36C24125Q0219_2.docx
DOCX document 15 KB Posted
- Attached to
- J061--518-25-2-4829-0027: Services - 518-25-510 ATS Preventive Maintenance (VA-25-00034583)
- Solicitation number
- 36C24125Q0219
About this file
This is an amendment extending the response due date to February 19, 2025 at 12PM EST for a combined synopsis/solicitation issued by the VA Medical Center in Providence, RI for inspection, testing, and maintenance services of Automatic Transfer Switches (ATS) and generator load bank testing at the Bedford VA Medical Center in Massachusetts.
The requirement is set aside for Service-Disabled Veteran-Owned Small Businesses under NAICS 238210 with a size standard of $19.0 million. The contractor must provide annual preventive maintenance, inspection and testing of ATS systems and load bank testing for multiple generators ranging from 180kW to 450kW. The work includes maintaining various ATS types including Zenith, Onan, Cutler-Hammer, Russ Electric, Kohler and ASCO switches. A mandatory site visit is scheduled for February 5, 2025 at 12PM. The contract will be awarded as a firm-fixed price contract for a base year plus four option years. Technical requirements include having certified technicians with electrical certification and OSHA safety training. Questions are due by February 7, 2025 at 12PM EST.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2523-102-E706.pdf | ||
| Generator 92 one-line.pdf | ||
| generator 61 One line drawing.pdf | ||
| January Generator PM Report.pdf | ||
| Electrical Distribution upgrades one-line.pdf | ||
| Automatic Transfer Switch Spec 263623.docx | DOCX document | |
| 2523-102-E704.pdf | ||
| 2523-102-E701.pdf | ||
| 2523-102-E705.pdf | ||
| VHA directive 1028.pdf | ||
| generator 95 One line drawing.pdf | ||
| generator 70 One line drawing.pdf | ||
| ATS Testing and Generator Load Bank Testing RFIs.docx | DOCX document | |
| Generator 94 one-line.pdf | ||
| 36C24125Q0219_3.docx | DOCX document | |
| ATS List 2025.xlsx | XLSX spreadsheet | |
| ATS service report April 2024.pdf | ||
| 2523-102-E703.pdf | ||
| 2523-102-E702.pdf | ||
| Generator 93 one-line.pdf | ||
| ATS List 2024.xlsx | XLSX spreadsheet | |
| 36C24125Q0219_1.docx | DOCX document | |
| Generator List.xlsx | XLSX spreadsheet | |
| 36C24125Q0219.docx | DOCX document |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment to a Previous Combined Solicitation
Amendment to a Previous Combined Solicitation
| SUBJECT* |
| Bedford VAMC – Inspection, Testing & Maintenance of Automatic Transfer Switches and Generator Load Bank Testing |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 02908 |
| SOLICITATION NUMBER* |
| 36C24125Q0219 |
| RESPONSE DATE/TIME/ZONE |
| 02-19-2025 12PM EASTERN TIME, NEW YORK, USA |
| ARCHIVE |
| 30 DAYS AFTER THE RESPONSE DATE |
| RECOVERY ACT FUNDS |
| N |
| SET-ASIDE |
| SDVOSBC |
| PRODUCT SERVICE CODE* |
| J061 |
| NAICS CODE* |
| 238210 |
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
VAMC Providence
830 Chalkstone Avenue Providence RI 02908
POINT OF CONTACT*
Contract Specialist Carissa Sarazin carissa.sarazin@va.gov
PLACE OF PERFORMANCE
| ADDRESS |
| Bedford VA Medical Center |
200 Springs Road
Bedford, MA 01730
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
DESCRIPTION
The Purpose of this amendment is to extend the responses due date to February 19, 2025 at 12PM.
| *= Required Field |
| Amendment to a Previous Combined Solicitation |
Page 1 of
Amendment to a Previous Combined Solicitation
File details come from the government source that posted it. Updated .