This notice announces an invitation for bid for a roof repair project at multiple buildings at the VA New Jersey Healthcare System. The solicitation number is 36C24222B0020 and seeks bids for the replacement of roofs at Buildings 2, 4, 6, 7, 9 and 57, with a project number and title of 561A4-17-108 Replace Roofs B-2, 4, 6, 7, 9, 57. Bids are due by January 28th, 2022 and the proposed award date is December 8th, 2021. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2 is the agency issuing this invitation for bid.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GR102
GR102
GR102
GR102
GR103
GR103
GR103
1 1
1 1 1
1 1
33 33
3 3
3 3
5 5
6 6
/ A
D
1 / AD101
2 2
BUILDING 8-9
CONNECTOR
BUILDING 9-2
CONNECTOR
MATCH LINE
M A
T C
H L
IN
E
REMOVE EXISTING ANTENNA AND
WIRE TEMPORARILY AND REPLACE
WHEN NEW WORK IS COMPLETED.
N
57143
NOT IN SCOPE OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:0
A
M
AD106
ROOF DEMOLITION PLAN - BUILDING 9 AND CONNECTOR
9-2
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
DEMOLITION - BUILDING 9 AND CONNECTOR 9-2
DEMOLITION KEY NOTES
Mark Description
1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR
SQUARE FOOTAGE.
2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS
3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE
GUTTERS DAILY.
4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE
5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM
6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING
7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING
8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.
9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK
SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING
10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.
11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.
KEY PLAN
1/8" = 1'-0"
0' 8'4' 16'2'
LEGEND
N
P N
Revisions: Date:
NOTE:
SEE GI102 FOR GENERAL DEMOLITION NOTES
GR102
GR102
44 4
1 11
1 1
1 1
3 3
3 3
/ A
D
1 / AD109
MATCH LINE
M A
T C
H L
IN
E
REMOVE EXISTING ANTENNA AND
WIRE TEMPORARILY AND REPLACE
WHEN NEW WORK IS COMPLETED.
N
57143
NOT IN SCOPE OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:0
A
M
AD107
ROOF DEMOLITION - BUILDING 57
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
DEMOLITION - BUILDING 57
DEMOLITION KEY NOTES
Mark Description
1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR
SQUARE FOOTAGE.
2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS
3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE
GUTTERS DAILY.
4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE
5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM
6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING
7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING
8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.
9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK
SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING
10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.
11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.
KEY PLAN1/8" = 1'-0"
0' 8'4' 16'2'
LEGEND
N
P N
Revisions: Date:
NOTE:
GR104
GR104
GR104
GR104
GR104
7 7
1 / AD107
B U
IL
D
IN
G
N
.I.
C
M A
T C
H L
IN
E
MATCH LINE
THIS CONNECTOR
NOT IN CONTRACT
N
CONNECTOR 57-54
57143
NOT IN SCOPE OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:0
A
M
AD108
ROOF DEMOLITION - CONNECTOR 57-54
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
DEMOLITION - CONNECTOR 57-54
DEMOLITION KEY NOTES
Mark Description
1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR
SQUARE FOOTAGE.
2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS
3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE
GUTTERS DAILY.
4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE
5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM
6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING
7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING
8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.
9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK
SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING
10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.
11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.
KEY PLAN1/8" = 1'-0"
0' 8'4' 16'2'
LEGEND
N
P N
Revisions: Date:
NOTE:
GR105
GR105
GR105
GR105
GR105
8 88
/ A
D
/ A
D
ADJACENT MECHANICAL BUILDING
SLATE ROOF (N.I.C.)
M A
T C
H L
IN
E
M A
T C
H L
IN
E
RD
RD
RD
RD
RDRD
8 888
/ A
D
RD
RD RD RDRD
RD
RD RD
B U
IL
D
IN
G
N
.I.
C
M A
T C
H L
IN
E
M A
T C
H L
IN
E
N
CONNECTOR
57-143
57143
NOT IN SCOPE OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:0
A
M
AD109
ROOF DEMOLITION - CONNECTOR 57-143
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
DEMOLITION - CONNECTOR 57-143A
1/8" = 1'-0"2
DEMOLITION - CONNECTOR 57-143B
DEMOLITION KEY NOTES
Mark Description
1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR
SQUARE FOOTAGE.
2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS
3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE
GUTTERS DAILY.
4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE
5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM
6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING
7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING
8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.
9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK
SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING
10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.
11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.
1/8" = 1'-0"
0' 8'4' 16'2'
KEY PLAN
LEGEND
N
P N
N
P N
Revisions: Date:
NOTE:
/ A
E
B U
IL
D
IN
G
N .I.
C
NEW
LOW
SLOPE RO
OF
SYSTEM
, M
INIM
UM
INSULATION REQUIRED TO
CREATE ROO
F PITCH
NEW SNOW GUARD / SNOW RAIL SYSTEM TO REPLACE
EXISTING - SAME LOCATION
AE201
AE201
AE201
AE201
AE201
AE204
LOW
HIGH
AE203
AE204
AE201
AE201
AE204
HIGH
CONNECTOR 2-3
BUILDING 2-9
CONNECTOR
AT
AT
AT
A T
A T
A T
A T
A T
A T
AT
AT
AT
AT
AT
AT
AT
AT
AT
AT
AT
A T
A T
A T
A T
A T
AT
AT
ATAT ATAT
DOWN TO GROUNDING ROD
SEE 7/AE201
DOWN TO GROUNDING ROD
SEE 7/AE201
DOWN TO GROUNDING ROD
SEE 7/AE201
DOWN TO GROUNDING ROD
SEE 7/AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE108
DS
VALL
EY
RIDGE
R
ID
G E
V E
N T
R
ID
G E
V E
N T
VALL
EY VALL
EY
VALL
EY
VALL
EY
VALL
EY
VALLEY
VALLEY
VALLEY
VALLEY
VALLEY
VALLEY
VS
VS
AE204
LOW
AE204
AE201
(TYP)
PROVIDE NEW CRICKET
AE203
PROVIDE NEW CRICKET
VS
VS
VS
AE201
AE201
AE204
AE204
AE204
AE204
AE204
AE204
PP
DS
AE201
AE203
HIGH
LOW
AE204
LOW
HIGH
RD
RD
M A
T C
H L
IN
E
M A
T C
H L
IN
E
AE203
DS
AE204
AE204
NEW INTAKE VENT, 55 LF
NEW INTAKE
VENT, 50 LF
NEW INTAKE VENT, 55 LF
NEW INTAKE VENT, 55 LF
NEW INTAKE VENT, 55 LF
NEW INTAKE
VENT, 45 LF
NEW INTAKE
VENT, 45 LF
NEW INTAKE
VENT, 50 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 50 LF
NEW INTAKE
VENT, 50 LF
NEW INTAKE
VENT, 5 LF
NEW INTAKE VENT, 5 LF
NEW INTAKE VENT, 5 LF
NEW INTAKE VENT, 5 LF
OS
OS
EXISTING CONCRETE
SPLASHBLOCK, REMOVE
DURING NEW WORK AND
RE-INSTALL AFTER NEW
WORK
AE204
LOW
AE204
LOW
NEW LOW SLOPE ROOF
SYSTEM SEE 1/AE203
DS
AE201
AE201
AE201
AE201
R
ID
G E
V E
N T
R
ID
G E
V E
N T
R
ID
G E
V E
N T
R
ID
G E
V E
N T
RIDGE VENTRIDGE VENT
NOTE:
CONTRACTOR SHALL REPLACE UP TO 10%
OF THE ROOF DECK ON THIS BUILDING
NEW SNOW GUARDS NEW SNOW GUARDS
NEW SNOW GUARDS
NEW SNOW GUARDS
NEW SNOW GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
AE201
AE201
AE201
AE201
AE201
AE201
(TYP)
AE201
HIGHLOW
AE201
AE201
AE201
AE201
AE201
NEW
LO
W
SLO
PE ROO
F
SYSTEM
SEE 1/AE203
N
57143
1. UPON AREA BY AREA DEMOLITION OF THE EXISTING ASPHALT SHINGLE SYSTEM, INSTALL SELF-ADHERING RUBBERIZED ASPHALT ICE DAMMING MEMBRANE, SAME DAY, TO CREATE A WEATHER TIGHT CONDITION DURING CONSTRUCTION. APPLY ICE DAMMING MEMBRANE DIRECTLY TO
EXISTING PLANK SHEATHING ROOF.
2. INSTALL NEW RIGID INSULATION ON ALL LOW SLOPED ROOFS.
3. INSTALL NEW RUBBERIZED ASPHALT ICE DAMMING MEMBRANE AT ALL EAVES AND VALLEYS AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.
4. INSTALL NEW POLY-FELT UNDERLAYMENT OVER ENTIRE AREA OF NEW ROOF.
5. INSTALL NEW ASPHALT SHINGLE SYSTEM OVER ENTIRE SCOPE AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.
6. SEE SHEET GI102 FOR ROOF LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:1
A
M
AE101
ROOF PLAN - BUILDING 2 & CONNECTOR 2-3
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
ROOF PLAN - BUILDING 2 & CONNECTOR 2-3
1/8" = 1'-0"
0' 8'4' 16'2'
KEY PLAN
ROOF CONSTRUCTION NOTES - BUILDINGS 2, 4, 7, 9, AND 57
N
P N
Revisions: Date: Page 30 of 42
N
5 57143
BUILDING 5 (N.I.C.)
B U
IL
D
IN
G
N .I.
C
NEW LOW SLOPE
ROOF SYSTEM
NEW LOW SLOPE
ROOF SYSTEM
N E
W L
O W
S
LO
P E
R
O O
F S
Y S
T E
M
NEW LOW SLOPE
ROOF SYSTEM
RD
AE201
AE201
AE204
AE204
AE201
AE204
AE201
AE201
AE204
AE201 4
AE201
LOW
HIGH
AE201
AE201
AE201
AE201
CONNECTOR 3-4
C O
N N
E C
T O
R
-5
AT
AT
AT
A T
A T
A T
DOWN TO GROUNDING ROD
SEE 7/AE201
A T
AT A
T
A T
A T
AT
AT
AT
AT
AT
AT
AT
AT
AT
AT
AT
A T
DOWN TO GROUNDING ROD
SEE 7/AE201
DOWN TO GROUNDING
ROD, SEE 7/AE201
DOWN TO GROUNDING
ROD, SEE 7/AE201
NEW INTAKE VENT, 8 LF NEW INTAKE VENT, 8 LF
NEW INTAKE
VENT, 8 LF NEW INTAKE
VENT, 8 LF
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
M A
T C
H L
IN
E
MATCH LINE
AE108
RD
AE204
AE204
AE204
AE204
AE204
AE204
AE108
VS
VS
VSVS
VS
VS
VS
AE204
SC
AE204
NEW INTAKE
VENT, 45 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 45 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 45 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 45 LF
NEW INTAKE
VENT, 40 LF
HIGH
AE201
AE201
AE201
AE201
AE201
AE201
VS VS
VS
HIGH
HIGH
AE204
LOW
AE204
LOW
VS
AE204
LOW
VS
AE203
LOW
R
ID
G E
V E
N T
VALLEY
VALL
EY
VALL
EY
VALLEY
R
ID
G E
V E
N T
R
ID
G E
V E
N T
R
ID
G E
V E
N T
R
ID
G E
V E
N T
VALL
EY
VALL
EY
VALL
EY
VALL
EY
VALLEY
VALLEY
VALLEY
VALLEY
NOTE:
CONTRACTOR SHALL REPLACE UP TO 10%
OF THE ROOF DECK ON THIS BUILDING
NEW SCUPPER
RIDGE VENT
NEW VENT, 70 LF
NEW VENT, 70 LF
NEW VENT, 70 LF
NEW VENT, 70 LF
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
EXISTING ROOFTOP
MECHANICAL UNIT
AE203
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
TYP.
AE201
AE204
TYP.
TYP.
AE204
NEW LOW SLOPE ROOF
SYSTEM SEE 1/AE203
NEW LOW SLOPE ROOF
SYSTEM SEE 1/AE203
VS
1. UPON AREA BY AREA DEMOLITION OF THE EXISTING ASPHALT SHINGLE SYSTEM, INSTALL SELF-ADHERING RUBBERIZED ASPHALT ICE DAMMING MEMBRANE, SAME DAY, TO CREATE A WEATHER TIGHT CONDITION DURING CONSTRUCTION. APPLY ICE DAMMING MEMBRANE DIRECTLY TO
EXISTING PLANK SHEATHING ROOF.
2. INSTALL NEW RIGID INSULATION ON ALL LOW SLOPED ROOFS.
3. INSTALL NEW RUBBERIZED ASPHALT ICE DAMMING MEMBRANE AT ALL EAVES AND VALLEYS AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.
4. INSTALL NEW POLY-FELT UNDERLAYMENT OVER ENTIRE AREA OF NEW ROOF.
5. INSTALL NEW ASPHALT SHINGLE SYSTEM OVER ENTIRE SCOPE AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.
6. SEE SHEET GI102 FOR ROOF LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:1
A
M
AE102
ROOF PLAN - BUILDING 4, CONNECTORS 3-4, AND 4-5
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
KEY PLAN
1/8" = 1'-0"1
ROOF PLAN - BUILDING 4, CONNECTOR 3-4 AND 4-5
1/8" = 1'-0"
0' 8'4' 16'2'
ROOF CONSTRUCTION NOTES - BUILDINGS 2, 4, 7, 9, AND 57
N
Revisions: Date: Page 31 of 42
EXISTING BRICK
CHIMNEYS TO REMAIN
SEE 1/AE202
D O
W N
BUILDING 5 (N.I.C.)
/ A
E
NEW FLASHING AT EXISTING
EXHAUST - TYPICAL
NEW LOW SLOPE
ROOF SYSTEM
AE201
AE201
AE201
AE201
AE201
AE201
NEW INTAKE VENT, 23 LF
NEW INTAKE
VENT, 30 LF
NEW INTAKE VENT, 23 LF
NEW INTAKE VENT, 30 LF
NEW INTAKE
VENT, 60 LF
NEW INTAKE
VENT, 60 LF
NEW INTAKE
VENT, 60 LF
NEW INTAKE
VENT, 60 LF
AE203
AE201
AE2012
AE204
HIGH
AE201
BUILDING 5-6
CONNECTOR
BUILDING 6-7
CONNECTOR
AT
AT
A T
AT
AT
AT
A T
A T
AT
AT
ATAT
AT AT
A T
A T
A T
AT
AT
AT
AT
AT
DOWN TO GROUNDING ROD
SEE 7/AE201
DOWN TO GROUNDING ROD
SEE 7/AE201
DOWN TO GROUNDING ROD
SEE 7/AE201
DOWN TO GROUNDING ROD
SEE 7/AE201
NEW INTAKE
VENT, 30 LF
NEW INTAKE VENT, 30 LF
NEW INTAKE VENT, 30 LF NEW INTAKE VENT, 30 LF
NEW INTAKE VENT, 6 LF
NEW INTAKE VENT, 6 LF
NEW INTAKE
VENT, 6 LF
NEW INTAKE
VENT, 6 LF
EXISTING FENCE ATTACHED
TO EXISTING PARAPET CAP.
AE203
AE203
AE204
AE203
AE203
AE203
AE203
AE203
AE203
EXISTING BUILDING (N.I.C.)
EXISTING ROUND DUCTS
ABOVE ROOF
RD
RD
M A
T C
H L
IN
E
THROUGH WALL
SCUPPER SEE 4/AE203
AE203
THROUGH WALL
SCUPPER SEE 4/AE203
AE204
AE204
LOW
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 40 LF
VS
VS
VS VS
EFEF
EF
EF
EF
AE201
DS
DS
PROVIDE CRICKET
@ HIGH SIDE (TYP.)
LOW
AE204
DS
AE204
AE204
NEW LOW SLOPE
ROOF SYSTEM
DS
AE204
AE204
R
ID
G E
V E
N T
VALLEY
R
ID
G E
V E
N T
R
ID
G E
V E
N T
R
ID
G E
V E
N T
R
ID
G E
V E
N T
R
ID
G E
V E
N T
VALL
EY
VALL
EY
VALL
EY
VALL
EY
VALL
EY
VALL
EY
VALL
EY
VALLEY
VALLEY
VALLEY
VALLEY
VALLEY
VALLEY
HIP
R
ID
GE V
ENT
HIP RIDG
E VENT
HIP
R
ID
GE V
ENT
HIP RIDG
E VENT
HIP
R
ID
GE V
ENT
HIP RIDG
E VENT
HIP RIDG
E VENTHIP
R
ID
G E V
ENT
RIDGE VENT RIDGE VENT
NOTE:
CONTRACTOR SHALL REPLACE UP TO 10%
OF THE ROOF DECK ON THIS BUILDING
NEW SNOW
GUARDS
NEW SNOW
GUARDS NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDSNEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
PLAN NOTES:
1. CONTRACTOR TO PROVIDE FALL PROTECTION,
SEE 9/AE203
PLAN NOTES:
1. CONTRACTOR TO PROVIDE FALL PROTECTION,
SEE 9/AE203
NEW LOW SLOPE ROOF
SYSTEM SEE 1/AE203
NEW LOW SLOPE ROOF
SYSTEM SEE 1/AE203
AE2014
AE201
AE201
AE201
AE201
AE201
AE201
NEW LOW SLOPE ROOF
SYSTEM SEE 1/AE203
TYP.
AE201
AE203
AE201
HIP
R
ID
GE V
ENTHIP RIDG
E VENT
PROVIDE PRECAST
CONCRETE SPLASH
BLOCK AT GRADE,
SEE 12/AE201
PROVIDE PRECAST
CONCRETE SPLASH
BLOCK AT GRADE,
SEE 12/AE201
N
57143
1. UPON AREA BY AREA DEMOLITION OF THE EXISTING ASPHALT SHINGLE SYSTEM, INSTALL SELF-ADHERING
RUBBERIZED ASPHALT ICE DAMMING MEMBRANE AS SHOWN IN DETAIL 1.
2. INSTALL NEW RIGID INSULATION ON ALL LOW SLOPED ROOFS. WHERE DISTANCES ARE TOO LONG TO PRODUCE A MINIMUM 1/8"/FT PITCH INSTALL THE INSULATION AT THE AME PITCH AS THE EXISTING.
3. INSTALL NEW FELT UNDERLAYMENT OVER ENTIRE AREA OF ROOF
4. INSTALL NEW ASPHALT SHINGLE SYSTEM OVER ENTIRE SCOPE AS NOTED ON DRAWINGS AND IN
SPECIFICATIONS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:1
A
M
AE103
ROOF PLAN - BUILDING 6, CONNECTOR 5-6 AND 6-7
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
ROOF PLAN - BUILDING 6, CONNECTOR 5-6 AND 6-7
1/8" = 1'-0"
0' 8'4' 16'2'
KEY PLAN
ROOF CONSTRUCTION NOTES - BUILDINGS 6 AND 8
N
Revisions: Date: Page 32 of 42
E
/ A
E
AE201
AE201
AE201
AE201
AE201
AE201
NEW INTAKE VENT, 20 LF NEW INTAKE VENT, 20 LF
NEW INTAKE
VENT, 68 LF
NEW INTAKE
VENT, 67 LF
NEW INTAKE
VENT, 67 LF
NEW INTAKE
VENT, 68 LF
AE201
AE201
AE204
HIGH
AE201
BUILDING 6-7
CONNECTOR
BUILDING 7-8
CONNECTOR
AT
AT
A T
AT
AT
AT
A T
A T
DOWN TO GROUNDING ROD
SEE 7/AE201
DOWN TO GROUNDING
ROD, SEE 7/AE201
AT
AT
AT
DOWN TO GROUNDING
ROD, SEE 7/AE201
ATAT
AT AT
AT
AT
AT
DOWN TO GROUNDING ROD
SEE 7/AE201
NEW INTAKE VENT, 30 LF NEW INTAKE VENT, 30 LF
NEW INTAKE VENT, 30 LFNEW INTAKE VENT, 30 LF
NEW INTAKE VENT, 30 LF NEW INTAKE VENT, 30 LF
NEW INTAKE VENT, 6 LF
NEW INTAKE VENT, 6 LF
NEW INTAKE VENT, 6 LF
NEW INTAKE VENT, 6 LF
NEW INTAKE
VENT, 9 LF
NEW INTAKE
VENT, 9 LF
AE204
LOW
M A
T C
H L
IN
E
M A
T C
H L
IN
E
AE203
AE203
AE204
THROUGH WALL
SCUPPER SEE L/AE203
THROUGH WALL
SCUPPER SEE L/AE203
AE204
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
NEW INTAKE
VENT, 45 LF
NEW INTAKE
VENT, 45 LF
NEW INTAKE
VENT, 45 LF
NEW INTAKE
VENT, 45 LF
PROVIDE
CRICKET
AE203
AE203
PROVIDE
CRICKET (TYP.)
AE203
VS
EF
VS VS
VS
VS
VSVSVS
AE201
AE201
AE201
AE201
LOW
LOW
LOW SLOPE ROOF
SYSTEM, SEE 1/AE203
LOW SLOPE ROOF
SYSTEM, SEE 1/AE203
LOW SLOPE ROOF
SYSTEM, SEE 1/AE203
EF
EF
EF
EF
EXISTING BRICK
CHIMNEY, SEE AE/202
FOR FLASHING DETAILS
EXISTING BRICK
CHIMNEYS TO REMAIN
SEE 1/AE202
A T
AT
A T
A T
AE201
AE201 11
AE201
AE201
VS
AE204
AE204
AE204
AE204
R
ID
G E
V E
N T
VALLEY
VALL
EY
R
ID
G E
V E
N T
R
ID
G E
V E
N T
R
ID
G E
V E
N T
R
ID
G E
V E
N T
RIDGE VENT RIDGE VENT
R
ID
G E
V E
N T
VALLEY
VALLEY
VALLEY
VALLEY
VALLEY
VALLEY
VALL
EY
VALL
EY
VALL
EY
VALL
EY
VALL
EY
VALL
EY
HIP RIDGE VENTHIP
R
ID
GE V
ENTHIP RIDGE VENTHIP
R
ID
GE V
ENT
HIP RIDGE VENT
HIP
R
ID
GE V
ENT
HIP RIDGE VENT
HIP
R
ID
GE V
ENT
NOTE:
CONTRACTOR SHALL REPLACE UP TO 50%
OF THE ROOF DECK ON THIS BUILDING
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS NEW SNOW
GUARDS
NEW SNOW GUARDS NEW SNOW GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
PLAN NOTES:
1. CONTRACTOR TO PROVIDE FALL PROTECTION,
SEE 9/AE203
NEW LOW SLOPE ROOF
SYSTEM SEE 1/AE203
EF
TYP.
TYP.
AE201
AE201
AE201
AE201
AE201
AE201
TYP.
AE201
HIP
R
ID
GE V
ENTHIP RIDGE VENT
N
57143
1. UPON AREA BY AREA DEMOLITION OF THE EXISTING ASPHALT SHINGLE SYSTEM, INSTALL SELF-ADHERING RUBBERIZED ASPHALT ICE DAMMING MEMBRANE, SAME DAY, TO CREATE A WEATHER TIGHT CONDITION DURING CONSTRUCTION. APPLY ICE DAMMING MEMBRANE DIRECTLY TO
EXISTING PLANK SHEATHING ROOF.
2. INSTALL NEW RIGID INSULATION ON ALL LOW SLOPED ROOFS.
3. INSTALL NEW RUBBERIZED ASPHALT ICE DAMMING MEMBRANE AT ALL EAVES AND VALLEYS AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.
4. INSTALL NEW POLY-FELT UNDERLAYMENT OVER ENTIRE AREA OF NEW ROOF.
5. INSTALL NEW ASPHALT SHINGLE SYSTEM OVER ENTIRE SCOPE AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.
6. SEE SHEET GI102 FOR ROOF LEGEND
1/8" = 1'-0"
0' 8'4' 16'2'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:1
A
M
AE104
ROOF PLAN - BUILDING 7 AND CONNECTOR 7-8
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
ROOF PLAN - BUILDING 7 AND CONNECTOR 7-8
KEY PLAN
ROOF CONSTRUCTION NOTES - BUILDINGS 2, 4, 7, 9, AND 57
N
Revisions: Date: Page 33 of 42
E
1 / AE106
AE201
AE201
AE201
AE201
AE201
NEW INTAKE VENT, 20 LF
NEW INTAKE VENT, 30 LF
NEW INTAKE VENT, 20 LF
NEW INTAKE VENT, 30 LF
NEW INTAKE
VENT, 60 LF
NEW INTAKE
VENT, 60 LF
NEW INTAKE
VENT, 60 LF
NEW INTAKE
VENT, 60 LF
AE203
AE203
AE201
AE201
AE204
HIGH
AE201
BUILDING 8-9
CONNECTOR
BUILDING 7-8
CONNECTOR
AT
AT
A T
AT
AT
AT
A T
A T
AT
AT
ATAT
AT AT
A T
A T
A T
AT
AT
AT
AT
DOWN TO GROUNDING ROD
SEE 7/AE201
DOWN TO GROUNDING ROD
SEE 7/AE201
DOWN TO GROUNDING ROD
SEE 7/AE201
DOWN TO GROUNDING ROD
SEE 7/AE201
A T
NEW INTAKE VENT, 6 LF
NEW INTAKE VENT, 6 LF
NEW INTAKE VENT, 6 LF
NEW INTAKE VENT, 6 LF
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
NEW INTAKE
VENT, 30 LF
NEW INTAKE
VENT, 30 LF
NEW INTAKE
VENT, 30 LF
NEW INTAKE
VENT, 30 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 40 LF
CONNECT EXISTING RAIN
WATER CONDUIT TO EXISTING
UNDERGROUND STORM PIPE
BOOT WITH NEW DOWNSPOUT.
SEE 2/GR102
VS
VS
VSVS VS VS
VS
LOW SLOPE ROOF
SYSTEM, SEE 1/AE203
EXISTING BRICK
CHIMNEYS TO REMAIN
SEE 1/AE202
AE203 3
AE201
EF
LOW SLOPE ROOF
SYSTEM, SEE H/AE203 6
AE204
AE204
CONNECT EXISTING RAIN
WATER SCUPPER TO
EXISTING UNDERGROUND
STORM PIPE BOOT
NOTE TO COR:
UNDERGROUND SYSTEM IS
FULL OF WATER
AE203
DS DS
AE204
AE204
AE204
AE204
LOW SLOPE ROOF
SYSTEM, SEE H/AE203
LOW SLOPE ROOF
SYSTEM, SEE H/AE203
AE201
AE201
M A
T C
H L
IN
E
MATCH LINE
R
ID
G
E V
E N
TVALLEY
R
ID
G E
V E
N T
R
ID
G E
V E
N T
R
ID
G E
V E
N T
R
ID
G E
V E
N
TR
ID
G
E V
E N
T
VALLEY
VALLEY
VALLEY
VALLEY
VALLEY
VALLEY
VALL
EY
VALL
EY
VALL
EY
VALL
EY
VALL
EY
VALL
EY
VALL
EY
HIP
R
ID
G
E V
ENTHIP RIDG
E VENT HIP
R
ID
G
E V
ENTHIP RIDG
E VENT
HIP RIDG
E VENTHIP
R
ID
G E V
ENT
HIP RIDG
E VENTHIP
R
ID
G
E V
ENT
NOTE:
CONTRACTOR SHALL REPLACE UP TO 50%
OF THE ROOF DECK ON THIS BUILDING
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
PLAN NOTES:
1. CONTRACTOR TO PROVIDE FALL PROTECTION,
SEE 9/AE203
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
TYP.
LOW
LOW
TYP.
V
V
V
HIP
R
ID
G
E V
ENTHIP RIDG
E VENT
PROVIDE PRECAST
CONCRETE SPLASH
BLOCK AT GRADE,
SEE 12/AE201
PROVIDE PRECAST
CONCRETE SPLASH
BLOCK AT GRADE,
SEE 12/AE201
N
57143
1. UPON AREA BY AREA DEMOLITION OF THE EXISTING ASPHALT SHINGLE SYSTEM, INSTALL SELF-ADHERING
RUBBERIZED ASPHALT ICE DAMMING MEMBRANE AS SHOWN IN DETAIL 1.
2. INSTALL NEW RIGID INSULATION ON ALL LOW SLOPED ROOFS. WHERE DISTANCES ARE TOO LONG TO PRODUCE A MINIMUM 1/8"/FT PITCH INSTALL THE INSULATION AT THE AME PITCH AS THE EXISTING.
3. INSTALL NEW FELT UNDERLAYMENT OVER ENTIRE AREA OF ROOF
4. INSTALL NEW ASPHALT SHINGLE SYSTEM OVER ENTIRE SCOPE AS NOTED ON DRAWINGS AND IN
SPECIFICATIONS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:1
A
M
AE105
ROOF PLAN - BUILDING 8 AND CONNECTOR 8-9
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
ROOF PLAN - BUILDING 8 AND CONNECTOR 8-9
1/8" = 1'-0"
0' 8'4' 16'2'
KEY PLAN
ROOF CONSTRUCTION NOTES - BUILDINGS 6 AND 8
N
Revisions: Date: Page 34 of 42
E
1 / AE101
INSPECT, CLEAN AND REPAIR
EXISTING COPPER GUTTER INLAY,
ENTIRE PERIMETER OF ROOF
NEW LOW SLOPE
ROOF SYSTEM
NEW LOW SLOPE
ROOF SYSTEM
AE201
AE201
AE201
AE201
AE201
NEW INTAKE VENT, 30 LF
NEW INTAKE VENT, 24 LF
NEW INTAKE VENT, 30 LF
NEW INTAKE VENT, 24 LF
NEW INTAKE
VENT, 65 LF
NEW INTAKE
VENT, 65 LF
NEW INTAKE
VENT, 65 LF
NEW INTAKE
VENT, 65 LF
NEW INTAKE
VENT, 35 LF
NEW INTAKE
VENT, 35 LF
AE203
AE201
AE201
AE201
BUILDING 8-9
CONNECTOR
BUILDING 9-2
CONNECTOR
AT
AT
AT
A T
A T
A T
A T
A T
A T
AT
AT
AT
AT
AT
AT
AT
AT
AT
AT
DOWN TO GROUNDING ROD
SEE 7/AE201
DOWN TO GROUNDING ROD
SEE 7/AE201
DOWN TO GROUNDING ROD
SEE 7/AE201
DOWN TO GROUNDING ROD
SEE 7/AE201
ATAT
AT AT
NEW INTAKE
VENT, 6 LF
NEW INTAKE
VENT, 6 LF
NEW INTAKE
VENT, 6 LF
NEW INTAKE
VENT, 6 LF
MATCH LINE
M A
T C
H L
IN
E
NEW INTAKE
VENT, 30 LF
NEW INTAKE
VENT, 30 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 40 LF
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
NEW INTAKE
VENT, 30 LF
NEW INTAKE
VENT, 30 LF
VS
VS
VS VS
VS
VS
VS
VS
VS
AE201
EF
EF
PROVIDE
CRICKET (TYP.)
AE204
HIGH
EXISTING BRICK
CHIMNEYS TO REMAIN
SEE 1/AE202
AE203
LOW SLOPE ROOF
SYSTEM, SEE 1/AE203
AE201
EF
EF
VS
AE203
LO
W
S
LO
P E
R O
O F
S
Y S
T E
M
S E
E H
/A E
AE204
AE204
AE203
DS
AE204
AE204 PROVIDE PRECAST
CONCRETE SPLASH BLOCK
AT GRADE, SEE 12/AE201
DS
AE204
AE204
PROVIDE PRECAST
CONCRETE SPLASH BLOCK
AT GRADE, SEE 12/AE201
VALL
EY
VALL
EY
VALL
EY
VALL
EY
VALL
EY
VALL
EY
VALL
EY
VALLEY
VALLEY
VALLEY
VALLEY
VALLEY
VALLEY
RIDGE VENTRIDGE VENT
R
ID
G E
V E
N T R
ID
G
E V
E N
T R
ID
G
E V
E N
T
R
ID
G E
V E
N T
R
ID
G E
V E
N T
R
ID
G E
V E
N T
HIP
R
ID
G
E V
ENTHIP RIDGE VENT HIP
R
ID
G E V
ENT
HIP RIDGE VENT
HIP
R
ID
G
E V
ENT HIP RIDGE VENTHIP
R
ID
G E V
ENT HIP RIDGE VENT
NOTE:
CONTRACTOR SHALL REPLACE UP TO 10%
OF THE ROOF DECK FOR THIS BUILDING
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDSNEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
PLAN NOTES:
1. CONTRACTOR TO PROVIDE FALL PROTECTION,
SEE 9/AE203
LOW
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
TYP
TYP
LOW
VS
REPLACE EXISTING
ANTENNA AND WIRE WHEN
NEW WORK IS COMPLETED.
V
V
V
V
HIP
R
ID
G
E V
ENTHIP RIDGE VENT
PROVIDE NEW DOWNSPOUTPROVIDE NEW DOWNSPOUT
N
57143
1. UPON AREA BY AREA DEMOLITION OF THE EXISTING ASPHALT SHINGLE SYSTEM, INSTALL SELF-ADHERING RUBBERIZED ASPHALT ICE DAMMING MEMBRANE, SAME DAY, TO CREATE A WEATHER TIGHT CONDITION DURING CONSTRUCTION. APPLY ICE DAMMING MEMBRANE DIRECTLY TO
EXISTING PLANK SHEATHING ROOF.
2. INSTALL NEW RIGID INSULATION ON ALL LOW SLOPED ROOFS.
3. INSTALL NEW RUBBERIZED ASPHALT ICE DAMMING MEMBRANE AT ALL EAVES AND VALLEYS AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.
4. INSTALL NEW POLY-FELT UNDERLAYMENT OVER ENTIRE AREA OF NEW ROOF.
5. INSTALL NEW ASPHALT SHINGLE SYSTEM OVER ENTIRE SCOPE AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.
6. SEE SHEET GI102 FOR ROOF LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:2
A
M
AE106
ROOF PLAN - BUILDING 9 AND CONNECTOR 9-2
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
ROOF PLAN - BUILDING 9 AND CONNECTOR 9-2
KEY PLAN
ROOF CONSTRUCTION NOTES - BUILDINGS 2, 4, 7, 9, AND 57
1/8" = 1'-0"
0' 8'4' 16'2'
N
P N
N
Revisions: Date: Page 35 of 42
E
1 / AE109
MATCH LINE
INSPECT, CLEAN AND REPAIR
EXISTING COPPER GUTTER INLAY,
ENTIRE PERIMETER OF ROOF
CLEAN AND REPAIR EXISTING
COPPER RAKE FLASHING
CLEAN AND REPAIR EXISTING
COPPER RAKE FLASHING
CLEAN AND REPAIR EXISTING
COPPER RAKE FLASHING
CLEAN AND REPAIR
EXISTING COPPER
RAKE FLASHING
AE201
AE201
AE201
AE201
NEW INTAKE VENT, 35 LF
NEW INTAKE VENT, 27 LF
NEW INTAKE VENT, 35 LF
NEW INTAKE VENT, 27 LF
NEW INTAKE
VENT, 72 LF
NEW INTAKE
VENT, 72 LF
NEW INTAKE
VENT, 72 LF
NEW INTAKE
VENT, 72 LF
NEW INTAKE
VENT, 36 LF
NEW INTAKE
VENT, 36 LF
AE201
AE201
AE201
AT
AT
A T
AT
AT
AT
A T
A T
A T
A T
A T
AT
AT
AT
DOWN TO GROUNDING ROD
SEE 7/AE201
AT
AT
AT
AT
AT
DOWN TO GROUNDING ROD
SEE 7/AE201
ATAT
AT AT
AT
A T
A T
AT
NEW INTAKE
VENT, 6 LF
NEW INTAKE
VENT, 6 LF
NEW INTAKE
VENT, 6 LF
NEW INTAKE
VENT, 6 LF
M A
T C
H L
IN
E
CONNECTOR 57-54
CONNECTOR 57-143
NEW INTAKE VENT, 30 LFNEW INTAKE VENT, 30 LF
NEW INTAKE
VENT, 45 LF
NEW INTAKE
VENT, 45 LF
NEW INTAKE
VENT, 45 LF
NEW INTAKE
VENT, 45 LF
DOWN TO GROUNDING
ROD, SEE 7/AE201
DOWN TO GROUNDING
ROD, SEE 7/AE201
NEW INTAKE
VENT, 30 LF
NEW INTAKE
VENT, 30 LF
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE204
HIGH
EXISTING BRICK
CHIMNEYS TO REMAIN
SEE 1/AE202
LOW SLOPE ROOF
SYSTEM, SEE 1/AE203
VS
VS
VS
VS
VS
VS
VS
VS
VS
VS
VS
VS
VS
AE201
AE201
VS
RIDGE VENT
VALL
EY
RIDGE VENT
R
ID
G E
V E
N T
R
ID
G E
V E
N T
R
ID
G E
V E
N T
R
ID
G E
V E
N T
R
ID
G E
V E
N T
R
ID
G E
V E
N T
HIP
R
ID
G
E V
ENTHIP RIDG
E VENT HIP
R
ID
G
E V
ENTHIP RIDG
E VENT
HIP
R
ID
G
E V
ENT
HIP RIDG
E VENT
HIP
R
ID
G
E V
ENT
HIP RIDG
E VENT
VALL
EY
VALL
EY
VALL
EY VALL
EY
VALL
EY
VALL
EY
VALLEY
VALLEY
VALLEY
VALLEY
VALLEYVALLEY
VALLEY
NOTE:
CONTRACTOR SHALL REPLACE UP TO 25%
OF THE ROOF DECK FOR THIS BUILDING
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDSNEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
AE201
AE201
AE201
AE201
TYP.
AE201
AE201
AE201
AE201
AE201
TYP.
VS
REPLACE EXISTING ANTENNA AND
WIRE WHEN NEW WORK IS
COMPLETED.
HIP RIDG
E VENT
HIP
R
ID
G
E V
ENT
N
57143
1. UPON AREA BY AREA DEMOLITION OF THE EXISTING ASPHALT SHINGLE SYSTEM, INSTALL SELF-ADHERING RUBBERIZED ASPHALT ICE DAMMING MEMBRANE, SAME DAY, TO CREATE A WEATHER TIGHT CONDITION DURING CONSTRUCTION. APPLY ICE DAMMING MEMBRANE DIRECTLY TO
EXISTING PLANK SHEATHING ROOF.
2. INSTALL NEW RIGID INSULATION ON ALL LOW SLOPED ROOFS.
3. INSTALL NEW RUBBERIZED ASPHALT ICE DAMMING MEMBRANE AT ALL EAVES AND VALLEYS AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.
4. INSTALL NEW POLY-FELT UNDERLAYMENT OVER ENTIRE AREA OF NEW ROOF.
5. INSTALL NEW ASPHALT SHINGLE SYSTEM OVER ENTIRE SCOPE AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.
6. SEE SHEET GI102 FOR ROOF LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:2
A
M
AE107
ROOF PLAN - BUILDING 57
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
ROOF PLAN - BUILDING 57
1/8" = 1'-0"
0' 8'4' 16'2'
KEY PLAN
ROOF CONSTRUCTION NOTES - BUILDINGS 2, 4, 7, 9, AND 57
N
P N
N
Revisions: Date: Page 36 of 42
CONNECTOR 57-54
57143
1 / AE107
B U
IL
D
IN
G
N
.I.
C
AE203
AE203
MATCH LINE
M A
T C
H L
IN
E
HIGH POINT
AE203
THIS CONNECTOR
NOT IN CONTRACT
CONNECT EXISTING RAIN
WATER SCUPPER TO
EXISTING UNDERGROUND
STORM PIPE BOOT
AE204
AE204
AE203
AE203
AE203 15
AE203
REMOVE EXISTING ANTENNAS
AS REQUIRED TO PERFORM
NEW ROOF WORK AND RE-
INSTALL IN PLACE WHEN WORK
IS COMPLETE. SEE 16/GR104
LOW SLOPE ROOF
SYSTEM, SEE 1/AE203
LOW SLOPE ROOF SYSTEM, SEE
1/AE203. IF THE DISTANCE IS TOO
LONG TO PRODUCE A MINIMUM 1/8"/FT
PITCH INSTALL THE INSULATION HIGH
POINT AT THE HIGHEST EXISTING
FLASHING ELEVATION.
7.
5"
+11.25"
AREA DIVIDER
9.
0"
PLAN NOTES:
1. CONTRACTOR TO PROVIDE FALL PROTECTION, SEE 9/AE203
EXISTING BRICK PIER
EXISTING BUILDING
EXISTING PAVER PATIO
EXISTING RAILING,
SEE NOTE 2
EXISTING RAILING
POST (TYP.)
EXISTING PRECAST COPING
STONES, SEE NOTE 1
EXISTING PRECAST COPING
STONES, SEE NOTE 1
EXISTING WALL SCUPPER
DRAIN, SEE DETAIL (TYP. FOR 2)
AE204
AE203
AE203
AE203
SIM
EXISTING BUILDING
NEW CRICKET FORMED
W/ INSULATION (TYP.)
PLAN NOTES:
1. CONTRACTOR SHALL REMOVE, NUMBER, CLEAN, AND STORE COPING STONES FOR
RE-INSTALLATION AFTER ALL NEW ROOF WORK IS COMPLETED.
2. CONTRACTOR SHALL REMOVE RAILING AS REQUIRED TO ALLOW THE REMOVAL OF
THE COPING STONES AND RE-INSTALL AFTER ALL NEW ROOF WORK IS COMPLETED.
3. CONTRACTOR TO PROVIDE FALL PROTECTION, SEE 9/AE203
LOW SLOPE ROOF
SYSTEM, SEE 1/AE203
+5.75
DS
EXISTING THOUGH-WALL
SCUPPER, SEE 4/AE203
AE204
AE204
AE204
RE-INSTALL EXISTING DOWNSPOUT ONCE
THE NEW WORK IS COMPLETE
AE204
AE203
AE203
AE203
EXISTING BUILDING
EXISTING BUILDING
AE204
AE204
HIGH
LOW
AE204
AE204
EXISTING OVERFLOW
SCUPPER, SEE DETAILS
AE204
EXISTING FENCE ATTACHED
TO EXISTING PARAPET CAP.
SEE 7/GR103
AE203
BUILDING 5 (N.I.C.)
MATCH LINE
RD
LOW SLOPE ROOF
SYSTEM, SEE 1/AE203
LOW SLOPE ROOF
SYSTEM, SEE 1/AE203
+6.75"
+8.75
PLAN NOTES:
1. CONTRACTOR TO PROVIDE FALL PROTECTION, SEE 9/AE203
EXISTING PAVER PATIO
EXISTING PRECAST COPING
STONES, SEE NOTE 1
EXISTING WALL SCUPPER
DRAIN, SEE DETAIL (TYP. FOR 2)
AE203
AE203
AE203
PLAN NOTES:
1. CONTRACTOR SHALL REMOVE, NUMBER, CLEAN, AND STORE COPING STONES FOR
RE-INSTALLATION AFTER ALL NEW ROOF WORK IS COMPLETED.
2. CONTRACTOR TO PROVIDE FALL PROTECTION, SEE 9/AE203
AE204
EXISTING BUILDING
LOW SLOPE ROOF
SYSTEM, SEE 1/AE203
+5.75
SIM
LOW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:2
A
M
AE108
ROOF PLAN - CONNECTORS 57-54 & 2-3
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
KEY PLAN
1/8" = 1'-0"1
ROOF PLAN - CONNECTOR 57-54
1/4" = 1'-0"2
ROOF PLAN - BUILDING CONNECTOR 2-3
1/4" = 1'-0"3
ROOF PLAN - BUILDING CONNECTOR 4-5
1/4" = 1'-0"4
ROOF PLAN - CONNECTOR 3-4
N
P N
N
P N
N
P N
N
Revisions: Date: Page 37 of 42
CONNECTOR
57-143
57143
/ A
D
/ A
E
ADJACENT MECHANICAL BUILDING
SLATE ROOF (N.I.C.)
NEW EXPANSION JOINT
ASSEMBLY, SEE DETAIL
NEW DRAIN BODIES - (TYP)
SEE DETAIL C/AE202
AE203
AE203
AE203 RD
RD
RD
RD
RDRD
AE203
AE203
AE203
AE203
AE204
AE203
M A
T C
H L
IN
E
M A
T C
H L
IN
E
AE204
RD
NEW ROOFING
SYSTEM, - (TYP)
NEW ROOFING SYSTEM, - (TYP) NEW ROOFING SYSTEM, - (TYP)
NEW ROOFING SYSTEM, - (TYP)
PLAN NOTES:
1. CONTRACTOR TO PROVIDE FALL PROTECTION, SEE 9/AE203
RDRDRDRD
AE203
AE203
AE204
AE204
RD
AE204
NEW DRAIN BODIES - (TYP)
SEE DETAIL C/AE202
1/ A
E
M A
T C
H L
IN
E
M A
T C
H L
IN
E
B U
IL
D
IN
G
N
.I.
C
NEW DRAIN BODIES - (TYP)
SEE DETAIL C/AE202
M A
T C
H L
IN
E
AE204
RDRD
NEW ROOFING SYSTEM, - (TYP)
NEW ROOFING
SYSTEM, - (TYP)
NEW ROOFING
SYSTEM, - (TYP)
NEW ROOFING SYSTEM, - (TYP)
AE203
AE203
AE204
AE204
SIM
SIM
AE204
AE204
SIM
SIM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:2
A
M
AE109
ROOF PLAN - CONNECTOR 57-143
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
KEY PLAN
1/8" = 1'-0"1
ROOF PLAN - CONNECTOR 57-143
1/8" = 1'-0"
0' 8'4' 16'2'
1/8" = 1'-0"2
ROOF PLAN - CONNECTOR 57-143
N
P N
N
P N
1/8" = 1'-0"
0' 8'4' 16'2'
Revisions: Date: Page 38 of 42
FURNISH & INSTALL NEW INTAKE VENT PER
MANUFACTURER'S RECOMMENDATIONS
FURNISH & INSTALL NO-FLASH
2-PIPE FENCE STYLE SNOW
GUARD W/ BRACKETS PER
MANUFACTURER'S
RECOMMENDATIONS
EXISTING 2x10 RAFTERS @ 24" O.C.
EXISTING ATTIC FLOOR
EXISTING CEILING
EXISTING GUTTER SYSTEM
TO REMAIN
EXISTING EXTERIOR WALL
CONTRACTOR TO CUT OUT THE EXISTING
SHEATHING AS REQUIRED PER THE ROOF
INTAKE VENT MANUFACTURER'S
RECOMMENDATIONS, SECURE ROOF DECK TOP
& BOTTOM OF CUT OUT SECTION AS REQUIRED.
FURNISH & INSTALL STYROFOAM AIR
BAFFLES IN ALL RAFTER BAYS WHERE
NEW INTAKE VENT IS INSTALLED
REMOVE EXISTING BATT INSULATION PRIOR TO INSTALLING
AIR BAFFLES. FURNISH & INSTALL R-30 BATT INSULATION
NEW STAINLESS STEEL FLASHING
IN
STALLED U
NDER F
ELT P
APER
42" O
F IC
E D
AMM
IN
G M
EMBRANE
NEW ROOF SHINGLES,
SEE 1/AE201
EXISTING EXTERIOR WALL
EXISTING COPPER RAKE FLASHING
EXISTING CAST STONE BUILT IN
GUTTER/ CORNICE
CONTINUOUS SEALANT
NEW ROOF SHINGLES,
SEE 1/AE201
EXISTING ROOF STRUCTURE
SEALANT
NEW ASPHALT SHINGLES, SEE 1/AE201
NEW HIGH PERF RIDGE VENT
FASTENED PER MANUFACTURER'S
SPECIFICATIONS
METAL EDGE DOWN OVER
HIGH PERF RIDGE VENT
NEW LOW SLOPE ROOF SEE 1/AE203
ROOF MEMBRANE FLASHING
FASTENERS @ 6” O.C.
REMOVE EXISTING BATT INSULATION PRIOR TO INSTALLING
AIR BAFFLES. FURNISH & INSTALL R-30 BATT INSULATION
FURNISH & INSTALL STYROFOAM AIR
BAFFLES IN ALL RAFTER BAYS WHERE
NEW INTAKE VENT IS INSTALLED
WOOD BLOCKING
EXISTING ROOF DECK
CONTRACTOR TO CUT OUT THE EXISTING
SHEATHING AS REQUIRED PER THE ROOF
INTAKE VENT MANUFACTURER'S
RECOMMENDATIONS
REMOVE AND REINSTALL VENTILATOR
AS REQUIRED FOR NEW WORK
EXISTING ROOF STRUCTURENEW ASPHALT SHINGLES
SEE 1/AE201
NEW ASPHALT SHINGLES
NEW VENTILATOR FLASHING
FURNISH & INSTALL NEW INTAKE VENT PER
MANUFACTURER'S RECOMMENDATIONS
FURNISH & INSTALL NO-FLASH 2-PIPE FENCE
STYLE SNOW GUARD W/ BRACKETS PER
MANUFACTURER'S RECOMMENDATIONS
EXISTING EXTERIOR WALL
CUT OUT THE EXISTING SHEATHING AS
REQUIRED PER THE ROOF INTAKE VENT
MANUFACTURER'S RECOMMENDATIONS
FURNISH & INSTALL STYROFOAM AIR
BAFFLES IN ALL RAFTER BAYS WHERE
NEW INTAKE VENT IS INSTALLED
REMOVE EXISTING BATT INSULATION PRIOR
TO INSTALLING AIR BAFFLES. FURNISH &
INSTALL R-30 BATT INSULATION
METAL BASE FLASHING
SEALANT
MEMBRANE FLASHING
EXISTING ROOF STRUCTURE
V A
R
IE
S
NEW ROOF SYSTEM, SEE 1/AE203
NEW ROOF SHINGLES,
SEE 1/AE201
3”
NEW ASPHALT SHINGLES
SEE 1/AE201
NEW VENT STACK FLASHING
EXISTING VENT STACK TO REMAIN
EXISTING SHEATHING
EXISTING RAFTERS
NEW 15# FELT PAPER
NEW ASPHALT SHINGLES
12" M
IN
RADIANT BARRIER
FIRE RESISTANT WOOD
GUSSET AS REQUIRED
ADD 2x FIRE RESISTANT WOOD
FRAMING TO THE BOTTOM OF
EVERY RAFTER TO MEET THE
MINIMUM DEPTH REQUIRED.
MINIMUM R-38
INSULATION
NEW PRE-MANUFACTURED RIDGE VENT
NOTE:
SEE DETAIL 4 THIS SHEET FOR DESCRIPTIONS
OF ALL OTHER ELEMENTS
GROUNDING WIRE
(2) FASTENERS PER SIDE MIN.
AIR TERMINAL
3" WIDE (MIN) CUSTOM AIR TERMINAL BRACKET
MIN.
2' - 0"
M
IN
FINISH GRADE
GROUNDING WIRE FROM ROOF
PROTECTION CLAMP
JUNCTION CLAMPS
BUILDING FOUNDATION
GROUNDING ROD DOWN TO
MIN. DEPTH REQUIRED (10'-0")
EXISTING 2x10 RAFTERS @ 24" O.C.
CUT OUT THE EXISTING SHEATHING AS
REQUIRED PER THE ROOF INTAKE VENT
MANUFACTURER'S RECOMMENDATIONS
FURNISH & INSTALL STYROFOAM AIR
BAFFLES IN ALL RAFTER BAYS WHERE
NEW INTAKE VENT IS INSTALLED
REMOVE EXISTING BATT INSULATION
PRIOR TO INSTALLING AIR BAFFLES.
FURNISH & INSTALL R-30 BATT INSULATION
NEW PRE-MANUFACTURED RIDGE VENT
NEW ASPHALT SHINGLES, SEE 1/AE201
NEW ASPHALT SHINGLES
SEE 1/AE201
EXISTING ROOF STRUCTURE
METAL VALLEY FLASHING
WITH 1" 'V' CRIMP
NEW ICE DAMMING MEMBRANE
UNDERLAYMENT AND POLY-FELT
UNDERLAYMENT
2" WIDE , 24 OZ COPPER
CLEATS, 2'-0" O.C. SECURE
WITH COPPER NAILS
24" MIN. 24" MIN.
1' - 0"
2" 7" 2"
1' - 0"
6"
2' - 6"
2' - 1"
SIDE VIEW
FRONT VIEWPLAN VIEW
ISOMETRIC VIEW
PRECAST CONCRETE
SPLASH BLOCK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:2
A
M
AE201
HIGH SLOPED ROOF DETAILS & SECTIONS
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1 1/2" = 1'-0"8
SECTION @ EXISTING GUTTER - TYPICAL
3" = 1'-0"9
SECTION @ EXISTING RAKE - TYPICAL
3" = 1'-0"10
ROOF TERMINATION SECTION - TYPICAL
3" = 1'-0"3
VENTILATOR DETAIL - TYPICAL
3" = 1'-0"11
ROOF TERMINATION SECTION - TYPICAL
3" = 1'-0"2
VENT STACK DETAIL - TYPICAL
3" = 1'-0"1
HIGH SLOPED ROOF MAKEUP DETAIL - TYPICAL
1 1/2" = 1'-0"6
LIGHTENING PROTECTION - RIDGE DETAIL - TYPICAL
1 1/2" = 1'-0"7
LIGHTENING PROTECTION - BASE DETAIL - TYPICAL
1 1/2" = 1'-0"4
RIDGE DETAIL - TYPICAL
3" = 1'-0"5
VALLEY FLASHING DETAIL - TYPICAL
Revisions: Date:
NTS
SPLASH BLOCK DETAILS
EXISTING ROOF STRUCTURE
NEW ASPHALT SHINGLES
OVER 15# FELT PAPER
EXISTING EXTERIOR SIDING WALL FINISH
REMOVE EXISTING BATT INSULATION
PRIOR TO INSTALLING AIR BAFFLES.
FURNISH & INSTALL R-30 BATT
INSULATION
FURNISH & INSTALL STYROFOAM AIR
BAFFLES IN ALL RAFTER BAYS WHERE
NEW INTAKE VENT IS INSTALLED
NEW HIGH PERF RIDGE VENT
FASTENED PER MANUFACTURER'S
SPECIFICATIONS
METAL FLASHING UP UNDER
SIDING AND DOWN OVER HIGH
PERF RIDGE VENT
CONTRACTOR TO CUT OUT THE EXISTING
SHEATHING AS REQUIRED PER THE ROOF
INTAKE VENT MANUFACTURER'S
RECOMMENDATIONS
REMOVE SIDING AS REQUIRED TO
INSTALL HIGH PERF RIDGE VENT
STEP FLASHING, 3" MIN OVERLAP
COUNTER FLASHING, EMBED TOP AT
LEAST 1" INTO BRICK MORTAR AND
PROVIDE A MIN. OF 3" OVERLAP OF
STEP FLASHING
EXISTING BRICK WALL
SHINGLES
LOW SLOPED ROOF
EXISTING BRICK COLUMN
SHINGLE ROOF
EXISTING SIDING
ROOF TERMINATION
SEE 2/AE204
EXISTING ROOF STRUCTURE
NEW ASPHALT SHINGLES
SEALANT WITH BACKER ROD
CLEAN MORTAR JOINT FOR
INSTALLATION OF NEW FLASHING
EXISTING EXTERIOR WALL
REMOVE EXISTING BATT
INSULATION PRIOR TO
INSTALLING AIR BAFFLES.
FURNISH & INSTALL R-30
BATT INSULATION
FURNISH & INSTALL STYROFOAM AIR
BAFFLES IN ALL RAFTER BAYS WHERE
NEW INTAKE VENT IS INSTALLED
EXPANSION WEDGE
NEW TWO-PIECE COUNTERFLASHING
FASTENERS 6" O.C. OVER BUTYL TAPE
NEW HIGH PERF RIDGE VENT
FASTENED PER MANUFACTURER'S
SPECIFICATIONS
ROOF FLASHING DOWN OVER
HIGH PERF RIDGE VENT
CONTRACTOR TO CUT OUT THE EXISTING
SHEATHING AS REQUIRED PER THE ROOF
INTAKE VENT MANUFACTURER'S
RECOMMENDATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:2
A
M
AE202
HIGH SLOPED ROOF DETAILS
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
3" = 1'-0"1B
ROOF TERMINATION SECTION - TYPICAL
1 1/2" = 1'-0"1C
STEP FLASHING DETAIL - TYPICAL
PARTIAL UPPER ROOF 3D VIEW - TYPICAL
3" = 1'-0"1A
ROOF TERMINATION SECTION - TYPICAL
Revisions: Date: Page 40 of 42
FLASHING PLY 9"
ONTO FIELD
WOOD CANT
FLASHING PLY 6" ONTO FIELD
EXTEND PLIES OVER
BLOCKING & FASTEN
@ 8" O.C.
RECEIVER FASTENED
@ 6" O.C.
RECEIVER
FASTENED
@ 6" O.C.
EXISTING METAL
PANEL FINISH
SEALANT &
BACKER ROD
6" CONCEALED SPLICE
PLATE @ EA. JOINT
NEW ROOF SYSTEM,
SEE DETAIL 1/AE203
MEMBRANE FLASHING PLY MIN 9" ON FIELD
BASE FLASHING PLY MIN 6" ON FIELD
EXISTING ROOF DECKING
FLEXIBLE VAPOR RETARDER TO SERVE AS INSULATION
RETAINER, ATTACH TO TOP OF CURB
COUNTERFLASHING FASTENED
8" O.C. THROUGH BUTYL TAPE
POLYURETHANE SEALANT
WOOD BLOCKING
WOOD CANT
M
IN
NEW ROOF SYSTEM,
SEE DETAIL 1/AE203
LEAD FLASHING 30" SQUARE MINIMUM
IN MASTIC. WRAPPED DOWN 2"MIN.
PRIME TOP SURFACE BEFORE
FLASHING
STRAINER
CLAMPING RING
BASE PLY
FLASHING PLY
EXISTING ROOF DECK
LEAD FLASHING 30" SQUARE MINIMUM
IN MASTIC. WRAPPED DOWN 2"MIN.
PRIME TOP SURFACE BEFORE
FLASHINGRECOVERY BOARD
TAPER INSULATION 1/4"/FT FOR
24" MINIMUM FROM CENTER OF
DRAIN, STAGGER ALL JOINTS,
FASTEN PER SPECIFICATIONS
48" SQUARE SUMP
NOTE:
ROOFING PLY CONFIGURATION PER
MANUFACTURER'S RECOMMENDATIONS
SECTION
PLAN
RD
L O
W P
O
IN
T
/2
+4.25"
+4.75"
(TYPICAL
INSULATION
THICKNESS)
SINGLE PLY ROOFING MEMBRANE
MEMBRANE FLASHING PLY MIN 9" ON FIELD
BASE FLASHING PLY MIN 6" ON FIELD
EXISTING
STRUCTURE
EXISTING ROOF
DECKING
FLEXIBLE WATER PROOF MEMBRANE CLOSURE
PRE-MANUFACTURED EXPANSION JOINT COVER
CHAMFER EACH SIDE OF WOOD CURB TO DRAIN
METAL CAP SECURED @ 12" O.C. W/ FASTENER
& NEOPRENE WASHER
MEMBRANE FLASHING SECURED @ 8" O.C.
FLEXIBLE VAPOR RETARDER TO SERVE AS INSULATION
RETAINER, ATTACH TO TOP OF CURB
WOOD CANT STRIP
NOTES:
1. EXISTING COMPONENTS SHADED IN GREY
2. FOR ALL FLASHING PLIES FOLLOW MANUFACTURER'S
RECOMMENDATIONS
TAPERED INSULATION
WOOD BLOCKING
RECOVERY BOARD
5/8" RECOVERY BOARD MECHANICALLY
FASTENED TO STRUCTURE
ROOF MEMBRANE
NEW TAPERED INSULATION ON
EXISTING ROOF DECK. PITCH
INSULATION 1/8"/FT. MINIMUM R VALUE
SHALL BE R-30. SEE ROOF
CONSTRUCTION NOTE 2 ON AE SHEETS.
EXISTING ROOF DECK
WOOD BLOCKING
ROOF DECK
INSULATION, STAGGER ALL JOINTS
COUNTER FLASHING FASTENED @ 8" O.C.
METAL FLANGE, SET IN ROOF CEMENT
AND PRIME PRIOR TO STRIPPING
ROOFING MEMBRANE FLASHING PLY
SEALANT
EXISTING CONDUCTOR HEAD
EXISTING WALL (SHADED)
MEMBRANE FLASHING PLY
MIN 9" ON FIELD
BASE FLASHING PLY MIN 6" ON FIELD
EXISTING STRUCTURE
METAL CAP SECURED @ 12" O.C. W/ FASTENER
& NEOPRENE WASHER
MEMBRANE FLASHING SECURED @ 8" O.C.
WOOD CANT STRIP
NOTES:
1. EXISTING COMPONENTS SHADED IN GREY
2. FOR ALL FLASHING PLIES FOLLOW MANUFACTURER'S
RECOMMENDATIONS
WOOD BLOCKING
NEW ROOF SYSTEM,
SEE DETAIL 1/AE203
FLASHING PLIES PER MANUFACTURER'S
RECOMMENDATIONS
EXISTING ROOF DECK
NEW ROOF SYSTEM, SEE DETAIL 1/AE203
SHEET METAL PITCH PAN 4" HIGH MIN.,
SOLDERED/WELDED WATERTIGHT
SEALANT
4" MIN
2 PART POURABLE
SEALANT
NON-SHRINK GROUT
WOOD BLOCKING
AS REQUIRED
ROOF PENETRATING FEATURE
(PIPE, ANGLE, ETC)
FLASHING PLIES UP ONTO
CURB & 9" ONTO FIELD
EXISTING ROOF DECK
NEW ROOF SYSTEM,
SEE DETAIL 1/AE203
MECHANICAL EQUIPMENT
M
IN
1/2" MIN
MECHANICAL EQUIPMENT CURB
FLASHING RECEIVER
COUNTER FLASHING
BASE OF UNIT EXTENDS
1/2" MIN BEYOND AND
DOWN OVER TOP OF CURB
WOOD CANT
WOOD BLOCKING
AS REQUIRED8
M
IN
FLASHING PLIES UP ONTO FAN CURB &
FASTENED 8" O.C. MIN
EXISTING ROOF DECK
NEW ROOF SYSTEM
EXHAUST FAN COVER
M
IN
EXHAUST FAN BODY
WOOD CANT
FLASHING PLY FASTEN 6" O.C.
OVER BUTYL TAPE, 9" ONTO FIELD
EXISTING PRECAST SILL
EXISTING WINDOW
NEW ROOF SYSTEM,
SEE DETAIL 1/AE203
BACKER ROD & SEALANT
CLEAN MORTAR JOINT FOR
INSTALLATION OF NEW FLASHING
EXPANSION WEDGE
NEW TWO-PIECE COUNTERFLASHING
EXISTING PRECAST PARAPET CAP, REMOVE,
NUMBER, CLEAN, AND STORE DURING RE-
ROOFING WORK AND RE-INSTALL WHEN
NEW ROOF WORK IS COMPLETED.
RUN NEW ROOFING MEMBRANE FLASHING UP
AND ON TOP OF ENTIRE EXISTING PARAPET WALL
EXISTING
PARAPET WALL
WHERE WROUGHT IRON RAILING IS PRESENT, REMOVE RAILING
AND CAP TOGETHER TO MAINTAIN IT'S STRUCTURAL INTEGRITY.
SEE PLANS FOR LOCATION
NEW ROOF SYSTEM,
SEE DETAIL 1/AE203
RUN NEW ROOFING MEMBRANE
FLASHING 9" ONTO FIELD
WOOD CANT
FURNISH & INSTALL METAL THROUGH WALL
FLASHING WHILE MAINTAINING EXISTING
PRECAST COPING DOWEL SYSTEM.
NEW ROOF SYSTEM,
SEE DETAIL 1/AE203
RUN NEW ROOFING MEMBRANE
FLASHING UP AND OVER PARAPET
WALL AND 9" ONTO FIELD
WOOD CANT
NEW ROOF MEMBRANE FLASHING PER
MANUFACTURER'S RECOMMENDATIONS
EXISTING
PARAPET WALL
METAL COPING ON RECEIVER
FASTENED TO WALL @ 6" O.C.
FASTEN ROOF
MEMBRANE @ 6" O.C.
EXISTING PRECAST PARAPET CAP
EXISTING PARAPET WALL
PARAPET CLAMPING GUARDRAIL SYSTEM
WOOD BLOCKING (TYP.)
EXISTING PRECAST PARAPET
CAP TO REMAIN
RUN NEW ROOFING MEMBRANE
FLASHING UP UNDER NEW
TERM BAR, FASTEN TERM BAR
@ 8" O.C.
EXISTING
PARAPET WALL
NEW ROOF SYSTEM,
SEE DETAIL 1/AE203
RUN NEW ROOFING MEMBRANE
FLASHING 9" ONTO FIELD
WOOD CANT
CUT OFF EXISTING METAL FLASHING
AT PARAPET WALL FACE FLUSH.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .