36C24218B0572-0003002.pdf

PDF 32 KB Posted

Attached to
528A8-18-805 RENOVATE ONCOLGY LAB FOR USP 800
Solicitation number
36C24218B0572
Issued by

About this file

36C24218B0572 0003 000110 2018-10-11 rev.pdf

View the file

Other files

File Type Posted
36C24219C0026-000.docx DOCX document
36C24218B0572-0005000.docx DOCX document
36C24218B0572-0005001.docx DOCX document
36C24218B0572-0005002.pdf PDF
36C24218B0572-0004000.docx DOCX document
36C24218B0572-0004002.pdf PDF
36C24218B0572-0004003.pdf PDF
36C24218B0572-0004001.docx DOCX document
36C24218B0572-0003001.docx DOCX document
36C24218B0572-0003000.docx DOCX document
36C24218B0572-0003003.pdf PDF
36C24218B0572-0002001.docx DOCX document
36C24218B0572-0002003.pdf PDF
36C24218B0572-0002002.pdf PDF
36C24218B0572-0002000.docx DOCX document
36C24218B0572-0002004.pdf PDF
36C24218B0572-0001000.docx DOCX document
36C24218B0572-005.pdf PDF
36C24218B0572-003.pdf PDF
36C24218B0572-001.docx DOCX document
36C24218B0572-002.docx DOCX document
36C24218B0572-004.zip ZIP file
36C24218B0572-000.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2018-07-16

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

RENOVATE ONCOLOGY LAB FOR USP 800

SAMUEL S. STRATTON MEDICAL CENTER

ALBANY, NY

SECTION # DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 01 33 23 Shop Drawings, Product Data, and Samples 01 35 26 Safety Requirements 01 74 19 Construction Waste Management 01 81 13 Sustainable Construction Requirements 01 91 00 General Commissioning Requirements

DIVISION 05 – METALS

05 50 00 Metal Fabrications

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 Thermal Insulation 07 72 00 Roof Accessories 07 84 00 Firestopping

DIVISION 08 - OPENINGS

08 90 00 Louvers and Vents

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 09 22 16 Non-Structural Metal Framing 09 29 00 Gypsum Board 09 51 00 Acoustical Ceilings RFI #1 09 65 16 Resilient Sheet Flooring 09 91 00 Painting

DIVISION 11 – EQUIPMENT

11 05 12 General Motor Requirements for Equipment 11 53 53 Biological Safety Cabinets Laminar Airflow Stations

DIVISION 12 – FURNISHINGS

12 31 00 Manufactured Metal Casework

DIVISION 21- FIRE SUPPRESSION

2018-07-16

00 01 10-2

21 13 13 Wet-Pipe Sprinkler Systems

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 22 05 23 General-Duty Valves for Plumbing Piping 22 07 11 Plumbing Insulation 22 11 00 Facility Water Distribution 22 13 00 Facility Sanitary and Vent Piping 22 40 00 Plumbing Fixtures

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment

23 05 93 Testing, Adjusting, and Balancing for HVAC 23 07 11 HVAC and Boiler Plant Insulation 23 08 00 Commissioning of HVAC Systems 23 09 23 Direct-Digital Control System for HVAC 23 21 13 Hydronic Piping RFI #2 23 23 00 Refrigerant Piping 23 31 00 HVAC Ducts and Casings 23 36 00 Air Terminal Units 23 37 00 Air Outlets and Inlets 23 73 00 Indoor Central-Station Air-Handling Units 23 81 00 Decentralized Unitary HVAC Equipment 23 82 16 Air Coils

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 33 Raceway and Boxes for Electrical Systems 26 27 26 Wiring Devices 26 29 11 Motor Controllers 26 29 21 Enclosed Switches and Circuit Breakers 26 41 00 Facility Lightning Protection 26 51 00 Interior Lighting

DIVISION 27 – COMMUNICATIONS

27 05 33 Raceways and Boxes for Communications Systems 27 08 00 Commissioning of Communications Systems 27 10 00 Control, Communication and Signal Wiring 27 52 23 Nurse Call and Code Blue Systems

File details come from the government source that posted it.