013200 Construction Documentation.docx
DOCX document 20 KB Posted
- Attached to
- Z1DA--632-15-101 REPLACE PRIMARY ELECTRICAL DISTRO, PH 1 Federal contract opportunity
- Solicitation number
- 36C24225R0044
About this file
The document is a Construction Documentation section (01 32 00) detailing the requirements for using the Autodesk Construction Cloud (ACC) platform for a VA project at Northport VA Medical Center. Contractors selected for the project must request access to the ACC platform and ProductivityNOW eLearning Site within 14 days of contract award, with only staff who will directly utilize the platform being granted access. Selected staff must complete required ACC platform training within 12 calendar days of receiving access and submit completion certificates within 2 business days.
The platform will be used as the primary communication and collaboration system for all project-related documentation, including RFIs, submittals, schedules, shutdown requests, safety inspections, photos, and site surveys. Contractors are required to use the platform exclusively for official project correspondence, with no additional time or cost allowances for failure to comply. Staff changes must be reported to the Contracting Officer Representative (COR) within 2 business days, and no work can begin without meeting all ACC platform requirements, including completing the mandatory training.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24225R0044 0001 - Amendment No.1 - RFI and Questions.pdf | ||
| ATI NPVA - Certificate.pdf | ||
| Post Installation Certification.pdf | ||
| Site Walkthrough Sign In Sheet.pdf | ||
| UPDATED Bid - Specifications.pdf | ||
| Protection and Controls Test Plan 9-14-22.pdf | ||
| Certified Relay Test Report.pdf | ||
| OI - 34610 - Northport VA - 020823.pdf | ||
| NVMA Center-CESIR Report.pdf | ||
| Attachment VI.- Wage Rate for Suffolk County__New York.pdf | ||
| Attachment II.- Bid - Specifications for Replace Primary Electrical Distribution.pdf | ||
| Attachment V.- Past Performance Questionnaire - PPQ.pdf | ||
| Attachment IV.- FAR 52.225-2 Buy American Certification.pdf | ||
| Attachment III.- VAAR 852.219-75 VA Notice of Limitations on Subcontracting.docx | DOCX document | |
| Attachment I.- Bid - Drawings for Replace Primary Electrical Distribution.pdf | ||
| 36C24225R0044_1.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
09-01-23
SECTION 01 32 00
CONSTRUCTION DOCUMENTATION
PART 1- GENERAL
1.1 DESCRIPTION:
A. Construction contractors and A/E design firms, selected by award to perform work at VISN 2 VA facilities, are required to utilize VISN 2 Autodesk Build Construction management platform, also called Autodesk Construction Cloud (ACC). Access to the platform and training portal will be provided by VISN 2 through project Contracting Officer Representative (COR) at no cost for the duration of the project. Autodesk Build is the management and collaborative environment that VISN 2 uses for all its Non-Recurring Maintenance (NRM), Minor Program projects, Feasibility Studies, Commissioning and Retro-Commissioning contracts. There is no user, license, or subscription fee to the contractor for using this cloud-based platform.
1.2 REQUIREMENTS:
| A. | Contractor shall accomplish and complete the following tasks upon award of contract: |
| 1. | Request access to ACC platform and ProductivityNOW eLearning Site to project VA COR NLT 14 days from contract award. |
| 2. | Only staff that shall utilize the platform to be granted access. Examples: Project manager, sub-contractors POC, Site manager, Safety officer, etc. |
3. The access request shall be in writing and include a list of staff. The list shall include the following information:
| • | Full Name |
| • | Company Name |
| • | Email Address |
| • | Role/Position on the project (i.e., Project manager, site super) |
| 4. | Upon granting access, staff shall complete required ACC training through ProductivityNOW platform within 12 Calendar days. |
| 5. | Upon successful completion of training, contractor shall submit certificates of completion to COR NLT 2 Business days. |
| B. | Access to ProductivityNOW eLearning will expire after 12 Calendar days after online access is granted. Contractor shall complete ACC training within that period. |
| C. | Additional Staff and Subcontractors can be added at any time with a request submission to the project COR as described above. |
| D. | The contractor shall only use the ACC platform for all contract required submissions, official project correspondence to be acknowledged, reviewed, and actioned by the responsible party. No additional time shall be added to the contract, nor an increase in contract amount be provided for the contractor’s failure to utilize the ACC platform as the project’s official communication and collaboration system. Any correspondence out of platform shall not be the governing authority contradicting direction and will be at the contractor’s expense. Official project correspondence and collaboration includes but not limited to: RFIs, submittals, schedules, shutdown requests, actionable tasks, reports, testing, safety inspections, photos, and site surveys. |
| E. | Contractor must inform the COR of any staff changes NLT 2 business days from the change. Staff changes pertains to staff who was granted access to the ACC platform. Contractor shall request termination of access, replacement of personnel and/or any other action that might impact the contractor ability to maintain required utilization of the platform. |
| F. | Contractor submission requirements cannot be accepted for work to begin without meeting all ACC Platform requirements outlined herein, including completing required ACC platform training. |
‑ ‑ ‑ E N D ‑ ‑ ‑ 01 32 00 - 1