Perry Point to building 101 -by truck entrance (002).pdf

PDF 1 MB Posted

Attached to
J059--Maintenance, Inspection, and Testing of the Electrical Power Distribution System
Solicitation number
36C24520Q0539
Issued by

About this file

This document provides details of a solicitation for maintenance, inspection, and testing services of the electrical power distribution system at the Perry Point VA Medical Center in Maryland. The one-year contract will be set aside as a tiered evaluation for service-disabled veteran-owned small businesses or veteran-owned small businesses, or in the alternative, other small businesses, with priority given to HUBZone and 8(a) participants. Interested parties must be registered in SAM and VIP and submit proposals by email to the specified contracting specialist no later than the closing date. The North American Industry Classification System code applicable to this procurement is 238210, with a $16.5 million business size standard.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

New Perry Point Truck Entrance Now Open Friday May 16th, 2014

The new Truck Entrance to the Perry Point VAMC facility is now open. This new extension of Fifth Street connects to the Marion Tapp Parkway (Perryville Community Park access road). The park access road connects to MD-327 which connects to MD-7. From MD-7, vehicles can access US-40 (refer to the attached PDF map).

Service Chiefs, please get the word out to any delivery drivers that your service may utilize:

Be aware of new traffic control pattern where Fifth Street intersects the Marion Tapp Parkway (park access road)

Truck Entrance gates will be open during business hours: 5:00 AM to 5:00 PM

All vehicles MUST ADHERE TO POSTED LOAD LIMITS ON PARK ACCESS ROAD:

o Single GVW – 54,000 LBS o Combination GVW – 70,000 LBS

If vehicles exceed the posted load rating, arrangements must be made ahead of time, the involved service will work with VA Police to unlock old truck entrance gate along the

Amtrak frontage road.

Effective June 1, 2014 the old gate along the

Amtrak frontage road will be permanently closed.

O:\PERRY POINT\800 CONSTRUCTION PROJECTS-ACAD FILES\NRM'S\512A5-10-334 Alternate Truck Entrance\Concept\Drawings\Exhibit_VAMC Truck Route_Open.dwg, 5/2/2014 10:51:01 AM, DWG To PDF.pc3

VHAFTHMcneiM Highlight

VHAFTHMcneiM Highlight

File details come from the government source that posted it. Updated .