Revised_Bid_Form.pdf

PDF 67 KB Posted

Attached to
460-321 Parking Garage
Solicitation number
36C24418R0652
Issued by

About this file

36C24418R0652 0005 Revised Bid Form.pdf

View the file

Other files

File Type Posted
36C24418R0652-0010000.docx DOCX document
36C24418R0652-0010001.pdf PDF
36C24418R0652-0009000.docx DOCX document
36C24418R0652-0008001.pdf PDF
36C24418R0652-0008000.docx DOCX document
36C24418R0652-0007000.docx DOCX document
36C24418R0652-0006001.pdf PDF
36C24418R0652-0006000.docx DOCX document
Site_temporary_fencing_plan.pdf PDF
36C24418R0652_0005.docx DOCX document
1.17.19_ATTACHMENT_PPQ_rev_2.docx DOCX document
App_2014-026_Addendum_1.pdf PDF
13_1052-C-160129_Temp_Parking_Revised_Plans_Stamped.pdf PDF
RFIs_through_01162019.pdf PDF
1.16.19_ATTACHMENT_PPQ_rev_1.docx DOCX document
36C24418R0652_0004.docx DOCX document
36C24418R0652_0003.docx DOCX document
Sign_in_roster_Site_visit_number_1_(2).pdf PDF
Sign_in_roster_Site_visit_number_1.pdf PDF
SITE_VISIT_2.AGENDA.NOTES.COMMENTS.pdf PDF
Sign_in_roster.pdf PDF
36C24418R0652_0002.docx DOCX document
5_Geotechnical_Report.pdf PDF
Garage_Floor_Drains.pdf PDF
RFI_Responses.pdf PDF
Code_Blue_CB1-S.pdf PDF
Duffield_Geotechnical_Eval_New_Entrance_Facilities_2010.pdf PDF
Code_Blue_4100.pdf PDF
SITE_VISIT_1.AGENDA.NOTES.COMMENTS.pdf PDF
36C24418R0652_0001.docx DOCX document
Code_Blue_4100.pdf PDF
Garage_Floor_Drains.pdf PDF
5_Geotechnical_Report.pdf PDF
Code_Blue_CB1-S.pdf PDF
Duffield_Geotechnical_Eval_New_Entrance_Facilities_2010.pdf PDF
36C24418R0652_14.docx DOCX document
36C24418R0652-017.docx DOCX document
36C24418R0652-016.docx DOCX document
36C24418R0652-011.pdf PDF
36C24418R0652-012.pdf PDF
36C24418R0652-014.pdf PDF
36C24418R0652-015.pdf PDF
36C24418R0652-009.docx DOCX document
36C24418R0652-013.pdf PDF
36C24418R0652-010.docx DOCX document
36C24418R0652-008.docx DOCX document
36C24418R0652-007.docx DOCX document
36C24418R0652-006.docx DOCX document
36C24418R0652-005.docx DOCX document
36C24418R0652-004.docx DOCX document
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item and Description Amount

BASE: Phase 1: Construct temporary parking area. Phase 2: Construct a precast concrete fully open parking garage. Work includes general construction, drainage, mechanical and electrical work, utility systems, elevators, necessary removal of existing structures and construction and certain other items. Phase 3: Remove temporary parking area and restore grounds.

ALTERNATE NO. 1: All items in the base less (deduct) parking equipment counting system.

ALTERNATE NO. 2: Alternate 1 and deduct milling and resurfacing of the parking lot as indicated on plan sheets CD101 and CS 101.

ALTERNATE NO. 3: Alternate 2 and deduct storefront system and replace with the precast and storefront infill. Deduct al labor and material to provide the storefront shown on Details SF7 and SF8 AS504 and provide all labor and material to provide the precast infill shown on Elevation 2/AS201 and Elevation 3/AS202.

ALTERNATE NO. 4: Alternate 3 and deduct connector. Deduct all labor and material to provide the connector shown on Drawings AS101, AS401 and AS403 including metal-framed skylights, glazing and metal canopy system and foundations.

ALTERNATE NO. 5: Alternate 4 and deduct security and suicide prevention screens. Deduct all labor and material required to provide the security and suicide prevention screens from the second floor level to the fourth tier floor level.

ALTERNATE NO. 6: Alternate 5 and deduct installation of second elevator.

ALTERNATE NO. 7: Alternate 6 and deduct one parking level $

The Alternates outlined in the table above are listed in order of preference. The government will award to the offeror that offers the best value, which may include a trade-off analysis. In other words, the government reserves the right to award to a lower priced, lower rated contractor-including the use of Alternate line items, if necessary.

Unit Pricing:

Item and Description Amount

Linear Foot for drilled pier/caisson of 3’-0” diameter $ /linear foot

Linear Foot for drilled pier/caisson of 5’-0” diameter

$ /linear foot

Linear Foot for drilled pier/caisson of 5’-6” diameter $ /linear foot

Linear Foot for drilled pier/caisson of 6’-0” diameter $ /linear foot

Linear Foot for drilled pier/caisson of 7’-0” diameter $ /linear foot

Linear Foot for drilled pier/caisson of 8’-0” diameter $ /linear foot

Unit pricing provided above will be used in modifications if different size/length of caissons are used other than those identified in the specifications and drawings.

End of Document

File details come from the government source that posted it.