The document appears to be a response to a Request for Information (RFI) related to a federal contract opportunity for the replacement of mission critical roofs at several buildings for the Department of Veterans Affairs. The key details are:

The RFI response discusses the structural support required for the fall protection system specified in the contract. The response indicates that the fall protection system and structural supports have already been designed, and the specifications note the manufacturer of the fall protection system and the structural engineer. The RFI response inquires whether the structural support for the fall protection system can be designed by the fall protection company/engineer responsible for certifying the system, as they typically would install a different structural support.

The related federal contract opportunity is Solicitation Number 36C24224B0014 for the "Y1DZ--620-20-201 Replace Mission Critical Roofs Phase I (Buildings 3, 6, 13, 14, 17 and 36)" project for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2.

View the file

Other files

File Type Posted
36C24224B0014 0010.docx DOCX document
36C24224B0014 0009.docx DOCX document
36C24224B0014 0008.docx DOCX document
240612 VMON-001 Detail Revisions.pdf PDF
36C24224B0014 0007.docx DOCX document
36C24224B0014 0006.docx DOCX document
36C24224B0014 0005.docx DOCX document
Mission Critical Roofs Phase I Responses RFI.xlsx XLSX spreadsheet
36C24224B0014 0004.docx DOCX document
VMON-002-Haz_Mat_Testing_Report-01.07.22.pdf PDF
36C24224B0014 0003.docx DOCX document
36C24224B0014 0002.docx DOCX document
36C24224B0014 0001.docx DOCX document
P07 - Wage Determination Dutchess County NY.txt TXT text file
52-225-2-Buy-American-Certificate.pdf PDF
620-20-201 Drawings Phase 1.pdf PDF
620-20-201 Specifications Phase 1 (2).pdf PDF
36C24224B0014.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

In reviewing the structural drawings a certified fall protection system designer advised that they typically would install a different structural support for their system. Can the structural support for the fall protection system be designed by the fall protection company/engineer responsible for certifying the system?

The fall protection system and structural supports have already been designed, and the specifications do state clearly the manufacturer of the fall protection system and note the structural engineer (Woods Peacock).