VA MHT Lab Reno - Addendum 1 MEP Sheets.pdf
PDF 4 MB Posted
- Attached to
- Z1DA--608-23-133, Third Floor Lab Construction Federal contract opportunity
- Solicitation number
- 36C24124B0052
About this file
This document is an Addendum 1 for the VA MHT Lab Renovation 100% Bid Set Submission. It provides detailed drawings and specifications for the mechanical, electrical, and plumbing systems for the third floor lab renovations at the Manchester, VAMC facility. The drawings include floor plans, riser diagrams, equipment schedules, and construction details for the new HVAC systems, hydronic piping, steam systems, exhaust fans, air terminals, and electrical panels. Key equipment includes an air handling unit, chilled water and heating hot water systems, steam humidifiers, condensate pumps, VAV boxes, and fan coil units. The document is part of Solicitation 36C24124B0052 for the Third Floor Lab Construction project, which is being procured by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 1.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
T
TT
T
T T
T
T
T
T
T
T
T
T
T
T T
G
A B C D E F
M401
M401
M401
NOT IN CONTRACT
NOT IN CONTRACT
NOT IN CONTRACT
M201
View
M202
View
M202
View
M402
M402
0'
SCALE : 1/8" = 1' - 0"
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
CFR ENGINEERING
20251 CENTURY BLVD.
SUITE 120
GERMANTOWN, MD 20874
877-871-4229
CONSULTANT:
COMPANY NAME
COMPANY ADDRESS
COMPANY ADDRESS
XXX-XXX-XXXX
ARCHITECT:
CB DESIGN GROUP
421 KING ST.
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
2345678910111213141516
B
C
D
E
F
G
H
J
K
12345678910111213141516
4'8' 8' 16'
KEY PLAN
LAB AREA
OFFICE AREA
NORTH
Addendum 1 09/12/2024
8/20/2024
608-23-133
AuthorChecker
VAMC LABORATORY DESIGN -
FLOOD REMEDIATION
100% BID SET SUBMISSION
OVERALL 3RD FLOOR PLAN - NEW
WORK - MECHANICAL PIPING
M200
-2
-1
M
/1
/2
.p d f
718 Smyth Road Manchester, NH 03104
SCALE: 1/8" = 1'-0"
OVERALL 3RD FLOOR PLAN - NEW WORK - MECHANICAL PIPING
T T
T
T T
T
T
T
G
A B C D E F
MECHANICAL ROOM
W309
HISTOLOGY
W305
INTAKE/PROC
W301
SEND OUT AREA
W302
CORRIDOR W
W312
HAZ STOR
W306
BULK SUPPLY
W307
M401
STAIR
NO.3
HAC
W308
MICROBIOLOGY
W304
CHEMISTRY, HEMATOLOGY,
COAG., GLYCOS.
W303
URINALYSIS
W310
BLOOD BANK
W311
DOAS-1
WH-1
M
M
M
M
FCU-4
FCU-2 FCU-1
CAV-S-1
CAV-S-2CAV-S-3
CAV-S-4
CAV-S-10
CAV-S-7
CAV-E-1
CAV-E-9
CAV-E-10
CAV-E-2
CAV-E-3
CAV-S-9
CAV-S-11
CAV-S-5
CAV-S-6
CAV-E-5
CAV-E-6
CAV-E-4
CAV-E-7
CAV-S-8
1 1/2"
1 1/4" 1 1/2"
UH-1
M401
2 1/2"
FCU-5
CAV-E-8
LPS/LPC (E)
(TYP)
1-1/2" CD
DN IN WALL
TO SAN
BLW SLAB
M401
1 1/4"
1 1/2"
3/ 4"
3/ 4"
1" 1"
1/ 2"
1/ 2"
3/ 4"
3/ 4"
3/ 4"
3/ 4"
3/ 4"
LPS / LPC (E)
(TYP ALL)
LPS / LPC (E)
(TYP ALL)
FCU-3
1 1/2"
2 1/2" 2 1/2"
1 1/2" HWR
1 1/2" HWS
2 1/2" CHWR
2 1/2" CHWS
3/ 4"
1/ 2"
1/ 2"
3/ 4"
3/ 4"
3/4" CD1" CD
1 1/4" CD
3/4" CD
C
LP
S
1/
2" L
P S
RO-2
H-DOAS-1
PF-1
3/ 4"
1/ 2"
1/ 2"
1" 1"
2" LPS
2" LPS
1/2"
1/2"
1/2"
1/2"
1/2" 1/2"
1/2"
1/2" 1/2"
1/2"
1/2"
1/2"
1" HWS
1" HWR
3/4"
3/4"
3/4"
1/2"
3/4"
3/4"
1/ 2"
1/ 2"
1" CD
3/ 4"
1 1/2" CD
1 1/4" LPSCLEARANCE
2 1/2" CHWS /R
FD
CP-1
FT-1
UH-3W
3/ 4"
3/ 4"
M402
FD
INSTALL BELOW
CEILING GRID
PF-1 ZONE DIVERTER
(HIGH IN SPACE)
4" LPC
2" SV
3/4" PC3/4" PC
NEW WORK GENERAL NOTES
1. DUCTWORK AND PIPING SHALL NOT BE LOCATED ABOVE ELECTRICAL PANELS OR EQUIPMENT.
2. EXISTING CONDITIONS SHOWN ON THIS DRAWING HAVE BEEN OBTAINED FROM RECORD DRAWINGS WHEN AVAILABLE AND GENERAL, NONDESTRUCTIVE FIELD SURVEY AND MAY NOT INDICATE ACTUAL EXISTING CONDITIONS IN DETAIL AND DIMENSION. UTILITIES IN CLOSED CEILINGS, WALLS, AND
SHAFTS WERE NOT ACCESSIBLE DURING SURVEY. THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING EXACT EXISTING CONDITIONS PRIOR TO THE FABRICATION OR ORDER OF EQUIPMENT OR PERFORMANCE OF ANY WORK. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OR ENGINEER IN WRITING IF EXISTING CONDITIONS ARE DISCOVERED THAT PREVENT THE EXECUTION OF WORK. THE
CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL DIRECTION IS PROVIDED.
3. CONTRACTOR SHALL FIRESTOP ALL PIPE PENETRATIONS THROUGH CONCRETE SLABS WITHIN
UTILITY CHASES. SUBMIT FIRESTOP TO VA AND AE FOR REVIEW.
4. SUPPORT EXPOSED PIPES WITH CLEVIS HANGERS.
5. COORDINATE ALL DUCTWORK, PIPING, AND EQUIPMENT WITH BUILDING STRUCTURE. DUCTS AND PIPING ARE COORDINATED TO BE ROUTED BELOW BEAMS. SEE ARCHITECTURAL AND STRUCTURAL
PLANS FOR ADDITIONAL INFORMATION. DUCTWORK AND PIPE ROUTING SHALL BE CAREFULLY
CONSIDERED PRIOR TO INSTALLATION COMMENCING. THE AREA OF WORK HAS VERY LIMITED
PLENUM SPACE.
6. PIPE ROUTING IS DIAGRAMMATIC IN NATURE. ROUTE PIPES STACKED BETWEEN LARGE DUCTS AND
ABOVE DUCTWORK WHERE POSSIBLE.
XNEW WORK PLAN NOTES
0'
SCALE : 1/4" = 1' - 0"
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
CFR ENGINEERING
20251 CENTURY BLVD.
SUITE 120
GERMANTOWN, MD 20874
877-871-4229
CONSULTANT:
COMPANY NAME
COMPANY ADDRESS
COMPANY ADDRESS
XXX-XXX-XXXX
ARCHITECT:
CB DESIGN GROUP
421 KING ST.
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
2345678910111213141516
B
C
D
E
F
G
H
J
K
12345678910111213141516
2'4' 4' 8'
KEY PLAN
LAB AREA
NORTH
Addendum 1 09/12/2024
8/20/2024
608-23-133
JH/DAKC
VAMC LABORATORY DESIGN -
FLOOD REMEDIATION
100% BID SET SUBMISSION
PARTIAL 3RD FLOOR PLAN - NEW
WORK - MECHANICAL PIPING
M201
-2
-1
M
/0
/1
.p d f
718 Smyth Road Manchester, NH 03104
1 PROVIDE AIR HANDLING UNIT DOAS-1 IN MECHANICAL ROOM TO SERVE LABORATORIES.
PROVIDE WITH INTEGRAL FACE AND BYPASS STEAM HEATING COIL AND CHILLED WATER
COOLING COIL. CHILLED WATER CONNECTION SHALL BE PROVIDED FROM BASE BUILDING
CHILLED WATER SYSTEM. STEAM COIL SHALL BE PROVIDED WITH LOW PRESSURE STEAM
PIPING FROM STEAM STATION IN NORTH MECHANICAL ROOM.
2 4-PIPE FAN COIL UNITS SHALL BE CONNECTED TO CHILLED WATER AND HEATING HOT WATER
MAINS FROM THE CORRIDOR. PROVIDE WITH CONTROL VALVES, ISOLATION VALVES,
BALANCING VALVES, STRAINERS, AND TEMPERATURE AND PRESSURE GAUGES PER
MECHANICAL DETAILS. PROVIDE CONDENSATE DRAIN PIPING FROM FAN COIL UNITS WITH
CONDENSATE PUMP. ROUTE CONDENSATE DRAIN PIPING TO CONDENSATE MAIN AND
CONNECT TO SANITARY DRAIN.
3 PROVIDE HYDRONIC CEILING HUNG UNIT HEATER IN MECHANICAL ROOM. PROVIDE WITH BASE
BUILDING HEATING HOT WATER PIPING SUPPLY AND RETURN. SEE MECHANICAL DETAILS FOR
MORE INFORMATION ON PIPING ACCESSORIES.
4 PROVIDE LOW PRESSURE STEAM PIPING FROM STEAM STATION PR-1 AND ROUTE TO
HUMIDIFIERS H-1 AND H-2 IN MECHANICAL ROOMS. PROVIDE HUMIDIFIERS WITH ALL STEAM
TRAPS, CONTROLS VALVES, AND ACCESSORIES FROM MANUFACTURER. PROVIDE LOW
PRESSURE STEAM CONDENSATE FROM HUMIDIFIERS AND ROUTE TO NEW CONDENSATE
RECEIVER TANK AND CONDENSATE PUMP. ROUTE OUTLET OF CONDENSATE PUMP TO
BASEMENT WATER ROOM LOW PRESSURE CONDENSATE RECEIVER TANK. EXACT ROUTING
AND PIPING LENGTH OF LOW PRESSURE CONDENSATE SHALL BE COORDINATED WITH THE
VA.
5 PROVIDE LOW PRESSURE CONDENSATE FLASH TANK FT-X, CONDENSATE RECEIVER TANK
AND CONDENSATE PUMP CP-X. ROUTE LOW PRESSURE STEAM CONDENSATE FROM AIR
HANDLING UNIT AND HUMIDIFIER GENERATOR TO EQUIPMENT. ROUTE OUTLET OF CP-1
ABOVE CEILING TO EXISTING SHAFT IN NORTH WING. MANIFOLD WITH PUMPED CONDENSATE
FROM OTHER MECHANICAL ROOM. ROUTE PUMPED CONDENSATE DOWN TO BASEMENT AND
CONNECT INTO EXISTING CONDENSATE RECEIVER IN NORTHWEST WATER ROOM.
SCALE: 1/4" = 1'-0"
PARTIAL 3RD FLOOR PLAN - NEW WORK - MECHANICAL PIPING - LAB AREA
T
T
T
T
T
T
T
T
G
M401
3" HHWS/R (E)
SUPERVISOR OFFICE
N318
INTAKE/PROC
W301
SUPERVISOR OFFICE
N319
BREAK ROOM
W300
AHU-1
H-AHU-1
WH-2
RO-1
M
M
M
M
2" H
W S
2" H
W R
2"
E
2"
E
1/
2"
E
1/
2"
E
VAV-01
VAV-02
VAV-04
VAV-03
FCU-6
UH-2
UH-3
MECHANICAL ROOM
N312
TELECOM ROOM
W300B
CONFERENCE ROOM
W300A
CORRIDOR N
N320
CORRIDOR N
N320
2" C
H W
S 2"
C H
W R
CLPS
VAV-09
SEE DETAIL 2 FOR
CONTINUATION
NOT IN CONTRACT
2" MPC
2" MPS
3" MPS UP/DN (E)
2" MPC UP/DN (E)
TO FD
M401
3/ 4"
C D
2" M
P S
2" MPS
3" CHWS
3" CHWR
1 1/2" HWS
1 1/2" HWR
2 1/2" 2 1/2"
1 1/2" 1 1/2"
2" 2"
3/ 4"
3/ 4"
3/ 4"
C H
W S
3/ 4"
C H
W R
3/4" CD3/
4"
3/ 4"
2 1/2" (E)
2 1/2" (E)
2" (E)
2" (E)
3/4" 3/4"
3/4" 3/4"
4" CHWS/R (E)
HHW
CHW
MPS
3/ 4"
H W
S 3/
4" H
W R
3/4" 3/4"
PR-1
2" M
P C
2" MPC
2" M
P C
1 1/2" HWR
1 1/2" HWS
2" LPS
2" L
P S
LPS / LPC (E)
CLEARANCE
4" SV
SRV-1
SV TO
OUTSIDE
TF-1
TO FD
FD
CP-2
FT-2
STEAM
PRESSURE
REDUCING
STATION
M402
3/ 4"
L P
C P
C
3/4" PC
3/ 4"
P C
DRIP LEG.
SEE RISER DIAGRAM
AND DETAILS. DRIP LEG.
SEE RISER DIAGRAM
AND DETAILS.
2" SV
3/4" PC
NEW WORK GENERAL NOTES
1. DUCTWORK AND PIPING SHALL NOT BE LOCATED ABOVE ELECTRICAL PANELS OR EQUIPMENT.
2. EXISTING CONDITIONS SHOWN ON THIS DRAWING HAVE BEEN OBTAINED FROM RECORD DRAWINGS WHEN AVAILABLE AND GENERAL, NONDESTRUCTIVE FIELD SURVEY AND MAY NOT INDICATE ACTUAL EXISTING CONDITIONS IN DETAIL AND DIMENSION. UTILITIES IN CLOSED CEILINGS, WALLS, AND
SHAFTS WERE NOT ACCESSIBLE DURING SURVEY. THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING EXACT EXISTING CONDITIONS PRIOR TO THE FABRICATION OR ORDER OF EQUIPMENT OR PERFORMANCE OF ANY WORK. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OR ENGINEER IN WRITING IF EXISTING CONDITIONS ARE DISCOVERED THAT PREVENT THE EXECUTION OF WORK. THE
CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL DIRECTION IS PROVIDED.
3. CONTRACTOR SHALL FIRESTOP ALL PIPE PENETRATIONS THROUGH CONCRETE SLABS WITHIN
UTILITY CHASES. SUBMIT FIRESTOP TO VA AND AE FOR REVIEW.
4. SUPPORT EXPOSED PIPES WITH CLEVIS HANGERS.
5. COORDINATE ALL DUCTWORK, PIPING, AND EQUIPMENT WITH BUILDING STRUCTURE. DUCTS AND PIPING ARE COORDINATED TO BE ROUTED BELOW BEAMS. SEE ARCHITECTURAL AND STRUCTURAL
PLANS FOR ADDITIONAL INFORMATION. DUCTWORK AND PIPE ROUTING SHALL BE CAREFULLY
CONSIDERED PRIOR TO INSTALLATION COMMENCING. THE AREA OF WORK HAS VERY LIMITED
PLENUM SPACE.
6. PIPE ROUTING IS DIAGRAMMATIC IN NATURE. ROUTE PIPES STACKED BETWEEN LARGE DUCTS AND
ABOVE DUCTWORK WHERE POSSIBLE.
XNEW WORK PLAN NOTES
CHIEF PATHOLOGIST
N316
MANAGER OFFICE
N317
CORRIDOR N
N320
EF-3
VAV-08
VAV-06
VAV-05
VAV-07
2" H
W S
2" H
W R
SEE DETAIL 1 FOR
CONTINUATION
NOT IN CONTRACT
3/ 4"
3/ 4"
3/4" 3/4"
3/4" 3/4"
3/4"
3/4"
WOMEN TOILET
N314
MEN TOILET
N313
GROUP OFFICE
N315
EWC / BOTTLE FILLER
W300E
M402
3/ 4"
P C
3/4" PC DN10
0'
SCALE : 1/4" = 1' - 0"
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
CFR ENGINEERING
20251 CENTURY BLVD.
SUITE 120
GERMANTOWN, MD 20874
877-871-4229
CONSULTANT:
COMPANY NAME
COMPANY ADDRESS
COMPANY ADDRESS
XXX-XXX-XXXX
ARCHITECT:
CB DESIGN GROUP
421 KING ST.
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
2345678910111213141516
B
C
D
E
F
G
H
J
K
12345678910111213141516
2'4' 4' 8'
KEY PLAN
OFFICE AREA
NORTH
Addendum 1 09/12/2024
8/20/2024
608-23-133
JH/DAKC
VAMC LABORATORY DESIGN -
FLOOD REMEDIATION
100% BID SET SUBMISSION
PARTIAL 3RD FLOOR PLAN - NEW
WORK - MECHANICAL PIPING
M202
-2
-1
M
/2
/2
.p d f
718 Smyth Road Manchester, NH 03104
SCALE: 1/4" = 1'-0"
PARTIAL 3RD FLOOR PLAN - NEW WORK - MECHANICAL PIPING - ADMIN AREA SOUTH
1 PROVIDE HEATING HOT WATER SUPPLY AND RETURN PIPING FROM EXISTING CAPPED PIPES AND
ROUTE TO AREA OF WORK. PROVIDE CONNECTIONS FOR SUPPLY AIR TERMINAL REHEAT COILS
AND FAN COIL UNITS IN EACH ZONE.
2 PROVIDE AIR HANDLING UNIT AHU-1 IN MECHANICAL ROOM TO SERVE ADMIN SPACE. PROVIDE
WITH WITH STEAM PREHEAT COIL AND CHILLED WATER COOLING COIL. CHILLED WATER
CONNECTION SHALL BE PROVIDED FROM BASE BUILDING CHILLED WATER SYSTEM. STEAM COIL
SHALL BE PROVIDED WITH LOW PRESSURE STEAM PIPING FROM STEAM STATION IN NORTH
MECHANICAL ROOM.
3 PROVIDE LOW PRESSURE STEAM PIPING FROM STEAM STATION PR-1 AND ROUTE TO
HUMIDIFIERS H-1 AND H-2 IN MECHANICAL ROOMS. PROVIDE HUMIDIFIERS WITH ALL STEAM
TRAPS, CONTROLS VALVES, AND ACCESSORIES FROM MANUFACTURER. PROVIDE LOW
PRESSURE STEAM CONDENSATE FROM HUMIDIFIERS AND ROUTE TO NEW CONDENSATE
RECEIVER TANK AND CONDENSATE PUMP. ROUTE OUTLET OF CONDENSATE PUMP TO BASEMENT
WATER ROOM LOW PRESSURE CONDENSATE RECEIVER TANK. EXACT ROUTING AND PIPING
LENGTH OF LOW PRESSURE CONDENSATE SHALL BE COORDINATED WITH THE VA.
4 PROVIDE STEAM STATION PR-1 TO CREATE LOW PRESSURE STEAM AT 15 PSIG. PROVIDE LOW
PRESSURE STEAM AT OUTLET AND ROUTE TO HUMIDIFIERS AND AIR HANDLING UNIT HEATING
COILS. PROVIDE LOW PRESSURE CONDENSATE AND ROUTE TO ADJACENT CONDENSATE
RECEIVER. ROUTE STEAM SAFETY RELIEF VALVE VENT OUT TO BUILDING EXTERIOR AND
TERMINATE WITH GOOSE NECK AND INSECT SCREEN. REFER TO RISER DIAGRAM FOR MORE
INFORMATION ON STEAM TRAPS, CONTROL VALVES, AND PIPE SIZES.
6 PROVIDE CHILLED WATER SUPPLY AND RETURN PIPING FROM EXISTING CAPPED PIPES AND
ROUTE TO AREA OF WORK. PROVIDE CONNECTIONS FOR AHU-1, DOAS-1, AND FAN COIL UNITS IN
EACH ZONE.
7 PROVIDE MEDIUM PRESSURE STEAM SUPPLY AND MEDIUM PRESSURE CONDENSATE PIPING
FROM EXISTING RISERS AND ROUTE TO STEAM STATION. PROVIDE BRANCHES WITH SHUTOFF
VALVES IN ACCESSIBLE LOCATION.
8 PROVIDE LOW PRESSURE CONDENSATE FLASH TANK FT-X, CONDENSATE RECEIVER TANK AND
CONDENSATE PUMP CP-X. ROUTE LOW PRESSURE STEAM CONDENSATE FROM AIR HANDLING
UNIT AND HUMIDIFIER GENERATOR TO EQUIPMENT. ROUTE OUTLET OF CP-1 ABOVE CEILING TO
EXISTING SHAFT IN NORTH WING. MANIFOLD WITH PUMPED CONDENSATE FROM OTHER
MECHANICAL ROOM. ROUTE PUMPED CONDENSATE DOWN TO BASEMENT AND CONNECT INTO
EXISTING CONDENSATE RECEIVER IN NORTHWEST WATER ROOM.
9 PROVIDE COOLING ONLY CHILLED WATER FAN COIL UNIT. PROVIDE PIPE CONNECTION FROM
MAIN CHILLED WATER PIPING IN CORRIDOR. SEE MECHANICAL DETAILS FOR MORE INFORMATION
ON REQUIRED PIPE ACCESSORIES.
10 PROVIDE PUMPED CONDENSATE PIPING DOWN TO CONDENSATE RECOVERY UNIT IN BASEMENT
MECHANICAL ROOM.
SCALE: 1/4" = 1'-0"
PARTIAL 3RD FLOOR PLAN - NEW WORK - MECHANICAL PIPING - ADMIN AREA NORTH
MINIMUM CLEARANCE FROM AIR OBSTRUCTIONS
AIRFLOW
DIRECTION
AIRFLOW
ELECTRIC POWER SUPPLY
SD
TUBE SUPPORT HOLE FOR DUCTS MORE THAN 36" WIDE
INLET TUBE HOLES ORIENTED UPSTREAM OF AIR FLOW
MINIMUM CLEARANCE FROM AIR INLET
INLET
TOP VIEW
RETURN AIR
SD
RUBBER CAP
SD
1 DUCT SMOKE DETECTOR DETAIL
NOT TO SCALE
6 DUCT WIDTHS
MINIMUM
TURN OR OFFSET
IN DUCT
6 DUCT WIDTHS
MINIMUM
RETURN TUBE; SLANT CUT FACE ORIENTED
DOWNSTREAM OF AIR FLOW
NOTES:
1. INLET TUBE LENGTH SHALL BE EQUAL TO FULL WIDTH OF DUCT.
2. RETURN TUBE SHALL BE AS RECOMMENDED BY THE DETECTOR'S MANUFACTURER.
3. CLEARANCES FROM OBSTRUCTIONS, INLETS AND PROPER LOCATION IN THE SYSTEM SHALL BE IN ACCORDANCE WITH NEMA:
"GUIDE FOR PROPER USE OF SMOKE DETECTORS IN DUCT APPLICATIONS", NFPA90A, U.L. STANDARD 268A AND NFPA 72E.
(4)
DRIP LEG LENGTH (5)(1)
(2)
6" MIN.
(6)
4 STEAM MAIN DRIP, END OF MAIN DRIP OR RISER DRIP
NOT TO SCALE
NOTES:
(1) DRIP LEG TO BE SAME AS MAIN THRU 4". ABOVE 4", DRIP LEG TO BE
AT LEAST 1/2 MAIN SIZE BUT NOT LESS THAN 4".
(2) TEST VALVE WITH 6" NIPPLE AND CAP. TEST VALVE TO BE LINE SIZE,
BUT NOT LARGER THAN 1". LOCATE TEST VALVE AT SIDE OF PIPE.
(3) DRIP TRAPS - 3/4" FOR MAIN PIPE SIZE THROUGH 8" AND 1" FOR MAIN
PIPE 10" AND LARGER, UNLESS OTHERWISE NOTED.
(4) DRAIN VALVE FOR WARM-UP AND BLOW DOWN.
(5) DRIP LEG LENGTH TO BE AT LEAST 1-1/2 TIMES DIAMETER OF MAIN,
BUT NEVER LESS THAN 10".
(6) CAP, DRILL AND TAP FOR 1" GATE VALVE WITH HOSE THREADED
ADAPTER AND CAP.
CONDENSATE
MAIN
TRAP (3)
STEAM
MAIN
LPS
LPR
STRAINER
UNION (TYP.)
DIRT POCKET (TYP.)
5 STEAM HUMIDIFIER PIPING DETAIL
NOT TO SCALE
NOTES:
1. THE ABOVE DIAGRAM SERVES AS A GENERAL PIPING INSTALLATION GUIDE.
THE ACTUAL FIELD INSTALLATION SHALL BE IN ACCORDANCE WITH THE
HUMIDIFIER MANUFACTURER'S RECOMMENDATIONS AND INSTALLATION
INSTRUCTIONS.
MANIFOLDS
EQUALLY SPACED
INSULATED STEAM MANIFOLD (TYP.)
SEE SCHEDULE FOR NUMBER
3/4" F&T TRAP
(TYP.) SEE TRAP
DETAIL
STAINLESS STEEL
STEAM SEPARATOR
STEAM CONTROL VALVE
(NORMALLY CLOSED)
SHUT-OFF VALVE
(TYP.)
MOTOR ACTUATOR OUTSIDE OF DUCTWORK
6 MOTOR OPERATED DAMPER DETAIL
NOT TO SCALE
NOTES:
1. MANUFACTURER'S INSTALLATION INSTRUCTIONS SHALL BE
STRICTLY ADHERED TO.
2. MECHANICAL LINKAGE TO OPERATE DAMPER BLADES ARE
INTERNAL TO DAMPER AND THEREFORE NOT SHOWN.
DAMPER BLADE, WITH NEOPRENE GASKETING
FOR NO LEAK RATING
ACCESS DOOR (SIDE OR BOTTOM
LOCATION AS REQUIRED)
10 FT MAX.
(5)
LPC
(3)
FO
LPS
(6)
3 STEAM HEATING COIL
SCALE: NOT TO SCALE
FO
(3)
(7)
NOTES:
(1) INSTALL COIL WITH PITCH RECOMMENDED BY COIL
MANUFACTURER FOR PROPER CONDENSATE DRAIN. MIN. 1/4" PER
FT. OF COIL LENGTH.
(2) HORIZONTAL COIL SHOWN. VERTICAL COIL SIMILAR.
(3) TEST VALVE WITH 6" NIPPLE AND CAP. TEST VALVE TO BE LINE
SIZE, BUT NOT LARGER THAN 1". LOCATE TEST VALVE AT SIDE OF
PIPE.
(4) THIS DETAIL APPLIES FOR STEAM PRESSURE BELOW 50 PSIG AT
CONTROL VALVE INLET.
(5) MIN. PITCH 1/2" PER FT.
(6) CAP, DRILL AND TAP FOR 1" GATE VALVE WITH HOSE THREADED
ADAPTER AND CAP.
(7) EACH TRAP SHALL HAVE 200 % CAPACITY.
TO CONDENSATE
RECEIVER DIRECTLY
DIRT
LEG
18"
MIN.
6"
MIN.
THERMOSTATIC
AIR VENT
6"
MIN.
FLEX CONNECTION
(TYP.)
UNION (TYP.)
CHECK VALVE (TYP.)
SHUT OFF
VALVE (TYP.)
STEAM TRAP (TYP.)
CONTROL VALVE (TYP.)
STRAINER (TYP.)
STEAM TRAP
STEAM HEATING
COIL
BYPASS
SLOPE (TYP.)
NC NC
P/T TEST PORT
VACUUM BREAKER
PRESSURE GAUGE (TYP)
2 BSC & FUMEHOOD DETAIL
SCALE: NOT TO SCALE
PROVIDE WITH
MANUFACTURER
PROVIDED EXHAUST
SHROUD FOR DUCTED
EXHAUST.
DRAIN LINE DRAIN PAN
(1)
CHWRCHWS
C
FO
FC
7 CHILLED WATER COOLING COIL PIPING
SCALE: NOT TO SCALE
NOTES:
(1) REFER TO COOLING COIL CONDENSATE DRAIN TRAP PIPING DETAIL.
FLEX CONNECTION (TYP.)
CHILLED WATER COIL
AIR VENT
P/T TEST PORT (TYP.)
BALANCING VALVE (TYP.)
3 WAY CONTROL VALVE
UNION (TYP.)
STRAINER
DRAIN VALVE
SHUT OFF
VALVE (TYP.)
THERMOMETER (TYP)
PRESSURE GAUGE (TYP)
SAFE OFF/SEAL SPACE BETWEEN COIL
CASING AND AHU HOUSING TO PREVENT
BYPASS AIRFLOW THAT WILL RESULT IN
NUISANCE TRIPS OF FREEZESTAT(S).
FREEZE PROTECTION
THERMOSTAT CONTROL UNIT
(TYPICAL) FOR OUTDOOR
INSTALLATION, PROVIDE
WEATHERPROOF CONNECTION
BOX WITH MANUAL RESET BUTTON
AND LED MONITORING, SHALL BE
CONNECTED TO BAS.
COIL CASING
AHU HOUSING
INSTALL BENDABLE NON-PVC
COVERED/COATED CAPILLARY
TUBE (BULB)
AIRFLOW
NOTES:
1. INSTALL FREEZESTAT CAPILLARY TUBE(S) ON UPSTREAM FACE OF EACH COIL. PROVIDE COMPLETE
COVERAGE SUCH THAT CAPILLARY TUBE(S) ARE WITHIN 6" OF EVERY POINT ON COIL FACE.
2. PROVIDE MULTIPLE FREEZESTATS AS REQUIRED FOR COMPLETE COVERAGE.
3. PITCH CAPILLARY TUBE(S) CONTINUALLY DOWNWARD WITHOUT SAGGING.
4. SWITCHING TEMPERATURE SHALL BE USER ADJUSTABLE FROM 30°F TO 44°F.
3"
12"
6"
PLENUM RATED
APPROVED
MATERIAL HOSE BULB
WIRE
ATTACH TO
HANGERAHU
CASING
SEAL/
GASKET
SENSOR
CONTROL
UNIT
NON-PVC
COVERED/COATED
CAPILLARY TUBE
12"
12"
6"
3"
8 FREEZE PROTECTION THERMOSTAT INSTALLATION DETAIL
SCALE: NOT TO SCALE
FLASH
(1)
LPC TANK
12" MIN.
9 FLASH TANK PIPING
SCALE: NOT TO SCALE
NOTE:
(1) DRAIN VALVE WITH 6" NIPPLE AND CAP. DRAIN VALVE TO BE LINE SIZE.
(2) SAFETY RELIEF VALVE SHALL BE SET TO 20 PSI.
(3) FLASH TANK SHALL BE MOUNTED AT MINIMUM 30" AFF TO ALLOW SPACE
FOR DRAIN CONNECTIONS AND TO ALLOW GRAVITY DRAINAGE OF
CONDENSATE TO CONDENSATE RECEIVE PUMP. COORDINATE FINAL
FLASH TANK MOUNTING HEIGHT WITH CONDENSATE RECEIVER PUMP
INLET HEIGHT.
TO CP
FLASH TANK SUPPORTS
30" MIN.
(4)
(2)
(3)
PC
LPC
(5)
(6)
10 DUPLEX CONDENSATE PUMP PIPING
SCALE: NOT TO SCALE
NOTES:
(1) UNLESS OTHERWISE NOTED, VENT PIPE AND OVERFLOW
PIPE SHALL BE EQUAL TO PORTS ON UNIT.
(2) PIPE OVERFLOW TO NEAREST FLOOR DRAIN.
(3) PLUG FOR LOOP FILL.
(4) PROVIDE DRAIN VALVE.
(5) ISOLATION VALVE.
(6) BASKET STRAINER.
4" CONC. PAD
(NOMINAL)
SEE RISERS AND PLANS FOR
CONTINUATION (1)
PUMPPUMP
FLEX
CONNECTION
(TYP.)
PRESSURE
GAUGE (TYP.)
CHECK VALVE
(TYP.)
SHUT OFF VALVE
(TYP.)
UNION (TYP.)
RECEIVER TANK
SLOPE
SEE RISERS AND PLANS FOR
CONTINUATION
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
CONSULTANT:
CFR ENGINEERING
20251 CENTURY BLVD.
SUITE 120
GERMANTOWN, MD 20874
877-871-4229
CONSULTANT:
COMPANY NAME
COMPANY ADDRESS
COMPANY ADDRESS
XXX-XXX-XXXX
ARCHITECT:
CB DESIGN GROUP
421 KING ST.
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
2345678910111213141516
B
C
D
E
F
G
H
J
K
12345678910111213141516
DRAWINGS NOT INTENDED FOR CONSTRUCTION.
08/20/2024
608-23-133
JH/DAKC
VAMC LABORATORY DESIGN -
FLOOD REMEDIATION
100% BID SET SUBMISSION 718 Smyth Road Manchester, NH 03104
Addendum 1 09/12/2024 DETAILS - MECHANICAL
M504
2 HEATING HOT WATER RISER DIAGRAM
NTS
4TH FLOOR
VAV-09REFER TO VAV
PIPING DETAIL
(TYP OF ALL)
VAV-03 VAV-04 VAV-05 VAV-07 VAV-06 VAV-08
VAV-02VAV-01
FCU-4
CAV-S-1
FCU-1
CAV-S-9
UH-1
CAV-S-2CAV-S-10
FCU-2
CAV-S-3CAV-S-11
FCU-5
CAV-S-8
FCU-3
CAV-S-4CAV-S-5CAV-S-6CAV-S-7
3TH FLOOR
1 CHILLED WATER RISER DIAGRAM
NTS
4TH FLOOR
(TYP. 2)
FCU-4
3TH FLOOR
REFER TO UNIT
HEATER PIPING DETAIL
(TYP OF ALL)
AHU-1
FCU-1
DOAS-1
FCU-2FCU-5FCU-3
3" HHWS/R (E)
REFER TO DETAILS FOR PIPE
ACCESSORIES
(TYP OF ALL)
2" HHWS/R (E)
3/4" HHWS/R
(TYP OF ALL UON)
2" HHWS/R1-1/2" HHWS/R
1-1/4" HHWS/R
1" HHWS/R
2" HHWS/R 1-1/2" HHWS/R
3/4" HHWS/R
(TYP OF ALL UON)
5" CHWS/R (E)
3" CHWS/R (E)
3" CHWS/R2-1/2" CHWS/R1-1/4" CHWS/R
3/4" CHWS/R
3/4" CHWS/R 3/4" CHWS/R
1" CHWS/R
1" CHWS/R
FCU-6
2-1/2" CHWS/R
1" CHWS/R
2-1/2" CHWS/R
2" CHWS/R
UH-2
UH-3
3 STEAM RISER DIAGRAM
NTS
4TH FLOOR
3TH FLOOR
3" MPS (E)
2" MPC (E)
2" MPS (40 PSIG)
2" MPS (40 PSIG)
2" MPC
2" MPS
2" MPS
1-1/2"
1-1/4"
1-1/2"
1-1/4" LPS
2" LPS
3/4" MPC 3/4" LPC
H-AHU-1
AHU-1
1" LPS
3/4" LPS
H-DOAS-1
DOAS-1
2" LPS
2" LPS (15 PSIG)
1-1/2" LPS
1-1/4" LPS
CLPS (1) CLPS (1)
CP-1
3/4" PC
PC DN TO
BASEMENT CRU (E)
3/4" PC
SHAFT (E)
1-1/2" LPS
1" LPS
1-1/4" LPS
3/4" LPS
ST-3
ST-1
ST-2
ST-6
TO FT-2FROM DOAS-1
ST-8
SCV-4
SCV-5
SCV-3SCV-1
SCV-2
SRV-1
4" SV TO BLDG
EXTERIOR
GENERAL NOTES:
1. PUMPS SHALL BE UPDATED TO CONTROL TO EXISTING DIFFERENTIAL PRESSURE
SENSOR AND NEW BRANCH DIFFERENTIAL PRESSURE SENSOR.
2. ALL HHW CONNECTIONS AT TERMINAL EQUIPMENT SHALL BE PROVIDED WITH 3
WAY CONTROL VALVES.
3. PROVIDE AIR VENTS AT ALL HIGH POINTS.
4. PROVIDE DRAIN VALVES AT ALL LOW POINTS.
DP
GENERAL NOTES:
1. PUMPS SHALL BE UPDATED TO CONTROL TO EXISTING DIFFERENTIAL PRESSURE
SENSOR AND NEW BRANCH DIFFERENTIAL PRESSURE SENSOR.
2. PROVIDE AIR VENTS AT ALL HIGH POINTS.
3. PROVIDE DRAIN VALVES AT ALL LOW POINTS.
HHW
MPS
CHW
DP
CP-2
FT-1
FT-2
SV TO BLDG
EXTERIOR SV TO BLDG
EXTERIOR
ST-7
UH-3W
3 WAY CONTROL VALVE
(TYP.)
4" LPC HEADER
ST-10
ST-4 ST-5
4" LPC HEADER
GENERAL NOTES:
A. PROVIDE AIR VENTS AT ALL HIGH POINTS.
B. PROVIDE DRAIN VALVES AT ALL LOW POINTS.
SPECIFIC NOTES:
1. SIZE PER HUMIDIFIER MANUFACTURER RECOMMENDATION.
2. PROVIDED WITH INTEGRAL STEAM TRAP AND STEAM CONTROL VALVES.
3. PROVIDE WITH DRAIN COOLER.
3/4" LPC
3/4" DRAIN TO FD (3)
3/4" LPC
3/4" MPC
3/4" LPC
2" SV 1" SV1" SV
1" SV
2" SV
1" SV
3/4" PC
DRIP LEG
3/4" LPC
ST-9
3/4" LPC
2" LPS
2" LPS (15 PSIG)
(2) (2)
TO FT-2
3/4" DRAIN TO FD (3)
3/4" LPC 3/4" LPC
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
CONSULTANT:
CFR ENGINEERING
20251 CENTURY BLVD.
SUITE 120
GERMANTOWN, MD 20874
877-871-4229
CONSULTANT:
COMPANY NAME
COMPANY ADDRESS
COMPANY ADDRESS
XXX-XXX-XXXX
ARCHITECT:
CB DESIGN GROUP
421 KING ST.
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
2345678910111213141516
B
C
D
E
F
G
H
J
K
12345678910111213141516
DRAWINGS NOT INTENDED FOR CONSTRUCTION.
08/20/2024
608-23-133
JH/DAKC
VAMC LABORATORY DESIGN -
FLOOD REMEDIATION
100% BID SET SUBMISSION 718 Smyth Road Manchester, NH 03104
Addendum 1 09/12/2024 HYDRONIC RISERS - MECHANICAL
M511
NOTES:
1. PROVIDE ROOF CURB.
2. PROVIDE STAINLESS STEEL SCROLL, WHEEL, AND INLET CONE.
3. PROVIDE STAINLESS STEEL AIRSTREAM AND STACK, SIZED FOR MINIMUM 3000 FPM EXHAUST VELOCITY.
4. INSTALL FANS IN UPBLAST POSITION.
5. PROVIDE WITH EC MOTOR.
6. PROVIDE WITH ALL MANUFACTURER RECOMMENDED SUPPORTS AND ACCESSORIES.
7. PROVIDE WITH MOTORS SUITABLE FOR VFDS.
8. PROVIDE WITH CHEMICAL AND CORROSION RESISTANT COATING (GREENHECK PERMATECTOR COATING OR APPROVED EQUAL).
9. PROVIDE WITH VFD.
PERFORMANCE DATA
CFM RPM
FAN SCHEDULE
OPERATING VOLTS/PH/HZ
MOTOR DATA
BASIS OF DESIGN NOTES
MAXIMUM
WEIGHT
(LBS.)ESP
(IN. W.G.) HP
INLET SOUND POWER BY OCTAVE BAND
62.5 125 250 500 1000 2000 4000 8000 LwA dBA
SERVICEMARK
1-4,7,9EF-1A, EF-1B LABORATORIES 2,000 1.9 208/3/60 GREENHECK USF-152.00.88 83 76 82 74 65 59 67701,770 70 78
HP
MARK
AIR HANDLING UNIT SCHEDULE
SUPPLY FANS CHILLED WATER COOLING COILSTEAM PREHEAT COIL
LOCATION ESP
(IN. WG.)
TOTAL
AIRFLOW
(CFM)
MHP / BHP
PER FAN
(HP)
EAT
(°F)
TOTAL
CAPACITY
(MBH)
SENSIBLE
CAPACITY
(MBH)
EAT
DB/WB
(°F)
LAT
DB/WB
(°F)
V/PH/HZ UNIT
MCA MOCP
FAN ELECTRICAL DATA
(PER FAN, QTY 2) APPROX
WEIGHT
(LBS)
BASIS OF DESIGN NOTESFAN
QTY
1. ALL FANS OR FAN SECTIONS SHALL BE PROVIDED WITH AND MODULATED THROUGH FACTORY ECM DRIVES.
2. PROVIDE SLOPED STAINLESS STEEL DRIP PAN UNDER COOLING COILS.
3. PROVIDE INTERNAL SPRING ISOLATORS FOR SUPPLY FANS.
4. ALL COMPONENTS SHALL BE KNOCKDOWN FOR FIELD-ERECTED AIR HANDLING UNIT.
5. PROVIDE 6-INCH TALL CONCRETE HOUSEKEEPING PAD BELOW UNIT. AIR HANDLING UNIT SHALL INCLUDE STEEL
EQUIPMENT BASE OF SUFFICIENT HEIGHT TO PROVIDE 12-INCH VERTICAL CLEARANCE BETWEEN CONDENSATE DRAIN
OUTLET AND FLOOR SLAB.
6. UNIT ELECTRICAL INFORMATION INDICATES THE TOTAL POWER REQUIREMENTS FOR THE UNIT. COORDINATE QUANTITY
AND SIZE OF ELECTRICAL FEEDS WITH ELECTRICAL DRAWINGS.
7. PROVIDE STEAM HUMIDIFIER. REFER TO HUMIDIFIER SCHEDULES FOR MORE INFORMATION.
8. PROVIDE SMOKE DETECTORS IN SUPPLY AND RETURN DUCTWORK AS APPLICABLE PER THE CONTROLS DIAGRAMS AND
FLOOR PLANS.
9. PROVIDE WITH FUSED DISCONNECT SWITCH PROVIDED BY MANUFACTURER.
10. SEE HUMIDIFIER SCHEDULES ON THIS SHEET.
11. PRE- AND FINAL FILTERS SHALL BE MERV 8 AND MERV 14.
12. SOUND POWER LEVELS SPECIFIED IN THE SCHEDULE APPLY TO THE UNIT SUPPLY AIR DISCHARGE.
NOTES
LAT
(°F)
DOAS-1 MECHANICAL
ROOM W309
ALLDAIKIN CAH012GDCM
CAPACITY
(MBH)
UNIT
FLA
200/3/60 22.7 30.010.14,600 2.0 2 4.4 / 2.21 269.0 183.0 91.0/72.0 54.6/54.1267.9 1.8 3,14255.8
STEAM
PRESSURE
(PSIG)
EWT/
LWT
(°F)
45.0/55.0 54.0
FLOW
(GPM)
FLUID P.D.
(FT. WG)
0.33 10.2
COIL
ROWS
COIL
ROWS
TSP
(IN. WG.)
3.88
AHU-1
MECHANICAL
ROOM N312 ALLDAIKIN CAH017GDCM200/3/60 22.7 30.010.17,400 1.7 2 4.4 / 3.03 216.2 178.1 77.0/63.8 55.0/53.945 49.5 3,96155 15.0 45.0/55.1 43.00.13 7.2513.32
STEAM HUMIDIFIER
STEAM
PRESSURE
(PSIG)
STEAM
FLOW RATE
(LB/HR)
120.0
28.0
5,6EF-3 RESTROOMS 350 0.5 115/60/1 GREENHECK SQ-90-VG1/60.07 76 73 63 56 46 40 51531,566 49 63 60
AIR P.D.
(IN WC)
EF-2A, EF-2B
HAZARDOUS
EXHAUST AIR
EQUIPMENT
3,000 2.3 208/3/60 GREENHECK USF-183.01.22 88 85 86 82 65 59 71761,311 72 83 400
HUMIDIFIER MANIFOLD SCHEDULE
TAG LOCATION
NOTES:
1. CONTRACTOR SHALL INSTALL PER MANUFACTURER RECOMMENDATIONS
2. PROVIDE MANIFOLD IN AIR HANDLER.
3. PROVIDE THE WITH THE FOLLOWING
a. OPERATING AND SAFETY CONTROLS TO ENSURE AN AUTOMATIC AND FAIL SAFE SYSTEM
b. SYSTEM TO SHUTDOWN AUTOMATICALLY ON LOSS OF CONTROL SIGNAL
c. TWO YEAR WARRANTY
d. SHORT ABSORPTION MANIFOLD
e. INSULATED MANIFOLD
H-1
MECHANICAL
ROOM
N312
AIR FLOW
(CFM)
7,400
STEAM
INLET
(PSI)
EAT
(°F)
55°F
59% RH
LAT
(°F)
55°F
68% RH
CAPACITY
(LB/HR)
ABSORPTION
(FT)
0.28
BASIS OF DESIGN
CONDAIR
SAM-E 48"
NOTES
ALL
TYPE
STEAM - TO - STEAM
H-2
MECHANICAL
ROOM
W309
4,600 15 55°F
4% RH
55°F
68% RH 120 1.69 CONDAIR
SAM-E 60" ALL
AHU
SERVED
AHU-1
DOAS-1 STEAM - TO - STEAM
STEAM TO STEAM HUMIDIFIER GENERATOR SCHEDULE
TAG LOCATION
NOTES:
1. PROVIDE REVERSE OSMOSIS WATER GENERATOR RO-A 200 WITH STORAGE TANK (32 GAL). SYSTEM SHALL PROVIDE MINIMUM 1270 GALLONS PER DAY WITH A 70% RECOVERY RATE FOR SOFTENED WATER (50% FOR HARD WATER). SALT REJECTION RATE OF 95-95%. RO MEMBRANE SHALL BE QUANTITY TWO (2) 21" NSR 99.4% MEMBRANES. PROVIDE WITH INTEGRAL PUMP WITH
4.4 GPM CAPACITY. PROVIDE INCOMING WATER QUALITY PER MANUFACTURER REQUIREMENTS. THE UNIT IS 120V/1 PHASE AND WEIGHS 131 LBS.
a. PROVIDE PREFILTER FOR RO EQUIPMENT ON INCOMING WATER SUPPLY. DUAL FILTER SHALL CONSIST OF (1) CHARCOAL FILTER AND (1) 5-MICRON FILTER.
b. PROVIDE WITH MANUFACTURER PROVIDED LEAKAGE MONITORING FOR RO SYSTEM COMPONENTS.
2. PROVIDE THE UNIT WITH THE FOLLOWING
a. PROVIDE WITH INTEGRAL DUAL FLOAT AND THERMOSTATIC STEAM TRAPS FOR THE COIL AND FOR THE DRIP LEG BEFORE THE CONTROL VALVE.
b. CONTRACTOR SHALL INSTALL PER MANUFACTURER RECOMMENDATIONS
c. MANUFACTURERS FACTORY STEAM TRAPS, WYE STRAINERS, HUMIDISTAT, AND TEMPERATURE SWITCH.
d. SYSTEM TO SHUTDOWN AUTOMATICALLY ON LOSS OF CONTROL SIGNAL
e. MANUFACTURER PROVIDED STEAM CONTROL VALVE COMPLETE WITH BRONZE BODY, STAINLESS STEEL SEAT, STEM AND PLUG
f. MODULATING CONTROL VALVE WITH EQUAL PERCENTAGE FLOW CHARACTERISTICS AND POSITIVE SHUT-OFF AGAINST STEAM.
g. TWO YEAR WARRANTY
h. FACTORY INSTALLED STAINLESS STEEL FEED WATER SOLENOID VALVE.
i. WATER SOFTENER ON WATER INLET PROVIDED BY MANUFACTURER.
j. FULL TANK BLOWDOWN CAPABILITY VIA TIMER OR BAS.
k. STAINLESS STEEL INSULATED HEADERS.
l. INTEGRAL DRAIN COOLER.
3. PROVIDE NEW CONCRETE HOUSEKEEPING PAD FOR ALL SYSTEM COMPONENTS. PROVIDE STAND FOR HUMIDIFIER GENERATOR.
4. INSTALL ENTIRE SYSTEM PER MANUFACTURER RECOMMENDATION. PROVIDE ALL MANUFACTURER RECOMMENDED ACCESSORIES FOR A COMPLETE AND FUNCTIONAL SYSTEM.
5. IF DISCHARGE WATER FROM REVERSE OSMOSIS WATER GENERATOR AND/OR CLEAN STEAM DOES NOT MEET DESIGN CONDITIONS, ALARM SHALL BE GENERATED AT THE DDC
H-AHU-1
INLET STEAM
(PSIG)
CAPACITY
(LBS/HR)
HUMIDIFIER
STEAM INLET
(PSI)
BASIS OF DESIGN
CONDAIR SETC-50
NOTES
ALL
TYPE
STEAM-TO-STEAM
OPERATING
WEIGHT (LBS)
H-DOAS-1 15 120 15 ALLSTEAM-TO-STEAM 423
NOMINAL
CAPACITY
(LB/HR)
50.0
175.0
MECHANICAL
ROOM
W312
MECHANICAL
ROOM
N309
NOMINAL
CAPACITY
(LBS/HR)
50.0
175.0
DIFFUSER, REGISTER AND GRILLE SCHEDULE
SERVICEMARK
24"x24" WHITE
FINISH
TITUS: TMS
BASIS OF DESIGN NOTES
SUPPLY AIR
SUPPLY AIR
2,3,4RETURN AIR WHITE
TITUS: ML-39/MPI-3948"x4-1/4" 2,3,4,5,6WHITE
TITUS: PAR24"x24"
NOTES:
1. PROVIDE 4 WAY THROW PATTERN UNLESS OTHERWISE NOTES.
2. PROVIDE BORDER TYPE TO SUIT CEILING REFLECTED ON ARCHITECTURAL DRAWINGS.
3. AIR DEVICE NECK SIZE SHALL MATCH AIR DEVICE RUNOUT.
4. COORDINATE FINISH WITH ARCHITECT. WHITE FINISH SHALL BE DEFAULT.
5. PROVIDE ALL LINEAR DIFFUSERS WITH CORRESPONDING INSULATED PLENUM TITUS MP.
6. PROVIDE WITH TWO 1-INCH SLOTS.
7. PROVIDE WITH THREE 1-INCH SLOTS.
8. PROVIDE WITH FOUR 1-INCH SLOTS.
9. LINEAR SLOT DIFFUSER WIDTHS ARE APPROXIMATE AND WILL DEPEND ON BORDER TYPE.
10. PROVIDE CONNECTION TO DUCT AND MANUAL VOLUME DAMPER.
GENERAL: NOT ALL AIR DEVICE NECK SIZES MAY BE USED ON PLANS.
FACE
DIMENSION
NOISE
CRITERIA
S1-1
S2-2
R1-1
0.10
MAX
PRESSURE
DROP (IN.WC.)
0.10
0.06
SUPPLY AIRS1-2
SUPPLY AIR 48"x7-3/4" WHITES1-3 0.1027
151-280
0-120
0-150
AIRFLOW
121-220
221-300
8"Ø
8"Ø
8"Ø
NECK SIZE
12"Ø TITUS: ML-39/MPI-39
24"x24" WHITE TITUS: TMSSUPPLY AIR 1,2,3,416S2-1 0.100-150 6"Ø
E1-1 EXHAUST AIR WHITE TITUS: 301RL0-100 8"x6" 10"x8" 0.0614
24"x24" WHITE TITUS: TMSSUPPLY AIR 20S2-3 0.10280-350 10"Ø
SUPPLY AIR TITUS: 301RL8"x8" 2,3,4,10WHITES3-1 0.10150-100 6"x6"
SUPPLY AIR TITUS: 301RL10"x8" WHITES3-2 0.1015101-150 8"x6"
SUPPLY AIR TITUS: 301RL14"x10" WHITES3-3 0.1016151-300 12"x8"
E1-2 EXHAUST AIR WHITE TITUS: 301RL101-200 12"x6" 14"x8" 0.0613
E1-3 EXHAUST AIR WHITE TITUS: 301RL201-300 12"x10" 14"x12" 0.0611
RETURN AIR WHITE TITUS: PAR24"x24"R1-2 0.0615151-250 10"Ø
RETURN AIR WHITE TITUS: PAR24"x24"R1-3 0.0615251-400 14"Ø
E2-1 EXHAUST AIR 0-75 WHITE TITUS: PAR24"x24" 0.06106"Ø
E1-4 EXHAUST AIR WHITE TITUS: 301RL301-400 18"x8" 20"x10" 0.0615
E3-1 EXHAUST AIR 0-75 WHITE TITUS: PAR12"x12" 0.06106"Ø
E2-2 EXHAUST AIR 76-160 WHITE TITUS: PAR24"x24" 0.06138"Ø
E2-3 EXHAUST AIR 161-250 WHITE TITUS: PAR24"x24" 0.061610"Ø
2,3,4,5,8
1,2,3,4
1,2,3,4
2,3,4,10
2,3,4,10
2,3,4
2,3,4
2,3,4,10
2,3,4,10
2,3,4,10
2,3,4,10
2,3,4
2,3,4
2,3,4
2,3,4
DUCT CONSTRUCTION SCHEDULE
SYSTEM
SUPPLY
UNIT DISCHARGE
RETURN
UNIT DISCHARGE UNIT SUCTION
EXHAUST
UNIT DISCHARGE UNIT SUCTION
- - - 2.0 2.0
SMACNA DUCT PRESSURE CLASS (INCHES WATER GAUGE)
2.0 - - - -
NOTES:
A. MIXED AIR DUCTS, INLET PLENUMS, LOUVER PLENUMS, AND TRANSFER AIR DUCT SHALL BE CONSTRUCTED AS RETURN AIR DUCTS.
B. ALL DUCT CONSTRUCTION SHALL BE CONSTRUCTED AS SEAL CLASS A.
C. DUCTWORK LEAKAGE TESTS PRESSURE SHALL BE EQUAL TO THE SMACNA DUCT PRESSURE CLASS.
D. ALL DUCTWORK SHALL BE LEAK TESTED UNLESS OTHERWISE NOTED. LEAKAGE RATES SHALL NOT EXCEED THE LEAKAGE FACTORS FOR THE LEAKAGE CLASS AT THE
ASSOCIATED TEST PRESSURE.
E. HAZARDOUS EXHAUST AIR SHALL BE WELDED STAINLESS STEEL CONSTRUCTION.
SMACNA LEAKAGE
CLASS -
RECTANGULAR
DUCTWORK
SMACNA LEAKAGE
CLASS - ROUND
DUCTWORK
24 12
- - 2.0 - -
SUPPLY AIR (LSA/SA) -
DOWNSTREAM OF TERMINAL
UNITS
GENERAL EXHAUST (EA)
- - - - 4.0 24 12
LABORATORY EXHAUST (LEA) -
DOWNSTREAM OF TERMINAL UNITS
4.0 - - - - 24 12
SUPPLY AIR (LSA/SA) -
UPSTREAM OF TERMINAL
UNITS
RETURN AIR (RA)
- - - 2.0 24 12
LABORATORY EXHAUST (LEA) -
UPSTREAM OF TERMINAL UNITS
ELECTRICAL DATA
V/PH/HZ
DIRECT
MARK NOTESBASIS OF DESIGN
ALLDAYTON 5PV43
NOTES:
1. CABINET SHALL BE GALVANIZED STEEL CONSTRUCTION.
2. PROVIDE NON-FUSED DISCONNECT SWITCH SIZED FOR FLA OF UNIT.
3. PROVIDE SINGLE POINT CONNECTION.
4. PROVIDE WITH HIGH TEMPERATURE CUTOFF SWITCH.
UNIT HEATER SCHEDULE
DRIVE
UH-1
UH-3
1.2
FLA
FAN
AIRFLOW
(CFM)
24 2.4
TOTAL
CAPACITY
(MBH)
GPM
HEATING COIL
180/160
EWT/LWT
(°F)
UH-2
120/1/60
DIRECT ALLDAYTON 5PV431.2550 24 2.4 180/160 120/1/60
DIRECT ALLDAYTON 5PV431.2550 24 2.4 180/160 120/1/60
CONDAIR SETC-175
- - - - 4.0 0 0
HAZARDOUS EXHAUST (HEA) -
DOWNSTREAM OF TERMINAL UNITS
- - - 2.0 0 0
HAZARDOUS EXHAUST (HEA) -
UPSTREAM OF TERMINAL UNITS
RETURN FANS
ESP
(IN. WG.)
TOTAL
AIRFLOW
(CFM)
FAN
QTY
TSP PA
(IN. WG.)
7,400 1.0 21.19
4.4 / 2.11
5,6TF-1 DUMBWAITER
SHAFT 250 0.5 115/60/1 GREENHECK CSP-A700-VG1/60.06 45 46 46 34 28 21 26321,632 29 40 40
15.0
SUPPLY AIR 12"x12" WHITES4-1 0.10160-150 6"Ø TITUS: TMS 1,2,3,4
STEAM
COND.
(LB/HR)
ELECTRICAL
V/PH/HZ MCA MOCP
120/1/60 1.25 15
120/1/60 1.25 15
DIMENSIONS
WxH (IN)
47x47
59x23
RETURN AIRR2-1 0-150 48"x6" WHITE0.102610"Ø TITUS: ML-39/MPI-39 2,3,4,5,7
OUTDOOR
AIRFLOW
(CFM)
4,600
1,110
1-4,7-9
UH-3W DIRECT ALLDAYTON 5PV261.4850 36 3.6 180/160 120/1/60
48"x7-3/4" WHITE0.102510"Ø TITUS: ML-39/MPI-39 2,3,4,5,7
STEAM TRAP SCHEDULE
MARK SERVICE BASIS OF DESIGN NOTES
CONNECTION
SIZE
(IN)
DIFFERENTIAL
PRESSURE
(PSI)
TRAP TYPE
NOTES:
1. STEAM TRAPS SHALL BE PROVIDED BY AND SELECTED BY THE MANUFACTURER FOR INSTALLATION WITH THE HEAT EXCHANGER. SCHEDULE PROVIDED FOR REFERENCE.
2. MINIMUM SAFETY FACTOR OF TRAP SHALL BE 2. SELECTED STEAM TRAPS HAVE FACTOR OF SAFETY OF 2 OR MORE.
3. PROVIDE CAST IRON TRAP.
ST-1 SPIRAX SARCO FT-15DOAS-1-PHT 3/4" 2.0 ALL
MAX CONDENSATE
LOAD
(LB/HR)
311 FLOAT & THERMOSTATIC
ST-3
ST-2
ST-6
ST-7
ST-8
LPS DRIP
AHU-1-PHT
LPS DRIP
MPS DRIP
MPS DRIP
3/4
3/4
3/4
3/4
3/4
0.5
0.5
0.5
0.5
5.0
FLOAT & THERMOSTATIC
FLOAT & THERMOSTATIC
THERMODYNAMIC
FLOAT & THERMOSTATIC
SPIRAX SARCO FT-15
SPIRAX SARCO FT-15
SPIRAX SARCO FT-15
SPIRAX SARCO FT-15
SPIRAX SARCO TD-52
ALL
ALL
ALL
ALL
ALL
MHP / BHP
PER FAN
(HP)
HEATING
AIRFLOW
(CFM)
4,600
3,700
UNIT SOUND POWER BY OCTAVE BAND (dB)
63 125 250 500 1000 2000 4000 8000
71 63 80 68 69 66 64 64
71 63 80 68 69 66 64 64
ST-10 MPS DRIP 3/4 6.5 5.0 THERMODYNAMIC SPIRAX SARCO TD-52 ALL
ST-9 LPS DRIP 3/4 486 5.0 FLOAT & THERMOSTATIC SPIRAX SARCO FT-15 ALL
ST-5 FT-2 3/4 100 0.5 FLOAT & THERMOSTATIC SPIRAX SARCO FT-15 ALL
ST-4 FT-1 3/4 486 5.0 FLOAT & THERMOSTATIC SPIRAX SARCO FT-15 ALL
AHU-1 SPECIFIC NOTES
A. STEAM HEATING COIL PROVIDED IN UNIT IS SMALLEST AVAILABLE CAPACITY. REQUIRED HEATING CAPACITY AND STEAM
FLOW IS INDICATED IN SCHEDULE.
FLOAT & THERMOSTATIC
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
CONSULTANT:
CFR ENGINEERING
20251 CENTURY BLVD.
SUITE 120
GERMANTOWN, MD 20874
877-871-4229
CONSULTANT:
COMPANY NAME
COMPANY ADDRESS
COMPANY ADDRESS
XXX-XXX-XXXX
ARCHITECT:
CB DESIGN GROUP
421 KING ST.
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
2345678910111213141516
B
C
D
E
F
G
H
J
K
12345678910111213141516
DRAWINGS NOT INTENDED FOR CONSTRUCTION.
08/20/2024
608-23-133
JH/DAKC
VAMC LABORATORY DESIGN -
FLOOD REMEDIATION
100% BID SET SUBMISSION 718 Smyth Road Manchester, NH 03104
Addendum 1 09/12/2024 SCHEDULES - MECHANICAL
M601
VENTILATION SCHEDULE - AHU-1
MARK SERVICE AREA SERVED INLET SIZE
HEATING HOT WATER HEATING COIL
BASIS OF DESIGN NOTESEAT (F) LAT (F)
CAV-S-1 SUPPLY M301
INTAKE/PROC 6"Ø 350 55 70 TRANE: VCEF ALL
LAB SIDE - SINGLE DUCT TERMINAL UNIT SCHEDULE
DESIGN
AIRFLOW
(CFM)
HEATING
CAPACITY
(MBH)
5.7
NOTES:
1. CONTRACTOR SHALL CONFIRM ACCESS PANEL / CONTROL PANEL SIDE AND DIMENSIONS PRIOR TO ORDERING.
2. RATINGS SHALL BE OBTAINED IN ACCORDANCE WITH THE LATEST EDITION OF AHRI-880 AND AHRI 410, AS APPLICABLE.
3. PROVIDE WIRELESS WALL MOUNTED ROOM TEMPERATURE SENSOR.
4. PROVIDE WITH HEATING HOT WATER HEATING.
5. PROVIDE ACCESS DOOR FOR HEATING HOT WATER COIL CLEANING.
6. ALL AIR TERMINALS SERVING BSCS OR FUME HOODS SHALL BE FAST ACTING VENTURI-TYPE AIR VALVES, 316L STAINLESS STEEL CONSTRUCTION.
MIN S.P.
(IN.WG.)
0.3
CAV-S-2 SUPPLY W102
SEND OUT AREA 6"Ø 350 55 70 TRANE: VCEF ALL5.7
CAV-S-3 SUPPLY W303 CHEMISTRY,
HEMATOLOGY, COAG., GLYCOLS. 350 55 TRANE: VCEF ALL5.7
CAV-S-4 SUPPLY W304
MICROBIOLOGY 1030 55 TRANE: VCEF ALL16.7
CAV-S-5 SUPPLY W305
HISTOLOGY
CAV-S-6 SUPPLY
W306
HAZARD STORAGE
TRANE: VCEF ALL
CAV-S-7 SUPPLY
W307
BULK SUPPLY
TRANE: VCEF ALL
CAV-E-1 EXHAUST 6"Ø 350 - - TRANE: VCEF 1-2- -
0.3
0.3
0.3
0.3
0.3
CAV-S-8 SUPPLY
W310 / W311/W309
URINALYSIS / BLOOD / MECH
50 55 TRANE: VCEF ALL1.60.3
100 55 TRANE: VCEF ALL0.3
CAV-S-9 SUPPLY 465 55 TRANE: VCEF ALL7.50.3
CAV-S-10 SUPPLY 230 55 TRANE: VCEF ALL3.70.3
CAV-S-11 SUPPLY 245 55 TRANE: VCEF ALL3.70.3
W305
HISTOLOGY
W312
CORRIDOR W
W312
CORRIDOR W
6"Ø
10"Ø
10"Ø
10"Ø
6"Ø
6"Ø
8"Ø
6"Ø
6"Ø
EWT (F)
LWT (F)
GPM
0.57
17.7
180 160
180 160
180 160
180 160
180 160
180 160
180 160
180 160
0.57
0.57
1.67
2.32
0.16
0.75
0.37
0.40
CAV-E-2 EXHAUST W102
SEND OUT AREA 6"Ø 450
CAV-E-3 EXHAUST
W303 / W308
CHEM, HEMATOLOGY, COAG.,
GLYCOLS / HAC
CAV-E-4 EXHAUST W304
MICROBIOLOGY 590
CAV-E-5 EXHAUST
W305
HISTOLOGYCAV-E-6 EXHAUST
W306
HAZARD STORAGE
CAV-E-7 EXHAUST
W307
BULK SUPPLY
0.3
0.3
0.5
CAV-E-8 EXHAUST
W310 / W311
URINALYSIS / BLOOD BANK
200 0.3
CAV-E-9 EXHAUST 250 0.3
CAV-E-10 EXHAUST 390 0.3
W304
MICROBIOLOGY
W305
HISTOLOGY
8"Ø
8"Ø
10"Ø
10"Ø
6"Ø
6"Ø
6"Ø
M301
INTAKE/PROC
- - TRANE: VCEF 1-2- - - -
- - TRANE: VCEF 1-2- - - -
- - SIEMENS: LGE 1,2,6- - - -
- - TRANE: VCEF 1-2- - - -
- - TRANE: VCEF 1-2- - - -
- - TRANE: VCEF 1-2- - - -
MARK SERVICE AREA SERVED INLET SIZE
HEATING HOT WATER HEATING COIL
BASIS OF DESIGN NOTESEAT (F) LAT (F)
VAV-01 SUPPLY BREAK ROOM 6"Ø 370 55 97 TRANE: VCEF ALL
ADMIN SIDE - SINGLE DUCT TERMINAL UNIT SCHEDULE
MAX DESIGN
AIRFLOW
(CFM)
HEATING
CAPACITY
(MBH)
5.5
NOTES:
1. CONTRACTOR SHALL CONFIRM ACCESS PANEL / CONTROL PANEL SIDE AND DIMENSIONS PRIOR TO ORDERING.
2. RATINGS SHALL BE OBTAINED IN ACCORDANCE WITH THE LATEST EDITION OF AHRI-880 AND AHRI 410, AS APPLICABLE.
3. PROVIDE WIRELESS WALL MOUNTED ROOM TEMPERATURE SENSOR.
4. PROVIDE WITH HEATING HOT WATER HEATING.
5. PROVIDE ACCESS DOOR FOR HEATING HOT WATER COIL CLEANING.
MIN S.P.
(IN.WG.)
0.5
SUPPLY CONF 6"Ø 400 TRANE: VCEF ALL-
SUPPLY N319 200 55 TRANE: VCEF ALL2.2
SUPPLY N318 TRANE: VCEF ALL
SUPPLY
N316
TRANE: VCEF ALL
SUPPLY
N315
TRANE: VCEF ALL
SUPPLY
CORRIDOR
55 TRANE: VCEF ALL
0.5
0.5
0.5
0.5
SUPPLY 340 55 TRANE: VCEF ALL2.90.5
SUPPLY 300 TRANE: VCEF ALL-0.5
N317
TLTS, N312 MECH
6"Ø
6"Ø
6"Ø
EWT (F)
LWT (F)
GPM
0.54
2.6
5.7
180 160
180 160
180 160
180 160
0.22
0.26
0.57
0.29
VAV-02
VAV-03
VAV-04
VAV-05
VAV-06
VAV-07
VAV-08
VAV-09
6"Ø
6"Ø
6"Ø
6"Ø
MIN DESIGN
AIRFLOW
(CFM)
MOTOR / ELECTRICAL DATA
V/PH/HZ
20.6 29.7 45/55 5.9 1/4
MARK NOTESBASIS OF DESIGN
ALL
SENSIBLE
CAPACITY
(MBH)
TOTAL
CAPACITY
(MBH)
EWT/LWT
(°F)
DAIKIN FCHC208
NOTES:
1. PROVIDE 4 ROW COILS.
2. PROVIDE FINISH COLOR TO MATCH CEILING GRID AND ARCHITECTURAL PLANS.
3. CABINET SHALL BE GALVANIZED STEEL CONSTRUCTION.
4. PROVIDE NON-FUSED DISCONNECT SWITCH SIZED FOR FLA OF UNIT.
5. FCU SHALL BE SINGLE POINT CONNECTION.
6. PROVIDE ECM MOTOR.
7. PROVIDE WITH CONDENSATE PUMP WITH HIGH LEVEL WATER DETECTION FLOAT SWITCH. PROVIDE BASIS OF DESIGN OR EQUAL TO
LITTLE GIANT VCMA-20, 1/2-GALLON COLLECTION TANK, 1/30 HP, 1.5 AMPS FLA, 115 V/60 HZ. PROVIDE HARD WIRED POWER CONNECTION.
FAN COIL UNIT SCHEDULE
GPM NOMINAL HP
FCU-1
FCU-3
FCU-4
7.9
MOCP
7.5 9.5 45/55 1.9 DAIKIN FCHC202
12.8 14.8 45/55 3.0
FAN
AIRFLOW
(CFM)
25.3 2.6
TOTAL
CAPACITY
(MBH)
GPM
HEATING COILCOOLING COIL
180/160
EWT/LWT
(°F)
FCU-2
FCU-5 6.1 6.3 45/55 1.3500
10.5 1.1 180/160
180/160
30.2 3.0 180/160
30.2 3.0
115/1/60
ALL
ALL
ALL
ALL
SIEMENS: LGE
SIEMENS: LGE
SIEMENS: LGE
0.5
0.5
0.5
LOUVER SCHEDULE
SERVICEMARK BASIS OF DESIGN NOTES
DOAS-1 OUTSIDE AIR RUSKIN ELM6375DX78"x38" ALL
NOTES:
1. COORDINATE BORDER FRAME, COLOR, AND FINISH WITH ARCHITECT.
2. PROVIDE LOUVERS WITH BIRD SCREEN, DRAINABLE BLADES, AND ALUMINUM CONSTRUCTION.
3. CONTRACTOR SHALL VERIFY IN FIELD PRIOR TO ORDERING LOUVER FOR THE EXACT DIMENSIONS OF THE EXISTING WINDOW OPENINGS AND COORDINATE WITH
A/E FOR ANY DEVIATIONS FROM THE SCOPE OF WORK.
4. PROVIDE WITH HEAT TRACE SNOW MELT ACCESSORY. PROVIDE DRAIN ON LOUVER DUCT CONNECTION.
5. PROVIDE WITH ADJUSTABLE BLADES FOR CONTROL BY DDC ACTUATOR.
6. LOUVER FACE VELOCITY INDICATED IS FOR MAXIMUM FLOW DURING ECONOMIZER MODE. LOUVER WATER ENTRAINMENT BEGINS AT 1000 FPM FACE VELOCITY.
FACE
DIMENSION
L-1
MAX
PRESSURE
DROP (IN.WC.)
0.03
AHU-1 OUTSIDE AIR 76"x38"L-2 0.07
AHU-1 RELIEF AIR 42"X38"L-3 0.06
AIRFLOW
(CFM)
76"x36"
NECK SIZE
(HEIGHT x WIDTH)
74"x36"
40"x36"
FREE AREA
57%
VELOCITY
(FPM)
57% 698
55% 676
RUSKIN ELM6375DX
0.3715 17.7 180 16085 2.3255
1.6 180 160 0.16
5908"Ø
HEATING
AIRFLOW
(CFM)
AHU-1 RELIEF AIR 42"X38"L-4 0.063700 40"x36" 55% 676
4.9
WATER PD
(FT)
1.1
2.2
0.4
18.7
WATER PD
(FT)
2.5
11.2
4.5
4.4
MCA
20.6 29.7 45/55 5.9 1/4 ALLDAIKIN FCHC2087.9734 25.3 2.6 180/160 115/1/604.9 18.7 4.4
1/4
1/4
1/4
7.9115/1/60 4.4
7.9115/1/60 4.4
7.9115/1/60 4.4
FCU-6 16.8 24.2 45/55 6.5600 - - - 4-716.7 - 1/20 5115/1/60 0.81
DAIKIN FCHC206
DAIKIN FCHC204
MULTIAQUA MHQWW-24-H-3
1,2,6
1,2,6
1,2,6
1,2,3,5,6
1,2,3,5
1,2,3,5
200 552.20.5 180 16096 0.2240 50
200 552.20.5 180 16096 0.2240 50
STEAM CONDENSATE PUMP SCHEDULE
SERVICEMARK BASIS OF DESIGN NOTES
WEST MER FABTEK C5AB2 ALL
NOTES:
1. UNIT IS SIZED AT 3 TIMES THE NORMAL CONDENSATE RATE.
2. PROVIDE HIGH WATER ALARM SWITCH AND AUTOMATIC BUT-OFF SWITCH TO PREVENT RECEIVER OVERFLOW. UNIT SHALL ALARM AT BAS.
3. PROVIDE DUPLEX PUMP PACKAGE.
4. PROVIDE NEMA RATED MANUFACTURER CONTROL PANEL.
5. PROVIDE 20-YEAR CORROSION WARRANTY.
6. PROVIDE WITH 12 GALLON RECEIVING TANK WITH EACH PUMP.
7. PROVIDE EACH PUMP WITH A CHECK VALVE.
PUMP QTY
CP-1
RPM
NORTH MERCP-2
PUMP
CAPACITY
(GPM)
PUMP DISCHARGE
PRESSURE
(PSIG)
RECEIVER SIZE
(GAL)
ELECTRICAL
(V/PH)
120/1
ALL
MHP
1/2
2 35003 10 10 120/1 1/2 FABTEK C5AB
FLASH TANK SCHEDULE
SERVICEMARK BASIS OF DESIGN NOTES
WEST MER, CP-1 SPIRAX SARCO FV VERTICAL0 ALL
NOTES:
1. PROVIDE ASME STAMP.
2. PROVIDE STANDS OF PROPER HEIGHT TO ALLOW GRAVITY DRAINAGE TO ASSOCIATED CONDENSATE RECEIVER.
FLASH STEAM
PRESSURE
(PSIG)
FT-1
NORTH MER, CP-2FT-2
COND FLOW
(LB/HR)
FLASH STEAM RATE
(LB/HR)
ALL
DIMENSIONS & WEIGHTS
HT (IN) Ø (IN) WT (LB)
36 6 75
SPIRAX SARCO FV VERTICAL0550 22 36 6 75
SOUND ATTENUATOR SCHEDULE
A = MIN DYNAMIC INSERTION LOSS, dB AT VELOCITY SHOWN (dB)
1 2 3 4 5 6 7 8
63 125 250 500 1000 2000 4000 8000
MARK NOTES
ALL
NOTES:
1. THE ACOUSTIC MEDIA SHALL BE COMPLERETLY ENCLOSED WITH POLYMER FILM TO PREVENT SHADING, EROSION AND IMPREGNATION.
2. THE ENCLOSED ACOUSTIC MEDIA SHALL BE SEPERATED FROM THE PERFORATED METAL BY A FACTORY-INSTALLED TRANSPARENT SPACER.
3. COORDINATE SOUND ATTENUATOR INTERIOR CROSS SECTIONAL AREA WITH CONNECTED DUCTWORK TO MINIMUM PRESSURE DROP.
PRESSURE
DROP
(IN. WG)
VELOCITY
(FPM) BASIS OF DESIGN
PRICE CS-C
SERVICE
SAT-S-1
SAT-S-2
SAT-S-3
SAT-S-4
SAT-S-5
SAT-S-9
SAT-E-1
SAT-E-2
SAT-E-3
CAV-S-1
CAV-S-2
CAV-S-3
CAV-S-4
CAV-S-5
CAV-S-9
CAV-E-1
CAV-E-2
CAV-E-3
LENGTH WIDTH / HEIGHT
DIMENSIONS (IN.)
DESIGN
AIRFLOW
(CFM)
STEAM CONTROL VALVE SCHEDULE
MARK SERVICE BASIS OF DESIGN NOTES
MAX STEAM
LOAD
(LB/HR)
DESIGN
PRESSURE
(PSI)
NOTES:
1. INSTALL PER MANUFACTURER RECOMMENDATION.
2. PROVIDE WITH ELECTRIC ACTUATOR TYPE WITH MODULATING CONTROL.
3. CONTROL VALVES SHALL MODULATE IN TANDEM TO CONTROL STEAM FLOW. SEE CONTROLS FOR MORE INFORMATION.
4. PROVIDE WITH BUILT IN REMOVABLE STRAINER.
5. VALVE IS INTENDED TO BE USED AS STEAM PRESSURE REDUCING VALVE SHOWN ON SHEET M501 DETAIL 1.
SCV-1 SPIRAX 1/2" LEA31PTSUSSDOAS-1 1/2 15105 1-4
CV
2.29
CONNECTION
SIZE
(IN)
DIFFERENTIAL
PRESSURE
(PSI)
SCV-2 3/4 152104.29 10 SPIRAX 3/4" LEA31PTSUSSDOAS-1
SCV-3 SPIRAX 1/2" LEA31PTSUSSAHU-1 1/2 15502.43 10
8"Ø
8"Ø
8"Ø
8"Ø
8"Ø
9"Ø
9"Ø
0.01
0.01
0.01
0.11
0.11
0.11
0.01
0.01
0.01
24"x10"
18"x8"
PRICE CS-C
PRICE CS-C
PRICE ERMT36/1C
PRICE RMT36/4B
PRICE CS-C
PRICE CS-C
PRICE CS-C
PRICE CS-C
5 8 15 31 34 28 19 10
5 8 15 31 34 28 19 10
5 8 15 31 34 28 19 10
5 9 14 18 29 36 27 17
3 5 7 13 15 15 11 8
5 8 15 31 34 28 19 10
6 9 16 32 35 28 18 10
6 9 16 32 35 28 18 10
6 9 16 32 35 28 18 10
EF-3 EXHAUST AIR 16"X16"L-5 0.05350 14"x14" 41% 537 RUSKIN ELF375DXH 1,2,3,5
LABORATORY AIR BALANCE SCHEDULE
ROOM NAME
AREA
(FT2)
SUPPLY AIR
(CFM)
OFFSET
(CFM)
W301 INTAKE/PROC 0125125
W302 SEND OUT AREA 010098
TOTAL
EXHAUST AIR
(CFM)
TOTAL
EXHAUST AIR
CFM/SF
W304 MICROBIO -1501030572 2
W305 HISTOLOGY -1501430436 4
W303 CHEM, HEMA, COAG,
GLYCOS
0825825 1
HAZ EXHAUST
AIR
(CFM)
LAB EXHAUST
AIR
(CFM)
W306 HAZ STOR -1505094 2200
W307 BULK SUPPLY -150100227 1250
W308 HAC -75031 275
W310 URIANALYSIS 0235234 1235
W311 BLOOD BANK 0155155 1255
W312 CORRIDOR +375475635 0.2100
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
SAT-E-10 CAV-E-10 36390 9"Ø 0.01 425 PRICE CS-C6 9 16 32 35 28 18 10 ALL
SCV-4 3/4 40200 ALL3.56 25 SPENCE E MAIN 1/2" FULL SEAT
FACTORSTEAM STATION
SCV-5 1 40400 ALL8.80 25 SPENCE E MAIN 3/4" FULL SEAT
FACTORSTEAM STATION
SAT-S-6 CAV-S-6 36715 0.1118"x8" 715 PRICE RMT36/4B3 5 7 13 15 15 11 8 ALL
RUSKIN ELM6375DX
RUSKIN ELM6375DX
NPSHR
(IN.WG.)
STEAM SAFETY RELIEF VALVE SCHEDULE
MARK LOCATION BASIS OF DESIGN NOTES
CAPACITY
(LB/HR)
ORIFICE
SIZE
(SQ IN)
NOTES:
1. INSTALL PER MANUFACTURER RECOMMENDATION.
2. PROVIDE WITH DRIP PAN ELBOW CONNECTION. BASIS OF DESIGN: SPIRAX SARCO DPE.
3. VALVE SHALL BE RATED FOR UP TO 300 PSIG AND UP TO 425°F.
4. PROVIDE WITH SIDE OUTLET, FULL NOZZLE DESIGN WITH BRONZE/BRASS TRIM.
5. PROVIDE WITH ORIFICE H.
SRV EMERSON KUNKLE 6010MECHANICAL ROOM
N312 20 0.8631,471 ALL
INLET
SIZE
(IN)
1-1/2
SET PRESSURE
(PSI)SERVICE
STEAM PRESSURE
REDUCING STATION 2
OUTLET
SIZE
(IN)
1-4
1-4
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
CONSULTANT:
CFR ENGINEERING
20251 CENTURY BLVD.
SUITE 120
GERMANTOWN, MD 20874
877-871-4229
CONSULTANT:
COMPANY NAME
COMPANY ADDRESS
COMPANY ADDRESS
XXX-XXX-XXXX
ARCHITECT:
CB DESIGN GROUP
421 KING ST.
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
2345678910111213141516
B
C
D
E
F
G
H
J
K
12345678910111213141516
DRAWINGS NOT INTENDED FOR CONSTRUCTION.
08/20/2024
608-23-133
JH/DAKC
VAMC LABORATORY DESIGN -
FLOOD REMEDIATION
100% BID SET SUBMISSION 718 Smyth Road Manchester, NH 03104
Addendum 1 09/12/2024 SCHEDULES - MECHANICAL
M602
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
CFR ENGINEERING
20251 CENTURY BLVD.
SUITE 120
GERMANTOWN, MD 20874
877-871-4229
CONSULTANT:
COMPANY NAME
COMPANY ADDRESS
COMPANY ADDRESS
XXX-XXX-XXXX
ARCHITECT:
CB DESIGN GROUP
421 KING ST.
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
2345678910111213141516
B
C
D
E
F
G
H
J
K
12345678910111213141516
Addendum 1 09/12/2024
8/20/2024
608-23-133
TKJC
VAMC LABORATORY DESIGN -
FLOOD REMEDIATION
100% BID SET SUBMISSION
PANEL SCHEDULES
E602
-2
-1
E
/1
/1
.p d f
718 Smyth Road Manchester, NH 03104
* AIC RATING WAS UNABLE TO BE CONFIRMED DUE TO NON-INVASIVE SURVEY. CONTRACTOR TO CONFIRM AIC RATING PRIOR TO CONSTRUCTION.
** UTILIZE EXISTING BREAKER
*** MATCH NEW BREAKER TO PANEL AIC RATING
NOTES:
DEMAND AMPS 139 A
OTHER POWER 24777 VA 1 24777 VA
MOTORS 0 VA 1.25(LARGEST)+1 0 VA
Kitchen Equipment 0 VA .65 0 VA
RECEPTACLES 0 VA NEC TABLE 220-13 0 VA
Lighting 0 VA 1 0 VA
CATEGORY CONNECTED VA DMD FACTOR DMD VA NOTES
LOAD COMPUTATIONS AND MINIMUM FEEDER AMPACITY
KVA BY PHASE
TOTAL CONNECTED KVA PER PHASE 18.3 14.6 17.1
EXISTING LOAD EXISTING 20 41 1 1 42
EXISTING LOAD -EXISTING 20 39 1 1 40
EXISTING LOAD EXISTING 20 37 1 1 38
20 EXISTING EXISTING LOAD
CP-1 - W3109 (N)** 2#12, #12G, 3/4"C 20 35 1.18 1.18 36 20 2#12, #12G, 3/4"C **(N) CP-2 - N312
CIRC P P-1,2 TP-1,2- N312, W309 (N)** 2#12, #12G, 3/4"C 20 33 0.65 1 34
31 4.5 1 32
70 EXISTING HEAT AND AC RM N391
WATER HEATER WH-2 - N312 (N)*** 2#4, #10G, 1 1/4"C 60
29 4.5 0.32 30 20 2#12, #12G, 3/4"C **(N) EF-3 - N314
27 1 1.5 28
AC ROOM E335 EXISTING 20
25 1 1.5 26
20 2#12, #12G, 3/4"C ***(N) W309 - WATER HEATER WH-1
23 1 0.49 24 20 2#12, #12G,3/4"C **(N) UH-1, H-2 - W309
EXISTING LOAD EXISTING 20
21 1 1 22 20 EXISTING WINDOW AC
19 1.21 1.21 20
17 1.21 1.21 18DOAS-1 (N)*** 4#10, #10G, 3/4"C 30
15 1.21 1.21 16
30 4#10, #10G, 3/4"C ***(N) AHU-1
UH-2,3, H-1 - N312 (N)** 2#12, #12G, 3/4"C 20 13 0.64 1.2 14 20 2#12, #12G, 3/4"C **(N) RO-1, RO-2 - N312, W309
AC ROOM 332 EXISTING 20 11 1 1 12
AC ROOM 335 EXISTING 20 9 1 1 10
20 EXISTING EXISTING LOAD
AC ROOM 336 EXISTING 20 7 1 1 8 20 EXISTING N336
AC ROOM 339 EXISTING 20 5 1 1 6 20 EXISTING N360
EXISTING LOAD EXISTING 20 3 1 1 4
EXISTING LOAD EXISTING 20 1 1 1 2
20 EXISTING EXISTING LOAD
LOAD DESCRIPTION FEEDER TRIP
CKT
A B C
CKT
# TRIP FEEDER LOAD DESCRIPTION
NOTES:
NEUTRAL RATING 100.00%
AIC 10kA* MAIN 400 A FED FROM PANEL DP-IR
SECTION 1 PH/WIRE 3/4
POLES 42 VOLTS 208/120 MOUNTING SURFACE
(E) PANEL: PNL AC3
* COMBINATION GFCI/AFCI BREAKER
NOTES:
DEMAND AMPS 140 A
OTHER POWER 10800 VA 1 10800 VA
MOTORS 6564 VA 1.25(LARGEST)+1 7519 VA
Kitchen Equipment 0 VA .65 0 VA
RECEPTACLES 31072 VA NEC TABLE 220-13 20536 VA
Lighting 0 VA 1 0 VA
CATEGORY CONNECTED VA DMD FACTOR DMD VA NOTES
LOAD COMPUTATIONS AND MINIMUM FEEDER AMPACITY
KVA BY PHASE
- 20.9 21.8 18.7 -
SPARE - 20 83 0 0 84 20 - SPARE
CP-7 W303 2#12, #12G, 3/4"C 20 81 0.72 0 82 20 - SPARE
CP-7 W303 2#12, #12G, 3/4"C 20 79 0.72 0.5 80 20 2#12, #12G, 3/4"C 02 SENSOR - W304
CP-7 W303 2#12, #12G, 3/4"C 20 77 0.72 0.72 78 20 2#12, #12G, 3/4"C CP-5 - W303
CP-7 W303 2#12, #12G, 3/4"C 20 75 1.6 0.72 76 20 2#12, #12G, 3/4"C CP-5 - W303
CP-8 W303 2#12, #12G, 3/4"C 20 73 0.72 0.72 74 20 2#12, #12G, 3/4"C CP-5 - W303
CP-8 W303 2#12, #12G, 3/4"C 20 71 0.72 0.72 72 20 2#12, #12G, 3/4"C CP-5 - W303
CP-8 W303 2#12, #12G, 3/4"C 20 69 0.72 0.72 70 20 2#12, #12G, 3/4"C CP-6 W303
CP-8 W303 2#12, #12G, 3/4"C 20 67 0.72 0.72 68 20 2#12, #12G, 3/4"C CP-6 W303
CP-9 W304 2#12, #12G, 3/4"C 20 65 0.72 0.72 66 20 2#12, #12G, 3/4"C CP-6 W303
CP-9 W304 2#12, #12G, 3/4"C 20 63 0.72 0.72 64 20 2#12, #12G, 3/4"C CP-6 W303
CP-9 W304 2#12, #12G, 3/4"C 20 61 0.72 0.72 62 20 2#12, #12G, 3/4"C CP-11 W305
CP-9 W304 2#12, #12G, 3/4"C 20 59 0.72 0.72 60 20 2#12, #12G, 3/4"C CP-11 W305
CP-10 W304 2#12, #12G, 3/4"C 20 57 0.72 0.72 58 20 2#12, #12G, 3/4"C CP-11 W305
CP-10 W304 2#12, #12G, 3/4"C 20 55 0.72 0.72 56 20 2#12, #12G, 3/4"C CP-11 W305
CP-10 W304 2#12, #12G, 3/4"C 20 53 0.72 0.72 54 20 2#12, #12G, 3/4"C CP-2 W310
CP-10 W304 2#12, #12G, 3/4"C 20 51 0.72 0.72 52 20 2#12, #12G, 3/4"C CP-2 W310
DATA RACK QUAD - W300B 2#12, #12G, 3/4"C 20 49 0.36 0.72 50 20 2#12, #12G, 3/4"C CP-2 W310
DATA RACK QUAD - W300B 2#12, #12G, 3/4"C 20 47 0.36 0.72 48 20 2#12, #12G, 3/4"C CP-2 W310
LAB FRIDGE - CORR W312 2#12, #12G, 3/4"C 20 45 1 0.72 46 20 2#12, #12G, 3/4"C CP-1 W310
LAB FRIDGE - CORR W312 2#12, #12G, 3/4"C 20 43 1 0.72 44 20 2#12, #12G, 3/4"C CP-1 W310
BREAK ROOM FRIDGE* 2#12, #12G, 3/4"C 20 41 1 0.72 42 20 2#12, #12G, 3/4"C CP-1 W310
RECEPTACLES - ROOF 2#12, #12G, 3/4"C 20 39 0.36 0.72 40 20 2#12, #12G, 3/4"C CP-1 W310
FREEZER - CORR W312 2#12, #12G, 3/4"C 20 37 1 1.5 38 20 2#12, #12G, 3/4"C MICROTOME - W305
LAB…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .