36C24418R0652-0009000.docx

DOCX document 22 KB Posted

Attached to
460-321 Parking Garage
Solicitation number
36C24418R0652
Issued by

About this file

36C24418R0652 0009 36C24418R0652 0009.docx

View the file

Other files

File Type Posted
36C24418R0652-0010000.docx DOCX document
36C24418R0652-0010001.pdf PDF
36C24418R0652-0008001.pdf PDF
36C24418R0652-0008000.docx DOCX document
36C24418R0652-0007000.docx DOCX document
36C24418R0652-0006001.pdf PDF
36C24418R0652-0006000.docx DOCX document
Site_temporary_fencing_plan.pdf PDF
36C24418R0652_0005.docx DOCX document
1.17.19_ATTACHMENT_PPQ_rev_2.docx DOCX document
Revised_Bid_Form.pdf PDF
App_2014-026_Addendum_1.pdf PDF
13_1052-C-160129_Temp_Parking_Revised_Plans_Stamped.pdf PDF
RFIs_through_01162019.pdf PDF
1.16.19_ATTACHMENT_PPQ_rev_1.docx DOCX document
36C24418R0652_0004.docx DOCX document
36C24418R0652_0003.docx DOCX document
Sign_in_roster_Site_visit_number_1_(2).pdf PDF
Sign_in_roster_Site_visit_number_1.pdf PDF
SITE_VISIT_2.AGENDA.NOTES.COMMENTS.pdf PDF
Sign_in_roster.pdf PDF
36C24418R0652_0002.docx DOCX document
5_Geotechnical_Report.pdf PDF
Garage_Floor_Drains.pdf PDF
RFI_Responses.pdf PDF
Code_Blue_CB1-S.pdf PDF
Duffield_Geotechnical_Eval_New_Entrance_Facilities_2010.pdf PDF
Code_Blue_4100.pdf PDF
SITE_VISIT_1.AGENDA.NOTES.COMMENTS.pdf PDF
36C24418R0652_0001.docx DOCX document
Code_Blue_4100.pdf PDF
Garage_Floor_Drains.pdf PDF
5_Geotechnical_Report.pdf PDF
Code_Blue_CB1-S.pdf PDF
Duffield_Geotechnical_Eval_New_Entrance_Facilities_2010.pdf PDF
36C24418R0652_14.docx DOCX document
36C24418R0652-017.docx DOCX document
36C24418R0652-016.docx DOCX document
36C24418R0652-011.pdf PDF
36C24418R0652-012.pdf PDF
36C24418R0652-014.pdf PDF
36C24418R0652-015.pdf PDF
36C24418R0652-009.docx DOCX document
36C24418R0652-013.pdf PDF
36C24418R0652-010.docx DOCX document
36C24418R0652-008.docx DOCX document
36C24418R0652-007.docx DOCX document
36C24418R0652-006.docx DOCX document
36C24418R0652-005.docx DOCX document
36C24418R0652-004.docx DOCX document
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 02-15-2019 460-321 00244 Department of Veterans Affairs Network Contracting Office 4

00244 Department of Veterans Affairs Network Contracting Office 4

To all Offerors/Bidders

36C24418R0652

X X X

X The purpose of this amendment is to provide answers to RFIs and extend the proposal due date.

The proposal due date is changed FROM: 2/20/2019 TO: 2/27/2019. Proposals are due no later than 4:00 pm local time.

MICHAEL F. WHITE

Contract Officer michael.white9@va.gov 460-321 New Parking Garage RFIs responses through 2/14/2019 Q1: Reference Contract Drawing EP101, General Sheet Note 7, and Specification Section 14 24 00, paragraph 2.33. We understand that the VA requires an ADA compliant auto dial telephone system which provides a two-way hands-free communication system which will automatically dial out to pre-programmed phone numbers with automatic rollover function to two phone numbers and is located in the car operating panel. Note 7 outlines an integrated wall phone. Please clarify if the VA prefers a standard integrated wall phone in the control panel with a engraved door or the standard ADA auto dial telephone system which is installed behind a perforated stainless steel panel without a typical handset (wall phone). In addition, it should be noted that the construction documents do not detail a typical telecom system for the parking garage, i.e., wall phones or lines to support the hands-free auto dialer telephone system specified for the elevators. Please provide information on the type of telephone system used for the existing elevator emergency telephone system and where we can tie in the new auto dial telephone lines that will support the new elevators.

A1: VA prefers a standard ADA auto dial telephone system installed behind a perforated stainless steel panel without a typical handset. New parking garage does not have any telephone infrastructure. The hands-free auto dialer telephone system for the elevators will require twisted pair telephone cables routed from building 1, room 156 (telecom room) utilizing the same routing as the new security FO routing shown on the Civil drawings.

Q2: Reference Contract Drawings E401 (detail 2), E601 (single line distribution), and Specification Section 14 24 00, paragraphs 2.4.B., C.; paragraph 2.10 A-F; and paragraph 2.12. There are several issues that I will outline related to the contract drawings and specifications related to the electrical service to the elevators and the way the controls are specified for the elevators when they are connected to an emergency generator along with a simple recommendation to resolve the issues noted.

a. The power plan for the elevator machine room (E401, detail 2) should show two lockable shunt trip circuit breakers located on the strike side of the door for feeding each elevator controller.

b. The power plan should note the circuit for elevator #1 (Distribution Panel, Circuit 5: DP5).

c. Currently the single line notes that elevator #2 is connected to emergency power (EDP) and elevator #1 is on normal power (NDP). The elevator specification was edited based on the elevators being connected to an auxiliary power source (generator) and notes the standard auxiliary power operation for the elevators where the elevator controllers will operator one car at a time to safely land the elevator at the main floor (ground floor for this project) and open the doors and shut down and then lower the second elevator to the main floor and open the doors and shut down. Then, based on how the selector switch for the aux power mode is set up, i.e., automatic or manual, one car will return to normal operation on emergency power. The elevator controllers are designed for auxiliary power operation based on both elevators being connected to the emergency power distribution system. In addition, there are several relays required with adjustable timers for sequencing the transfer operations and these are described in paragraphs 2.10.B., C., D., & E.

Recommendation: It would be our recommendation to add a standard emergency rescue unit (battery backup control unit – Rescuvator – web link for general info: http://www.colleyelevator.com/pro_battery.html ). A rescuvator is a standard design feature for buildings without emergency power or power limitations. It provides power to the elevator controller to lower the elevator to the lowest level on loss of normal power and supplies power to the door controls. It allows for a safe landing and to allow enough time for passengers to exit the elevator. Upon restoration of normal power, the rescuvator automatically resets and returns the elevator to normal operation. The aux power operation noted in the specs would then need to be edited to add the rescuvator unit and modify the aux power operation to just one elevator.

A2:

a. It is acceptable to locate lockable shunt trip circuit breakers in electrical room. E-601 shows enclosed circuit breakers stated.

b. Panel schedule notes circuit for elevator as does single line diagram.

c. Install Rescuvator or equal for elevator #1 operation.

Q3: Reference specification 31 63 26 and also Q&A 26 from RFI answers in amendment 0005 concerning drilled concrete pier load tests. The answer given in Q&A 26 does not provide any clarity and does not answer the question asked. Please provide an answer to the question so all may have a clear basis to bid by. The answers to these questions, or lack thereof, greatly affect the price of this work.

a. Is a load test required?

b. How many load tests are required?

c. What diameter pier is to be tested?

d. What are the required test load capacities?

e. Can the test be performed on a production pile?

f. Is the load test to be accomplished by the Statnamic Test Method or the Osterberg Cell Method?

A3: a. Yes

b. One passing load test is required

c. Test a DP72 or larger diameter

d. Load capacity is 50 kips/square foot. Testing agency to determine required testing load based on pier size tested and selected testing procedure.

e. Yes, but if the drilled pier fails during the test, it will need to be replaced at the contractor’s expense.

f. Both test methods or static load testing are acceptable as long as they conform to the requirements of ASTM D1143 as required in the specifications.

Q4: Reference specification 31 63 26, section 1.7. The plumbness requirement of 1 inch in 10 feet for full depth is (.83%). According to ACI-336.1-01, tolerance for out-of-plumbness of piers shall not exceed 1.5%. Can the plumbness tolerance be per ACI-336.1-01?

A4: Follow the plumbness requirement in the specification.

Q5: Reference specification 31 63 26 and also Q&A 28 from RFI answers in amendment 0005 concerning drilled concrete pier bottom test probes. Based on all the parameters surrounding this site and this scope of work, probe testing is extremely unsafe to perform as mentioned in question 28, and additionally it doesn’t provide rock recovery percentages as prescribed. In order to know that rock recoveries are greater than 85%, is it acceptable to perform a cored boring at each shaft location prior to drilling, and core the rock twice the shaft diameter as mention in specification?

A5: This is acceptable but “the tip of the caisson shall be observed and approved by a qualified testing agency registered and licensed in the state… The shaft shall be inspected, cleared of mud, water, loose material and debris.” per Section 31 63 26 Paragraph 3.3.A.

Q6: Please clarify where the compressible expansion joint is to be installed. Detail 4/S.03 required this material to be installed on all horizontal and vertical locations exposed to view. However, Detail 3/AS1.3 indicates the compressible materials to be installed at the top tier only.

A6: Provide in all visible locations per detail 4/S0.3

Q7: Signs S-11, S-11A and S-11B are specified in the sign schedule to be VA Specification Sign Guide Types IN-01.02 (Fire Equipment), single sided, flush mount against wall. However, Sheet AS-803/2 shows the sign style as a double-sided, flag mount (perpendicular to wall) signs with an aluminum bracket, following VA Specification Sign IN-01.03.

a. Is Sign Type S-11 one-sided, flush mount (IN-01.02) or two-sided, flag mount (IN-01.03)?

b. Is Sign Type S-11A one-sided, flush mount (IN-01.02) or two-sided, flag mount (IN-01.03)?

c. Is Sign Type S-11B one-sided, flush mount (IN-01.02) or two-sided, flag mount (IN-01.03)?

A7: Signs S-11, S-11A and S-11B per detail 2 on AS803 (IN-01-.03).

Q8: Sign S-18 is specified as VA Sign Guide Type IN-16.51 in which there are three message layout designs. The Sign Schedule indicates the lettering to be 3” high, which follow Layout A. Drawing AS803/9 shows the left arrow graphic to be 3” x 3”, which follows Layout C, but Layout C specifies 2” letters. Is this sign to follow Layout A, left arrow graphic 4”, with 3” lettering or Layout C, left arrow graphic 3”, with 2” lettering?

A8: Follow layout A, 4” Arrow and 3” letters.

Q9: Sign S-19 is specified in the Sign Schedule as VA Sign Guide Type PS-09, a PVC “Bang Bar” of either Type A (6” dia) or Type B (flat 6” high), both designed to be suspended and hung by cable. However, the Sign Schedule shows the sign to use Mounting Detail 12 which is a welded back mount for a metal sign. Sheet AS201 (east and north elevations) show these two signs to be installed flush on the walkway exterior and not to hang below. Please advise if this sign is to be PS-09 Type A or PS-09 Type B or other and what the required mounting options are?

A9: Sign S-19 goes on the north and south sides of the Connector structure, as shown on 3/AS201 North Connector Elevation and 2/AS801. Mounting detail 12/AS803 applies, except connection is to a metal structure, not concrete.

Q10: Sign S-19 is specified in the Sign Schedule with text to read: Clearance 16’-0”. However, Sheet AS803/10 shows the text as Clearance 16’-4”. Which is the correct text?

A10: 16’-0” since this is the called out elevation on detail 3/AS201.

Q11: What is the ISO thickness?

A11: 0.080” thick.

Q12: Could more details be provided about the Roof Parapet and Scupper shown in Detail 12/AS1.5? How high is the parapet? Is coping required on the parapet?

A12: TOW is called out on AS1.3. No coping is called out on detail 12/AS1.5. EDPM membrane goes up to termination bar.

Q13: Please clarify the thickness and finishes for Sign Types 1, 2, 3, 4 and 5.

A13: Aluminum 0.080” thick

Q14: What is the design concept for Sign Type 15. The copy on Sheet AS803 looks like a bundle of sticks.

A14: The concept is solid aluminum letters, 4’-8” high and 2” deep. Please disregard the ‘bundle of sticks’ graphics.

Q15: Please provide finish for Sign Type 17.

A15: Powder Coated aluminum, VA Blue

Q16: Please confirm that Sign Types 11 and 18 are painted letters on the floor.

A16: No, they are not painted letters on the floor. Sign type 11 is per detail 2/AS803 and Sign Type 18 is per detail 9/AS803 End of Document

File details come from the government source that posted it.