About this file

This notice announces an invitation for bid for a roof repair project at multiple buildings at the VA New Jersey Healthcare System. The solicitation number is 36C24222B0020 and seeks bids for the replacement of roofs at Buildings 2, 4, 6, 7, 9 and 57, with a project number and title of 561A4-17-108 Replace Roofs B-2, 4, 6, 7, 9, 57. Bids are due by January 28th, 2022 and the proposed award date is December 8th, 2021. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2 is the agency issuing this invitation for bid.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GR102

GR102

GR102

GR102

GR103

GR103

GR103

1 1

1 1 1

1 1

33 33

3 3

3 3

5 5

6 6

/ A

D

1 / AD101

2 2

BUILDING 8-9

CONNECTOR

BUILDING 9-2

CONNECTOR

MATCH LINE

M A

T C

H L

IN

E

REMOVE EXISTING ANTENNA AND

WIRE TEMPORARILY AND REPLACE

WHEN NEW WORK IS COMPLETED.

N

57143

NOT IN SCOPE OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:0

A

M

AD106

ROOF DEMOLITION PLAN - BUILDING 9 AND CONNECTOR

9-2

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

DEMOLITION - BUILDING 9 AND CONNECTOR 9-2

DEMOLITION KEY NOTES

Mark Description

1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR

SQUARE FOOTAGE.

2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS

3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE

GUTTERS DAILY.

4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE

5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM

6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING

7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING

8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.

9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK

SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING

10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.

11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.

KEY PLAN

1/8" = 1'-0"

0' 8'4' 16'2'

LEGEND

N

P N

Revisions: Date:

NOTE:

SEE GI102 FOR GENERAL DEMOLITION NOTES

GR102

GR102

44 4

1 11

1 1

1 1

3 3

3 3

/ A

D

1 / AD109

MATCH LINE

M A

T C

H L

IN

E

REMOVE EXISTING ANTENNA AND

WIRE TEMPORARILY AND REPLACE

WHEN NEW WORK IS COMPLETED.

N

57143

NOT IN SCOPE OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:0

A

M

AD107

ROOF DEMOLITION - BUILDING 57

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

DEMOLITION - BUILDING 57

DEMOLITION KEY NOTES

Mark Description

1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR

SQUARE FOOTAGE.

2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS

3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE

GUTTERS DAILY.

4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE

5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM

6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING

7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING

8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.

9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK

SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING

10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.

11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.

KEY PLAN1/8" = 1'-0"

0' 8'4' 16'2'

LEGEND

N

P N

Revisions: Date:

NOTE:

GR104

GR104

GR104

GR104

GR104

7 7

1 / AD107

B U

IL

D

IN

G

N

.I.

C

M A

T C

H L

IN

E

MATCH LINE

THIS CONNECTOR

NOT IN CONTRACT

N

CONNECTOR 57-54

57143

NOT IN SCOPE OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:0

A

M

AD108

ROOF DEMOLITION - CONNECTOR 57-54

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

DEMOLITION - CONNECTOR 57-54

DEMOLITION KEY NOTES

Mark Description

1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR

SQUARE FOOTAGE.

2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS

3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE

GUTTERS DAILY.

4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE

5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM

6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING

7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING

8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.

9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK

SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING

10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.

11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.

KEY PLAN1/8" = 1'-0"

0' 8'4' 16'2'

LEGEND

N

P N

Revisions: Date:

NOTE:

GR105

GR105

GR105

GR105

GR105

8 88

/ A

D

/ A

D

ADJACENT MECHANICAL BUILDING

SLATE ROOF (N.I.C.)

M A

T C

H L

IN

E

M A

T C

H L

IN

E

RD

RD

RD

RD

RDRD

8 888

/ A

D

RD

RD RD RDRD

RD

RD RD

B U

IL

D

IN

G

N

.I.

C

M A

T C

H L

IN

E

M A

T C

H L

IN

E

N

CONNECTOR

57-143

57143

NOT IN SCOPE OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:0

A

M

AD109

ROOF DEMOLITION - CONNECTOR 57-143

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

DEMOLITION - CONNECTOR 57-143A

1/8" = 1'-0"2

DEMOLITION - CONNECTOR 57-143B

DEMOLITION KEY NOTES

Mark Description

1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR

SQUARE FOOTAGE.

2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS

3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE

GUTTERS DAILY.

4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE

5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM

6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING

7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING

8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.

9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK

SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING

10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.

11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.

1/8" = 1'-0"

0' 8'4' 16'2'

KEY PLAN

LEGEND

N

P N

N

P N

Revisions: Date:

NOTE:

/ A

E

B U

IL

D

IN

G

N .I.

C

NEW

LOW

SLOPE RO

OF

SYSTEM

, M

INIM

UM

INSULATION REQUIRED TO

CREATE ROO

F PITCH

NEW SNOW GUARD / SNOW RAIL SYSTEM TO REPLACE

EXISTING - SAME LOCATION

AE201

AE201

AE201

AE201

AE201

AE204

LOW

HIGH

AE203

AE204

AE201

AE201

AE204

HIGH

CONNECTOR 2-3

BUILDING 2-9

CONNECTOR

AT

AT

AT

A T

A T

A T

A T

A T

A T

AT

AT

AT

AT

AT

AT

AT

AT

AT

AT

AT

A T

A T

A T

A T

A T

AT

AT

ATAT ATAT

DOWN TO GROUNDING ROD

SEE 7/AE201

DOWN TO GROUNDING ROD

SEE 7/AE201

DOWN TO GROUNDING ROD

SEE 7/AE201

DOWN TO GROUNDING ROD

SEE 7/AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE108

DS

VALL

EY

RIDGE

R

ID

G E

V E

N T

R

ID

G E

V E

N T

VALL

EY VALL

EY

VALL

EY

VALL

EY

VALL

EY

VALLEY

VALLEY

VALLEY

VALLEY

VALLEY

VALLEY

VS

VS

AE204

LOW

AE204

AE201

(TYP)

PROVIDE NEW CRICKET

AE203

PROVIDE NEW CRICKET

VS

VS

VS

AE201

AE201

AE204

AE204

AE204

AE204

AE204

AE204

PP

DS

AE201

AE203

HIGH

LOW

AE204

LOW

HIGH

RD

RD

M A

T C

H L

IN

E

M A

T C

H L

IN

E

AE203

DS

AE204

AE204

NEW INTAKE VENT, 55 LF

NEW INTAKE

VENT, 50 LF

NEW INTAKE VENT, 55 LF

NEW INTAKE VENT, 55 LF

NEW INTAKE VENT, 55 LF

NEW INTAKE

VENT, 45 LF

NEW INTAKE

VENT, 45 LF

NEW INTAKE

VENT, 50 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 50 LF

NEW INTAKE

VENT, 50 LF

NEW INTAKE

VENT, 5 LF

NEW INTAKE VENT, 5 LF

NEW INTAKE VENT, 5 LF

NEW INTAKE VENT, 5 LF

OS

OS

EXISTING CONCRETE

SPLASHBLOCK, REMOVE

DURING NEW WORK AND

RE-INSTALL AFTER NEW

WORK

AE204

LOW

AE204

LOW

NEW LOW SLOPE ROOF

SYSTEM SEE 1/AE203

DS

AE201

AE201

AE201

AE201

R

ID

G E

V E

N T

R

ID

G E

V E

N T

R

ID

G E

V E

N T

R

ID

G E

V E

N T

RIDGE VENTRIDGE VENT

NOTE:

CONTRACTOR SHALL REPLACE UP TO 10%

OF THE ROOF DECK ON THIS BUILDING

NEW SNOW GUARDS NEW SNOW GUARDS

NEW SNOW GUARDS

NEW SNOW GUARDS

NEW SNOW GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

AE201

AE201

AE201

AE201

AE201

AE201

(TYP)

AE201

HIGHLOW

AE201

AE201

AE201

AE201

AE201

NEW

LO

W

SLO

PE ROO

F

SYSTEM

SEE 1/AE203

N

57143

1. UPON AREA BY AREA DEMOLITION OF THE EXISTING ASPHALT SHINGLE SYSTEM, INSTALL SELF-ADHERING RUBBERIZED ASPHALT ICE DAMMING MEMBRANE, SAME DAY, TO CREATE A WEATHER TIGHT CONDITION DURING CONSTRUCTION. APPLY ICE DAMMING MEMBRANE DIRECTLY TO

EXISTING PLANK SHEATHING ROOF.

2. INSTALL NEW RIGID INSULATION ON ALL LOW SLOPED ROOFS.

3. INSTALL NEW RUBBERIZED ASPHALT ICE DAMMING MEMBRANE AT ALL EAVES AND VALLEYS AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.

4. INSTALL NEW POLY-FELT UNDERLAYMENT OVER ENTIRE AREA OF NEW ROOF.

5. INSTALL NEW ASPHALT SHINGLE SYSTEM OVER ENTIRE SCOPE AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.

6. SEE SHEET GI102 FOR ROOF LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:1

A

M

AE101

ROOF PLAN - BUILDING 2 & CONNECTOR 2-3

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

ROOF PLAN - BUILDING 2 & CONNECTOR 2-3

1/8" = 1'-0"

0' 8'4' 16'2'

KEY PLAN

ROOF CONSTRUCTION NOTES - BUILDINGS 2, 4, 7, 9, AND 57

N

P N

Revisions: Date: Page 30 of 42

N

5 57143

BUILDING 5 (N.I.C.)

B U

IL

D

IN

G

N .I.

C

NEW LOW SLOPE

ROOF SYSTEM

NEW LOW SLOPE

ROOF SYSTEM

N E

W L

O W

S

LO

P E

R

O O

F S

Y S

T E

M

NEW LOW SLOPE

ROOF SYSTEM

RD

AE201

AE201

AE204

AE204

AE201

AE204

AE201

AE201

AE204

AE201 4

AE201

LOW

HIGH

AE201

AE201

AE201

AE201

CONNECTOR 3-4

C O

N N

E C

T O

R

-5

AT

AT

AT

A T

A T

A T

DOWN TO GROUNDING ROD

SEE 7/AE201

A T

AT A

T

A T

A T

AT

AT

AT

AT

AT

AT

AT

AT

AT

AT

AT

A T

DOWN TO GROUNDING ROD

SEE 7/AE201

DOWN TO GROUNDING

ROD, SEE 7/AE201

DOWN TO GROUNDING

ROD, SEE 7/AE201

NEW INTAKE VENT, 8 LF NEW INTAKE VENT, 8 LF

NEW INTAKE

VENT, 8 LF NEW INTAKE

VENT, 8 LF

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

M A

T C

H L

IN

E

MATCH LINE

AE108

RD

AE204

AE204

AE204

AE204

AE204

AE204

AE108

VS

VS

VSVS

VS

VS

VS

AE204

SC

AE204

NEW INTAKE

VENT, 45 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 45 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 45 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 45 LF

NEW INTAKE

VENT, 40 LF

HIGH

AE201

AE201

AE201

AE201

AE201

AE201

VS VS

VS

HIGH

HIGH

AE204

LOW

AE204

LOW

VS

AE204

LOW

VS

AE203

LOW

R

ID

G E

V E

N T

VALLEY

VALL

EY

VALL

EY

VALLEY

R

ID

G E

V E

N T

R

ID

G E

V E

N T

R

ID

G E

V E

N T

R

ID

G E

V E

N T

VALL

EY

VALL

EY

VALL

EY

VALL

EY

VALLEY

VALLEY

VALLEY

VALLEY

NOTE:

CONTRACTOR SHALL REPLACE UP TO 10%

OF THE ROOF DECK ON THIS BUILDING

NEW SCUPPER

RIDGE VENT

NEW VENT, 70 LF

NEW VENT, 70 LF

NEW VENT, 70 LF

NEW VENT, 70 LF

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

EXISTING ROOFTOP

MECHANICAL UNIT

AE203

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

TYP.

AE201

AE204

TYP.

TYP.

AE204

NEW LOW SLOPE ROOF

SYSTEM SEE 1/AE203

NEW LOW SLOPE ROOF

SYSTEM SEE 1/AE203

VS

1. UPON AREA BY AREA DEMOLITION OF THE EXISTING ASPHALT SHINGLE SYSTEM, INSTALL SELF-ADHERING RUBBERIZED ASPHALT ICE DAMMING MEMBRANE, SAME DAY, TO CREATE A WEATHER TIGHT CONDITION DURING CONSTRUCTION. APPLY ICE DAMMING MEMBRANE DIRECTLY TO

EXISTING PLANK SHEATHING ROOF.

2. INSTALL NEW RIGID INSULATION ON ALL LOW SLOPED ROOFS.

3. INSTALL NEW RUBBERIZED ASPHALT ICE DAMMING MEMBRANE AT ALL EAVES AND VALLEYS AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.

4. INSTALL NEW POLY-FELT UNDERLAYMENT OVER ENTIRE AREA OF NEW ROOF.

5. INSTALL NEW ASPHALT SHINGLE SYSTEM OVER ENTIRE SCOPE AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.

6. SEE SHEET GI102 FOR ROOF LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:1

A

M

AE102

ROOF PLAN - BUILDING 4, CONNECTORS 3-4, AND 4-5

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

KEY PLAN

1/8" = 1'-0"1

ROOF PLAN - BUILDING 4, CONNECTOR 3-4 AND 4-5

1/8" = 1'-0"

0' 8'4' 16'2'

ROOF CONSTRUCTION NOTES - BUILDINGS 2, 4, 7, 9, AND 57

N

Revisions: Date: Page 31 of 42

EXISTING BRICK

CHIMNEYS TO REMAIN

SEE 1/AE202

D O

W N

BUILDING 5 (N.I.C.)

/ A

E

NEW FLASHING AT EXISTING

EXHAUST - TYPICAL

NEW LOW SLOPE

ROOF SYSTEM

AE201

AE201

AE201

AE201

AE201

AE201

NEW INTAKE VENT, 23 LF

NEW INTAKE

VENT, 30 LF

NEW INTAKE VENT, 23 LF

NEW INTAKE VENT, 30 LF

NEW INTAKE

VENT, 60 LF

NEW INTAKE

VENT, 60 LF

NEW INTAKE

VENT, 60 LF

NEW INTAKE

VENT, 60 LF

AE203

AE201

AE2012

AE204

HIGH

AE201

BUILDING 5-6

CONNECTOR

BUILDING 6-7

CONNECTOR

AT

AT

A T

AT

AT

AT

A T

A T

AT

AT

ATAT

AT AT

A T

A T

A T

AT

AT

AT

AT

AT

DOWN TO GROUNDING ROD

SEE 7/AE201

DOWN TO GROUNDING ROD

SEE 7/AE201

DOWN TO GROUNDING ROD

SEE 7/AE201

DOWN TO GROUNDING ROD

SEE 7/AE201

NEW INTAKE

VENT, 30 LF

NEW INTAKE VENT, 30 LF

NEW INTAKE VENT, 30 LF NEW INTAKE VENT, 30 LF

NEW INTAKE VENT, 6 LF

NEW INTAKE VENT, 6 LF

NEW INTAKE

VENT, 6 LF

NEW INTAKE

VENT, 6 LF

EXISTING FENCE ATTACHED

TO EXISTING PARAPET CAP.

AE203

AE203

AE204

AE203

AE203

AE203

AE203

AE203

AE203

EXISTING BUILDING (N.I.C.)

EXISTING ROUND DUCTS

ABOVE ROOF

RD

RD

M A

T C

H L

IN

E

THROUGH WALL

SCUPPER SEE 4/AE203

AE203

THROUGH WALL

SCUPPER SEE 4/AE203

AE204

AE204

LOW

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 40 LF

VS

VS

VS VS

EFEF

EF

EF

EF

AE201

DS

DS

PROVIDE CRICKET

@ HIGH SIDE (TYP.)

LOW

AE204

DS

AE204

AE204

NEW LOW SLOPE

ROOF SYSTEM

DS

AE204

AE204

R

ID

G E

V E

N T

VALLEY

R

ID

G E

V E

N T

R

ID

G E

V E

N T

R

ID

G E

V E

N T

R

ID

G E

V E

N T

R

ID

G E

V E

N T

VALL

EY

VALL

EY

VALL

EY

VALL

EY

VALL

EY

VALL

EY

VALL

EY

VALLEY

VALLEY

VALLEY

VALLEY

VALLEY

VALLEY

HIP

R

ID

GE V

ENT

HIP RIDG

E VENT

HIP

R

ID

GE V

ENT

HIP RIDG

E VENT

HIP

R

ID

GE V

ENT

HIP RIDG

E VENT

HIP RIDG

E VENTHIP

R

ID

G E V

ENT

RIDGE VENT RIDGE VENT

NOTE:

CONTRACTOR SHALL REPLACE UP TO 10%

OF THE ROOF DECK ON THIS BUILDING

NEW SNOW

GUARDS

NEW SNOW

GUARDS NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDSNEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

PLAN NOTES:

1. CONTRACTOR TO PROVIDE FALL PROTECTION,

SEE 9/AE203

PLAN NOTES:

1. CONTRACTOR TO PROVIDE FALL PROTECTION,

SEE 9/AE203

NEW LOW SLOPE ROOF

SYSTEM SEE 1/AE203

NEW LOW SLOPE ROOF

SYSTEM SEE 1/AE203

AE2014

AE201

AE201

AE201

AE201

AE201

AE201

NEW LOW SLOPE ROOF

SYSTEM SEE 1/AE203

TYP.

AE201

AE203

AE201

HIP

R

ID

GE V

ENTHIP RIDG

E VENT

PROVIDE PRECAST

CONCRETE SPLASH

BLOCK AT GRADE,

SEE 12/AE201

PROVIDE PRECAST

CONCRETE SPLASH

BLOCK AT GRADE,

SEE 12/AE201

N

57143

1. UPON AREA BY AREA DEMOLITION OF THE EXISTING ASPHALT SHINGLE SYSTEM, INSTALL SELF-ADHERING

RUBBERIZED ASPHALT ICE DAMMING MEMBRANE AS SHOWN IN DETAIL 1.

2. INSTALL NEW RIGID INSULATION ON ALL LOW SLOPED ROOFS. WHERE DISTANCES ARE TOO LONG TO PRODUCE A MINIMUM 1/8"/FT PITCH INSTALL THE INSULATION AT THE AME PITCH AS THE EXISTING.

3. INSTALL NEW FELT UNDERLAYMENT OVER ENTIRE AREA OF ROOF

4. INSTALL NEW ASPHALT SHINGLE SYSTEM OVER ENTIRE SCOPE AS NOTED ON DRAWINGS AND IN

SPECIFICATIONS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:1

A

M

AE103

ROOF PLAN - BUILDING 6, CONNECTOR 5-6 AND 6-7

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

ROOF PLAN - BUILDING 6, CONNECTOR 5-6 AND 6-7

1/8" = 1'-0"

0' 8'4' 16'2'

KEY PLAN

ROOF CONSTRUCTION NOTES - BUILDINGS 6 AND 8

N

Revisions: Date: Page 32 of 42

E

/ A

E

AE201

AE201

AE201

AE201

AE201

AE201

NEW INTAKE VENT, 20 LF NEW INTAKE VENT, 20 LF

NEW INTAKE

VENT, 68 LF

NEW INTAKE

VENT, 67 LF

NEW INTAKE

VENT, 67 LF

NEW INTAKE

VENT, 68 LF

AE201

AE201

AE204

HIGH

AE201

BUILDING 6-7

CONNECTOR

BUILDING 7-8

CONNECTOR

AT

AT

A T

AT

AT

AT

A T

A T

DOWN TO GROUNDING ROD

SEE 7/AE201

DOWN TO GROUNDING

ROD, SEE 7/AE201

AT

AT

AT

DOWN TO GROUNDING

ROD, SEE 7/AE201

ATAT

AT AT

AT

AT

AT

DOWN TO GROUNDING ROD

SEE 7/AE201

NEW INTAKE VENT, 30 LF NEW INTAKE VENT, 30 LF

NEW INTAKE VENT, 30 LFNEW INTAKE VENT, 30 LF

NEW INTAKE VENT, 30 LF NEW INTAKE VENT, 30 LF

NEW INTAKE VENT, 6 LF

NEW INTAKE VENT, 6 LF

NEW INTAKE VENT, 6 LF

NEW INTAKE VENT, 6 LF

NEW INTAKE

VENT, 9 LF

NEW INTAKE

VENT, 9 LF

AE204

LOW

M A

T C

H L

IN

E

M A

T C

H L

IN

E

AE203

AE203

AE204

THROUGH WALL

SCUPPER SEE L/AE203

THROUGH WALL

SCUPPER SEE L/AE203

AE204

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

NEW INTAKE

VENT, 45 LF

NEW INTAKE

VENT, 45 LF

NEW INTAKE

VENT, 45 LF

NEW INTAKE

VENT, 45 LF

PROVIDE

CRICKET

AE203

AE203

PROVIDE

CRICKET (TYP.)

AE203

VS

EF

VS VS

VS

VS

VSVSVS

AE201

AE201

AE201

AE201

LOW

LOW

LOW SLOPE ROOF

SYSTEM, SEE 1/AE203

LOW SLOPE ROOF

SYSTEM, SEE 1/AE203

LOW SLOPE ROOF

SYSTEM, SEE 1/AE203

EF

EF

EF

EF

EXISTING BRICK

CHIMNEY, SEE AE/202

FOR FLASHING DETAILS

EXISTING BRICK

CHIMNEYS TO REMAIN

SEE 1/AE202

A T

AT

A T

A T

AE201

AE201 11

AE201

AE201

VS

AE204

AE204

AE204

AE204

R

ID

G E

V E

N T

VALLEY

VALL

EY

R

ID

G E

V E

N T

R

ID

G E

V E

N T

R

ID

G E

V E

N T

R

ID

G E

V E

N T

RIDGE VENT RIDGE VENT

R

ID

G E

V E

N T

VALLEY

VALLEY

VALLEY

VALLEY

VALLEY

VALLEY

VALL

EY

VALL

EY

VALL

EY

VALL

EY

VALL

EY

VALL

EY

HIP RIDGE VENTHIP

R

ID

GE V

ENTHIP RIDGE VENTHIP

R

ID

GE V

ENT

HIP RIDGE VENT

HIP

R

ID

GE V

ENT

HIP RIDGE VENT

HIP

R

ID

GE V

ENT

NOTE:

CONTRACTOR SHALL REPLACE UP TO 50%

OF THE ROOF DECK ON THIS BUILDING

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS NEW SNOW

GUARDS

NEW SNOW GUARDS NEW SNOW GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

PLAN NOTES:

1. CONTRACTOR TO PROVIDE FALL PROTECTION,

SEE 9/AE203

NEW LOW SLOPE ROOF

SYSTEM SEE 1/AE203

EF

TYP.

TYP.

AE201

AE201

AE201

AE201

AE201

AE201

TYP.

AE201

HIP

R

ID

GE V

ENTHIP RIDGE VENT

N

57143

1. UPON AREA BY AREA DEMOLITION OF THE EXISTING ASPHALT SHINGLE SYSTEM, INSTALL SELF-ADHERING RUBBERIZED ASPHALT ICE DAMMING MEMBRANE, SAME DAY, TO CREATE A WEATHER TIGHT CONDITION DURING CONSTRUCTION. APPLY ICE DAMMING MEMBRANE DIRECTLY TO

EXISTING PLANK SHEATHING ROOF.

2. INSTALL NEW RIGID INSULATION ON ALL LOW SLOPED ROOFS.

3. INSTALL NEW RUBBERIZED ASPHALT ICE DAMMING MEMBRANE AT ALL EAVES AND VALLEYS AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.

4. INSTALL NEW POLY-FELT UNDERLAYMENT OVER ENTIRE AREA OF NEW ROOF.

5. INSTALL NEW ASPHALT SHINGLE SYSTEM OVER ENTIRE SCOPE AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.

6. SEE SHEET GI102 FOR ROOF LEGEND

1/8" = 1'-0"

0' 8'4' 16'2'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:1

A

M

AE104

ROOF PLAN - BUILDING 7 AND CONNECTOR 7-8

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

ROOF PLAN - BUILDING 7 AND CONNECTOR 7-8

KEY PLAN

ROOF CONSTRUCTION NOTES - BUILDINGS 2, 4, 7, 9, AND 57

N

Revisions: Date: Page 33 of 42

E

1 / AE106

AE201

AE201

AE201

AE201

AE201

NEW INTAKE VENT, 20 LF

NEW INTAKE VENT, 30 LF

NEW INTAKE VENT, 20 LF

NEW INTAKE VENT, 30 LF

NEW INTAKE

VENT, 60 LF

NEW INTAKE

VENT, 60 LF

NEW INTAKE

VENT, 60 LF

NEW INTAKE

VENT, 60 LF

AE203

AE203

AE201

AE201

AE204

HIGH

AE201

BUILDING 8-9

CONNECTOR

BUILDING 7-8

CONNECTOR

AT

AT

A T

AT

AT

AT

A T

A T

AT

AT

ATAT

AT AT

A T

A T

A T

AT

AT

AT

AT

DOWN TO GROUNDING ROD

SEE 7/AE201

DOWN TO GROUNDING ROD

SEE 7/AE201

DOWN TO GROUNDING ROD

SEE 7/AE201

DOWN TO GROUNDING ROD

SEE 7/AE201

A T

NEW INTAKE VENT, 6 LF

NEW INTAKE VENT, 6 LF

NEW INTAKE VENT, 6 LF

NEW INTAKE VENT, 6 LF

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

NEW INTAKE

VENT, 30 LF

NEW INTAKE

VENT, 30 LF

NEW INTAKE

VENT, 30 LF

NEW INTAKE

VENT, 30 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 40 LF

CONNECT EXISTING RAIN

WATER CONDUIT TO EXISTING

UNDERGROUND STORM PIPE

BOOT WITH NEW DOWNSPOUT.

SEE 2/GR102

VS

VS

VSVS VS VS

VS

LOW SLOPE ROOF

SYSTEM, SEE 1/AE203

EXISTING BRICK

CHIMNEYS TO REMAIN

SEE 1/AE202

AE203 3

AE201

EF

LOW SLOPE ROOF

SYSTEM, SEE H/AE203 6

AE204

AE204

CONNECT EXISTING RAIN

WATER SCUPPER TO

EXISTING UNDERGROUND

STORM PIPE BOOT

NOTE TO COR:

UNDERGROUND SYSTEM IS

FULL OF WATER

AE203

DS DS

AE204

AE204

AE204

AE204

LOW SLOPE ROOF

SYSTEM, SEE H/AE203

LOW SLOPE ROOF

SYSTEM, SEE H/AE203

AE201

AE201

M A

T C

H L

IN

E

MATCH LINE

R

ID

G

E V

E N

TVALLEY

R

ID

G E

V E

N T

R

ID

G E

V E

N T

R

ID

G E

V E

N T

R

ID

G E

V E

N

TR

ID

G

E V

E N

T

VALLEY

VALLEY

VALLEY

VALLEY

VALLEY

VALLEY

VALL

EY

VALL

EY

VALL

EY

VALL

EY

VALL

EY

VALL

EY

VALL

EY

HIP

R

ID

G

E V

ENTHIP RIDG

E VENT HIP

R

ID

G

E V

ENTHIP RIDG

E VENT

HIP RIDG

E VENTHIP

R

ID

G E V

ENT

HIP RIDG

E VENTHIP

R

ID

G

E V

ENT

NOTE:

CONTRACTOR SHALL REPLACE UP TO 50%

OF THE ROOF DECK ON THIS BUILDING

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

PLAN NOTES:

1. CONTRACTOR TO PROVIDE FALL PROTECTION,

SEE 9/AE203

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

TYP.

LOW

LOW

TYP.

V

V

V

HIP

R

ID

G

E V

ENTHIP RIDG

E VENT

PROVIDE PRECAST

CONCRETE SPLASH

BLOCK AT GRADE,

SEE 12/AE201

PROVIDE PRECAST

CONCRETE SPLASH

BLOCK AT GRADE,

SEE 12/AE201

N

57143

1. UPON AREA BY AREA DEMOLITION OF THE EXISTING ASPHALT SHINGLE SYSTEM, INSTALL SELF-ADHERING

RUBBERIZED ASPHALT ICE DAMMING MEMBRANE AS SHOWN IN DETAIL 1.

2. INSTALL NEW RIGID INSULATION ON ALL LOW SLOPED ROOFS. WHERE DISTANCES ARE TOO LONG TO PRODUCE A MINIMUM 1/8"/FT PITCH INSTALL THE INSULATION AT THE AME PITCH AS THE EXISTING.

3. INSTALL NEW FELT UNDERLAYMENT OVER ENTIRE AREA OF ROOF

4. INSTALL NEW ASPHALT SHINGLE SYSTEM OVER ENTIRE SCOPE AS NOTED ON DRAWINGS AND IN

SPECIFICATIONS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:1

A

M

AE105

ROOF PLAN - BUILDING 8 AND CONNECTOR 8-9

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

ROOF PLAN - BUILDING 8 AND CONNECTOR 8-9

1/8" = 1'-0"

0' 8'4' 16'2'

KEY PLAN

ROOF CONSTRUCTION NOTES - BUILDINGS 6 AND 8

N

Revisions: Date: Page 34 of 42

E

1 / AE101

INSPECT, CLEAN AND REPAIR

EXISTING COPPER GUTTER INLAY,

ENTIRE PERIMETER OF ROOF

NEW LOW SLOPE

ROOF SYSTEM

NEW LOW SLOPE

ROOF SYSTEM

AE201

AE201

AE201

AE201

AE201

NEW INTAKE VENT, 30 LF

NEW INTAKE VENT, 24 LF

NEW INTAKE VENT, 30 LF

NEW INTAKE VENT, 24 LF

NEW INTAKE

VENT, 65 LF

NEW INTAKE

VENT, 65 LF

NEW INTAKE

VENT, 65 LF

NEW INTAKE

VENT, 65 LF

NEW INTAKE

VENT, 35 LF

NEW INTAKE

VENT, 35 LF

AE203

AE201

AE201

AE201

BUILDING 8-9

CONNECTOR

BUILDING 9-2

CONNECTOR

AT

AT

AT

A T

A T

A T

A T

A T

A T

AT

AT

AT

AT

AT

AT

AT

AT

AT

AT

DOWN TO GROUNDING ROD

SEE 7/AE201

DOWN TO GROUNDING ROD

SEE 7/AE201

DOWN TO GROUNDING ROD

SEE 7/AE201

DOWN TO GROUNDING ROD

SEE 7/AE201

ATAT

AT AT

NEW INTAKE

VENT, 6 LF

NEW INTAKE

VENT, 6 LF

NEW INTAKE

VENT, 6 LF

NEW INTAKE

VENT, 6 LF

MATCH LINE

M A

T C

H L

IN

E

NEW INTAKE

VENT, 30 LF

NEW INTAKE

VENT, 30 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 40 LF

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

NEW INTAKE

VENT, 30 LF

NEW INTAKE

VENT, 30 LF

VS

VS

VS VS

VS

VS

VS

VS

VS

AE201

EF

EF

PROVIDE

CRICKET (TYP.)

AE204

HIGH

EXISTING BRICK

CHIMNEYS TO REMAIN

SEE 1/AE202

AE203

LOW SLOPE ROOF

SYSTEM, SEE 1/AE203

AE201

EF

EF

VS

AE203

LO

W

S

LO

P E

R O

O F

S

Y S

T E

M

S E

E H

/A E

AE204

AE204

AE203

DS

AE204

AE204 PROVIDE PRECAST

CONCRETE SPLASH BLOCK

AT GRADE, SEE 12/AE201

DS

AE204

AE204

PROVIDE PRECAST

CONCRETE SPLASH BLOCK

AT GRADE, SEE 12/AE201

VALL

EY

VALL

EY

VALL

EY

VALL

EY

VALL

EY

VALL

EY

VALL

EY

VALLEY

VALLEY

VALLEY

VALLEY

VALLEY

VALLEY

RIDGE VENTRIDGE VENT

R

ID

G E

V E

N T R

ID

G

E V

E N

T R

ID

G

E V

E N

T

R

ID

G E

V E

N T

R

ID

G E

V E

N T

R

ID

G E

V E

N T

HIP

R

ID

G

E V

ENTHIP RIDGE VENT HIP

R

ID

G E V

ENT

HIP RIDGE VENT

HIP

R

ID

G

E V

ENT HIP RIDGE VENTHIP

R

ID

G E V

ENT HIP RIDGE VENT

NOTE:

CONTRACTOR SHALL REPLACE UP TO 10%

OF THE ROOF DECK FOR THIS BUILDING

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDSNEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

PLAN NOTES:

1. CONTRACTOR TO PROVIDE FALL PROTECTION,

SEE 9/AE203

LOW

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

TYP

TYP

LOW

VS

REPLACE EXISTING

ANTENNA AND WIRE WHEN

NEW WORK IS COMPLETED.

V

V

V

V

HIP

R

ID

G

E V

ENTHIP RIDGE VENT

PROVIDE NEW DOWNSPOUTPROVIDE NEW DOWNSPOUT

N

57143

1. UPON AREA BY AREA DEMOLITION OF THE EXISTING ASPHALT SHINGLE SYSTEM, INSTALL SELF-ADHERING RUBBERIZED ASPHALT ICE DAMMING MEMBRANE, SAME DAY, TO CREATE A WEATHER TIGHT CONDITION DURING CONSTRUCTION. APPLY ICE DAMMING MEMBRANE DIRECTLY TO

EXISTING PLANK SHEATHING ROOF.

2. INSTALL NEW RIGID INSULATION ON ALL LOW SLOPED ROOFS.

3. INSTALL NEW RUBBERIZED ASPHALT ICE DAMMING MEMBRANE AT ALL EAVES AND VALLEYS AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.

4. INSTALL NEW POLY-FELT UNDERLAYMENT OVER ENTIRE AREA OF NEW ROOF.

5. INSTALL NEW ASPHALT SHINGLE SYSTEM OVER ENTIRE SCOPE AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.

6. SEE SHEET GI102 FOR ROOF LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:2

A

M

AE106

ROOF PLAN - BUILDING 9 AND CONNECTOR 9-2

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

ROOF PLAN - BUILDING 9 AND CONNECTOR 9-2

KEY PLAN

ROOF CONSTRUCTION NOTES - BUILDINGS 2, 4, 7, 9, AND 57

1/8" = 1'-0"

0' 8'4' 16'2'

N

P N

N

Revisions: Date: Page 35 of 42

E

1 / AE109

MATCH LINE

INSPECT, CLEAN AND REPAIR

EXISTING COPPER GUTTER INLAY,

ENTIRE PERIMETER OF ROOF

CLEAN AND REPAIR EXISTING

COPPER RAKE FLASHING

CLEAN AND REPAIR EXISTING

COPPER RAKE FLASHING

CLEAN AND REPAIR EXISTING

COPPER RAKE FLASHING

CLEAN AND REPAIR

EXISTING COPPER

RAKE FLASHING

AE201

AE201

AE201

AE201

NEW INTAKE VENT, 35 LF

NEW INTAKE VENT, 27 LF

NEW INTAKE VENT, 35 LF

NEW INTAKE VENT, 27 LF

NEW INTAKE

VENT, 72 LF

NEW INTAKE

VENT, 72 LF

NEW INTAKE

VENT, 72 LF

NEW INTAKE

VENT, 72 LF

NEW INTAKE

VENT, 36 LF

NEW INTAKE

VENT, 36 LF

AE201

AE201

AE201

AT

AT

A T

AT

AT

AT

A T

A T

A T

A T

A T

AT

AT

AT

DOWN TO GROUNDING ROD

SEE 7/AE201

AT

AT

AT

AT

AT

DOWN TO GROUNDING ROD

SEE 7/AE201

ATAT

AT AT

AT

A T

A T

AT

NEW INTAKE

VENT, 6 LF

NEW INTAKE

VENT, 6 LF

NEW INTAKE

VENT, 6 LF

NEW INTAKE

VENT, 6 LF

M A

T C

H L

IN

E

CONNECTOR 57-54

CONNECTOR 57-143

NEW INTAKE VENT, 30 LFNEW INTAKE VENT, 30 LF

NEW INTAKE

VENT, 45 LF

NEW INTAKE

VENT, 45 LF

NEW INTAKE

VENT, 45 LF

NEW INTAKE

VENT, 45 LF

DOWN TO GROUNDING

ROD, SEE 7/AE201

DOWN TO GROUNDING

ROD, SEE 7/AE201

NEW INTAKE

VENT, 30 LF

NEW INTAKE

VENT, 30 LF

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE204

HIGH

EXISTING BRICK

CHIMNEYS TO REMAIN

SEE 1/AE202

LOW SLOPE ROOF

SYSTEM, SEE 1/AE203

VS

VS

VS

VS

VS

VS

VS

VS

VS

VS

VS

VS

VS

AE201

AE201

VS

RIDGE VENT

VALL

EY

RIDGE VENT

R

ID

G E

V E

N T

R

ID

G E

V E

N T

R

ID

G E

V E

N T

R

ID

G E

V E

N T

R

ID

G E

V E

N T

R

ID

G E

V E

N T

HIP

R

ID

G

E V

ENTHIP RIDG

E VENT HIP

R

ID

G

E V

ENTHIP RIDG

E VENT

HIP

R

ID

G

E V

ENT

HIP RIDG

E VENT

HIP

R

ID

G

E V

ENT

HIP RIDG

E VENT

VALL

EY

VALL

EY

VALL

EY VALL

EY

VALL

EY

VALL

EY

VALLEY

VALLEY

VALLEY

VALLEY

VALLEYVALLEY

VALLEY

NOTE:

CONTRACTOR SHALL REPLACE UP TO 25%

OF THE ROOF DECK FOR THIS BUILDING

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDSNEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

AE201

AE201

AE201

AE201

TYP.

AE201

AE201

AE201

AE201

AE201

TYP.

VS

REPLACE EXISTING ANTENNA AND

WIRE WHEN NEW WORK IS

COMPLETED.

HIP RIDG

E VENT

HIP

R

ID

G

E V

ENT

N

57143

1. UPON AREA BY AREA DEMOLITION OF THE EXISTING ASPHALT SHINGLE SYSTEM, INSTALL SELF-ADHERING RUBBERIZED ASPHALT ICE DAMMING MEMBRANE, SAME DAY, TO CREATE A WEATHER TIGHT CONDITION DURING CONSTRUCTION. APPLY ICE DAMMING MEMBRANE DIRECTLY TO

EXISTING PLANK SHEATHING ROOF.

2. INSTALL NEW RIGID INSULATION ON ALL LOW SLOPED ROOFS.

3. INSTALL NEW RUBBERIZED ASPHALT ICE DAMMING MEMBRANE AT ALL EAVES AND VALLEYS AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.

4. INSTALL NEW POLY-FELT UNDERLAYMENT OVER ENTIRE AREA OF NEW ROOF.

5. INSTALL NEW ASPHALT SHINGLE SYSTEM OVER ENTIRE SCOPE AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.

6. SEE SHEET GI102 FOR ROOF LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:2

A

M

AE107

ROOF PLAN - BUILDING 57

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

ROOF PLAN - BUILDING 57

1/8" = 1'-0"

0' 8'4' 16'2'

KEY PLAN

ROOF CONSTRUCTION NOTES - BUILDINGS 2, 4, 7, 9, AND 57

N

P N

N

Revisions: Date: Page 36 of 42

CONNECTOR 57-54

57143

1 / AE107

B U

IL

D

IN

G

N

.I.

C

AE203

AE203

MATCH LINE

M A

T C

H L

IN

E

HIGH POINT

AE203

THIS CONNECTOR

NOT IN CONTRACT

CONNECT EXISTING RAIN

WATER SCUPPER TO

EXISTING UNDERGROUND

STORM PIPE BOOT

AE204

AE204

AE203

AE203

AE203 15

AE203

REMOVE EXISTING ANTENNAS

AS REQUIRED TO PERFORM

NEW ROOF WORK AND RE-

INSTALL IN PLACE WHEN WORK

IS COMPLETE. SEE 16/GR104

LOW SLOPE ROOF

SYSTEM, SEE 1/AE203

LOW SLOPE ROOF SYSTEM, SEE

1/AE203. IF THE DISTANCE IS TOO

LONG TO PRODUCE A MINIMUM 1/8"/FT

PITCH INSTALL THE INSULATION HIGH

POINT AT THE HIGHEST EXISTING

FLASHING ELEVATION.

7.

5"

+11.25"

AREA DIVIDER

9.

0"

PLAN NOTES:

1. CONTRACTOR TO PROVIDE FALL PROTECTION, SEE 9/AE203

EXISTING BRICK PIER

EXISTING BUILDING

EXISTING PAVER PATIO

EXISTING RAILING,

SEE NOTE 2

EXISTING RAILING

POST (TYP.)

EXISTING PRECAST COPING

STONES, SEE NOTE 1

EXISTING PRECAST COPING

STONES, SEE NOTE 1

EXISTING WALL SCUPPER

DRAIN, SEE DETAIL (TYP. FOR 2)

AE204

AE203

AE203

AE203

SIM

EXISTING BUILDING

NEW CRICKET FORMED

W/ INSULATION (TYP.)

PLAN NOTES:

1. CONTRACTOR SHALL REMOVE, NUMBER, CLEAN, AND STORE COPING STONES FOR

RE-INSTALLATION AFTER ALL NEW ROOF WORK IS COMPLETED.

2. CONTRACTOR SHALL REMOVE RAILING AS REQUIRED TO ALLOW THE REMOVAL OF

THE COPING STONES AND RE-INSTALL AFTER ALL NEW ROOF WORK IS COMPLETED.

3. CONTRACTOR TO PROVIDE FALL PROTECTION, SEE 9/AE203

LOW SLOPE ROOF

SYSTEM, SEE 1/AE203

+5.75

DS

EXISTING THOUGH-WALL

SCUPPER, SEE 4/AE203

AE204

AE204

AE204

RE-INSTALL EXISTING DOWNSPOUT ONCE

THE NEW WORK IS COMPLETE

AE204

AE203

AE203

AE203

EXISTING BUILDING

EXISTING BUILDING

AE204

AE204

HIGH

LOW

AE204

AE204

EXISTING OVERFLOW

SCUPPER, SEE DETAILS

AE204

EXISTING FENCE ATTACHED

TO EXISTING PARAPET CAP.

SEE 7/GR103

AE203

BUILDING 5 (N.I.C.)

MATCH LINE

RD

LOW SLOPE ROOF

SYSTEM, SEE 1/AE203

LOW SLOPE ROOF

SYSTEM, SEE 1/AE203

+6.75"

+8.75

PLAN NOTES:

1. CONTRACTOR TO PROVIDE FALL PROTECTION, SEE 9/AE203

EXISTING PAVER PATIO

EXISTING PRECAST COPING

STONES, SEE NOTE 1

EXISTING WALL SCUPPER

DRAIN, SEE DETAIL (TYP. FOR 2)

AE203

AE203

AE203

PLAN NOTES:

1. CONTRACTOR SHALL REMOVE, NUMBER, CLEAN, AND STORE COPING STONES FOR

RE-INSTALLATION AFTER ALL NEW ROOF WORK IS COMPLETED.

2. CONTRACTOR TO PROVIDE FALL PROTECTION, SEE 9/AE203

AE204

EXISTING BUILDING

LOW SLOPE ROOF

SYSTEM, SEE 1/AE203

+5.75

SIM

LOW

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:2

A

M

AE108

ROOF PLAN - CONNECTORS 57-54 & 2-3

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

KEY PLAN

1/8" = 1'-0"1

ROOF PLAN - CONNECTOR 57-54

1/4" = 1'-0"2

ROOF PLAN - BUILDING CONNECTOR 2-3

1/4" = 1'-0"3

ROOF PLAN - BUILDING CONNECTOR 4-5

1/4" = 1'-0"4

ROOF PLAN - CONNECTOR 3-4

N

P N

N

P N

N

P N

N

Revisions: Date: Page 37 of 42

CONNECTOR

57-143

57143

/ A

D

/ A

E

ADJACENT MECHANICAL BUILDING

SLATE ROOF (N.I.C.)

NEW EXPANSION JOINT

ASSEMBLY, SEE DETAIL

NEW DRAIN BODIES - (TYP)

SEE DETAIL C/AE202

AE203

AE203

AE203 RD

RD

RD

RD

RDRD

AE203

AE203

AE203

AE203

AE204

AE203

M A

T C

H L

IN

E

M A

T C

H L

IN

E

AE204

RD

NEW ROOFING

SYSTEM, - (TYP)

NEW ROOFING SYSTEM, - (TYP) NEW ROOFING SYSTEM, - (TYP)

NEW ROOFING SYSTEM, - (TYP)

PLAN NOTES:

1. CONTRACTOR TO PROVIDE FALL PROTECTION, SEE 9/AE203

RDRDRDRD

AE203

AE203

AE204

AE204

RD

AE204

NEW DRAIN BODIES - (TYP)

SEE DETAIL C/AE202

1/ A

E

M A

T C

H L

IN

E

M A

T C

H L

IN

E

B U

IL

D

IN

G

N

.I.

C

NEW DRAIN BODIES - (TYP)

SEE DETAIL C/AE202

M A

T C

H L

IN

E

AE204

RDRD

NEW ROOFING SYSTEM, - (TYP)

NEW ROOFING

SYSTEM, - (TYP)

NEW ROOFING

SYSTEM, - (TYP)

NEW ROOFING SYSTEM, - (TYP)

AE203

AE203

AE204

AE204

SIM

SIM

AE204

AE204

SIM

SIM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:2

A

M

AE109

ROOF PLAN - CONNECTOR 57-143

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

KEY PLAN

1/8" = 1'-0"1

ROOF PLAN - CONNECTOR 57-143

1/8" = 1'-0"

0' 8'4' 16'2'

1/8" = 1'-0"2

ROOF PLAN - CONNECTOR 57-143

N

P N

N

P N

1/8" = 1'-0"

0' 8'4' 16'2'

Revisions: Date: Page 38 of 42

FURNISH & INSTALL NEW INTAKE VENT PER

MANUFACTURER'S RECOMMENDATIONS

FURNISH & INSTALL NO-FLASH

2-PIPE FENCE STYLE SNOW

GUARD W/ BRACKETS PER

MANUFACTURER'S

RECOMMENDATIONS

EXISTING 2x10 RAFTERS @ 24" O.C.

EXISTING ATTIC FLOOR

EXISTING CEILING

EXISTING GUTTER SYSTEM

TO REMAIN

EXISTING EXTERIOR WALL

CONTRACTOR TO CUT OUT THE EXISTING

SHEATHING AS REQUIRED PER THE ROOF

INTAKE VENT MANUFACTURER'S

RECOMMENDATIONS, SECURE ROOF DECK TOP

& BOTTOM OF CUT OUT SECTION AS REQUIRED.

FURNISH & INSTALL STYROFOAM AIR

BAFFLES IN ALL RAFTER BAYS WHERE

NEW INTAKE VENT IS INSTALLED

REMOVE EXISTING BATT INSULATION PRIOR TO INSTALLING

AIR BAFFLES. FURNISH & INSTALL R-30 BATT INSULATION

NEW STAINLESS STEEL FLASHING

IN

STALLED U

NDER F

ELT P

APER

42" O

F IC

E D

AMM

IN

G M

EMBRANE

NEW ROOF SHINGLES,

SEE 1/AE201

EXISTING EXTERIOR WALL

EXISTING COPPER RAKE FLASHING

EXISTING CAST STONE BUILT IN

GUTTER/ CORNICE

CONTINUOUS SEALANT

NEW ROOF SHINGLES,

SEE 1/AE201

EXISTING ROOF STRUCTURE

SEALANT

NEW ASPHALT SHINGLES, SEE 1/AE201

NEW HIGH PERF RIDGE VENT

FASTENED PER MANUFACTURER'S

SPECIFICATIONS

METAL EDGE DOWN OVER

HIGH PERF RIDGE VENT

NEW LOW SLOPE ROOF SEE 1/AE203

ROOF MEMBRANE FLASHING

FASTENERS @ 6” O.C.

REMOVE EXISTING BATT INSULATION PRIOR TO INSTALLING

AIR BAFFLES. FURNISH & INSTALL R-30 BATT INSULATION

FURNISH & INSTALL STYROFOAM AIR

BAFFLES IN ALL RAFTER BAYS WHERE

NEW INTAKE VENT IS INSTALLED

WOOD BLOCKING

EXISTING ROOF DECK

CONTRACTOR TO CUT OUT THE EXISTING

SHEATHING AS REQUIRED PER THE ROOF

INTAKE VENT MANUFACTURER'S

RECOMMENDATIONS

REMOVE AND REINSTALL VENTILATOR

AS REQUIRED FOR NEW WORK

EXISTING ROOF STRUCTURENEW ASPHALT SHINGLES

SEE 1/AE201

NEW ASPHALT SHINGLES

NEW VENTILATOR FLASHING

FURNISH & INSTALL NEW INTAKE VENT PER

MANUFACTURER'S RECOMMENDATIONS

FURNISH & INSTALL NO-FLASH 2-PIPE FENCE

STYLE SNOW GUARD W/ BRACKETS PER

MANUFACTURER'S RECOMMENDATIONS

EXISTING EXTERIOR WALL

CUT OUT THE EXISTING SHEATHING AS

REQUIRED PER THE ROOF INTAKE VENT

MANUFACTURER'S RECOMMENDATIONS

FURNISH & INSTALL STYROFOAM AIR

BAFFLES IN ALL RAFTER BAYS WHERE

NEW INTAKE VENT IS INSTALLED

REMOVE EXISTING BATT INSULATION PRIOR

TO INSTALLING AIR BAFFLES. FURNISH &

INSTALL R-30 BATT INSULATION

METAL BASE FLASHING

SEALANT

MEMBRANE FLASHING

EXISTING ROOF STRUCTURE

V A

R

IE

S

NEW ROOF SYSTEM, SEE 1/AE203

NEW ROOF SHINGLES,

SEE 1/AE201

3”

NEW ASPHALT SHINGLES

SEE 1/AE201

NEW VENT STACK FLASHING

EXISTING VENT STACK TO REMAIN

EXISTING SHEATHING

EXISTING RAFTERS

NEW 15# FELT PAPER

NEW ASPHALT SHINGLES

12" M

IN

RADIANT BARRIER

FIRE RESISTANT WOOD

GUSSET AS REQUIRED

ADD 2x FIRE RESISTANT WOOD

FRAMING TO THE BOTTOM OF

EVERY RAFTER TO MEET THE

MINIMUM DEPTH REQUIRED.

MINIMUM R-38

INSULATION

NEW PRE-MANUFACTURED RIDGE VENT

NOTE:

SEE DETAIL 4 THIS SHEET FOR DESCRIPTIONS

OF ALL OTHER ELEMENTS

GROUNDING WIRE

(2) FASTENERS PER SIDE MIN.

AIR TERMINAL

3" WIDE (MIN) CUSTOM AIR TERMINAL BRACKET

MIN.

2' - 0"

M

IN

FINISH GRADE

GROUNDING WIRE FROM ROOF

PROTECTION CLAMP

JUNCTION CLAMPS

BUILDING FOUNDATION

GROUNDING ROD DOWN TO

MIN. DEPTH REQUIRED (10'-0")

EXISTING 2x10 RAFTERS @ 24" O.C.

CUT OUT THE EXISTING SHEATHING AS

REQUIRED PER THE ROOF INTAKE VENT

MANUFACTURER'S RECOMMENDATIONS

FURNISH & INSTALL STYROFOAM AIR

BAFFLES IN ALL RAFTER BAYS WHERE

NEW INTAKE VENT IS INSTALLED

REMOVE EXISTING BATT INSULATION

PRIOR TO INSTALLING AIR BAFFLES.

FURNISH & INSTALL R-30 BATT INSULATION

NEW PRE-MANUFACTURED RIDGE VENT

NEW ASPHALT SHINGLES, SEE 1/AE201

NEW ASPHALT SHINGLES

SEE 1/AE201

EXISTING ROOF STRUCTURE

METAL VALLEY FLASHING

WITH 1" 'V' CRIMP

NEW ICE DAMMING MEMBRANE

UNDERLAYMENT AND POLY-FELT

UNDERLAYMENT

2" WIDE , 24 OZ COPPER

CLEATS, 2'-0" O.C. SECURE

WITH COPPER NAILS

24" MIN. 24" MIN.

1' - 0"

2" 7" 2"

1' - 0"

6"

2' - 6"

2' - 1"

SIDE VIEW

FRONT VIEWPLAN VIEW

ISOMETRIC VIEW

PRECAST CONCRETE

SPLASH BLOCK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:2

A

M

AE201

HIGH SLOPED ROOF DETAILS & SECTIONS

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1 1/2" = 1'-0"8

SECTION @ EXISTING GUTTER - TYPICAL

3" = 1'-0"9

SECTION @ EXISTING RAKE - TYPICAL

3" = 1'-0"10

ROOF TERMINATION SECTION - TYPICAL

3" = 1'-0"3

VENTILATOR DETAIL - TYPICAL

3" = 1'-0"11

ROOF TERMINATION SECTION - TYPICAL

3" = 1'-0"2

VENT STACK DETAIL - TYPICAL

3" = 1'-0"1

HIGH SLOPED ROOF MAKEUP DETAIL - TYPICAL

1 1/2" = 1'-0"6

LIGHTENING PROTECTION - RIDGE DETAIL - TYPICAL

1 1/2" = 1'-0"7

LIGHTENING PROTECTION - BASE DETAIL - TYPICAL

1 1/2" = 1'-0"4

RIDGE DETAIL - TYPICAL

3" = 1'-0"5

VALLEY FLASHING DETAIL - TYPICAL

Revisions: Date:

NTS

SPLASH BLOCK DETAILS

EXISTING ROOF STRUCTURE

NEW ASPHALT SHINGLES

OVER 15# FELT PAPER

EXISTING EXTERIOR SIDING WALL FINISH

REMOVE EXISTING BATT INSULATION

PRIOR TO INSTALLING AIR BAFFLES.

FURNISH & INSTALL R-30 BATT

INSULATION

FURNISH & INSTALL STYROFOAM AIR

BAFFLES IN ALL RAFTER BAYS WHERE

NEW INTAKE VENT IS INSTALLED

NEW HIGH PERF RIDGE VENT

FASTENED PER MANUFACTURER'S

SPECIFICATIONS

METAL FLASHING UP UNDER

SIDING AND DOWN OVER HIGH

PERF RIDGE VENT

CONTRACTOR TO CUT OUT THE EXISTING

SHEATHING AS REQUIRED PER THE ROOF

INTAKE VENT MANUFACTURER'S

RECOMMENDATIONS

REMOVE SIDING AS REQUIRED TO

INSTALL HIGH PERF RIDGE VENT

STEP FLASHING, 3" MIN OVERLAP

COUNTER FLASHING, EMBED TOP AT

LEAST 1" INTO BRICK MORTAR AND

PROVIDE A MIN. OF 3" OVERLAP OF

STEP FLASHING

EXISTING BRICK WALL

SHINGLES

LOW SLOPED ROOF

EXISTING BRICK COLUMN

SHINGLE ROOF

EXISTING SIDING

ROOF TERMINATION

SEE 2/AE204

EXISTING ROOF STRUCTURE

NEW ASPHALT SHINGLES

SEALANT WITH BACKER ROD

CLEAN MORTAR JOINT FOR

INSTALLATION OF NEW FLASHING

EXISTING EXTERIOR WALL

REMOVE EXISTING BATT

INSULATION PRIOR TO

INSTALLING AIR BAFFLES.

FURNISH & INSTALL R-30

BATT INSULATION

FURNISH & INSTALL STYROFOAM AIR

BAFFLES IN ALL RAFTER BAYS WHERE

NEW INTAKE VENT IS INSTALLED

EXPANSION WEDGE

NEW TWO-PIECE COUNTERFLASHING

FASTENERS 6" O.C. OVER BUTYL TAPE

NEW HIGH PERF RIDGE VENT

FASTENED PER MANUFACTURER'S

SPECIFICATIONS

ROOF FLASHING DOWN OVER

HIGH PERF RIDGE VENT

CONTRACTOR TO CUT OUT THE EXISTING

SHEATHING AS REQUIRED PER THE ROOF

INTAKE VENT MANUFACTURER'S

RECOMMENDATIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:2

A

M

AE202

HIGH SLOPED ROOF DETAILS

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

3" = 1'-0"1B

ROOF TERMINATION SECTION - TYPICAL

1 1/2" = 1'-0"1C

STEP FLASHING DETAIL - TYPICAL

PARTIAL UPPER ROOF 3D VIEW - TYPICAL

3" = 1'-0"1A

ROOF TERMINATION SECTION - TYPICAL

Revisions: Date: Page 40 of 42

FLASHING PLY 9"

ONTO FIELD

WOOD CANT

FLASHING PLY 6" ONTO FIELD

EXTEND PLIES OVER

BLOCKING & FASTEN

@ 8" O.C.

RECEIVER FASTENED

@ 6" O.C.

RECEIVER

FASTENED

@ 6" O.C.

EXISTING METAL

PANEL FINISH

SEALANT &

BACKER ROD

6" CONCEALED SPLICE

PLATE @ EA. JOINT

NEW ROOF SYSTEM,

SEE DETAIL 1/AE203

MEMBRANE FLASHING PLY MIN 9" ON FIELD

BASE FLASHING PLY MIN 6" ON FIELD

EXISTING ROOF DECKING

FLEXIBLE VAPOR RETARDER TO SERVE AS INSULATION

RETAINER, ATTACH TO TOP OF CURB

COUNTERFLASHING FASTENED

8" O.C. THROUGH BUTYL TAPE

POLYURETHANE SEALANT

WOOD BLOCKING

WOOD CANT

M

IN

NEW ROOF SYSTEM,

SEE DETAIL 1/AE203

LEAD FLASHING 30" SQUARE MINIMUM

IN MASTIC. WRAPPED DOWN 2"MIN.

PRIME TOP SURFACE BEFORE

FLASHING

STRAINER

CLAMPING RING

BASE PLY

FLASHING PLY

EXISTING ROOF DECK

LEAD FLASHING 30" SQUARE MINIMUM

IN MASTIC. WRAPPED DOWN 2"MIN.

PRIME TOP SURFACE BEFORE

FLASHINGRECOVERY BOARD

TAPER INSULATION 1/4"/FT FOR

24" MINIMUM FROM CENTER OF

DRAIN, STAGGER ALL JOINTS,

FASTEN PER SPECIFICATIONS

48" SQUARE SUMP

NOTE:

ROOFING PLY CONFIGURATION PER

MANUFACTURER'S RECOMMENDATIONS

SECTION

PLAN

RD

L O

W P

O

IN

T

/2

+4.25"

+4.75"

(TYPICAL

INSULATION

THICKNESS)

SINGLE PLY ROOFING MEMBRANE

MEMBRANE FLASHING PLY MIN 9" ON FIELD

BASE FLASHING PLY MIN 6" ON FIELD

EXISTING

STRUCTURE

EXISTING ROOF

DECKING

FLEXIBLE WATER PROOF MEMBRANE CLOSURE

PRE-MANUFACTURED EXPANSION JOINT COVER

CHAMFER EACH SIDE OF WOOD CURB TO DRAIN

METAL CAP SECURED @ 12" O.C. W/ FASTENER

& NEOPRENE WASHER

MEMBRANE FLASHING SECURED @ 8" O.C.

FLEXIBLE VAPOR RETARDER TO SERVE AS INSULATION

RETAINER, ATTACH TO TOP OF CURB

WOOD CANT STRIP

NOTES:

1. EXISTING COMPONENTS SHADED IN GREY

2. FOR ALL FLASHING PLIES FOLLOW MANUFACTURER'S

RECOMMENDATIONS

TAPERED INSULATION

WOOD BLOCKING

RECOVERY BOARD

5/8" RECOVERY BOARD MECHANICALLY

FASTENED TO STRUCTURE

ROOF MEMBRANE

NEW TAPERED INSULATION ON

EXISTING ROOF DECK. PITCH

INSULATION 1/8"/FT. MINIMUM R VALUE

SHALL BE R-30. SEE ROOF

CONSTRUCTION NOTE 2 ON AE SHEETS.

EXISTING ROOF DECK

WOOD BLOCKING

ROOF DECK

INSULATION, STAGGER ALL JOINTS

COUNTER FLASHING FASTENED @ 8" O.C.

METAL FLANGE, SET IN ROOF CEMENT

AND PRIME PRIOR TO STRIPPING

ROOFING MEMBRANE FLASHING PLY

SEALANT

EXISTING CONDUCTOR HEAD

EXISTING WALL (SHADED)

MEMBRANE FLASHING PLY

MIN 9" ON FIELD

BASE FLASHING PLY MIN 6" ON FIELD

EXISTING STRUCTURE

METAL CAP SECURED @ 12" O.C. W/ FASTENER

& NEOPRENE WASHER

MEMBRANE FLASHING SECURED @ 8" O.C.

WOOD CANT STRIP

NOTES:

1. EXISTING COMPONENTS SHADED IN GREY

2. FOR ALL FLASHING PLIES FOLLOW MANUFACTURER'S

RECOMMENDATIONS

WOOD BLOCKING

NEW ROOF SYSTEM,

SEE DETAIL 1/AE203

FLASHING PLIES PER MANUFACTURER'S

RECOMMENDATIONS

EXISTING ROOF DECK

NEW ROOF SYSTEM, SEE DETAIL 1/AE203

SHEET METAL PITCH PAN 4" HIGH MIN.,

SOLDERED/WELDED WATERTIGHT

SEALANT

4" MIN

2 PART POURABLE

SEALANT

NON-SHRINK GROUT

WOOD BLOCKING

AS REQUIRED

ROOF PENETRATING FEATURE

(PIPE, ANGLE, ETC)

FLASHING PLIES UP ONTO

CURB & 9" ONTO FIELD

EXISTING ROOF DECK

NEW ROOF SYSTEM,

SEE DETAIL 1/AE203

MECHANICAL EQUIPMENT

M

IN

1/2" MIN

MECHANICAL EQUIPMENT CURB

FLASHING RECEIVER

COUNTER FLASHING

BASE OF UNIT EXTENDS

1/2" MIN BEYOND AND

DOWN OVER TOP OF CURB

WOOD CANT

WOOD BLOCKING

AS REQUIRED8

M

IN

FLASHING PLIES UP ONTO FAN CURB &

FASTENED 8" O.C. MIN

EXISTING ROOF DECK

NEW ROOF SYSTEM

EXHAUST FAN COVER

M

IN

EXHAUST FAN BODY

WOOD CANT

FLASHING PLY FASTEN 6" O.C.

OVER BUTYL TAPE, 9" ONTO FIELD

EXISTING PRECAST SILL

EXISTING WINDOW

NEW ROOF SYSTEM,

SEE DETAIL 1/AE203

BACKER ROD & SEALANT

CLEAN MORTAR JOINT FOR

INSTALLATION OF NEW FLASHING

EXPANSION WEDGE

NEW TWO-PIECE COUNTERFLASHING

EXISTING PRECAST PARAPET CAP, REMOVE,

NUMBER, CLEAN, AND STORE DURING RE-

ROOFING WORK AND RE-INSTALL WHEN

NEW ROOF WORK IS COMPLETED.

RUN NEW ROOFING MEMBRANE FLASHING UP

AND ON TOP OF ENTIRE EXISTING PARAPET WALL

EXISTING

PARAPET WALL

WHERE WROUGHT IRON RAILING IS PRESENT, REMOVE RAILING

AND CAP TOGETHER TO MAINTAIN IT'S STRUCTURAL INTEGRITY.

SEE PLANS FOR LOCATION

NEW ROOF SYSTEM,

SEE DETAIL 1/AE203

RUN NEW ROOFING MEMBRANE

FLASHING 9" ONTO FIELD

WOOD CANT

FURNISH & INSTALL METAL THROUGH WALL

FLASHING WHILE MAINTAINING EXISTING

PRECAST COPING DOWEL SYSTEM.

NEW ROOF SYSTEM,

SEE DETAIL 1/AE203

RUN NEW ROOFING MEMBRANE

FLASHING UP AND OVER PARAPET

WALL AND 9" ONTO FIELD

WOOD CANT

NEW ROOF MEMBRANE FLASHING PER

MANUFACTURER'S RECOMMENDATIONS

EXISTING

PARAPET WALL

METAL COPING ON RECEIVER

FASTENED TO WALL @ 6" O.C.

FASTEN ROOF

MEMBRANE @ 6" O.C.

EXISTING PRECAST PARAPET CAP

EXISTING PARAPET WALL

PARAPET CLAMPING GUARDRAIL SYSTEM

WOOD BLOCKING (TYP.)

EXISTING PRECAST PARAPET

CAP TO REMAIN

RUN NEW ROOFING MEMBRANE

FLASHING UP UNDER NEW

TERM BAR, FASTEN TERM BAR

@ 8" O.C.

EXISTING

PARAPET WALL

NEW ROOF SYSTEM,

SEE DETAIL 1/AE203

RUN NEW ROOFING MEMBRANE

FLASHING 9" ONTO FIELD

WOOD CANT

CUT OFF EXISTING METAL FLASHING

AT PARAPET WALL FACE FLUSH.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .