2018 B20 Electrical As-Built Drawings.pdf

PDF 10 MB Posted

Attached to
Z1DA-- 523A5-22-010 Enhanced Kitchen Equipment Site Prep
Solicitation number
36C24124B0032
Issued by

About this file

This document provides details for a federal solicitation for site preparation work. The solicitation number 36C24124B0032 is an invitation for bid from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1 for project 523A5-22-010 Enhanced Kitchen Equipment Site Prep at the VAMC Brockton located at 940 Belmont Street, Brockton, MA 02301. The description specifies this is for site preparation related to enhanced kitchen equipment. No further details are provided on requirements, pricing terms, response dates or other bid details.

View the file

Other files

File Type Posted
CRP 20 Conduit run towards door.jpeg JPEG file
Hood Vent Pictures above ceiling tiles 5.jpeg JPEG file
Scope Ph1 14 Drain connection below floor.jpeg JPEG file
Mechanical Original Drawings.pdf PDF
2010 B20 Roof Warranty Letter.pdf PDF
Electrical Original Drawings.pdf PDF
Rm.116E looking towards Rm.102.jpeg JPEG file
Scope 1.1 Pipes.jpeg JPEG file
Panel CRP 20.jpeg JPEG file
Rm.116E at near door opening 2.jpeg JPEG file
Plumbing Original Drawings.pdf PDF
Hood Vent Pictures above ceiling tiles 2.jpeg JPEG file
Rm.116C looking towards E.jpeg JPEG file
2009 B20 HVAC Drawings 523A5-08-101.pdf PDF
Rm.118 Panel CRP20.jpeg JPEG file
Scope Clarifications.pdf PDF
S06 523A5-22-010 Site Visit Sign In-Sheet.pdf PDF
Hood Vent Pictures above ceiling tiles 7.jpeg JPEG file
Hood Vent Pictures above ceiling tiles 8.jpeg JPEG file
Hood Vent Pictures above ceiling tiles 3.jpeg JPEG file
36C24124B0032 0003.docx DOCX document
Rm.118 Panel CRP20 from door.jpeg JPEG file
CRP 20 conduit in direction of LSP 20.jpeg JPEG file
CRP 20 Conduit from door to wall.jpeg JPEG file
1983 B.20 Upgrade Freezer Area MEP plans.pdf PDF
Hood Vent Pictures above ceiling tiles 6.jpeg JPEG file
2021 B20 Fire Protection As-Built Drawings.pdf PDF
WD MA202400112 03012024.pdf PDF
Hood Vent Pictures above ceiling tiles 4.jpeg JPEG file
RFIs.pdf PDF
Rm.116E at near door opening.jpeg JPEG file
PDR Wall counter pipes above freezer 110A.jpeg JPEG file
Architectural Original Drawings.pdf PDF
PDR Wall counter pipes above freezer 110A to demo.jpeg JPEG file
Hood Vent Pictures above ceiling tiles 1.jpeg JPEG file
Structural Original Drawings.pdf PDF
Floor Plans with Room Numbers.pdf PDF
CRP 20 Interior.jpeg JPEG file
2005 Roof Specifications.pdf PDF
Rm.118 next to stairs.jpeg JPEG file
Scope 1.1 Water Pipe.jpeg JPEG file
2005 Roofing Details.pdf PDF
36C24124B0032 0002.docx DOCX document
36C24124B0032 0001.docx DOCX document
Spec Sheet RTV7-05UV-ST Retherm Ovens.pdf PDF
Design Drawings DMA Brock 091823 FS.pdf PDF
B-22 Roof Warranty Letter.pdf PDF
ICRA Kitchen Site Prep.pdf PDF
Spec List Final 091323.pdf PDF
36C24124B0032 Pre-SOL.docx DOCX document
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX TO DRAWINGS

GENERAL NOTES

1.

2.

DEPARTMENT OF VETERANS AFFAIRS

PROJECT NUMBER 523A5-12-305

VA MEDICAL CENTER

MANY AREAS WITHIN THIS FACILITY (MULTIPLE BUILDINGS) ARE CONTAMINATED TO SOME EXTENT WITH ASBESTOS CONTAINING

MATERIALS. IF WORK IS REQUIRED IN AREAS THAT DO CONTAIN HAZARDOUS MATERIALS TAKE ALL PRECAUTIONS AS REQUIRED

TO REMOVE HAZARDOUS MATERIALS IN THE WORK AREA SAFELY PRIOR TO WORK COMMENCING. SEE HAZARDOUS MATERIALS

REPORT IN SPECIFICATIONS. DISPOSE OF ALL HAZARDOUS MATERIALS PROPERLY.

BROCKTON, MA

MANY WALLS WITHIN THIS FACILITY (MULTIPLE BUILDINGS) ARE CONTAMINATED TO SOME EXTENT WITH LEAD PAINT. IF WORK IS

REQUIRED ON WALLS THAT CONTAIN LEAD PAINT TAKE ALL PRECAUTIONS AS REQUIRED TO REMOVE PAINT IN THE WORK AREA

SAFELY PRIOR TO WORK COMMENCING. SEE HAZARDOUS MATERIALS REPORT IN SPECIFICATIONS. DISPOSE OF ALL HAZARDOUS

MATERIALS SAFELY.

Seal for Civil Drawings

Seal for Architectural Drawings

Seal for Structural Drawings

Seal for Electrical Drawings

Seal for Mechanical Drawings

GENERAL

G00.0 01 COVER SHEET

G00.1 02 SITE MAP

E001 03 ELECTRICAL LEGEND AND ABBREVIATIONS

PROJECT 01 - BUILDING 01 UPGRADES

C01-40-01-01 04 BUILDING 01 UPGRADES SITE PLAN AND EXISTING CONDITIONS

C01-40-01-02 05 BUILDING 01 UPGRADES NOTES PLAN

C01-40-01-03 06 BUILDING 01 UPGRADES SITE DETAIL SHEET

C01-40-01-04 07 BUILDING 01 UPGRADES SITE DETAIL SHEET

A01-10-01-00 08 BUILDING 01 UPGRADES BASEMENT FLOOR PLAN

E01-00-01-01 09 BUILDING 01 UPGRADES FIRST FLOOR PART PLAN, DETAILS AND PHASING

E01-20-01-00 10 BUILDING 01 UPGRADES FLOOR PLANS

E01-50-01-00 11 BUILDING 01 UPGRADES ONE-LINE DIAGRAMS

E01-80-01-01 12 BUILDING 01 UPGRADES SITE PLANS, DETAILS + SCHEDULES

PROJECT 02 - BUILDING 20 UPGRADES

C02-40-20-01 13 BUILDING 20 UPGRADES SITE PLAN

C02-40-20-02 14 BUILDING 20 UPGRADES DETAILS AND NOTES PLAN

C02-40-20-03 15 BUILDING 20 UPGRADES SITE DETAIL SHEET

A02-05-20-01 16 BUILDING 20 UPGRADES FIRST FLOOR DEMOLITION PLAN

A02-10-20-01 17 BUILDING 20 UPGRADES FIRST FLOOR PLAN

A02-10-20-02 18 BUILDING 20 UPGRADES SECOND FLOOR PLAN

A02-40-20-01 19 BUILDING 20 UPGRADES CONSTRUCTION DETAILS AND DOOR SCHEDULE

M02-00-20-01 20 BUILDING 20 UPGRADES LEGEND, GENERAL NOTES, DETAIL AND SCHEDULES

M02-05-20-01 21 BUILDING 20 UPGRADES FIRST FLOOR PIPING DEMOLITION

M02-05-20-02 22 BUILDING 20 UPGRADES SECOND FLOOR PIPING DEMOLITION

M02-20-20-01 23 BUILDING 20 UPGRADES FIRST FLOOR PIPING

M02-20-20-02 24 BUILDING 20 UPGRADES SECOND FLOOR PIPING

E02-00-20-01 25 BUILDING 20 UPGRADES LIGHTING FIXTURE SCHEDULE, ATS CONT. SCHEDULE AND PHASING

E02-02-20-01 26 BUILDING 20 UPGRADES FIRST FLOOR EXISTING CONDITIONS AND DEMOLITION PLAN

E02-02-20-02 27 BUILDING 20 UPGRADES SECOND FLOOR AND PENTHOUSE EXISTING CONDITIONS AND

DEMO PLAN

E02-05-20-01 28 BUILDING 20 UPGRADES POWER RISER EXISTING CONDITIONS AND DEMOLITION

E02-10-20-01 29 BUILDING 20 UPGRADES FIRST FLOOR LIGHTING PLAN

E02-10-20-02 30 BUILDING 20 UPGRADES SECOND FLOOR AND PENTHOUSE LIGHTING PLAN

E02-20-20-01 31 BUILDING 20 UPGRADES FIRST FLOOR POWER PLAN

E02-20-20-02 32 BUILDING 20 UPGRADES SECOND FLOOR AND PENTHOUSE POWER PLAN

E02-21-20-01 33 BUILDING 20 UPGRADES 1/4" SCALE PART PLANS

E02-50-20-01 34 BUILDING 20 UPGRADES POWER RISER

E02-60-20-01 35 BUILDING 20 UPGRADES PANELBOARD SCHEDULES

E02-70-20-01 36 BUILDING 20 UPGRADES DETAILS

E02-70-20-02 37 BUILDING 20 UPGRADES DETAILS

E02-80-20-01 38 BUILDING 20 UPGRADES PARTIAL SITE PLAN

PROJECT 03 - BUILDING 23 UPGRADES

C03-40-23-01 39 BUILDING 23 UPGRADES SITE AND NOTES PLAN

C03-40-23-02 40 BUILDING 23 UPGRADES DETAILS AND NOTES PLAN

C03-40-23-03 41 BUILDING 23 UPGRADES SITE DETAIL SHEET

A03-10-23-01 42 BUILDING 23 UPGRADES FIRST FLOOR PLAN

A03-10-23-02 43 BUILDING 23 UPGRADES SECOND FLOOR PLAN

A03-20-23-01 44 BUILDING 23 UPGRADES EXTERIOR ELEVATION AND EXTERIOR DETAILS

A03-40-23-01 45 BUILDING 23 UPGRADES CONSTRUCTION DETAILS AND DOOR SCHEDULE

S03-20-23-01 46 BUILDING 23 UPGRADES FLOOR AND ROOF FRAMING PLANS

S03-60-23-01 47 BUILDING 23 UPGRADES FRAMING NOTES AND DETAILS

M03-00-23-01 48 BUILDING 23 UPGRADES LEGEND, GENERAL NOTES AND SCHEDULES

M03-10-23-01 49 BUILDING 23 UPGRADES FIRST FLOOR MECHANICAL

M03-10-23-02 50 BUILDING 23 UPGRADES SECOND FLOOR MECHANICAL

E03-00-23-01 51 BUILDING 23 UPGRADES LIGHTING FIXTURE SCHEDULE, ATS CONT. SCHEDULE AND PHASING

E03-02-23-00 52 BUILDING 23 UPGRADES BASEMENT FLOOR EXISTING CONDITIONS AND DEMOLITION PLAN

E03-02-23-01 53 BUILDING 23 UPGRADES FIRST FLOOR EXISTING CONDITIONS AND DEMOLITION PLAN

E03-02-23-02 54 BUILDING 23 UPGRADES SECOND FLOOR EXISTING CONDITIONS AND DEMOLITION PLAN

E03-05-23-01 55 BUILDING 23 UPGRADES POWER RISER EXISTING CONDITIONS AND DEMOLITION

E03-10-23-01 56 BUILDING 23 UPGRADES PART PLANS LIGHTING

E03-20-23-00 57 BUILDING 23 UPGRADES BASEMENT FLOOR POWER PLAN

E03-20-23-01 58 BUILDING 23 UPGRADES FIRST FLOOR POWER PLAN

E03-20-23-02 59 BUILDING 23 UPGRADES SECOND FLOOR POWER PLAN

E03-50-23-01 60 BUILDING 23 UPGRADES POWER RISER

E03-60-23-01 61 BUILDING 23 UPGRADES PANELBOARD SCHEDULES

E03-70-23-01 62 BUILDING 23 UPGRADES DETAILS

E03-80-23-01 63 BUILDING 23 UPGRADES EXISTING CONDITIONS AND DEMOLITION AND NEW WORK SITE PLANS

PROJECT 04 - BUILDING 61 UPGRADES

C04-40-61-01 64 BUILDING 61 UPGRADES SITE AND NOTES PLAN

C04-40-61-02 65 BUILDING 61 UPGRADES DETAILS AND NOTES PLAN

C04-40-61-03 66 BUILDING 61 UPGRADES SITE DETAIL SHEET

E04-20-61-00 67 BUILDING 61 UPGRADES BASEMENT FLOOR PLANS + ONE-LINE DIAGRAMS

E04-80-61-01 68 BUILDING 61 UPGRADES SITE PLANS + SCHEDULES

PROJECT 05 - BUILDINGS 69 AND 70 UPGRADES

C05-40-6970-01 69 BUILDINGS 69 AND 70 UPGRADES SITE PLAN

C05-40-6970-02 70 BUILDINGS 69 AND 70 UPGRADES DETAILS AND NOTES PLAN

C05-40-6970-03 71 BUILDINGS 69 AND 70 UPGRADES SITE DETAIL SHEET

A05-10-6970-01 72 BUILDINGS 69 AND 70 UPGRADES FLOOR AND ROOF PLANS AND EXTERIOR ELEVATIONS

A05-50-6970-01 73 BUILDINGS 69 AND 70 UPGRADES EXTERIOR DETAILS

M05-00-6970-01 74 BUILDINGS 69 AND 70 UPGRADES LEGEND, GENERAL NOTES AND SCHEDULES

M05-10-6970-01 75 BUILDINGS 69 AND 70 UPGRADES MECHANICAL PLANS

M05-31-6970-01 76 BUILDINGS 69 AND 70 UPGRADES SECTIONS

E05-00-6970-01 77 BUILDINGS 69 AND 70 UPGRADES LIGHTING FIXTURE SCHEDULE AND PHASING

E05-02-6970-01 78 BUILDINGS 69 AND 70 UPGRADES EXISTING CONDITIONS AND DEMOLITION PLANS

E05-05-6970-01 79 BUILDINGS 69 AND 70 UPGRADES POWER RISERS EXISTING CONDITIONS AND DEMOLITION

E05-20-05-01 80 BUILDINGS 69 AND 70 UPGRADES BUILDING 5 PART PLANS POWER

E05-20-07-01 81 BUILDINGS 69 AND 70 UPGRADES BUILDING 7 PART PLANS POWER

E05-20-22-01 82 BUILDINGS 69 AND 70 UPGRADES BUILDING 22 PART PLANS POWER

E05-20-6970-01 83 BUILDINGS 69 AND 70 UPGRADES PLANS

E05-50-6970-01 84 BUILDINGS 69 AND 70 UPGRADES POWER RISER AND PANELBOARD SCHEDULES

E05-50-6970-02 85 BUILDINGS 69 AND 70 UPGRADES POWER RISER AND PANELBOARD SCHEDULES

E05-70-6970-01 86 BUILDINGS 69 AND 70 UPGRADES DETAILS

E05-80-6970-01 87 BUILDINGS 69 AND 70 UPGRADES SITE PART PLAN POWER

PROJECT 06 - BUILDING 05 UPGRADES

E06-10-05-00A 88 BUILDING 05 UPGRADES BASEMENT FLOOR - WEST LIGHTING

E06-10-05-00B 89 BUILDING 05 UPGRADES BASEMENT FLOOR - EAST LIGHTING

E06-10-05-01A 90 BUILDING 05 UPGRADES FIRST FLOOR - WEST LIGHTING

E06-10-05-01B 91 BUILDING 05 UPGRADES FIRST FLOOR - EAST LIGHTING

E06-10-05-02A 92 BUILDING 05 UPGRADES SECOND FLOOR - WEST LIGHTING

E06-10-05-02B 93 BUILDING 05 UPGRADES SECOND FLOOR - EAST LIGHTING

E06-10-05-P 94 BUILDING 05 UPGRADES PENTHOUSE LIGHTING

ELECTRICAL UPGRADE PHASE 2

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS:

o n e e i g h t h i n c h o n e f o o t 1

B

A

C

D

E

F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Management and Facilities

Construction

Office ofARCHITECT/ENGINEERS:

HA PROJECT NUMBER: 16457

523A5-12-305

VAMC BROCKTON- MA

ELECTRICAL UPGRADE

PHASE 2

207.784.5100

Auburn, ME

© 2021

617.426.5050

Boston, MA

207.775.0053

Portland, ME

603.626.1242

Portsmouth, NH

April 26, 2022

"AS-BUILT" CONSTRUCTION DOCUMENTS

JANUARY 05, 2018

These Record Documents have been prepared based on information provided by others. The Consultant has not verified the accuracy and / or completeness of this information and shall not be responsible for any errors or omissions that may be incorporated as a result of erroneous information provided by others.

RECORD DRAWING

COVER SHEET

G00.0

JMBCLH 01

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS:

o n e e i g h t h i n c h o n e f o o t 1

B

A

C

D

E

F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Management and Facilities

Construction

Office ofARCHITECT/ENGINEERS:

HA PROJECT NUMBER: 16457

523A5-12-305

VAMC BROCKTON- MA

ELECTRICAL UPGRADE

PHASE 2

207.784.5100

Auburn, ME

© 2021

617.426.5050

Boston, MA

207.775.0053

Portland, ME

603.626.1242

Portsmouth, NH

August 27, 2021

"AS-BUILT" CONSTRUCTION DOCUMENTS

JANUARY 05, 2018

MINATURE GOLF

COURSE

113.0

112.0

112.0

PL

B A S E B A L L

F I E L D S

108.0

112.0

PL

P

A

R

K

I

N

G

121.0

67 P

A

R

K

I

N

G 11

119.0

119.0

120.0

P

A

R

K

I

N

G

E

N

C

L

O

S

E

D

W

A

L

K

P

A

R

K

I

N

G

110 P

A

R

K

I

N

G

111.0

119.0

121.0

122.0

P A R K I N G

PL

118.0

P A R

K I N G

117.0

P

A

R

K

I

N

G

P

A

R

K

I

N

G

V A

B E N C H

M A R K

116.0

P

A

R

K

I

N

G

P

A

R

K

I

N

G

B

L

M

O

N

T

P

R

K

I

N

G

P A R K I N G

P

A

R

K

I

N

G

P A R K I N G

117.0

117.0

P A R K I N G

P

A

R

K

I

N

G

P

A

R

K

I

N

G

TENNINIS

COURT

119.0

S

T

R

E

E

T

P A R K I N G

116.0

112.0

M A N L E Y

S T R

E E T

PL

118.0

119.0

LP

111.0

109.0

P

A

R

K

I

N

G

112.0

111.0

117.0

P

A

R

K

I

N

G

P A R K I N G

109.0

E N C L O S E D W A L K

108.0

P A R K I N G

109.5

P

A

R

K

I

N

G

117.0

112.0

O

PL

116.0

PL

119.0

PL

111.0

109.0

111.0

107.0 111.0 110

110 65

111.0

111.0

P A R K I N G

R A M P

P A R K I N G

P A R K I N G

117.040

112.0

107.0

P A R K

I N G

119.0

110.5

P

A

R

K

I

G

P A R

K I N G

11O

E

N

C

L

O

S

D

W

L

K

110.5

P A R K I N G

P A R K I N G

109.0

121.0

E N C L O S E D W A L K

108.0

S

T

R

E

E

T

B

L

M

O

N

T

EMERGENCY GENERATOR76

EMERGENCY GENERATOR75

EMERGENCY GENERATOR74

73 EMERGENCY GENERATOR

72 EMERGENCY GENERATOR

EMERGENCY GENERATOR71

EMERGENCY GENERATOR70

69 EMERGENCY GENERATOR

EMERGENCY GENERATOR68

67 EMERGENCY GENERATOR

51 IMPLEMENT STORAGE

50 SEWAGE PUMPING STATION

65 GREENHOUSE

64 PICNIC AREA

62 INPATIENT MENTAL HEALTH

61 APARTMENT BUILDING

60 LEASED SPACE (CATHOLIC CHARITIES)

49 500,000 GALLON RESERVOIR

48 WATER TANK

47 WATER PUMP HOUSE

46 RESEARCH LAB BUILDING

45 LAUNDRY BUILDING

44 GARAGE & UTILITY SHOP BUILDING

43 INCINERATOR BUILDING

40 BOILER BUILDING

37 BULK OXYGEN STORAGE TANK

27 BULK OXYGEN STORAGE TANK

26 FLAGPOLE

25 MEDICAL REHABILITATION BUILDING

24 CHAPEL BUILDING

23 GYMNASIUM & SWIMMING BUILDING

22 RECREATION & LIBRARY BUILDING

(DEMO'D) THEATRE BUILDING21

20 NUTRITION & FOOD SVC & WAREHOUSE BLDG.

SPINAL CORD INJURY, BUILDING RENOV.8

7 DOMICILIARY

5 OUTPATIENT MENTAL HEALTH

4 NURSING HOME & PSYCHATRIC BUILDING

3 OUTPATIENT AMBULATORY CARE

2 INPATIENT MENTAL HEALTH

ADMINISTRATION BUILDING1

BUILDING SCHEDULENO

SMOKING

SHELTER

NOT TO SCALE

BROCKTON VA SITE PLAN

8-26-05

P

A

R

K

I

N

G

P A R K I N G

34 EMR

32 SPD

FOR STORAGE CONTAINERS

POTENTIAL LAYDOWN AREA

PARKING AREA

POTENTIAL CONTRACTOR

FOR STORAGE CONTAINERS

POTENTIAL LAYDOWN AREA

NOTE:

POTENTIAL CONTRACTOR PARKING AND LAYDOWN

AREAS ARE AS INDICATED ON THIS DRAWING, FINAL

CONTRACTOR PARKING AND LAYDOWN AREA/S

SHALL BE AS DIRECTED BY THE VAMC COR.

PROPOSED OVERALL PHASING NOTES:

BELOW IS A PROPOSED PHASING PLAN OUTLINING A PATH TO FACILITATE

CONSTRUCTION. NOT ALL ITEMS ARE NECESSARILY NOTED.

REFER TO EACH PROJECT FOR SPECIFIC PROPOSED PHASING NOTES FOR EACH SPECIFIC

PROJECT.

PHASING BETWEEN EACH PROJECT CONSIST OF WORK ASSOCIATED WITH THE MEDIUM

VOLTAGE (PRIMARY) LOOP.

NO MORE THAN ONE BUILDING SHALL BE PERMITTED TO BE DISCONNECTED FROM THE LOOP

AT ANY GIVEN TIME. COORDINATE WITH VAMC COR AND OBTAIN WRITTEN APPROVAL PRIOR

TO OPENING OR CLOSING ANY POINT ALONG THE LOOP.

THE CONTRACTOR SHALL MINIMIZE THE NUMBER AND DURATION OF POWER INTERRUPTIONS

THROUGHOUT CONSTRUCTION. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO

VERIFY PHASING AND ENSURE THAT ALL WORK INDICATED ON THE CONSTRUCTION

DOCUMENTS IS COMPLETED.

PRIOR TO BEGINNING CONSTRUCTION THE CONTRACTOR SHALL GENERATE A

COMPLETE AND THOROUGH PHASING PLAN WITH PROPOSED TIMELINE INDICATING

DATES AND TIMES OF ALL WORK. A FINAL TIMELINE SHALL BE COORDINATED WITH

AND ACCEPTED BY THE VAMC COR.

G00.1

JMBJWT 02

SITE MAP

These Record Documents have been prepared based on information provided by others. The Consultant has not verified the accuracy and / or completeness of this information and shall not be responsible for any errors or omissions that may be incorporated as a result of erroneous information provided by others.

RECORD DRAWING

April 26, 2022

CLH

T

DIST

MAIN

PULL

J

F

S

OC

GFI

GFI

GFI

GFI

BATT

FACP

HD

FANN

F

F

I

R

E

F

I

R

E

F

I

R

E

F

I

R

E

F

WAA

A

F F

A

F F

A

F F

ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION

A AMPERE

AB ABOVE

ACET ACETYLENE

AC ALTERNATING CURRENT

ADA AMERICANS WITH DISABILITIES ACT

AF AMPERE FRAME

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITY HAVING JURISDICTION

AHU AIR HANDLING UNIT

AIC AMPERE INTERRUPTING CAPACITY

ANN ANNUNCIATOR

ARCH ARCHITECT

AT AMPERE TRIP

ATC AUTOMATIC TEMPERATURE CONTROL

ATS AUTOMATIC TRANSFER SWITCH

AUX AUXILIARY

AWG AMERICAN WIRE GAUGE

BATT BATTERY

BB BACKBOARD

BC BARE COPPER

BFG BELOW FINISHED GRADE

BLDG BUILDING

BKR BREAKER

BTM BOTTOM

BW BOTH WAYS

C CONDUIT

CAB CABINET

CAT CATALOG

CATV CABLE TELEVISION

CB CIRCUIT BREAKER

CKT CIRCUIT

C/L CENTERLINE

CLF CURRENT LIMITING FUSE

CLG CEILING

CO COMPANY

COL COLUMN

COMM COMMUNICATIONS

CONC CONCRETE

CONN CONNECTION, CONNECT

COORD COORDINATE

CONTR CONTRACTOR

CPT CURRENT POWER TRANSFORMER

CT CURRENT TRANSFORMER

CTL CONTROL

CU COPPER

CUH CABINET UNIT HEATER

CW COOL WHITE

� DELTA CONNECTION

D DEEP

DB DECIBEL

DC DIRECT CURRENT

DET DETECTOR

DIA DIAMETER

DISC DISCONNECT

DIST DISTRIBUTION

DIV DIVISION

DN DOWN

DP DISTRIBUTION PANEL

DWG DRAWING

G, GND GROUND OR GROUNDING

GALV GALVANIZE(D)

GEN GENERATOR

GFCI GROUND FAULT CIRCUIT INTERUPTER

GFP GROUND FAULT PROTECTION

GRMC GALVINIZED RIGID MATAL CONDUIT

HD HEAVY DUTY

HGT HEIGHT

HH HAND HOLE

HID HIGH INTENSITY DISCHARGE

HO HIGH OUTPUT

HOA HAND-OFF-AUTOMATIC

HP HORSE POWER, HEAT PUMP

HPF HIGH POWER FACTOR

HPS HIGH PRESSURE SODIUM

HTR HEATER

HV HIGH VOLTAGE

HW HOT WATER

K KILO

KAIC KILOAMPERES INTERRUPTING RATING

KCMIL THOUSAND CIRCULAR MILS

KVA KILOVOLT-AMPERE

KW KILOWATT

KWH KILOWATT HOUR

MA MILLIAMPERE

MAINT MAINTAINED

MAX MAXIMUM

MC METAL CLAD CABLE

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MCM THOUSAND CIRCULAR MILS

MCP MOTOR CIRCUIT PROTECTOR

MDP MAIN DISTRIBUTION PANEL

MFR MANUFACTURER

MH METAL HALIDE

MIN MINIMUM

MISC MISCELLANEOUS

MLO MAIN LUGS ONLY

MSCC MOTOR STARTER CONTROL CIRCUIT

MT MOUNT

MTD MOUNTED

MTR MOTOR

MV MEDIUM VOLTAGE

O2 OXYGEN

OC OVER COUNTER

OCPD OVER CURRENT PROTECTIVE DEVICE

OH OVERHEAD

OHD OVERHEAD DOOR OPERATION

OL OVERLOAD

OS OCCUPANCY SENSOR

P POLE(S)

PA PUBLIC ADDRESS

PB PULL BOX

PBN PUSH BUTTON

PC PHOTOCELL

PF POWER FACTOR

PH,Ø PHASE

PL PILOT LIGHT

PNL PANEL

PNLBD PANELBOARD

PR PAIR

PRI PRIMARY

PVC POLYVINYL CHLORIDE

PWR POWER

QTY QUANTITY

R REMOVE

RE RELOCATE EXISTING

REC, RCPTS RECEPTACLE(S)

REFR REFRIGERATOR

REQ'D REQUIRED

RGS RIGID GALVANIZED METAL CONDUIT

RNMC RIGID NON-METALLIC CONDUIT

RM ROOM

RMC RIGID METAL CONDUIT

T, TEL, TELE TELEPHONE

TBB TELEPHONE BACKBOARD

TC TIME CLOCK

TCP TEMPERATURE CONTROL PANEL

TEMP TEMPORARY

TERM TERMINAL, TERMINATE

TMCB THERMAL MAGNETIC CIRCUIT BREAKER

TO TELEPHONE OUTLET

T-STAT THERMOSTATE

TTB TELEPHONE TERMINAL BOARD

TV TELEVISION

TVSS TRANSIENT VOLTAGE SURGE SUPPRESSOR

TW TWISTED

TWSP TWISTED SHIELDED PAIR

TWU THROUGH-THE-WALL UNIT

TYP TYPICAL

V VOLT(S)

VA VOLT-AMPERES

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

VIE VERIFY EXACT LOCATION

VM VOLTMETER

VT VOLTAGE TRANSFORMER

Y WYE CONFIGURATION

W WIRE

W/ WITH

WH WATER HEATER

WP WEATHER PROOF

WT WATER TIGHT

ZAM ZONE ACCESS MODULE

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

R

S

T

U

V

W

X

Z

SCH SCHEDULE

SEC SECONDARY

SFL SUB-FEED LUGS

SH SMOKE HATCH

SHT SHEET

SMR SURFACE METAL RACEWAY

SPC SPACE

SPD SURGIENT PROTECTIVE DEVICE

SPDT SINGLE POLE DOUBLE THROW

SPKR SPEAKER

SPR SPARE

SQ SQUARE

SR SURFACE RACEWAY

STP STOP-STOP

SS STAILNESS STEEL

SSA SOUND SYSTEM AMPLIFIER

STA STATION

STP SHIELDED TWISTED PAIR

SUSP SUSPEND(ED)

SW SWITCH

SWBD SWITCHBOARD

SWGR SWITCHGEAR

E, EX, EXIST EXISTING

EA EACH

EBU EMERGENCY BATTERY UNIT

EC EMPTY CONDUIT

E.C. ELECTRICAL CONTRACTOR

EF EXHAUST FAN

EG EQUIPMENT GROUND

E.I.F.S. EXTERIOR INSULATED FINISH SYSTEM

EL ELEVATION

ELEC ELECTRIC(AL)

EM, EMER EMERGENCY

EMT ELECTRICAL METALIC TUBING

ENCL ENCLOSURE

EP ELECTRICAL PANEL

EPO EMERGENCY POWER OFF

EQUIP EQUIPMENT

ETC ETCETERA

EUH ELECTRIC UNIT HEATER

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

JB, J-BOX JUNCTION BOX

JCT JUNCTION

U ULTRASONIC

UC UNDER COUNTER

UG UNDERGROUND

UGC UNDERGROUND CABLE TELEVISION

UGL UNDERGROUND LIGHTING

UGP UNDERGROUND PRIMARY

UGS UNDERGROUND SECONDARY

UGT UNDERGROUND TELEPHONE

UH UNIT HEATER

UNO UNLESS NOTED OTHERWISE

UPS UNITERRUPTIBLE POWER SUPPLY

UTIL UTILITY

UTP UNSHIELDED TWISTED PAIR

F FUSED

FA FIRE ALARM

FAA FIRE ALARM ANNUNCIATOR

FACP FIRE ALARM CONTROL PANEL

FAGA FIRE ALARM GRAPHIC ANNUNCIATOR

FBO FURNISHED BY OTHERS

FCU FAN COIL UNIT

FDR FEEDER

FIBO FURNISHED AND INSTALLED BY OTHERS

FIXT FIXTURE

FL FLUORESCENT

FLA FULL LOAD AMPERES

FLR FLOOR

FLEX FLEXIBLE

FLUOR FLUORESCENT

FMC FLEXIBLE METAL CONDUIT

FO FIBER OPTIC

FT FEET

FUT FUTURE

FURN FURNITURE

IC INTERRUPTING CAPACITY

ID IDENTIFY, IDENTIFICATION

IEEE INSTITUTE OF ELECTRICAL AND ELECTRONIC

ENGINEERS

IG ISOLATED GROUND

IMC INTERMEDIATE METAL CONDUIT

INCAND INCANDESCENT

INCO INTERCOMMUNICATION

INT INTERLOCK

IPS INTERRUPTIBLE POWER SUPPLY

IR PASSIVE INFRARED

IWH INSTANTANEOUS WATER HEATER

LFMC LIQUID TIGHT FLEXIBLE METAL CONDUIT

LTG LIGHTING

LT(S) LIGHT(S)

LV LOW VOLTAGE

N NORTH

NC NORMALLY CLOSED

NEC NATIONAL ELECTRIC CODE

NEMA NATIONAL ELECTRICAL MANUFACTURERS

ASSOCIATION

NF NON-FUSED

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NO NORMALLY OPEN

NTS NOT TO SCALE

XFMR TRANSFORMER

XM EXISTING TO BE MAINTAINED

XN EXISTING TO BE REMOVED AND REPLACED

WITH NEW

XP EXPLOSION PROOF

XR EXISTING TO BE REMOVED

XRE EXISTING TO BE REMOVED AND RELOCATED,

AS SHOWN AND EXTEND EXISTING CIRCUIT

AND FEED AS REQUIRED

SWITCHBOARD PULL SECTION

SWITCHBOARD MAIN SECTION

SWITCHBOARD DISTRIBUTION SECTION

120/208V PANELBOARD (SURFACE MOUNTED)

AUTOMATIC TRANSFER SWITCH

TRANSFORMER

FUSED DISCONNECT SWITCH

STARTER

DISCONNECT SWITCH

VARIABLE FREQUENCY DRIVE

SUBLETTER INDICATES SWITCH CONTROL

SINGLE POLE SWITCH

THREE WAY SWITCH

DIMMER SWITCH

MOTOR RATED SWITCH

LIGHTING CONTROL STATION

CEILING MOUNTED OCCUPANCY SENSOR

LIGHTING FIXTURE - 2x4 RECESSED

LIGHTING FIXTURE - 1x4 RECESSED

LIGHTING FIXTURE - 4 FOOT STRIP

LIGHTING FIXTURE - 4 FOOT LIFE-SAFETY

DUPLEX RECEPTACLE - "A" INDICATES MOUNT ABOVE COUNTER

DOUBLE DUPLEX RECEPTACLE - "A" INDICATES MOUNT ABOVE COUNTER

SPECIAL RECEPTACLE - NEMA CONFIGURATION AS REQUIRED OR INDICATED

DUPLEX GFCI RECEPTACLE - "A" INDICATES MOUNT ABOVE COUNTER

DOUBLE DUPLEX GFCI RECEPTACLE - "A" INDICATES MOUNT ABOVE COUNTER

DUPLEX RECEPTACLE ON EMERGENCY POWER - "A" INDICATES MOUNT ABOVE COUNTER

DOUBLE DUPLEX RECEPTACLE ON EMERGENCY POWER - "A" INDICATES MOUNT ABOVE COUNTER

DUPLEX GFCI RECEPTACLE ON EMERGENCY POWER - "A" INDICATES MOUNT ABOVE COUNTER

DOUBLE DUPLEX GFCI RECEPTACLE ON EMERGENCY POWER - "A" INDICATES MOUNT ABOVE COUNTER

REMOTE EMERGENCY LIGHTING HEAD(S)

EMERGENCY BATTERY UNIT WITHOUT HEADS

WALL MOUNTED EXIT SIGN - SHADING INDICATES DIRECTION

OF FACE(S). ARROWS INDICATE DIRECTION OF EGRESS

CEILING MOUNTED EXIT SIGN - SHADING INDICATES DIRECTION

OF FACE(S). ARROWS INDICATE DIRECTION OF EGRESS

MOTOR

JUNCTION BOX

FLOOR BOX

CEILING MOUNTED SPEAKER

PUSH BUTTON

EMERGENCY CALL STATION - SEE DETAIL A3 / E701

CARD READER

MAGNETIC LOCK

DOOR CONTACT

KEYPAD

FIRE ALARM CONTROL PANEL

FIRE ALARM REMOTE ANNUNCIATOR

MANUAL PULL STATION

FIRE ALARM STROBE ONLY UNIT

FIRE ALARM HORN / STROBE UNIT

HEAT DETECTOR

SMOKE DETECTOR

A

F F

O R

A

B O

V E

C O

U N

T E

R O

R B

A C

K S

P L

A S

H

FIRE

FINISHED FLOOR

POLE MOUNTED LUMINAIRE

EMERGENCY LIGHTING BATTERY UNIT WITH HEAD(S)

AS INDICATED

EXIT

CENTER ABOVE DOOR

INTERIOR MOUNTING HEIGHTS

VOICE AND DATA OUTLET - MOUNT AT SAME HEIGHT AS ASSOCIATED RECEPTACLE - SEE

SPECIFICATIONS FOR REQUIREMENTS

REQUEST TO EXIT SENSORREX

COORDINATE WITH VA PROJECT ENGINEER (COR) AND OTHER TRADES

TO PROVIDE CEILING ACCESS CONTAINMENT CARTS AND OTHER

CONTAINMENT SYSTEMS AS SPECIFIED PRIOR TO ANY INTERIOR

WORK. REFER TO DIV 1 SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

LINE TYPES

EXISTING ITEMS REQUIRING WORK (DASHED BOLD LINE)

EXISTING ITEMS TO REMAIN (DASHED THIN LINE)

NEW ITEM/WORK (SOLID BOLD LINE)

180° VIDEO SURVEILLANCE (CCTV) CAMERA

SECTION MARKER

IS CUT FROM

DRAWING THE SECTION

SECTION IS SHOWN

DRAWING NUMBER THE

SECTION NUMBER

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS:

o n e e i g h t h i n c h o n e f o o t 1

B

A

C

D

E

F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Management and Facilities

Construction

Office ofARCHITECT/ENGINEERS:

HA PROJECT NUMBER: 16457

523A5-12-305

VAMC BROCKTON- MA

ELECTRICAL UPGRADE

PHASE 2

207.784.5100

Auburn, ME

© 2021

617.426.5050

Boston, MA

207.775.0053

Portland, ME

603.626.1242

Portsmouth, NH

August 27, 2021

"AS-BUILT" CONSTRUCTION DOCUMENTS

JANUARY 05, 2018

ELECTRICAL LEGEND

AND ABBREVIATIONS

E001

JMBJWT 03

These Record Documents have been prepared based on information provided by others. The Consultant has not verified the accuracy and / or completeness of this information and shall not be responsible for any errors or omissions that may be incorporated as a result of erroneous information provided by others.

RECORD DRAWING

"AS-BUILT" CONSTRUCTION DOCUMENTS

August 27, 2021

Auburn, ME 207.784.5100

© 2021

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242

These Record Documents have been prepared based on information provided by others. The Consultant has not verified the accuracy and / or completeness of this information and shall not be responsible for any errors or omissions that may be incorporated as a result of erroneous information provided by others.

RECORD DRAWING

SKF

These Record Documents have been prepared based on information provided by others. The Consultant has not verified the accuracy and / or completeness of this information and shall not be responsible for any errors or omissions that may be incorporated as a result of erroneous information provided by others.

RECORD DRAWING

on information provided by others. The Consultant has not verified the accuracy and / or completeness of this information and shall not be responsible for any errors or omissions that may be incorporated as a result of erroneous information provided by others.

RECORD DRAWING

UP

DN

DN

DN

STORAGE

116F

CORRIDOR

CR101

STORAGE

116B

STORAGE

108A

FOOD STORAGE

COOLER FREEZER A & B

MEAT REFRIGERATOR

110A

REFRIGERATOR

109A

LOCKERS

WOMENS

108A

TRANSFORMER ROOM

CLOSET

CORRIDOR

CR104

WIDGET STORAGE

CORRIDOR

CR103

REFRIGERATOR

116A

REFRIGERATOR

ELEVATOR

S-14

PIPE CHASE

ALCOVE

116G

REFRIGERATION MACHINE ROOM

116C

SERVICE ROOM

116D

SUPPLY REFRIGERATOR

102J

STAIR HALL #2

ST2101

ROOM

STORAGE

116E

WASH ROOM

MENS TOILET

105A

MENS LOUNGE

REFRIGERATION

MECHANICAL STORAGE

LOUNGE

CORRIDOR

WASH ROOM

VEGETABLE FREEZER

JANITOR

102A

VAULT

102E

VAULT

102F

MACHINE ROOM

101A

ELEVATOR #1

P-15

TOILET

102B

OFFICE

102C

ELEVATOR LOBBY

STAIRS #1

ST1101

LOADING DOCK

102G

REPRODUCTION

102K

TANK

102H

ALCOVE

102L

MEAT REFRIGERATOR

110B

CORRIDOR

GENERAL STORAGE

LOADING DOCK

ELEVATOR

COMPRESSOR

STORAGE/

STORAGE/

PASSENGER

SOLAR STORAGE

COMM ROOM

102 I

TELEPHONE ROOM

102M

COOLER FREEZER

110C

STAIRS #1

ST3101

OFFICE

102D

ROOM

COMP

ROOM

COMP

POWER

CRITICAL

105B

SLAB.

REMOVING EXISTING ROUGH

OF INSTALLING CONDUITS AND

AS SHOWN FOR THE PURPOSE

REMOVE THE CONCRETE SLAB

BACK-UP TO MATCH EXISTING

WITH BRICK VENEER AND CMU

IN-FILL LOUVER OPENING

LOUVER

REMOVE EXISTING WALL

3'-4" 3'-8"

WITH VA. ARTWORK REMOVAL/RELOCATION BY VA.

COORDINATE REMOVAL/RELOCATION OF ARTWORK ON CORRIDOR SIDE

BRICK AND CMU MASONRY WALL WITHIN A FORMER WINDOW OPENING.

NEW DOOR OPENING THROUGH EXISTING

9'-0"8'-6"

2'-0"

7'-0"8'-6"

ADJACENT EXISTING SLAB.

THE SURFACE WITH THE

CONCRETE SLAB, ALIGNING

POUR AND FINISH NEW

LEGEND

NEW CONCRETE SLAB ON GRADE

REMOVE EXISTING CONCRETE SLAB ON GRADE

SUSPENSION SYSTEM

REMOVE EXISTING PLASTER CEILING AND

ELEC PANEL

FIRE EXTINGUISHER CABINET

PROVIDE SURFACE MOUNTED

/ CR102

PARTITION

EXG CMU

BENEATH THE CORRIDOR..

THE PURPOSE OF INSTALLING CONDUITS FROM THE PIPE CHASE

REMOVE THE CONCRETE SLAB IN THE CROSS HATCHED AREA FOR REINSTALL LOCKERS IN THE CONFIGURATION SHOWN.

CEILING SURFACE AND PAINT) IN WOMENS LOCKERS AND MENS LOUNGE

RESTORE FINISHES (FLOORING, WALL BASE, WALL SURFACE AND PAINT,

CONCRETE SLAB. ALIGN THE SURFACE WITH THE ADJACENT EXISTING SLAB.

AFTER INSTALLATION OF ELECTRIC CONDUIT, POUR AND FINISH NEW

CONSTRUCTION PARTITIONS

TEMPORARY DUST AND SMOKE

REMOVED (SALVAGED) LOCKERS SHALL BE TURNED OVER TO THE VA.

THE CONFIGURATIONS (TEMPORARY AND PERMANENT LOCATIONS AS SHOWN). EXCESS

CONTRACTOR SHALL REMOVE, SALVAGE, STORE AND REINSTALL EXISTING LOCKERS IN4.

WORK AREA.

DOOR WITH LOCKING HARDWARE, CLOSER AND BOTTOM SWEEP FOR ACCESS TO THE

PROVIDE POSITIVE SEAL AGAINST THE MIGRATION OF DUST. AND SMOKE. PROVIDE SOLID

FLOOR TO CEILING/STRUCTURE ABOVE AND START AND FINISH AT WALLS/PARTITIONS AND

TEMPORARY DUST AND SMOKE CONSTRUCTION PARTITIONS SHALL BE CONSTRUCTED FROM3.

PARTITION DIMENSIONS ARE FACE TO FACE OF FINISH WALL, UNLESS NOTED OTHERWISE.2.

REFER TO DRAWING E02-00-20-01 FOR PROPOSED CONSTRUCTION PHASING NOTES.1.

GENERAL NOTES:

3'-0"

"1'-8"

MATCH EXISTING FLOOR FINISH

RESINOUS FLOORING (RES-2) TO

LOCKER BASE. FINISH WITH

6" HIGH x 20" WIDE CONCRETE

ACM FLOOR TILE AND MASTIC

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS:

o n e e i g h t h i n c h o n e f o o t 1

B

A

C

D

E

F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Management and Facilities

Construction

Office ofARCHITECT/ENGINEERS:

HA PROJECT NUMBER: 16457

523A5-12-305

VAMC BROCKTON- MA

ELECTRICAL UPGRADE

PHASE 2

207.784.5100

Auburn, ME

© 2021

617.426.5050

Boston, MA

207.775.0053

Portland, ME

603.626.1242

Portsmouth, NH

August 27, 2021

"AS-BUILT" CONSTRUCTION DOCUMENTS

JANUARY 05, 2018

UP

CORRIDOR

CR101

STORAGE

108A

FOOD STORAGE

REFRIGERATOR

109A

LOCKERS

WOMENS

108A

WIDGET STORAGE

STAIR HALL #2

ST2101

ROOM

MENS TOILET

105A

MENS LOUNGE

LOUNGE

COMPRESSOR

ROOM

COMP

POWER

CRITICAL

105B

AND WOMENS LOCKERS.

PERFORM PARTIAL PARTITION DEMO BETWEEN MENS LOUNGE

REMOVE LOCKERS AND LOCKER BASE FOR REUSE.

LOCKERS AS SHOWN

RECONFIGURE EXISTING

CONTRACTOR SHALL

THE CONTRACTOR

OF LOCKERS BY

TEMPORARY RELOCATION

CONTRACTOR

OF LOCKERS BY THE

TEMPORARY RELOCATION

DURING CONSTRUCTION

EXG DOOR TO BE LOCKED

W/ CONCRETE BASE

LOCKERS AS SHOWN

RECONFIGURE EXISTING

CONTRACTOR SHALL

REMOVE EXG CLG

20-01 A02-05-

BUILDING 20 UPGRADES

FIRST FLOOR DEMOLITION PLAN

SJDJLJ

REF:

A1

FIRST FLOOR DEMOLITION PLAN

1/8" = 1'-0" 0 4' 8' 12'

WOMEN'S LOCKER ROOM

CEILING REMOVAL IN EXISTING

AND TEMPORARY LOCKER LAYOUT

LOCKER ROOM LOCKER REMOVALS

These Record Documents have been prepared based on information provided by others. The Consultant has not verified the accuracy and / or completeness of this information and shall not be responsible for any errors or omissions that may be incorporated as a result of erroneous information provided by others.

RECORD DRAWING

MDL

DN

DN

DN

STORAGE

116F

CORRIDOR

CR101

STORAGE

116B

STORAGE

108A

FOOD STORAGE

COOLER FREEZER A & B

MEAT REFRIGERATOR

110A

REFRIGERATOR

109A

LOCKERS

WOMENS

108A

TRANSFORMER ROOM

CLOSET

CORRIDOR

CR104

WIDGET STORAGE

CORRIDOR

CR103

REFRIGERATOR

116A

REFRIGERATOR

ELEVATOR

S-14

PIPE CHASE

ALCOVE

116G

REFRIGERATION MACHINE ROOM

116C

SERVICE ROOM

116D

SUPPLY REFRIGERATOR

102J

STAIR HALL #2

ST2101

ROOM

STORAGE

116E

WASH ROOM

MENS TOILET

105A

MENS LOUNGE

REFRIGERATION

MECHANICAL STORAGE

LOUNGE

CORRIDOR

WASH ROOM

VEGETABLE FREEZER

JANITOR

102A

VAULT

102E

VAULT

102F

MACHINE ROOM

101A

ELEVATOR #1

P-15

TOILET

102B

OFFICE

102C

ELEVATOR LOBBY

STAIRS #1

ST1101

LOADING DOCK

102G

REPRODUCTION

102K

TANK

102H

ALCOVE

102L

MEAT REFRIGERATOR

110B

CORRIDOR

GENERAL STORAGE

LOADING DOCK

ELEVATOR

COMPRESSOR

STORAGE/

STORAGE/

PASSENGER

SOLAR STORAGE

COMM ROOM

102 I

TELEPHONE ROOM

102M

COOLER FREEZER

110C

STAIRS #1

ST3101

OFFICE

102D

ROOM

COMP

ROOM

COMP

POWER

CRITICAL

105B

BACK-UP TO MATCH EXISTING

WITH BRICK VENEER AND CMU

IN-FILL LOUVER OPENING

3'-4" 3'-8"

9'-0"8'-6"

2'-0"

7'-0"8'-6"

8'-4"

ADJACENT EXISTING SLAB.

THE SURFACE WITH THE

CONCRETE SLAB, ALIGNING

POUR AND FINISH NEW

LEGEND

NEW CONCRETE SLAB ON GRADE

REMOVE EXISTING CONCRETE SLAB ON GRADE

SUSPENSION SYSTEM

REMOVE EXISTING PLASTER CEILING AND

ELEC PANEL

FIRE EXTINGUISHER CABINET

PROVIDE SURFACE MOUNTED

/ CR102

PARTITION

EXG CMU

AND 5/8" GYP. BD. CLG,, PAINTED

PROVIDE NEW METAL SUPPORT GRID

REINSTALL LOCKERS IN THE CONFIGURATION SHOWN.

CEILING SURFACE AND PAINT) IN WOMENS LOCKERS AND MENS LOUNGE

RESTORE FINISHES (FLOORING, WALL BASE, WALL SURFACE AND PAINT,

CONCRETE SLAB. ALIGN THE SURFACE WITH THE ADJACENT EXISTING SLAB.

AFTER INSTALLATION OF ELECTRIC CONDUIT, POUR AND FINISH NEW

FRAME AND DOOR DETAILS. HARDWARE SET: HW-SH-3D

3'-0"X7'-0" HOLLOW METAL B-LABEL DOOR, RE: B2/A02-40-20-01 FOR

CONSTRUCTION PARTITIONS

TEMPORARY DUST AND SMOKE

REMOVED (SALVAGED) LOCKERS SHALL BE TURNED OVER TO THE VA.

THE CONFIGURATIONS (TEMPORARY AND PERMANENT LOCATIONS AS SHOWN). EXCESS

CONTRACTOR SHALL REMOVE, SALVAGE, STORE AND REINSTALL EXISTING LOCKERS IN4.

WORK AREA.

DOOR WITH LOCKING HARDWARE, CLOSER AND BOTTOM SWEEP FOR ACCESS TO THE

PROVIDE POSITIVE SEAL AGAINST THE MIGRATION OF DUST. AND SMOKE. PROVIDE SOLID

FLOOR TO CEILING/STRUCTURE ABOVE AND START AND FINISH AT WALLS/PARTITIONS AND

TEMPORARY DUST AND SMOKE CONSTRUCTION PARTITIONS SHALL BE CONSTRUCTED FROM3.

PARTITION DIMENSIONS ARE FACE TO FACE OF FINISH WALL, UNLESS NOTED OTHERWISE.2.

REFER TO DRAWING E02-00-20-01 FOR PROPOSED CONSTRUCTION PHASING NOTES.1.

GENERAL NOTES:

3'-0"

"1'-8"

MATCH EXISTING FLOOR FINISH

RESINOUS FLOORING (RES-2) TO

LOCKER BASE. FINISH WITH

6" HIGH x 20" WIDE CONCRETE

ACM FLOOR TILE AND MASTIC

SOFFIT

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS:

o n e e i g h t h i n c h o n e f o o t 1

B

A

C

D

E

F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Management and Facilities

Construction

Office ofARCHITECT/ENGINEERS:

HA PROJECT NUMBER: 16457

523A5-12-305

VAMC BROCKTON- MA

ELECTRICAL UPGRADE

PHASE 2

207.784.5100

Auburn, ME

© 2021

617.426.5050

Boston, MA

207.775.0053

Portland, ME

603.626.1242

Portsmouth, NH

August 27, 2021

"AS-BUILT" CONSTRUCTION DOCUMENTS

JANUARY 05, 2018

UP

CORRIDOR

CR101

STORAGE

108A

FOOD STORAGE

REFRIGERATOR

109A

LOCKERS

WOMENS

108A

WIDGET STORAGE

STAIR HALL #2

ST2101

ROOM

MENS TOILET

105A

MENS LOUNGE

LOUNGE

COMPRESSOR

ROOM

COMP

POWER

CRITICAL

105B

3'-4" 3'-8"

AND 5/8" GYP. BD. CLG,, PAINTED

PROVIDE NEW METAL SUPPORT GRID

LOCKERS AS SHOWN

REINSTALL REMOVED

CONTRACTOR SHALL

W/ CONCRETE BASE

REMOVED LOCKERS AS SHOWN

CONTRACTOR SHALL REINSTALL

SOFFIT

REFRIGERATOR

109A

LOCKERS

WOMENS

108A

ROOM

COMP

POWER

CRITICAL

105B

3'-4" 3'-8"

AND 5/8" GYP. BD. CLG,, PAINTED

PROVIDE NEW METAL SUPPORT GRID

SOFFIT

SJD

BUILDING 20 UPGRADES

SJDJLJ

FIRST FLOOR PLAN

20-01 A02-10-

REF:

A1

FIRST FLOOR PLAN

1/8" = 1'-0" 0 4' 8' 12'

NEW CEILING IN WOMEN'S LOCKER ROOM

NEW LOCKER LAYOUT

on information provided by others. The Consultant has not verified the accuracy and / or completeness of this information and shall not be responsible for any errors or omissions that may be incorporated as a result of erroneous information provided by others.

RECORD DRAWING

DN

DN

DN

UP

FC201

Eng Service

223A

H.A.C.

Nutrition/Food

REFRIGERATOR

216A Nutrition/Food

REFRIGERATOR

Nutrition/Food

FOOD PREP.

Nu/Food

STORAGE

Nutrition/Food

STORAGE

CR202

Nutrition/Food

CORRIDOR

Nutrition/Food

MENS STAFF TOILET

Nutrition/Food

WOMENS STAFF TOILET

Nutrition/Food

COOKS STORAGE

204B Nutrition/Food

DEEP FREEZE

204A

Nu/Food

REFRIGERATOR

202H

Nu/Food

OFFICE

202A

Nu/Food

OFFICE

202D

Nu/Food

OFFICE

Nutrition/Food

OFFICE

Nu/Food

STORAGE

202I

Nu/Food

OFFICE

Nu/Food

OFFICE

Nutrition/Food

INGREDIENT CONTROL NUTRITION ROOM

CR203

Nutrition/Food

CORRIDOR

CR201

Nu/Food

CORRIDOR

Nutrition/Food

MAIN KITCHEN

Nutrition/Food

STORAGE

Nutrition/Food

SERVING KITCHEN

Nutrition/Food

STORAGE

202C Nutrition/Food

CART STORAGE

Nu/Food

TOILET

210C Nutrition/Food

ATTENDANTS DINING ROOM

202G

Nu/Food

OFFICE

Nutrition/Food

CENTRALIZED TRY PREP AREA

Nu/Food

ELEVATOR

TEL CLOSET

217A Nutrition/Food

POT WASHING

202B Nu/Food

STORAGE

203A

Nu/Food

OFFICE

203B

Nu/Food

OFFICE

211A Nutrition/Food

CHIEF OF DIETITIAN

210A Nutrition/Food

202E Nu/Food

ALCOVE

210B Nutrition/Food

STORAGE

209A Nutrition/Food

STORAGE

211B

Nutrition/Food

CONFERENCE ROOM

213A

TOILET

Nutrition/Food

WOMENS KITCHEN LOCKERS

STORAGE

Nutrition/Food

REFRIGERATOR

Nutrition/Food

OFFICE

211C

Nu/Food

OFFICE

ST1201

STAIRWAY #1

P-15

ELEVATOR

ST2201

STAIRWAY #2

S-14

PASSENGER

PH-20

STAIRS #3

Gross

Construction

ST3201

STAIRS

Nu/Food

= Environmental Management serviceEMs

LEGEND

= Information Resource ManagementIRM

SCALE: 1/16" = 1'-0"

BLDG 20 2ND FLOOR PLAN

= Nutrition/Food

LOBBY

IRM

IRM

TEL CLOSET

EMs

ELEVATOR

Nu/Food

Nu/Food

STORAGE

CLOSET

ELECT PANEL

FIRE EXTINGUISHER CABINET

PROVIDE SURFACE MOUNTED

8" ABOVE LANDING

CABINET AT APPROXIMATELY

FOR 64"X24" HEAT CONVECTOR

PROVIDE OPENING IN CMU WALL

A02-40-20-01

BOX FLASHING. RE: B1 & A3 ON

PROVIDE EQUIPMENT SUPPORT AND PIPE

COORDINATE EXACT LOCATION IN FIELD.

PIPING TO ROOF TOP CONDENSER.

ELECTRIC CONDUITS AND REFRIGERANT

PROVIDE ROOF SLAB PENETRATIONS FOR

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS:

o n e e i g h t h i n c h o n e f o o t 1

B

A

C

D

E

F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Management and Facilities

Construction

Office ofARCHITECT/ENGINEERS:

HA PROJECT NUMBER: 16457

523A5-12-305

VAMC BROCKTON- MA

ELECTRICAL UPGRADE

PHASE 2

207.784.5100

Auburn, ME

© 2021

617.426.5050

Boston, MA

207.775.0053

Portland, ME

603.626.1242

Portsmouth, NH

August 27, 2021

"AS-BUILT" CONSTRUCTION DOCUMENTS

JANUARY 05, 2018

NORTH

BUILDING 20 UPGRADES

SECOND FLOOR PLAN

SJDJLJ

20-02 A02-10-

REF:

A1

SECOND FLOOR PLAN

1/8" = 1'-0"

These Record Documents have been prepared based on information provided by others. The Consultant has not verified the accuracy and / or completeness of this information and shall not be responsible for any errors or omissions that may be incorporated as a result of erroneous information provided by others.

RECORD DRAWING

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS:

o n e e i g h t h i n c h o n e f o o t 1

B

A

C

D

E

F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Management and Facilities

Construction

Office ofARCHITECT/ENGINEERS:

HA PROJECT NUMBER: 16457

523A5-12-305

VAMC BROCKTON- MA

ELECTRICAL UPGRADE

PHASE 2

207.784.5100

Auburn, ME

© 2021

617.426.5050

Boston, MA

207.775.0053

Portland, ME

603.626.1242

Portsmouth, NH

August 27, 2021

"AS-BUILT" CONSTRUCTION DOCUMENTS

JANUARY 05, 2018

REF:

A2

N.T.S. REF:

A1

PARTITION TYPES

N.T.S.

FLOOR SLAB

CONCRETE

STRUCTURE

PARTITION TO

STRUCTURE SCRIBE

EXG CONCRETE ROOF

2 HR.

UL DESIGN No. U906

MEET UL LISTING

6" CMU TO

EACH FACE

OF STRUCTURE

TOP CMU TO BOTTOM

FIRE SEALANT FROM

1.

NOTES:

NOTED OTHERWISE.

PARTITIONS DIMENSIONS ARE FACE TO FACE OF FINISH WALL, UNLESS

STANDARD DOOR FRAME

[6mm]

[64mm]

WELDED TO PLATE

PIPE SEPARATORS

AROUND

CAULK ALL

m m

GROUT

MASONRY

[13mm] [13mm]

IS REQUIRED

DRYWALL FINISH

FRAME WHERE

ADD RETURN ON

SPECIFIED

GAGE AS

m m

(DOOR SIDE)

[49mm] m m

FRAMES IN MASONRY PARTITION

m m

PLATE WELDED TO FRAME

BOLT

EXP.

F.H. CSK.

IS REQUIRED

WHERE PLASTER

CASING BEAD

8 3/4" w/ 8" CMU [210 / 200 mm]

6 3/4" w/ 6" CMU [160 / 150 mm]

4 3/4" w/ 4" CMU [100 / 100 mm]

*** FRAME WIDTH FOR NOMINAL MASONRY

.2 m

76.2m 1/

947.15m

2 1/2"MIN.

.5 m

227.83m

1/2"

227.83m

1/2"

827.41m

VARIES

924.35m

1 15/16"

963.51m

VARIES

.1 m

.3 m

WIDTH + 1/8" MIN [3mm]

THROAT OPNG = PARTITION

FRAME AT EXISTING CMU WALLS

REF:

B2

N.T.S.

INTERIOR DOORS AND FRAMES

JAMB DETAIL 1

CONSTRUCTION JOINT

(TYP.)

6" MASONRY PARTITION

W/ #5 VERT REBAR AT CORNERS

AND 48" O.C. MAX.

DRILL AND EPOXY DOWELS

INTO SLAB W/ 3 1/2" EMBED.

AND SPACING TO MATCH

WALL REINFORCING

NOTES:

1. IF EXISTING SLAB THICKNESS IS GREATER THAN 5", OMIT SLAB DEMO

AND DRILL DOWELS INTO SLAB.

2. REFER TO ARCH'L PLANS FOR WALL LOCATIONS.

EXISTING CONCRETE

SLAB TO REMAIN

O

R L

E S

S

2'-0" 2'-0"

EXISTING CONCRETE

SLAB TO REMAIN

4" 1'-0" 4"

3/8" DIA. x 16" LONG

SMOOTH GREASED DOWELS

AT 24" O.C. EMBED. 4" INTO

EXISTING CONCRETE SLAB

3/8" DIA. x 16" LONG

SMOOTH GREASED DOWELS

AT 24" O.C. EMBED. 4" INTO

EXISTING CONCRETE SLAB

(2) #4 CONT.

REF:

C1

THICKENED SLAB @ CMU PARTITIONS

N.T.S.

[6mm]

[64mm]

AROUND

CAULK ALL

m m

GROUT

MASONRY

m m

IS REQUIRED

WHERE PLASTER

CASING BEAD

.2 m

76.2m 1/

947.15m

2 1/2"MIN.

.5 m

FRAME AT EXISTING CMU WALLS

HEAD DETAIL

(2" TO 4")

OPENING

WITH NEW

FACE SIZE

COORDINATE

DOOR SHALL BE FLUSH - 1 3/4" [44mm] THICK UNLESS NOTED OTHERWISE.1.

NOTES:

FLUSH

'B' LABEL

A02-10-20-01

REF:

B1

N.T.S.

ANCHORED EQUIPMENT SUPPORT ROOF DETAIL

NEW 16 OZ. S.S. OR COPPER CAP - PITCH TO DRAIN

CRIMP AND SOLDERED JOINT BETWEEN

AND SOLDER ALL SEAMS WATERTIGHT (TYP)

CAP AND BASE FLASHING CONTINUOUS

FILL BOX-OUT TO HEIGHT OF ROOF INS. W/

LOW RISE FOAM INSULATION BY ROOFING CONTRACTOR

SEAL PENETRATION IN WATER

CUT-OFF MASTIC

M

IN

ECOLASTIC FLOODCOAT AND AGGREGATE (TYP)

- RE-DRESS WITH EMBEDDED IN ASPHALT MASTIC

2 PLYS (12" OVER 6") OF FIBERGLASS FLASHING MESH

REMAIN (TYP)

CONSTRUCTION TO

EXISTING ROOF SYSTEM

MEMBRANE PRIOR TO FLASHING (TYP)

NEW WORK BOX - CLEAN AND PRIME EXPOSED

SYSTEM MEMBRANE 12" MIN. FROM EDGE OF

SCARIFY AGGREGATE FROM EXIST. BUR ROOF

(TYP)BLOCKING @3" O.C.

SET OVER BASE PLYS IN ROOFING MASTIC - FASTEN INTO

LB. LEAD FLANGE (4" MIN. WIDE) - PRIME FLANGE AND

16 OZ. COPPER WORK BOX FLASHING WITH SOLDERED, 4

BLOCKING PER FM 1-49

WORK BOX - FASTEN & ANCHOR

TREATED WOOD BLOCKING FOR

*NEW 3-1/2" MIN. WIDE SOLID

RELATED BLOCKING (TYP)

INSTALLATION OF NEW WORK BOX AND

INSULATION TO CONCRETE DECK FOR

ROOFING SYSTEM, COVERBOARD AND

CAREFULLY REMOVE EXISTING BUR

MIN.

4"

SEAL PENETRATION IN WATER

CUT-OFF MASTIC

ALTERNATE 16 OZ. STAINLESS-STEEL OR

COPPER CAP FOR UPRIGHT PENETRATION

-SET FLANGE IN MASTIC

FOR WORK BOX 4"X4" OR SMALLER

*WOOD BLOCKING NOT REQUIRED

CONCRETE DECK

M

IN

WITH ECOLASTIC FLOODCOAT & AGGREGATE (TYP)

- RE-DRESS MESH EMBEDDED IN ASPHALT MASTIC

2 PLYS (12" OVER 6") OF FIBERGLASS FLASHING

MIN.

6"

(TYP)

CONSTRUCTION TO REMAIN

EXISTING ROOF SYSTEM

FM 1-49 (TYP)

FASTEN & ANCHOR BLOCKING PER

REQUIRED MOUNTING HEIGHT -

WOOD BLOCKING ASSEMBLY TO

NEW 5-1/2" WIDE SOLID TREATED

WASHERS @ 12" O.C. (TYP)

S.S. SCREWS AND NEOPRENE

CONNECTIONS. SECURE WITH

WITH WELDED FLAT-SEAM

NEW 16 OZ. COPPER CAP

SCREWS PER MFGR. (TYP)

SUPPORT -ANCHOR WITH GASKETED SS. WOOD

NEW NEOPRENE PAD BELOW EQUIPMENT/DUCT

& OVER SUPPORT BLOCKING

ADHERED IN POLYROOF SF MASTIC - RUN UP

TRA REINFORCED MEMBRANE FLASHING

ADHESIVE (TYP)

STRIP ADHERED IN INSULATION

NEW HD WOOD FIBRE CANT

STRIPPING IN NEW PLYS (TYP)

AND PRIME EXPOSED MEMBRANE PRIOR TO

NEW EQUIPMENT SUPPORT OPENING - CLEAN

SYSTEM MEMBRANE 12" MIN. FROM EDGE OF

SCARIFY AGGREGATE FROM EXIST. BUR ROOF

TO TOP OF NEW WOOD FIBRE CANT STRIP (TYP)

OVERLAY ON EXISTING MEMBRANE 6" MIN. AND RUN

4-PLY BURMASTIC COLD-PROCESS ROOFING SYSTEM

CONCRETE DECK

EQUIP. SUPPORT BLOCKING (TYP)

CONCRETE DECK FOR INSTALLATION OF

SYSTEM, COVERBOARD AND INSULATION TO

CAREFULLY REMOVE EXISTING BUR ROOFING

REF:

A3

N.T.S.

PIPE SUPPORT DETAILPIPE PENETRATION BOX FLASHING DETAIL

A02-10-20-02

A02-10-20-02

4"

" 8

STEEL BENT PLATE

5/16" THICK x 6" LONG

SIZE AS REQUIRED

CONDUIT CLAMP

(TYP. AT CENTER OF EACH CLIP)

HILTI HIT HY 200 ADHESIVE ANCHOR

(1) 5/8" DIA. X 3 1/2" MIN. EMBED.

EXISTING CONC DECK

CORE DRILL HOLE THRU

EXISTING STEEL REINFORCING

STEEL BENT PLATE

MOUNTING CHANNEL, WELD TO

INTEGRAL GALVANIZED LIPPED STEEL

PROPER METHODS & MATERIALS ARE USED TO MAINTAIN ROOF WARRANTY.

COORDINATE FLASHING INSTALLATION WITH ROOFING CONTRACTOR TO ENSURE4.

VERIFY ROOF AND STRUCTURAL SYSTEM WITH ARCHITECT.3.

FLANGES OF ADJACENT FLASHING SHALL NOT BE CUT OR OVERLAPPED.2.

PROPER FLASHING.

PENETRATION FROM WALLS, CURBS, AND OTHER PROJECTIONS TO FACILITATE

MAINTAIN A MINIMUM CLEARANCE OF 305mm (12") ON ALL SIDES OF ROOF1.

GENERAL NOTES:

2'-1"

VERIFY IN FIELD

SJDJLJ

20-01 A02-40-

BUILDING 20 UPGRADES

CONSTRUCTION DETAILS AND

DOOR SCHEDULE

These Record Documents have been prepared based on information provided by others. The Consultant has not verified the accuracy and / or completeness of this information and shall not be responsible for any errors or omissions that may be incorporated as a result of erroneous information provided by others.

RECORD DRAWING

AMS

TIGHT SHUT-OFF VALVE

FD (3 HR) FIRE DAMPER (3 HOUR RATED)

S2 4

SUPPLY DIFFUSER ( TYPE 2 )

400 CFM EA

DIFFUSER DESCRIPTION

QUANTITY

FIRE DAMPER (1 1/2 HOUR RATED)

( SEE REG., GRILLES & DIFF SCHEDULE )

BD

H

HS

V

DN

10'-0" FL

10.0 gpm

T

V

ACOUSTICALLY LINED DUCT

LENGTH, 10,000 BTU/HR) WITHOUT DAMPER

RADIATION I.D. ( TYPE A, 10'-0" FINNED

10'-0" FL/D

10.0 GPM LENGTH, 10,000 BTU/HR) WITH DAMPER

A

M10.1

ACV 2 - WAY

ACV 3 - WAY

BALANCE VALVE

BACKDRAFT DAMPER

CAP - PIPE

CHECK VALVE

COMBINATION BALANCING, FLOW MEASURING &

DUCT SECTION - SUPPLY/OUTDOOR AIR

DUCT SECTION - RETURN AIR

DUCT TURNING VANES

FLEXIBLE DUCT

FLOAT & THERMOSTATIC TRAP

ISOLATION VALVE

GLOBE VALVE

HUMIDISTAT

HUMIDITY SENSOR

LOCKSHIELD GATE VALVE

LOUVER

MANUAL AIR VENT

MOTORIZED DAMPER

OS&Y GATE VALVE

PETCOCK FOR GAUGE CONNECTION

PIPE ANCHOR

PIPE GUIDE

PITCH DOWN

PLUG VALVE

PRESSURE GAUGE

PRESSURE REDUCING VALVE

PRESSURE RELIEF VALVE

PRESSURE RELIEF DAMPER

RADIATION I.D. ( TYPE A, 10'-0" FINNED

REDUCER - CONCENTRIC

REDUCER - ECCENTRIC

RETURN AIR

SECTION I.D. ( SECTION A SHOWN ON DWG. M10.1)

SMOKE DAMPER

STRAINER

SUPPLY AIR

TAKE - OFF FROM BOTTOM OF PIPE

TAKE - OFF FROM TOP OF PIPE

TEMPERATURE SENSOR

THERMOMETER

THERMOMETER WELL

THERMOSTAT

THERMOSTAT COOLING

THERMOSTAT HEATING

THERMOSTAT - NIGHT

THERMOSTAT - HEATING/COOLING

THERMOSTATIC TRAP

UNION

VOLUME DAMPER

DUCT DIAMETER

CB COUNTERBALANCED DAMPER

S (SUPPLY) R (RETURN)

E (EXHAUST) T (TRANSFER)

DESCRIPTIONSYMBOL

S

PRD

M

F

AIRFLOW MEASURING STATION

DUCT MOUNTED SMOKE DETECTOR

T

TS

T C

H

N

H/C

T

T

T

DESCRIPTIONSYMBOL

EXISTING EQUIPMENT TO REMAIN

NEW EQUIPMENT

SD

EXISTING SUPPLY PIPING TO REMAIN

EXISTING RETURN PIPING TO REMAIN

NEW SUPPLY PIPING

NEW RETURN PIPING

EXISTING DUCTWORK TO REMAIN

NEW DUCTWORK

PIPE DOWN

PIPE UP

DUCT SECTION - EXHAUST AIR

DIFFERENTIAL PRESSURE SENSORDPS

INVERTED BUCKET TRAPIB

STATIC PRESSURE SENSORSPS

CONNECTION - NEW TO EXISTING

PITCH DN

PITCH DN

NEW CONVECTOR,

CONV-1 AND COIL

3/4" TT

LPS RUNOUT PITCH

AS SPECIFIED

LPS MAIN

CR

CR MAIN

DIRT

POCKET

THERMOSTATIC

NON-ELECTRIC

CONTROL VALVE.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project No.

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th i n c h o n e f o o t

B

A

C

D

E

F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Auburn, ME

207.784.5100

Portland, ME

207.775.0053

Portsmouth, NH

603.626.1242

Boston, MA

617.426.5050

HA PROJECT NUMBER:

523A5-12-305

© 2021

"AS-BUILT" CONSTRUCTION DOCUMENTS

August 27, 2021

JANUARY 05, 2018

ELECTRICAL UPGRADE

PHASE 2

VAMC BROCKTON MA

16457

DWS DBR

M02-00-20-01

BUILDING 20 UPGRADES

LEGEND, GENERAL NOTES, DETAIL

AND SCHEDULES

20 94

ABBREV DESCRIPTION

LAT LEAVING AIR TEMPERATURE

LPCR LOW PRESSURE CONDENSATE

RETURN (LESS THAN 15 PSI)

LPS LOW PRESSURE STEAM(LESS THAN

15 PSI)

LRA LOCKED ROTOR AMPS

LSGV LOCK & SHIELD GATE VALVE

LWT LEAVING WATER TEMPERATURE

M MOTORIZED DAMPER

MAX MAXIMUM

MBH 1000 BRITISH THERMAL UNITS

MCA MINIMUM CIRCUIT AMPS

MIN MINIMUM

MOPD MAXIMUM OVERCURRENT

PROTECTIVE DEVICE

MPCR MEDIUM PRESSURE CONDENSATE

RETURN(16-30 PSIG)

MPS MEDIUM PRESSURE STEAM (16-30

PSIG)

NA NOT APPLICABLE

NC NOISE CRITERIA

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NTS NOT TO SCALE

OA OUTSIDE AIR

OC ON CENTER

OED OPEN END DUCT

OS&Y OUTSIDE SCREW & YOKE GATE

VALVE

PD PRESSURE DROP

PRD PRESSURE RELIEF DAMPER

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

RET RETURN

RET RETURN

RL RIFRIGERANT LIQUID

RLA RATED LOAD AMPERES

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

S SMOKE DAMPER

S/F SMOKE AND FIRE COMBINATION

DAMPER

SP STATIC PRESSURE

SS STAINLESS STEEL

SUP SUPPLY

TEMP TEMPERATURE

TT THERMOSTATIC TRAP

TYP TYPICAL

V VOLUME DAMPER

VFD VARIABLE FREQUENCY DRIVE

W/ WITH

W/O WITHOUT

WC WATER COLUMN

WG WATER GAUGE

WPD WATER PRESSURE DROP

WWMS WELDED WIRE MESH SCREEN

Z ZONE DAMPER

PREFIX OF X EXISTING

ABBREV DESCRIPTION

ACV AUTOMATIC CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

ALD ACOUSTICAL LINED DUCT

AMS AIRFLOW MEASURING STATION

APD AIR PRESSURE DROP

ATC AUTOMATIC TEMPERATURE

CONTROL

B BAROMETRIC DAMPER

BD BACKDRAFT DAMPER

BHP BRAKE HORSEPOWER

BPD BYPASS DAMPER

BTU BRITISH THERMAL UNITS

CBD COUNTERBALANCED BACKDRAFT

DAMPER

CFM CUBIC FEET PER MINUTE

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CO CLEANOUT

CTE CONNECT TO EXISTING

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

DCW DOMESTIC COLD WATER

DEG.F DEGREES FAHRENHEIT

DHW DOMESTIC HOT WATER

DIA DIAMETER

DN DOWN

EAT ENTERING AIR TEMPERATURE

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

EXG EXISTING

EXH EXHAUST

F&T FLOAT & THERMOSTATIC TRAP

FD FIRE DAMPER

FL FINNED LENGTH OF RADIATION

FM FLOW METER

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FPF FINS PER FOOT

FPI FINS PER/INCH

FPM FEET PER MINUTE

FT FEET

FT-HD FEET OF HEAD

FT-WG FEET WATER GAUGE

FTR FIN TUBE RADIATOR

GAL GALLONS

GPM GALLONS PER MINUTE

HP HORSEPOWER

HPCR HIGH PRESSURE CONDENSATE

RETURN (OVER 30 PSIG)

HPS HIGH PRESSURE STEAM (OVER

30PSIG)

HRR HEAT RECOVERY RETURN

HRS HEAT RECOVERY SUPPLY

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

IN INCHES

GENERAL NOTES

1 VISIT THE BUILDING SITE PRIOR TO BIDDING TO BECOME FAMILIAR WITH EXISTING CONDITIONS, AND TO

TAKE MEASUREMENTS AS NECESSARY FOR COMPLETION OF THE WORK ASSOCIATED WITH THE DESIGN

INTENT OF THE CONTRACT DOCUMENTS.

2 COORDINATE WORK OF MECHANICAL SUBCONTRACTOR WITH WORK OF OTHER TRADES.

3 DUCTWORK, PIPING AND EQUIPMENT ARE INDICATED DIAGRAMMATICALLY. FIELD-VERIFY LOCATIONS.

4 PRIOR TO FABRICATING DUCTWORK, COORDINATE WITH OTHER TRADES TO ENSURE THAT THE DUCTWORK CAN BE INSTALLED WITH THE INDICATED SIZES AND LOCATIONS.FIELD-VERIFY EXISTING DUCT SIZES AND

CONDITIONS.SUBMIT ANY DISCREPANCIES OR PROPOSED CHANGES.

5 REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR LOCATIONS OF CEILING DIFFUSERS AND REGISTERS.PROVIDE VOLUME DAMPERS SO THAT EVERY REGISTER, GRILLE AND DIFFUSER (SUPPLY, RETURN, AND EXHAUST) CAN BE INDIVIDUALLY BALANCED.

6 VERIFY INSTALLATION OF EXISTING VOLUME DAMPERS AT EACH BRANCH IN EXISTING SUPPLY DUCT.

PROVIDE ADDITIONAL VOLUME DAMPERS WHERE REQUIRED.

7 LOCATE VOLUME DAMPERS AS FAR AWAY FROM REGISTERS, GRILLES AND DIFFUSERS AS POSSIBLE TO MINIMIZE NOISE. LOCATE TO BE UNOBSTRUCTED AND EASILY ACCESSIBLE FOR TESTING AND BALANCING.

LOCATE POSSIBLE. WHERE VOLUME DAMPERS MUST BE LOCATED ABOVE HARD CEILINGS SUCH AS GYPSUM WALLBOARD, PROVIDE ACCESS PANELS AS SPECIFIED, AND NOTIFY THE ARCHITECT OF SUCH LOCATIONS VERBALLY AND IN WRITING. OBTAIN PERMISSION FROM THE ARCHITECT BEFORE INSTALLING

ACCESS PANELS.

8 DUCT ELBOWS SHALL BE LONG-RADIUS TYPE (THROAT RADIUS EQUAL TO OR GREATER THAN DUCT WIDTH IN THE PLANE OF THE TURN) WHEREVER SPACE ALLOWS. IF SPACE IS NOT ADEQUATE, PROVIDE MITERED

ELBOWS WITH TURNING VANES.

9 PROVIDE 16 GAUGE SINGLE-THICKNESS TURNING VANES AT MITERED DUCT ELBOWS. VANE EDGES

(LEADING AND TRAILING) SHALL BE TANGENTIAL TO AIRFLOW.

10 FLEXIBLE DUCT LENGTHS SHALL NOT EXCEED 5'-0"

11 PAINT DUCTWORK VISIBLE THRU CEILING OPENINGS, DUCT OPENINGS, AND REGISTERS, GRILLES, AND

DIFFUSERS WITH BLACK PAINT IN ACCORDANCE WITH DIVISION 09 SECTION "PAINTING."

12 MOUNT THERMOSTATS AND TEMPERATURE AND HUMIDITY SENSORS AT 48 INCHES AFF TO TOP OF ITEM.

PROVIDE ELECTRICAL WALL BOX ATTACHED TO FRAMING.

13 WHERE THERMOSTATS/TEMPERATURE SENSORS ARE LOCATED NEAR LIGHT SWITCHES, INSTALL SO THAT LIGHT SWITCHES ARE NEARER TO THE DOOR JAMBS. THE INTENT IS TO LOCATE THERMOSTATS/ TEMPERATURE SENSORS SO THEY WILL NOT INTERFERE WITH ACCESSIBILITY OF LIGHT SWITCHES.

14 PIPING INDICATED IN OUTSIDE WALLS SHALL BE RUN ON THE WARM SIDE OF BUILDING INSULATION AND VAPOR BARRIER. BUILDING INSULATION BEHIND SUCH PIPING SHALL BE CONTINUOUS, WITHOUT JOINTS OR

GAPS.

15 PIPING SHALL BE CONCEALED EXCEPT IN MECHANICAL ROOMS AND AS INDICATED. WHERE PIPES DROP IN

BLOCK WALLS, PROVIDE 1/2" THICK INSULATION MINIMUM.

16 SEAL DUCTWORK AND PIPING THRU MECHANICAL ROOM FLOORS AND PARTITIONS, AND THRU FIRE-RATED

ASSEMBLIES, WITH FIRESTOP MATERIAL AS SPECIFIED.

DUCTLESS AIR CONDITIONER SCHEDULE

TAGS MANUFACTURER MODEL SERVICE

COOLING

CAPACITY

(MBH) REFRIGERANT

INDOOR UNIT OUTDOOR UNIT PIPING SIZES ELECTRIC

EER

(BTUH PER WATT) NOTES

AIR FLOW

HIGH

(CFM)

NOISE

(HI SPEED dB(A))

HEIGHT

(IN)

WIDTH

(IN)

DEPTH

(IN)

WEIGHT

(LBS)

HEIGHT

(IN)

WIDTH

(IN)

DEPTH

(IN)

SUCTION

(IN)

LIQUID

(IN)

MAX

LENGTH

(FT)

MAX

HEIGHT

(FT) VOLTS PHASE

RLA

(AMPS)

MAX FUSE

(AMPS)

IU-1/OU-1 Daikin FHQ42MVJURZR42PVJU CRITICAL POWER ROOM - 105B 42 R-410A 850 47 0' - 7 11/16" 5' - 2 5/8" 2' - 2 3/4" 283.00 4' - 4 15/16" 2' - 11 7/16" 1'…