LOTO procedures example.pdf
PDF 654 KB Posted
- Solicitation number
- 36C24224Q0406
About this file
This document is a combined synopsis/solicitation for a firm fixed-price service contract for Energy Control Procedures (ECP)/Lockout Tagout (LOTO) procedures at the Syracuse VA Medical Center and Rome VA Clinic. The Department of Veterans Affairs is seeking a Service-Disabled Veteran-Owned Small Business (SDVOSB) contractor to provide all materials and labor identified in the Statement of Work within 180 days of award. The contract has a North American Industry Classification System (NAICS) code of 541330 with a small business size standard of $25.5 million. Contractors must attend a mandatory site visit on April 3, 2024, to be considered. The Government will evaluate proposals based on technical capability, past performance, and price, with the award going to the quotation that provides the best value. Proposals are due by 12:00 PM EST on April 12, 2024, and should be submitted electronically to the Contract Specialist.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1Rome.pdf | ||
| 36C24224Q0406 0001.pdf | ||
| LS-2022.pdf | ||
| Final SOW.docx | DOCX document | |
| 36C24224Q0406 Pricing Worksheet.xlsx | XLSX spreadsheet | |
| ECP Current List.xlsx | XLSX spreadsheet | |
| SCA WD 2015-4165 Rev 24 - Oneida County.pdf | ||
| SCA WD 2015-4163 Rev 24 - Onondaga County.pdf | ||
| 36C24224Q0406.pdf | ||
| 852.219-75 VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Procedure Title: OE-14-AHU107 JHF 06-21-2023
Lockout/Tagout Procedure Form
Instructions: The Authorized Employee and the Program Administrator will complete this digital, fillable form for each piece of equipment separately. This form should inventory all energy sources and LOTO points for each piece
Procedure Description
Equipment Description: Air handling Unit 107
Serial Number:
CAXM XT016
Location of Equipment:
S510 (5R)
Area or Department:
Operations
Number of Lockout Points:
Lockout Device(s) Needed:
Circuit Breaker type, Clamshell type & padlocks
Lockout Procedure:
Shut down unit from ECC.
Move disconnect switches to OFF position on VFD's for AHU, lock & tag.
Open breaker on panel EQPD-2 #17, lock & tag.
Move Disconnect for Supply Fan to OFF position. Lock & Tag.
If applicable close Chilled Water valves CHWS & CHWR #1013, Steam Valve MPS #1010, Low Pressure Clean
Steam LPCS #1028, lock & tag.
Photos of lockout points in (S:) Drive>Engineering>Operations>Control of Hazardous Energy>
Documents>procedure forms>AHU Control of Hazardous Energy Lockout Procedures
Procedure to Verify Lockout is Complete:
Clear all personnel from danger zone, be sure to check isolated equipment is secured correctly before beginning task.
Verify main disconnect switches & breakers cannot be moved to ON position.
Move all power switches to "off or neutral" position.
Attempt to activate operating controls to ensure power is off.
Inform workers task is about to begin.
Date Written:
21 June 2023 Procedure Written By:
John Foisia Date Revised:
Date Reviewed: Reviewing Personnel:
Date Approved: Approvals:
Release and Start Up Procedure:
Clean up & inspect area of debris.
Where applicable remove isolation devices then SLOWLY open steam and/or water valves to protect coils from damage.
Remove locks, return Breaker Switches & Disconnects to ON position.
Remove locks, return VFD disconnects to ON position.
Contact ECC that all locking devices are removed & points of isolation are returned to ON position and can restart AHU.
VISN 2 Lockout/Tagout Written Program
Equipment-Specific Procedure
Facility Name: Syracuse VA Medical Center Date: 21 June 2023
Machine Identification
General Description: Air Handling Unit 107 serves 4th floor of SCI wing
Manufacturer: YORK Solutions XT Johnson Controls
Model Number: XTI-072X120-GARA046A
Serial Number: *CAXM XT0126
* If more than one piece of same equipment, list all serial numbers.
Location of equipment: S510 (5R)
Operator Controls
The types of controls available to the operator need to be determined. This should help identify energy sources and lockout capacity for the equipment.
List types of operator controls:
Circuit Breakers panel Variable Speed Drive (VFD) Supply Fan (SF) Exhaust fan (EF) Chilled Water valves (CHW) Medium Pressure Steam Valve (MPS) Low Pressure Clean Steam Valve (LPCS) Interior Light/receptacle
Energy Sources The energy sources, such as electrical, steam, hydraulic, pneumatic, natural gas, and stored energy, present on this equipment are:
Energy Source
Location
Lockable
Type Lock or Block
Needed
Electric Panel
EQPD-2 #17
East Wall near Mech Rm
S510 Door
Y
Circuit Breaker Type &
Padlock
VFD Disconnect
Mounted in front of Unit in
Center Aisle
Supply fan Disconnect
Mounted on North Wall of
Unit near Supply Fan Door
Chilled Water Supply &
Return #1013
Between units North Aisle overhead
Padlocks
Medium Pressure Steam
MPS #1010
Between units North Aisle overhead
Low Pressure Clean Steam
Near North Wall of unit
Shoulder height
Clamshell type
Shutdown Procedures
List the steps in order necessary to shut down and de-energize the equipment. Be specific.
For stored energy, be specific about how the energy will be dissipated or restrained.
Procedure:
Shutdown Unit from ECC Move Supply fan & Exhaust fan VFD disconnect to “OFF” position. Move Circuit Breaker to “OFF” position If applicable close Steam, Glycol Water & Chilled Water valves to closed position
Lock Type & Location:
Circuit Breaker, Clamshell or cable type locking devices, Locks & tags All Locks & Lock out devices located in the Energy Control Center NG15
How will the de-energized state be verified?
Clear all personnel from danger areas.
Check all isolated equipment is secured correctly before beginning task.
Verify main disconnect switches & circuit breakers cannot be moved to "ON" position.
Attempt to activate operating controls to ensure power is off.
Return all power switches & disconnects to “OFF” or “NEUTRAL” position.
If water or steam is being shut down, open drains to relieve pressure.
Notify All Affected Employees When This Procedure Is In Application!
Start Up Procedures List the steps in order necessary to reactivate (energize) the equipment. Be specific.
Procedure:
Clean up and Inspect work areas.
Remove locking devices from valves and close any drains that are open. SLOWLY open valves.
Remove all locking devices and close all Knife type disconnects.
Remove locking devices &/or locks from VFD's move to ON/START/RUN position.
Remove locking devices & locks from circuit breakers move switches to ON position.
Verify all personnel are removed from Danger areas.
Contact ECC to start up AHU.
Energy Source Activated:
Hot Water & Chilled Water valves Steam valves Electrical from Panel Knife switches for fans and interior lights/receptacles VFD's for Supply fan, Exhaust Fans
Notify All Affected Employees When This Procedure
Is in Application!
AHU107-1 ID Plate
AHU107-2 Breaker Panel EQPD-2 #17
AHU107-3 VFD Disconnect
AHU107-4 Supply Fan Disconnect
AHU107-5 Chilled Water Supply CHWS#1013
AHU107-6 Chilled Water Return CHWR#1013
AHU107-7 Medium Pressure Steam MPS#1010
AHU107-8 Low Pressure Clean Steam