36C24226Q0023 0003.docx
DOCX document 31 KB Posted
- Attached to
- J059--BK/SA Electrical ITM Service Federal contract opportunity
- Solicitation number
- 36C24226Q0023
About this file
This document is an Amendment to a Solicitation/Modification of Contract (Standard Form 30) for electrical system inspection, testing, and maintenance services at the Brooklyn VA Medical Center and St. Albans Community Living Center. The amendment extends the receipt of offers deadline from November 17, 2025, to November 18, 2025, at 4:30 PM EST, and provides detailed responses to 11 vendor questions regarding the contract requirements.
Key contract details include primary and secondary injection testing for switchgear and circuit breakers, with specific testing requirements for Brooklyn and St. Albans campuses. The contract involves annual maintenance of electrical systems, with work to be conducted consecutively within an 8-weekend period per campus. Contractors will be responsible for oil changes per manufacturer specifications, temporary power accommodations, oil containment, off-site disposal, and providing comprehensive relay test reports that satisfy NFPA requirements. The solicitation is issued by the Department of Veterans Affairs Network Contracting Office, with the contract number 36C24226Q0023, and is effective through November 14, 2025.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Brooklyn Breakers .docx | DOCX document | |
| 36C24226Q0023 0002.docx | DOCX document | |
| 36C24226Q0023 0001.docx | DOCX document | |
| Attachment B.docx | DOCX document | |
| Attachment A.docx | DOCX document | |
| WD 2015-4187 Rev. 33.pdf | ||
| 36C24226Q0023_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority)
THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 11-14-2025 36C528 Department of Veterans Affairs Network Contracting Office (NCO) 2 3495 Bailey Avenue Building 3, 2nd floor Buffalo NY 14215 36C528 Department of Veterans Affairs Network Contracting Office (NCO) 2 3495 Bailey Avenue Building 3, 2nd floor Buffalo NY 14215 To all Offerors/Bidders
36C24226Q0023 10-31-2025
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 11-18-2025 4:30pm EST
a. The purpose of this amendment is to answer questions from interested vendors and extend the receipt date for offers.
b. See page two for answers to questions from interested vendors.
c. The receipt date for offers is hereby extended from November 17, 2025, to 4:30pm EST, Tuesday November 18, 2025.
d. The period to submit questions is closed.
Christopher Weider Contracting Officer
1. Could you please clarify which breakers are required to receive primary injection testing (e.g., by building, amperage, or panel)?
Brooklyn Response: All Switchgear A & B breakers shall be Primary Injection Tested for year 1 ONLY. Secondary Injection Testing shall be required thereafter.
St Albans Response: Primary Injection Testing for all breakers/switches in Buildings 64, 65, 88, 89,167 168, 169, 173, and all rooms for year 1 ONLY. Secondary Injection Testing shall be required thereafter.
SOW Revisions: Section 11.A.14. Three-year Circuit Breaker Maintenance in compliance with NETA regulations, per specific circuit breaker type is hereby amended to include line g. Conduct primary injection testing on year 1 only. All subsequent years shall have secondary injection testing conducted.
Section 11.A.16. b. iii. is hereby amended from Test functions of the trip unit by means of primary current injection testing.
to now read: Test functions of the trip unit by means of secondary current injection testing.
2. Bolt‑in low‑voltage air breakers (St. Albans) We understand some breakers on the St. Albans campus are bolt‑in LV air breakers.
Request: Does the VA require primary injection testing for these units? Primary injection of these type of breakers will increase testing duration, outage windows, and coordination needs.
VA Response: No
3. Molded Case Circuit Breakers (MCCBs) Request: Please provide a detailed inventory of circuit breakers.
VA Response: Detailed list of Brooklyn breakers is attached. Brooklyn’s 2021 Electrical Testing & Maintenance report may be provided to the awarded contractor. Please see Attachment B for the St Albans equipment list. No additional reports are currently available for St Albans.
4. Power requirements for test equipment The PWS states that if the contractor requires a specific power source for test equipment, details must be submitted with the proposal. We anticipate requiring power for a primary injection test set.
Request: Please confirm the VA can accommodate temporary power (voltage, available capacity, location(s), and access) for the primary injection set during planned outages. If there are restrictions on tie‑ins or receptacle use, please advise.
VA Response: Yes, the VA can accommodate temporary power.
5. Oil change cadence Request: Are full oil changes expected annually under this contract, or only when due per each manufacturer’s service interval and operating hours?
VA Response: Only when due, per manufacturer specs, starting with year 1 of contract.
6. Maintenance history by unit Request: Please provide the date and scope of the last completed oil service for each generator at both Brooklyn and St. Albans. This will determine which units are within/past service intervals for oil change and/or oil analysis.
VA Response: Please consider all generators due for service.
7. Oil handling, storage, and disposal Request: Will the VA provide on‑site storage/containment for used oil drums and waste oil during service? Or should the contractor plan for immediate off‑site removal and disposal of all waste materials (oil, filters, absorbents), including any manifesting or documentation requirements?
VA Response: Contractor shall provide oil containment and immediate off-site disposal with waste manifest documentation.
8. Electrical Distribution Documentation Request: Will the VA provide current single‑line diagrams and/or updated electrical distribution drawings prior to testing? Accurate diagrams are critical for tagging, identification, LOTO, safe isolation, and sequencing. If updates are in progress, please share the latest redlines/as‑builts available and note any known discrepancies.
VA Response: Yes.
9. The PWS states annual relay testing.
Request: Please confirm whether trip‑setting verification and calibration are required each year, or if functional testing only is expected annually with calibration at a longer interval (e.g., 3–5 years) per manufacturer/NETA guidance. If settings review is required annually, please confirm the expectation to capture, compare, and submit settings reports with each annual test cycle.
VA Response: Relay test reports shall satisfy NFPA requirements and shall be submitted by contractor upon submission of project schedule.
10. Work Duration and Sequencing.
Request: Is the annual scope intended to be performed consecutively over a defined block of days/weeks, or may it be distributed throughout the year at the VA’s direction? If distributed, please indicate anticipated intervals or priorities (e.g., by building, system, or campus).
VA Response: Scope is intended to be conducted consecutively, within an 8-weekend period per campus.
11. Existing or planned outage schedules Request: Does the VA maintain or plan to publish a shutdown calendar for:
• Years 1 & 3: Major switchgear/switchboard and generator testing years
• Years 2, 4 & 5: Routine/annual testing years If available, please share planned outage windows or historical preferred months/quarters when outages are typically approved for each campus.
VA Response: No. TBD upon award, based on existing operational conditions of each facility.
See attached document: Brooklyn Breakers .
Electrical System Inspection, Testing and Maintenance at the Brooklyn VA Medical Center and St Albans Community Living Center