About this file

This pre-bid agenda outlines requirements for a federal contract to correct safety issues at a Veterans Affairs medical center. The solicitation seeks bids for project number 517-19-301 to address safety deficiencies at the Beckley VAMC in West Virginia. The procurement is set aside solely for SDVOSB firms certified through VetBiz. Key dates include a June 24th pre-bid meeting, July 1st question deadline and July 18th bid due date. The contracting officer is Millard Adkins and bids are to be submitted through beta.SAM.gov. The contractor must hold OSHA certifications, submit required bonds within ten days of award, and register in CPARS for evaluations if the contract exceeds $650,000. Site visits are not scheduled beyond the pre-bid conference.

View the file

Other files

File Type Posted
RFI Responses amendment 0006.pdf PDF
36C24522B0006 0006.docx DOCX document
36C24522B0006 0005.docx DOCX document
36C24522B0006 0004.docx DOCX document
S06 Revised Response to RFIs -Revised (002).pdf PDF
36C24522B0006 0003.docx DOCX document
36C24522B0006 0002.docx DOCX document
S06 Response to RFIs 36C245220006.pdf PDF
36C24522B0006 0001.docx DOCX document
S04 Pre Bid Attendance list.pdf PDF
S02 drawings Plumbing Final .pdf PDF
36C24522B0006.docx DOCX document
S02 drawings Structural-Final .pdf PDF
S02 drawings Mechanical Final .pdf PDF
S02 Final Combined Specs V1 .pdf PDF
S02 Drawings Architectural Final .pdf PDF
S02 wage determination SPS .pdf PDF
S02 Drawings Fire Protection Final-Bond .pdf PDF
S02 Final Combined Specs V2 .pdf PDF
S02 Drawings Electrical Final-Bond .pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Correct Safety FCA Issues SPS - IFB: 36C245-22-B-0006 - Project No. 517-19-301

Department of Veterans Affairs Page 1

AGENDA

PRE-Bid CONFERENCE

Correct Safety FCA Issues SPS

Beckley VAMC, Beckley, WV

SOLICITATION: 36C245-22-B-0006

PROJECT NO. 517-19-301

June 24, 2022

I. Introduction: The agenda for this conference is established as follows:

II. Please do not take pictures of any staff or patients.

A. Contracting Specialist’s general remarks B. Facility Management Service’s general remarks

C. General questions/discussion from the attendees D. Walk-through of Construction Area

III. Names of Key Individuals for This Procurement:

A. The Contracting Officer is:

Millard Adkins Contracting Officer Department of Veterans Affairs NCO (Network Contracting Office) 5 Construction Team 200 Veterans Ave.

Beckley, WV 25801 (PH) 304-255-2121 ext. 4136 Millard.Adkins@va.gov

B. The Contracting Officer’s Representative (COR):

Andrew Lester Facilities Managements Service (FMS) General Engineer

IV. Milestone Dates for This Procurement:

A. Date of Issue: IFB June 17, 2022 B. Pre-bid Conference: June 24, 2022 10:00 a.m.

mailto:Millard.Adkins@va.gov

Department of Veterans Affairs Page 2

C. Cutoff for Questions: July 1, 2022 at 2:00 PM (EST) D. IFB due date: July 18, 2022 at 2:00 PM (EST)

V. General Comments/Instructions to Bidders:

A. The IFB Package consists of:

1. IFB

2. Scope of Work

3. Bid items list

4. Wage Determination

5. Contractor Security Packet.

6. Specifications

7. Drawings

1. This requirement has been set-aside MATOC for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). In order to be eligible to participate, the offeror must be registered and certified as an SDVOSB firm in the Center for Veteran Enterprise database (VetBiz) which can be found at www.vetbiz.gov.

V. Procedure for Requesting Clarifications/Information:

A. Any and all questions must be emailed to the Contract Specialist, Millard Adkins at Millard.adkins@va.gov. NO TELEPHONIC QUESTIONS. The cutoff date for questions is July 1, 2022 at 2:00 PM (EST). Facility Management Service should not be contacted directly. Failure to submit questions by the due date/time may result in the questions going unanswered.

B. The Contracting Officer, via an amendment, will answer any and all technical questions. Any and all amendments will be posted to SAM. Bidders are responsible for obtaining any amendments from the website.

C. An amendment may also be used to communicate other information (for example, updated wage decision, revised clauses, new bid opening date).

Bidders are encouraged to check the SAM routinely to determine if amendments have been issued.

VI. Additional Visits to the Construction Area:

NO ADDITIONAL SITE VISITS ARE SCHEDULED AT THIS TIME.

VII. Availability of Bid Sets:

The solicitation is available for download at the SAM website.

http://www.vetbiz.gov/ mailto:Millard.adkins@va.gov

Department of Veterans Affairs Page 3

VIII. Prior to Award:

A. Contractor must submit their VETS 4212 reporting information annually. The report must be current in order for award to be made.

B. Contractor must be registered in the System for Award Management (SAM) database. No award can be made unless the contractor is registered.

C. Contractor must ensure that their reps and certs are current and have the correct NAICS Code (236220) listed under the socio-economic grouping set aside within the solicitation.

IX. After Award

A. Contractor shall submit a payment bond and performance bond, each 100% of the award amount, within ten calendar days of award.

B. Contractor shall submit documentation of completion of OSHA certified construction safety course by employees (both prime contractor and subcontractor) who will work on the job site.

C. Contractor shall submit documentation of “competent person’s” completion of the 30-hour OSHA certified construction safety course.

D. Contractor shall submit original Certificate of Liability Insurance prior to any work commencing.

E. The Department of Veterans Affairs (VA) evaluates contractor past performance on all contracts that exceed $650,000, and shares those evaluations with other Federal Government contract specialists and procurement officials. Each contractor whose contract award is estimated to exceed $650,000 is required to register with the Contractor Performance Assessment Reporting System (CPARS)/Construction Contractor Appraisal

Support System (CCASS).

Access Requirements: (IAW OMB M-05-24, VA Directive 0710, and Draft VA Handbook 0735) ID Requirements: IDs compliant with VA Guidelines. TB Test. COVID requirements

X. Reminder:

This procurement is 100% set-aside for certified Service-Disabled, Veteran-

Owned Small Business (SDVOSB).

XI. ONLY questions general in nature will be addressed during the Pre-bid Conference / Site Visit. ALL technical questions require e-mail submittals to millard.adkins@va.gov in order to ensure that everyone has the same information for bidding purposes.

mailto:millard.adkins@va.gov

File details come from the government source that posted it. Updated .