36C24418R0652-0010001.pdf

PDF 103 KB Posted

Attached to
460-321 Parking Garage
Solicitation number
36C24418R0652
Issued by

About this file

36C24418R0652 0010 RFIs through 02192019.pdf

View the file

Other files

File Type Posted
36C24418R0652-0010000.docx DOCX document
36C24418R0652-0009000.docx DOCX document
36C24418R0652-0008001.pdf PDF
36C24418R0652-0008000.docx DOCX document
36C24418R0652-0007000.docx DOCX document
36C24418R0652-0006001.pdf PDF
36C24418R0652-0006000.docx DOCX document
Site_temporary_fencing_plan.pdf PDF
36C24418R0652_0005.docx DOCX document
1.17.19_ATTACHMENT_PPQ_rev_2.docx DOCX document
Revised_Bid_Form.pdf PDF
App_2014-026_Addendum_1.pdf PDF
13_1052-C-160129_Temp_Parking_Revised_Plans_Stamped.pdf PDF
RFIs_through_01162019.pdf PDF
1.16.19_ATTACHMENT_PPQ_rev_1.docx DOCX document
36C24418R0652_0004.docx DOCX document
36C24418R0652_0003.docx DOCX document
Sign_in_roster_Site_visit_number_1_(2).pdf PDF
Sign_in_roster_Site_visit_number_1.pdf PDF
SITE_VISIT_2.AGENDA.NOTES.COMMENTS.pdf PDF
Sign_in_roster.pdf PDF
36C24418R0652_0002.docx DOCX document
5_Geotechnical_Report.pdf PDF
Garage_Floor_Drains.pdf PDF
RFI_Responses.pdf PDF
Code_Blue_CB1-S.pdf PDF
Duffield_Geotechnical_Eval_New_Entrance_Facilities_2010.pdf PDF
Code_Blue_4100.pdf PDF
SITE_VISIT_1.AGENDA.NOTES.COMMENTS.pdf PDF
36C24418R0652_0001.docx DOCX document
Code_Blue_4100.pdf PDF
Garage_Floor_Drains.pdf PDF
5_Geotechnical_Report.pdf PDF
Code_Blue_CB1-S.pdf PDF
Duffield_Geotechnical_Eval_New_Entrance_Facilities_2010.pdf PDF
36C24418R0652_14.docx DOCX document
36C24418R0652-017.docx DOCX document
36C24418R0652-016.docx DOCX document
36C24418R0652-011.pdf PDF
36C24418R0652-012.pdf PDF
36C24418R0652-014.pdf PDF
36C24418R0652-015.pdf PDF
36C24418R0652-009.docx DOCX document
36C24418R0652-013.pdf PDF
36C24418R0652-010.docx DOCX document
36C24418R0652-008.docx DOCX document
36C24418R0652-007.docx DOCX document
36C24418R0652-006.docx DOCX document
36C24418R0652-005.docx DOCX document
36C24418R0652-004.docx DOCX document
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

460-321 New Parking Garage

RFIs responses through 2/19/2019

Q1: After reviewing the earthwork specification and Urban Engineers geotextile report, there appears to be conflicting information regarding the earthwork procedures. Urban Engineering recommends all fill and backfill material within the parking garage be select granular off-site borrow material and removing the existing fill in the parking garage footprint & replacing with the same select granular off-site borrow material. The specifications only mention utilizing satisfactory soil material. Please provide direction how to proceed with pricing and if we should be following the recommendations of Urban Engineering.

A1: Follow the recommendation of the geotechnical report.

Q2: Is Sch. 40 PVC piping acceptable for the underground storm water piping in lieu of the service weight cast iron hub piping listed in the specs?

A2: Sch. 40 PVC is acceptable outside the garage limits.

Q3: Reference the soil boring report developed by Urban Engineers for the parking garage site.

In Part V. Analysis and Recommendations, Sub-Part A. Foundations, Section – Ground Floor Slab it states, “The ground floor slab may be placed on grade after removal of the existing fill and replacing with engineered fill, as described in the following sections”. In Part V. Analysis and

Recommendations, Sub-Part C. Site Work it states “The proposed construction area must be cleared of pavement and light pole foundations, and the existing fill should be removed from the proposed parking garage area. Filling to achieve grades in the proposed parking garage, and backfilling around foundations, must be performed with engineered fill.” The borings of B-1 and

B-5 both indicated a layer of “fill” just underneath the paving. Please clarify the following:

a. Is the “existing fill” noted to be removed and replaced in the recommendations the same fill indicated in B-1 and B-5?

b. Please define the extent of the fill to be removed and replaced for estimating purposes.

c. Will a schedule of unit prices for removal and replacement of unsuitable soils be issued for use in the overage / underage concerning this work?

A3: Follow the recommendation of the geotechnical report.