This document package includes asbestos abatement plans and specifications for a roof replacement project at a Veterans Affairs medical center, as well as a related federal contract solicitation. The solicitation seeks bids to replace roofs on multiple buildings requiring asbestos abatement. The work includes removal and disposal of all asbestos-containing materials in the flashings, mastics and roof assemblies. The specifications provide details on the abatement procedures, regulatory compliance, hazard controls and disposal methods. Bids are due on January 28th and award is proposed for December 8th. The solicitation is issued by the VA Veterans Health Administration VISN 2 for the New Jersey VA Healthcare System.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
/ H
A
M A
T C
H L
IN
E
B U
IL
D
IN
G
N .I.
C
BUILDING 2-3
CONNECTOR
BUILDING 2-9 CONNECTOR
M A
T C
H L
IN
E
AE204
RD
RD
EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK EXISTING COPPER GUTTERS
NOT IN SCOPE OF WORK
EXISTING COPPER GUTTERS
NOT IN SCOPE OF WORK
EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK
EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK
EXISTING COPPER GUTTERS
NOT IN SCOPE OF WORKEXISTING COPPER GUTTERS NOT IN SCOPE OF WORK
2 22 2
2 2 2 2 2 2
3 3
3 3
SEE HA106
SCOPE OF ABATEMENT WORK. REFER TO NOTES AND SUMMARY
OF MATERIALS FOR ADDITIONAL INFORMATION. WIDTH OF HATCH
DOES NOT DETERMINE WIDTH OF CONTRACTORS LIMIT OF
ABATEMENT SCOPE
NOT IN ABATEMENT SCOPE
N
57143
C2-3-2
RUBBER
NONE
C2-3-3
RUBBER
NONE
C2-3-1
CAULK
NONE
LD-1
PERLITE,
FOAM, TAR
NONE
LD-2
WALL,
BUILT-UP
NONE
LD-3
CAULK
NONE
LD-4
COUNTERFLASHING
CAULK
NONE
L2-2
SHINGLE
NONE
L2-1
BUILT-UP
ROOF
NONE
L2-1 SAMPLE NUMBER
BUILT-UP ROOF LOCATION
N.D. ASBESTOS DETECTED
SAMPLE LABEL LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:4
A
M
HA101
ASBESTOS ABATEMENT PLAN - BUILDING 2 AND
CONNECTOR 2-3
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
ASBESTOS ABATEMENT PLAN - BUILDING 2 AND CONNECTOR 2-3
ABATEMENT LEGEND
ABATEMENT KEY NOTES
Mark Description
1 REMOVE ASBESTOS CONTAINING FLASHING AND MASTIC IN ACCORDANCE WITH THE SPECIFICATIONS, FEDERAL, STATE, AND
LOCAL REGULATIONS, AND THE APPROVED HAZARD ABATEMENT PLAN.
2 ROOF EDGE FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
3 VALLEY FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
4 FLASHINGS AT ROOF PENETRATIONS - REMOVE ALL ASBESTOS CONTAINING MATERIAL
5 RISING WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
6 PARAPET WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
KEY PLAN1/8" = 1'-0"
0' 8'4' 16'2'
N
P N
1/32" = 1'-0"2
SAMPLE LOCATION PLAN - BUILDING 2 AND CONNECTOR 2-3
Revisions: Date:
ABATEMENT SCHEDULE - HA101
LOCATION NUMBER
LENGTH OF ROOF
EDGE (LF)
LENGTH OF
VALLEYS (LF)
ROOF
PENETRATIONS
BUILDING 2 780 335 7
CONNECTOR 2-3 70
NOTE:
SEE GI102 FOR ABATEMENT GENERAL NOTES
BUILDING 5 (N.I.C.)
B U
IL
D
IN
G
N .I.
C
M A
T C
H L
IN
E
BUILDING 3-4
CONNECTOR
BUILDING 4-5
CONNECTOR
MATCH LINE
RD
RD RD
RD
EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK
EXISTING COPPER
GUTTERS NOT IN
SCOPE OF WORK
EXISTING COPPER GUTTERS
NOT IN SCOPE OF WORK
EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK
EXISTING COPPER GUTTERS
NOT IN SCOPE OF WORK
2 2 2 2
2 2
2 2
2 2
3 3
3 3
2 3
EXISTING COPPER GUTTERS
NOT IN SCOPE OF WORK
2 2
EXISTING ROOFTOP
MECHANICAL UNIT
EXISTING COPPER GUTTERS
NOT IN SCOPE OF WORK
SCOPE OF ABATEMENT WORK. REFER TO NOTES AND SUMMARY
OF MATERIALS FOR ADDITIONAL INFORMATION. WIDTH OF HATCH
DOES NOT DETERMINE WIDTH OF CONTRACTORS LIMIT OF
ABATEMENT SCOPE
NOT IN ABATEMENT SCOPE
N
5 57143
L4-6
GUTTR CAULK
NONE
L4-5
ROOF SHINGLE
NONE
L4-4
FLASHING
10% CHRYSOTILE
L4-3
EPDM ROOF
NONE
C4-5-1
PARAPET CAP EPDM
NONE
C4-5-2
EPDM ROOF
NONE
C4-5-6
PATCHING
NONE
C4-5-3
COUNTER FLASHING
10% CHRYSOLITE
C4-5-4
PARAPET CAULK
NONE
C4-5-5
PARAPET WALL CUT
3% CHRYSOLITE
L4-1
EPDM ROOF
NONE
L4-2
EPDM ROOF
NONE
L2-1 SAMPLE NUMBER
BUILT-UP ROOF LOCATION
N.D. ASBESTOS DETECTED
SAMPLE LABEL LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:4
A
M
HA102
ASBESTOS ABATEMENT PLAN - BUILDING 4,
CONNECTOR 3-4, AND CONNECTOR 4-5
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
ASBESTOS ABATEMENT PLAN - BUILDING 4, CONNECTORS 3-4 AND 4-5
ABATEMENT LEGEND
ABATEMENT KEY NOTES
Mark Description
1 REMOVE ASBESTOS CONTAINING FLASHING AND MASTIC IN ACCORDANCE WITH THE SPECIFICATIONS, FEDERAL, STATE, AND
LOCAL REGULATIONS, AND THE APPROVED HAZARD ABATEMENT PLAN.
2 ROOF EDGE FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
3 VALLEY FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
4 FLASHINGS AT ROOF PENETRATIONS - REMOVE ALL ASBESTOS CONTAINING MATERIAL
5 RISING WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
6 PARAPET WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
1/8" = 1'-0"
0' 8'4' 16'2'
KEY PLAN
N
P N
1/32" = 1'-0"2
SAMPLE LOCATION PLAN - BUILDING 4, CONNECTORS 3-4 AND 4-5
ABATEMENT SCHEDULE - HA102
LOCATION NUMBER
LENGTH OF ROOF
EDGE (LF)
LENGTH OF
VALLEYS (LF)
ROOF
PENETRATIONS
BUILDING 4 620 300 14
CONNECTOR 3-4 70
CONNECTOR 4-5 55
Revisions: Date:
NOTE:
EXISTING BRICK
CHIMNEYS TO REMAIN
EXISTING BRICK
CHIMNEYS TO REMAIN
D O
W N
MATCH LINE
BUILDING 5 (N.I.C.)
/ H
A
BUILDING 5-6
CONNECTOR
BUILDING 6-7
CONNECTOR
M A
T C
H L
IN
E
5 6 5
EXISTING COPPER
GUTTERS NOT IN
SCOPE OF WORK
EXISTING COPPER
GUTTERS NOT IN
SCOPE OF WORK
EXISTING COPPER GUTTERS
NOT IN SCOPE OF WORK
EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK
EXISTING COPPER GUTTERS NOT IN SCOPE OF WORKEXISTING COPPER GUTTERS NOT IN SCOPE OF WORK
EXISTING COPPER
GUTTERS NOT IN
SCOPE OF WORK
EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK
4 4
2 2
2 2
5 5
EXISTING BUILDING (N.I.C.)
SCOPE OF ABATEMENT WORK. REFER TO NOTES AND SUMMARY
OF MATERIALS FOR ADDITIONAL INFORMATION. WIDTH OF HATCH
DOES NOT DETERMINE WIDTH OF CONTRACTORS LIMIT OF
ABATEMENT SCOPE
NOT IN ABATEMENT SCOPE
N
57143
L6-1
ROOF SHINGLE
NONE
L2-1 SAMPLE NUMBER
BUILT-UP ROOF LOCATION
NONE ASBESTOS DETECTED
SAMPLE LABEL LEGEND
C5-6-2
CAULK
NONE
C5-6-1
EPDM ROOF
NONE
C5-6-3
CAULK
NONE
C5-6-4
MASTIC
3% CHRYSOLITE
BUILDING 5-6
CONNECTOR
BUILDING 6-7
CONNECTOR
C6-7-2
CAULK
NONE
C6-7-1
EPDM ROOF
NONE
C6-7-3
PARAPET WALL
NONE
C6-7-4
EPDM ROOF
NONE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:5
A
M
HA103
ASBESTOS ABATEMENT PLAN - BUILDING 6,
CONNECTOR 5-6 AND CONNECTOR 6-7
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
ASBESTOS ABATEMENT PLAN - BUILDING 6, CONNECTORS 5-6 AND 6-7
ABATEMENT LEGEND
ABATEMENT KEY NOTES
Mark Description
1 REMOVE ASBESTOS CONTAINING FLASHING AND MASTIC IN ACCORDANCE WITH THE SPECIFICATIONS, FEDERAL, STATE, AND
LOCAL REGULATIONS, AND THE APPROVED HAZARD ABATEMENT PLAN.
2 ROOF EDGE FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
3 VALLEY FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
4 FLASHINGS AT ROOF PENETRATIONS - REMOVE ALL ASBESTOS CONTAINING MATERIAL
5 RISING WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
6 PARAPET WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
KEY PLAN
1/8" = 1'-0"
0' 8'4' 16'2'
N
P N
1/32" = 1'-0"2
SAMPLE LOCATION PLAN -
BUILDING 6, CONNECTORS 5-6 & 6-7
ABATEMENT SCHEDULE - HA103
LOCATION NUMBER
LENGTH OF ROOF
EDGE (LF)
LENGTH OF
VALLEYS (LF)
ROOF
PENETRATIONS
BUILDING 6 875 331 12
CONNECTOR 5-6 155
CONNECTOR 6-7 115
Revisions: Date:
NOTE:
EXISTING BRICK
CHIMNEYS TO REMAIN
M A
T C
H L
IN
E
/ H
A
/ H
A
BUILDING 6-7
CONNECTOR
BUILDING 7-8
CONNECTOR
M A
T C
H L
IN
E
6 5
EXISTING COPPER
GUTTERS NOT IN
SCOPE OF WORK
EXISTING COPPER
GUTTERS NOT IN
SCOPE OF WORKEXISTING COPPER GUTTERS
NOT IN SCOPE OF WORK
EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK
EXISTING COPPER
GUTTERS NOT IN
SCOPE OF WORK
EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK
EXISTING COPPER
GUTTERS NOT IN
SCOPE OF WORK
EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK
4 4
44 4
3 3
3 3
5 5
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
SCOPE OF ABATEMENT WORK. REFER TO NOTES AND SUMMARY
OF MATERIALS FOR ADDITIONAL INFORMATION. WIDTH OF HATCH
DOES NOT DETERMINE WIDTH OF CONTRACTORS LIMIT OF
ABATEMENT SCOPE
NOT IN ABATEMENT SCOPE
N
57143
C7-8-5
MASTIC
5% CHRYSOLITE
L2-1 SAMPLE NUMBER
BUILT-UP ROOF LOCATION
NONE ASBESTOS DETECTED
SAMPLE LABEL LEGEND
L7-2
CAULK
NONE
C7-8-2
EPDM ROOF
NONE
C7-8-1
CAULK
NONE
C7-8-4
PATCHING
NONE
C7-8-3
CAULK
NONE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:0
A
M
HA104
ASBESTOS ABATEMENT PLAN - BUILDING 7 AND
CONNECTOR 7-8
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
ASBESTOS ABATEMENT PLAN - BUILDING 7 AND CONNECTOR 7-8
ABATEMENT KEY NOTES
Mark Description
1 REMOVE ASBESTOS CONTAINING FLASHING AND MASTIC IN ACCORDANCE WITH THE SPECIFICATIONS, FEDERAL, STATE, AND
LOCAL REGULATIONS, AND THE APPROVED HAZARD ABATEMENT PLAN.
2 ROOF EDGE FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
3 VALLEY FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
4 FLASHINGS AT ROOF PENETRATIONS - REMOVE ALL ASBESTOS CONTAINING MATERIAL
5 RISING WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
6 PARAPET WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
ABATEMENT LEGEND
KEY PLAN
1/8" = 1'-0"
0' 8'4' 16'2'
N
P N
1/32" = 1'-0"2
SAMPLE LOCATION PLAN -
BUILDING 7 AND CONNECTOR 7-8
ABATEMENT SCHEDULE - HA104
LOCATION NUMBER
LENGTH OF ROOF
EDGE (LF)
LENGTH OF
VALLEYS (LF)
ROOF
PENETRATIONS
BUILDING 7 955 363 11
CONNECTOR 7-8 125
Revisions: Date:
NOTE:
/ H
A
MATCH LINE
1 / HA106
BUILDING 8-9
CONNECTOR
BUILDING 7-8
CONNECTOR
M A
T C
H L
IN
E
EXISTING COPPER
GUTTERS NOT IN
SCOPE OF WORK EXISTING COPPER
GUTTERS NOT IN
SCOPE OF WORK
EXISTING COPPER GUTTERS
NOT IN SCOPE OF WORK
EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK
EXISTING COPPER
GUTTERS NOT IN
SCOPE OF WORK
EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK
EXISTING COPPER
GUTTERS NOT IN
SCOPE OF WORK
EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK
4 4
42 2
5 5
2 2
2 22 2
2 2 2 2
3 3
SCOPE OF ABATEMENT WORK. REFER TO NOTES AND SUMMARY
OF MATERIALS FOR ADDITIONAL INFORMATION. WIDTH OF HATCH
DOES NOT DETERMINE WIDTH OF CONTRACTORS LIMIT OF
ABATEMENT SCOPE
NOT IN ABATEMENT SCOPE
N
57143
L2-1 SAMPLE NUMBER
BUILT-UP ROOF LOCATION
NONE ASBESTOS DETECTED
SAMPLE LABEL LEGEND
L8-2
EPDM ROOF
NONE
L8-1
SHINGLE ROOF
NONE
C8-9-2
EPDM ROOF
NONE
C8-9-1
PARAPET WALL
NONE
C8-9-3
EPDM/CAULK
NONE
C8-9-4
EPDM ROOF
NONE
C8-9-5
CAULK
NONE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:0
A
M
HA105
ASBESTOS ABATEMENT PLAN - BUILDING 8 AND
CONNECTOR 8-9
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
ASBESTOS ABATEMENT PLAN - BUILDING 8 AND CONNECTOR 8-9
ABATEMENT KEY NOTES
Mark Description
1 REMOVE ASBESTOS CONTAINING FLASHING AND MASTIC IN ACCORDANCE WITH THE SPECIFICATIONS, FEDERAL, STATE, AND
LOCAL REGULATIONS, AND THE APPROVED HAZARD ABATEMENT PLAN.
2 ROOF EDGE FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
3 VALLEY FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
4 FLASHINGS AT ROOF PENETRATIONS - REMOVE ALL ASBESTOS CONTAINING MATERIAL
5 RISING WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
6 PARAPET WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
ABATEMENT LEGEND
KEY PLAN1/8" = 1'-0"
0' 8'4' 16'2'
N
P N
1/32" = 1'-0"2
SAMPLE LOCATION PLAN -
BUILDING 8 AND CONNECTOR 8-9
ABATEMENT SCHEDULE - HA105
LOCATION NUMBER
LENGTH OF ROOF
EDGE (LF)
LENGTH OF
VALLEYS (LF)
ROOF
PENETRATIONS
BUILDING 8 880 331 11
CONNECTOR 8-9 160
Revisions: Date:
NOTE:
M A
T C
H L
IN
E
/ H
A
1 / HA101
BUILDING 8-9
CONNECTOR
BUILDING 9-2
CONNECTOR
MATCH LINE
2 2
2 2
22 2222
2 2
EXISTING COPPER
GUTTERS NOT IN
SCOPE OF WORK EXISTING COPPER
GUTTERS NOT IN
SCOPE OF WORK
EXISTING COPPER GUTTERS
NOT IN SCOPE OF WORK
EXISTING COPPER
GUTTERS NOT IN
SCOPE OF WORK
EXISTING COPPER
GUTTERS NOT IN
SCOPE OF WORK
EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK
EXISTING COPPER
GUTTERS NOT IN
SCOPE OF WORK
EXISTING COPPER
GUTTERS NOT IN
SCOPE OF WORK
SCOPE OF ABATEMENT WORK. REFER TO NOTES AND SUMMARY
OF MATERIALS FOR ADDITIONAL INFORMATION. WIDTH OF HATCH
DOES NOT DETERMINE WIDTH OF CONTRACTORS LIMIT OF
ABATEMENT SCOPE
NOT IN ABATEMENT SCOPE
N
57143
L2-1 SAMPLE NUMBER
BUILT-UP ROOF LOCATION
NONE ASBESTOS DETECTED
SAMPLE LABEL LEGEND
C9-2-2
COUNTERFLASHING
CAULK
NONE
C9-2-3
PARAPET CAP
CAULK
NONE
C9-2-1
EPDM ROOF
NONE
L9-1
SHINGLE ROOF
NONE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:0
:2
A
M
HA106
ASBESTOS ABATEMENT PLAN - BUILDING 9 AND
CONNECTOR 9-2
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
ASBESTOS ABATEMENT PLAN - BUILDING 9 AND CONNECTOR 9-2
ABATEMENT LEGEND
ABATEMENT KEY NOTES
Mark Description
1 REMOVE ASBESTOS CONTAINING FLASHING AND MASTIC IN ACCORDANCE WITH THE SPECIFICATIONS, FEDERAL, STATE, AND
LOCAL REGULATIONS, AND THE APPROVED HAZARD ABATEMENT PLAN.
2 ROOF EDGE FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
3 VALLEY FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
4 FLASHINGS AT ROOF PENETRATIONS - REMOVE ALL ASBESTOS CONTAINING MATERIAL
5 RISING WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
6 PARAPET WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
KEY PLAN
1/8" = 1'-0"
0' 8'4' 16'2'
N
P N
1/32" = 1'-0"2
SAMPLE LOCATION PLAN -
BUILDING 9 AND CONNECTOR 9-2
ABATEMENT SCHEDULE - HA106
LOCATION NUMBER
LENGTH OF ROOF
EDGE (LF)
LENGTH OF
VALLEYS (LF)
ROOF
PENETRATIONS
BUILDING 9 960 370 17
CONNECTOR 9-2 132
Revisions: Date:
NOTE:
/ A
D
/ A
D
1 / AD109
1 / AD107
4 4
2 2
2 2
2 22 2
2 2 2 2
2 2
2 2
EXISTING COPPER
GUTTERS NOT IN
SCOPE OF WORK
EXISTING COPPER GUTTERS
NOT IN SCOPE OF WORK
EXISTING COPPER GUTTERS
NOT IN SCOPE OF WORK
EXISTING COPPER
GUTTERS NOT IN
SCOPE OF WORK
EXISTING COPPER GUTTERS
NOT IN SCOPE OF WORK
EXISTING COPPER GUTTERS
NOT IN SCOPE OF WORK
EXISTING COPPER
GUTTERS NOT IN
SCOPE OF WORK
EXISTING COPPER
GUTTERS NOT IN
SCOPE OF WORK
SCOPE OF ABATEMENT WORK. REFER TO NOTES AND SUMMARY
OF MATERIALS FOR ADDITIONAL INFORMATION. WIDTH OF HATCH
DOES NOT DETERMINE WIDTH OF CONTRACTORS LIMIT OF
ABATEMENT SCOPE
NOT IN ABATEMENT SCOPE
N
57143
L2-1 SAMPLE NUMBER
BUILT-UP ROOF LOCATION
NONE ASBESTOS DETECTED
SAMPLE LABEL LEGEND
L57-2
SHINGLE ROOF
NONE
L57-1
SHINGLE ROOF
NONE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:1
A
M
HA107
ASBESTOS ABATEMENT PLAN - BUILDING 57
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
ASBESTOS ABATEMENT PLAN - BUILDING 57
ABATEMENT LEGEND
ABATEMENT KEY NOTES
Mark Description
1 REMOVE ASBESTOS CONTAINING FLASHING AND MASTIC IN ACCORDANCE WITH THE SPECIFICATIONS, FEDERAL, STATE, AND
LOCAL REGULATIONS, AND THE APPROVED HAZARD ABATEMENT PLAN.
2 ROOF EDGE FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
3 VALLEY FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
4 FLASHINGS AT ROOF PENETRATIONS - REMOVE ALL ASBESTOS CONTAINING MATERIAL
5 RISING WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
6 PARAPET WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
KEY PLAN
N
P N
ABATEMENT SCHEDULE - HA107
LOCATION NUMBER
LENGTH OF ROOF
EDGE (LF)
LENGTH OF
VALLEYS (LF)
ROOF
PENETRATIONS
BUILDING 57 1060 331 14
1/32" = 1'-0"2
SAMPLE LOCATION PLAN - BUILDING 57
Revisions: Date:
1/8" = 1'-0"
0' 8'4' 16'2'
NOTE:
N
CONNECTOR 57-54
57143
A. FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND SERVICES NECESSARY FOR THE REMOVAL AND DISPOSAL OF ASBESTOS- CONTAINING MATERIALS AS NOTED INCLUDING THE REMOVAL OF ALL NON ASBESTOS-CONTAINING MATERIALS SUCH AS FLASHING AND ROOF PLIES , AND ANY DEMOLITION, REMOVAL AND DISPOSAL NECESSARY TO EXPOSE ASBESTOS CONTAINING MATERIALS AND DEBRIS INCLUDING ALL REQUIRED PREPARATION, CLEANING, ENCAPSULATION AND DECONTAMINATION IN ACCORDANCE WITH ALL REGULATORY AGENCY REQUIREMENTS AND THE PROJECT PLANS AND SPECIFICATIONS.
B. IF SUSPECTED ASBESTOS OR HAZARDOUS MATERIAL IS ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL STOP WORK IMMEDIATELY , AND NOTIFY THE OWNER/ARCHITECT IN WRITING, PRIOR TO CONTINUING WORK.
C. INSTALL WARNING SIGNS TO ESTABLISH ABATEMENT WORK AREAS PRIOR TO THE START OF REMOVAL AND DISPOSAL OF
HAZARDOUS MATERIALS PER THE PROJECT SPECIFICATIONS.
D. FOR MATERIALS REPORTED TO CONTAIN <1% ASBESTOS, FOLLOW OSHA REQUIREMENTS FOR MATERIALS WITH 1% OR LESS ASBESTOS, INCLUDING WET HANDLING, CLEAN UP, DISPOSAL IN LEAK TIGHT CONTAINERS, AND AN EXPOSURE ASSESSMENT.
E. AN ASBESTOS SURVEY REPORT FOR THE ENTIRE AREA IS INCLUDED IN THE SPECIFICATIONS.
SCOPE OF ABATEMENT WORK. REFER TO NOTES AND SUMMARY
OF MATERIALS FOR ADDITIONAL INFORMATION. WIDTH OF HATCH
DOES NOT DETERMINE WIDTH OF CONTRACTORS LIMIT OF
ABATEMENT SCOPE
NOT IN ABATEMENT SCOPE
THIS CONNECTOR
NOT IN CONTRACT
L2-1 SAMPLE NUMBER
BUILT-UP ROOF LOCATION
NONE ASBESTOS DETECTED
SAMPLE LABEL LEGEND
C57-55-2
EPDM ROOF
NONE
C57-55-1
EPDM ROOF
NONE
C57-55-3
PARAPET CUT
EPDM
NONE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:2
A
M
HA108
ASBESTOS ABATEMENT PLAN - CONNECTOR 57-54
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
Revisions: Date:
KEY PLAN
ABATEMENT - GENERAL NOTES
ABATEMENT LEGEND
ABATEMENT KEY NOTES
Mark Description
1 REMOVE ASBESTOS CONTAINING FLASHING AND MASTIC IN ACCORDANCE WITH THE SPECIFICATIONS, FEDERAL, STATE, AND
LOCAL REGULATIONS, AND THE APPROVED HAZARD ABATEMENT PLAN.
2 ROOF EDGE FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
3 VALLEY FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
4 FLASHINGS AT ROOF PENETRATIONS - REMOVE ALL ASBESTOS CONTAINING MATERIAL
5 RISING WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
6 PARAPET WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL
ABATEMENT SCHEDULE - HA108
LOCATION NUMBER
LENGTH OF ROOF
EDGE (LF)
LENGTH OF
VALLEYS (LF)
ROOF
PENETRATIONS
CONNECTOR 57-54 435
1/8" = 1'-0"1
ASBESTOS ABATEMENT PLAN - CONNECTOR 57-54
N
P N
1/32" = 1'-0"2
SAMPLE LOCATION PLAN -
GR101
GR101
GR101
GR103
GR103
1 1
2 2
3 33 3
3 3
33 3
5 5
7 7
/ A
D
M A
T C
H L
IN
E
B U
IL
D
IN
G
N .I.
C
BUILDING 2-3
CONNECTOR
BUILDING 2-9
CONNECTOR
M A
T C
H L
IN
E
RD
RD
N
57143
NOT IN SCOPE OF WORK
DEMOLITION KEY NOTES
Mark Description
1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR
SQUARE FOOTAGE.
2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS
3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE
GUTTERS DAILY.
4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE
5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM
6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING
7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING
8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.
9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK
SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING
10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.
11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:2
:5
A
M
AD101
ROOF DEMOLITION PLAN - BUILDING 2 AND CONNECTOR
2-3
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
DEMOLITION - BUILDING 2 AND CONNECTOR 2-3
KEY PLAN
1/8" = 1'-0"
0' 8'4' 16'2'
LEGEND
N
P N
Revisions: Date:
NOTE:
SEE GI102 FOR GENERAL DEMOLITION NOTES
GR101
GR101
GR101
GR101
GR101
GR103
GR103
GR103
1 1
2 2 2
3 3
33 3
3 3
3 3
3 3
6 6
BUILDING 5 (N.I.C.)
B U
IL
D
IN
G
N .I.
C
BUILDING 3-4
CONNECTOR
BUILDING 4-5
CONNECTOR
M A
T C
H L
IN
E
MATCH LINE
DS
RD
RD
RD
RD
EXISTING ROOFTOP
MECHANICAL UNIT
N
5 57143
NOT IN SCOPE OF WORK
DEMOLITION KEY NOTES
Mark Description
1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR
SQUARE FOOTAGE.
2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS
3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE
GUTTERS DAILY.
4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE
5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM
6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING
7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING
8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.
9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK
SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING
10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.
11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:2
:5
A
M
AD102
ROOF DEMOLITION PLAN - BUILDING 4, CONNECTOR 3-4,
AND CONNECTOR 4-5
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
DEMOLITION - BUILDING 4, CONNECTOR 3-4 AND 4-5
KEY PLAN
1/8" = 1'-0"
0' 8'4' 16'2'
LEGEND
N
P N
Revisions: Date:
NOTE:
GR103
GR103
GR103
GR103
GR103
GR103
GR101
GR101
EXISTING BRICK
CHIMNEYS TO REMAIN
EXISTING BRICK
CHIMNEYS TO REMAIN
5 5
5 5
2 2
6 6
3 3
3 333
3 3
3 333
3 3
1 1
D O
W N
MATCH LINE
BUILDING 5 (N.I.C.)
/ A
D
BUILDING 5-6
CONNECTOR
BUILDING 6-7
CONNECTOR
M A
T C
H L
IN
E
EXISTING BUILDING (N.I.C.)
N
57143
NOT IN SCOPE OF WORK
DEMOLITION KEY NOTES
Mark Description
1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR
SQUARE FOOTAGE.
2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS
3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE
GUTTERS DAILY.
4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE
5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM
6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING
7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING
8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.
9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK
SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING
10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.
11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:2
:5
A
M
AD103
ROOF DEMOLITION PLAN - BUILDING 6, CONNECTOR 5-6
AND CONNECTOR 6-7
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
DEMOLITION - BUILDING 6,
CONNECTOR 5-6 AND CONNECTOR
6-7
KEY PLAN
1/8" = 1'-0"
0' 8'4' 16'2'
LEGEND
N
P N
Revisions: Date:
NOTE:
GR101
GR104
GR104
GR104
GR104
GR104
EXISTING BRICK
CHIMNEYS TO REMAIN
EXISTING BRICK
CHIMNEYS TO REMAIN
2 2
1 1
1 1
3 3
3 3
3 3
3 3
6 6
M A
T C
H L
IN
E
/ A
D
/ A
D
BUILDING 6-7
CONNECTOR
BUILDING 7-8
CONNECTOR
M A
T C
H L
IN
E
N
57143
NOT IN SCOPE OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:2
:5
A
M
AD104
ROOF DEMOLITION PLAN - BUILDING 7 AND CONNECTOR
7-8
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
DEMOLITION - BUILDING 7 AND CONNECTOR 7-8
DEMOLITION KEY NOTES
Mark Description
1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR
SQUARE FOOTAGE.
2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS
3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE
GUTTERS DAILY.
4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE
5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM
6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING
7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING
8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.
9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK
SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING
10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.
11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.
KEY PLAN
1/8" = 1'-0"
0' 8'4' 16'2'
LEGEND
N
P N
Revisions: Date:
NOTE:
GR102
GR102
GR102
GR104
GR104
GR104
GR104
GR104
GR104
1 1
1 1
1 1
2 2
33 33
3 3
3 3
3 3
/ A
D
1 / AD106
BUILDING 8-9
CONNECTOR
BUILDING 7-8
CONNECTOR
MATCH LINE
M A
T C
H L
IN
E
N
57143
NOT IN SCOPE OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:0
A
M
AD105
ROOF DEMOLITION PLAN - BUILDING 8 AND CONNECTOR
8-9
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
DEMOLITION - BUILDING 8 AND CONNECTOR 8-9
DEMOLITION KEY NOTES
Mark Description
1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR
SQUARE FOOTAGE.
2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS
3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE
GUTTERS DAILY.
4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE
5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM
6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING
7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING
8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.
9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK
SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING
10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.
11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.
KEY PLAN
1/8" = 1'-0"
0' 8'4' 16'2'
LEGEND
N
P N
Revisions: Date:
NOTE:
GR102
GR102
GR102
GR103
GR103
GR103
1 1
1 1 1
1 1
33 33
3 3
3 3
5 5
6 6
/ A
D
1 / AD101
2 2
BUILDING 8-9
CONNECTOR
BUILDING 9-2
CONNECTOR
MATCH LINE
M A
T C
H L
IN
E
REMOVE EXISTING ANTENNA AND
WIRE TEMPORARILY AND REPLACE
WHEN NEW WORK IS COMPLETED.
N
57143
NOT IN SCOPE OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:0
A
M
AD106
ROOF DEMOLITION PLAN - BUILDING 9 AND CONNECTOR
9-2
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
DEMOLITION - BUILDING 9 AND CONNECTOR 9-2
DEMOLITION KEY NOTES
Mark Description
1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR
SQUARE FOOTAGE.
2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS
3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE
GUTTERS DAILY.
4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE
5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM
6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING
7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING
8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.
9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK
SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING
10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.
11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.
KEY PLAN
1/8" = 1'-0"
0' 8'4' 16'2'
LEGEND
N
P N
Revisions: Date:
NOTE:
GR102
44 4
1 11
1 1
1 1
3 3
3 3
/ A
D
1 / AD109
MATCH LINE
M A
T C
H L
IN
E
REMOVE EXISTING ANTENNA AND
WIRE TEMPORARILY AND REPLACE
WHEN NEW WORK IS COMPLETED.
N
57143
NOT IN SCOPE OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:0
A
M
AD107
ROOF DEMOLITION - BUILDING 57
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
DEMOLITION - BUILDING 57
DEMOLITION KEY NOTES
Mark Description
1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR
SQUARE FOOTAGE.
2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS
3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE
GUTTERS DAILY.
4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE
5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM
6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING
7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING
8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.
9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK
SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING
10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.
11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.
KEY PLAN1/8" = 1'-0"
0' 8'4' 16'2'
LEGEND
N
P N
Revisions: Date:
NOTE:
GR104
GR104
GR104
GR104
GR104
7 7
1 / AD107
B U
IL
D
IN
G
N
.I.
C
M A
T C
H L
IN
E
MATCH LINE
THIS CONNECTOR
NOT IN CONTRACT
N
CONNECTOR 57-54
57143
NOT IN SCOPE OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:0
A
M
AD108
ROOF DEMOLITION - CONNECTOR 57-54
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
DEMOLITION - CONNECTOR 57-54
DEMOLITION KEY NOTES
Mark Description
1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR
SQUARE FOOTAGE.
2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS
3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE
GUTTERS DAILY.
4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE
5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM
6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING
7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING
8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.
9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK
SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING
10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.
11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.
KEY PLAN1/8" = 1'-0"
0' 8'4' 16'2'
LEGEND
N
P N
Revisions: Date:
NOTE:
GR105
GR105
GR105
GR105
GR105
8 88
/ A
D
/ A
D
ADJACENT MECHANICAL BUILDING
SLATE ROOF (N.I.C.)
M A
T C
H L
IN
E
M A
T C
H L
IN
E
RD
RD
RD
RD
RDRD
8 888
/ A
D
RD
RD RD RDRD
RD
RD RD
B U
IL
D
IN
G
N
.I.
C
M A
T C
H L
IN
E
M A
T C
H L
IN
E
N
CONNECTOR
57-143
57143
NOT IN SCOPE OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:0
A
M
AD109
ROOF DEMOLITION - CONNECTOR 57-143
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
DEMOLITION - CONNECTOR 57-143A
1/8" = 1'-0"2
DEMOLITION - CONNECTOR 57-143B
DEMOLITION KEY NOTES
Mark Description
1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR
SQUARE FOOTAGE.
2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS
3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE
GUTTERS DAILY.
4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE
5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM
6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING
7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING
8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.
9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK
SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING
10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.
11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.
1/8" = 1'-0"
0' 8'4' 16'2'
KEY PLAN
LEGEND
N
P N
N
P N
Revisions: Date:
NOTE:
E
B U
IL
D
IN
G
N .I.
C
NEW
LOW
SLOPE RO
OF
SYSTEM
, M
INIM
UM
INSULATION REQUIRED TO
CREATE ROO
F PITCH
NEW SNOW GUARD / SNOW RAIL SYSTEM TO REPLACE
EXISTING - SAME LOCATION
AE201
AE201
AE201
AE201
AE201
AE204
LOW
HIGH
AE203
AE204
AE201
AE201
AE204
HIGH
CONNECTOR 2-3
BUILDING 2-9
CONNECTOR
AT
AT
AT
A T
A T
A T
A T
A T
A T
AT
AT
AT
AT
AT
AT
AT
AT
AT
AT
AT
A T
A T
A T
A T
A T
AT
AT
ATAT ATAT
DOWN TO GROUNDING ROD
SEE 7/AE201
DOWN TO GROUNDING ROD
SEE 7/AE201
DOWN TO GROUNDING ROD
SEE 7/AE201
DOWN TO GROUNDING ROD
SEE 7/AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE108
DS
VALL
EY
RIDGE
R
ID
G E
V E
N T
R
ID
G E
V E
N T
VALL
EY VALL
EY
VALL
EY
VALL
EY
VALL
EY
VALLEY
VALLEY
VALLEY
VALLEY
VALLEY
VALLEY
VS
VS
AE204
LOW
AE204
AE201
(TYP)
PROVIDE NEW CRICKET
AE203
PROVIDE NEW CRICKET
VS
VS
VS
AE201
AE201
AE204
AE204
AE204
AE204
AE204
AE204
PP
DS
AE201
AE203
HIGH
LOW
AE204
LOW
HIGH
RD
RD
M A
T C
H L
IN
E
M A
T C
H L
IN
E
AE203
DS
AE204
AE204
NEW INTAKE VENT, 55 LF
NEW INTAKE
VENT, 50 LF
NEW INTAKE VENT, 55 LF
NEW INTAKE VENT, 55 LF
NEW INTAKE VENT, 55 LF
NEW INTAKE
VENT, 45 LF
NEW INTAKE
VENT, 45 LF
NEW INTAKE
VENT, 50 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 50 LF
NEW INTAKE
VENT, 50 LF
NEW INTAKE
VENT, 5 LF
NEW INTAKE VENT, 5 LF
NEW INTAKE VENT, 5 LF
NEW INTAKE VENT, 5 LF
OS
OS
EXISTING CONCRETE
SPLASHBLOCK, REMOVE
DURING NEW WORK AND
RE-INSTALL AFTER NEW
WORK
AE204
LOW
AE204
LOW
NEW LOW SLOPE ROOF
SYSTEM SEE 1/AE203
DS
AE201
AE201
AE201
AE201
R
ID
G E
V E
N T
R
ID
G E
V E
N T
R
ID
G E
V E
N T
R
ID
G E
V E
N T
RIDGE VENTRIDGE VENT
NOTE:
CONTRACTOR SHALL REPLACE UP TO 10%
OF THE ROOF DECK ON THIS BUILDING
NEW SNOW GUARDS NEW SNOW GUARDS
NEW SNOW GUARDS
NEW SNOW GUARDS
NEW SNOW GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
AE201
AE201
AE201
AE201
AE201
AE201
(TYP)
AE201
HIGHLOW
AE201
AE201
AE201
AE201
AE201
NEW
LO
W
SLO
PE ROO
F
SYSTEM
SEE 1/AE203
N
57143
1. UPON AREA BY AREA DEMOLITION OF THE EXISTING ASPHALT SHINGLE SYSTEM, INSTALL SELF-ADHERING RUBBERIZED ASPHALT ICE DAMMING MEMBRANE, SAME DAY, TO CREATE A WEATHER TIGHT CONDITION DURING CONSTRUCTION. APPLY ICE DAMMING MEMBRANE DIRECTLY TO
EXISTING PLANK SHEATHING ROOF.
2. INSTALL NEW RIGID INSULATION ON ALL LOW SLOPED ROOFS.
3. INSTALL NEW RUBBERIZED ASPHALT ICE DAMMING MEMBRANE AT ALL EAVES AND VALLEYS AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.
4. INSTALL NEW POLY-FELT UNDERLAYMENT OVER ENTIRE AREA OF NEW ROOF.
5. INSTALL NEW ASPHALT SHINGLE SYSTEM OVER ENTIRE SCOPE AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.
6. SEE SHEET GI102 FOR ROOF LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:1
A
M
AE101
ROOF PLAN - BUILDING 2 & CONNECTOR 2-3
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
1/8" = 1'-0"1
ROOF PLAN - BUILDING 2 & CONNECTOR 2-3
1/8" = 1'-0"
0' 8'4' 16'2'
KEY PLAN
ROOF CONSTRUCTION NOTES - BUILDINGS 2, 4, 7, 9, AND 57
N
P N
Revisions: Date: Page 30 of 42
5 57143
BUILDING 5 (N.I.C.)
B U
IL
D
IN
G
N .I.
C
NEW LOW SLOPE
ROOF SYSTEM
NEW LOW SLOPE
ROOF SYSTEM
N E
W L
O W
S
LO
P E
R
O O
F S
Y S
T E
M
NEW LOW SLOPE
ROOF SYSTEM
RD
AE201
AE201
AE204
AE204
AE201
AE204
AE201
AE201
AE204
AE201 4
AE201
LOW
HIGH
AE201
AE201
AE201
AE201
CONNECTOR 3-4
C O
N N
E C
T O
R
-5
AT
AT
AT
A T
A T
A T
DOWN TO GROUNDING ROD
SEE 7/AE201
A T
AT A
T
A T
A T
AT
AT
AT
AT
AT
AT
AT
AT
AT
AT
AT
A T
DOWN TO GROUNDING ROD
SEE 7/AE201
DOWN TO GROUNDING
ROD, SEE 7/AE201
DOWN TO GROUNDING
ROD, SEE 7/AE201
NEW INTAKE VENT, 8 LF NEW INTAKE VENT, 8 LF
NEW INTAKE
VENT, 8 LF NEW INTAKE
VENT, 8 LF
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
M A
T C
H L
IN
E
MATCH LINE
AE108
RD
AE204
AE204
AE204
AE204
AE204
AE204
AE108
VS
VS
VSVS
VS
VS
VS
AE204
SC
AE204
NEW INTAKE
VENT, 45 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 45 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 45 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 45 LF
NEW INTAKE
VENT, 40 LF
HIGH
AE201
AE201
AE201
AE201
AE201
AE201
VS VS
VS
HIGH
HIGH
AE204
LOW
AE204
LOW
VS
AE204
LOW
VS
AE203
LOW
R
ID
G E
V E
N T
VALLEY
VALL
EY
VALL
EY
VALLEY
R
ID
G E
V E
N T
R
ID
G E
V E
N T
R
ID
G E
V E
N T
R
ID
G E
V E
N T
VALL
EY
VALL
EY
VALL
EY
VALL
EY
VALLEY
VALLEY
VALLEY
VALLEY
NOTE:
CONTRACTOR SHALL REPLACE UP TO 10%
OF THE ROOF DECK ON THIS BUILDING
NEW SCUPPER
RIDGE VENT
NEW VENT, 70 LF
NEW VENT, 70 LF
NEW VENT, 70 LF
NEW VENT, 70 LF
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
EXISTING ROOFTOP
MECHANICAL UNIT
AE203
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
TYP.
AE201
AE204
TYP.
TYP.
AE204
NEW LOW SLOPE ROOF
SYSTEM SEE 1/AE203
NEW LOW SLOPE ROOF
SYSTEM SEE 1/AE203
VS
1. UPON AREA BY AREA DEMOLITION OF THE EXISTING ASPHALT SHINGLE SYSTEM, INSTALL SELF-ADHERING RUBBERIZED ASPHALT ICE DAMMING MEMBRANE, SAME DAY, TO CREATE A WEATHER TIGHT CONDITION DURING CONSTRUCTION. APPLY ICE DAMMING MEMBRANE DIRECTLY TO
EXISTING PLANK SHEATHING ROOF.
2. INSTALL NEW RIGID INSULATION ON ALL LOW SLOPED ROOFS.
3. INSTALL NEW RUBBERIZED ASPHALT ICE DAMMING MEMBRANE AT ALL EAVES AND VALLEYS AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.
4. INSTALL NEW POLY-FELT UNDERLAYMENT OVER ENTIRE AREA OF NEW ROOF.
5. INSTALL NEW ASPHALT SHINGLE SYSTEM OVER ENTIRE SCOPE AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.
6. SEE SHEET GI102 FOR ROOF LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs
\b s tr a u b in g e r\
D o c u m e n ts
\2
-U S
D V
A -1 b s tr a u b in g e r.
rv t
/1
/2
:3
:1
A
M
AE102
ROOF PLAN - BUILDING 4, CONNECTORS 3-4, AND 4-5
9/17/2021 JLH ACELA
Veterans Health Administration New Jersey Health Care System
2,4,6,7,8,9 & 57
561A4-17-108REPLACEMENT OF ROOFS -
BUILDINGS 2, 4, 6, 7, 8, 9 AND 57
100% WORKING DRAWINGS
KEY PLAN
1/8" = 1'-0"1
ROOF PLAN - BUILDING 4, CONNECTOR 3-4 AND 4-5
1/8" = 1'-0"
0' 8'4' 16'2'
ROOF CONSTRUCTION NOTES - BUILDINGS 2, 4, 7, 9, AND 57
N
Revisions: Date: Page 31 of 42
SEE 1/AE202
D O
W N
BUILDING 5 (N.I.C.)
/ A
E
NEW FLASHING AT EXISTING
EXHAUST - TYPICAL
NEW LOW SLOPE
ROOF SYSTEM
AE201
AE201
AE201
AE201
AE201
AE201
NEW INTAKE VENT, 23 LF
NEW INTAKE
VENT, 30 LF
NEW INTAKE VENT, 23 LF
NEW INTAKE VENT, 30 LF
NEW INTAKE
VENT, 60 LF
NEW INTAKE
VENT, 60 LF
NEW INTAKE
VENT, 60 LF
NEW INTAKE
VENT, 60 LF
AE203
AE201
AE2012
AE204
HIGH
AE201
BUILDING 5-6
CONNECTOR
BUILDING 6-7
CONNECTOR
AT
AT
A T
AT
AT
AT
A T
A T
AT
AT
ATAT
AT AT
A T
A T
A T
AT
AT
AT
AT
AT
DOWN TO GROUNDING ROD
SEE 7/AE201
DOWN TO GROUNDING ROD
SEE 7/AE201
DOWN TO GROUNDING ROD
SEE 7/AE201
DOWN TO GROUNDING ROD
SEE 7/AE201
NEW INTAKE
VENT, 30 LF
NEW INTAKE VENT, 30 LF
NEW INTAKE VENT, 30 LF NEW INTAKE VENT, 30 LF
NEW INTAKE VENT, 6 LF
NEW INTAKE VENT, 6 LF
NEW INTAKE
VENT, 6 LF
NEW INTAKE
VENT, 6 LF
EXISTING FENCE ATTACHED
TO EXISTING PARAPET CAP.
AE203
AE203
AE204
AE203
AE203
AE203
AE203
AE203
AE203
EXISTING BUILDING (N.I.C.)
EXISTING ROUND DUCTS
ABOVE ROOF
RD
RD
M A
T C
H L
IN
E
THROUGH WALL
SCUPPER SEE 4/AE203
AE203
THROUGH WALL
SCUPPER SEE 4/AE203
AE204
AE204
LOW
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
AE201
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 40 LF
NEW INTAKE
VENT, 40 LF
VS
VS
VS VS
EFEF
EF
EF
EF
AE201
DS
DS
PROVIDE CRICKET
@ HIGH SIDE (TYP.)
LOW
AE204
DS
AE204
AE204
NEW LOW SLOPE
ROOF SYSTEM
DS
AE204
AE204
R
ID
G E
V E
N T
VALLEY
R
ID
G E
V E
N T
R
ID
G E
V E
N T
R
ID
G E
V E
N T
R
ID
G E
V E
N T
R
ID
G E
V E
N T
VALL
EY
VALL
EY
VALL
EY
VALL
EY
VALL
EY
VALL
EY
VALL
EY
VALLEY
VALLEY
VALLEY
VALLEY
VALLEY
VALLEY
HIP
R
ID
GE V
ENT
HIP RIDG
E VENT
HIP
R
ID
GE V
ENT
HIP RIDG
E VENT
HIP
R
ID
GE V
ENT
HIP RIDG
E VENT
HIP RIDG
E VENTHIP
R
ID
G E V
ENT
RIDGE VENT RIDGE VENT
NOTE:
CONTRACTOR SHALL REPLACE UP TO 10%
OF THE ROOF DECK ON THIS BUILDING
NEW SNOW
GUARDS
NEW SNOW
GUARDS NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDSNEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
NEW SNOW
GUARDS
PLAN NOTES:
1. CONTRACTOR TO PROVIDE FALL PROTECTION,
SEE 9/AE203
PLAN NOTES:
1. CONTRACTOR TO PROVIDE FALL PROTECTION,
SEE 9/AE203
NEW LOW SLOPE ROOF
SYSTEM SEE 1/AE203
NEW LOW SLOPE ROOF
SYSTEM SEE 1/AE203
AE2014
AE201
AE201
AE201
AE201
AE201
AE201
NEW LOW SLOPE ROOF
SYSTEM SEE 1/AE203
TYP.
AE201
AE203
AE201
HIP
R
ID
GE V
ENTHIP RIDG
E VENT
PROVIDE PRECAST
CONCRETE SPLASH
BLOCK AT GRADE,
SEE 12/AE201
PROVIDE PRECAST
CONCRETE SPLASH
BLOCK AT GRADE,
SEE 12/AE201
N
57143
1. UPON AREA BY AREA DEMOLITION OF THE EXISTING ASPHALT SHINGLE SYSTEM, INSTALL SELF-ADHERING
RUBBERIZED ASPHALT ICE DAMMING MEMBRANE AS SHOWN IN DETAIL 1.
2. INSTALL NEW RIGID INSULATION ON ALL LOW SLOPED ROOFS. WHERE DISTANCES ARE TOO LONG TO PRODUCE A MINIMUM 1/8"/FT PITCH INSTALL THE INSULATION AT THE AME PITCH AS THE EXISTING.
3. INSTALL NEW FELT UNDERLAYMENT OVER ENTIRE AREA OF ROOF
4. INSTALL NEW ASPHALT SHINGLE SYSTEM OVER ENTIRE SCOPE AS NOTED ON DRAWINGS AND IN
SPECIFICATIONS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .