.01 MODIFIED RLP PARAGRAPHS (OCT 2016)
5.02 OWNERSHIP
5.03 FEDERAL ACQUISITION REGULATIONS (FAR) CLAUSES – INCORPORATES ONE OR MORE CLAUSES BY REFERENCE, WITH
THE SAME FORCE AND EFFECT AS IF THEY WERE GIVEN IN FULL TEXT
5.04 BUILDING SHELL REQUIREMENTS
5.05 LABOR STANDARDS
5.06 SECURITY
RLP NO. 36C24522R0015, PAGE 4 GSA R101WH (10/22)
REQUEST FOR LEASE
PROPOSALS NO. 36C24522R0015
WAREHOUSE RLP GSA R101WH (OCT 2022)
SECTION 1 STATEMENT OF REQUIREMENTS
1.01 GENERAL INFORMATION (WAREHOUSE) (OCT 2020)
A. This Request for Lease Proposals (RLP) sets forth instructions and requirements for proposals for a Warehouse Lease described in the RLP documents. The Government will select an Offeror for award by evaluating proposals conforming to the RLP requirements in accordance with the Method of Award set forth below. The Government will award the Lease to the selected Offeror, subject to the conditions below.
B. The RLP documents include a lease template setting forth the terms and conditions of the Lease contemplated by this RLP. The RLP documents include a GSA Proposal to Lease Space (GSA Form 1364WH) on which Offeror shall submit its offered rent and other price data, together with required information and submissions. The Lease paragraph titled "Definitions and General Terms" shall apply to the terms of this RLP.
C. Offeror should not attempt to complete the lease template. Upon selection for award, VA will transcribe the successful Offeror's final offered rent and other price data as provided by Offeror in its GSA Form 1364WH into the GSA Form L201WH lease template , creating a completed Lease. VA will transmit the completed Lease, including any appropriate attachments, to the successful Offeror for execution. Neither the RLP nor any other part of an Offeror's proposal shall be part of the Lease except to the extent expressly incorporated therein. The Offeror should review the completed Lease for accuracy and consistency with his or her proposal, sign and date the signature page, initial each page of the Lease, and return it to the Lease Contracting Officer (LCO).
D. The Offeror's executed Lease shall constitute a firm offer. The Lease is not a binding contract until the LCO executes the Lease and delivers a signed copy to the Offeror.
1.02 AMOUNT AND TYPE OF SPACE, LEASE TERM, AND OCCUPANCY DATE (WAREHOUSE) (OCT 2022)
A. The Government seeks a maximum of 10,529 rentable square feet (RSF), resulting in 7,799 net usable square feet (NUSF) of contiguous space on a single floor in a warehouse type building. See section 2 of the lease for applicable NUSF standards. The required space shall be contiguous space located all on ground level. Also see Section 4 of this RLP for details on the calculation of the Present Value Price Evaluation–—Warehouse Square Foot Method that will determine the lowest priced offer. The space shall have a minimum clear ceiling height of 10 feet.
B. The space shall be located in a modern quality building of sound and substantial construction in good condition and acceptable to the LCO. If not a new building, the offered space shall be in a building that has undergone, or will complete by occupancy, modernization or adaptive reuse for the space in conformance with this RLP and the associated documents either attached to or incorporated by reference (and itemized in the paragraph entitled “List Of RLP Documents”). Unless specifically stated as tenant improvements (TI), the Lessor shall perform all work at Lessor’s sole cost and expense.
C. Bay Width, Bay Depth, and Column Spacing:
1. Bay Width: 20 feet (the distance from one side of the bay to the other side of the bay in linear feet and inches)
2. Bay Depth: 60 feet (the distance from the front of the bay to the back of the bay in linear feet and inches)
3. Column Spacing: Columns shall be at least 20 linear feet apart, measured from the nearest surface of each.
D. Floors and Floor Load: See lease Paragraph entitled FLOORS AND FLOOR LOAD–—SHELL (WAREHOUSE) in Section 3 of the Lease.
E. Automobile Parking: 5 parking spaces for automobiles of which all 5 spaces shall be marked as reserved for the exclusive use of the Government. All spaces must be secured and lit in accordance with the Security Requirements set forth in this Lease. The cost of this parking shall be included as part of the rental consideration.
F. Delivery Route: At least one unobstructed route at least 36 inches wide having no steps or abrupt changes in level to connect all accessible elements, spaces, buildings, and courses of passage.
G. Loading Docks: (Also see the “LOADING DOCKS—SHELL (WAREHOUSE)” paragraph in Section 3 of the lease form).
Lessor shall provide a minimum of 1 loading dock(s) for the exclusive use of the Government. The dock height and configuration shall support 53-Foot truck. All dock doors shall include electronic openers as a part of Shell Rent unless otherwise specified in the Agency Special Requirements. Any other upgrades (e.g., security enhancements) to the dock doors shall be consider to be Tenant Improvements.
H. Truck Turning Radius: At a minimum, a truck turning radius of 30 feet, for all loading docks shall be designed for semi-trucks. One-way design for service traffic is preferred in order to avoid the need for large turning areas.
RLP NO. 36C24522R0015, PAGE 5 GSA R101WH (10/22)
I. The Government may provide vending machines within the Government's leased area under the provisions of the Randolph-Sheppard Act (20 USC 107 et. seq.). The Government will control the number, kind, and locations of vending facilities and will control and receive income from all automatic vending machines. Offeror shall provide necessary utilities and make related alterations. The cost of the improvements is part of Tenant Improvement (TI) costs. The Government will not compete with other facilities having exclusive rights in the Building. The Offeror shall advise the Government if such rights exist.
J. The Lease term shall be 10 Years, 5 Years Firm, 5 Years Soft, with Government termination rights, in whole or in parts, effective at any time after the Firm Term of the Lease by providing not less than 90 days’ prior written notice. Should the Government make the determination to modify the term or option(s), an amendment to the RLP will be issued.
K. Occupancy is required in accordance with the schedule outlined in the Schedule for Completion of Space paragraph under the Lease.
L. See loading dock requirements and other requirements in Section 3 of the Lease.
M. The space requirement identified in subparagraph “A” will include 212 NUSF of office and related space. The ceiling height of this area shall be as outlined in the Special Requirements, but for price evaluation purposes using cubic volume the height of this area shall be considered to be 10 feet.
1.03 UNIQUE REQUIREMENTS (OCT 2021)
The offered Building and/or Property must have the following features as a minimum requirement:
All requirements are stated in the Lease and Exhibits added hereto and become part of this RLP.
A. Meet all requirements identified in the Lease and Exhibits.
RLP NO. 36C24522R0015, PAGE 6 GSA R101WH (10/22)
1.04 AREA OF CONSIDERATION (OCT 2021)
The Government requests offers of space in the area bounded as follows:
North: Co Rd 20, Co Rd 4/4, Co Rd 4, Co Rd 38, Co Rd 9, Co Rd 3, Co Rd 11, Co Rd 11/16, Co Rd 48/4, Co Rd 4/8, Co Rd 19, Co Rd 19/2, Co Rd 19/2A, Co Rd 27/4, Co Rd 27, Co Rd 27/9
South: Co Rd 8, Co Rd 1, Co Rd 35 East: Co Rd 73, Co Rd 250, Co Rd 3.7, Co Rd 3/5, Co Rd 3, US-50, WV-76, Co Rd 17, Co Rd 77/4, Co Rd 23/9, Co Rd 57/1, WV-57, WV-20, WV-46, Co Rd 52 West: Co Rd 35/1, Co Rd 48/2, Co Rd 48/1, Co Rd 15, Co Rd 23, Co Rd 16, Co Rd 1, Co Rd 8, Co Rd 20
Buildings with Property boundary(ies) on the boundary streets or boundary marked identification are within the delineated Area of Consideration.
RLP NO. 36C24522R0015, PAGE 7 GSA R101WH (10/22)
1.05 PARKING (WAREHOUSE) (OCT 2021)
Automobile Parking: 5 parking spaces for automobiles of which all 5 spaces shall be marked as reserved for the exclusive use of the Government. All spaces must be secured and lit in accordance with the Security Requirements set forth in this Lease. The cost of this parking shall be included as part of the rental consideration.
1.06 LIST OF RLP DOCUMENTS (WAREHOUSE) (OCT 2022)
The following documents are attached to and included as part of this RLP package:
DOCUMENT NAME NO. OF PAGES EXHIBIT
Lease No. 36C24522L0003 (L201WH) 40 A Agency’s Special Requirements (including Racking Plan(s)) 5 B GSA Form 3516, Solicitation Provisions 7 C GSA Form 3517B, General Clauses 16 D Proposal to Lease Space (GSA Form 1364WH) 4 E GSA Form 1217, Lessor's Annual Cost Statement 3 F GSA Form 12000-WH for Prelease Fire Protection and Life Safety Evaluation for a Warehouse Building (Part A or Part B) (See Section 3 for applicable requirements)
8 G
FAR 52.204-24, Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment
4 H
Tennant Improvement Cost Summary (TIC’S Table) Spreadsheet I Federal Security Level 8 J Security Unit Price List Spreadsheet K DOL Wage Determination 7 L Past Performance Questionnaire 5 M Contract Submittal Schedule 4 N
1.07 AMENDMENTS TO THE RLP (JUN 2012)
This RLP may be amended by notice from the LCO. Amendments may modify the terms of this RLP, or the terms, conditions, and requirements of the Lease contemplated by the RLP.
1.08 LEASE DESCRIPTION (WAREHOUSE) (OCT 2021)
A. Offeror shall examine the Lease template included in the RLP documents to understand the Government's and the Lessor's respective rights and responsibilities under the contemplated Lease.
B. The Lease contemplated by this RLP includes:
1. The term of the Lease both, Firm and Soft, and renewal option, if any.
2. Terms and Conditions of the Lease, including Definitions, Standards, and Formulas applicable to the Lease and this RLP.
3. Building Shell standards and requirements.
4. Information concerning the tenant agency's buildout requirements (“Special Requirements”), to be supplemented after award.
5. Security Requirements.
6. A description of all services to be provided by the Lessor.
C. Should the Offeror be awarded the Lease, the terms of the Lease shall be binding upon the Lessor without regard to any statements contained in this RLP.
D. The Lease contemplated by this RLP is a fully serviced Lease with rent that covers all Lessor costs, including all shell upgrades, real estate taxes, and operating costs. Rent shall be based upon a proposed rental rate per Net Usable Square Foot (NUSF), limited by the offered rate and the maximum NUSF solicited under this RLP. The Tenant Improvements to be delivered by the Lessor shall be based upon information provided with this RLP and Lease, including Agency Specific Requirements (ASR). The Lessor shall design and build the Tis after award of the Lease; design reflects the VA’s full requirements. The Lessor shall provide a not-to-exceed cost for design, project management, and buildout of Tis and will be compensated up to the not-to-exceed costs. Although the TI requirements will not be fully developed until after award, Offerors shall provide the not-to-exceed cost as part of the lease proposal and the not-to-exceed price will be recorded in the lease in the Tenant Improvement Allowance paragraph. Offerors are encouraged to consider the use of existing fit-out and other improvements to minimize waste. However, any existing improvements must be deemed equivalent to Lease requirements for new installation, and Offerors are cautioned to consider those requirements before assuming efficiencies in its TI costs resulting from use of existing improvements.
E. After award, the Lessor must prepare Design Intent Drawings (DIDs) for the leased Space conforming to the Lease and Agency Specific Requirements. The Government will have the opportunity to review the Lessor's DIDs to determine that the Lessor's design meets the requirements of
RLP NO. 36C24522R0015, PAGE 8 GSA R101WH (10/22)
the Lease. Only after the Government approves the DIDs will the Lessor be released to proceed with buildout. VA review and approval does not release the Lessor from obligation to meet the requirement as state in the lease. The Lease also provides that the Government may modify the TI requirements, subject to the Lessor's right to receive compensation for such changes.
F. The security Level II pricing process is described in a separate paragraph.
G. Upon completion and acceptance of the leased Space, the Space will be measured for establishing the actual annual rent, and the lease term shall commence. The Government will not pay for additional NUSF above the solicitation requirements
H. Offerors are advised that doing business with the Government carries special responsibilities with respect to sustainability, fire protection and life safety, and security, as well as other requirements not typically found in private commercial leases. These are set forth both in the lease form and in the GSA Form 3517B, and will be made part of the Lease.
1.09 RELATIONSHIP OF RLP BUILDING MINIMUM REQUIREMENTS AND LEASE OBLIGATIONS (OCT 2016)
The Lease establishes various requirements relating to the Building shell. Such requirements are not deemed TIs. There are c Building requirements that are established as minimum requirements in this RLP and Lease. If the Lessor's Building does not meet the requirements at the time of award, the Lessor may still be awarded the Lease. However, as a condition of award, the Government will require Lessor to identify those Building improvements that will bring the Building into compliance with RLP and Lease requirements. Upon award of the Lease, completion of those Building improvements will become Lease obligations.
1.10 PRICING OF SECURITY REQUIREMENTS (OCT 2022)
A. The proposed Lease contains an attachment with the security requirements and obligations for the Building, which are based on the facility security level (FSL). The Federal Government determines the facility’s FSL rating, which ranges from FSL I to FSL IV. The FSL is based on client agency mix, required size of space, number of employees, use of the space, location, configuration of the site and lot, and public access into and around the facility.
B. The security requirements attached to this Lease includes a list of security countermeasures that must be installed in the leased Space. The Offeror shall use the Security Unit Price List to provide the Government with itemized costs of these security countermeasures.
C. There shall be no charge to the Government for any items that already exist in the offered Building or facility.
1.11 SECURITY LEVEL DETERMINATION FOR FACILITY HOUSING OTHER FEDERAL TENANTS (APR 2011)
If an Offeror is offering Space in a facility currently housing a Federal agency, the security requirements of the facility may be increased and the Offeror may be required to adhere to a higher security standard than other Offerors competing for the same space requirement. If two or more Federal space requirements are being competed at the same time, an Offeror submitting on both or more space requirements may be subject to a higher security standard if the Offeror is determined to be the successful Offeror on more than one space requirement. It is incumbent upon the Offeror to prepare the Offeror’s proposal accordingly.
1.12 INSPECTION—RIGHT OF ENTRY (OCT 2021)
A. At any time and from time to time after receipt of an offer (until the same has been duly withdrawn or rejected), the agents, employees and contractors of the Government may, upon reasonable prior notice to Offeror, enter upon the offered Space or the Premises, and all other areas of the Building access to which is necessary to accomplish the purposes of entry, to determine the potential or actual compliance by the Offeror with the requirements of the RLP and its attachments, which purposes shall include, but not be limited to:
1. Inspecting, sampling, and analyzing of suspected asbestos-containing materials and air monitoring for asbestos fibers, and/or reviewing similar existing Offeror records.
2. Inspecting the heating, ventilation and air conditioning system, maintenance records, and mechanical rooms for the offered Space or the
Premises.
3. Inspecting for any leaks, spills, or other potentially hazardous conditions which may involve tenant exposure to hazardous or toxic substances.
4. Inspecting for any current or past hazardous waste operations, to ensure that appropriate actions were taken to alleviate any environmentally unsound activities in accordance with Federal, state, and local law.
B. Nothing in this paragraph shall be construed to create a Government duty to inspect for toxic materials or to impose a higher standard of care on the Government than on other lessees. The purpose of this paragraph is to promote the ease with which the Government may inspect the Building.
Nothing in this paragraph shall act to relieve the Offeror of any duty to inspect or liability which might arise because of Offeror’s failure to inspect for or correct a hazardous condition.
1.13 AUTHORIZED REPRESENTATIVES (OCT 2020)
With respect to all matters relating to this RLP, only the Government's LCO designated below shall have the authority to amend the RLP and award a Lease. The Government shall have the right to substitute its LCO by notice, without an express delegation by the prior LCO.
Lease LCO:
James R. MacIntyre Supervisory Lease Contracting Officer, NCO5
RLP NO. 36C24522R0015, PAGE 9 GSA R101WH (10/22)
Department of Veterans Affairs Martinsburg Veterans Medical Center 510 Butler Avenue Martinsburg, WV. 25405
James.Macintyre@va.gov
As to all other matters, Offerors may contact the Alternate Government Contact designated below.
Alternate Government Contact:
Christopher R. Tate Leasing Contract Specialist, NCO5 Department of Veterans Affairs Martinsburg Veterans Medical Center 510 Butler Avenue Martinsburg, WV. 25405
Christopher.tate2@va.gov
1.14 BROKER COMMISSION AND COMMISSION CREDIT (OCT 2020) – INTENTIONALLY DELETED
1.15 PLANNED USE BY GOVERNMENT (WAREHOUSE) (MAY 2014)
The Government shall be entitled to use the space for any lawful purpose. However, the Government intends to initially use the space for storage of Personal Protective Equipment (PPE), as well as other equipment, required for medical readiness. Such use may involve the use of hazardous materials. The Government will agree in the Lease to use and maintain any hazardous materials in conformance with all applicable Federal, state, and local environmental regulations.
1.16 NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS SIZE STANDARD (OCT 2020)
A. The North American Industry Classification System (NAICS) code for this acquisition is 531120, unless the real property is self-storage (#531130), land (#531190), or residential (#531110).
B. The small business size standard for the applicable NAICS codes is found at HTTPS://WWW.SBA.GOV/SIZE-STANDARD/.
1.17 UNIQUE ENTITY IDENTIFIER (OCT 2021)
Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See WWW.SAM.GOV for the designated entity for establishing unique entity identifiers. If an offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one.
https://www.sba.gov/SIZE-STANDARD/ http://www.sam.gov/
RLP NO. 36C24522R0015, PAGE 10 GSA R101WH (10/22)
SECTION 2 ELIGIBILITY AND PREFERENCES FOR AWARD
2.01 EFFICIENCY OF LAYOUT (WAREHOUSE) (MAY 2014)
A. In order to be acceptable for award, the offered Space must provide for an efficient layout as determined by the LCO.
B. To demonstrate potential for efficient layout, VA may request the Offeror to provide a test fit layout at the Offeror’s expense. The Government will advise the Offeror if the test fit layout demonstrates that the Government's requirement cannot be accommodated within the Space offered. The Offeror will have the option of increasing the NUSF square footage offered, if it does not exceed the maximum NUSF square footage in this RLP offer package. If the Offeror is already providing the maximum NUSF square footage and cannot house the Government's space requirements efficiently, then the Government will advise the Offeror that the offer is unacceptable.
C. Space offered must have a minimum column spacing of 20 feet, an overall minimum width of 20 feet, and an overall minimum depth of 60 feet.
2.02 FLOOD PLAINS (OCT 2022)
A Lease will not be awarded for any offered Property located within a 1-percent-annual-chance floodplain (formerly referred to as 100-year floodplain) unless the Government has determined that there is no practicable alternative. An Offeror may offer less than its entire site in order to exclude a portion of the site that falls within a floodplain, so long as the portion offered meets all the requirements of this RLP and does not impact the Government’s full use and enjoyment of the Premises. If an Offeror intends that the offered Property that will become the Premises for purposes of this Lease will be something other than the entire site as recorded in tax or other property records the Offeror shall clearly demarcate the offered Property on its site plan/map submissions and shall propose an adjustment to property taxes on an appropriate pro rata basis. For such an offer, the Government may determine that the offered Property does not adequately avoid development in a 1-percent-annual-chance floodplain.
In addition, a Lease will not be awarded for any offered Property adjacent to a 1-percent-annual-chance floodplain, where such an adjacency would, as determined by the Government, restrict ingress or egress to the Premises in the event of a flood, unless there is no practicable alternative.
2.03 SEISMIC SAFETY–—MODERATE SEISMICITY (OCT 2022) – INTENTIONALLY DELETED
2.04 SEISMIC SAFETY–—HIGH SEISMICITY (OCT 2022) – INTENTIONALLY DELETED
2.05 HISTORIC PREFERENCE (SEP 2013)
A. The Government will give preference to offers of Space in Historic Properties and/or Historic Districts following this hierarchy of consideration:
1. Historic Properties within Historic Districts.
2. Non-historic developed sites and non-historic undeveloped sites within Historic Districts.
3. Historic Properties outside of Historic Districts.
B. Definitions:
1. Determination of eligibility means a decision by the Department of the Interior that a district, site, Building, structure or object meets the National Register criteria for evaluation although the Property is not formally listed in the National Register (36 CFR 60.3(c)).
2. Historic District means a geographically definable area, urban or rural, possessing a significant concentration, linkage, or continuity of sites, Buildings, structures, or objects united by past events or aesthetically by plan or physical development. A district may also comprise individual elements separated geographically but linked by association or history (36 CFR 60.3(d)). The Historic District must be included in or be determined eligible for inclusion in the National Register of Historic Places (NRHP).
3. Historic Property means any prehistoric or Historic District, site, building, structure, or object included in or been determined eligible for inclusion in the NRHP maintained by the Secretary of the Interior (36 CFR 800.16(l)).
4. National Register of Historic Places means the National Register of districts, sites, buildings, structures and objects significant in American history, architecture, archeology, engineering and culture that the Secretary of the Interior is authorized to expand and maintain under the National Historic Preservation Act (36 CFR 60.1).
C. The offer of Space must meet the terms and conditions of this RLP package and its attachments. The LCO has discretion to accept alternatives to certain architectural characteristics and safety features defined elsewhere in this RLP package to maintain the historical integrity of an Historic Building, such as high ceilings and wooden floors, or to maintain the integrity of an Historic District, such as setbacks, floor-to-ceiling heights, and location and appearance of parking.
D. When award will be based on the lowest price technically acceptable source selection process, the Government will give a price evaluation preference, based on the total annual ABOA SF present value cost to the Government, to Historic Properties as follows:
1. First to suitable Historic Properties within Historic Districts, a 10 percent price preference.
RLP NO. 36C24522R0015, PAGE 11 GSA R101WH (10/22)
2. If no suitable Historic Property within an Historic District is offered, or the 10 percent preference does not result in such property being the lowest price technically acceptable offer, the Government will give a 2.5 percent price preference to suitable non-historic developed or undeveloped sites within Historic Districts.
3. If no suitable, non-historic, developed, or undeveloped site within a Historic District is offered, or the 2.5 percent preference does not result in such property being the lowest price technically acceptable offer, the Government will give a 10 percent price preference to suitable Historic Properties outside of Historic Districts.
4. Finally, if no suitable Historic Property outside of Historic Districts is offered, no historic price preference will be given to any property offered.
E. When award will be based on the best value tradeoff source selection process, which permits tradeoffs among price and non-price factors, the Government will give a price evaluation preference, based on the total annual ABOA SF present value cost to the Government, to Historic Properties as follows:
1. First, to suitable Historic Properties within Historic Districts, a 10 percent price preference.
2. If no suitable Historic Property within a Historic District is offered or remains in the competition, the Government will give a 2.5 percent price preference to suitable non-historic developed or undeveloped sites within Historic Districts.
3. If no suitable, non-historic developed or undeveloped site within an Historic District is offered or remains in the competition, the Government will give a 10 percent price preference to suitable Historic Properties outside of Historic Districts.
4. Finally, if no suitable Historic Property outside of Historic Districts is offered, no historic price preference will be given to any property offered.
F. The Government will compute price evaluation preferences by reducing the price(s) of the Offerors qualifying for a price evaluation preference by the applicable percentage provided in this provision. The price evaluation preference will be used for price evaluation purposes only. The Government will award a Lease for the actual prices proposed by the successful Offeror and accepted by the Government.
G. To qualify for a price evaluation preference, Offeror must provide satisfactory documentation in their offer that their property qualifies as one of the following:
1. A Historic Property within a Historic District.
2. A non-historic developed or undeveloped site within a Historic District.
3. A Historic Property outside of a Historic District.
2.06 ASBESTOS (OCT 2021)
A. Government requires space with no asbestos-containing materials (ACM), or with undamaged, nonfriable ACM. For purposes of this paragraph, “space” includes the 1) space offered for lease; 2) common building area; 3) ventilation systems and zones serving the space offered; and 4) the area above suspended ceilings and engineering space in the same ventilation zone as the space offered. Notwithstanding the preceding, if no offers are received for such space, the Government may consider space with thermal system insulation ACM (e.g., wrapped pipe or boiler lagging), which is not damaged or subject to damage by routine operations.
B. ACM is defined as any material with a trace or more of asbestos quantity present.
C. Space with ACM of any type or condition may be upgraded by the Offeror to meet conditions described in sub-paragraph A by abatement (removal, enclosure, encapsulation, or repair) of ACM not meeting those conditions. If any offer involving abatement of ACM is accepted by the Government, the successful Offeror will be required to successfully complete the abatement in accordance with OSHA, EPA, Department of Transportation (DOT), state, and local regulations and guidance prior to occupancy.
D. Management Plan and Reinspection Report Submittals. If space is offered which contains ACM, the Offeror shall submit a current asbestos-related management plan or operations and maintenance plan, along with a current asbestos re-inspection report (performed within the past 5 years) for acceptance by the Government prior to lease award. The management plan or operations and maintenance plan, and re-inspection report shall conform to generally accepted industry practice in accordance with EPA guidance.
2.07 ACCESSIBILITY (SEP 2013)
The Lease contemplated by this RLP contains requirements for Accessibility. In order to be eligible for award, Offeror must either:
A. Verify in the Lease proposal that the Building, offered Space, and areas serving the offered Space meet the Lease accessibility requirements, or
B. Include as a specific obligation in its Lease proposal that improvements to bring the Building, offered Space, and areas serving the offered Space into compliance with Lease accessibility requirements will be completed prior to acceptance of the Space.
RLP NO. 36C24522R0015, PAGE 12 GSA R101WH (10/22)
2.08 FIRE PROTECTION AND LIFE SAFETY (SEP 2013)
The Lease contemplated by this RLP contains Building requirements for Means of Egress, Automatic Fire Sprinkler System, and Fire Alarm System. In order to be eligible for award, Offeror must either:
A. Verify in the Lease proposal that the Building in which Space is offered meets the Means of Egress, Automatic Fire Sprinkler System, and Fire Alarm System requirements of the Lease; or
B. Include as a specific obligation in its Lease proposal that improvements to bring the Building into compliance with Lease requirements will be completed prior to acceptance of the Space.
2.09 ENERGY INDEPENDENCE AND SECURITY ACT (OCT 2022)
A. The Energy Independence and Security Act (EISA) establishes requirements for Government leases relating to energy efficiency standards and potential cost effective energy efficiency and conservation improvements.
B. Subject to the exceptions below, unless one of the statutory exceptions listed in sub-paragraph C below applies, GSA may award a Lease for a Building only if the Building has earned the ENERGY STAR® label conferred by the U.S. Environmental Protection Agency (EPA) within the most recent year prior to the due date for final proposal revisions. The term “most recent year” means that the date of award of the ENERGY STAR® label by EPA must not be more than 1 year prior to the due date of final proposal revisions. For example, an ENERGY STAR® label awarded by EPA on October 1, 2010, is valid for all lease procurements where final proposal revisions are due on or before September 30, 2011. Notwithstanding the above, buildings that meet the following are considered as equivalent to having an Energy Star label in the most recent year. All new Buildings being specifically constructed for the Government must achieve an ENERGY STAR® label within 18 months after occupancy by the Government. In addition, Offerors of the following Buildings shall also have up to 18 months after occupancy by the Government, or as soon thereafter as the Building is eligible for Energy Star consideration, to achieve an Energy Star label: 1) All existing Buildings that have had an Energy Star label but are unable to obtain a label in the most recent year (i.e., within 12 months prior to the due date for final proposal revisions) because of insufficient occupancy; 2) Newly built Buildings that have used Energy Star’s Target Finder tool and either achieved a “Designed to Earn the Energy Star” certification or received an unofficial score (in strict adherence to Target Finder’s usage instructions, including the use of required energy modeling) of 75 or higher prior to the due date for final proposal revisions and who are unable to obtain a label in the most recent year because of insufficient occupancy; 3) An existing Building that is unable to obtain a label because of insufficient occupancy but that can produce an indication, through the use of energy modeling or past utility and occupancy data input into Energy Star’s Portfolio Manager tool or Target Finder, that it can receive an unofficial score of 75 or higher using all other requirements of Target Finder or Portfolio Manager, except for actual data from the most recent year. ENERGY STAR tools and resources can be found at
HTTPS://WWW.ENERGYSTAR.GOV/BUILDINGS/TOOLS-AND-RESOURCES.
C. EISA allows a Federal agency to lease Space in a Building that does not have an ENERGY STAR® Label if:
1. No Space is offered in a Building with an ENERGY STAR® Label that meets RLP requirements, including locational needs;
2. The agency will remain in a Building it currently occupies;
3. The Lease will be in a Building of historical, architectural, or cultural significance listed or eligible to be listed on the National Register of Historic Places; or
4. The Lease is for 10,000 RSF or less.
D. If one or more of the statutory exceptions applies, and the offered Space is not in a Building that has earned the ENERGY STAR® Label within one year prior to the due date for final proposal revisions, Offerors are required to include in their lease proposal an agreement to renovate the Building for all energy efficiency and conservation improvements that it has determined would be cost effective over the Firm Term of the Lease, if any, prior to acceptance of the Space (or not later than one year after the Lease Award Date of a succeeding or superseding Lease). Such improvements may consist of, but are not limited to, the following:
1. Heating, Ventilating, and Air Conditioning (HVAC) upgrades, including boilers, chillers, and Building Automation System (BAS)/Monitoring /Control System (EMCS).
2. Lighting Improvements.
3. Building Envelope Modifications.
NOTE: Additional information can be found on HTTP://WWW.GSA.GOV/LEASING under “Green Leasing.”
E. The term "cost effective" means an improvement that will result in substantial operational cost savings to the landlord by reducing electricity or fossil fuel consumption, water, or other utility costs. The term "operational cost savings" means a reduction in operational costs to the landlord through the application of Building improvements that achieve cost savings over the Firm Term of the Lease sufficient to pay the incremental additional costs of making the Building improvements.
F. Instructions for obtaining an ENERGY STAR® Label are provided at ENERGYSTAR.GOV (use “Portfolio Manager” to apply). ENERGY STAR® tools and resources can be found at HTTPS://WWW.ENERGYSTAR.GOV/BUILDINGS/TOOLS-AND-RESOURCES. The ENERGY STAR® BUILDING UPGRADE MANUAL and BUILDING UPGRADE VALUE CALCULATOR are tools which can be useful in considering energy efficiency and conservation improvements to Buildings.
https://www.energystar.gov/BUILDINGS/TOOLS-AND-RESOURCES http://www.gsa.gov/LEASING http://www.energystar.gov/BUILDINGS/FACILITY-OWNERS-AND-MANAGERS/EXISTING-BUILDINGS/EARN-RECOGNITION/ENERGY-STAR-CERTIFICATION https://www.energystar.gov/BUILDINGS/TOOLS-AND-RESOURCES http://www.energystar.gov/BUILDINGS/FACILITY-OWNERS-AND-MANAGERS/EXISTING-BUILDINGS/SAVE-ENERGY/COMPREHENSIVE-APPROACH/ENERGY-STAr http://www.energystar.gov/BUILDINGS/FACILITY-OWNERS-AND-MANAGERS/EXISTING-BUILDINGS/SAVE-ENERGY/COMPREHENSIVE-APPROACH/ENERGY-STAr http://www.energystar.gov/BUILDINGS/TOOLS-AND-RESOURCES/BUILDING-UPGRADE-VALUE-CALCULATOR
RLP NO. 36C24522R0015, PAGE 13 GSA R101WH (10/22)
G. If one or more of the statutory exceptions applies, and the offered Space is not in a Building that has earned the ENERGY STAR® Label within one year prior to the due date for final proposal revisions, the successful Offeror will be excused from performing any agreed-to energy efficiency and conservation renovations, and benchmarking with public disclosure (as provided in (I) below, if it obtains the ENERGY STAR® Label prior to the Government’s acceptance of the Space (or not later than one year after the Lease Award Date for succeeding and superseding leases).
H. If no improvements are proposed, the Offeror must demonstrate to the Government using the ENERGY STAR® Online Tools why no energy efficiency and conservation improvements are cost effective. If such explanation is unreasonable, the offer may be rejected.
I. As described in Section 3 of the Lease, successful Offerors meeting one of the statutory exceptions above must agree to benchmark and publicly disclose the Building’s current ENERGY STAR® score, using EPA’s Portfolio Manager online software application. See the Lease for additional details.
J. All new Buildings being specifically constructed for the Government must achieve the ENERGY STAR® Label within 18 months after occupancy by the Government.
K. As part of the cost effective upgrades specified under sub-paragraph D above, existing lighting systems must be upgraded to meet or exceed the stated lighting specifications in the Lease unless, with respect to upgrades otherwise in excess of the minimum stated requirements, Offeror can demonstrate, using the Building Upgrade Value Calculator discussed above, that such additional upgrades are not cost effective over the Firm Term of the Lease.
2.10 ENVIRONMENTAL CONSIDERATIONS (SEP 2013)
A. The Government requests space with no known hazardous conditions or recognized environmental conditions that would pose a health and safety risk or environmental liability to the Government.
B. Upon request by the Government, Offeror must provide all known previous uses of the Building.
C. Offeror must indicate in its written offer any known hazardous conditions or environmental releases with/from the offered Space, Building or Property.
2.11 DUE DILIGENCE AND NATIONAL ENVIRONMENTAL POLICY ACT REQUIREMENTS - RLP (SEP 2014)
A. Environmental Due Diligence
1. At the direction of the LCO, the Offeror must provide, at the Offeror’s sole cost and expense, a current Phase I Environmental Site Assessment (ESA), using the American Society for Testing and Materials (ASTM) Standard E1527-13 and timeline, as such standard may be revised from time to time. In accordance with ASTM standards, the study must be performed by an environmental professional with qualifications that meet ASTM standards. This Phase I ESA must be prepared with a focus on the Government being the “user” of the Phase I, as the term “user” is defined in E1527-13. Failure to submit the required study may result in dismissal from consideration.
2. If the Phase I ESA identifies any recognized environmental conditions (RECs), the Offeror will be responsible for addressing such RECs, at its sole cost and expense, including performing any necessary Phase II ESA (using ASTM Standard E1903-11), performing any necessary cleanup actions in accordance with federal and state standards and requirements and submitting a proposed schedule for complying with these obligations. The Government will evaluate whether the nature of any of the RECs, the results of the Phase II, any completed cleanup, and the proposed schedule meet the Government’s needs.
B. National Environmental Policy Act
1. While the Offeror is responsible for performing all environmental due diligence studies of the offered Property, the Government is responsible for compliance with NEPA, whether in whole or in part, on its own or with the assistance of the Offerors. NEPA requires federal agencies to consider the effects of their actions on the quality of the human environment as part of the federal decision making process and, to that end, the Government’s obligations may, and in some cases will, be augmented by the Offerors as described in greater detail in the RLP.
2. The Government may either request information from the Offerors to help it meet its obligations under NEPA or share information provided in response to this provision with federal, state and local regulatory agencies as part of its compliance responsibilities under NEPA and other applicable federal, state and local environmental laws and regulations. Further consultation with these regulatory agencies may be necessary as part of the NEPA process.
3. The Offerors are advised that the Government may be required to release the location of each offered site and other building specific information in public hearings or in public NEPA documents. By submitting an offer in response to this RLP and without the need for any further documentation, the Offeror acknowledges and consents to such release.
4. The Government reserves the right to reject any offer where (i) the NEPA-related documentation provided by the Offeror for the offered Property is inadequate, (ii) the offer entails unacceptably adverse impacts on the human environment, (iii) the identified adverse impacts cannot be readily mitigated, or (iv) the level of NEPA analysis is more extensive than is acceptable to the Government (e.g., offers must be of a nature that would allow NEPA to be satisfied by preparation of a Categorical Exclusion (CATEX) NEPA study or an Environmental Assessment (EA) with or without mandatory mitigation).
5. An Offeror must allow the Government access to the offered Property to conduct studies in furtherance of NEPA compliance. This requires research and field surveys to assess the potential impacts to the natural, social and cultural environments. Any recent studies previously conducted by the Offeror may be submitted to be included in the NEPA process.
RLP NO. 36C24522R0015, PAGE 14 GSA R101WH (10/22)
6. The Government will not proceed with Lease award until the NEPA process is complete as evidenced by the Government’s issuance of a completed CATEX, EA or Environmental Impact Statement. Upon Lease award, any mitigation measures, whether optional or mandatory, identified and adopted by the Government will become Lease obligations. All costs and expenses for development of design alternatives, mitigation measures and review submittals for work to be performed under the Lease will be the sole responsibility of Lessor.
2.12 NATIONAL HISTORIC PRESERVATION ACT REQUIREMENTS - RLP (OCT 2020)
A. The Government is responsible for complying with section 106 of the National Historic Preservation Act of 1966, as amended, 54 U.S.C. § 306108 (Section 106). Section 106 requires federal agencies to consider the effects of their actions on historic properties prior to expending any federal funds on the undertaking. The Government is responsible for identifying whether any historic properties exist in, on, under, or near the offered Property that could be affected by the leasing action. Historic properties include both above-grade (i.e., buildings and historic districts) and below-grade (i.e., archeological sites) resources. The Government is responsible for assessing effects to identified historic properties and for consulting with the State Historic Preservation Officer (SHPO), the Tribal Historic Preservation Officer (THPO), if applicable, any local Historic Preservation or Landmarks Commission, and other interested parties, if applicable, in accordance with the implementing regulations set forth at 36 C.F.R. part 800 (Protection of Historic Properties).
B. An Offeror must allow the Government access to the offered Property to conduct studies in furtherance of the Section 106 compliance. This requires research and field surveys to assess the potential presence of historic properties that may be affected by construction activity, both above- and below-grade. Compliance also may require below-grade testing to determine the presence of archeological resources and possible artifact recovery, recordation and interpretation mitigation measures.
C. Demolition or destruction of a historic property by an Offeror in anticipation of an award of a Government lease may disqualify the Offeror from further consideration.
D. The Government reserves the right to reject any offer where documentation for the offered Property is inadequate or otherwise indicates preservation concerns or adverse effects to historic properties that cannot be reasonably mitigated.
E. If the Government determines that the leasing action could affect historic property, the Offeror of any Property that the Government determines could affect historic property will be required to retain, at its sole cost and expense, the services of a preservation architect who meets or exceeds the Secretary of the Interior’s Professional Qualifications Standards for Historic Architecture, as amended and annotated and previously published in the Code of Federal Regulations, 36 C.F.R. part 61, and the GSA’s Qualification Requirements for Preservation Architects and Other Specialists. These standards are available at: HTTPS://WWW.GSA.GOV/REAL-ESTATE/HISTORIC-PRESERVATION/HISTORIC-PRESERVATION-POLICY- TOOLS/PRESERVATION-TOOLS-RESOURCES/PROOF-OF-COMPETENCY-OTHER-DOCUMENTATION. The preservation architect will be responsible for developing preservation design solutions and project documentation required for review by the Government, the SHPO, the THPO, if applicable, and other consulting parties in accordance with Section 106.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .