This document is a hazardous materials testing report conducted by Pennoni Associates at the Montrose VA Medical Center in Montrose, New York. The report identifies asbestos-containing materials (ACM), lead-based paint (LBP), and polychlorinated biphenyls (PCBs) associated with the roofs of buildings 3, 5, 6, 12, 13, 14, 17, 27, and 36 that are planned for replacement.
The asbestos survey identified 55 materials containing greater than 1% asbestos, including roofing felts, flashing, and coatings. The LBP screening identified 9 components exceeding the EPA/HUD threshold, primarily on HVAC and metal building components. PCB sampling found no levels exceeding EPA thresholds. The report provides approximate quantities and locations of the identified hazardous materials. Pennoni recommends the contractor performing the roof replacement should be notified of the presence of ACM and LBP and take appropriate handling and disposal precautions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24224B0014 0010.docx | DOCX document | |
| 36C24224B0014 0009.docx | DOCX document | |
| 36C24224B0014 0008.docx | DOCX document | |
| 240612 VMON-001 Detail Revisions.pdf | ||
| 36C24224B0014 0007.docx | DOCX document | |
| 36C24224B0014 0006.docx | DOCX document | |
| RFI Responses Contd.docx | DOCX document | |
| 36C24224B0014 0005.docx | DOCX document | |
| Mission Critical Roofs Phase I Responses RFI.xlsx | XLSX spreadsheet | |
| 36C24224B0014 0004.docx | DOCX document | |
| 36C24224B0014 0003.docx | DOCX document | |
| 36C24224B0014 0002.docx | DOCX document | |
| 36C24224B0014 0001.docx | DOCX document | |
| P07 - Wage Determination Dutchess County NY.txt | TXT text file | |
| 52-225-2-Buy-American-Certificate.pdf | ||
| 620-20-201 Drawings Phase 1.pdf | ||
| 620-20-201 Specifications Phase 1 (2).pdf | ||
| 36C24224B0014.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
130 West 29th Street 5th Floor, Suite 5F
New York, New York 10001 T: 212-239-7608 F: 212-239-7600 www.pennoni.com
January 7, 2022
AEWLA20033
A/E Works Attn: Mr. Chris Hutchins, PMP 209 Sandusky Street Pittsburg, PA 15212
RE: HAZARDOUS MATERIALS TESTING
MONTROSE VA MEDICAL CENTER
2094 ALBANY POST ROAD
MONTROSE, NEW YORK 10548
Dear Mr. Hutchins:
Pennoni submits this report to A/E Works to document the hazardous materials testing we conducted at the above referenced location. Our investigation included a survey for asbestos-containing materials (ACM), lead-based paint (LBP), and polychlorinated biphenyls (PCBs). It is Pennoni's understanding that the roofs of buildings 3, 5, 6, 12, 13, 14, 17, 27, and 36 will be replaced.
ASBESTOS SURVEY
Pennoni performed a comprehensive asbestos survey on November 23rd and 24th, 2021 to identify accessible ACM associated with the roof areas being renovated. Our asbestos inspection was conducted by a team of Pennoni’s New York State-accredited Asbestos Building Inspectors (see Appendix A – Pennoni Inspector Credentials). During the survey, Pennoni identified and collected 172 samples of the following 86 suspect ACM systems, listed here by Homogeneous ID number (see Appendix B – Sampling Locations and Appendix C – Site Photographs):
Building 3
46. Green Epoxy Coating at Gutter, Pitched Roof
47. White Flashing – Roof Edge, Pitched Roof, Roof
Valleys, and Capstone
48. Felt Paper under Slate shingle, Pitched Roof
49. Black Patch Flashing Tar, Pitched Roof
50. Red Nail Caulk at Copper, Pitched Roof
51. Black Asphaltic Roof, Flat Roof
52. Felt Paper Wall, Flat Roof
53. Black Flashing, Flat Roof
54. White Capstone Flashing, Flat Roof
55. Mechanical Equipment Caulking, Flat Roof
Building 5
1. Capstone Caulking, Roof Capstone
2. Capstone, Roof Capstone
3. Flashing Associated with Old Mechanical Equipment, Roof
4. Flashing Associated with New Mechanical Equipment, Roof
5. Top Layer Roofing, Roof
6. Bottom Layer Roofing, Roof
7. Copper Flashing Parapet, Roof
Building 6
16. Green Epoxy Coating at Gutter, Pitched Roof
17. White Flashing – Roof Edge, Pitched Roof, Roof
Valleys, and Capstone
18. Felt Paper under Slate shingle, Pitched Roof
19. Black Patch Flashing Tar, Pitched Roof
20. Red Nail Caulk at Copper, Pitched Roof
21. Black Asphaltic Roof, Flat Roof
22. Felt Paper Wall, Flat Roof
AEWLA20033 January 7, 2022 Page 2 Mr. Christ Hutchins, PMP Montrose VA Roof Replacement Hazardous Materials Testing
23. Black Flashing, Flat Roof
24. White Capstone Flashing, Flat Roof
25. Mechanical Equipment Caulking, Flat Roof
Building 12
36. Green Epoxy Coating at Gutter, Pitched Roof
37. White Flashing – Roof Edge, Pitched Roof, Roof
Valleys, and Capstone
38. Felt Paper under Slate shingle, Pitched Roof
39. Black Patch Flashing Tar, Pitched Roof
40. Red Nail Caulk at Copper, Pitched Roof
41. Black Asphaltic Roof, Flat Roof
42. Felt Paper Wall, Flat Roof
43. Black Flashing, Flat Roof
44. White Capstone Flashing, Flat Roof
45. Mechanical Equipment Caulking, Flat Roof
Building 13
1. Black Seam Tar – Slate shingle, Pitched Roof
2. Paint Coating Roof Edge Copper Cap, Pitched
Roof
3. Red Nail Caulk at Copper, Pitched Roof
4. White Glue on Slate shingle Pitched Roof
5. Brown Felt Associated with Slate shingle, Pitched Roof
6. Slate Roof Shingle, Pitched Roof
7. Cream Gutter Epoxy Coating, Pitched Roof
8. Grey Sealant at Gutter Edge, Pitched Roof
9. Metal Flashing Caulking, Flat Roof
10. Flashing Top Layer, Flat Roof
11. HVAC Caulking, Flat Roof
12. Black Asphaltic Flashing, Flat Roof
13. White Capstone Caulking, Flat Roof
14. Built Up Asphalt Roof, Flat Roof
15. Brick Mortar, Flat Roof
Building 14
26. Green Epoxy Coating at Gutter, Pitched Roof
27. White Flashing – Roof Edge, Pitched Roof, Roof
Valleys, and Capstone
28. Felt Paper under Slate shingle, Pitched Roof
29. Black Patch Flashing Tar, Pitched Roof
30. Red Nail Caulk at Copper, Pitched Roof
31. Black Asphaltic Roof, Flat Roof
32. Felt Paper Wall, Flat Roof
33. Black Flashing, Flat Roof
34. White Capstone Flashing, Flat Roof
35. Mechanical Equipment Caulking, Flat Roof
Building 17
1. Built Up Asphalt Roof, Roof
2. Flashing, Roof
3. Capstone Mortar, Roof Capstone
Building 27
1. Drywall Under Flashing, Flat Roof
2. Bottom Layer – Flashing, Flat Roof
3. Top Layer – Flashing, Flat Roof
4. Capstone Mortar, Roof Capstone
5. White Flashing, Flat Roof
6. Top Layer - Asphalt Roof, Flat Roof
7. Bottom Layer – Asphalt Roof, Flat Roof
8. Gutter Epoxy, Pitched Roof
9. Pitched Roof – Felt Paper, Pitched Roof
10. White Caulk Under Copper Flashing, Pitched
Roof
Building 36
1. Felt Paper, Roof
2. Metal Flashing Caulking, Roof
3. Capstone Flashing, Roof Capstone
The samples were properly packaged, labeled and transported to IRIS Environmental (IRIS), in Union, New Jersey.
IRIS is accredited under the National Voluntary Laboratory Accreditation Program (NVLAP). The samples were analyzed for asbestos content utilizing Polarized Light Microscopy (PLM) via EPA Method 600/R-93/116. In accordance with New York Department of Labor regulations, non-friable organically bound materials (NOBs) such as flooring, mastic, caulk and glazing with negative PLM results were re-analyzed utilizing Transmission Electron Microscopy (TEM) via EPA Method 600/R-93/116b Section 2.5.5.1 with Gravimetric Reduction.
Analytical results revealed 55 sampled materials contain greater than one percent (>1%) asbestos (see Appendix D – Asbestos Laboratory Analytical Certificates).
AEWLA20033 January 7, 2022 Page 3
Table 1 – Identified ACM Building 3
Montrose VA Medical Center 2094 Albany Post Road, Montrose NY 10548
Homogenous Material Location Approx.
Quantity
46. Green Epoxy Gutter Coating Building 3, pitched roof, gutters 1,075 SF
47. White Flashing Building 3, pitched roof, at roof edge, roof valleys, and capstone
500 SF and
1,350 LF
48. Felt Paper Building 3, pitched roof, under slate shingle 12,750 SF
49. Black Patch Flashing Tar Building 3, pitched roof 90 LF
50. Red Nail Caulk Building 3, pitched roof, at copper 40 SF
53. Black Flashing Building 3, flat roof 200 SF
54. White Capstone Flashing Building 3, flat roof 120 LF
55. Mechanical Equipment Caulking Building 3, flat roof 40 LF
SF – Square Feet; LF – Linear Feet
Table 2 – Identified ACM Building 5
Montrose VA Medical Center 2094 Albany Post Road, Montrose NY 10548
Homogenous Material Location Approx.
Quantity
01. Capstone Caulking Building 5, roof capstone 1,590 SF
03. Flashing Associated with Old Mechanical Equipment Building 5, roof 190 LF
SF – Square Feet; LF – Linear Feet
Table 3 – Identified ACM Building 6
Montrose VA Medical Center 2094 Albany Post Road, Montrose NY 10548
Homogenous Material Location Approx.
Quantity
16. Green Epoxy Gutter Coating Building 6, pitched roof, gutters 1,075 SF
17. White Flashing Building 6, pitched roof, at roof edge, roof valleys, and capstone
500 SF and
1,350 LF
18. Felt Paper Building 6, pitched roof, under slate shingle 12,750 SF
19. Black Patch Flashing Tar Building 6, pitched roof 90 LF
20. Red Nail Caulk Building 6, pitched roof, at copper 40 SF
22. Felt Paper Building 6, flat roof, parapet walls 200 SF
23. Black Flashing Building 6, flat roof 200 SF
24. White Capstone Flashing Building 6, flat roof, at capstone 120 LF
25. Mechanical Equipment Caulking Building 6, flat roof 40 LF
SF – Square Feet; LF – Linear Feet
AEWLA20033 January 7, 2022 Page 4
Table 4 – Identified ACM Building 12
Montrose VA Medical Center 2094 Albany Post Road, Montrose NY 10548
Homogenous Material Location Approx.
Quantity
36. Green Epoxy Gutter Coating Building 12, pitched roof, gutters 1,075 SF
37. White Flashing Building 12, pitched roof, at roof edge roof valleys, and capstone
500 SF and
1,350 LF
38. Felt Paper Building 12, pitched roof, under slate shingle 12,750 SF
39. Black Patch Flashing Tar Building 12, pitched roof 90 LF
40. Red Nail Caulk Building 12, pitched roof, at copper 40 SF
43. Black Flashing Building 12, flat roof 200 SF
44. White Capstone Flashing Building 12, flat roof, at capstone 120 LF
45. Mechanical Equipment Caulking Building 12, flat roof 40 LF
SF – Square Feet; LF – Linear Feet
Table 5 – Identified ACM Building 13
Montrose VA Medical Center 2094 Albany Post Road, Montrose NY 10548
Homogenous Material Location Approx.
Quantity
03. Red Nail Caulk Building 13, pitched roof, at copper 40 SF
08. Grey Sealant Building 13, pitched roof, at gutter edge, roof valleys, and capstone
500 SF and
1,350 LF
11. Mechanical Equipment Caulking Building 13, flat roof 40 LF
12. Black Asphaltic Flashing Building 13, flat roof 200 SF
13. White Capstone Caulk Building 13, flat roof, at capstone 120 LF
14. Built-up Asphalt Roof Building 13, flat roof 800 SF
Felt Paper (assumed ACM) Building 13, pitched roof, under slate shingle 12,750 SF
AEWLA20033 January 7, 2022 Page 5
Table 6 – Identified ACM Building 14
Montrose VA Medical Center 2094 Albany Post Road, Montrose NY 10548
Homogenous Material Location Approx.
Quantity
26. Green Epoxy Gutter Coating Building 14, pitched roof, gutters 1,075 SF
27. White Flashing Building 14, pitched roof, at roof edge, roof valleys, and capstone
500 SF and
1,350 LF
28. Felt Paper Building 14, pitched roof, under slate shingle 12,750 SF
29. Black Patch Flashing Tar Building 14, pitched roof 90 LF
30. Red Nail Caulk Building 14, pitched roof, at copper 40 SF
33. Black Flashing Building 14, flat roof 200 SF
34. White Capstone Flashing Building 14, flat roof, at capstone 120 LF
35. Mechanical Equipment Caulking Building 14, flat roof 40 LF
SF – Square Feet; LF – Linear Feet
Table 7 – Identified ACM Building 17
Montrose VA Medical Center 2094 Albany Post Road, Montrose NY 10548
Homogenous Material Location Approx.
Quantity
01. Built-up Asphalt Roof Building 17, roof 10,000 SF
02. Black Flashing Building 17, roof 500 LF
SF – Square Feet; LF – Linear Feet
Table 8 – Identified ACM Building 27
Montrose VA Medical Center 2094 Albany Post Road, Montrose NY 10548
Homogenous Material Location Approx.
Quantity
05. White Flashing Building 27, flat roof, at roof edge 345 SF
08. Green Epoxy Gutter Coating Building 27, pitched roof, gutters 300 SF
09. Felt Paper Building 27, pitched roof, under slate shingle 6,750 SF
10. White Caulk Building 27, pitched roof, under copper flashing 300 SF
AEWLA20033 January 7, 2022 Page 6
Table 9 – Identified ACM Building 36
Montrose VA Medical Center 2094 Albany Post Road, Montrose NY 10548
Homogenous Material Location Approx.
Quantity
02. Metal Flashing Caulk Building 36, roof 265 LF
SF – Square Feet; LF – Linear Feet
LEAD-BASED PAINT (LBP) SCREENING
Pennoni performed a limited lead-based paint (LBP) screening of the renovation area on November 29th, 2021 to determine if LBP is present on any of the existing painted surfaces or building components associated with the replacement of the roofs. The inspection and testing were performed following US HUD Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing, 2016 edition.
The testing was performed on-site utilizing a Niton® XLp300A portable x-ray fluorescence lead-in-paint analyzer (XRF). Homogeneous painted surfaces were scanned with the handheld XRF which yielded readings of lead content of tested paint.
The XRF results are based on the Performance Characteristic Sheets (PCS) and were obtained in the K&L Mode. This mode takes reading results and errors for both K and L-shell readings and corrects for substrate. The “Lead Detected in the mg/cm2 total” field is represented as a corrected value of the analyzer which represents the component as to being positive or negative. This is the result reported on the data sheets. Please refer to Appendix I for the instrument performance characteristic sheet.
HUD and the USEPA defines lead-based paint as a painted surface containing greater than or equal to one milligram of lead per square centimeter (1.0 mg/cm2) as measured by a hand-held XRF lead-in-paint analyzer or greater than 0.5% by weight as measured by laboratory analysis of collected paint chip samples (see components designated as red in Appendix G).
OSHA regulation 24 CFR 1926.62 OSHA Lead in Construction Standard has established a threshold of any level of lead above the detection level is defined as lead containing (i.e., greater than 0.0 ug/ cm2). XRF readings between
0.1 ug/cm2 and 0.9 ug/cm2 has been identified as OSHA positive (see components designated as blue in Appendix G).
A total of 55 surfaces were tested throughout the roofs of the buildings, of which nine (9) component systems exceeded the EPA/HUD threshold for LBP (see Appendix E – Lead Paint Testing Results):
Table 10 – Identified Lead-Based Painted Components Montrose VA Medical Center
2094 Albany Post Road, Montrose NY 10548 Location Component Substrate Material
Building 12, Roof HVAC Vent (Brown) Metal
Building 14, Roof HVAC Round Vent Base (Brown) Metal
Building 3, Roof HVAC Vent Base (Brown) Metal
Building 36, Roof HVAC Round Vent Base (Black) Metal
Building 36, Roof HVAC Round Vent Base (Black) Metal
Building 36, Roof HVAC Round Vent Base (Black) Metal
AEWLA20033 January 7, 2022 Page 7
Table 10 – Identified Lead-Based Painted Components Montrose VA Medical Center
2094 Albany Post Road, Montrose NY 10548 Location Component Substrate Material
Building 36, Roof HVAC Vent Pipe (Black) Metal
Building 36, Roof Pipe (Black) Metal
Building 36, Roof Ladder (Black) Metal
The identified LBP was generally found to be in a peeling condition. Paint of similar colors as those listed in Appendix H should also be considered LBP if found in other parts of the building. Removal of existing LBP is not required prior to renovation; however, the contractor performing renovation work should be notified that LBP is present and waste should be tested using the Toxic Characteristic Leaching (Leachate) Procedure (TCLP) prior to transport and disposal. Renovation contractors should be instructed to follow applicable OSHA and EPA regulations regarding working around LBP.
POLYCHLORINATED BIPHENYLS (PCBs) SURVEY
PCB sampling was conducted to determine if there are PCBs in the building matrix. One caulk sample from was collected during this survey. EMSL Analytical, Inc., an independent laboratory accredited by the National Environmental Laboratory Accreditation Conference (NELAC), analyzed the bulk sample for PCBs utilizing Gas Chromatography / Electron Capture Detectors (GC/ECD) according to the current revision of SOP 409 based on EPA SW-846 test method 8082.
The Toxic Substances Control Act (TSCA) regulations at 40 CFR 761 provide disposal and cleanup requirements for PCBs. The disposal and cleanup requirements for PCB-contaminated building material depend on whether the material is classified as a PCB bulk product waste or PCB remediation waste. Waste derived from caulk or paint containing PCBs at greater than or equal to 50 parts per million (ppm) is defined as PCB bulk product waste in 40 CFR 761.3. The definition of PCB bulk product waste includes "non-liquid bulk wastes or debris from the demolition of buildings and other man-made structures manufactured, coated, or serviced with PCBs. Materials containing PCBs in a non-liquid state at the time of disposal greater than or equal to 50 ppm are regulated.
Laboratory analysis revealed none of the PCB samples collected exceeded the EPA threshold for PCBs (see Appendix G – PCB Laboratory Analytical Certificates).
LIMITATIONS
The goal of the survey was to identify readily accessible suspect hazardous building materials that would be impacted by planned renovations. Pennoni’s survey did not include operational utility systems, below-grade or subfloor sampling, concealed pipe chase spaces, or inaccessible crawlspaces associated with foundations.
Hazardous materials may be present in these areas. Quantities in this report are estimated and should be verified for bidding purposes. Pennoni should be contacted immediately if renovation or demolition activities uncover materials that are not identified in this report.
If you have any questions concerning this report or require additional information, please contact us at 973-265- 9775.
AEWLA20033 January 7, 2022 Page 8
Sincerely, PENNONI ASSOCIATES INC.
Nic Vasquez, CIH, CHMM Ralph Coppola, CIEC Senior Industrial Hygienist Senior Industrial Hygienist
Attachments:
Appendix A – Pennoni Inspector Credentials Appendix B – Sampling Locations Appendix C – Site Photographs Appendix D – Asbestos Laboratory Analytical Certificates Appendix E – Lead Paint Testing Results Appendix F – Niton® XLp300 Performance Characteristic Sheet Appendix G – PCB Laboratory Analytical Certificates
U:\Accounts\AEWLA\AEWLA20033 - Montrose NY VAMC Design of Roof Replace\DOC PREP\Montrose VA ACM LBP PCB Report AEWLA20033.docx
APPENDIX A
Pennoni Inspector Credentials
APPENDIX B
Sampling Locations
RCoppola Text Box Building 3 Roof
RCoppola Arrow
RCoppola Arrow
RCoppola Text Box 46A 47A
RCoppola Arrow
RCoppola Arrow
RCoppola Text Box 46B 47B
RCoppola Text Box 48A 49A
RCoppola Text Box 48A 49A
RCoppola Text Box 50B
RCoppola Text Box 50A
RCoppola Arrow
RCoppola Arrow
RCoppola Text Box 51A 51B
RCoppola Arrow
RCoppola Arrow
RCoppola Text Box 52A,52B 53A,53B 54A,54B
RCoppola Arrow
RCoppola Arrow
RCoppola Text Box 55A 55B
Arrow
RCoppola Text Box 01A
RCoppola Arrow
RCoppola Text Box 01B
RCoppola Text Box 02A
RCoppola Text Box 02B
RCoppola Arrow
RCoppola Text Box 03A
RCoppola Arrow
RCoppola Text Box 03B
RCoppola Arrow
RCoppola Text Box 04B
RCoppola Arrow
RCoppola Text Box 04A
RCoppola Arrow
RCoppola Text Box 05A 06A
RCoppola Arrow
RCoppola Text Box 05B 06B
RCoppola Arrow
RCoppola Text Box 07B
RCoppola Arrow
RCoppola Text Box 07A nvasquez
Building 5 Roof
Building 6 Roof
RCoppola Arrow
RCoppola Arrow
RCoppola Text Box 16A 17A 20A
RCoppola Arrow
RCoppola Arrow
RCoppola Text Box 16B 17B 20B
RCoppola Text Box 18A 19A
RCoppola Text Box 18B 19B
RCoppola Arrow
RCoppola Arrow
RCoppola Text Box 21A 21B
RCoppola Arrow
RCoppola Arrow
RCoppola Text Box 22A,22B 23A,23B 24A,24B
RCoppola Arrow
RCoppola Arrow
RCoppola Text Box 25A 25B
Building 12 Roof
RCoppola Arrow
RCoppola Arrow
RCoppola Text Box 36A 37A 40A
RCoppola Arrow
RCoppola Arrow
RCoppola Text Box 36B 37B 40B
RCoppola Text Box 38A 39A
RCoppola Text Box 38B 39B
RCoppola Arrow
RCoppola Arrow
RCoppola Text Box 41A 41B
RCoppola Arrow
RCoppola Arrow
RCoppola Text Box 42A,42B 43A,43B 44A,44B
RCoppola Arrow
RCoppola Arrow
RCoppola Text Box 45A 45B
Building 13 Roof
RCoppola Arrow
RCoppola Arrow
RCoppola Text Box 02A 03A 07A 08A
RCoppola Arrow
RCoppola Text Box 02B 03B 07B 08B
RCoppola Text Box 01A 04A 05A 06A
RCoppola Text Box 01B 04B 05B 06B
RCoppola Arrow
RCoppola Arrow
RCoppola Text Box 14A 14B
RCoppola Arrow
RCoppola Arrow
RCoppola Text Box 09A,09B 10A,10B 12A,12B 13A,13B 15A,15B
RCoppola Arrow
RCoppola Arrow
RCoppola Text Box 11A 11B
Building 14 Roof
RCoppola Arrow
RCoppola Arrow
RCoppola Text Box 26A 27A 30A
RCoppola Arrow
RCoppola Arrow
RCoppola Text Box 26B 27B 30B
RCoppola Text Box 28A 29A
RCoppola Text Box 28B 29B
RCoppola Arrow
RCoppola Arrow
RCoppola Text Box 31A 31B
RCoppola Arrow
RCoppola Arrow
RCoppola Text Box 32A,32B 33A,33B 34A,34B
RCoppola Arrow
RCoppola Arrow
RCoppola Text Box 35A 35B
RCoppola Text Box 01A
RCoppola Arrow
RCoppola Text Box 02A 03A
RCoppola Arrow
RCoppola Text Box 01B
RCoppola Arrow
RCoppola Text Box 02B 03B nvasquez
Building 17 Roof
01A 02A 03A
RCoppola Text Box 01B 02B 03B
RCoppola Text Box 04A 05A
RCoppola Text Box 04B 05B
RCoppola Text Box 06A 07A
RCoppola Text Box 06B 07B
RCoppola Text Box 08A 09A 10A
RCoppola Text Box 08B 09B 10B nvasquez
Building 27 Roof
APPENDIX C
Site Photographs
Job No.
Date Taken:
SITE PHOTOGRAPHS
ACM, LBP, & PCB SURVEY
MONTROSE VA MEDICAL CENTER
2094 ALBANY POST ROAD
MONTROSE, NEW YORK 10548
AEWLA20033 November 23-24, 2021
Pennoni Associates Inc.
130 West 29th Street, 5th Floor Suite 5F
New York, New York 10001
Photograph 3
Green Epoxy Gutter Coating (ACM)
Gutters of Pitched Roof of Buildings 3, 6, 12, 13, 14, & 27
Photograph 4
Black Flashing (ACM)
Flat Roofs of Buildings 3, 6, 12, 13, & 14
Photograph 1
Black Asphaltic Roofing (ACM)
Flat Roofs of Buildings 13 & 17
Photograph 2
Flashing Associated with Old Mechanical Equipment (ACM)
Building 5
SITE PHOTOGRAPHS
ACM, LBP, & PCB SURVEY
MONTROSE VA MEDICAL CENTER
2094 ALBANY POST ROAD
MONTROSE, NEW YORK 10548
AEWLA20033 November 23-24, 2021
Pennoni Associates Inc.
130 West 29th Street, 5th Floor Suite 5F
New York, New York 10001
Photograph 7
Green Epoxy Gutter Coating (ACM)
Gutters of Pitched Roof of Buildings 3, 5, 6, 12, 13, & 14
Photograph 8
White Flashing (ACM)
Pitched Roofs of Buildings 3, 12, 13, & 14
Photograph 5
Red Nail Caulk (ACM)
Pitched Roofs at Copper on Buildings 3, 6, 12, 13, & 14
Photograph 6
White Capstone Flashing (ACM)
Flat Roofs of Buildings 3, 6, 12, 13, & 14
SITE PHOTOGRAPHS
ACM, LBP, & PCB SURVEY
MONTROSE VA MEDICAL CENTER
2094 ALBANY POST ROAD
MONTROSE, NEW YORK 10548
AEWLA20033 November 23-24, 2021
Pennoni Associates Inc.
130 West 29th Street, 5th Floor Suite 5F
New York, New York 10001
Photograph 11
Building 36 Ladder (LBP)
Photograph 12
Building 36 HVAC Vents (LBP)
Photograph 9
Metal Flashing Caulk (ACM)
Building 36
Photograph 10
White Flashing (ACM)
Roofs of Buildings 3, 6, 12, 13, 14, & 27
SITE PHOTOGRAPHS
ACM, LBP, & PCB SURVEY
MONTROSE VA MEDICAL CENTER
2094 ALBANY POST ROAD
MONTROSE, NEW YORK 10548
AEWLA20033 November 23-24, 2021
Pennoni Associates Inc.
130 West 29th Street, 5th Floor Suite 5F
New York, New York 10001
Photograph 15
Building 14 HVAC Round Vent Base (LBP)
Photograph 13
Building 36 HVAC Vents (LBP)
Photograph 14
Building 3 HVAC Vent (LBP)
APPENDIX D
Asbestos Laboratory Analytical Certificates
Polarized Light Microscopy Analytical Report
NJDEP #: 20045
Lab ID:
Analyzed:
Received:
Sampled:
Reported:
12/01/2021
11/30/2021
11/24/2021
12/23/2021
RP211223002ReportID:
211130017
Job Site : Montrose VA, Building 6, Roof
Samples Analyzed: 110
NOB :
NOB Split :
Friable :
Friable Split :
0 0
Stop : 32
Client :
Address:
Phone:
Email:
Pennoni
(973) 265-9763
RCoppola@pennoni.com
130 West 29th Street, 5th Floor
New York NY 10001
Sample Description
Location
NOB
Other Data % Non-Asbestos Fibers
/Other
Asbestos % Type(s)
Sample Lab ID
Client Sample ID
Black Roofing Material
Building 13 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected0101A
Black Roofing Material
Building 13 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected0201B
Gray Caulk
Building 13 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected0302A
Gray Caulk
Building 13 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected0402B
Black/Red Roofing Material
Building 13 - Roof
YES
93% Other Non-Fibrous7% Chrysotile
0503A
Stop At First Positive - Not Analyzed
Building 13 - Roof
0603B
Gray/White Glue
Building 13 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected0704A
Gray/White Glue
Building 13 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected0804B
Brown Felt Paper
Building 13 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected0905A
Brown Felt Paper
Building 13 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected1005B
Sample Description
Location
NOB
Other Data % Non-Asbestos Fibers
/Other
Asbestos % Type(s)
Sample Lab ID
Client Sample ID
Red Clay tile
Building 13 - Roof
NO
100% Other Non-Fibrous
No Asbestos Detected1106A
Red Clay tile
Building 13 - Roof
NO
100% Other Non-Fibrous
No Asbestos Detected1206B
Gray/Green Glue
Building 13 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected1307A
Gray/Green Glue
Building 13 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected1407B
Green/White Roofing Material
Building 13 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected1508A
Green/White Roofing Material
Building 13 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected1608B
Black/White Caulk
Building 13 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected1709A
Black/White Caulk
Building 13 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected1809B
Black Roofing Shingle
Building 13 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected1910A
Black Roofing Shingle
Building 13 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected2010B
Gray Caulk
Building 13 - Roof
YES
98% Other Non-Fibrous2% Anthophylite
2111A
Stop At First Positive - Not Analyzed
Building 13 - Roof
2211B
Black Flashing
Building 13 - Roof
YES
94% Other Non-Fibrous6% Chrysotile
2312A
Stop At First Positive - Not Analyzed
Building 13 - Roof
2412B
Location
NOB
Other Data % Non-Asbestos Fibers
/Other
Asbestos % Type(s)
Sample Lab ID
Client Sample ID
White Caulk
Building 13 - Roof
YES
97% Other Non-Fibrous3% Chrysotile
2513A
Stop At First Positive - Not Analyzed
Building 13 - Roof
2613B
Black Roofing Material
Building 13 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected2714A
Black Roofing Material
Building 13 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected2814B
Gray Mortar
Building 13 - Roof
NO
100% Other Non-Fibrous
No Asbestos Detected2915A
Gray Mortar
Building 13 - Roof
NO
100% Other Non-Fibrous
No Asbestos Detected3015B
Red/White Roofing Material
Building 06 Pitched Roof
YES
100% Other Non-Fibrous
No Asbestos Detected3116A
Red/White Roofing Material
Building 06 Pitched Roof
YES
100% Other Non-Fibrous
No Asbestos Detected3216B
Red/White Roofing Material
Building 06 Pitched Roof
YES
100% Other Non-Fibrous
No Asbestos Detected3317A
Red/White Roofing Material
Building 06 Pitched Roof
YES
100% Other Non-Fibrous
No Asbestos Detected3417B
Black/Red Roofing Material
Building 06 Pitched Roof
YES
92% Other Non-Fibrous8% Chrysotile
3518A
Stop At First Positive - Not Analyzed
Building 06 Pitched Roof
3618B
Black Flashing tar
Building 06 Pitched Roof
YES
100% Other Non-Fibrous
No Asbestos Detected3719A
Black Flashing tar
Building 06 Pitched Roof
YES
100% Other Non-Fibrous
No Asbestos Detected3819B
Location
NOB
Other Data % Non-Asbestos Fibers
/Other
Asbestos % Type(s)
Sample Lab ID
Client Sample ID
Red Caulk
Building 06 Pitched Roof
YES
92% Other Non-Fibrous8% Chrysotile
3920A
Stop At First Positive - Not Analyzed
Building 06 Pitched Roof
4020B
Black Roofing Material
Building 06 Flat Roof
YES
100% Other Non-Fibrous
No Asbestos Detected4121A
Black Roofing Material
Building 06 Flat Roof
YES
100% Other Non-Fibrous
No Asbestos Detected4221B
Black Roofing Material
Building 06 Flat Roof
YES
100% Other Non-Fibrous
No Asbestos Detected4322A
Black Roofing Material
Building 06 Flat Roof
YES
100% Other Non-Fibrous
No Asbestos Detected4422B
Black Flashing
Building 06 Flat Roof
YES
96% Other Non-Fibrous4% Chrysotile
4523A
Stop At First Positive - Not Analyzed
Building 06 Flat Roof
4623B
White Caulk
Building 06 Flat Roof
YES
95% Other Non-Fibrous5% Chrysotile
4724A
Stop At First Positive - Not Analyzed
Building 06 Flat Roof
4824B
Green/Red Caulk
Building 06 Flat Roof
YES
96% Other Non-Fibrous4% Chrysotile
4925A
Stop At First Positive - Not Analyzed
Building 06 Flat Roof
5025B
Red/White Roofing Material
Building 14 Pitched Roof
YES
96% Other Non-Fibrous4% Chrysotile
5126A
Stop At First Positive - Not Analyzed
Building 14 Pitched Roof
5226B
Location
NOB
Other Data % Non-Asbestos Fibers
/Other
Asbestos % Type(s)
Sample Lab ID
Client Sample ID
Black Flashing
Building 14 Pitched Roof
YES
95% Other Non-Fibrous5% Chrysotile
5327A
Stop At First Positive - Not Analyzed
Building 14 Pitched Roof
5427B
Black Felt Paper
Building 14 Pitched Roof
YES
94% Other Non-Fibrous6% Chrysotile
5528A
Stop At First Positive - Not Analyzed
Building 14 Pitched Roof
5628B
Black Roofing Material
Building 14 Pitched Roof
YES
100% Other Non-Fibrous
No Asbestos Detected5729A
Black Roofing Material
Building 14 Pitched Roof
YES
100% Other Non-Fibrous
No Asbestos Detected5829B
Black Roofing Material
Building 14 Pitched Roof
YES
94% Other Non-Fibrous6% Chrysotile
5930A
Stop At First Positive - Not Analyzed
Building 14 Pitched Roof
6030B
Black Roofing Material
Building 14 Flat Roof
YES
100% Other Non-Fibrous
No Asbestos Detected6131A
Black Roofing Material
Building 14 Flat Roof
YES
100% Other Non-Fibrous
No Asbestos Detected6231B
Black Felt Paper
Building 14 Flat Roof
YES
100% Other Non-Fibrous
No Asbestos Detected6332A
Black Felt Paper
Building 14 Flat Roof
YES
100% Other Non-Fibrous
No Asbestos Detected6432B
Black Flashing
Building 14 Flat Roof
YES
94% Other Non-Fibrous6% Chrysotile
6533A
Stop At First Positive - Not Analyzed
Building 14 Flat Roof
6633B
Location
NOB
Other Data % Non-Asbestos Fibers
/Other
Asbestos % Type(s)
Sample Lab ID
Client Sample ID
Red/White Roofing Material
Building 14 Flat Roof
YES
93% Other Non-Fibrous7% Chrysotile
6734A
Stop At First Positive - Not Analyzed
Building 14 Flat Roof
6834B
Red/White Caulk
Building 14 Flat Roof
YES
94% Other Non-Fibrous6% Chrysotile
6935A
Stop At First Positive - Not Analyzed
Building 14 Flat Roof
7035B
Green/Red Roofing Material
Building 12 Pitched Roof
YES
96% Other Non-Fibrous4% Chrysotile
7136A
Stop At First Positive - Not Analyzed
Building 12 Pitched Roof
7236B
Red/White Flashing
Building 12 Pitched Roof
YES
94% Other Non-Fibrous6% Chrysotile
7337A
Stop At First Positive - Not Analyzed
Building 12 Pitched Roof
7437B
Black Felt Paper
Building 12 Pitched Roof
YES
95% Other Non-Fibrous5% Chrysotile
7538A
Stop At First Positive - Not Analyzed
Building 12 Pitched Roof
7638B
Black Roofing Material
Building 12 Pitched Roof
YES
100% Other Non-Fibrous
No Asbestos Detected7739A
Black Roofing Material
Building 12 Pitched Roof
YES
100% Other Non-Fibrous
No Asbestos Detected7839B
Red Caulk
Building 12 Pitched Roof
YES
94% Other Non-Fibrous6% Chrysotile
7940A
Stop At First Positive - Not Analyzed
Building 12 Pitched Roof
8040B
Location
NOB
Other Data % Non-Asbestos Fibers
/Other
Asbestos % Type(s)
Sample Lab ID
Client Sample ID
Black Roofing Material
Building 12 Flat Roof
YES
100% Other Non-Fibrous
No Asbestos Detected8141A
Black Roofing Material
Building 12 Flat Roof
YES
100% Other Non-Fibrous
No Asbestos Detected8241B
Black Felt Paper
Building 12 Flat Roof
YES
100% Other Non-Fibrous
No Asbestos Detected8342A
Black Felt Paper
Building 12 Flat Roof
YES
100% Other Non-Fibrous
No Asbestos Detected8442B
Black Flashing
Building 12 Flat Roof
YES
97% Other Non-Fibrous3% Chrysotile
8543A
Stop At First Positive - Not Analyzed
Building 12 Flat Roof
8643B
Green/White Flashing
Building 12 Flat Roof
YES
93% Other Non-Fibrous7% Chrysotile
8744A
Stop At First Positive - Not Analyzed
Building 12 Flat Roof
8844B
Gray Caulking
Building 12 Flat Roof
YES
93% Other Non-Fibrous7% Chrysotile
8945A
Stop At First Positive - Not Analyzed
Building 12 Flat Roof
9045B
Gray Caulking
Building 3 Pitched Roof
YES
96% Other Non-Fibrous4% Chrysotile
9146A
Stop At First Positive - Not Analyzed
Building 3 Pitched Roof
9246B
White Flashing
Building 3 Pitched Roof
YES
97% Other Non-Fibrous3% Chrysotile
9347A
Stop At First Positive - Not Analyzed
Building 3 Pitched Roof
9447B
Location
NOB
Other Data % Non-Asbestos Fibers
/Other
Asbestos % Type(s)
Sample Lab ID
Client Sample ID
Black/Red Felt Paper
Building 3 Pitched Roof
YES
57% Cellulose
40% Other Non-Fibrous 3% Chrysotile
9548A
Stop At First Positive - Not Analyzed
Building 3 Pitched Roof
9648B
Black Flashing
Building 3 Pitched Roof
YES
100% Other Non-Fibrous
No Asbestos Detected9749A
Black Flashing
Building 3 Pitched Roof
YES
100% Other Non-Fibrous
No Asbestos Detected9849B
Red Caulk
Building 3 Pitched Roof
YES
93% Other Non-Fibrous7% Chrysotile
9950A
Stop At First Positive - Not Analyzed
Building 3 Pitched Roof
10050B
Black Roofing Material
Building 3 Flat Roof
YES
100% Other Non-Fibrous
No Asbestos Detected10151A
Black Roofing Material
Building 3 Flat Roof
YES
100% Other Non-Fibrous
No Asbestos Detected10251B
Black Felt Paper
Building 3 Flat Roof
YES
43% Cellulose
57% Other Non-FibrousNo Asbestos Detected10352A
Felt Paper
Building 3 Flat Roof
YES
43% Cellulose
57% Other Non-FibrousNo Asbestos Detected10452B
Black Flashing
Building 3 Flat Roof
YES
96% Other Non-Fibrous4% Chrysotile
10553A
Stop At First Positive - Not Analyzed
Building 3 Flat Roof
10653B
White Flashing
Building 3 Flat Roof
YES
93% Other Non-Fibrous7% Chrysotile
10754A
Stop At First Positive - Not Analyzed
Building 3 Flat Roof
10854B
Location
NOB
Other Data % Non-Asbestos Fibers
/Other
Asbestos % Type(s)
Sample Lab ID
Client Sample ID
Gray Caulking
Building 3 Flat Roof
YES
91% Other Non-Fibrous9% Chrysotile
10955A
Stop At First Positive - Not Analyzed
Building 3 Flat Roof
11055B
Pennoni collected the sample(s) above.
Lab Manager: Analyst:
The analysis above was performed in accordance with EPA Method 600/M4/82/020 or NYSDOH ELAP 198.6 for the determination of asbestos in bulk building materials by polarized light microscopy (PLM). Please note that while PLM analysis is commonly performed on non-friable and fine grained materials such as floor tiles and dust, the EPA method recognizes that PLM is subject to limitations. In these situations, accurate results may only be obtainable through the use of more sophisticated and accurate techniques such as transmission electron microscopy (TEM) or X-ray diffraction (XRD).lntra-laboratory Sr values: 0.29. The above report may not be reproduced, except in full, without written approval by IRIS Environmental Laboratories, Inc.
Iris Environmental Laboratories, Inc.
2333 Route 22 West, Union, NJ 07083
Phone: (908) 206-0073
Print Name: Beidi HePrint Name: Rick Eustaquio
Pa ge of of of of of of
Asbestos Analysis of Non-Friable Organically Bound Materials via Transmission Electron Microscopy
Analyzed:
Received:
Sampled:
Reported:
12/03/2021
11/30/2021
11/24/2021
12/23/2021
ReportID: RP211203015
Job Site :
Samples Analyzed :
Montrose VA, Building 6, Roof
46Client:
Address:
Phone:
Email:
Pennoni
(973) 265-9763
130 West 29th Street,5th Floor
RCoppola@pennoni.com
New York NY 10001
Description Sample Location
%Non-Fibrous Material
%Non_ Asbestos Fibrous
Asbestos Types
%Total Asbestos
Gravimetrically Reduced
SubsampleLab ID
Sample ID
Building 13 - Roof
Black Roofing Material 100%
No Asbestos Detected.
35% 211130017
01A
Building 13 - Roof
Black Roofing Material 100%
No Asbestos Detected.
45% 211130017
01B
Building 13 - Roof
Gray Caulk 100%
No Asbestos Detected.
38% 211130017
02A
Building 13 - Roof
Gray Caulk 100%
No Asbestos Detected.
32% 211130017
02B
Building 13 - Roof
Gray/White Glue 100%
No Asbestos Detected.
36% 211130017
04A
Building 13 - Roof
Gray/White Glue 100%
No Asbestos Detected.
32% 211130017
04B
Building 13 - Roof
Brown Felt Paper 100%
No Asbestos Detected.
4% 211130017
05A
Building 13 - Roof
Brown Felt Paper 100%
No Asbestos Detected.
40% 211130017
05B
Building 13 - Roof
Green Glue 100%
No Asbestos Detected.
24% 211130017
07A
Building 13 - Roof
Green Glue 100%
No Asbestos Detected.
22% 211130017
07B
Building 13 - Roof
Green/White Roofing Material87%Chrysotile13%44%
211130017
08A
Building 13 - Roof
Green/White Roofing Materia
Stop at First Positive-Sample Not Analyzed.
52% 211130017
08B
Building 13 - Roof
White Caulk 100%
No Asbestos Detected.
19% 211130017
09A
Any sample containing 1% or greater amount of asbestos is considered to be an asbestos containing material (ACM) Test Methods -ELAP 198.4 "Method for identifying and Quantitating Asbestos is Non-Friable Organically Bound Bulk
Samples" and/or EPA-600/R-93/116 Section 2.5" Asbestos in Bulk Building Materials By TEM Gravimetry. "
Pennoni collected the sample(s) above.
Analyzed:
Received:
Sampled:
Reported:
12/03/2021
11/30/2021
11/24/2021
12/23/2021
ReportID: RP211203015
Job Site :
Samples Analyzed :
Montrose VA, Building 6, Roof
46Client:
Address:
Phone:
Email:
Pennoni
(973) 265-9763
130 West 29th Street,5th Floor
RCoppola@pennoni.com
New York NY 10001
Description Sample Location
%Non-Fibrous Material
%Non_ Asbestos Fibrous
Asbestos Types
%Total Asbestos
Gravimetrically Reduced
SubsampleLab ID
Sample ID
Building 13 - Roof
White Caulk 100%
No Asbestos Detected.
11% 211130017
09B
Building 13 - Roof
Black Shingle 100%
No Asbestos Detected.
43% 211130017
10A
Building 13 - Roof
Black Shingle 100%
No Asbestos Detected.
36% 211130017
10B
Building 13 - Roof
Black Roofing Material 99%Chrysotile1%3%
211130017
14A
Building 13 - Roof
Black Roofing MaterialStop at First Positive-Sample Not Analyzed.
15% 211130017
14B
Building 06 Pitched Roof
Red Roofing Material 93%Chrysotile7%41%
211130017
16A
Building 06 Pitched Roof
Red Roofing MaterialStop at First Positive-Sample Not Analyzed.
41% 211130017
16B
Building 06 Pitched Roof
Red Roofing Material 91%Chrysotile9%45%
211130017
17A
Building 06 Pitched Roof
Red Roofing MaterialStop at First Positive-Sample Not Analyzed.
42% 211130017
17B
Building 06 Pitched Roof
Black Flashing 96%Chrysotile4%10%
211130017
19A
Building 06 Pitched Roof
Black FlashingStop at First Positive-Sample Not Analyzed.
9% 211130017
19B
Building 06 Flat Roof
Black Roofing Material 100%
No Asbestos Detected.
83% 211130017
21A
Building 06 Flat Roof
Black Roofing Material 100%
No Asbestos Detected.
56% 211130017
21B
Building 06 Flat Roof
Black Roofing Material 99%Chrysotile1%6%
211130017
22A
Any sample containing 1% or greater amount of asbestos is considered to be an asbestos containing material (ACM) Test Methods -ELAP 198.4 "Method for identifying and Quantitating Asbestos is Non-Friable Organically Bound Bulk
Samples" and/or EPA-600/R-93/116 Section 2.5" Asbestos in Bulk Building Materials By TEM Gravimetry. "
Sampled:
Reported:
12/03/2021
11/30/2021
11/24/2021
12/23/2021
ReportID: RP211203015
Job Site :
Samples Analyzed :
Montrose VA, Building 6, Roof
46Client:
Address:
Phone:
Email:
Pennoni
(973) 265-9763
130 West 29th Street,5th Floor
RCoppola@pennoni.com
New York NY 10001
Description Sample Location
%Non-Fibrous Material
%Non_ Asbestos Fibrous
Asbestos Types
%Total Asbestos
Gravimetrically Reduced
SubsampleLab ID
Sample ID
Building 06 Flat Roof
Black Roofing MaterialStop at First Positive-Sample Not Analyzed.
4% 211130017
22B
Building 14 Pitched Roof
Black Roofing Material 93%Chrysotile7%18%
211130017
29A
Building 14 Pitched Roof
Black Roofing MaterialStop at First Positive-Sample Not Analyzed.
18% 211130017
29B
Building 14 Flat Roof
Black Roofing Material 100%
No Asbestos Detected.
22% 211130017
31A
Building 14 Flat Roof
Black Roofing Material 100%
No Asbestos Detected.
36% 211130017
31B
Building 14 Flat Roof
Black Felt Paper 100%
No Asbestos Detected.
7% 211130017
32A
Building 14 Flat Roof
Black Felt Paper 100%
No Asbestos Detected.
7% 211130017
32B
Building 12 Pitched Roof
Black Roofing Material 90%Chrysotile10%25%
211130017
39A
Building 12 Pitched Roof
Black Roofing MaterialStop at First Positive-Sample Not Analyzed.
23% 211130017
39B
Building 12 Flat Roof
Black Roofing Material 100%
No Asbestos Detected.
47% 211130017
41A
Building 12 Flat Roof
Black Roofing Material 100%
No Asbestos Detected.
52% 211130017
41B
Building 12 Flat Roof
Black Felt Paper 100%
No Asbestos Detected.
9% 211130017
42A
Building 12 Flat Roof
Black Felt Paper 100%
No Asbestos Detected.
9% 211130017
42B
Building 3 Pitched Roof
Black Flashing 99%Chrysotile1%4%
211130017
49A
Any sample containing 1% or greater amount of asbestos is considered to be an asbestos containing material (ACM) Test Methods -ELAP 198.4 "Method for identifying and Quantitating Asbestos is Non-Friable Organically Bound Bulk
Samples" and/or EPA-600/R-93/116 Section 2.5" Asbestos in Bulk Building Materials By TEM Gravimetry. "
Sampled:
Reported:
12/03/2021
11/30/2021
11/24/2021
12/23/2021
ReportID: RP211203015
Job Site :
Samples Analyzed :
Montrose VA, Building 6, Roof
46Client:
Address:
Phone:
Email:
Pennoni
(973) 265-9763
130 West 29th Street,5th Floor
RCoppola@pennoni.com
New York NY 10001
Description Sample Location
%Non-Fibrous Material
%Non_ Asbestos Fibrous
Asbestos Types
%Total Asbestos
Gravimetrically Reduced
SubsampleLab ID
Sample ID
Building 3 Pitched Roof
Black FlashingStop at First Positive-Sample Not Analyzed.
38% 211130017
49B
Building 3 Flat Roof
Black Roofing Material 100%
No Asbestos Detected.
56% 211130017
51A
Building 3 Flat Roof
Black Roofing Material 100%
No Asbestos Detected.
74% 211130017
51B
Building 3 Flat Roof
Black Felt Paper 100%
No Asbestos Detected.
7% 211130017
52A
Building 3 Flat Roof
Black Felt Paper 100%
No Asbestos Detected.
5% 211130017
52B
Any sample containing 1% or greater amount of asbestos is considered to be an asbestos containing material (ACM) Test Methods -ELAP 198.4 "Method for identifying and Quantitating Asbestos is Non-Friable Organically Bound Bulk
Samples" and/or EPA-600/R-93/116 Section 2.5" Asbestos in Bulk Building Materials By TEM Gravimetry. "
Pennoni collected the sample(s) above.
Lab Manager: Analyst:
The analysis above was performed in accordance with ELAP 198.4 or EPA-600/M4/82/020 for the determination of asbestos in bulk building materials by Transmission Electron Microscopy (TEM). According to NYS law, all negative NOB's (floor tiles, roofing materials, etc.) must be confirmed by TEM. These results apply to only these samples. IRIS assumes that all sampling methods and data upon which these results are based have been accurately supplied by the client.lntra-laboratory Sr values: 0.29.The above report may not be reproduced except in full, without written approval by IRIS Environmental Laboratories, Inc. This report is not induced by any U.S Government Agency. NJ DEP#: 20045
NIOSH PAT #:173498 ELAP# 12078
Iris Environmental Laboratories, Inc.
2333 Route 22 West, Union, NJ 07083
Phone: (908) 206-0073 o f 1 o f 1 o f 1 o f 1 o f 1 of
NJDEP #: 20045
Lab ID:
Analyzed:
Received:
Sampled:
Reported:
12/01/2021
11/30/2021
11/23/2021
12/01/2021
RP211201005ReportID:
211130011
Job Site : Montrose VA, Building 5, Roof
Samples Analyzed: 14
NOB :
NOB Split :
Friable :
Friable Split :
0 0
Stop : 0
Client :
Address:
Phone:
Email:
Pennoni
(973) 265-9763
RCoppola@pennoni.com
130 West 29th Street, 5th Floor
New York NY 10001
Sample Description
Location
NOB
Other Data % Non-Asbestos Fibers
/Other
Asbestos % Type(s)
Sample Lab ID
Client Sample ID
Gray/White Caulk
Building 5 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected0101A
Gray/White Caulk
Building 5 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected0201B
Gray Plaster
Building 5 - Roof
NO
100% Other Non-Fibrous
No Asbestos Detected0302A
Gray Plaster
Building 5 - Roof
NO
100% Other Non-Fibrous
No Asbestos Detected0402B
Black Flashing
Building 5 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected0503A
Black Flashing
Building 5 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected0603B
Black Flashing
Building 5 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected0704A
Black Flashing
Building 5 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected0804B
Black Roofing Shingle
Building 5 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected0905A
Black Roofing Shingle
Building 5 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected1005B
Location
NOB
Other Data % Non-Asbestos Fibers
/Other
Asbestos % Type(s)
Sample Lab ID
Client Sample ID
Black Roofing Material
Building 5 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected1106A
Black Roofing Material
Building 5 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected1206B
Black Flashing
Building 5 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected1307A
Black Flashing
Building 5 - Roof
YES
100% Other Non-Fibrous
No Asbestos Detected1407B
Pennoni collected the sample(s) above.
Lab Manager: Analyst:
The analysis above was performed in accordance with EPA Method 600/M4/82/020 or NYSDOH ELAP 198.6 for the determination of asbestos in bulk building materials by polarized light microscopy (PLM). Please note that while PLM analysis is commonly performed on non-friable and fine grained materials such as floor tiles and dust, the EPA method recognizes that PLM is subject to limitations. In these situations, accurate results may only be obtainable through the use of more sophisticated and accurate techniques such as transmission electron microscopy (TEM) or X-ray diffraction (XRD).lntra-laboratory Sr values: 0.29. The above report may not be reproduced, except in full, without written approval by IRIS Environmental Laboratories, Inc.
Iris Environmental Laboratories, Inc.
2333 Route 22 West, Union, NJ 07083
Phone: (908) 206-0073
Print Name: Divyani ParmarPrint Name: Rick Eustaquio
211130011
Analyzed:
Received:
Sampled:
Reported:
12/03/2021
11/30/2021
11/23/2021
12/03/2021
ReportID: RP211203006
Job Site :
Samples Analyzed :
Montrose VA, Building 5, Roof
12Client:
Address:
Phone:
Email:
Pennoni
(973) 265-9763
130 West 29th Street,5th Floor
RCoppola@pennoni.com
New York NY 10001
Description Sample Location
%Non-Fibrous Material
%Non_ Asbestos Fibrous
Asbestos Types
%Total Asbestos
Gravimetrically Reduced
SubsampleLab ID
Sample ID
Building 5 - Roof
Gray/White Caulk 98%Chrysotile2%16%
211130011
01A
Building 5 - Roof
Gray/White CaulkStop at First Positive-Sample Not Analyzed.
18% 211130011
01B
Building 5 - Roof
Black Flashing 96%Chrysotile4%12%
211130011
03A
Building 5 - Roof
Black FlashingStop at First Positive-Sample Not Analyzed.
12% 211130011
03B
Building 5 - Roof
Black Flashing 100%
No Asbestos Detected.
50% 211130011
04A
Building 5 - Roof
Black Flashing 100%
No Asbestos Detected.
30% 211130011
04B
Building 5 - Roof
Black Shingle 100%
No Asbestos Detected.
18% 211130011
05A
Building 5 - Roof
Black Shingle 100%
No Asbestos Detected.
15% 211130011
05B
Building 5 - Roof
Black Roofing Material 100%
No Asbestos Detected.
12% 211130011
06A
Building 5 - Roof
Black Roofing Material 100%
No Asbestos Detected.
4% 211130011
06B
Building 5 - Roof
Black Flashing 100%
No Asbestos Detected.
5% 211130011
07A
Building 5 - Roof
Black Flashing 100%
No Asbestos Detected.
8% 211130011
07B
Any sample containing 1% or greater amount of asbestos is considered to be an asbestos containing material (ACM) Test Methods -ELAP 198.4 "Method for identifying and Quantitating Asbestos is Non-Friable Organically Bound Bulk
Samples" and/or EPA-600/R-93/116 Section 2.5" Asbestos in Bulk Building Materials By TEM Gravimetry. "
Sampled:
Reported:
12/03/2021
11/30/2021
11/23/2021
12/03/2021
ReportID: RP211203006
Job Site :
Samples Analyzed :
Montrose VA, Building 5, Roof
12Client:
Address:
Phone:
Email:
Pennoni
(973) 265-9763
130 West 29th Street,5th Floor
RCoppola@pennoni.com
New York NY 10001
Description Sample Location
%Non-Fibrous Material
%Non_ Asbestos Fibrous
Asbestos Types
%Total Asbestos
Gravimetrically Reduced
SubsampleLab ID
Sample ID
Lab Manager: Analyst:
The analysis above was performed in accordance with ELAP 198.4 or EPA-600/M4/82/020 for the determination of asbestos in bulk building materials by Transmission Electron Microscopy (TEM). According to NYS law, all negative NOB's (floor tiles, roofing materials, etc.) must be confirmed by TEM. These results apply to only these samples. IRIS assumes that all sampling methods and data upon which these results are based have been accurately supplied by the client.lntra-laboratory Sr values: 0.29.The above report may not be reproduced except in full, without written approval by IRIS Environmental Laboratories, Inc. This report is not induced by any U.S Government Agency. NJ DEP#: 20045
NIOSH PAT #:173498 ELAP# 12078
Iris Environmental Laboratories, Inc.
2333 Route 22 West, Union, NJ 07083
211130011
NJDEP #: 20045
Lab ID:
Analyzed:
Received:
Sampled:
Reported:
11/30/2021
11/30/2021
11/24/2021
11/30/2021
RP211130019ReportID:
211130014
Job Site : Montrose VA, Building 17, Roof
Samples Analyzed: 6
NOB :
NOB Split :
Friable :
Friable Split :
0 0
Stop : 1
Client :
Address:
Phone:
Email:
Pennoni
(973) 265-9763
RCoppola@pennoni.com
130 West 29th Street, 5th Floor
New York NY 10001
Sample Description
Location
NOB
Other Data % Non-Asbestos Fibers
/Other
Asbestos % Type(s)
Sample Lab ID
Client Sample ID
Black Build Up Roofing
Roof - Building 17
YES
100% Other Non-Fibrous
No Asbestos Detected0101A
Black Build Up Roofing
Roof - Building 17
YES
100% Other Non-Fibrous
No Asbestos Detected0201B
Black Flashing
Roof - Building 17
YES
88% Other Non-Fibrous12% Chrysotile
0302A
Stop At First Positive - Not Analyzed
Roof - Building 17
0402B
White Mortar
Roof - Building 17
NO
100% Other Non-Fibrous
No Asbestos Detected0503A
White Mortar
Roof - Building 17
NO
100% Other Non-Fibrous
No Asbestos Detected0603B
Pennoni collected the sample(s) above.
Lab Manager: Analyst:
The analysis above was performed in accordance with EPA Method 600/M4/82/020 or NYSDOH ELAP 198.6 for the determination of asbestos in bulk building materials by polarized light microscopy (PLM). Please note that while PLM analysis is commonly performed on non-friable and fine grained materials such as floor tiles and dust, the EPA method recognizes that PLM is subject to limitations. In these situations, accurate results may only be obtainable through the use of more sophisticated and accurate techniques such as transmission electron microscopy (TEM) or X-ray diffraction (XRD).lntra-laboratory Sr values: 0.29. The above report may not be reproduced, except in full, without written approval by IRIS Environmental Laboratories, Inc.
Iris Environmental Laboratories, Inc.
2333 Route 22 West, Union, NJ 07083
Phone: (908) 206-0073
211130014
NJDEP #: 20045
Lab ID:
Analyzed:
Received:
Sampled:
Reported:
12/01/2021
11/30/2021
11/24/2021
12/02/2021
RP211202001ReportID:
211130010
Job Site : Montrose VA, Building 27, Roof
Samples Analyzed: 20
NOB :
NOB Split :
Friable :
Friable Split :
0 0
Stop : 4
Client :
Address:
Phone:
Email:
Pennoni
(973) 265-9763
RCoppola@pennoni.com
130 West 29th Street, 5th Floor
New York NY 10001
Sample Description
Location
NOB
Other Data % Non-Asbestos Fibers
/Other
Asbestos % Type(s)
Sample Lab ID
Client Sample ID
Brown/White Drywall
Building 27 - Flat Roof
NO
12% Cellulose
88% Other Non-FibrousNo Asbestos Detected0101A
Brown/White Drywall
Building 27 - Flat Roof
NO
12% Cellulose
88% Other Non-FibrousNo Asbestos Detected0201B
Black Flashing
Building 27 - Flat Roof
YES
100% Other Non-Fibrous
No Asbestos Detected0302A
Black Flashing
Building 27 - Flat Roof
YES
100% Other Non-Fibrous
No Asbestos Detected0402B
Black Flashing
Building 27 - Flat Roof
YES
100% Other Non-Fibrous
No Asbestos Detected0503A
Black Flashing
Building 27 - Flat Roof
YES
100% Other Non-Fibrous
No Asbestos Detected0603B
White Glue
Building 27 - Flat Roof
YES
100% Other Non-Fibrous
No Asbestos Detected0704A
White Glue
Building 27 - Flat Roof
YES
100% Other Non-Fibrous
No Asbestos Detected0804B
White Flashing
Building 27 - Flat Roof
YES
94% Other Non-Fibrous6% Chrysotile
0905A
Stop At First Positive - Not Analyzed
Building 27 - Flat Roof
1005B
Location
NOB
Other Data % Non-Asbestos Fibers
/Other
Asbestos % Type(s)
Sample Lab ID
Client Sample ID
Black Roofing Material
Building 27 - Flat Roof
YES
100% Other Non-Fibrous
No Asbestos Detected1106A
Black Roofing Material
Building 27 - Flat Roof
YES
100% Other Non-Fibrous
No Asbestos Detected1206B
Black Roofing Material
Building 27 - Flat Roof
YES
100% Other Non-Fibrous
No Asbestos Detected1307A
Black Roofing Material
Building 27 - Flat Roof
YES
100% Other Non-Fibrous
No Asbestos Detected1407B
Black/Red Roofing Material
Building 27 - Pitched Roof
YES
93% Other Non-Fibrous7% Chrysotile
1508A
Stop At First Positive - Not Analyzed
Building 27 - Pitched Roof
1608B
Black/Red Roofing Material
Building 27 - Pitched Roof
YES
94% Other Non-Fibrous6% Chrysotile
1709A
Stop At First Positive - Not Analyzed
Building 27 - Pitched Roof
1809B
White Caulk
Building 27 - Pitched Roof
YES
93% Other Non-Fibrous7% Chrysotile
1910A
Stop At First Positive - Not Analyzed
Building 27 - Pitched Roof
2010B
Pennoni collected the sample(s) above.
Lab Manager: Analyst:
The analysis above was performed in accordance with EPA Method 600/M4/82/020 or NYSDOH ELAP 198.6 for the determination of asbestos in bulk building materials by polarized light microscopy (PLM).
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .