About this file

This document package includes asbestos abatement plans and specifications for a roof replacement project at a Veterans Affairs medical center, as well as a related federal contract solicitation. The solicitation seeks bids to replace roofs on multiple buildings requiring asbestos abatement. The work includes removal and disposal of all asbestos-containing materials in the flashings, mastics and roof assemblies. The specifications provide details on the abatement procedures, regulatory compliance, hazard controls and disposal methods. Bids are due on January 28th and award is proposed for December 8th. The solicitation is issued by the VA Veterans Health Administration VISN 2 for the New Jersey VA Healthcare System.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

/ H

A

M A

T C

H L

IN

E

B U

IL

D

IN

G

N .I.

C

BUILDING 2-3

CONNECTOR

BUILDING 2-9 CONNECTOR

M A

T C

H L

IN

E

AE204

RD

RD

EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK EXISTING COPPER GUTTERS

NOT IN SCOPE OF WORK

EXISTING COPPER GUTTERS

NOT IN SCOPE OF WORK

EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK

EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK

EXISTING COPPER GUTTERS

NOT IN SCOPE OF WORKEXISTING COPPER GUTTERS NOT IN SCOPE OF WORK

2 22 2

2 2 2 2 2 2

3 3

3 3

SEE HA106

SCOPE OF ABATEMENT WORK. REFER TO NOTES AND SUMMARY

OF MATERIALS FOR ADDITIONAL INFORMATION. WIDTH OF HATCH

DOES NOT DETERMINE WIDTH OF CONTRACTORS LIMIT OF

ABATEMENT SCOPE

NOT IN ABATEMENT SCOPE

N

57143

C2-3-2

RUBBER

NONE

C2-3-3

RUBBER

NONE

C2-3-1

CAULK

NONE

LD-1

PERLITE,

FOAM, TAR

NONE

LD-2

WALL,

BUILT-UP

NONE

LD-3

CAULK

NONE

LD-4

COUNTERFLASHING

CAULK

NONE

L2-2

SHINGLE

NONE

L2-1

BUILT-UP

ROOF

NONE

L2-1 SAMPLE NUMBER

BUILT-UP ROOF LOCATION

N.D. ASBESTOS DETECTED

SAMPLE LABEL LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:4

A

M

HA101

ASBESTOS ABATEMENT PLAN - BUILDING 2 AND

CONNECTOR 2-3

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

ASBESTOS ABATEMENT PLAN - BUILDING 2 AND CONNECTOR 2-3

ABATEMENT LEGEND

ABATEMENT KEY NOTES

Mark Description

1 REMOVE ASBESTOS CONTAINING FLASHING AND MASTIC IN ACCORDANCE WITH THE SPECIFICATIONS, FEDERAL, STATE, AND

LOCAL REGULATIONS, AND THE APPROVED HAZARD ABATEMENT PLAN.

2 ROOF EDGE FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

3 VALLEY FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

4 FLASHINGS AT ROOF PENETRATIONS - REMOVE ALL ASBESTOS CONTAINING MATERIAL

5 RISING WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

6 PARAPET WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

KEY PLAN1/8" = 1'-0"

0' 8'4' 16'2'

N

P N

1/32" = 1'-0"2

SAMPLE LOCATION PLAN - BUILDING 2 AND CONNECTOR 2-3

Revisions: Date:

ABATEMENT SCHEDULE - HA101

LOCATION NUMBER

LENGTH OF ROOF

EDGE (LF)

LENGTH OF

VALLEYS (LF)

ROOF

PENETRATIONS

BUILDING 2 780 335 7

CONNECTOR 2-3 70

NOTE:

SEE GI102 FOR ABATEMENT GENERAL NOTES

BUILDING 5 (N.I.C.)

B U

IL

D

IN

G

N .I.

C

M A

T C

H L

IN

E

BUILDING 3-4

CONNECTOR

BUILDING 4-5

CONNECTOR

MATCH LINE

RD

RD RD

RD

EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK

EXISTING COPPER

GUTTERS NOT IN

SCOPE OF WORK

EXISTING COPPER GUTTERS

NOT IN SCOPE OF WORK

EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK

EXISTING COPPER GUTTERS

NOT IN SCOPE OF WORK

2 2 2 2

2 2

2 2

2 2

3 3

3 3

2 3

EXISTING COPPER GUTTERS

NOT IN SCOPE OF WORK

2 2

EXISTING ROOFTOP

MECHANICAL UNIT

EXISTING COPPER GUTTERS

NOT IN SCOPE OF WORK

SCOPE OF ABATEMENT WORK. REFER TO NOTES AND SUMMARY

OF MATERIALS FOR ADDITIONAL INFORMATION. WIDTH OF HATCH

DOES NOT DETERMINE WIDTH OF CONTRACTORS LIMIT OF

ABATEMENT SCOPE

NOT IN ABATEMENT SCOPE

N

5 57143

L4-6

GUTTR CAULK

NONE

L4-5

ROOF SHINGLE

NONE

L4-4

FLASHING

10% CHRYSOTILE

L4-3

EPDM ROOF

NONE

C4-5-1

PARAPET CAP EPDM

NONE

C4-5-2

EPDM ROOF

NONE

C4-5-6

PATCHING

NONE

C4-5-3

COUNTER FLASHING

10% CHRYSOLITE

C4-5-4

PARAPET CAULK

NONE

C4-5-5

PARAPET WALL CUT

3% CHRYSOLITE

L4-1

EPDM ROOF

NONE

L4-2

EPDM ROOF

NONE

L2-1 SAMPLE NUMBER

BUILT-UP ROOF LOCATION

N.D. ASBESTOS DETECTED

SAMPLE LABEL LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:4

A

M

HA102

ASBESTOS ABATEMENT PLAN - BUILDING 4,

CONNECTOR 3-4, AND CONNECTOR 4-5

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

ASBESTOS ABATEMENT PLAN - BUILDING 4, CONNECTORS 3-4 AND 4-5

ABATEMENT LEGEND

ABATEMENT KEY NOTES

Mark Description

1 REMOVE ASBESTOS CONTAINING FLASHING AND MASTIC IN ACCORDANCE WITH THE SPECIFICATIONS, FEDERAL, STATE, AND

LOCAL REGULATIONS, AND THE APPROVED HAZARD ABATEMENT PLAN.

