The drawings show plans for demolishing and replacing roofs on multiple buildings, detailing removal of existing roofing materials and preparation of surfaces to receive new roof systems. The related federal contract opportunity is a solicitation for bids for the required roof repair project. Interested contractors are invited to submit proposals by January 28, 2022 for replacing roofs on buildings 2, 4, 6, 7, 9 and 57 at the VA New Jersey Healthcare System. The proposed award date is December 8, 2021. The Department of Veterans Affairs Veterans Health Administration is the contracting agency.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GR101

GR101

GR101

GR103

GR103

1 1

2 2

3 33 3

3 3

33 3

5 5

7 7

/ A

D

M A

T C

H L

IN

E

B U

IL

D

IN

G

N .I.

C

BUILDING 2-3

CONNECTOR

BUILDING 2-9

CONNECTOR

M A

T C

H L

IN

E

RD

RD

N

57143

NOT IN SCOPE OF WORK

DEMOLITION KEY NOTES

Mark Description

1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR

SQUARE FOOTAGE.

2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS

3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE

GUTTERS DAILY.

4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE

5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM

6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING

7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING

8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.

9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK

SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING

10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.

11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:2

:5

A

M

AD101

ROOF DEMOLITION PLAN - BUILDING 2 AND CONNECTOR

2-3

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

DEMOLITION - BUILDING 2 AND CONNECTOR 2-3

KEY PLAN

1/8" = 1'-0"

0' 8'4' 16'2'

LEGEND

N

P N

Revisions: Date:

NOTE:

SEE GI102 FOR GENERAL DEMOLITION NOTES

GR101

GR101

GR101

GR101

GR101

GR103

GR103

GR103

1 1

2 2 2

3 3

33 3

3 3

3 3

3 3

6 6

BUILDING 5 (N.I.C.)

B U

IL

D

IN

G

N .I.

C

BUILDING 3-4

CONNECTOR

BUILDING 4-5

CONNECTOR

M A

T C

H L

IN

E

MATCH LINE

DS

RD

RD

RD

RD

EXISTING ROOFTOP

MECHANICAL UNIT

N

5 57143

NOT IN SCOPE OF WORK

DEMOLITION KEY NOTES

Mark Description

1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR

SQUARE FOOTAGE.

2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS

3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE

GUTTERS DAILY.

4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE

5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM

6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING

7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING

8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.

9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK

SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING

10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.

11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:2

:5

A

M

AD102

ROOF DEMOLITION PLAN - BUILDING 4, CONNECTOR 3-4,

AND CONNECTOR 4-5

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

DEMOLITION - BUILDING 4, CONNECTOR 3-4 AND 4-5

KEY PLAN

1/8" = 1'-0"

0' 8'4' 16'2'

LEGEND

N

P N

Revisions: Date:

NOTE:

GR103

GR103

GR103

GR103

GR103

GR103

GR101

GR101

EXISTING BRICK

CHIMNEYS TO REMAIN

EXISTING BRICK

CHIMNEYS TO REMAIN

5 5

5 5

2 2

6 6

3 3

3 333

3 3

3 333

3 3

1 1

D O

W N

MATCH LINE

BUILDING 5 (N.I.C.)

/ A

D

BUILDING 5-6

CONNECTOR

BUILDING 6-7

CONNECTOR

M A

T C

H L

IN

E

EXISTING BUILDING (N.I.C.)

N

57143

NOT IN SCOPE OF WORK

DEMOLITION KEY NOTES

Mark Description

1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR

SQUARE FOOTAGE.

2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS

3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE

GUTTERS DAILY.

4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE

5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM

6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING

7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING

8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.

9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK

SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING

10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.

11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:2

:5

A

M

AD103

ROOF DEMOLITION PLAN - BUILDING 6, CONNECTOR 5-6

AND CONNECTOR 6-7

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

DEMOLITION - BUILDING 6,

CONNECTOR 5-6 AND CONNECTOR

6-7

KEY PLAN

1/8" = 1'-0"

0' 8'4' 16'2'

LEGEND

N

P N

Revisions: Date:

NOTE:

GR101

GR104

GR104

GR104

GR104

GR104

EXISTING BRICK

CHIMNEYS TO REMAIN

EXISTING BRICK

CHIMNEYS TO REMAIN

2 2

1 1

1 1

3 3

3 3

3 3

3 3

6 6

M A

T C

H L

IN

E

/ A

D

/ A

D

BUILDING 6-7

CONNECTOR

BUILDING 7-8

CONNECTOR

M A

T C

H L

IN

E

N

57143

NOT IN SCOPE OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:2

:5

A

M

AD104

ROOF DEMOLITION PLAN - BUILDING 7 AND CONNECTOR

7-8

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

DEMOLITION - BUILDING 7 AND CONNECTOR 7-8

DEMOLITION KEY NOTES

Mark Description

1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR

SQUARE FOOTAGE.

2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS

3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE

GUTTERS DAILY.

4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE

5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM

6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING

7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING

8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.

9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK

SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING

10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.

11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.

KEY PLAN

1/8" = 1'-0"

0' 8'4' 16'2'

LEGEND

N

P N

Revisions: Date:

NOTE:

GR102

GR102

GR102

GR104

GR104

GR104

GR104

GR104

GR104

1 1

1 1

1 1

2 2

33 33

3 3

3 3

3 3

/ A

D

1 / AD106

BUILDING 8-9

CONNECTOR

BUILDING 7-8

CONNECTOR

MATCH LINE

M A

T C

H L

IN

E

N

57143

NOT IN SCOPE OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:0

A

M

AD105

ROOF DEMOLITION PLAN - BUILDING 8 AND CONNECTOR

8-9

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

DEMOLITION - BUILDING 8 AND CONNECTOR 8-9

DEMOLITION KEY NOTES

Mark Description

1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR

SQUARE FOOTAGE.

2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS

3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE

GUTTERS DAILY.

4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE

5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM

6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING

7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING

8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.

9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK

SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING

10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.

11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.

KEY PLAN

1/8" = 1'-0"

0' 8'4' 16'2'

LEGEND

N

P N

Revisions: Date:

NOTE:

561A4-17-108_Roofs Replacementking_Drawings for Construction 21
561A4-17-108_Roofs Replacementking_Drawings for Construction 22
561A4-17-108_Roofs Replacementking_Drawings for Construction 23
561A4-17-108_Roofs Replacementking_Drawings for Construction 24
561A4-17-108_Roofs Replacementking_Drawings for Construction 25