RFIs.pdf

PDF 109 KB Posted

Attached to
Z1DA-- 523A5-22-010 Enhanced Kitchen Equipment Site Prep
Solicitation number
36C24124B0032
Issued by

About this file

This document provides details for a federal solicitation notice. The solicitation number 36C24124B0032 is for project 523A5-22-010 Enhanced Kitchen Equipment Site Prep at the Veterans Affairs Medical Center Brockton located in Brockton, Massachusetts. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1 is seeking bids for site preparation work to support new kitchen equipment through an invitation for bids process. The description specifies this is for site preparation related to enhanced kitchen equipment at the listed Veterans Affairs medical facility location. No further details are provided on requirements, response dates, or other terms.

View the file

Other files

File Type Posted
2018 B20 Electrical As-Built Drawings.pdf PDF
CRP 20 Conduit run towards door.jpeg JPEG file
Hood Vent Pictures above ceiling tiles 5.jpeg JPEG file
Scope Ph1 14 Drain connection below floor.jpeg JPEG file
Mechanical Original Drawings.pdf PDF
2010 B20 Roof Warranty Letter.pdf PDF
Electrical Original Drawings.pdf PDF
Rm.116E looking towards Rm.102.jpeg JPEG file
Scope 1.1 Pipes.jpeg JPEG file
Panel CRP 20.jpeg JPEG file
Rm.116E at near door opening 2.jpeg JPEG file
Plumbing Original Drawings.pdf PDF
Hood Vent Pictures above ceiling tiles 2.jpeg JPEG file
Rm.116C looking towards E.jpeg JPEG file
2009 B20 HVAC Drawings 523A5-08-101.pdf PDF
Rm.118 Panel CRP20.jpeg JPEG file
Scope Clarifications.pdf PDF
S06 523A5-22-010 Site Visit Sign In-Sheet.pdf PDF
Hood Vent Pictures above ceiling tiles 7.jpeg JPEG file
Hood Vent Pictures above ceiling tiles 8.jpeg JPEG file
Hood Vent Pictures above ceiling tiles 3.jpeg JPEG file
36C24124B0032 0003.docx DOCX document
Rm.118 Panel CRP20 from door.jpeg JPEG file
CRP 20 conduit in direction of LSP 20.jpeg JPEG file
CRP 20 Conduit from door to wall.jpeg JPEG file
1983 B.20 Upgrade Freezer Area MEP plans.pdf PDF
Hood Vent Pictures above ceiling tiles 6.jpeg JPEG file
2021 B20 Fire Protection As-Built Drawings.pdf PDF
WD MA202400112 03012024.pdf PDF
Hood Vent Pictures above ceiling tiles 4.jpeg JPEG file
Rm.116E at near door opening.jpeg JPEG file
PDR Wall counter pipes above freezer 110A.jpeg JPEG file
Architectural Original Drawings.pdf PDF
PDR Wall counter pipes above freezer 110A to demo.jpeg JPEG file
Hood Vent Pictures above ceiling tiles 1.jpeg JPEG file
Structural Original Drawings.pdf PDF
Floor Plans with Room Numbers.pdf PDF
CRP 20 Interior.jpeg JPEG file
2005 Roof Specifications.pdf PDF
Rm.118 next to stairs.jpeg JPEG file
Scope 1.1 Water Pipe.jpeg JPEG file
2005 Roofing Details.pdf PDF
36C24124B0032 0002.docx DOCX document
36C24124B0032 0001.docx DOCX document
Spec Sheet RTV7-05UV-ST Retherm Ovens.pdf PDF
Design Drawings DMA Brock 091823 FS.pdf PDF
B-22 Roof Warranty Letter.pdf PDF
ICRA Kitchen Site Prep.pdf PDF
Spec List Final 091323.pdf PDF
36C24124B0032 Pre-SOL.docx DOCX document
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No. RFI Question Answer

Please supply as‐built drawing for the work area

Original 1951 drawings and latest project as‐builts of various projects are provided for reference. If you need specific question / clarification, please review attached scope clarifications document (Attachment Scope Clarifications).

Please supply new design drawings for Arch, Structural, Plumbing, Elect and Mech

New MEP design drawings were part of original solicitation posted with file title "Design Drawings DMA Brock 091823 FS" (page 2 of the drawings). In addition, original 1951 drawings and latest project as‐builts of various projects are provided for reference as mentioned in RFI # 1. If you need specific question / clarification, please review attached scope clarifications document (Attachment Scope Clarifications).

Please supply an equipment list with who is furnishing and who is installing

For the main kitchen (MK), the new equipment list is portrayed on solicitation design drawings "Design Drawings DMA Brock 091823 FS" page 1. With proper coordination with GC, all new equipment will be ordered and delivered by VA (different vendor contract) to Brockton Campus. Upon delivery, GC shall be responsible for storage due to any GC caused delays and all installation as specified in Phase 4 of the "scope clarifications" document.

The new hood and vent system going in PDR room is to be furnished and installed by the GC.

4 Is this project a Design Build This is not a Design Build contract. However, since it is a station level project, we only have limited design information available. Therefore, performing limited specialized site investigation and providing coordination drawings for VA approval before construction is part of the scope.

Does all existing equipment slated for reuse currently work properly

All existing equipment slated for reuse is being used daily and is currently working properly. Any equipment not working properly would be VA's responsibility to replace with same kind of equipment.

6 Please clarify new countertop locations

All countertops in patient dining room (PDR) are only being demolished and disposed of. No new countertops are going in PDR. In main kitchen (MK), the existing and new equipment locations are shown on design drawings provided in solicitation "Design Drawings DMA Brock 091823 FS". Final location of each equipment is to be field verified by GC during construction based on the design layout provided.

7 Who has the existing roof warranty The existing roof warranty is with Tremco. Refer to Scope Clarification document (Attachment Scope Clarifications)‐Phase 1 ‐ #7 and attached B.20 Roof Warranty Letter (Attachment 2010 B20 Roof Warranty Letter).

Please clarify where spec section 07 40 00 is applicable

This spec section is not applicable as the roof type is EPDM.

523A5‐22‐010 Enhanced Kitchen Equipment Site Prep VAMC Brockton, MA

Bid RFIs

Please supply a drawing showing locations of finish types per the finish schedule

All finishes shall match the surrounding areas. This spec section 09 06 00 is for reference only and some items may not be applicable. Any wall surface damaged / changed due to demolition or new work shall be painted to match existing surrounding wall colors. This color and paint type shall be approved via samples during submittal process.

What type materials/manufacturer to be used for damaged flooring tiles?

The existing tiles are Quarry tiles from American Olean manufacturer. See details in Scope clarifications document (Attachment Scope Clarifications) "Phase‐1 # 2".

Please Clarify process manufacturer tests/commissioning?

See scope clarifications document (Attachment Scope Clarifications) "Phase 4 # 3".

Please supply a hazardous material survey

A hazardous material survey is not performed and not required for this project.

If asbestos, lead paint or other hazardous material is found during demolition or at any point during construction, GC shall immediately notify the COR and CO.

13 Please clarify flooring scope.

Flooring is to match existing tiles upon demolition of one partition wall in PDR and the walk‐in cooler in main kitchen (MK). Refer to RFI # 10 for tile information. The GC will be responsible to provide tile samples during the submittal process to get matching colors approved tiles and mud/grout and associated assesorries. In addition, the GC shall patch any holes opened in the slab during demolition or temporary relocation phases for the flooring work. All patches will need to have tile work to match existing surroundings.

14 Additional information:

Past Project roofing specifications and design details are attached for reference to aid roof patching work (Attachment 2005 Roof Specifications and Attachment 2005 Roofing Details).

15 Additional information: Scope Clarifications Document (Attachment Scope Clarifications) is attached to aid bidding process.

16 Additional information: Additional photos are provided for various pipes, electrical rooms, and panels.

File details come from the government source that posted it. Updated .