2 ROOF EDGE FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

3 VALLEY FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

4 FLASHINGS AT ROOF PENETRATIONS - REMOVE ALL ASBESTOS CONTAINING MATERIAL

5 RISING WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

6 PARAPET WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

1/8" = 1'-0"

0' 8'4' 16'2'

KEY PLAN

N

P N

1/32" = 1'-0"2

SAMPLE LOCATION PLAN - BUILDING 4, CONNECTORS 3-4 AND 4-5

ABATEMENT SCHEDULE - HA102

LOCATION NUMBER

LENGTH OF ROOF

EDGE (LF)

LENGTH OF

VALLEYS (LF)

ROOF

PENETRATIONS

BUILDING 4 620 300 14

CONNECTOR 3-4 70

CONNECTOR 4-5 55

Revisions: Date:

NOTE:

EXISTING BRICK

CHIMNEYS TO REMAIN

EXISTING BRICK

CHIMNEYS TO REMAIN

D O

W N

MATCH LINE

BUILDING 5 (N.I.C.)

/ H

A

BUILDING 5-6

CONNECTOR

BUILDING 6-7

CONNECTOR

M A

T C

H L

IN

E

5 6 5

EXISTING COPPER

GUTTERS NOT IN

SCOPE OF WORK

EXISTING COPPER

GUTTERS NOT IN

SCOPE OF WORK

EXISTING COPPER GUTTERS

NOT IN SCOPE OF WORK

EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK

EXISTING COPPER GUTTERS NOT IN SCOPE OF WORKEXISTING COPPER GUTTERS NOT IN SCOPE OF WORK

EXISTING COPPER

GUTTERS NOT IN

SCOPE OF WORK

EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK

4 4

2 2

2 2

5 5

EXISTING BUILDING (N.I.C.)

SCOPE OF ABATEMENT WORK. REFER TO NOTES AND SUMMARY

OF MATERIALS FOR ADDITIONAL INFORMATION. WIDTH OF HATCH

DOES NOT DETERMINE WIDTH OF CONTRACTORS LIMIT OF

ABATEMENT SCOPE

NOT IN ABATEMENT SCOPE

N

57143

L6-1

ROOF SHINGLE

NONE

L2-1 SAMPLE NUMBER

BUILT-UP ROOF LOCATION

NONE ASBESTOS DETECTED

SAMPLE LABEL LEGEND

C5-6-2

CAULK

NONE

C5-6-1

EPDM ROOF

NONE

C5-6-3

CAULK

NONE

C5-6-4

MASTIC

3% CHRYSOLITE

BUILDING 5-6

CONNECTOR

BUILDING 6-7

CONNECTOR

C6-7-2

CAULK

NONE

C6-7-1

EPDM ROOF

NONE

C6-7-3

PARAPET WALL

NONE

C6-7-4

EPDM ROOF

NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:5

A

M

HA103

ASBESTOS ABATEMENT PLAN - BUILDING 6,

CONNECTOR 5-6 AND CONNECTOR 6-7

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

ASBESTOS ABATEMENT PLAN - BUILDING 6, CONNECTORS 5-6 AND 6-7

ABATEMENT LEGEND

ABATEMENT KEY NOTES

Mark Description

1 REMOVE ASBESTOS CONTAINING FLASHING AND MASTIC IN ACCORDANCE WITH THE SPECIFICATIONS, FEDERAL, STATE, AND

LOCAL REGULATIONS, AND THE APPROVED HAZARD ABATEMENT PLAN.

2 ROOF EDGE FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

3 VALLEY FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

4 FLASHINGS AT ROOF PENETRATIONS - REMOVE ALL ASBESTOS CONTAINING MATERIAL

5 RISING WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

6 PARAPET WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

KEY PLAN

1/8" = 1'-0"

0' 8'4' 16'2'

N

P N

1/32" = 1'-0"2

SAMPLE LOCATION PLAN -

BUILDING 6, CONNECTORS 5-6 & 6-7

ABATEMENT SCHEDULE - HA103

LOCATION NUMBER

LENGTH OF ROOF

EDGE (LF)

LENGTH OF

VALLEYS (LF)

ROOF

PENETRATIONS

BUILDING 6 875 331 12

CONNECTOR 5-6 155

CONNECTOR 6-7 115

Revisions: Date:

NOTE:

EXISTING BRICK

CHIMNEYS TO REMAIN

M A

T C

H L

IN

E

/ H

A

/ H

A

BUILDING 6-7

CONNECTOR

BUILDING 7-8

CONNECTOR

M A

T C

H L

IN

E

6 5

EXISTING COPPER

GUTTERS NOT IN

SCOPE OF WORK

EXISTING COPPER

GUTTERS NOT IN

SCOPE OF WORKEXISTING COPPER GUTTERS

NOT IN SCOPE OF WORK

EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK

EXISTING COPPER

GUTTERS NOT IN

SCOPE OF WORK

EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK

EXISTING COPPER

GUTTERS NOT IN

SCOPE OF WORK

EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK

4 4

44 4

3 3

3 3

5 5

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

SCOPE OF ABATEMENT WORK. REFER TO NOTES AND SUMMARY

OF MATERIALS FOR ADDITIONAL INFORMATION. WIDTH OF HATCH

DOES NOT DETERMINE WIDTH OF CONTRACTORS LIMIT OF

ABATEMENT SCOPE

NOT IN ABATEMENT SCOPE

N

57143

C7-8-5

MASTIC

5% CHRYSOLITE

L2-1 SAMPLE NUMBER

BUILT-UP ROOF LOCATION

NONE ASBESTOS DETECTED

SAMPLE LABEL LEGEND

L7-2

CAULK

NONE

C7-8-2

EPDM ROOF

NONE

C7-8-1

CAULK

NONE

C7-8-4

PATCHING

NONE

C7-8-3

CAULK

NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:0

A

M

HA104

ASBESTOS ABATEMENT PLAN - BUILDING 7 AND

CONNECTOR 7-8

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

ASBESTOS ABATEMENT PLAN - BUILDING 7 AND CONNECTOR 7-8

ABATEMENT KEY NOTES

Mark Description

1 REMOVE ASBESTOS CONTAINING FLASHING AND MASTIC IN ACCORDANCE WITH THE SPECIFICATIONS, FEDERAL, STATE, AND

LOCAL REGULATIONS, AND THE APPROVED HAZARD ABATEMENT PLAN.

2 ROOF EDGE FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

3 VALLEY FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

4 FLASHINGS AT ROOF PENETRATIONS - REMOVE ALL ASBESTOS CONTAINING MATERIAL

5 RISING WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

6 PARAPET WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

ABATEMENT LEGEND

KEY PLAN

1/8" = 1'-0"

0' 8'4' 16'2'

N

P N

1/32" = 1'-0"2

SAMPLE LOCATION PLAN -

BUILDING 7 AND CONNECTOR 7-8

ABATEMENT SCHEDULE - HA104

LOCATION NUMBER

LENGTH OF ROOF

EDGE (LF)

LENGTH OF

VALLEYS (LF)

ROOF

PENETRATIONS

BUILDING 7 955 363 11

CONNECTOR 7-8 125

Revisions: Date:

NOTE:

/ H

A

MATCH LINE

1 / HA106

BUILDING 8-9

CONNECTOR

BUILDING 7-8

CONNECTOR

M A

T C

H L

IN

E

EXISTING COPPER

GUTTERS NOT IN

SCOPE OF WORK EXISTING COPPER

GUTTERS NOT IN

SCOPE OF WORK

EXISTING COPPER GUTTERS

NOT IN SCOPE OF WORK

EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK

EXISTING COPPER

GUTTERS NOT IN

SCOPE OF WORK

EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK

EXISTING COPPER

GUTTERS NOT IN

SCOPE OF WORK

EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK

4 4

42 2

5 5

2 2

2 22 2

2 2 2 2

3 3

SCOPE OF ABATEMENT WORK. REFER TO NOTES AND SUMMARY

OF MATERIALS FOR ADDITIONAL INFORMATION. WIDTH OF HATCH

DOES NOT DETERMINE WIDTH OF CONTRACTORS LIMIT OF

ABATEMENT SCOPE

NOT IN ABATEMENT SCOPE

N

57143

L2-1 SAMPLE NUMBER

BUILT-UP ROOF LOCATION

NONE ASBESTOS DETECTED

SAMPLE LABEL LEGEND

L8-2

EPDM ROOF

NONE

L8-1

SHINGLE ROOF

NONE

C8-9-2

EPDM ROOF

NONE

C8-9-1

PARAPET WALL

NONE

C8-9-3

EPDM/CAULK

NONE

C8-9-4

EPDM ROOF

NONE

C8-9-5

CAULK

NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:0

A

M

HA105

ASBESTOS ABATEMENT PLAN - BUILDING 8 AND

CONNECTOR 8-9

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

ASBESTOS ABATEMENT PLAN - BUILDING 8 AND CONNECTOR 8-9

ABATEMENT KEY NOTES

Mark Description

1 REMOVE ASBESTOS CONTAINING FLASHING AND MASTIC IN ACCORDANCE WITH THE SPECIFICATIONS, FEDERAL, STATE, AND

LOCAL REGULATIONS, AND THE APPROVED HAZARD ABATEMENT PLAN.

2 ROOF EDGE FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

3 VALLEY FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

4 FLASHINGS AT ROOF PENETRATIONS - REMOVE ALL ASBESTOS CONTAINING MATERIAL

5 RISING WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

6 PARAPET WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

ABATEMENT LEGEND

KEY PLAN1/8" = 1'-0"

0' 8'4' 16'2'

N

P N

1/32" = 1'-0"2

SAMPLE LOCATION PLAN -

BUILDING 8 AND CONNECTOR 8-9

ABATEMENT SCHEDULE - HA105

LOCATION NUMBER

LENGTH OF ROOF

EDGE (LF)

LENGTH OF

VALLEYS (LF)

ROOF

PENETRATIONS

BUILDING 8 880 331 11

CONNECTOR 8-9 160

Revisions: Date:

NOTE:

M A

T C

H L

IN

E

/ H

A

1 / HA101

BUILDING 8-9

CONNECTOR

BUILDING 9-2

CONNECTOR

MATCH LINE

2 2

2 2

22 2222

2 2

EXISTING COPPER

GUTTERS NOT IN

SCOPE OF WORK EXISTING COPPER

GUTTERS NOT IN

SCOPE OF WORK

EXISTING COPPER GUTTERS

NOT IN SCOPE OF WORK

EXISTING COPPER

GUTTERS NOT IN

SCOPE OF WORK

EXISTING COPPER

GUTTERS NOT IN

SCOPE OF WORK

EXISTING COPPER GUTTERS NOT IN SCOPE OF WORK

EXISTING COPPER

GUTTERS NOT IN

SCOPE OF WORK

EXISTING COPPER

GUTTERS NOT IN

SCOPE OF WORK

SCOPE OF ABATEMENT WORK. REFER TO NOTES AND SUMMARY

OF MATERIALS FOR ADDITIONAL INFORMATION. WIDTH OF HATCH

DOES NOT DETERMINE WIDTH OF CONTRACTORS LIMIT OF

ABATEMENT SCOPE

NOT IN ABATEMENT SCOPE

N

57143

L2-1 SAMPLE NUMBER

BUILT-UP ROOF LOCATION

NONE ASBESTOS DETECTED

SAMPLE LABEL LEGEND

C9-2-2

COUNTERFLASHING

CAULK

NONE

C9-2-3

PARAPET CAP

CAULK

NONE

C9-2-1

EPDM ROOF

NONE

L9-1

SHINGLE ROOF

NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:0

:2

A

M

HA106

ASBESTOS ABATEMENT PLAN - BUILDING 9 AND

CONNECTOR 9-2

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

ASBESTOS ABATEMENT PLAN - BUILDING 9 AND CONNECTOR 9-2

ABATEMENT LEGEND

ABATEMENT KEY NOTES

Mark Description

1 REMOVE ASBESTOS CONTAINING FLASHING AND MASTIC IN ACCORDANCE WITH THE SPECIFICATIONS, FEDERAL, STATE, AND

LOCAL REGULATIONS, AND THE APPROVED HAZARD ABATEMENT PLAN.

2 ROOF EDGE FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

3 VALLEY FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

4 FLASHINGS AT ROOF PENETRATIONS - REMOVE ALL ASBESTOS CONTAINING MATERIAL

5 RISING WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

6 PARAPET WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

KEY PLAN

1/8" = 1'-0"

0' 8'4' 16'2'

N

P N

1/32" = 1'-0"2

SAMPLE LOCATION PLAN -

BUILDING 9 AND CONNECTOR 9-2

ABATEMENT SCHEDULE - HA106

LOCATION NUMBER

LENGTH OF ROOF

EDGE (LF)

LENGTH OF

VALLEYS (LF)

ROOF

PENETRATIONS

BUILDING 9 960 370 17

CONNECTOR 9-2 132

Revisions: Date:

NOTE:

/ A

D

/ A

D

1 / AD109

1 / AD107

4 4

2 2

2 2

2 22 2

2 2 2 2

2 2

2 2

EXISTING COPPER

GUTTERS NOT IN

SCOPE OF WORK

EXISTING COPPER GUTTERS

NOT IN SCOPE OF WORK

EXISTING COPPER GUTTERS

NOT IN SCOPE OF WORK

EXISTING COPPER

GUTTERS NOT IN

SCOPE OF WORK

EXISTING COPPER GUTTERS

NOT IN SCOPE OF WORK

EXISTING COPPER GUTTERS

NOT IN SCOPE OF WORK

EXISTING COPPER

GUTTERS NOT IN

SCOPE OF WORK

EXISTING COPPER

GUTTERS NOT IN

SCOPE OF WORK

SCOPE OF ABATEMENT WORK. REFER TO NOTES AND SUMMARY

OF MATERIALS FOR ADDITIONAL INFORMATION. WIDTH OF HATCH

DOES NOT DETERMINE WIDTH OF CONTRACTORS LIMIT OF

ABATEMENT SCOPE

NOT IN ABATEMENT SCOPE

N

57143

L2-1 SAMPLE NUMBER

BUILT-UP ROOF LOCATION

NONE ASBESTOS DETECTED

SAMPLE LABEL LEGEND

L57-2

SHINGLE ROOF

NONE

L57-1

SHINGLE ROOF

NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:1

A

M

HA107

ASBESTOS ABATEMENT PLAN - BUILDING 57

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

ASBESTOS ABATEMENT PLAN - BUILDING 57

ABATEMENT LEGEND

ABATEMENT KEY NOTES

Mark Description

1 REMOVE ASBESTOS CONTAINING FLASHING AND MASTIC IN ACCORDANCE WITH THE SPECIFICATIONS, FEDERAL, STATE, AND

LOCAL REGULATIONS, AND THE APPROVED HAZARD ABATEMENT PLAN.

2 ROOF EDGE FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

3 VALLEY FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

4 FLASHINGS AT ROOF PENETRATIONS - REMOVE ALL ASBESTOS CONTAINING MATERIAL

5 RISING WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

6 PARAPET WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

KEY PLAN

N

P N

ABATEMENT SCHEDULE - HA107

LOCATION NUMBER

LENGTH OF ROOF

EDGE (LF)

LENGTH OF

VALLEYS (LF)

ROOF

PENETRATIONS

BUILDING 57 1060 331 14

1/32" = 1'-0"2

SAMPLE LOCATION PLAN - BUILDING 57

Revisions: Date:

1/8" = 1'-0"

0' 8'4' 16'2'

NOTE:

N

CONNECTOR 57-54

57143

A. FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND SERVICES NECESSARY FOR THE REMOVAL AND DISPOSAL OF ASBESTOS- CONTAINING MATERIALS AS NOTED INCLUDING THE REMOVAL OF ALL NON ASBESTOS-CONTAINING MATERIALS SUCH AS FLASHING AND ROOF PLIES , AND ANY DEMOLITION, REMOVAL AND DISPOSAL NECESSARY TO EXPOSE ASBESTOS CONTAINING MATERIALS AND DEBRIS INCLUDING ALL REQUIRED PREPARATION, CLEANING, ENCAPSULATION AND DECONTAMINATION IN ACCORDANCE WITH ALL REGULATORY AGENCY REQUIREMENTS AND THE PROJECT PLANS AND SPECIFICATIONS.

B. IF SUSPECTED ASBESTOS OR HAZARDOUS MATERIAL IS ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL STOP WORK IMMEDIATELY , AND NOTIFY THE OWNER/ARCHITECT IN WRITING, PRIOR TO CONTINUING WORK.

C. INSTALL WARNING SIGNS TO ESTABLISH ABATEMENT WORK AREAS PRIOR TO THE START OF REMOVAL AND DISPOSAL OF

HAZARDOUS MATERIALS PER THE PROJECT SPECIFICATIONS.

D. FOR MATERIALS REPORTED TO CONTAIN <1% ASBESTOS, FOLLOW OSHA REQUIREMENTS FOR MATERIALS WITH 1% OR LESS ASBESTOS, INCLUDING WET HANDLING, CLEAN UP, DISPOSAL IN LEAK TIGHT CONTAINERS, AND AN EXPOSURE ASSESSMENT.

E. AN ASBESTOS SURVEY REPORT FOR THE ENTIRE AREA IS INCLUDED IN THE SPECIFICATIONS.

SCOPE OF ABATEMENT WORK. REFER TO NOTES AND SUMMARY

OF MATERIALS FOR ADDITIONAL INFORMATION. WIDTH OF HATCH

DOES NOT DETERMINE WIDTH OF CONTRACTORS LIMIT OF

ABATEMENT SCOPE

NOT IN ABATEMENT SCOPE

THIS CONNECTOR

NOT IN CONTRACT

L2-1 SAMPLE NUMBER

BUILT-UP ROOF LOCATION

NONE ASBESTOS DETECTED

SAMPLE LABEL LEGEND

C57-55-2

EPDM ROOF

NONE

C57-55-1

EPDM ROOF

NONE

C57-55-3

PARAPET CUT

EPDM

NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:2

A

M

HA108

ASBESTOS ABATEMENT PLAN - CONNECTOR 57-54

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

Revisions: Date:

KEY PLAN

ABATEMENT - GENERAL NOTES

ABATEMENT LEGEND

ABATEMENT KEY NOTES

Mark Description

1 REMOVE ASBESTOS CONTAINING FLASHING AND MASTIC IN ACCORDANCE WITH THE SPECIFICATIONS, FEDERAL, STATE, AND

LOCAL REGULATIONS, AND THE APPROVED HAZARD ABATEMENT PLAN.

2 ROOF EDGE FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

3 VALLEY FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

4 FLASHINGS AT ROOF PENETRATIONS - REMOVE ALL ASBESTOS CONTAINING MATERIAL

5 RISING WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

6 PARAPET WALL FLASHING - REMOVE ALL ASBESTOS CONTAINING MATERIAL

ABATEMENT SCHEDULE - HA108

LOCATION NUMBER

LENGTH OF ROOF

EDGE (LF)

LENGTH OF

VALLEYS (LF)

ROOF

PENETRATIONS

CONNECTOR 57-54 435

1/8" = 1'-0"1

ASBESTOS ABATEMENT PLAN - CONNECTOR 57-54

N

P N

1/32" = 1'-0"2

SAMPLE LOCATION PLAN -

GR101

GR101

GR101

GR103

GR103

1 1

2 2

3 33 3

3 3

33 3

5 5

7 7

/ A

D

M A

T C

H L

IN

E

B U

IL

D

IN

G

N .I.

C

BUILDING 2-3

CONNECTOR

BUILDING 2-9

CONNECTOR

M A

T C

H L

IN

E

RD

RD

N

57143

NOT IN SCOPE OF WORK

DEMOLITION KEY NOTES

Mark Description

1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR

SQUARE FOOTAGE.

2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS

3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE

GUTTERS DAILY.

4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE

5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM

6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING

7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING

8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.

9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK

SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING

10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.

11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:2

:5

A

M

AD101

ROOF DEMOLITION PLAN - BUILDING 2 AND CONNECTOR

2-3

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

DEMOLITION - BUILDING 2 AND CONNECTOR 2-3

KEY PLAN

1/8" = 1'-0"

0' 8'4' 16'2'

LEGEND

N

P N

Revisions: Date:

NOTE:

SEE GI102 FOR GENERAL DEMOLITION NOTES

GR101

GR101

GR101

GR101

GR101

GR103

GR103

GR103

1 1

2 2 2

3 3

33 3

3 3

3 3

3 3

6 6

BUILDING 5 (N.I.C.)

B U

IL

D

IN

G

N .I.

C

BUILDING 3-4

CONNECTOR

BUILDING 4-5

CONNECTOR

M A

T C

H L

IN

E

MATCH LINE

DS

RD

RD

RD

RD

EXISTING ROOFTOP

MECHANICAL UNIT

N

5 57143

NOT IN SCOPE OF WORK

DEMOLITION KEY NOTES

Mark Description

1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR

SQUARE FOOTAGE.

2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS

3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE

GUTTERS DAILY.

4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE

5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM

6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING

7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING

8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.

9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK

SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING

10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.

11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:2

:5

A

M

AD102

ROOF DEMOLITION PLAN - BUILDING 4, CONNECTOR 3-4,

AND CONNECTOR 4-5

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

DEMOLITION - BUILDING 4, CONNECTOR 3-4 AND 4-5

KEY PLAN

1/8" = 1'-0"

0' 8'4' 16'2'

LEGEND

N

P N

Revisions: Date:

NOTE:

GR103

GR103

GR103

GR103

GR103

GR103

GR101

GR101

EXISTING BRICK

CHIMNEYS TO REMAIN

EXISTING BRICK

CHIMNEYS TO REMAIN

5 5

5 5

2 2

6 6

3 3

3 333

3 3

3 333

3 3

1 1

D O

W N

MATCH LINE

BUILDING 5 (N.I.C.)

/ A

D

BUILDING 5-6

CONNECTOR

BUILDING 6-7

CONNECTOR

M A

T C

H L

IN

E

EXISTING BUILDING (N.I.C.)

N

57143

NOT IN SCOPE OF WORK

DEMOLITION KEY NOTES

Mark Description

1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR

SQUARE FOOTAGE.

2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS

3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE

GUTTERS DAILY.

4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE

5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM

6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING

7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING

8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.

9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK

SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING

10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.

11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:2

:5

A

M

AD103

ROOF DEMOLITION PLAN - BUILDING 6, CONNECTOR 5-6

AND CONNECTOR 6-7

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

DEMOLITION - BUILDING 6,

CONNECTOR 5-6 AND CONNECTOR

6-7

KEY PLAN

1/8" = 1'-0"

0' 8'4' 16'2'

LEGEND

N

P N

Revisions: Date:

NOTE:

GR101

GR104

GR104

GR104

GR104

GR104

EXISTING BRICK

CHIMNEYS TO REMAIN

EXISTING BRICK

CHIMNEYS TO REMAIN

2 2

1 1

1 1

3 3

3 3

3 3

3 3

6 6

M A

T C

H L

IN

E

/ A

D

/ A

D

BUILDING 6-7

CONNECTOR

BUILDING 7-8

CONNECTOR

M A

T C

H L

IN

E

N

57143

NOT IN SCOPE OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:2

:5

A

M

AD104

ROOF DEMOLITION PLAN - BUILDING 7 AND CONNECTOR

7-8

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

DEMOLITION - BUILDING 7 AND CONNECTOR 7-8

DEMOLITION KEY NOTES

Mark Description

1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR

SQUARE FOOTAGE.

2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS

3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE

GUTTERS DAILY.

4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE

5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM

6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING

7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING

8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.

9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK

SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING

10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.

11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.

KEY PLAN

1/8" = 1'-0"

0' 8'4' 16'2'

LEGEND

N

P N

Revisions: Date:

NOTE:

GR102

GR102

GR102

GR104

GR104

GR104

GR104

GR104

GR104

1 1

1 1

1 1

2 2

33 33

3 3

3 3

3 3

/ A

D

1 / AD106

BUILDING 8-9

CONNECTOR

BUILDING 7-8

CONNECTOR

MATCH LINE

M A

T C

H L

IN

E

N

57143

NOT IN SCOPE OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:0

A

M

AD105

ROOF DEMOLITION PLAN - BUILDING 8 AND CONNECTOR

8-9

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

DEMOLITION - BUILDING 8 AND CONNECTOR 8-9

DEMOLITION KEY NOTES

Mark Description

1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR

SQUARE FOOTAGE.

2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS

3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE

GUTTERS DAILY.

4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE

5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM

6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING

7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING

8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.

9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK

SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING

10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.

11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.

KEY PLAN

1/8" = 1'-0"

0' 8'4' 16'2'

LEGEND

N

P N

Revisions: Date:

NOTE:

GR102

GR102

GR102

GR103

GR103

GR103

1 1

1 1 1

1 1

33 33

3 3

3 3

5 5

6 6

/ A

D

1 / AD101

2 2

BUILDING 8-9

CONNECTOR

BUILDING 9-2

CONNECTOR

MATCH LINE

M A

T C

H L

IN

E

REMOVE EXISTING ANTENNA AND

WIRE TEMPORARILY AND REPLACE

WHEN NEW WORK IS COMPLETED.

N

57143

NOT IN SCOPE OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:0

A

M

AD106

ROOF DEMOLITION PLAN - BUILDING 9 AND CONNECTOR

9-2

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

DEMOLITION - BUILDING 9 AND CONNECTOR 9-2

DEMOLITION KEY NOTES

Mark Description

1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR

SQUARE FOOTAGE.

2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS

3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE

GUTTERS DAILY.

4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE

5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM

6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING

7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING

8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.

9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK

SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING

10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.

11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.

KEY PLAN

1/8" = 1'-0"

0' 8'4' 16'2'

LEGEND

N

P N

Revisions: Date:

NOTE:

GR102

44 4

1 11

1 1

1 1

3 3

3 3

/ A

D

1 / AD109

MATCH LINE

M A

T C

H L

IN

E

REMOVE EXISTING ANTENNA AND

WIRE TEMPORARILY AND REPLACE

WHEN NEW WORK IS COMPLETED.

N

57143

NOT IN SCOPE OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:0

A

M

AD107

ROOF DEMOLITION - BUILDING 57

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

DEMOLITION - BUILDING 57

DEMOLITION KEY NOTES

Mark Description

1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR

SQUARE FOOTAGE.

2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS

3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE

GUTTERS DAILY.

4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE

5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM

6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING

7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING

8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.

9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK

SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING

10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.

11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.

KEY PLAN1/8" = 1'-0"

0' 8'4' 16'2'

LEGEND

N

P N

Revisions: Date:

NOTE:

GR104

GR104

GR104

GR104

GR104

7 7

1 / AD107

B U

IL

D

IN

G

N

.I.

C

M A

T C

H L

IN

E

MATCH LINE

THIS CONNECTOR

NOT IN CONTRACT

N

CONNECTOR 57-54

57143

NOT IN SCOPE OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:0

A

M

AD108

ROOF DEMOLITION - CONNECTOR 57-54

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

DEMOLITION - CONNECTOR 57-54

DEMOLITION KEY NOTES

Mark Description

1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR

SQUARE FOOTAGE.

2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS

3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE

GUTTERS DAILY.

4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE

5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM

6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING

7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING

8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.

9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK

SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING

10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.

11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.

KEY PLAN1/8" = 1'-0"

0' 8'4' 16'2'

LEGEND

N

P N

Revisions: Date:

NOTE:

GR105

GR105

GR105

GR105

GR105

8 88

/ A

D

/ A

D

ADJACENT MECHANICAL BUILDING

SLATE ROOF (N.I.C.)

M A

T C

H L

IN

E

M A

T C

H L

IN

E

RD

RD

RD

RD

RDRD

8 888

/ A

D

RD

RD RD RDRD

RD

RD RD

B U

IL

D

IN

G

N

.I.

C

M A

T C

H L

IN

E

M A

T C

H L

IN

E

N

CONNECTOR

57-143

57143

NOT IN SCOPE OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:0

A

M

AD109

ROOF DEMOLITION - CONNECTOR 57-143

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

DEMOLITION - CONNECTOR 57-143A

1/8" = 1'-0"2

DEMOLITION - CONNECTOR 57-143B

DEMOLITION KEY NOTES

Mark Description

1 REMOVE EXISTING ASPHALT SHINGLE ROOF SYSTEM, INCLIDING FELTS AND ICE DAMMING MEMBRANE DOWN TO EXISTING PLANK SHEATHING, AND DISPOSE. PREPARE EXISITNG ROOF SHEATHING TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR

SQUARE FOOTAGE.

2 REMOVE EXISTING EPDM ROOF SYSTEM, INCLUDING INSULATION, DOWN TO EXISTING DECK AND DISPOSE. PREPARE EXISTING DECK TO RECEIVE NEW ROOF SYSTEM. REFER TO ROOF SCHEDULE FOR SQUARE FOOTAGE. SEE HA DRAWINGS

3 EXISTING COPPER GUTTERS AND RAKES NOT IN SCOPE OF WORK. CONTRACTOR TO CLEAN ANY DEBRIS FROM WORK CAUGHT IN THE

GUTTERS DAILY.

4 REMOVE EXISTING SNOW GUARDS IN THEIR ENTIRETY AND DISPOSE

5 EXISTING EXHAUST TO REMAIN, PREPARE FOR NEW ROOF SYSTEM

6 EXISTING VENT PIPE TO REMAIN, PREPARE FOR NEW PIPE FLASHING

7 EXISTING SCUPPER TO REMAIN, PREPARE FOR NEW THROUGH WALL SCUPPER FLASHING

8 REMOVE EXISTING ROOF DRAIN BODY, CLEAN AND PREP STORM WATER PIPE TO RECEIVE NEW ROOF DRAIN.

9 REMOVE EXISTING ROOF HATCH AND ASSOCIATED FLASHING IN ITS ENTIRETY. PROVIDE NEW 2"x10" ROOF FRAMING AND 1"x6" WOOD PLANK

SHEATHING TO MATCH EXISTING CONSTRUCTION, TO CONCEAL EXISTING OPENING

10 REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY, PREPARE FOR INSTALLATION OF NEW EXPANSION JOINT.

11 REMOVE EXISTING DOWNSPOUT TO PERFORM THE ROOF DEMOLITION, SEE NEW WORK DRAWING.

1/8" = 1'-0"

0' 8'4' 16'2'

KEY PLAN

LEGEND

N

P N

N

P N

Revisions: Date:

NOTE:

E

B U

IL

D

IN

G

N .I.

C

NEW

LOW

SLOPE RO

OF

SYSTEM

, M

INIM

UM

INSULATION REQUIRED TO

CREATE ROO

F PITCH

NEW SNOW GUARD / SNOW RAIL SYSTEM TO REPLACE

EXISTING - SAME LOCATION

AE201

AE201

AE201

AE201

AE201

AE204

LOW

HIGH

AE203

AE204

AE201

AE201

AE204

HIGH

CONNECTOR 2-3

BUILDING 2-9

CONNECTOR

AT

AT

AT

A T

A T

A T

A T

A T

A T

AT

AT

AT

AT

AT

AT

AT

AT

AT

AT

AT

A T

A T

A T

A T

A T

AT

AT

ATAT ATAT

DOWN TO GROUNDING ROD

SEE 7/AE201

DOWN TO GROUNDING ROD

SEE 7/AE201

DOWN TO GROUNDING ROD

SEE 7/AE201

DOWN TO GROUNDING ROD

SEE 7/AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE108

DS

VALL

EY

RIDGE

R

ID

G E

V E

N T

R

ID

G E

V E

N T

VALL

EY VALL

EY

VALL

EY

VALL

EY

VALL

EY

VALLEY

VALLEY

VALLEY

VALLEY

VALLEY

VALLEY

VS

VS

AE204

LOW

AE204

AE201

(TYP)

PROVIDE NEW CRICKET

AE203

PROVIDE NEW CRICKET

VS

VS

VS

AE201

AE201

AE204

AE204

AE204

AE204

AE204

AE204

PP

DS

AE201

AE203

HIGH

LOW

AE204

LOW

HIGH

RD

RD

M A

T C

H L

IN

E

M A

T C

H L

IN

E

AE203

DS

AE204

AE204

NEW INTAKE VENT, 55 LF

NEW INTAKE

VENT, 50 LF

NEW INTAKE VENT, 55 LF

NEW INTAKE VENT, 55 LF

NEW INTAKE VENT, 55 LF

NEW INTAKE

VENT, 45 LF

NEW INTAKE

VENT, 45 LF

NEW INTAKE

VENT, 50 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 50 LF

NEW INTAKE

VENT, 50 LF

NEW INTAKE

VENT, 5 LF

NEW INTAKE VENT, 5 LF

NEW INTAKE VENT, 5 LF

NEW INTAKE VENT, 5 LF

OS

OS

EXISTING CONCRETE

SPLASHBLOCK, REMOVE

DURING NEW WORK AND

RE-INSTALL AFTER NEW

WORK

AE204

LOW

AE204

LOW

NEW LOW SLOPE ROOF

SYSTEM SEE 1/AE203

DS

AE201

AE201

AE201

AE201

R

ID

G E

V E

N T

R

ID

G E

V E

N T

R

ID

G E

V E

N T

R

ID

G E

V E

N T

RIDGE VENTRIDGE VENT

NOTE:

CONTRACTOR SHALL REPLACE UP TO 10%

OF THE ROOF DECK ON THIS BUILDING

NEW SNOW GUARDS NEW SNOW GUARDS

NEW SNOW GUARDS

NEW SNOW GUARDS

NEW SNOW GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

AE201

AE201

AE201

AE201

AE201

AE201

(TYP)

AE201

HIGHLOW

AE201

AE201

AE201

AE201

AE201

NEW

LO

W

SLO

PE ROO

F

SYSTEM

SEE 1/AE203

N

57143

1. UPON AREA BY AREA DEMOLITION OF THE EXISTING ASPHALT SHINGLE SYSTEM, INSTALL SELF-ADHERING RUBBERIZED ASPHALT ICE DAMMING MEMBRANE, SAME DAY, TO CREATE A WEATHER TIGHT CONDITION DURING CONSTRUCTION. APPLY ICE DAMMING MEMBRANE DIRECTLY TO

EXISTING PLANK SHEATHING ROOF.

2. INSTALL NEW RIGID INSULATION ON ALL LOW SLOPED ROOFS.

3. INSTALL NEW RUBBERIZED ASPHALT ICE DAMMING MEMBRANE AT ALL EAVES AND VALLEYS AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.

4. INSTALL NEW POLY-FELT UNDERLAYMENT OVER ENTIRE AREA OF NEW ROOF.

5. INSTALL NEW ASPHALT SHINGLE SYSTEM OVER ENTIRE SCOPE AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.

6. SEE SHEET GI102 FOR ROOF LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:1

A

M

AE101

ROOF PLAN - BUILDING 2 & CONNECTOR 2-3

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

1/8" = 1'-0"1

ROOF PLAN - BUILDING 2 & CONNECTOR 2-3

1/8" = 1'-0"

0' 8'4' 16'2'

KEY PLAN

ROOF CONSTRUCTION NOTES - BUILDINGS 2, 4, 7, 9, AND 57

N

P N

Revisions: Date: Page 30 of 42

5 57143

BUILDING 5 (N.I.C.)

B U

IL

D

IN

G

N .I.

C

NEW LOW SLOPE

ROOF SYSTEM

NEW LOW SLOPE

ROOF SYSTEM

N E

W L

O W

S

LO

P E

R

O O

F S

Y S

T E

M

NEW LOW SLOPE

ROOF SYSTEM

RD

AE201

AE201

AE204

AE204

AE201

AE204

AE201

AE201

AE204

AE201 4

AE201

LOW

HIGH

AE201

AE201

AE201

AE201

CONNECTOR 3-4

C O

N N

E C

T O

R

-5

AT

AT

AT

A T

A T

A T

DOWN TO GROUNDING ROD

SEE 7/AE201

A T

AT A

T

A T

A T

AT

AT

AT

AT

AT

AT

AT

AT

AT

AT

AT

A T

DOWN TO GROUNDING ROD

SEE 7/AE201

DOWN TO GROUNDING

ROD, SEE 7/AE201

DOWN TO GROUNDING

ROD, SEE 7/AE201

NEW INTAKE VENT, 8 LF NEW INTAKE VENT, 8 LF

NEW INTAKE

VENT, 8 LF NEW INTAKE

VENT, 8 LF

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

M A

T C

H L

IN

E

MATCH LINE

AE108

RD

AE204

AE204

AE204

AE204

AE204

AE204

AE108

VS

VS

VSVS

VS

VS

VS

AE204

SC

AE204

NEW INTAKE

VENT, 45 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 45 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 45 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 45 LF

NEW INTAKE

VENT, 40 LF

HIGH

AE201

AE201

AE201

AE201

AE201

AE201

VS VS

VS

HIGH

HIGH

AE204

LOW

AE204

LOW

VS

AE204

LOW

VS

AE203

LOW

R

ID

G E

V E

N T

VALLEY

VALL

EY

VALL

EY

VALLEY

R

ID

G E

V E

N T

R

ID

G E

V E

N T

R

ID

G E

V E

N T

R

ID

G E

V E

N T

VALL

EY

VALL

EY

VALL

EY

VALL

EY

VALLEY

VALLEY

VALLEY

VALLEY

NOTE:

CONTRACTOR SHALL REPLACE UP TO 10%

OF THE ROOF DECK ON THIS BUILDING

NEW SCUPPER

RIDGE VENT

NEW VENT, 70 LF

NEW VENT, 70 LF

NEW VENT, 70 LF

NEW VENT, 70 LF

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

EXISTING ROOFTOP

MECHANICAL UNIT

AE203

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

TYP.

AE201

AE204

TYP.

TYP.

AE204

NEW LOW SLOPE ROOF

SYSTEM SEE 1/AE203

NEW LOW SLOPE ROOF

SYSTEM SEE 1/AE203

VS

1. UPON AREA BY AREA DEMOLITION OF THE EXISTING ASPHALT SHINGLE SYSTEM, INSTALL SELF-ADHERING RUBBERIZED ASPHALT ICE DAMMING MEMBRANE, SAME DAY, TO CREATE A WEATHER TIGHT CONDITION DURING CONSTRUCTION. APPLY ICE DAMMING MEMBRANE DIRECTLY TO

EXISTING PLANK SHEATHING ROOF.

2. INSTALL NEW RIGID INSULATION ON ALL LOW SLOPED ROOFS.

3. INSTALL NEW RUBBERIZED ASPHALT ICE DAMMING MEMBRANE AT ALL EAVES AND VALLEYS AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.

4. INSTALL NEW POLY-FELT UNDERLAYMENT OVER ENTIRE AREA OF NEW ROOF.

5. INSTALL NEW ASPHALT SHINGLE SYSTEM OVER ENTIRE SCOPE AS NOTED ON DRAWINGS AND IN SPECIFICATIONS.

6. SEE SHEET GI102 FOR ROOF LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs

\b s tr a u b in g e r\

D o c u m e n ts

\2

-U S

D V

A -1 b s tr a u b in g e r.

rv t

/1

/2

:3

:1

A

M

AE102

ROOF PLAN - BUILDING 4, CONNECTORS 3-4, AND 4-5

9/17/2021 JLH ACELA

Veterans Health Administration New Jersey Health Care System

2,4,6,7,8,9 & 57

561A4-17-108REPLACEMENT OF ROOFS -

BUILDINGS 2, 4, 6, 7, 8, 9 AND 57

100% WORKING DRAWINGS

KEY PLAN

1/8" = 1'-0"1

ROOF PLAN - BUILDING 4, CONNECTOR 3-4 AND 4-5

1/8" = 1'-0"

0' 8'4' 16'2'

ROOF CONSTRUCTION NOTES - BUILDINGS 2, 4, 7, 9, AND 57

N

Revisions: Date: Page 31 of 42

SEE 1/AE202

D O

W N

BUILDING 5 (N.I.C.)

/ A

E

NEW FLASHING AT EXISTING

EXHAUST - TYPICAL

NEW LOW SLOPE

ROOF SYSTEM

AE201

AE201

AE201

AE201

AE201

AE201

NEW INTAKE VENT, 23 LF

NEW INTAKE

VENT, 30 LF

NEW INTAKE VENT, 23 LF

NEW INTAKE VENT, 30 LF

NEW INTAKE

VENT, 60 LF

NEW INTAKE

VENT, 60 LF

NEW INTAKE

VENT, 60 LF

NEW INTAKE

VENT, 60 LF

AE203

AE201

AE2012

AE204

HIGH

AE201

BUILDING 5-6

CONNECTOR

BUILDING 6-7

CONNECTOR

AT

AT

A T

AT

AT

AT

A T

A T

AT

AT

ATAT

AT AT

A T

A T

A T

AT

AT

AT

AT

AT

DOWN TO GROUNDING ROD

SEE 7/AE201

DOWN TO GROUNDING ROD

SEE 7/AE201

DOWN TO GROUNDING ROD

SEE 7/AE201

DOWN TO GROUNDING ROD

SEE 7/AE201

NEW INTAKE

VENT, 30 LF

NEW INTAKE VENT, 30 LF

NEW INTAKE VENT, 30 LF NEW INTAKE VENT, 30 LF

NEW INTAKE VENT, 6 LF

NEW INTAKE VENT, 6 LF

NEW INTAKE

VENT, 6 LF

NEW INTAKE

VENT, 6 LF

EXISTING FENCE ATTACHED

TO EXISTING PARAPET CAP.

AE203

AE203

AE204

AE203

AE203

AE203

AE203

AE203

AE203

EXISTING BUILDING (N.I.C.)

EXISTING ROUND DUCTS

ABOVE ROOF

RD

RD

M A

T C

H L

IN

E

THROUGH WALL

SCUPPER SEE 4/AE203

AE203

THROUGH WALL

SCUPPER SEE 4/AE203

AE204

AE204

LOW

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

AE201

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 40 LF

NEW INTAKE

VENT, 40 LF

VS

VS

VS VS

EFEF

EF

EF

EF

AE201

DS

DS

PROVIDE CRICKET

@ HIGH SIDE (TYP.)

LOW

AE204

DS

AE204

AE204

NEW LOW SLOPE

ROOF SYSTEM

DS

AE204

AE204

R

ID

G E

V E

N T

VALLEY

R

ID

G E

V E

N T

R

ID

G E

V E

N T

R

ID

G E

V E

N T

R

ID

G E

V E

N T

R

ID

G E

V E

N T

VALL

EY

VALL

EY

VALL

EY

VALL

EY

VALL

EY

VALL

EY

VALL

EY

VALLEY

VALLEY

VALLEY

VALLEY

VALLEY

VALLEY

HIP

R

ID

GE V

ENT

HIP RIDG

E VENT

HIP

R

ID

GE V

ENT

HIP RIDG

E VENT

HIP

R

ID

GE V

ENT

HIP RIDG

E VENT

HIP RIDG

E VENTHIP

R

ID

G E V

ENT

RIDGE VENT RIDGE VENT

NOTE:

CONTRACTOR SHALL REPLACE UP TO 10%

OF THE ROOF DECK ON THIS BUILDING

NEW SNOW

GUARDS

NEW SNOW

GUARDS NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDSNEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

NEW SNOW

GUARDS

PLAN NOTES:

1. CONTRACTOR TO PROVIDE FALL PROTECTION,

SEE 9/AE203

PLAN NOTES:

1. CONTRACTOR TO PROVIDE FALL PROTECTION,

SEE 9/AE203

NEW LOW SLOPE ROOF

SYSTEM SEE 1/AE203

NEW LOW SLOPE ROOF

SYSTEM SEE 1/AE203

AE2014

AE201

AE201

AE201

AE201

AE201

AE201

NEW LOW SLOPE ROOF

SYSTEM SEE 1/AE203

TYP.

AE201

AE203

AE201

HIP

R

ID

GE V

ENTHIP RIDG

E VENT

PROVIDE PRECAST

CONCRETE SPLASH

BLOCK AT GRADE,

SEE 12/AE201

PROVIDE PRECAST

CONCRETE SPLASH

BLOCK AT GRADE,

SEE 12/AE201

N

57143

1. UPON AREA BY AREA DEMOLITION OF THE EXISTING ASPHALT SHINGLE SYSTEM, INSTALL SELF-ADHERING

RUBBERIZED ASPHALT ICE DAMMING MEMBRANE AS SHOWN IN DETAIL 1.

2. INSTALL NEW RIGID INSULATION ON ALL LOW SLOPED ROOFS. WHERE DISTANCES ARE TOO LONG TO PRODUCE A MINIMUM 1/8"/FT PITCH INSTALL THE INSULATION AT THE AME PITCH AS THE EXISTING.

3. INSTALL NEW FELT UNDERLAYMENT OVER ENTIRE AREA OF ROOF

4. INSTALL NEW ASPHALT SHINGLE SYSTEM OVER ENTIRE SCOPE AS NOTED ON DRAWINGS AND IN

SPECIFICATIONS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .