This solicitation package includes plans and specifications for a roof replacement project at multiple buildings within the VA New Jersey Healthcare System. The project involves removing and disposing of asbestos-containing materials and other roof components before installing new high and low-sloped roofs on buildings 2, 4, 6, 7, 8, 9 and 57 as well as various connectors. Bids for the roof replacement work are due by January 28th, 2022 with an anticipated award date of December 8th, 2021. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BLDG 6
BLDG 7BLDG 8
BLDG 9
BLDG 2
BLDG 4
BLDG 57
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
U.S. Department of Veterans Affairs
LIST OF DRAWINGS
PROJECT CONTACT DIRECTORY
LOCATION MAP
CONTRACTING OFFICER REPRESENTATIVE (COR) ARCHITECT / MEP/FP & STRUCTURAL ENGINEERS acela architects + engineers, pc 2633 Moravian Avenue Allentown, PA 18103
Joseph L. Herman, AIA, NCARB, LEED AP Cell: (610) 417-7850 jherman@acela-ae.com
APPROVALS
PROJECT INFORMATION
CONTRACT OFFICER/SPECIALIST
9/
/2
9:
:4
A
M C
:\U se rs \b st ra ub in ge r\D oc um en ts
\2 0-
U S
D V
A -1
1_ bs tr au bi ng er .rv t
GI101
COVER SHEET
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
Veterans Health Administration New Jersey Health Care System
100% WORKING DRAWINGS
151 Knollcroft Road, Lyons, New Jersey
Nadi Atalla Nadi.Atalla@va.gov cell: 908-416-4224 Ofiice: 908-647-0180
Approved by Medical Center Director
Approved by Project COR
Approved by Infection Control
Approved by Project CO
Approved by
Approved by Director of Facility Management Service
Approved by Medical Director
Approved by Safety Offcer
GENERAL CONTRACT
SHEET
NUMBER
DRAWING
NUMBER DRAWING NAME
3 GC101 SITE PLAN - SCOPE OF WORK AND STAGING
4 GC102 FALLING OBJECT PROTECTION PLANS
5 GC103 FALLING OBJECT PROTECTION PLANS
6 GC104 FALLING OBJECT PROTECTION PLANS
7 GC105 FALLING OBJECT PROTECTION SCAFFOLD -
ELEVATIONS
GENERAL INFORMATION
SHEET
NUMBER
DRAWING
NUMBER SHEET NAME
1 GI101 COVER SHEET
2 GI102 GENERAL INFORMATION
ASBESTOS / LEAD ABATEMENT
SHEET
NUMBER
DRAWING
NUMBER SHEET NAME
13 HA101 ASBESTOS ABATEMENT PLAN - BUILDING 2
AND CONNECTOR 2-3
14 HA102 ASBESTOS ABATEMENT PLAN - BUILDING 4,
CONNECTOR 3-4, AND CONNECTOR 4-5
15 HA103 ASBESTOS ABATEMENT PLAN - BUILDING 6,
CONNECTOR 5-6 AND CONNECTOR 6-7
16 HA104 ASBESTOS ABATEMENT PLAN - BUILDING 7
AND CONNECTOR 7-8
17 HA105 ASBESTOS ABATEMENT PLAN - BUILDING 8
AND CONNECTOR 8-9
18 HA106 ASBESTOS ABATEMENT PLAN - BUILDING 9
AND CONNECTOR 9-2
19 HA107 ASBESTOS ABATEMENT PLAN - BUILDING
HA108 ASBESTOS ABATEMENT PLAN -
CONNECTOR 57-54
ARCHITECTURAL ELEMENTS
SHEET
NUMBER
DRAWING
NUMBER SHEET NAME
29 AE101 ROOF PLAN - BUILDING 2 & CONNECTOR 2-3
30 AE102 ROOF PLAN - BUILDING 4, CONNECTORS 3-4,
AND 4-5
31 AE103 ROOF PLAN - BUILDING 6, CONNECTOR 5-6
AND 6-7
32 AE104 ROOF PLAN - BUILDING 7 AND CONNECTOR
7-8
33 AE105 ROOF PLAN - BUILDING 8 AND CONNECTOR
8-9
34 AE106 ROOF PLAN - BUILDING 9 AND CONNECTOR
9-2
35 AE107 ROOF PLAN - BUILDING 57
36 AE108 ROOF PLAN - CONNECTORS 57-54 & 2-3
37 AE109 ROOF PLAN - CONNECTOR 57-143
38 AE201 HIGH SLOPED ROOF DETAILS & SECTIONS
39 AE202 HIGH SLOPED ROOF DETAILS
40 AE203 LOW SLOPED ROOF DETAILS & SECTIONS
41 AE204 LOW SLOPED ROOF SECTIONS
ARCHITECTURAL DEMOLITION
SHEET
NUMBER
DRAWING
NUMBER DRAWING NAME
20 AD101 ROOF DEMOLITION PLAN - BUILDING 2
AND CONNECTOR 2-3
21 AD102 ROOF DEMOLITION PLAN - BUILDING 4,
CONNECTOR 3-4, AND CONNECTOR 4-5
22 AD103 ROOF DEMOLITION PLAN - BUILDING 6,
CONNECTOR 5-6 AND CONNECTOR 6-7
23 AD104 ROOF DEMOLITION PLAN - BUILDING 7
AND CONNECTOR 7-8
24 AD105 ROOF DEMOLITION PLAN - BUILDING 8
AND CONNECTOR 8-9
25 AD106 ROOF DEMOLITION PLAN - BUILDING 9
AND CONNECTOR 9-2
26 AD107 ROOF DEMOLITION - BUILDING 57
27 AD108 ROOF DEMOLITION - CONNECTOR 57-54
28 AD109 ROOF DEMOLITION - CONNECTOR 57-143
SITE
GENERAL RESOURCE
SHEET
NUMBER
DRAWING
NUMBER SHEET NAME
8 GR101 PROJECT PICTURES - BUILDINGS 2, 4, 6, & 7
9 GR102 PROJECT PICTURES - BUILDINGS 8, 9, & 57
10 GR103 PROJECT PICTURES - CONNECTORS 2-3,
2-9, 4-5, 5-6, 6-7
11 GR104 PROJECT PICTURES - CONNECTORS 7-8,
8-9, 54-57
12 GR105 PROJECT PICTURES - CONNECTOR 57-143
CAMPUS VIEW
Revisions: Date: Page 1 of 42
A100
& AND
@ AT
C CENTERLINE
# NUMBER
AB ANCHOR BOLT
ABV ABOVE
ACT ACOUSTIC CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH
DISABILITIES ACT
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALUM ALUMINUM
ALT ALTERNATE
AP ACCESS PANEL
APPROX APPROXIMATE
ARCH ARCHITECTURAL
AUTO AUTOMATIC
AVG AVERAGE
BD BOARD
BLDG BUILDING
BLK BLOCK
BM BEAM
BOT BOTTOM
BRG BEARING
BEL BELOW
BR BUMPER RAIL
BRK BRICK
CAB CABINET
CB CATCH BASIN
CEM CEMENT
CCT CUBICLE CURTAIN TRACK
CG CORNER GUARD
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CT CERAMIC TILE
CLG CEILING
CL CLOSET
COL COLUMN
CONC CONCRETE
CONF CONFERENCE
CONT CONTINUOUS
CPT CARPET
CU CUBIC
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DISP DISPENSER
DN DOWN
DO DOOR OPENING
DOZ DOZEN
DP DAMPPROOFING
DR DOOR
DWG DRAWING
DWGS DRAWINGS
DWR DRAWER
E EAST
EA EXHAUST AIR, EACH
EL ELEVATION
ELEV ELEVATION
ELEC ELECTRICAL
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
EP ELECTRICAL PANELBOARD
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXP EXPANSION
EJ EXPANSION JOINT
EXIST EXISTING
EXT EXTERIOR
FA FIRE ALARM
FB FACE BRICK
FD FLOOR DRAIN
FDC FIRE DEPARTMENT
CONNECTION
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FF FINISH FACE
FHC FIRE HOSE CABINET
FIN FINISH
FLR FLOOR
FLUOR FLUORESCENT
FO __ FACE OF __
FOC FACE OF CONCRETE
FOS FACE OF STUD
FOW FACE OF WALL
FPRF FIREPROOF(ING)
FR FIRE RATING, FRAME
FRMG FRAMING
FS FULL SIZE
FT FOOT OR FEET
FTG FOOTING
FUR FURRING
FUT FUTURE
GC GENERAL CONTRACTOR
GA GAUGE
GAL GALLON
GALV GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GL GLASS
GND GROUND
GR GRADE
GWB GYPSUM WALLBOARD
GYP BD GYPSUM WALLBOARD
HB HOSE BIBB
HC HOLLOW CORE
HD HEAD
HDWR HARDWARE
HDWD HARDWOOD
HT HEIGHT
HNDRL HANDRAIL
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HMF HOLLOW METAL FRAME
HR HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HP HIGH POINT
HR HOUR
HVAC HEATING, VENTILATION, AIR
CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE
DIAMETER / DIMENSION
IN INCH
INCL INDLUDE(D)
INSUL INSULATION
INT INTERIOR
INV INVERT
JAN JANITOR
JST JOIST
JT JOINT
KP KICK PLATE
KO KNOCKOUT
L LENGTH
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LBS POUND
LED LIGHT EMITTING DIODE
LF LINEAR FEET
LH LEFT HAND
LIN LINEAR
LIQ LIQUID
LKR LOCKER
LG LONG
LL LEAD LINED
LLV LONG LEG VERTICAL
LP LOW POINT
LRG LARGE
LT LIGHT
LT WT LIGHTWEIGHT
LVR LOUVER
MATL MATERIAL
MAS MASONRY
MAX MAXIMUM
MECH MECHANICAL
MTL METAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MP MOP PLATE
MTD MOUNTED
N NORTH
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER / DIMENSION
OFF OFFICE
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OH OVERHEAD
OZ OUNCE
PAV PAVING
PC PRECAST CONCRETE
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLYWD PLYWOOD
PLBG PLUMBING
PMF PREMOLDED FILLER
PR PAIR
PT POINT
PTN PARTITION
QT QUARRY TILE
R RADIUS, RISER
RA RETURN AIR
RAD RADIUS
RB RESILIENT BASE, RUBBER
BASE
RD ROOF DRAIN
RL ROOF LEADER
REF REFERENCE
REFR REFRIGERATOR
REQ'D REQUIRED
REV REVISION
RFI REQUEST FOR
INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
S SOUTH
SA SUPPLY AIR
SAN SANITARY
SC SOLID CORE
SCHED SCHEDULE
SECT SECTION
SH SPRINKLER HEAD
SHT SHEET
SIM SIMILAR
SM SMOKE
SPEC SPECIFICATION
SPKR SPEAKER
SQ SQUARE
STA STATION
STD STANDARD
STO STORAGE
STL STEEL
SS STAINLESS STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
TEL TELEPHONE
TEMP TEMPERED
T&G TONGUE AND GROOVE
THK THICK
TOC TOP OF CONCRETE
TOP TOP OF PAVEMENT
TOS TOP OF STEEL
TOW TOP OF WALL
TV TELEVISION
TYP TYPICAL
UNFIN UNFINISHED
UON UNLESS OTHERWISE
NOTED
VB BAPOR BARRIER
VERT VERTICAL
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VS VENT STACK THRU ROOF
W WEST
W/ WITH
WD WOOD
W/O WITHOUT
WP WATERPROOF
WT WEIGHT
WWF WELDED WIRE FRAME
NOTE: ALL ABBREVIATIONS
SHOWN MAY NOT BE USED ON
THIS PROJECT. CERTAIN COMMON
ABBREVIATIONS MAY NOT BE
SHOWN.
CENTER LINE
DETAIL INDICATOR
DETAIL INDICATOR
DRAWING BLOCK TITLE, TYPICAL
CORRIDOR ELEVATION INDICATOR
BUILDING SECTION INDICATOR
TYPICAL DETAIL INDICATOR
KEYNOTE
NORTH ARROW
DETAIL NUMBER
SHEET NUMBER
XX-XX
XX-XX
XX-XX
CL
XX-XX
x'-x" SPOT ELEVATION
1 REVISION
REVISION CLOUD
BREAK LINE
View Name 1/8" = 1'-0"
AE888
X
SHEET NUMBERDETAIL
NUMBER
BUILDING ELEVATION INDICATOR
SHEET NUMBERDETAIL
NUMBER
DETAIL
NUMBER
SHEET NUMBER
N
P N
NEW ROOF INTAKE VENT, RIDGE VENT, AND
HIP RIDGE VENT
AT NEW LIGHTENING PROTECTION AIR
TERMINAL, SEE DETAIL 6/AE201.
SPACE 25'-0" O.C. MAX.
NEW LIGHTENING PROTECTION TERMINAL
WIRING, SIZE AS REQUIRED
EXISTING ROOF LINES
NEW DOWNSPOUTDS
NEW ROOF DRAIN, SEE 2/AE203
RD
VENT STACK, PROVIDE NEW FLASHING,
SEE 2/AE201
VS
EXISTING DOWNSPOUT
DS
EXHAUST FAN, PROVIDE NEW FLASHING,
SEE 8/AE203
EF
RD
EXISTING ROOF DRAIN
EXISTING AREA NOT IN CONTRACT
DENOTES INSULATION THICKNESS FROM
ROOF DECK ON LOW SLOPED ROOFS
+5.75
INDICATES DIRECTION OF PITCH (HIGH TO LOW),
PITCH IS 1/8"/FOOT ON LOW SLOPED ROOFS
OVERFLOW SCUPPER, SEE DETAIL 4/AE203OS
VENTILATOR, PROVIDE NEW FLASHING,
SEE 3/AE201
V
1. DO NOT SCALE DRAWINGS. THESE ARE CONCEPTUAL PLANS.
2. THE WORK OF THE CONTRACTOR SHALL INCLUDE ALL LABOR AND MATERIALS FOR ALL TRADES CONCERNED FOR COMPLETING
THE PROJECT IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS.
3. THE CONTRACTOR SHALL PAY FOR, PROCURE, AND APPLY FOR ALL PERMITS AS REQUIRED TO CONSTRUCT THE PROJECT. SEE PROJECT SPECIFICATION FOR VA REQUIRED PERMITS AND PROCEEDURES. PERMITS INCLUDE BUT ARE NOT LIMITED TO THE
FOLLOWING:
A. GENERAL CONTRACTOR EMPLOYEE PARKING PERMITS.
B. INFECTION CONTROL PERMIT.
C. HOT WORK PERMIT.
D. SYSTEM SHUT DOWN PERMIT.
E. ENERGIZING WORK REVIEW PERMIT.
F. CRANE COORDINATION PLAN PERMIT.
G. STATE OF NEW JERSEY ASBESTOS ABATEMENT WORK PERMITS AND LICENSES.
H. STATE OF NEW JERSEY ASBESTOS DISPOSAL PERMIT.
4. THE CONTRACTOR SHALL BE FAMILIAR WITH THE CONTRACT DOCUMENTS AND MUST VISIT THE SITE AND BE ACQUAINTED WITH
THE CONDITIONS AFFECTING THE WORK.
5. ALL WORK TO BE FIRST RATE, HIGH QUALITY, AND ACCOMPLISHED IN A WORKMANLIKE MANNER BY SKILLED CRAFTSMEN USING
ACCEPTED PRACTICES AND METHODS APPROPRIATE TO THE TRADE INVOLVED.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DAILY CLEANING UP OF THE WORK AREA. THE AREA SHALL BE CLEANED EACH DAY AND TRASH SHALL BE DISPOSED OF AT THE END OF EACH DAY. AT THE END OF THE PROJECT, THE CONTRACTOR
SHALL CLEAN THE WORK AREA THOROUGHLY.
7. ALL WORK SHALL BE GUARANTEED FOR ONE YEAR FROM THE TIME OF ACCEPTANCE BY THE OWNER.
8. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL VERIFY ALL BUILDING CONDITIONS AND VERIFY ALL LOCATIONS OF
UTILITIES IN THE FIELD.
9. CONTRACTOR SHALL INSPECT, CLEAN AND REPAIR EXISTING COPPER GUTTER INLAY AS REQUIRED, BELOW AREA OF WORK AT
THE END OF EACH WORK DAY.
10. CONTRACTOR TO PROVIDE AN 8 FEET HIGH TEMPORARY FENCE AROUND THE STAGING AREA
11. CONTRACTOR TO PROVIDE A CHUTE SYSTEM FOR THE LOWERING OF ROOF DEBRIS FOR EACH SIDE OF A SLOPED ROOF
SCHEDULED FOR NEW WORK.
12. CONTRACTOR TO DAILY POLICE AREA OF WORK FOR ANY GROUND DEBRIS. SITE TO BE FREE OF ANY DEMOLITION AND/OR
DISCARDED MATERIALS.
13. CONTRACTOR TO ISOLATE AREA OF WORK TO KEEP PUBLIC OUT OF HARMS WAY DUE TO FALLING DEBRIS/TOOLS.
14. CONTRACTOR TO REPAIR ANY SITE FEATURES DAMAGED DURING CONSTRUCTION. SITE FEATURES INCLUDE BUT ARE NOT
LIMITED TO ROADS, SIDEWALKS, CURBS, SOIL, GRASS, BUILDING ELEMENTS, ETC.
15. CONTRACTOR TO REQUEST APPROVAL FROM THE COR FOR ALL CONTRACTOR PARKING LOCATIONS. CONTRACTOR PARKING WILL NOT INTERFERE WITH VEHICLE TRAFFIC OR LIMIT ACCESS OF EMERGENCY EQUIPMENT AND/OR MAINTENANCE
EQUIPMENT.
16. DUMPSTERS LOCATED NEAR BUILDINGS TO BE REMOVED/RELOCATED ONCE DEMOLITION IS COMPLETE IN THE VICINITY OF
WORK.
17. THE COTRACTOR SHALL NOT BLOCK ACCESS TO HYDRANTS AND FIRE DEPARTMENT CONNECTIONS WITH DUMPSTERS OR
SCAFOLDING.
18. DUMPSTERS ARE TO BE CLOSED AT ALL TIMES WHEN NOT IN USE
19. CONTRACTOR IS RESPONSIBLE FOR PROVIDING A MENIFEST FOR ALL DISPOSED ACM AND NON ACM MATERIALS
20. ALL WOOD BLOCKING SHALL BE FIRE TREATED LUMBER.
A. FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND SERVICES NECESSARY FOR THE REMOVAL AND DISPOSAL OF ASBESTOS- CONTAINING MATERIALS AS NOTED INCLUDING THE REMOVAL OF ALL NON ASBESTOS-CONTAINING MATERIALS SUCH AS FLASHING AND ROOF PLIES , AND ANY DEMOLITION, REMOVAL AND DISPOSAL NECESSARY TO EXPOSE ASBESTOS CONTAINING MATERIALS AND DEBRIS INCLUDING ALL REQUIRED PREPARATION, CLEANING, ENCAPSULATION AND DECONTAMINATION IN ACCORDANCE WITH ALL REGULATORY AGENCY REQUIREMENTS AND THE PROJECT PLANS AND SPECIFICATIONS.
B. IF SUSPECTED ASBESTOS OR HAZARDOUS MATERIAL IS ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL STOP WORK IMMEDIATELY , AND NOTIFY THE OWNER/ARCHITECT IN WRITING, PRIOR TO CONTINUING WORK.
C. INSTALL WARNING SIGNS TO ESTABLISH ABATEMENT WORK AREAS PRIOR TO THE START OF REMOVAL AND DISPOSAL OF
HAZARDOUS MATERIALS PER THE PROJECT SPECIFICATIONS.
D. FOR MATERIALS REPORTED TO CONTAIN <1% ASBESTOS, FOLLOW OSHA REQUIREMENTS FOR MATERIALS WITH 1% OR LESS ASBESTOS, INCLUDING WET HANDLING, CLEAN UP, DISPOSAL IN LEAK TIGHT CONTAINERS, AND AN EXPOSURE ASSESSMENT.
E. AN ASBESTOS SURVEY REPORT FOR THE ENTIRE AREA IS INCLUDED IN THE SPECIFICATIONS.
1. ALL AREAS WHERE EXISTING ROOFING REMOVAL HAVE BEEN MADE SHALL BE COVERED BY NEW ROOFING, AND MADE WATER
TIGHT IN THE SAME DAY.
2. REFER TO SPECIFICATIONS SECTION 024119 - SELECTIVE DEMOLITION FOR ADDITIONAL REQUIREMENTS AND INFORMATION.
3. ARCHITECTURAL DEMOLITION DRAWINGS ARE FOR SCHEMATIC PURPOSES. CONTRACTOR SHALL COORDINATE ALL DEMOLITION WITH THE ENTIRE SET OF CONTRACT DOCUMENTS FOR FULL SCOPE OF SPECIFIED WORK REQUIRED FOR THE PROJECT.
4. EXISTING CONDITIONS SHOWN ON THESE DRAWINGS ARE NOT GUARANTEED TO BE COMPLETE OR ACCURATE. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND MATERIALS REQUIRED FOR THE CONTRACTED WORK. REPORT ALL DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATION, ERECTION AND/OR INSTALLATION.
5. COORDINATE ALL NEW PENETRATIONS AND/OR OPENINGS WITH OTHER ASSOCIATED TRADES.
6. SOME ITEMS MAY BE INDICATED IN THE DEMOLITION DRAWINGS AND DEMOLITION NOTES WHICH ARE NOT NECESSARILY DEMOLITION WORK BUT ARE INCLUDED TO DESCRIBE THE OVERALL SCOPE OF THE PROJECT AND TO AID IN THE DEMOLITION COORDINATION. THE CONTRACTOR IS RESPONSIBLE FOR ALL WORK REQUIRED TO COMPLETE THE INTENDED WORK
SPECIFIED FOR THIS PROJECT.
7. REMOVE MISCELLANEOUS ITEMS WITHIN LIMITS OF DEMOLITION. COORDINATE WITH OWNER ANY ITEMS TO BE SALVAGED.
8. PROTECT EXISTING FINISHED WORK & EQUIPMENT WHICH IS TO REMAIN IN AREAS OF DEMOLITION WORK.
9. CONTRACTOR SHALL COORDINATE WITH OWNER PRIOR TO DISCONNECTING ANY EQUIPMENT.
10. ALL ACCESS AND EGRESS ROUTES TO AND FROM THE BUILDING SHALL BE MAINTAINED THROUGHOUT THE DURATION OF WORK. CONTACTOR TO PROVIDE TEMPORARY FALL PROTECTION TO PROTECT THE PUBLIC AT EACH ACCESS AND EGRESS.
11. CONTRACTOR TO PROVIDE SAFETY PLAN SUBMITTAL PRIOR TO ANY WORK. SAFETY PLAN TO INCLUDE SPECIFIC FALL
PROTECTION.
12. CLEAN ALL DEBRIS FROM ROOF AREAS AND SITE.
ARCHITECTURAL ABREVIATIONS ARCHITECTURAL SYMBOLS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:4
A
M
GI102
GENERAL INFORMATION
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
ROOFING LEGEND
GENERAL PROJECT NOTES
Revisions: Date:
ABATEMENT - GENERAL NOTES
GENERAL DEMOLITION NOTES
K N
O
LL
C R
O F
T R
O A
D
EAST CIRCLE DRIVE
EAST CIRCLE DRIVE
VALLEY VIEW DRIVE
WEST CIRCLE DRIVE
WEST CIRCLE DRIVE
BUILDING 1
(N.I.C)
BUILDING 3
(N.I.C)
BUILDING 5
(N.I.C)
BUILDING 4BUILDING 2
BUILDING 6
BUILDING 7
BUILDING 8
BUILDING 9
BUILDING 57
BUILDING 143
(N.I.C)
BUILDING 53
(N.I.C)
BUILDING 54
(N.I.C)
BUILDING 55
(N.I.C)
CONNECTOR 6-7
CONNECTOR 7-8
CONNECTOR 8-9
CONNECTOR 9-2
CONNECTOR 2-3
CONNECTOR 3-4
CONNECTOR 4-5
CONNECTOR 5-6
CONNECTOR 57-143
CONNECTOR 57-54
HA101
HA102
HA103
HA104
HA105
HA106
AD101
AD102
AD103
AD104
AD105
AD106
AE101
AE102
AE103
AE104
AE105
AE106
AD107
AE107
AD108
AE108
AD109
AE109
AD109
AE109
ROOFS OF BUILDINGS SCHEDULED FOR ROOF REPLACEMENT
ROOFS OF BUILDING CONNECTORS SCHEDULED FOR ROOF
REPLACEMENT
GENERAL LOCATION OF
APPROXIMATELY 15,000 SF OF
CONTRACTOR STAGING AREA.
- PROVIDE AN 8'-0" HIGH
SECURITY FENCE AROUND THE
ENTIRE PERIMETER WITH
LOCKABLE VEHICLE GATE.
GC101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:3
A
M
GC101
SITE PLAN - SCOPE OF WORK AND STAGING
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1" = 80'-0"1
SITE PLAN - SCOPE OF WORK
ROOF SCHEDULE
BUILDING / CONNECTOR Type Area
Exist EPDM
2 Exist EPDM 4078 SF
3-4 Exist EPDM 192 SF
4 Exist EPDM 5059 SF
4-5 Exist EPDM 355 SF
5-6 Exist EPDM 358 SF
6 Exist EPDM 803 SF
6-7 Exist EPDM 343 SF
7 Exist EPDM 1695 SF
7-8 Exist EPDM 380 SF
8 Exist EPDM 880 SF
8-9 Exist EPDM 552 SF
9 Exist EPDM 727 SF
9-2 Exist EPDM 425 SF
57 Exist EPDM 646 SF
57-54 Exist EPDM 1631 SF
57-143 Exist EPDM 7915 SF
Exist EPDM: 42 26040 SF
Exist Shingle Roof
2 Exist Shingle Roof 24372 SF
4 Exist Shingle Roof 18327 SF
6 Exist Shingle Roof 19461 SF
7 Exist Shingle Roof 23516 SF
8 Exist Shingle Roof 19461 SF
9 Exist Shingle Roof 21397 SF
57 Exist Shingle Roof 23736 SF
Exist Shingle Roof: 16 150270 SF
SITE PLAN LEGEND
1" = 400'-0"2
LOCATION OF STAGING AREA
Revisions: Date: Page 3 of 42
EXISTING ROOFS
COVER THESE DOORS
FDC
FIRE DEPARTMENT
CONNECTIONFIRE DEPARTMENT
POST INDICATOR
VALVE
T E
M P
F E
N C
ET
E
M P
F E
N C
E T
E M
P F
E N
C E
T E
M P
F E
N C
E
TEMP FENCE
TEMP FENCE
T E
M P
F E
N C
E
T E
M P
F E
N C
E
BUILDING 57
CONNECTOR 57-143
CONNECTOR 57-57
TEMP FENCE
TEMP FENCE
TEMP FENCE
TEMP FENCE
CONNECTOR 8-9
BUILDING 9
BUILDING 8
BUILDING 2
FDC
FIRE DEPARTMENT
CONNECTION
FIRE DEPARTMENT
POST INDICATOR VALVE
SEE 4/GC103
T E
M P
F E
N C
E
T E
M P
F E
N C
E
TEMP FENCETEMP FENCE
TEMP FENCE
TEMP FENCE
TE
M
P F
EN
C
E
TEM
P FENCE
BUILDING 9
CONNECTOR 2-9
CONNECTOR 2-3
BUILDING 3
F D
C
FDC
FIRE DEPARTMENT
CONNECTION
FIRE DEPARTMENT
CONNECTION
FIRE DEPARTMENT
POST INDICATOR
VALVE
TEMP FENCE
TEMP FENCE
TEMP FENCE
TEMP FENCE
TEMP FENCE
T E
M P
F E
N C
E
T E
M P
F E
N C
E
T E
M P
F E
N C
E
TEMP
FENCE
TEMP
FENCE
TEMP FENCE
TEM
P F
ENCE
BUILDING 4
CONNECTOR 3-4
BUILDING 3
C O
N N
E C
T O
R
-5
BUILDING 5
8-9 68
57143
FDC
FIRE DEPARTMENT CONNECTION ACCESS LOCATION -
CONTRACTOR TO PROVIDE A GATE IN THE FENCE
SECURED WITH A CHAIN AND A PADLOCK. PROVIDE A
SIGN WITH 12" HIGH INITIALS FDC ATTACHED TO FENCE
@ 48" ABOVE GROUND. GC TO PROVIDE THE COR AND
CAMPUS SECURITY WITH THE COMBINATION OF THE
PADLOCK. DO NOT BLOCK EXISTING HYDRANTS, FDC'S,
OR ACCESS GATES.
TEMPORARY CONSTRUCTION FENCE (8 FEET HIGH) 6 FEET
FROM BUILDING MIN., ADJUST FENCE LOCATION FOR WORK
AREA.
DO NOT BLOCK ACCESS TO ANY HYDRANTS OR SPRINKLER
SIAMESE CONNECTIONS.
TEMP FENCE
SCAFFOLD WALL
OPEN END SECURE TEMPORARY CONSTRUCTION
FENCE TO SCAFFOLD WITH A CHAIN AND
PADLOCK - TYPICAL
BUILDING ACCESS LOCATION
EXISTING BUILDING
BUILDING ACCESS
TEMP FENCETEMP FENCE
TYPICAL SCAFFOLDING NOTES:
- CONTRACTOR SHALL COVER AND SECURE ANY
EXISTING WINDOW WITH 3/4" FIRE TREATED PLYWOOD
WITHIN 36" (VERTICALLY) OF THE SCAFFOLDING.
- CONTRACTOR TO PROVIDE TEMPORARY LIGHTING
UNDER SCAFFOLDING. LIGHTS TO BE MINIMUM 6'-0" ON-
CENTER IN ALL DIRECTIONS. GC SHALL CONNECT TO
NEAREST RECEPTACLE AND/OR EXTERIOR LIGHT
FIXTURE FOR TEMPORARY LIGHTING POWER.
- ROOF OF SCAFFOLDING TO BE 3/4" FIRE TREATED
PLYWOOD.
TYPICAL SCAFFOLDING NOTES
M
IN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:3
A
M
GC102
FALLING OBJECT PROTECTION PLANS
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/16" = 1'-0"3
BUILDING 57 PLAN
1/16" = 1'-0"1
CONNECTOR 8-9 PLAN
1/16" = 1'-0"2
BUILDING 2 PLAN
1/16" = 1'-0"4
BUILDING 4 PLAN
KEY PLAN
SCAFFOLD TYPES KEYNOTES
NUMBER DESCRIPTION
1 SINGLE DOOR: PROVIDE SCAFFOLDING 1'-0" FROM EDGE OF DOOR OPENING ON EACH SIDE,
PROJECTING 10'-0" AWAY FROM BUILDING A MIN OF 10 FEET ABOVE THE LEVEL OF DISCHARGE
WITH A TOE BOARD ON ALL OPEN SIDES
2 SINGLE DOOR WITH STAIR: PROVIDE SCAFFOLDING 1'-0" FROM EDGE OF STAIR ON EACH SIDE, 10'-0" LONG, A MIN OF 10 FEET ABOVE THE LEVEL OF DISCHARGE WITH A TOE BOARD ON ALL
OPEN SIDES
3 DOUBLE DOOR WITH LANDING AND STAIR: PROVIDE SCAFFOLDING 1'-0" FROM EDGE OF STAIR ON EACH SIDE, PROJECTING THE ENTIRE LENGTH OF STAIR OR 10'-0" AWAY FROM BUILDING A
MIN OF 10 FEET ABOVE THE LEVEL OF DISCHARGE WITH A TOE BOARD ON ALL OPEN SIDES
4 DOUBLE DOOR WITH LANDING & TWO-WAY STAIRS - PROVIDE SCAFFOLDING 1'-0" FROM EDGE OF STAIR LANDING ON EACH SIDE, PROTECT ENTIRE STAIR OR MIN 10'-0" AWAY FROM BUILDING
A MIN OF 10 FEET ABOVE THE LEVEL OF DISCHARGE WITH A TOE BOARD ON ALL OPEN SIDES
5 SINGLE DOOR WITH RAMP: PROVIDE SCAFFOLDING 1'-0" FROM EDGE OF RAMP ON EACH SIDE, PROTECT ENTIRE RAMP OR MIN 10'-0" AWAY FROM BUILDING A MIN OF 10 FEET ABOVE THE
LEVEL OF DISCHARGE WITH A TOE BOARD ON ALL OPEN SIDES
6 DOUBLE DOOR WITH LANDING: PROVIDE SCAFFOLDING 1'-0" FROM EDGE OF LANDING ON EACH
SIDE, PROJECTING 10'-0" AWAY FROM BUILDING A MIN OF 10 FEET ABOVE THE LEVEL OF
DISCHARGE WITH A TOE BOARD ON ALL OPEN SIDES
7 CONTRACTOR TO PROVIDE TEMPORARY LIGHTING UNDER SCAFFOLDING. LIGHTS TO BE
MINIMUM 6'-0" ON-CENTER IN ALL DIRECTIONS. GC SHALL CONNECT TO NEAREST RECEPTACLE
AND/OR EXTERIOR LIGHT FIXTURE FOR TEMPORARY LIGHTING POWER.
FALLING OBJECT PROTECTION LEGEND
N
P N
N
P N
N
P N
N
P N
Revisions: Date: Page 4 of 42
2 2
FDC
FIRE DEPARTMENT
CONNECTION
FIRE DEPARTMENT
POST INDICATOR
VALVE
8 FEET HIGH CHAIN LINK
CONSTRUCTION FENCE 6 FEET
FROM BUILDING (TYP.)
SEE ROOFING LEGEND
EXISTING ROOF
TEMPORARY SCAFOLD
OVER RAMPS
TEMP FENCE
TEMP FENCE
TEMP FENCE
TEMP FENCE
TEMP FENCE
TEMP FENCE
TEMP FENCE
T E
M P
F E
N C
E
T E
M P
F E
N C
E
T E
M P
F E
N C
E
T E
M P
F E
N C
E
BUILDING 6
BUILDING 5
BUILDING 7
CONNECTOR 6-7
C O
N N
E C
T O
R
-6
ROOFS NOT IN SCOPE
OF WORK
FDC
FIRE DEPARTMENT
CONNECTION
FIRE DEPARTMENT
POST INDICATOR
VALVE
SEE 3/GC103
TEMP FENCE
TEMP FENCE
TEMP FENCE
TEM
P F
ENCE
TEMP FENCE
TEMP FENCE
T E
M P
F E
N C
E
T E
M P
F E
N C
E
T E
M P
F E
N C
E
T E
M P
F E
N C
E
T E
M P
F E
N C
E
T E
M P
F E
N C
E
BUILDING 7
BUILDING 8
CONNECTOR 7-8 CONNECTOR 7-6
6 LANDING
STAIR DOWN TO
GRADE
SEE 2/GC103
TEMP FENCE TEMP FENCE
TEMP FENCE TEMP FENCE
T E
M P
F E
N C
E
T E
M P
F E
N C
E
T E
M P
F E
N C
E
T E
M P
F E
N C
E
T E
M P
F E
N C
E
T E
M P
F E
N C
E
TEM
P F
ENCE
TEM
P FENCE
TEMP FENCE TEMP FENCE
TEMP FENCETEMP FENCE
BUILDING 8
CONNECTOR 7-8
CONNECTOR 8-9
BUILDING 9
4 FDC
FIRE DEPARTMENT
CONNECTION
FIRE DEPARTMENT
POST INDICATOR
VALVE
SCAFOLD OVER
STAIR AND RAMP
SEE 3/GC103
T E
M P
F E
N C
E
T E
M P
F E
N C
E
T E
M P
F E
N C
E
T E
M P
F E
N C
E
T E
M P
F E
N C
E
TEMP FENCE
TEMP FENCE
TEMP FENCE
T E
M P
F E
N C
E
T E
M P
F E
N C
E
BUILDING 9
TEMP FENCETEMP FENCE
BUILDING 8
BUILDING 2
C O
N N
E C
T
IO
N
-9
C O
N N
E C
T
IO
N
-9
57143
FDC
FIRE DEPARTMENT CONNECTION ACCESS LOCATION -
CONTRACTOR TO PROVIDE A GATE IN THE FENCE
SECURED WITH A CHAIN AND A PADLOCK. PROVIDE A
SIGN WITH 12" HIGH INITIALS FDC ATTACHED TO FENCE
@ 48" ABOVE GROUND. GC TO PROVIDE THE COR AND
CAMPUS SECURITY WITH THE COMBINATION OF THE
PADLOCK. DO NOT BLOCK EXISTING HYDRANTS, FDC'S,
OR ACCESS GATES.
TEMPORARY CONSTRUCTION FENCE (8 FEET HIGH) 6 FEET
FROM BUILDING MIN., ADJUST FENCE LOCATION FOR WORK
AREA.
DO NOT BLOCK ACCESS TO ANY HYDRANTS OR SPRINKLER
SIAMESE CONNECTIONS.
TEMP FENCE
SCAFFOLD WALL
OPEN END SECURE TEMPORARY CONSTRUCTION
FENCE TO SCAFFOLD WITH A CHAIN AND
PADLOCK - TYPICAL
BUILDING ACCESS LOCATION
EXISTING BUILDING
BUILDING ACCESS
TEMP FENCETEMP FENCE
TYPICAL SCAFFOLDING NOTES:
- CONTRACTOR SHALL COVER AND SECURE ANY
EXISTING WINDOW WITH 3/4" FIRE TREATED PLYWOOD
WITHIN 36" (VERTICALLY) OF THE SCAFFOLDING.
- CONTRACTOR TO PROVIDE TEMPORARY LIGHTING
UNDER SCAFFOLDING. LIGHTS TO BE MINIMUM 6'-0" ON-
CENTER IN ALL DIRECTIONS. GC SHALL CONNECT TO
NEAREST RECEPTACLE AND/OR EXTERIOR LIGHT
FIXTURE FOR TEMPORARY LIGHTING POWER.
- ROOF OF SCAFFOLDING TO BE 3/4" FIRE TREATED
PLYWOOD.
TYPICAL SCAFFOLDING NOTES
M
IN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:3
A
M
GC103
FALLING OBJECT PROTECTION PLANS
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/16" = 1'-0"3
BUILDING 6 PLAN
1/16" = 1'-0"2
BUILDING 7 PLAN
1/16" = 1'-0"1
BUILDING 8 PLAN
1/16" = 1'-0"4
BUILDING 9 PLAN
KEY PLAN
SCAFFOLD TYPES KEYNOTES
NUMBER DESCRIPTION
1 SINGLE DOOR: PROVIDE SCAFFOLDING 1'-0" FROM EDGE OF DOOR OPENING ON EACH SIDE,
PROJECTING 10'-0" AWAY FROM BUILDING A MIN OF 10 FEET ABOVE THE LEVEL OF DISCHARGE
WITH A TOE BOARD ON ALL OPEN SIDES
2 SINGLE DOOR WITH STAIR: PROVIDE SCAFFOLDING 1'-0" FROM EDGE OF STAIR ON EACH SIDE, 10'-0" LONG, A MIN OF 10 FEET ABOVE THE LEVEL OF DISCHARGE WITH A TOE BOARD ON ALL
OPEN SIDES
3 DOUBLE DOOR WITH LANDING AND STAIR: PROVIDE SCAFFOLDING 1'-0" FROM EDGE OF STAIR ON EACH SIDE, PROJECTING THE ENTIRE LENGTH OF STAIR OR 10'-0" AWAY FROM BUILDING A
MIN OF 10 FEET ABOVE THE LEVEL OF DISCHARGE WITH A TOE BOARD ON ALL OPEN SIDES
4 DOUBLE DOOR WITH LANDING & TWO-WAY STAIRS - PROVIDE SCAFFOLDING 1'-0" FROM EDGE OF STAIR LANDING ON EACH SIDE, PROTECT ENTIRE STAIR OR MIN 10'-0" AWAY FROM BUILDING
A MIN OF 10 FEET ABOVE THE LEVEL OF DISCHARGE WITH A TOE BOARD ON ALL OPEN SIDES
5 SINGLE DOOR WITH RAMP: PROVIDE SCAFFOLDING 1'-0" FROM EDGE OF RAMP ON EACH SIDE, PROTECT ENTIRE RAMP OR MIN 10'-0" AWAY FROM BUILDING A MIN OF 10 FEET ABOVE THE
LEVEL OF DISCHARGE WITH A TOE BOARD ON ALL OPEN SIDES
6 DOUBLE DOOR WITH LANDING: PROVIDE SCAFFOLDING 1'-0" FROM EDGE OF LANDING ON EACH
SIDE, PROJECTING 10'-0" AWAY FROM BUILDING A MIN OF 10 FEET ABOVE THE LEVEL OF
DISCHARGE WITH A TOE BOARD ON ALL OPEN SIDES
7 CONTRACTOR TO PROVIDE TEMPORARY LIGHTING UNDER SCAFFOLDING. LIGHTS TO BE
MINIMUM 6'-0" ON-CENTER IN ALL DIRECTIONS. GC SHALL CONNECT TO NEAREST RECEPTACLE
AND/OR EXTERIOR LIGHT FIXTURE FOR TEMPORARY LIGHTING POWER.
FALLING OBJECT PROTECTION LEGEND
N
P N
N
P N
N
P N
N
Revisions: Date: Page 5 of 42
TEMP FENCE
TEM
P FENCE
T E
M P
F E
N C
E T
E M
P F
E N
C E
T E
M P
F E
N C
E
CONNECTOR 57-54
C O
N N
E C
T O
R
7-
BUILDING 54
CONNECTOR TO BUILDING 55
NOT IN SCOPE OF WORK
BUILDING 57
TEMP FENCE
TEMP FENCE
TEMP FENCE
TEMP FENCE
TEMP FENCE
TEMP FENCE
TEMP FENCE
TEMP FENCE
TEMP FENCE
TEMP FENCE
TEMP FENCE
TEMP FENCE
CONNECTOR 57-143
CONNECTOR 57-143
CONNECTOR 57-143
BUILDING 143
BUILDING 57
THIS ROOF IS
NOT IN SCOPE OF
WORK
N
CONNECTOR 57-54
CONNECTOR 57-143
57143
FDC
FIRE DEPARTMENT CONNECTION ACCESS LOCATION -
CONTRACTOR TO PROVIDE A GATE IN THE FENCE
SECURED WITH A CHAIN AND A PADLOCK. PROVIDE A
SIGN WITH 12" HIGH INITIALS FDC ATTACHED TO FENCE
@ 48" ABOVE GROUND. GC TO PROVIDE THE COR AND
CAMPUS SECURITY WITH THE COMBINATION OF THE
PADLOCK. DO NOT BLOCK EXISTING HYDRANTS, FDC'S,
OR ACCESS GATES.
TEMPORARY CONSTRUCTION FENCE (8 FEET HIGH) 6 FEET
FROM BUILDING MIN., ADJUST FENCE LOCATION FOR WORK
AREA.
DO NOT BLOCK ACCESS TO ANY HYDRANTS OR SPRINKLER
SIAMESE CONNECTIONS.
TEMP FENCE
SCAFFOLD WALL
OPEN END SECURE TEMPORARY CONSTRUCTION
FENCE TO SCAFFOLD WITH A CHAIN AND
PADLOCK - TYPICAL
BUILDING ACCESS LOCATION
EXISTING BUILDING
BUILDING ACCESS
TEMP FENCETEMP FENCE
TYPICAL SCAFFOLDING NOTES:
- CONTRACTOR SHALL COVER AND SECURE ANY
EXISTING WINDOW WITH 3/4" FIRE TREATED PLYWOOD
WITHIN 36" (VERTICALLY) OF THE SCAFFOLDING.
- CONTRACTOR TO PROVIDE TEMPORARY LIGHTING
UNDER SCAFFOLDING. LIGHTS TO BE MINIMUM 6'-0" ON-
CENTER IN ALL DIRECTIONS. GC SHALL CONNECT TO
NEAREST RECEPTACLE AND/OR EXTERIOR LIGHT
FIXTURE FOR TEMPORARY LIGHTING POWER.
- ROOF OF SCAFFOLDING TO BE 3/4" FIRE TREATED
PLYWOOD.
TYPICAL SCAFFOLDING NOTES
M
IN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:3
A
M
GC104
FALLING OBJECT PROTECTION PLANS
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/16" = 1'-0"2
CONNECTOR 57-54
1/16" = 1'-0"1
CONNECTOR 57-143 PLAN
SCAFFOLD TYPES KEYNOTES
NUMBER DESCRIPTION
1 SINGLE DOOR: PROVIDE SCAFFOLDING 1'-0" FROM EDGE OF DOOR OPENING ON EACH SIDE,
PROJECTING 10'-0" AWAY FROM BUILDING A MIN OF 10 FEET ABOVE THE LEVEL OF DISCHARGE
WITH A TOE BOARD ON ALL OPEN SIDES
2 SINGLE DOOR WITH STAIR: PROVIDE SCAFFOLDING 1'-0" FROM EDGE OF STAIR ON EACH SIDE, 10'-0" LONG, A MIN OF 10 FEET ABOVE THE LEVEL OF DISCHARGE WITH A TOE BOARD ON ALL
OPEN SIDES
3 DOUBLE DOOR WITH LANDING AND STAIR: PROVIDE SCAFFOLDING 1'-0" FROM EDGE OF STAIR ON EACH SIDE, PROJECTING THE ENTIRE LENGTH OF STAIR OR 10'-0" AWAY FROM BUILDING A
MIN OF 10 FEET ABOVE THE LEVEL OF DISCHARGE WITH A TOE BOARD ON ALL OPEN SIDES
4 DOUBLE DOOR WITH LANDING & TWO-WAY STAIRS - PROVIDE SCAFFOLDING 1'-0" FROM EDGE OF STAIR LANDING ON EACH SIDE, PROTECT ENTIRE STAIR OR MIN 10'-0" AWAY FROM BUILDING
A MIN OF 10 FEET ABOVE THE LEVEL OF DISCHARGE WITH A TOE BOARD ON ALL OPEN SIDES
5 SINGLE DOOR WITH RAMP: PROVIDE SCAFFOLDING 1'-0" FROM EDGE OF RAMP ON EACH SIDE, PROTECT ENTIRE RAMP OR MIN 10'-0" AWAY FROM BUILDING A MIN OF 10 FEET ABOVE THE
LEVEL OF DISCHARGE WITH A TOE BOARD ON ALL OPEN SIDES
6 DOUBLE DOOR WITH LANDING: PROVIDE SCAFFOLDING 1'-0" FROM EDGE OF LANDING ON EACH
SIDE, PROJECTING 10'-0" AWAY FROM BUILDING A MIN OF 10 FEET ABOVE THE LEVEL OF
DISCHARGE WITH A TOE BOARD ON ALL OPEN SIDES
7 CONTRACTOR TO PROVIDE TEMPORARY LIGHTING UNDER SCAFFOLDING. LIGHTS TO BE
MINIMUM 6'-0" ON-CENTER IN ALL DIRECTIONS. GC SHALL CONNECT TO NEAREST RECEPTACLE
AND/OR EXTERIOR LIGHT FIXTURE FOR TEMPORARY LIGHTING POWER.
KEY PLAN
FALLING OBJECT PROTECTION LEGEND
N
P N
N
Revisions: Date: Page 6 of 42
C L
R
TOP RAIL
3/4" PLYWOOD ON SUPPORTS @ 24" O.C.
SCAFFOLD SECTIONS
2x4 TOE BOARD FASTENED TO
PLYWOOD, (TYP. ALL OPEN SIDES)
GRADE
TOP RAIL
3/4" PLYWOOD ON SUPPORTS @ 24" O.C.
CROSS BRACING
1' - 0" (TYP.)
GRADE
2x4 TOE BOARD FASTENED TO
PLYWOOD, (TYP. ALL OPEN SIDES)
SCAFFOLD WALL,
SEE TYPE 1 SIDE
ELEVATION
TOP RAIL
3/4" PLYWOOD
SCAFFOLD WALL
BUILDING WALL
CROSS BRACING
2x4 TOE BOARD FASTENED TO
PLYWOOD, (TYP. ALL OPEN SIDES)
C L
R
GRADE
TOP RAIL
3/4" PLYWOOD ON SUPPORTS @ 24" O.C.
SCAFFOLD SECTIONS
2x4 TOE BOARD FASTENED TO
PLYWOOD, (TYP. ALL OPEN SIDES)
TOP RAIL
3/4" PLYWOOD ON SUPPORTS @ 24" O.C.
2x4 TOE BOARD FASTENED TO
PLYWOOD, (TYP. ALL OPEN SIDES)
CROSS BRACING, PROVIDE AT
EACH END OF SCAFFOLDING
C L
E A
R F
O R
D O
O R
S W
IN
G
1' - 0" (TYP.)
BOTTOM RAIL
GRADE
SCAFFOLD WALL,
SEE TYPE 3 SIDE
ELEVATION
TOP RAIL
3/4" PLYWOOD ON SUPPORTS @ 24" O.C.
2x4 TOE BOARD FASTENED TO
PLYWOOD, (TYP. ALL OPEN SIDES)
SCAFFOLD WALL,
SEE TYPE 1 SIDE
ELEVATION
SCAFFOLD WALL,
SEE TYPE 1 SIDE
ELEVATION
C L
E A
R F
O R
D O
O R
S W
IN
G
GRADE
END WALL OF STAIR
EXISTING STAIR
OPEN FOR
EGRESS
OPEN FOR
EGRESS
C L
R
GRADE
TOP RAIL
3/4" PLYWOOD ON SUPPORTS @ 24" O.C.
SCAFFOLD SECTIONS
2x4 TOE BOARD FASTENED TO
PLYWOOD, (TYP. ALL OPEN SIDES)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:3
A
M
GC105
FALLING OBJECT PROTECTION SCAFFOLD -
ELEVATIONS
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/4" = 1'-0"1
TYPE 1 SIDE ELEVATION
1/4" = 1'-0"2
TYPE 1 FRONT ELEVATION
1/4" = 1'-0"3
TYPE 2 FRONT ELEVATION
1/4" = 1'-0"5
TYPE 3 SIDE ELEVATION
1/4" = 1'-0"6
TYPE 3 FRONT ELEVATION
1/4" = 1'-0"7
TYPE 4 FRONT ELEVATION
SCAFFOLD TYPES KEYNOTES
NUMBER DESCRIPTION
1 SINGLE DOOR: PROVIDE SCAFFOLDING 1'-0" FROM EDGE OF DOOR OPENING ON EACH SIDE,
PROJECTING 10'-0" AWAY FROM BUILDING A MIN OF 10 FEET ABOVE THE LEVEL OF DISCHARGE
WITH A TOE BOARD ON ALL OPEN SIDES
2 SINGLE DOOR WITH STAIR: PROVIDE SCAFFOLDING 1'-0" FROM EDGE OF STAIR ON EACH SIDE, 10'-0" LONG, A MIN OF 10 FEET ABOVE THE LEVEL OF DISCHARGE WITH A TOE BOARD ON ALL
OPEN SIDES
3 DOUBLE DOOR WITH LANDING AND STAIR: PROVIDE SCAFFOLDING 1'-0" FROM EDGE OF STAIR ON EACH SIDE, PROJECTING THE ENTIRE LENGTH OF STAIR OR 10'-0" AWAY FROM BUILDING A
MIN OF 10 FEET ABOVE THE LEVEL OF DISCHARGE WITH A TOE BOARD ON ALL OPEN SIDES
4 DOUBLE DOOR WITH LANDING & TWO-WAY STAIRS - PROVIDE SCAFFOLDING 1'-0" FROM EDGE OF STAIR LANDING ON EACH SIDE, PROTECT ENTIRE STAIR OR MIN 10'-0" AWAY FROM BUILDING
A MIN OF 10 FEET ABOVE THE LEVEL OF DISCHARGE WITH A TOE BOARD ON ALL OPEN SIDES
5 SINGLE DOOR WITH RAMP: PROVIDE SCAFFOLDING 1'-0" FROM EDGE OF RAMP ON EACH SIDE, PROTECT ENTIRE RAMP OR MIN 10'-0" AWAY FROM BUILDING A MIN OF 10 FEET ABOVE THE
LEVEL OF DISCHARGE WITH A TOE BOARD ON ALL OPEN SIDES
6 DOUBLE DOOR WITH LANDING: PROVIDE SCAFFOLDING 1'-0" FROM EDGE OF LANDING ON EACH
SIDE, PROJECTING 10'-0" AWAY FROM BUILDING A MIN OF 10 FEET ABOVE THE LEVEL OF
DISCHARGE WITH A TOE BOARD ON ALL OPEN SIDES
7 CONTRACTOR TO PROVIDE TEMPORARY LIGHTING UNDER SCAFFOLDING. LIGHTS TO BE
MINIMUM 6'-0" ON-CENTER IN ALL DIRECTIONS. GC SHALL CONNECT TO NEAREST RECEPTACLE
AND/OR EXTERIOR LIGHT FIXTURE FOR TEMPORARY LIGHTING POWER.
1/4" = 1'-0"4
TYPE 2 SIDE ELEVATION
Revisions: Date: Page 7 of 42
File details come from the government source that posted it. Updated .