S06 M-121 Marked Up.pdf

PDF 675 KB Posted

Attached to
Z1DA--NRM-CONST 526-23-133 Improve OR and SPD HVAC
Solicitation number
36C24226B0027
Issued by

About this file

This is a mechanical engineering drawing prepared by Miller-Remick LLC and LaBella Associates, DPC for a Veterans Affairs facility improvement project (Project No. 0499-0170). The document depicts mechanical new work plans for the 2nd and 3rd floors in Area E of what appears to be a Bronx medical center operating room and surgical preparation area expansion.

The drawings show the installation and routing of HVAC systems, including air handling units (AHU-14, AHU-16), chilled water coils, pre-filters, MPS preheat coils, and a fan array with variable frequency drives. Key equipment specifications include components such as 6-inch chilled water supply and return lines (CHS/CHR), 5-inch hot water piping (HPS/HPR), glycol accumulator units (GLY-ACCH-16), heat exchangers (HX-ACCH-16), and concrete pads for equipment mounting, with select equipment noting weights of 292 to 6,906 pounds. The plans utilize scales of 1/4 inch equals 1 foot and indicate both existing (E) and new (N) work, including connections from above and coordination between mechanical systems. The drawing is sealed by a Professional Engineer and includes general sheet notes regarding construction standards, symbols, and system requirements for the mechanical infrastructure supporting the renovated operating and surgical preparation rooms.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

A2

A7

B

B3

11 10.2 10 9.5

TELEPHONE CLOSET

2E-12

STAIR E

E

CORRIDOR

C2-42

STORAGE

2E-10

MECH

2E-11

CORRIDOR

C2-41

OR #7

2E-05P

CORRIDOR

C2-41A

SCRUB RM

2E-14

OR #6

2E-09

CORRIDOR

C2-41

(E)AHU-16

(E)EF-20

(E)52x24

(E)56x36 (E)40x40

(E )5

6x

M-302

(E )P

R E

-F

IL

T E

R S

(E )M

P S

P R

E H

E A

T C

O

IL

(N )C

H

IL

LE

D

W A

T E

R C

O

IL

(E )C

LE

A

N L

P S

H U

M

ID

. C O

IL

(N )F

A N

A R

R A

Y

D

IR

E C

T D

R

IV

E

(E)BAS

(E)BAS

(N)SF-VFD (TYP 2) (E)132x88

6'-0" AFF

(E)4" MPS

(E)2" MPR

EA FROM ABOVE

FROM ABOVE

UP

(E)CUH

R

(N)6" CHS

(N)6" CHR (E)5" CHR UP/DN

(E)5" CHS UP/DN

(E)5" HPR

(E)2" V

(E)4" MPS

(E)2" MPR

(E)5" MPS

(E)5" HPS

(E)3" V (E)2" DCW

(E)OA LOUVER

(E)EF-21

(ABOVE)

(E)CSG

(N)CC-AHU-16

(N)6" CHS

(N)6" CHR

A7

B

B3

11 10.2 10 9.5

M-302

(6,906 LB)

(N)6" GCS

(E)AHU-14 MECH

(3E-63)

ET-AHU-16

AS-AHU-16

GLY-ACCH-16

(N)4"

CONC.

PAD

(N)4"

CONC.

PAD

(N)3/4" DCW UP

(N)6" CHR UP

(E)CSG

BCF-AHU-16

BCF-ACCH-16

(E)3" V UP

(E)6" V UP

(E)2 1/2" V UP

(N)6" CHR

(N)6" GCS

FROM ABOVE

CHWP-16C/D

(N)6" CHS

(N)6" CHS

HX-ACCH-16

(E)5" CHS UP

(E)5" CHR UP

(E)2" MPR UP

(N)3/4" DCW

(N)1" CHS

(292 LB)

(564 LB)

(990 LB)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

CONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

ENGINEER OF RECORD

M-R PROJECT NO:

Architect:

LABELLA ASSOCIATES, DPC

AREA E

C U s e rs

\m k e n n e d y \D o c u m e n ts

\0 -0

-B ro n x I m p ro v e O

R

S P

D -M

E P

-R M

K e n n e d y E

Z P

Y .r v t

/2

/2

:5 :1

A

M

M-121

MECHANICAL

NEW WORK PLAN

2ND & 3RD FLOOR - AREA E

IMPROVE OR & SPD HVAC (A/E) 526-23-133

Project Director

2025-09-23 LPM MBK

BID DOCUMENTS

FULLY SPRINKLERED

JAMES J. PETERS VA MEDICAL CENTER

BRONX, NEW YORK

0499-0170

SCALE: 1/4" = 1'-0"2 NEW WORK PLAN - 2ND FLOOR - AREA E

GENERAL SHEET NOTES:

1. REFER TO DRAWING M-001 AND M-002 FOR ABBREVIATIONS, SYMBOLS, AND

GENERAL NOTES.

2. SCHEDULING AND PHASING OF ALL WORK SHALL BE COORDINATED WITH THE VA

COR DURING UNOCCUPIED HOURS UNLESS STRICTLY EXPRESSED OTHERWISE.

O.R. SCHEDULED CONSTRUCTION AND ANY POSSBILE AHU DOWNTIME MUST BE

COORDINATED MINIMUM 2 WEEKS IN ADVANCE.

3. EXISTING AIR HANDLING UNIT (E)AHU-16 AND EXHAUST FAN (E)EF-20 SHALL BE

REBALANCED TO SERVE O.R. SUITE SPACES OUTSIDE OF PROJECT BOUNDARY.

ALL SUPPLY AND EXHAUST DUCTWORK REQUIRED FOR TEMPORARY REMOVAL

AND RECONNECTION TO SERVE EXISTING SPACES SHALL BE REINSTALLED AND

REBALANCED TO EXISTING AIRFLOWS PRIOR TO OCCUPANCY. REFER TO O.R.

ROOM AIR BALANCE SCHEDULE ON DRAWING M-702 AND AHU-16 CONTROLS

DIAGRAM ON DRAWING M-802 FOR ADDITIONAL INFORMATION.

SHEET KEYNOTES:

1 PROVIDE INDICATED EQUIPMENT HOUSEKEEPING PAD WITH 4" HI-VISIBLE SPILL

BERM AROUND PERIMETER FOR GYLCOL RETENTION. REFER TO STRUCTURAL

DETAIL FOR ADDITIONAL INFORMATION.

2 PROVIDE NEW 10-ROW STACKED CHILLED WATER COOLING COIL WITH ALL

APPURTENANCES PER MECHANICAL DETAILS. INTEGRATE VALVE AND SENSORS

WITH BAS. EXTEND NEW CONDENSATE PIPING TO EXISTING FLOOR DRAIN.

3 PROVIDE NEW 2x2 DIRECT DRIVE PLENUM FAN ARRAY WITH (2) VFD CONTROLLERS.

REFER TO MECHANICAL SCHEDULE FOR ADDITIONAL DETAILS.

4 PROVIDE NEW GYLCOL STORAGE FILL TANK WITH INTEGRATED PUMP AND GLYCOL

LOOP BYPASS CHEMICAL SHOT FEEDER THIS LOCATION. GLYCOL AND NON-GLYCOL

MAKEUP SHALL BE SOURCED FROM CLEAN STEAM GENERATOR SOFTENED COLD

WATER SUPPLY LINE WITHIN MECH ROOM.

5 EXTEND NEW 3/4" ROOF HYDRANT PIPING FROM EXISTING DOMESTIC COLD WATER

MAIN SUPPLYING EXISTING CLEAN STEAM GENERATOR MAKEUP. PROVIDE BRANCH

CONNECTION WITH COMBINATION FILL VALVE AND BACKFLOW PREVENTER. BOD:

WATTS SERIES 911 OR EQUAL.

6 PROVIDE (4) 24 VAC 2-WAY MODULATING CONTROL VALVES WITH NEMA 4X

ENCLOSURE AND HAND WHEEL. BOD: BRAY F7125 / F7150 OR EQUAL. PROVIDE NEMA

3R VALVE POWER PANEL WITH 120 / 24 VAC TRANSFORMERS. REFER TO M-800

CONTROLS SERIES DWGS FOR ADDITIONAL DETAILS.

7 PROVIDE NEW 6" CHS/R PIPE PENETRATIONS SPACED 18" O.C. DOWN THRU FLOOR.

UTLIZE NON-DESTRUCTIVE BAR DETECTION METHOD TO LOCATE AND AVOID

CUTTING/DRILLING ANY EXISTING SLAB REINFORCEMENT.

8 PROVIDE NEW NORMALLY CLOSED 2-WAY AUTOMATIC CONTROL VALVE AND PIPE TO

EXISTING CENTRAL PLANT CHILLED WATER.

SCALE: 1/4" = 1'-0"1 NEW WORK PLAN - 3RD FLOOR - AREA E

VHABRXNgD2 Rectangle

VHABRXNgD2 Rectangle

VHABRXNgD2 Rectangle

VHABRXNgD2 Rectangle

VHABRXNgD2 Rectangle

VHABRXNgD2 Rectangle

VHABRXNgD2 Rectangle

VHABRXNgD2 Line

VHABRXNgD2 Typewritten Text

(E)WF-12

VHABRXNgD2 Rectangle

VHABRXNgD2 Rectangle

VHABRXNgD2 Rectangle

VHABRXNgD2 Rectangle

VHABRXNgD2 Rectangle