36C24224R0083 0001.docx

DOCX document 65 KB Posted

Attached to
Z1DA--630-CSI-120 NY SPECT CT SITE PREP DESIGN BUILD
Solicitation number
36C24224R0083
Issued by

About this file

This is an amendment (SF-30 form) containing questions and answers for solicitation 36C24224R0083, a design-build project for SPECT CT site preparation at the VA Medical Center in New York. The amendment clarifies design phase drawing requirements, specifying deliverables at 65% CD, 95% CD, 100% Construction, Redline, and As-built phases with specific format requirements for each phase.

Key submission requirements include SF330s for A/E services, proposal breakdowns for both A/E services and construction labor/materials, VETS 4212 form, SBA status approval, limitations on subcontracting, Buy American certification, project schedule, and safety/environmental ratings. The RFI submission deadline is November 27, 2024, at 4:00 PM, with final proposals due December 6, 2024, at 2:00 PM via email to Vladimir.Stoyanov@va.gov. Contract award is anticipated by December 30, 2024. The amendment also addresses several technical questions regarding room sizes and design requirements, confirming that deviations from VA Nuclear Medicine Design Guide standards are acceptable for the injection room, and clarifying that a connected bathroom is not required.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 4 of 4 36C24224R0083 Amendment #1

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 12-03-2024

630-CSI-120

36C242 Department of Veterans Affairs Network Contracting Office 2

800 POLY PLACE (138)

BLDG: 1, ROOM: 6-228

BROOKLYN NY 11209-0002

ATTN: VLADIMIR STOYANOV

CONTRACTING OFFICER

36C242 Department of Veterans Affairs Network Contracting Office 2

800 POLY PLACE (138)

BLDG: 1, ROOM: 6-228

BROOKLYN NY 11209-0002

To all Offerors/Bidders

36C24224R0083

X X X X SEE CHANGES BELLOW and RFI ANSWERS ATTCHED: ALL OTHER TERM AND CONDITIONS REMAIN UNCHANGED AND THE SAME.

RFI SUBMITTAL DATE: 11/27/2024 04:00 PM - BY EMAIL ONLY - Vladimir.Stoyanov@VA.GOV RFP RESPONSE DATE (SF-330 and proposal): 12/06/2024 2:00 PM - BY EMAIL ONLY - Vladimir.Stoyanov@VA.GOV Estimated/Anticipated Contract Award: 12/30/2022 4:00 PM

VLADIMIR STOYANOV

CONTRACTING OFFICER

VA-VHA-SAOE-2014-VA15F-71403

RFI QUESTIONS AND ANSWERS.

1. Q: Please clarify the Design Phase drawing requirements. The Design-Build specs indicate packages at 30%, 95%, 100%, and As-Built. The SO2 indicates Design drawings, Redline drawings, and As-Built drawings. The 30% package is the equivalent of the design drawings, the 95% package is the equivalent of the redline drawings, and the 100% drawings in the design-build specs are the equivalent of the as-built drawings in the SO2. Please indicate the specific sets that are required.

A: The following Design requirement is required:

1. 65% CD (Instead of 30%, since sample drawing is provided), 2x half, PDF.

1. 95% CD, 2x half, 1x full, completed spec document, PDF.

1. 100% for Construction, 2x half, 1x full, spec in hard-copy, AutoCAD, PDF, sealed stamp.

1. Redline Drawing (During Construction markup by Construction Contractor), 1x half, PDF; refer to Construction shop drawings in spec 001121.

1. As-built Drawing (Finalized drawing for the record), 2x half, 2x full, revised spec in hard-copy, AutoCAD, PDF, refer to Project Close-out in spec 001121.

Ensure drawings are submitted with the A/E Design Review Checklist of all applicable disciplines, found in VA A/E Submissions & Review. All relevant VA TIL specifications are required, with the highlight of the relevant section.

1. Q: Please advise what documents are required for submission by the contractor for Phase I.

A: Submission must have the following documents attached:

4. SF30 filled out and acknowledging the mod(s).

4. SF330’s for the A/E.

4. The proposal must have two parts: 1) a breakdown of the A/E services and 2) a labor and material breakdown by division for the construction portion. Interviews will be scheduled only with the top three firms selected.

4. VETS 4212.

4. SBA status approval with UEI #.

4. Limitations on subcontracting filled out.

4. Buy American Certification

4. Project schedule – Assuming the award is issued on or before 12/30/2024.

4. Safety and Environmental Rating – EMR.

1. Q: The proposed 2021 layout for the Gamma Camera area, which was included in the bid documentation, includes an Uptake/Injection Room that does not comply with the current VA Guidelines. VA Guidelines require a 12’ x 12’ room with specific features such as cabinetry, countertop, infusion recliner, medical gas, patient lift system, IV stand, injection stand, infectious waste disposal, computer workstation, and vital sign monitor. The existing width of the current layout cannot accommodate these features. Please advise if the VA intends to forgo these features or if more space will be provided to expand the size of the injection room.

A: It is acceptable that the design will differ from the VHA Nuclear Medicine Design Guide for Injection Room. The required room size is specified in SOW.

1. Q: The width of the injection room in the 2021 proposed layout for the Gamma Camera area does not comply with the accessibility requirements as required by ANSI 117. Please advise if the VA intends to forgo this requirement or expand the size of the injection room.

A: It is acceptable that the design will differ from the VHA Nuclear Medicine Design Guide for Injection Room. The required room size is specified in SOW.

1. Q: VA Guidelines also require Injection/Uptake Rooms to have an accessible patient bathroom connected to the uptake room. The space limitation of the existing proposed layout from 2021 does not allow for the inclusion of an accessible bathroom. Please advise if the VA intends to forgo this requirement or expand the size of the injection room.

A: A bathroom is not required.

1. Q: According to the VA Imaging Services Design Guide, released September 1, 2020, the patient uptake room is sized at 12’-0”x12’-0”. It includes several major features, such as a countertop spanning an entire wall with cabinets and storage, a large infusion incliner, medical gas, and a patient lift. Also included in the Design Guide are required equipment such as the injection stand, IV stands, infectious waste disposals, computer workstations, and vital sign monitors. Our current room is approximately 5’-4” wide x 18’-6” deep. We do not have the width to support almost any of this equipment individually; nonetheless, all are in the same room. Additionally, the current width cannot comply with accessibility requirements as required by ANSI 117.

We want to be certain the end user is aware of the space limitations of the proposed injection room 6503D and it has been stated that the proposed injection room cannot comply with the VA Design Guide.

A: It is acceptable that the design will differ from the VHA Nuclear Medicine Design Guide for Injection Room. The end user is aware of the reduced room size.

1. Q: The VA Design Guide incorporated a bathroom inside the exam room; there is no room for that either. Are we to adhere to this requirement?

A: No, a bathroom will NOT be needed as part of this design and construction.

1. Q: When are sf330’s are due, and will there be an interview?

A: SF-330s are due on 12/06/2024 at 2:00 PM EST, together with a proposal for the project – BY EMAIL ONLY to Vladimir.Stoyanov@va.gov. The proposal must have two parts: 1) a breakdown of the A/E services and 2) a labor and material breakdown by division for the construction portion. Interviews will be scheduled only with the top three firms selected.

image1.jpeg

File details come from the government source that posted it. Updated .