240612 VMON-001 Detail Revisions.pdf

PDF 3 MB Posted

Attached to
Y1DZ--620-20-201 Replace Mission Critical Roofs Phase I (Buildings 3, 6, 13, 14, 17 and 36)
Solicitation number
36C24224B0014
Issued by

About this file

This document contains drawings and details for the roof replacement project at the Montrose, NY VA medical facility. The project, titled "Mission Critical Roofs, Montrose, Phase 1", will replace the roofs on Buildings 3, 6, 13, 14, 17, and 36. The work includes removing existing roofing materials, repairing or replacing roof decking and structure as needed, and installing new copper, terracotta tile, EPDM, and modified bitumen roofing systems. The drawings provide specifications for flashing, insulation, gutters, and other roofing components. This project is being solicited by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 2 under Solicitation Number 36C24224B0014.

View the file

Other files

File Type Posted
36C24224B0014 0010.docx DOCX document
36C24224B0014 0009.docx DOCX document
36C24224B0014 0008.docx DOCX document
36C24224B0014 0007.docx DOCX document
36C24224B0014 0006.docx DOCX document
RFI Responses Contd.docx DOCX document
36C24224B0014 0005.docx DOCX document
Mission Critical Roofs Phase I Responses RFI.xlsx XLSX spreadsheet
36C24224B0014 0004.docx DOCX document
VMON-002-Haz_Mat_Testing_Report-01.07.22.pdf PDF
36C24224B0014 0003.docx DOCX document
36C24224B0014 0002.docx DOCX document
36C24224B0014 0001.docx DOCX document
P07 - Wage Determination Dutchess County NY.txt TXT text file
52-225-2-Buy-American-Certificate.pdf PDF
620-20-201 Drawings Phase 1.pdf PDF
620-20-201 Specifications Phase 1 (2).pdf PDF
36C24224B0014.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A113

7.01

7.03

7.08

7.02

7.10

7.06

7.07

7.12

7.03

7.01 7.01

7.01 7.01

7.017.01 7.01

7.05

A401

A401

A403

A401

A401

5.04

85' - 0" +/- 39' - 9" +/- 50' - 2 1/2" +/-

174' - 11 1/2" +/-

/4

/4

/4

5'

8'

/4

8'

45' - 0" +/-

FUTURE STAIR TOWER (NOT IN SCOPE)

FUTURE STAIR TOWER (NOT IN SCOPE)

FUTURE CHILLER

LOCATIONS

5.06

A402

A4025.04

A402

A401

A402

A402

7.15

A403

A401

A403

A403

8.01

TOP OF ATTIC SLAB

35' - 8"

7.01

6.01

6.03

7.08

A401

A403

H.P. OF PH ROOF SLAB (TYP)

51' - 8 1/2"

3'

/4

4'

/2

D1

D4

D3

D2

D12

D6

D8

D13

D1 D1

D1 D1

D1 D1D1

D22 D22 D22

D22 D22

D22 D22 D22

D24

FUTURE STAIR TOWER (NOT IN SCOPE)

FUTURE STAIR TOWER (NOT IN SCOPE)

D9

D9

D9

D9

D9

D26

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

M O

N -0

M o n tr o s e R o o f R e p la c e m e n t/ V

M O

N -0

M o n tr o s e

R o o f R e p la c e m e n t

P h a s e

.r v t

/1

/2

:2

:1

P

M

A113

BLDG 13 ROOF PLANS & SECTION MISSION CRITICAL ROOFS,

MONTROSE, PHASE 1

2094 ALBANY POST RD, MONTROSE, NY 10548

620-20-201

06.12.23 RS AC

BID DOCUMENTS

1/16" = 1'-0"

BUILDING 13 ROOF PLAN

1/8" = 1'-0"

BUILDING 13 ROOF SECTION

CONSTRUCTION KEYNOTES

03.01 KEYNOTE NOT USED.

03.02 5% CONCRETE ROOF SLAB AREA REPAIR.

03.03 KEYNOTE NOT USED.

03.04 100 SF OF CONCRETE ROOF SLAB REPAIR. NO REPAIR FOR NEWER ADDITION WITH METAL

DECKING.

4.01 CAST STONE CAP. MATCH EXISTING STONE CAP PROFILE AND COLOR. TYPICAL FOR ALL

PARAPETS ON BUILDING 5 ROOF.

4.02 CAST STONE CAP AT AREAS WHERE DAMAGED STONE CAPS HAVE BEEN REMOVED. MATCH

EXISTING STONE CAP PROFILE AND COLOR. ASSUME 5% OF STONE CAP TO BE REPLACED

ALONG PERIMETER.

4.07 CAST STONE CAP. MATCH EXISTING STONE CAP PROFILE AND COLOR.

5.01 ADJUSTABLE LADDER. REFER TO FALL PROTECTION DRAWINGS.

5.02 METAL GUTTER AND DOWNSPOUT TO SPLASHBLOCK.

5.03 KEYNOTE NOT USED.

5.04 METAL LADDER. REFER TO FALL PROTECTION DRAWINGS.

5.05 ROOF DRAIN (TYP)

5.06 FIXED HATCH RAILING SYSTEM WITH SELF-CLOSING AND LATCHING GATE.

5.07 NEW CATWALK TO REPLACE EXISTING

5.08 METAL GUARDRAIL. REFER TO FALL PROTECTION DRAWINGS.

6.01 REPLACE DAMAGED 6" T&G SHEATHING. ASSUME 10% OF AREA TO BE REPLACED AT BUILDING

13 AND 5% OF AREA TO BE REPLACED AT OTHER BUILDINGS.

6.02 KEYNOTE NOT USED.

6.03 STRUCTURAL REPAIR OF WOOD RAFTER FRAMING. 100' OF 2X10s TO BE REPLACED AS NEEDED

THROUGHOUT THE ROOF FRAMING FOR BUILDINGS 2, 6, 12, 13, & 14.

7.01 TERRACOTTA TILES WITH HEAVY FELT UNDERLAYMENT ON ICE & WATER SHIELD OVER

EXISTING ROOF SHEATHING. PATCH EXISTING ROOF SHEATHING PRIOR TO INSTALLATION.

NETTED BATT INSULATION BETWEEN JOISTS BELOW. PROVIDE NEW SNOW GUARDS.

TERRACOTTA TILES TO BE CUSTOM COLORS TO MATCH EXISTING TILE COLORS AT

PROPORTIONS OF 60% BROWN, 20% SLATE GRAY, AND 20% FOREST GREEN/EMPIRE GREEN.

TYPICAL AT ALL TERRACOTTA ROOFS.

7.02 COPPER ROOF ON UNDERLAYMENT ON ICE & WATER SHIELD OVER EXISTING SHEATHING.

PATCH EXISTING ROOF SHEATHING PRIOR TO INSTALLATION. NETTED BATT INSULATION

BETWEEN JOISTS BELOW.

7.03 COPPER FLASHING. TYPICAL AT ALL ROOF INTERSECTIONS, RIDGES, VALLEYS, STEPPED

FLASHINGS, AND DORMERS.

7.04 3 PLY MODIFIED BITUMEN ROOFING ON PROTECTION BOARD OVER 4" RIGID INSULATION ON AIR

& VAPOR CONTROL MEMBRANE. ADDITIONAL TAPERED INSULATION AS NEEDED FOR POSITIVE

SLOPE TO DRAINS. PATCH EXISTING SHEATHING AS NEEDED PRIOR TO INSTALLATION.

7.05 TERRACOTTA TILES AT DORMER ROOFS AND WALLS, TYP. HEAVY FELT UNDERLAYMENT ON ICE

& WATER SHIELD OVER EXISTING ROOF SHEATHING. PATCH EXISTING ROOF SHEATHING PRIOR

TO INSTALLATION. NETTED BATT INSULATION BETWEEN JOISTS BELOW ROOF & BETWEEN

WALL STUDS. TERRACOTTA TILES TO BE CUSTOM COLORS TO MATCH EXISTING TILE COLORS

AT PROPORTIONS OF 60% BROWN, 20% SLATE GRAY, AND 20% FOREST GREEN/EMPIRE GREEN.

TYPICAL AT ALL DORMER ROOFS AND WALL.

7.06 PROVIDE SHEET METAL FLASHING AT EXISTING HVAC EQUIPMENT CURBS AND PIPE

PENETRATIONS, TYPICAL.

7.07 PROVIDE SHEET METAL FLASHING AT PARAPETS, TYPICAL. MODIFIED BITUMEN ROOFING TO

EXTEND UP OVER CANT.

7.08 INSTALL COPPER GUTTER LINING OVER EXISTING GUTTER LINING. PROVIDE GUTTER GUARD, TYP. REPLACE ALL DRAIN BODIES INSIDE GUTTERS AND ON ROOF. SEE DETAIL 1/A401.

7.09 3 PLY MODIFIED BITUMEN ROOFING OVER 4" RIGID INSULATION ON AIR & VAPOR CONTROL

BARRIER. ADDITIONAL TAPERED INSULATION AS REQUIRED FOR POSITIVE SLOPE TO DRAINS.

7.10 EPDM ROOFING OVER 4" RIGID INSULATION ON AIR & VAPOR CONTROL BARRIER. ADDITIONAL

TAPERED INSULATION AS REQUIRED FOR POSITIVE SLOPE TO DRAINS. REINSTALL BALAST.

7.11 EPDM ROOF WALKWAY PADS, TYPICAL.

7.12 METAL ROOF HATCH.

7.14 METAL EDGE WITH DRIP EDGE AT ROOF EDGES.

7.15 COPPER FLASHING AT ALL EXISTING PIPE PENETRATIONS, TYP.

8.01 REINSTALL WINDOW. TYPICAL AT ALL DORMERS AT PITCHED ROOF BUILDINGS. COORDINATE

WITH VA FOR LOCATIONS WHERE LOUVER TO BE INSTALLED AT BUILDING 13.

DEMOLITION KEYNOTES

D1 REMOVE EXISTING CLAY TILE. REMOVE EXISTING FELT UNDERLAYMENT. REMOVE EXISTING

SNOW GUARDS. AREA OF WORK SHALL BE PROTECTED FROM WEATHER ONCE REMOVAL

OCCURS. TYPICAL AT ALL CLAY TILE ROOF.

D2 REMOVE METAL ROOF AND UNDERLAYMENT.

D3 REMOVE EXISTING ROOF DRAINS. CLEAR GUTTERS OF ALL DEBRIS. REMOVE EXISTING FASCIA

BOARD. TYPICAL AT ALL ROOF DRAINS AND GUTTERS.

D4 REMOVE EXISTING CLAY TILE AT GABLE WALL.

D5 REMOVE EXISTING MODIFIED BITUMEN ROOFING AND INSULATION.

D6 REMOVE FLASHING AT EXISTING HVAC EQUIPMENT CURBS AND PIPE PENETRATIONS, TYPICAL.

D7 REMOVE EXISTING METAL GUTTER AND DOWNSPOUT.

D8 REMOVE EXISTING FLASHING AT PARAPETS, TYPICAL.

D9 REMOVE EXISTING FLASHING, TYPICAL.

D10 KEYNOTE NOT USED.

D11 REMOVE EXISTING EPDM ROOFING AND INSULATION.

D12 REMOVE EXISTING EPDM ROOFING, UNDERLAYMENT AND BALAST. STORE BALAST ON SITE

FOR REUSE.

D13 REMOVE EXISTING ROOF HATCH.

D14 REMOVE EXISTING WALKWAY PADS, TYPICAL.

D15 REMOVE EXISTING WOODEN CATWALK, STAIRS AND RAMP.

D16 KEYNOTE NOT USED.

D17 KEYNOTE NOT USED.

D18 KEYNOTE NOT USED.

D19 KEYNOTE NOT USED.

D20 REMOVE EXISTING DAMAGED STONE CAPS AT PARAPET OF BUILDING 17. ASSUME 5% OF

STONE CAP TO BE REMOVED ALONG PERIMETER.

D21 KEYNOTE NOT USED.

D22 REMOVE DAMAGED 6" T&G WOOD DECKING. ASSUME 5% OF AREA TO BE REPLACED.

D23 KEYNOTE NOT USED.

D24 REMOVE EXISTING LIFELINE. REPAIR SHEATHING AS REQUIRED.

D25 REMOVE STONE CAP AT DIGESTER. REMOVE WEEDS AND DEBRIS AT DIGESTER PERIMETER

PRIOR TO STONE CAP REMOVAL.

D26 REMOVE EXISTING WINDOW. STORE FOR REINSTALLATION. TYPICAL AT ALL DORMERS AT

PITCHED ROOF BUILDINGS.

1/16" = 1'-0"

BUILDING 13 ROOF DEMO PLAN

N

# Revisions Date

ICE & WATER SHIELD

EXISTING T&G SHEATHING TO REMAIN U.N.O.; REPLACE

EXISTING T&G SHEATHING IF FOUND DAMAGED, TYP.

ASSUME 10% REPLACEMENT AT BLDG 13,

5% REPLACEMENT AT OTHER BUILDINGS

EXISTING STONE CORNICE TO

REMAIN; PATCH AND REPAIR AS

REQUIRED TO COMPLETE

GUTTER RELINING

EXISTING GALVANIZED LEADER

PIPE TO REMAIN U.N.O.

EXISTING ATTIC SLAB

TO REMAIN

COPPER GUTTER LINING

COPPER CLEATS AT 12" O.C.

12" +/-

EXISTING WOOD RAFTERS

TYPICALLY TO REMAIN -

ASSUME 100 FT ALLOWANCE

FOR REPLACEMENT OF

DAMAGED 2X10S

TERRA COTTA TILE OVER HEAVY FELT

UNDERLAYMENT

EXISTING REGLET GROOVE

SEALANT

6" BATT INSULATION

(R-21 MIN)

LEAF GUARD SCREEN

PT 1X WOOD BOARD

EXISTING GUTTER LINING TO REMAIN

COPPER FLASHING

ICE & WATER SHIELD

3/4" PLYWOOD

OVERHANG

3/4" MIN

3" MIN. HEADLAP (TYP)

2' - 0" MIN

CANT STRIP

EXISTING SILL PLATE

TYPICALLY TO REMAIN -

ASSUME 100 FT ALLOWANCE

FOR REPLACEMENT OF

DAMAGED SILL PLATES

COPPER CLEATS AT 12" O.C.

LAP LAYER OF UNDERLAYMENT

OVER FLASHING

COPPER

FLASHING

FOUNDATION GRADE WOOD NAILERS

EXISTING T&G SHEATHING

TO REMAIN U.N.O.;

REPLACE EXISTING T&G

SHEATHING IF FOUND

DAMAGED, TPY.

EXISTING STRUCTURE TO

REMAIN

PAINTED WOOD TRIM BOARD -

MATCH EXISTING COLOR

REPLACE EXISTING FASCIA BOARD

WITH NEW PT FASCIA BOARD -

REPAINT TO MATCH EXISTING

ICE & WATER SHIELD

TERRA COTTA TILE OVER HEAVY FELT

UNDERLAYMENT

MIN 3/4" M

AX 2"

EXISTING T&G SHEATHING

TO REMAIN U.N.O.;

REPLACE EXISTING T&G

SHEATHING IF FOUND

DAMAGED, TYP.

CANT STRIP

COPPER FORMED DRIP

EDGE WITH 1/2" HEM

TERRACOTTA / SYNTHETIC SLATE TILE

OVER HEAVY FELT UNDERLAYMENT

TERRA COTTA TILE

OVER HEAVY FELT

UNDERLAYMENT

ICE & WATER SHIELD

- EXTEND UP WALL

6" BATT INSULATION

(R-21 MIN)

7"

1'-0"

2' - 0 " M

IN

8" MIN

8" M

IN

SEALANT

PT WOOD BLOCKING

TERRA COTTA TILE OVER HEAVY FELT

UNDERLAYMENT

ANCHOR GABLE END

BAND TO SHEATHING

ICE & WATER SHIELD

REPLACE EXISTING FASCIA BOARD

WITH NEW PT FASCIA BOARD

- REPAINT TO MATCH EXISTING

REMOVE AND REPLACE BLOCKING

WITH PT WOOD BLOCKING

REMOVE AND REINSTALL EXISTING WINDOW

REMOVED FOR CONSTRUCTION.

COORDINATE WITH VA FOR LOCATIONS

WHERE LOUVER IS TO BE INSTALLED FOR

OTHER PROJECT.

EXISTING TRIM AT WINDOW HEAD TO

REMAIN. PATCH AND REPAIR ANY

DAMAGED OR DETERIORATED TRIM.

REPLACE / PROVIDE SEALANT AT ALL

EDGES BETWEEN TRIM

COPPER APRON - OVERLAP TILE

BY 8" MIN, TURN UP WALL BEHIND

BLOCKING

SEALANT

TERRA COTTA TILE OVER

HEAVY FELT UNDERLAYMENT

ICE & WATER SHIELD

EXISTING T&G SHEATHING TO

REMAIN U.N.O.; REPLACE EXISTING

T&G SHEATHING IF FOUND

DAMAGED, TYP.

6" BATT INSULATION

(R-21 MIN)

2' - 0" MIN

SEALANT AROUND FULL PERIMETER

OF WINDOW / LOUVER

SEALANT AROUND FULL PERIMETER

OF WINDOW / LOUVER

PT WOOD BLOCKING / SHIM AS

REQUIRED

PT WOOD BLOCKING / SHIM AS

REQUIRED

SEALANT AROUND FULL PERIMETER

OF WINDOW / LOUVER

REPLACE / PROVIDE SEALANT AT

EDGE BETWEEN VERTICAL TRIM AND

NEW METAL SILL

SEALANT AROUND FULL PERIMETER

OF WINDOW / LOUVER

SEALANT

REMOVE AND REPLACE METAL SILL -

MATCH EXISTING FINISH

EXISTING TRIM AT JAMBS TO REMAIN.

PATCH AND REPAIR ANY DAMAGED OR

DETERIORATED TRIM. REPLACE /

PROVIDE SEALANT AT ALL EDGES

BETWEEN TRIM

8" M

IN

COPPER CLEATS AT 12" O.C.

METAL FLASHING

REGLET WITH LEAD WEDGE

2 PIECE COPPER CAP

FLASHING

COPPER STEP

FLASHING

TERRACOTTA TILE OVER

HEAVY FELT UNDERLAYMENT

8" MIN.

ADHERED FLASHING STRIP PER

EPDM MANUFACTURER

COPPER COUNTER

FLASHING

EXISITNG CANT TO REMAIN

BALLAST

EPDM ROOFING

PROTECTION BOARD

TAPERED RIGID INSULATION

- SLOPE 1/4" PER FT FOR POSITIVE

SLOPE TO DRAINS

AIR & VAPOR CONTROL MEMBRANE

MIN 4" RIGID INSULATION (R-26 MIN)

EXISTING SLAB

TO REMAIN

ICE & WATER SHIELD

EXISTING T&G SHEATHING TO

REMAIN U.N.O.; REPLACE

EXISTING T&G SHEATHING IF

FOUND DAMAGED, TYP.

6" BATT INSULATION (R-21 MIN)

EXISTING BRICK VENEER

TO REMAIN

2'-0" MIN

SEALANT

9" M

IN

9" M

IN

REGLET WITH LEAD WEDGE

4" M

IN

L

A P

COPPER CLEATS AT 12" O.C.

TERMINATION BAR

WITH SEALANT

6" M

IN

ROOF CEMENT OR SEALANT

COPPER FLASHING

TERRACOTTA TILE OVER

HEAVY FELT UNDERLAYMENT

ICE & WATER SHIELD

EXISTING T&G SHEATHING TO REMAIN U.N.O.;

REPLACE EXISTING T&G SHEATHING IF

FOUND DAMAGED, TYP.

6" BATT INSULATION (R-21 MIN)

EXISTING BRICK VENEER

TO REMAIN

COVER ROOF TILE 8" MINIMUM

WITH COPPER APRON FLASHING

ICE & WATERSHIELD

SEALANT

2' - 0" MIN

REGLET WITH LEAD WEDGE

8" MIN.

COPPER RECEIVER

8" M

IN

COPPER CLEATS AT 12" O.C.

TERRA COTTA TILE OVER HEAVY FELT

UNDERLAYMENT

ICE & WATER SHIELD

EXISTING CORNICE TO REMAIN

EXISTING T&G SHEATHING TO REMAIN U.N.O.;

REPLACE EXISTING T&G SHEATHING IF FOUND

DAMAGED, TYP.

COPPER FLASHING

COPPER CLEAT

2'-0" MIN

3"

8" MIN

HEMMED DRIP EDGE

COPPER COUNTER FLASHING

LIQUID-APPLIED FLASHING

SYSTEM, TYP.

EXISTING DIGESTER TO REMAIN

EXISTING CONCRETE WALL TO REMAIN

EXISTING CANT TO REMAIN

3 PLY MODIFIED

BITUMEN ROOFING

PROTECTION BOARD

TAPERED RIGID INSULATION

- SLOPE 1/4" PER FT FOR

POSITIVE SLOPE TO DRAINS

MIN 4" RIGID

INSULATION (R-26 MIN)

AIR & VAPOR CONTROL

MEMBRANE

EXISTING SLAB TO REMAIN

9" M

IN

REGLET WITH LEAD WEDGE

4" M

IN

SEALANT

REGLET WITH LEAD WEDGE

TWO PIECE COPPER

CAP FLASHING

COPPER STEP FLASHING

10 1/8" TYP. EXPOSURE

8" MIN.

TERRA COTTA TILE

HEAVY FELT

UNDERLAYMENT

ICE & WATER SHIELD

EXISTING T&G SHEATHING TO

REMAIN U.N.O.; REPLACE

EXISTING T&G SHEATHING IF

FOUND DAMAGED, TYP.

REQUIRED FASTENERS

SEALANT

9" M

IN

COPPER CLEATS AT 12" O.C.

4" M

IN

L

A P

REGLET WITH SEALANT

COPPER FLASHING

- JOINTS LAPPED 6" IN THE

DIRECTION OF FLOW,

SOLDER AT COPPER APRON

TERRA COTTA TILE

HEAVY FELT

UNDERLAYMENT

ICE & WATER SHIELD

EXISTING T&G SHEATHING TO

REMAIN U.N.O.; REPLACE

EXISTING T&G SHEATHING IF

FOUND DAMAGED, TYP.

REQUIRED FASTENERS

10 1/8" TYP. EXPOSURE

8" MIN.

8" M

IN

COPPER CLEATS AT 12" O.C.

CLEAT AT 12" O.C.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

M O

N -0

M o n tr o s e R o o f R e p la c e m e n t/ V

M O

N -0

M o n tr o s e

R o o f R e p la c e m e n t

P h a s e

.r v t

/1

/2

:2

:2

P

M

A401

DETAILS MISSION CRITICAL ROOFS,

MONTROSE, PHASE 1

2094 ALBANY POST RD, MONTROSE, NY 10548

620-20-201

06.12.23 RS AC

BID DOCUMENTS

1 1/2" = 1'-0"

TYPICAL CONCEALED GUTTER DETAIL

1 1/2" = 1'-0"

DORMER SECTION DETAIL AT SIDE WALL

1 1/2" = 1'-0"

DORMER SECTION DETAIL AT WINDOW

1 1/2" = 1'-0"

SECTION DETAIL AT PENTHOUSE

# Revisions Date

1 1/2" = 1'-0"

SECTION DETAIL AT WALL BASE AND SLOPED ROOF

1 1/2" = 1'-0"

PEDIMENT SECTION DETAIL

1 1/2" = 1'-0"

SECTION DETAIL AT BLDG 36

3" = 1'-0"

TYPICAL DETAIL AT STEP FLASHING

3" = 1'-0"

TYPICAL DETAIL AT DORMER SIDE WALL

EXISTING CANT TO REMAIN

EXISTING STONE CAP TO

REMAIN

COPPER ROOFING

COPPER ROOFING

FLUID APPLIED FLASHING

SYSTEM AS SPECIFIED

ICE & WATER SHIELD

2' - 0" M

IN

REGLET WITH LEAD WEDGE

COPPER RECEIVER

SEALANT

8" M

IN

8" M

IN

COPPER RECEIVER

EXISTING BRICK VENEER TO REMAIN

EXISTING T&G SHEATHING TO REMAIN

U.N.O.; REPLACE EXISTING T&G

SHEATHING IF FOUND DAMAGED, TYP.

ICE & WATER SHIELD

COPPER ROOFING

COPPER FLASHING

EXISTING RAFTERS TO

REMAIN U.N.O.

6" BATT INSULATION

(R-21 MIN)

2' - 0

" MIN

SEALANT

REGLET WITH LEAD WEDGE

8" M

IN

8" MIN.

3/4" LOCK SOLDERED

TAPERED RIGID INSULATION

- SLOPE 1/4" PER FT FOR

POSITIVE SLOPE TO DRAINS

PROTECTION BOARD

4" RIGID INSULATION

(R-26 MIN)

AIR & VAPOR CONTROL

MEMBRANE

3 PLY MODIFIED BITUMEN

ROOFING

SELF-ADHERING BASE

FLASHING SYSTEM PER MFR

METAL EDGE FLASHING

PT WOOD BLOCKING

METAL FLASHING

METAL GUTTER

EXISTING BRICK VENEER

TO REMAIN

CONTINUOUS CLEAT

TERRA COTTA SHINGLE TILE

EXISTING T&G SHEATHING TO REMAIN

U.N.O.; REPLACE EXISTING T&G

SHEATHING IF FOUND DAMAGED, TYP.

EXISTING RAFTERS TO

REMAIN U.N.O.

HEAVY FELT UNDERLAYMENT

ICE & WATER SHIELD

6" BATT INSULATION

(R-21 MIN)

COPPER ROOFING

COPPER FLASHING OVER PARAPET 2'-0"

END DAM BEYOND

EXISTING MASONRY WALL

TO REMAIN

2' - 0 " M

IN

SEALANT ALONG EDGE

2'-0" MIN

COPPER CLEAT

3/4" LOCK SOLDERED

LAP LAYER OF UNDERLAYMENT

OVER FLASHING

COPPER CLEATS AT 12" O.C.

CAST STONE CAP

-MATCH EXISTING SIZE, PROFILE

AND APPEARANCE

EXISTING DIGESTER COVER TO REMAIN

EXISTING WALL TO REMAIN

SELF-ADHERING BASE FLASHING SYSTEM PER MFR

EXISTING CANT TO REMAIN; REPLACE IF DAMAGED, TYP

3 PLY MODIFIED BITUMEN ROOFING

PROTECTION BOARD

TAPERED RIGID INSULATION

- SLOPE 1/4" PER FT FOR POSITIVE

SLOPE TO DRAINS

MIN 3" RIGID INSULATION (R-19 MIN)

AIR & VAPOR CONTROL MEMBRANE

THRU-WALL FLASHING AND COUNTER-FLASHING

WITH SEALANT

8" MIN

COPPER ROOFING

TERRA COTTA ROOFING

TERRA COTTA SHINGLE TILE

EXISTING T&G SHEATHING TO REMAIN

U.N.O.; REPLACE EXISTING T&G

SHEATHING IF FOUND DAMAGED, TYP.

EXISTING RAFTERS TO

REMAIN U.N.O.

HEAVY FELT UNDERLAYMENT

6" BATT INSULATION

(R-21 MIN)

COPPER ROOFING

LAP LAYER OF UNDERLAYMENT

OVER FLASHING

8" M

IN

3/4" LOCK SOLDERED

COPPER CLEATS AT 12" O.C.

COPPER FLASHING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

M O

N -0

M o n tr o s e R o o f R e p la c e m e n t/ V

M O

N -0

M o n tr o s e

R o o f R e p la c e m e n t

P h a s e

.r v t

/1

/2

:2

:2

P

M

A402

DETAILS MISSION CRITICAL ROOFS,

MONTROSE, PHASE 1

2094 ALBANY POST RD, MONTROSE, NY 10548

620-20-201

06.12.23 RS AC

BID DOCUMENTS

# Revisions Date

1 1/2" = 1'-0"

SECTION DETAIL AT METAL ROOF AND PARAPET

1 1/2" = 1'-0"

SECTION AT WALL BASE AND METAL ROOF

1 1/2" = 1'-0"

BUILDING 17 PENTHOUSE DETAIL AT GUTTER

1 1/2" = 1'-0"

SECTION AT PARAPET AND METAL ROOF

1 1/2" = 1'-0"

SECTION DETAIL AT BLDG 36

AXONOMETRIC VIEW - METAL ROOFING AREA

1 1/2" = 1'-0"

SECTION DETAIL AT METAL ROOF AND TERRA COTTA TILES

6/ A4

1/ A4

3 PLY MODIFIED BITUMEN ROOFING

PROTECTION BOARD

TAPERED RIGID INSULATION

- SLOPE 1/4" PER FT FOR

POSITIVE SLOPE

MIN 3" RIGID INSULATION (R-19 MIN)

AIR & VAPOR CONTROL

MEMBRANE

EXISTING SLAB TO REMAIN

PT WOOD BLOCKING

METAL EDGE DRIP EDGE

TWO-PLY STRIPPING, TYP.

EXISTING BRICK VENEER TO REMAIN

EXISTING CMU TO REMAIN

EXISTING OPEN WEB STEEL

JOISTS TO REMAIN

CONTINUOUS CLEAT

SEALANT PER MODIFIED BITUMEN MFR

SEALANT PER MOD BIT MFR

1/4" / 1'-0"

8" MIN

METAL FLASHING

SELF-ADHERING BASE FLASHING SYSTEM PER MFR

EXISTING CANT TO REMAIN

TAPERED RIGID INSULATION

- SLOPE 1/4" MIN PER FT FOR POSITIVE SLOPE TO DRAINS

PROTECTION BOARD

MIN 4" RIGID INSULATION (R-26 MIN)

AIR & VAPOR CONTROL MEMBRANE

3 PLY MODIFIED BITUMEN ROOFING

STONE COPING TO REMAIN EXCEPT

REPLACE WHERE DAMAGED WITH NEW

STONE COPING - MATCH COLOR AND

PROFILE (ASSUME 5% OF STONE CAP

ALONG PERIMETER TO BE REPLACED)

SEALANT

NOTE CONTRACTOR TO VERIFY

EXISTING WALL ASSEMBLY OF

PARAPET WHERE STONE

COPING TO BE REPLACED.

SEALANT

REGLET WITH LEAD WEDGE

9" M

IN

4" M

IN

L

A P

8" MIN

EXISTING STONE CAP TO REMAIN

COPPER RECEIVER

COPPER FLASHING

TERRA COTTA TILE OVER HEAVY FELT

UNDERLAYMENT

ICE & WATER SHIELD

EXISTING T&G SHEATHING TO REMAIN U.N.O.; REPLACE

EXISTING T&G SHEATHING IF FOUND DAMAGED, TYP.

2' - 0" MIN

REGLET WITH LEAD WEDGE

SEALANT

8" MIN.

CLEATS AT 12" O.C.

NOTE: REPOINT BRICK AT

END GABLES AS REQUIRED

TO REPAIR CONDITION

SHIP LAPPED V-RIDGE TILE, TYP

FOUNDATION GRADE

BLOCKING AS REQUIRED

BY TILE MFR

TERRA COTTA TILE OVER HEAVY FELT

UNDERLAYMENT

ICE & WATER SHIELD

EXISTING T&G SHEATHING TO REMAIN U.N.O.; REPLACE

EXISTING T&G SHEATHING IF FOUND DAMAGED, TYP.

SEALANT

EXISTING STRUCTURE

TO REMAIN

6" BATT INSULATION (R-21 MIN)

2' - 0" MIN

2' - 0

" M

IN

COPPER FLASHING

8" MIN

8" M

IN

COPPER RIDGE CAP

LOOSE LOCK SEAM

TERRA COTTA TILE OVER HEAVY FELT

UNDERLAYMENT

ICE & WATER SHIELD

EXISTING T&G SHEATHING TO REMAIN

U.N.O.; REPLACE EXISTING T&G

SHEATHING IF FOUND DAMAGED, TYP.

EXISTING STRUCTURE

TO REMAIN U.N.O.

COPPER VALLEY FLASHING

CLEAT AT 12" O.C.

6" BATT INSULATION (R-21 MIN)

VALLEY TO OPEN 1/8"

WIDER PER FOOT DOWN

SLOPE, TYP

3' - 0 " M

IN

3' - 0" MIN

AT TOP OF VALLEY

6" MIN. OPENING

8" M

IN.

COPPER CANT

SOLDERED TO FLASHING

8" MIN.

COPPER CANT

SOLDERED TO FLASHING

CLEAT AT 12" O.C.

COPPER CLEAT 12" O.C.

BEND OVER FASTENER

COPPER VALLEY FLASHING

ICE & WATER SHIELD

TERRA COTTA TILE

HEAVY FELT UNDERLAYMENT

8" MIN.

COPPER CANT SOLDERED

TO FLASHING

ADHERED FLASHING STRIP PER

EPDM MANUFACTURER

THROUGH-WALL

COPPER FLASHING

EXISITNG CANT TO REMAIN

BALLAST

EPDM ROOFING

PROTECTION BOARD

TAPERED RIGID INSULATION

- SLOPE 1/4" PER FT FOR POSITIVE

SLOPE TO DRAINS

AIR & VAPOR CONTROL MEMBRANE

MIN 4" RIGID INSULATION (R-26 MIN)

EXISTING SLAB

TO REMAIN

4" M

IN

L

A P

REPLACE EXISTING DOUBLE WHYTHE

PARAPET WALL AT DAMAGED

NORTHEAST PENTHOUSE PARAPET

WALL OF BUILDING 13 PER STRUCTURAL

ENGINEERING REQUIREMENTS

REPLACE EXISTING STONE COPING AT

DAMAGED NORTHEAST PENTHOUSE

PARAPET WALL OF BUILDING 13

6" M

IN

9" M

IN

NOTE: WALL CONDITION AND

CONFIGURATION TO BE REVIEWED

BY STRUCTURAL ENGINEER PRIOR

TO CONSTRUCTION

TERMINATION BAR

WITH SEALANT

8" MIN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

M O

N -0

M o n tr o s e R o o f R e p la c e m e n t/ V

M O

N -0

M o n tr o s e

R o o f R e p la c e m e n t

P h a s e

.r v t

/1

/2

:2

:2

P

M

A403

DETAILS MISSION CRITICAL ROOFS,

MONTROSE, PHASE 1

2094 ALBANY POST RD, MONTROSE, NY 10548

620-20-201

06.12.23 RS AC

BID DOCUMENTS

1 1/2" = 1'-0"

SECTION DETAIL AT BLDG 36

1 1/2" = 1'-0"

SECTION DETAIL AT BLDG 17

# Revisions Date

1 1/2" = 1'-0"

END GABLE SECTION DETAIL

1 1/2" = 1'-0"

TYPICAL RIDGE DETAIL

1 1/2" = 1'-0"

TYPICAL VALLEY DETAIL

1 1/2" = 1'-0"

SECTION DETAIL AT BUILDING 13 PENTHOUSE - NE PARAPET

WATER CUT OFF MASTIC

PREMOLDED PIPE BOOT

EXISTING ROOF STRUCTURE TO REMAIN

CLAMPING RING

IN-SEAM SEALANT

MODIFIED BITUMEN SEALANT PER MANUF.

MIN 4" RIGID INSULATION (R-26 MIN)

FULLY ADHERED ROOF MEMBRANE

TAPERED RIGID INSULATION

- SLOPE 1/4" PER FT FOR POSITIVE SLOPE TO DRAINS

EXISTING PIPE TO REMAIN

3 PLY MODIFIED BITUMEN ROOFING

SELF-ADHERING BASE FLASHING SYSTEM PER MFR

EXISTING ROOF MOUNTED MECHANICAL

EQUIPMENT TO REMAIN

3 PLY MODIFIED BITUMEN ROOFING

TAPERED RIGID INSULATION

- SLOPE 1/4" PER FT FOR POSITIVE

SLOPE TO DRAINS

MIN 4" RIGID INSULATION (R-26 MIN)

EXISTING ROOF STRUCTURE TO REMAIN

EXISTING ROOF CURB

EXISTING WOOD BLOCKING (VIF)

EXISTING FRAMED OPENING

V A

R

IE

S

AIR & VAPOR CONTROL MEMBRANE

SELF-ADHERING BASE FLASHING SYSTEM PER MFR

METAL FLASHING

EXISTING EQUIPMENT TO REMAIN

3 PLY MODIFIED BITUMEN ROOFING

TAPERED RIGID INSULATION

- SLOPE 1/4" PER FT FOR POSITIVE

SLOPE TO DRAINS

MIN 4" RIGID INSULATION (R-26 MIN)

EXISTING ROOF STRUCTURE TO REMAIN

EXISTING ROOF CURB (VIF)

EXISTING CANT (VIF)

EXISTING FRAMED OPENING

AIR & VAPOR CONTROL MEMBRANE

SELF-ADHERING BASE FLASHING SYSTEM PER MFR

SEALANT

METAL FLASHING

ROOF DRAIN

WATER CUT OFF MASTIC

EXISTING ROOF

STRUCTURE TO REMAIN

CLAMPING RING

3 PLY MODIFIED BITUMEN ROOFING

RAIN WATER CONDUCTOR

4" RIGID INSULATION (R-26 MIN)

- TAPER TO DRAIN

TAPERED RIGID INSULATION

- SLOPE 1/4" MIN PER FT FOR

POSITIVE SLOPE TO DRAINS

AIR & VAPOR BARRIER

ROLL TOP OF FLASHING INTO PIPE OR

CAP WITH FORMED SOFT METAL CAP

16" OZ. COPPER FLASHING EXTENDED

UPSLOPE TO ACHIEVE 3" HEAD LAP

SOLDERED FLASHING SLEEVE

24" x 24" ICE AND WATER SHIELD

EXISTING ROOF MOUNTED MECHANICAL

EQUIPMENT TO REMAIN

EPDM ROOFING

TAPERED RIGID INSULATION

- SLOPE 1/4" PER FT FOR POSITIVE

SLOPE TO DRAINS

MIN 4" RIGID INSULATION (R-26 MIN)

EXISTING ROOF STRUCTURE TO REMAIN

EXISTING ROOF CURB

EXISTING WOOD BLOCKING (VIF)

EXISTING FRAMED OPENING

V A

R

IE

S

AIR & VAPOR CONTROL MEMBRANE

BONDING ADHESIVE AT CURB, TYP.

METAL FLASHING

8" MIN

EPDM ROOFING

TERMINATION BAR WITH SEALANT

WATER CUT OFF MASTIC

PREMOLDED PIPE BOOT

EXISTING ROOF STRUCTURE TO REMAIN

CLAMPING RING

IN-SEAM SEALANT

SEALANT PER EPDM MANUF.

MIN 4" RIGID INSULATION (R-26 MIN)

FULLY ADHERED ROOF MEMBRANE

TAPERED RIGID INSULATION

- SLOPE 1/4" PER FT FOR POSITIVE SLOPE TO DRAINS

EXISTING PIPE TO REMAIN

EPDM ROOFING

LIQUID-APPLIED FLASHING SYSTEM PER MFR, TYP.

ROOF DRAIN

WATER CUT OFF MASTIC

EXISTING ROOF

STRUCTURE TO REMAIN

CLAMPING RING

EPDM ROOFING

RAIN WATER CONDUCTOR

4" RIGID INSULATION (R-26 MIN)

- TAPER TO DRAIN

TAPERED RIGID INSULATION

- SLOPE 1/4" MIN PER FT FOR

POSITIVE SLOPE TO DRAINS

AIR & VAPOR BARRIER

CLEATS AT 12" O.C.

SINGLE PIECE COPPER

BASE FLASHING

REFER TO 8/A401 FOR

SECTION DETAIL AT

STEP FLASHING

TWO PIECE COPPER CAP

SOLDERED, TYPICAL

FORMED CANT STRIP IN

BASE FLASHING

COPPER FLASHING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

M O

N -0

M o n tr o s e R o o f R e p la c e m e n t/ V

M O

N -0

M o n tr o s e

R o o f R e p la c e m e n t

P h a s e

.r v t

/1

/2

:2

:2

P

M

A404

DETAILS MISSION CRITICAL ROOFS,

MONTROSE, PHASE 1

2094 ALBANY POST RD, MONTROSE, NY 10548

620-20-201

06.12.23 RS AC

BID DOCUMENTS

# Revisions Date

1 1/2" = 1'-0"

PIPE PENETRATION DETAIL AT MODIFIED BITUMEN ROOFING

1 1/2" = 1'-0"

MECHANICAL CURB DETAIL AT MODIFIED BITUMEN ROOFING

1 1/2" = 1'-0"

ROOF EXHAUST FLASHING DETAIL AT MODIFIED BITUMEN ROOFING

1 1/2" = 1'-0"

ROOF DRAIN DETAIL AT MODIFIED BITUMEN ROOFING

PIPE PENETRATION DETAIL AT TERRA COTTA TILE

1 1/2" = 1'-0"

MECHANICAL CURB DETAIL AT EPDM ROOFING

1 1/2" = 1'-0"

PIPE PENETRATION DETAIL AT EPDM ROOFING

1 1/2" = 1'-0"

ROOF DRAIN DETAIL AT EPDM ROOFING

STEP FLASHING DETAIL

Sheets
A113 - BLDG 13 ROOF PLANS & SECTION
A401 - DETAILS
A402 - DETAILS
A403 - DETAILS
A404 - DETAILS

File details come from the government source that posted it. Updated .