This document provides details for a federal solicitation for site preparation work. The solicitation number 36C24124B0032 is an invitation for bid from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1 for project 523A5-22-010 Enhanced Kitchen Equipment Site Prep at the VAMC Brockton located at 940 Belmont Street, Brockton, MA 02301. The description specifies this is for site preparation related to enhanced kitchen equipment. No further details are provided on requirements, pricing terms, response dates or other bid details.
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX TO DRAWINGS
GENERAL NOTES
1.
2.
DEPARTMENT OF VETERANS AFFAIRS
PROJECT NUMBER 523A5-12-305
VA MEDICAL CENTER
MANY AREAS WITHIN THIS FACILITY (MULTIPLE BUILDINGS) ARE CONTAMINATED TO SOME EXTENT WITH ASBESTOS CONTAINING
MATERIALS. IF WORK IS REQUIRED IN AREAS THAT DO CONTAIN HAZARDOUS MATERIALS TAKE ALL PRECAUTIONS AS REQUIRED
TO REMOVE HAZARDOUS MATERIALS IN THE WORK AREA SAFELY PRIOR TO WORK COMMENCING. SEE HAZARDOUS MATERIALS
REPORT IN SPECIFICATIONS. DISPOSE OF ALL HAZARDOUS MATERIALS PROPERLY.
BROCKTON, MA
MANY WALLS WITHIN THIS FACILITY (MULTIPLE BUILDINGS) ARE CONTAMINATED TO SOME EXTENT WITH LEAD PAINT. IF WORK IS
REQUIRED ON WALLS THAT CONTAIN LEAD PAINT TAKE ALL PRECAUTIONS AS REQUIRED TO REMOVE PAINT IN THE WORK AREA
SAFELY PRIOR TO WORK COMMENCING. SEE HAZARDOUS MATERIALS REPORT IN SPECIFICATIONS. DISPOSE OF ALL HAZARDOUS
MATERIALS SAFELY.
Seal for Civil Drawings
Seal for Architectural Drawings
Seal for Structural Drawings
Seal for Electrical Drawings
Seal for Mechanical Drawings
GENERAL
G00.0 01 COVER SHEET
G00.1 02 SITE MAP
E001 03 ELECTRICAL LEGEND AND ABBREVIATIONS
PROJECT 01 - BUILDING 01 UPGRADES
C01-40-01-01 04 BUILDING 01 UPGRADES SITE PLAN AND EXISTING CONDITIONS
C01-40-01-02 05 BUILDING 01 UPGRADES NOTES PLAN
C01-40-01-03 06 BUILDING 01 UPGRADES SITE DETAIL SHEET
C01-40-01-04 07 BUILDING 01 UPGRADES SITE DETAIL SHEET
A01-10-01-00 08 BUILDING 01 UPGRADES BASEMENT FLOOR PLAN
E01-00-01-01 09 BUILDING 01 UPGRADES FIRST FLOOR PART PLAN, DETAILS AND PHASING
E01-20-01-00 10 BUILDING 01 UPGRADES FLOOR PLANS
E01-50-01-00 11 BUILDING 01 UPGRADES ONE-LINE DIAGRAMS
E01-80-01-01 12 BUILDING 01 UPGRADES SITE PLANS, DETAILS + SCHEDULES
PROJECT 02 - BUILDING 20 UPGRADES
C02-40-20-01 13 BUILDING 20 UPGRADES SITE PLAN
C02-40-20-02 14 BUILDING 20 UPGRADES DETAILS AND NOTES PLAN
C02-40-20-03 15 BUILDING 20 UPGRADES SITE DETAIL SHEET
A02-05-20-01 16 BUILDING 20 UPGRADES FIRST FLOOR DEMOLITION PLAN
A02-10-20-01 17 BUILDING 20 UPGRADES FIRST FLOOR PLAN
A02-10-20-02 18 BUILDING 20 UPGRADES SECOND FLOOR PLAN
A02-40-20-01 19 BUILDING 20 UPGRADES CONSTRUCTION DETAILS AND DOOR SCHEDULE
M02-00-20-01 20 BUILDING 20 UPGRADES LEGEND, GENERAL NOTES, DETAIL AND SCHEDULES
M02-05-20-01 21 BUILDING 20 UPGRADES FIRST FLOOR PIPING DEMOLITION
M02-05-20-02 22 BUILDING 20 UPGRADES SECOND FLOOR PIPING DEMOLITION
M02-20-20-01 23 BUILDING 20 UPGRADES FIRST FLOOR PIPING
M02-20-20-02 24 BUILDING 20 UPGRADES SECOND FLOOR PIPING
E02-00-20-01 25 BUILDING 20 UPGRADES LIGHTING FIXTURE SCHEDULE, ATS CONT. SCHEDULE AND PHASING
E02-02-20-01 26 BUILDING 20 UPGRADES FIRST FLOOR EXISTING CONDITIONS AND DEMOLITION PLAN
E02-02-20-02 27 BUILDING 20 UPGRADES SECOND FLOOR AND PENTHOUSE EXISTING CONDITIONS AND
DEMO PLAN
E02-05-20-01 28 BUILDING 20 UPGRADES POWER RISER EXISTING CONDITIONS AND DEMOLITION
E02-10-20-01 29 BUILDING 20 UPGRADES FIRST FLOOR LIGHTING PLAN
E02-10-20-02 30 BUILDING 20 UPGRADES SECOND FLOOR AND PENTHOUSE LIGHTING PLAN
E02-20-20-01 31 BUILDING 20 UPGRADES FIRST FLOOR POWER PLAN
E02-20-20-02 32 BUILDING 20 UPGRADES SECOND FLOOR AND PENTHOUSE POWER PLAN
E02-21-20-01 33 BUILDING 20 UPGRADES 1/4" SCALE PART PLANS
E02-50-20-01 34 BUILDING 20 UPGRADES POWER RISER
E02-60-20-01 35 BUILDING 20 UPGRADES PANELBOARD SCHEDULES
E02-70-20-01 36 BUILDING 20 UPGRADES DETAILS
E02-70-20-02 37 BUILDING 20 UPGRADES DETAILS
E02-80-20-01 38 BUILDING 20 UPGRADES PARTIAL SITE PLAN
PROJECT 03 - BUILDING 23 UPGRADES
C03-40-23-01 39 BUILDING 23 UPGRADES SITE AND NOTES PLAN
C03-40-23-02 40 BUILDING 23 UPGRADES DETAILS AND NOTES PLAN
C03-40-23-03 41 BUILDING 23 UPGRADES SITE DETAIL SHEET
A03-10-23-01 42 BUILDING 23 UPGRADES FIRST FLOOR PLAN
A03-10-23-02 43 BUILDING 23 UPGRADES SECOND FLOOR PLAN
A03-20-23-01 44 BUILDING 23 UPGRADES EXTERIOR ELEVATION AND EXTERIOR DETAILS
A03-40-23-01 45 BUILDING 23 UPGRADES CONSTRUCTION DETAILS AND DOOR SCHEDULE
S03-20-23-01 46 BUILDING 23 UPGRADES FLOOR AND ROOF FRAMING PLANS
S03-60-23-01 47 BUILDING 23 UPGRADES FRAMING NOTES AND DETAILS
M03-00-23-01 48 BUILDING 23 UPGRADES LEGEND, GENERAL NOTES AND SCHEDULES
M03-10-23-01 49 BUILDING 23 UPGRADES FIRST FLOOR MECHANICAL
M03-10-23-02 50 BUILDING 23 UPGRADES SECOND FLOOR MECHANICAL
E03-00-23-01 51 BUILDING 23 UPGRADES LIGHTING FIXTURE SCHEDULE, ATS CONT. SCHEDULE AND PHASING
E03-02-23-00 52 BUILDING 23 UPGRADES BASEMENT FLOOR EXISTING CONDITIONS AND DEMOLITION PLAN
E03-02-23-01 53 BUILDING 23 UPGRADES FIRST FLOOR EXISTING CONDITIONS AND DEMOLITION PLAN
E03-02-23-02 54 BUILDING 23 UPGRADES SECOND FLOOR EXISTING CONDITIONS AND DEMOLITION PLAN
E03-05-23-01 55 BUILDING 23 UPGRADES POWER RISER EXISTING CONDITIONS AND DEMOLITION
E03-10-23-01 56 BUILDING 23 UPGRADES PART PLANS LIGHTING
E03-20-23-00 57 BUILDING 23 UPGRADES BASEMENT FLOOR POWER PLAN
E03-20-23-01 58 BUILDING 23 UPGRADES FIRST FLOOR POWER PLAN
E03-20-23-02 59 BUILDING 23 UPGRADES SECOND FLOOR POWER PLAN
E03-50-23-01 60 BUILDING 23 UPGRADES POWER RISER
E03-60-23-01 61 BUILDING 23 UPGRADES PANELBOARD SCHEDULES
E03-70-23-01 62 BUILDING 23 UPGRADES DETAILS
E03-80-23-01 63 BUILDING 23 UPGRADES EXISTING CONDITIONS AND DEMOLITION AND NEW WORK SITE PLANS
PROJECT 04 - BUILDING 61 UPGRADES
C04-40-61-01 64 BUILDING 61 UPGRADES SITE AND NOTES PLAN
C04-40-61-02 65 BUILDING 61 UPGRADES DETAILS AND NOTES PLAN
C04-40-61-03 66 BUILDING 61 UPGRADES SITE DETAIL SHEET
E04-20-61-00 67 BUILDING 61 UPGRADES BASEMENT FLOOR PLANS + ONE-LINE DIAGRAMS
E04-80-61-01 68 BUILDING 61 UPGRADES SITE PLANS + SCHEDULES
PROJECT 05 - BUILDINGS 69 AND 70 UPGRADES
C05-40-6970-01 69 BUILDINGS 69 AND 70 UPGRADES SITE PLAN
C05-40-6970-02 70 BUILDINGS 69 AND 70 UPGRADES DETAILS AND NOTES PLAN
C05-40-6970-03 71 BUILDINGS 69 AND 70 UPGRADES SITE DETAIL SHEET
A05-10-6970-01 72 BUILDINGS 69 AND 70 UPGRADES FLOOR AND ROOF PLANS AND EXTERIOR ELEVATIONS
A05-50-6970-01 73 BUILDINGS 69 AND 70 UPGRADES EXTERIOR DETAILS
M05-00-6970-01 74 BUILDINGS 69 AND 70 UPGRADES LEGEND, GENERAL NOTES AND SCHEDULES
M05-10-6970-01 75 BUILDINGS 69 AND 70 UPGRADES MECHANICAL PLANS
M05-31-6970-01 76 BUILDINGS 69 AND 70 UPGRADES SECTIONS
E05-00-6970-01 77 BUILDINGS 69 AND 70 UPGRADES LIGHTING FIXTURE SCHEDULE AND PHASING
E05-02-6970-01 78 BUILDINGS 69 AND 70 UPGRADES EXISTING CONDITIONS AND DEMOLITION PLANS
E05-05-6970-01 79 BUILDINGS 69 AND 70 UPGRADES POWER RISERS EXISTING CONDITIONS AND DEMOLITION
E05-20-05-01 80 BUILDINGS 69 AND 70 UPGRADES BUILDING 5 PART PLANS POWER
E05-20-07-01 81 BUILDINGS 69 AND 70 UPGRADES BUILDING 7 PART PLANS POWER
E05-20-22-01 82 BUILDINGS 69 AND 70 UPGRADES BUILDING 22 PART PLANS POWER
E05-20-6970-01 83 BUILDINGS 69 AND 70 UPGRADES PLANS
E05-50-6970-01 84 BUILDINGS 69 AND 70 UPGRADES POWER RISER AND PANELBOARD SCHEDULES
E05-50-6970-02 85 BUILDINGS 69 AND 70 UPGRADES POWER RISER AND PANELBOARD SCHEDULES
E05-70-6970-01 86 BUILDINGS 69 AND 70 UPGRADES DETAILS
E05-80-6970-01 87 BUILDINGS 69 AND 70 UPGRADES SITE PART PLAN POWER
PROJECT 06 - BUILDING 05 UPGRADES
E06-10-05-00A 88 BUILDING 05 UPGRADES BASEMENT FLOOR - WEST LIGHTING
E06-10-05-00B 89 BUILDING 05 UPGRADES BASEMENT FLOOR - EAST LIGHTING
E06-10-05-01A 90 BUILDING 05 UPGRADES FIRST FLOOR - WEST LIGHTING
E06-10-05-01B 91 BUILDING 05 UPGRADES FIRST FLOOR - EAST LIGHTING
E06-10-05-02A 92 BUILDING 05 UPGRADES SECOND FLOOR - WEST LIGHTING
E06-10-05-02B 93 BUILDING 05 UPGRADES SECOND FLOOR - EAST LIGHTING
E06-10-05-P 94 BUILDING 05 UPGRADES PENTHOUSE LIGHTING
ELECTRICAL UPGRADE PHASE 2
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
o n e e i g h t h i n c h o n e f o o t 1
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Management and Facilities
Construction
Office ofARCHITECT/ENGINEERS:
HA PROJECT NUMBER: 16457
523A5-12-305
VAMC BROCKTON- MA
ELECTRICAL UPGRADE
PHASE 2
207.784.5100
Auburn, ME
© 2021
617.426.5050
Boston, MA
207.775.0053
Portland, ME
603.626.1242
Portsmouth, NH
April 26, 2022
"AS-BUILT" CONSTRUCTION DOCUMENTS
JANUARY 05, 2018
These Record Documents have been prepared based on information provided by others. The Consultant has not verified the accuracy and / or completeness of this information and shall not be responsible for any errors or omissions that may be incorporated as a result of erroneous information provided by others.
RECORD DRAWING
COVER SHEET
G00.0
JMBCLH 01
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
o n e e i g h t h i n c h o n e f o o t 1
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Management and Facilities
Construction
Office ofARCHITECT/ENGINEERS:
HA PROJECT NUMBER: 16457
523A5-12-305
VAMC BROCKTON- MA
ELECTRICAL UPGRADE
PHASE 2
207.784.5100
Auburn, ME
© 2021
617.426.5050
Boston, MA
207.775.0053
Portland, ME
603.626.1242
Portsmouth, NH
August 27, 2021
"AS-BUILT" CONSTRUCTION DOCUMENTS
JANUARY 05, 2018
MINATURE GOLF
COURSE
113.0
112.0
112.0
PL
B A S E B A L L
F I E L D S
108.0
112.0
PL
P
A
R
K
I
N
G
121.0
67 P
A
R
K
I
N
G 11
119.0
119.0
120.0
P
A
R
K
I
N
G
E
N
C
L
O
S
E
D
W
A
L
K
P
A
R
K
I
N
G
110 P
A
R
K
I
N
G
111.0
119.0
121.0
122.0
P A R K I N G
PL
118.0
P A R
K I N G
117.0
P
A
R
K
I
N
G
P
A
R
K
I
N
G
V A
B E N C H
M A R K
116.0
P
A
R
K
I
N
G
P
A
R
K
I
N
G
B
L
M
O
N
T
P
R
K
I
N
G
P A R K I N G
P
A
R
K
I
N
G
P A R K I N G
117.0
117.0
P A R K I N G
P
A
R
K
I
N
G
P
A
R
K
I
N
G
TENNINIS
COURT
119.0
S
T
R
E
E
T
P A R K I N G
116.0
112.0
M A N L E Y
S T R
E E T
PL
118.0
119.0
LP
111.0
109.0
P
A
R
K
I
N
G
112.0
111.0
117.0
P
A
R
K
I
N
G
P A R K I N G
109.0
E N C L O S E D W A L K
108.0
P A R K I N G
109.5
P
A
R
K
I
N
G
117.0
112.0
O
PL
116.0
PL
119.0
PL
111.0
109.0
111.0
107.0 111.0 110
110 65
111.0
111.0
P A R K I N G
R A M P
P A R K I N G
P A R K I N G
117.040
112.0
107.0
P A R K
I N G
119.0
110.5
P
A
R
K
I
G
P A R
K I N G
11O
E
N
C
L
O
S
D
W
L
K
110.5
P A R K I N G
P A R K I N G
109.0
121.0
E N C L O S E D W A L K
108.0
S
T
R
E
E
T
B
L
M
O
N
T
EMERGENCY GENERATOR76
EMERGENCY GENERATOR75
EMERGENCY GENERATOR74
73 EMERGENCY GENERATOR
72 EMERGENCY GENERATOR
EMERGENCY GENERATOR71
EMERGENCY GENERATOR70
69 EMERGENCY GENERATOR
EMERGENCY GENERATOR68
67 EMERGENCY GENERATOR
51 IMPLEMENT STORAGE
50 SEWAGE PUMPING STATION
65 GREENHOUSE
64 PICNIC AREA
62 INPATIENT MENTAL HEALTH
61 APARTMENT BUILDING
60 LEASED SPACE (CATHOLIC CHARITIES)
49 500,000 GALLON RESERVOIR
48 WATER TANK
47 WATER PUMP HOUSE
46 RESEARCH LAB BUILDING
45 LAUNDRY BUILDING
44 GARAGE & UTILITY SHOP BUILDING
43 INCINERATOR BUILDING
40 BOILER BUILDING
37 BULK OXYGEN STORAGE TANK
27 BULK OXYGEN STORAGE TANK
26 FLAGPOLE
25 MEDICAL REHABILITATION BUILDING
24 CHAPEL BUILDING
23 GYMNASIUM & SWIMMING BUILDING
22 RECREATION & LIBRARY BUILDING
(DEMO'D) THEATRE BUILDING21
20 NUTRITION & FOOD SVC & WAREHOUSE BLDG.
SPINAL CORD INJURY, BUILDING RENOV.8
7 DOMICILIARY
5 OUTPATIENT MENTAL HEALTH
4 NURSING HOME & PSYCHATRIC BUILDING
3 OUTPATIENT AMBULATORY CARE
2 INPATIENT MENTAL HEALTH
ADMINISTRATION BUILDING1
BUILDING SCHEDULENO
SMOKING
SHELTER
NOT TO SCALE
BROCKTON VA SITE PLAN
8-26-05
P
A
R
K
I
N
G
P A R K I N G
34 EMR
32 SPD
FOR STORAGE CONTAINERS
POTENTIAL LAYDOWN AREA
PARKING AREA
POTENTIAL CONTRACTOR
FOR STORAGE CONTAINERS
POTENTIAL LAYDOWN AREA
NOTE:
POTENTIAL CONTRACTOR PARKING AND LAYDOWN
AREAS ARE AS INDICATED ON THIS DRAWING, FINAL
CONTRACTOR PARKING AND LAYDOWN AREA/S
SHALL BE AS DIRECTED BY THE VAMC COR.
PROPOSED OVERALL PHASING NOTES:
BELOW IS A PROPOSED PHASING PLAN OUTLINING A PATH TO FACILITATE
CONSTRUCTION. NOT ALL ITEMS ARE NECESSARILY NOTED.
REFER TO EACH PROJECT FOR SPECIFIC PROPOSED PHASING NOTES FOR EACH SPECIFIC
PROJECT.
PHASING BETWEEN EACH PROJECT CONSIST OF WORK ASSOCIATED WITH THE MEDIUM
VOLTAGE (PRIMARY) LOOP.
NO MORE THAN ONE BUILDING SHALL BE PERMITTED TO BE DISCONNECTED FROM THE LOOP
AT ANY GIVEN TIME. COORDINATE WITH VAMC COR AND OBTAIN WRITTEN APPROVAL PRIOR
TO OPENING OR CLOSING ANY POINT ALONG THE LOOP.
THE CONTRACTOR SHALL MINIMIZE THE NUMBER AND DURATION OF POWER INTERRUPTIONS
THROUGHOUT CONSTRUCTION. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO
VERIFY PHASING AND ENSURE THAT ALL WORK INDICATED ON THE CONSTRUCTION
DOCUMENTS IS COMPLETED.
PRIOR TO BEGINNING CONSTRUCTION THE CONTRACTOR SHALL GENERATE A
COMPLETE AND THOROUGH PHASING PLAN WITH PROPOSED TIMELINE INDICATING
DATES AND TIMES OF ALL WORK. A FINAL TIMELINE SHALL BE COORDINATED WITH
AND ACCEPTED BY THE VAMC COR.
G00.1
JMBJWT 02
SITE MAP
These Record Documents have been prepared based on information provided by others. The Consultant has not verified the accuracy and / or completeness of this information and shall not be responsible for any errors or omissions that may be incorporated as a result of erroneous information provided by others.
RECORD DRAWING
April 26, 2022
CLH
T
DIST
MAIN
PULL
J
F
S
OC
GFI
GFI
GFI
GFI
BATT
FACP
HD
FANN
F
F
I
R
E
F
I
R
E
F
I
R
E
F
I
R
E
F
WAA
A
F F
A
F F
A
F F
ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION
A AMPERE
AB ABOVE
ACET ACETYLENE
AC ALTERNATING CURRENT
ADA AMERICANS WITH DISABILITIES ACT
AF AMPERE FRAME
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AHU AIR HANDLING UNIT
AIC AMPERE INTERRUPTING CAPACITY
ANN ANNUNCIATOR
ARCH ARCHITECT
AT AMPERE TRIP
ATC AUTOMATIC TEMPERATURE CONTROL
ATS AUTOMATIC TRANSFER SWITCH
AUX AUXILIARY
AWG AMERICAN WIRE GAUGE
BATT BATTERY
BB BACKBOARD
BC BARE COPPER
BFG BELOW FINISHED GRADE
BLDG BUILDING
BKR BREAKER
BTM BOTTOM
BW BOTH WAYS
C CONDUIT
CAB CABINET
CAT CATALOG
CATV CABLE TELEVISION
CB CIRCUIT BREAKER
CKT CIRCUIT
C/L CENTERLINE
CLF CURRENT LIMITING FUSE
CLG CEILING
CO COMPANY
COL COLUMN
COMM COMMUNICATIONS
CONC CONCRETE
CONN CONNECTION, CONNECT
COORD COORDINATE
CONTR CONTRACTOR
CPT CURRENT POWER TRANSFORMER
CT CURRENT TRANSFORMER
CTL CONTROL
CU COPPER
CUH CABINET UNIT HEATER
CW COOL WHITE
� DELTA CONNECTION
D DEEP
DB DECIBEL
DC DIRECT CURRENT
DET DETECTOR
DIA DIAMETER
DISC DISCONNECT
DIST DISTRIBUTION
DIV DIVISION
DN DOWN
DP DISTRIBUTION PANEL
DWG DRAWING
G, GND GROUND OR GROUNDING
GALV GALVANIZE(D)
GEN GENERATOR
GFCI GROUND FAULT CIRCUIT INTERUPTER
GFP GROUND FAULT PROTECTION
GRMC GALVINIZED RIGID MATAL CONDUIT
HD HEAVY DUTY
HGT HEIGHT
HH HAND HOLE
HID HIGH INTENSITY DISCHARGE
HO HIGH OUTPUT
HOA HAND-OFF-AUTOMATIC
HP HORSE POWER, HEAT PUMP
HPF HIGH POWER FACTOR
HPS HIGH PRESSURE SODIUM
HTR HEATER
HV HIGH VOLTAGE
HW HOT WATER
K KILO
KAIC KILOAMPERES INTERRUPTING RATING
KCMIL THOUSAND CIRCULAR MILS
KVA KILOVOLT-AMPERE
KW KILOWATT
KWH KILOWATT HOUR
MA MILLIAMPERE
MAINT MAINTAINED
MAX MAXIMUM
MC METAL CLAD CABLE
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MCM THOUSAND CIRCULAR MILS
MCP MOTOR CIRCUIT PROTECTOR
MDP MAIN DISTRIBUTION PANEL
MFR MANUFACTURER
MH METAL HALIDE
MIN MINIMUM
MISC MISCELLANEOUS
MLO MAIN LUGS ONLY
MSCC MOTOR STARTER CONTROL CIRCUIT
MT MOUNT
MTD MOUNTED
MTR MOTOR
MV MEDIUM VOLTAGE
O2 OXYGEN
OC OVER COUNTER
OCPD OVER CURRENT PROTECTIVE DEVICE
OH OVERHEAD
OHD OVERHEAD DOOR OPERATION
OL OVERLOAD
OS OCCUPANCY SENSOR
P POLE(S)
PA PUBLIC ADDRESS
PB PULL BOX
PBN PUSH BUTTON
PC PHOTOCELL
PF POWER FACTOR
PH,Ø PHASE
PL PILOT LIGHT
PNL PANEL
PNLBD PANELBOARD
PR PAIR
PRI PRIMARY
PVC POLYVINYL CHLORIDE
PWR POWER
QTY QUANTITY
R REMOVE
RE RELOCATE EXISTING
REC, RCPTS RECEPTACLE(S)
REFR REFRIGERATOR
REQ'D REQUIRED
RGS RIGID GALVANIZED METAL CONDUIT
RNMC RIGID NON-METALLIC CONDUIT
RM ROOM
RMC RIGID METAL CONDUIT
T, TEL, TELE TELEPHONE
TBB TELEPHONE BACKBOARD
TC TIME CLOCK
TCP TEMPERATURE CONTROL PANEL
TEMP TEMPORARY
TERM TERMINAL, TERMINATE
TMCB THERMAL MAGNETIC CIRCUIT BREAKER
TO TELEPHONE OUTLET
T-STAT THERMOSTATE
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
TVSS TRANSIENT VOLTAGE SURGE SUPPRESSOR
TW TWISTED
TWSP TWISTED SHIELDED PAIR
TWU THROUGH-THE-WALL UNIT
TYP TYPICAL
V VOLT(S)
VA VOLT-AMPERES
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
VIE VERIFY EXACT LOCATION
VM VOLTMETER
VT VOLTAGE TRANSFORMER
Y WYE CONFIGURATION
W WIRE
W/ WITH
WH WATER HEATER
WP WEATHER PROOF
WT WATER TIGHT
ZAM ZONE ACCESS MODULE
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Z
SCH SCHEDULE
SEC SECONDARY
SFL SUB-FEED LUGS
SH SMOKE HATCH
SHT SHEET
SMR SURFACE METAL RACEWAY
SPC SPACE
SPD SURGIENT PROTECTIVE DEVICE
SPDT SINGLE POLE DOUBLE THROW
SPKR SPEAKER
SPR SPARE
SQ SQUARE
SR SURFACE RACEWAY
STP STOP-STOP
SS STAILNESS STEEL
SSA SOUND SYSTEM AMPLIFIER
STA STATION
STP SHIELDED TWISTED PAIR
SUSP SUSPEND(ED)
SW SWITCH
SWBD SWITCHBOARD
SWGR SWITCHGEAR
E, EX, EXIST EXISTING
EA EACH
EBU EMERGENCY BATTERY UNIT
EC EMPTY CONDUIT
E.C. ELECTRICAL CONTRACTOR
EF EXHAUST FAN
EG EQUIPMENT GROUND
E.I.F.S. EXTERIOR INSULATED FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
EM, EMER EMERGENCY
EMT ELECTRICAL METALIC TUBING
ENCL ENCLOSURE
EP ELECTRICAL PANEL
EPO EMERGENCY POWER OFF
EQUIP EQUIPMENT
ETC ETCETERA
EUH ELECTRIC UNIT HEATER
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
JB, J-BOX JUNCTION BOX
JCT JUNCTION
U ULTRASONIC
UC UNDER COUNTER
UG UNDERGROUND
UGC UNDERGROUND CABLE TELEVISION
UGL UNDERGROUND LIGHTING
UGP UNDERGROUND PRIMARY
UGS UNDERGROUND SECONDARY
UGT UNDERGROUND TELEPHONE
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
UPS UNITERRUPTIBLE POWER SUPPLY
UTIL UTILITY
UTP UNSHIELDED TWISTED PAIR
F FUSED
FA FIRE ALARM
FAA FIRE ALARM ANNUNCIATOR
FACP FIRE ALARM CONTROL PANEL
FAGA FIRE ALARM GRAPHIC ANNUNCIATOR
FBO FURNISHED BY OTHERS
FCU FAN COIL UNIT
FDR FEEDER
FIBO FURNISHED AND INSTALLED BY OTHERS
FIXT FIXTURE
FL FLUORESCENT
FLA FULL LOAD AMPERES
FLR FLOOR
FLEX FLEXIBLE
FLUOR FLUORESCENT
FMC FLEXIBLE METAL CONDUIT
FO FIBER OPTIC
FT FEET
FUT FUTURE
FURN FURNITURE
IC INTERRUPTING CAPACITY
ID IDENTIFY, IDENTIFICATION
IEEE INSTITUTE OF ELECTRICAL AND ELECTRONIC
ENGINEERS
IG ISOLATED GROUND
IMC INTERMEDIATE METAL CONDUIT
INCAND INCANDESCENT
INCO INTERCOMMUNICATION
INT INTERLOCK
IPS INTERRUPTIBLE POWER SUPPLY
IR PASSIVE INFRARED
IWH INSTANTANEOUS WATER HEATER
LFMC LIQUID TIGHT FLEXIBLE METAL CONDUIT
LTG LIGHTING
LT(S) LIGHT(S)
LV LOW VOLTAGE
N NORTH
NC NORMALLY CLOSED
NEC NATIONAL ELECTRIC CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION
NF NON-FUSED
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NORMALLY OPEN
NTS NOT TO SCALE
XFMR TRANSFORMER
XM EXISTING TO BE MAINTAINED
XN EXISTING TO BE REMOVED AND REPLACED
WITH NEW
XP EXPLOSION PROOF
XR EXISTING TO BE REMOVED
XRE EXISTING TO BE REMOVED AND RELOCATED,
AS SHOWN AND EXTEND EXISTING CIRCUIT
AND FEED AS REQUIRED
SWITCHBOARD PULL SECTION
SWITCHBOARD MAIN SECTION
SWITCHBOARD DISTRIBUTION SECTION
120/208V PANELBOARD (SURFACE MOUNTED)
AUTOMATIC TRANSFER SWITCH
TRANSFORMER
FUSED DISCONNECT SWITCH
STARTER
DISCONNECT SWITCH
VARIABLE FREQUENCY DRIVE
SUBLETTER INDICATES SWITCH CONTROL
SINGLE POLE SWITCH
THREE WAY SWITCH
DIMMER SWITCH
MOTOR RATED SWITCH
LIGHTING CONTROL STATION
CEILING MOUNTED OCCUPANCY SENSOR
LIGHTING FIXTURE - 2x4 RECESSED
LIGHTING FIXTURE - 1x4 RECESSED
LIGHTING FIXTURE - 4 FOOT STRIP
LIGHTING FIXTURE - 4 FOOT LIFE-SAFETY
DUPLEX RECEPTACLE - "A" INDICATES MOUNT ABOVE COUNTER
DOUBLE DUPLEX RECEPTACLE - "A" INDICATES MOUNT ABOVE COUNTER
SPECIAL RECEPTACLE - NEMA CONFIGURATION AS REQUIRED OR INDICATED
DUPLEX GFCI RECEPTACLE - "A" INDICATES MOUNT ABOVE COUNTER
DOUBLE DUPLEX GFCI RECEPTACLE - "A" INDICATES MOUNT ABOVE COUNTER
DUPLEX RECEPTACLE ON EMERGENCY POWER - "A" INDICATES MOUNT ABOVE COUNTER
DOUBLE DUPLEX RECEPTACLE ON EMERGENCY POWER - "A" INDICATES MOUNT ABOVE COUNTER
DUPLEX GFCI RECEPTACLE ON EMERGENCY POWER - "A" INDICATES MOUNT ABOVE COUNTER
DOUBLE DUPLEX GFCI RECEPTACLE ON EMERGENCY POWER - "A" INDICATES MOUNT ABOVE COUNTER
REMOTE EMERGENCY LIGHTING HEAD(S)
EMERGENCY BATTERY UNIT WITHOUT HEADS
WALL MOUNTED EXIT SIGN - SHADING INDICATES DIRECTION
OF FACE(S). ARROWS INDICATE DIRECTION OF EGRESS
CEILING MOUNTED EXIT SIGN - SHADING INDICATES DIRECTION
OF FACE(S). ARROWS INDICATE DIRECTION OF EGRESS
MOTOR
JUNCTION BOX
FLOOR BOX
CEILING MOUNTED SPEAKER
PUSH BUTTON
EMERGENCY CALL STATION - SEE DETAIL A3 / E701
CARD READER
MAGNETIC LOCK
DOOR CONTACT
KEYPAD
FIRE ALARM CONTROL PANEL
FIRE ALARM REMOTE ANNUNCIATOR
MANUAL PULL STATION
FIRE ALARM STROBE ONLY UNIT
FIRE ALARM HORN / STROBE UNIT
HEAT DETECTOR
SMOKE DETECTOR
A
F F
O R
A
B O
V E
C O
U N
T E
R O
R B
A C
K S
P L
A S
H
FIRE
FINISHED FLOOR
POLE MOUNTED LUMINAIRE
EMERGENCY LIGHTING BATTERY UNIT WITH HEAD(S)
AS INDICATED
EXIT
CENTER ABOVE DOOR
INTERIOR MOUNTING HEIGHTS
VOICE AND DATA OUTLET - MOUNT AT SAME HEIGHT AS ASSOCIATED RECEPTACLE - SEE
SPECIFICATIONS FOR REQUIREMENTS
REQUEST TO EXIT SENSORREX
COORDINATE WITH VA PROJECT ENGINEER (COR) AND OTHER TRADES
TO PROVIDE CEILING ACCESS CONTAINMENT CARTS AND OTHER
CONTAINMENT SYSTEMS AS SPECIFIED PRIOR TO ANY INTERIOR
WORK. REFER TO DIV 1 SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
LINE TYPES
EXISTING ITEMS REQUIRING WORK (DASHED BOLD LINE)
EXISTING ITEMS TO REMAIN (DASHED THIN LINE)
NEW ITEM/WORK (SOLID BOLD LINE)
180° VIDEO SURVEILLANCE (CCTV) CAMERA
SECTION MARKER
IS CUT FROM
DRAWING THE SECTION
SECTION IS SHOWN
DRAWING NUMBER THE
SECTION NUMBER
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
o n e e i g h t h i n c h o n e f o o t 1
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Management and Facilities
Construction
Office ofARCHITECT/ENGINEERS:
HA PROJECT NUMBER: 16457
523A5-12-305
VAMC BROCKTON- MA
ELECTRICAL UPGRADE
PHASE 2
207.784.5100
Auburn, ME
© 2021
617.426.5050
Boston, MA
207.775.0053
Portland, ME
603.626.1242
Portsmouth, NH
August 27, 2021
"AS-BUILT" CONSTRUCTION DOCUMENTS
JANUARY 05, 2018
ELECTRICAL LEGEND
AND ABBREVIATIONS
E001
JMBJWT 03
These Record Documents have been prepared based on information provided by others. The Consultant has not verified the accuracy and / or completeness of this information and shall not be responsible for any errors or omissions that may be incorporated as a result of erroneous information provided by others.
RECORD DRAWING
"AS-BUILT" CONSTRUCTION DOCUMENTS
August 27, 2021
Auburn, ME 207.784.5100
© 2021
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242
These Record Documents have been prepared based on information provided by others. The Consultant has not verified the accuracy and / or completeness of this information and shall not be responsible for any errors or omissions that may be incorporated as a result of erroneous information provided by others.
RECORD DRAWING
SKF
These Record Documents have been prepared based on information provided by others. The Consultant has not verified the accuracy and / or completeness of this information and shall not be responsible for any errors or omissions that may be incorporated as a result of erroneous information provided by others.
RECORD DRAWING
on information provided by others. The Consultant has not verified the accuracy and / or completeness of this information and shall not be responsible for any errors or omissions that may be incorporated as a result of erroneous information provided by others.
RECORD DRAWING
UP
DN
DN
DN
STORAGE
116F
CORRIDOR
CR101
STORAGE
116B
STORAGE
108A
FOOD STORAGE
COOLER FREEZER A & B
MEAT REFRIGERATOR
110A
REFRIGERATOR
109A
LOCKERS
WOMENS
108A
TRANSFORMER ROOM
CLOSET
CORRIDOR
CR104
WIDGET STORAGE
CORRIDOR
CR103
REFRIGERATOR
116A
REFRIGERATOR
ELEVATOR
S-14
PIPE CHASE
ALCOVE
116G
REFRIGERATION MACHINE ROOM
116C
SERVICE ROOM
116D
SUPPLY REFRIGERATOR
102J
STAIR HALL #2
ST2101
ROOM
STORAGE
116E
WASH ROOM
MENS TOILET
105A
MENS LOUNGE
REFRIGERATION
MECHANICAL STORAGE
LOUNGE
CORRIDOR
WASH ROOM
VEGETABLE FREEZER
JANITOR
102A
VAULT
102E
VAULT
102F
MACHINE ROOM
101A
ELEVATOR #1
P-15
TOILET
102B
OFFICE
102C
ELEVATOR LOBBY
STAIRS #1
ST1101
LOADING DOCK
102G
REPRODUCTION
102K
TANK
102H
ALCOVE
102L
MEAT REFRIGERATOR
110B
CORRIDOR
GENERAL STORAGE
LOADING DOCK
ELEVATOR
COMPRESSOR
STORAGE/
STORAGE/
PASSENGER
SOLAR STORAGE
COMM ROOM
102 I
TELEPHONE ROOM
102M
COOLER FREEZER
110C
STAIRS #1
ST3101
OFFICE
102D
ROOM
COMP
ROOM
COMP
POWER
CRITICAL
105B
SLAB.
REMOVING EXISTING ROUGH
OF INSTALLING CONDUITS AND
AS SHOWN FOR THE PURPOSE
REMOVE THE CONCRETE SLAB
BACK-UP TO MATCH EXISTING
WITH BRICK VENEER AND CMU
IN-FILL LOUVER OPENING
LOUVER
REMOVE EXISTING WALL
3'-4" 3'-8"
WITH VA. ARTWORK REMOVAL/RELOCATION BY VA.
COORDINATE REMOVAL/RELOCATION OF ARTWORK ON CORRIDOR SIDE
BRICK AND CMU MASONRY WALL WITHIN A FORMER WINDOW OPENING.
NEW DOOR OPENING THROUGH EXISTING
9'-0"8'-6"
2'-0"
7'-0"8'-6"
ADJACENT EXISTING SLAB.
THE SURFACE WITH THE
CONCRETE SLAB, ALIGNING
POUR AND FINISH NEW
LEGEND
NEW CONCRETE SLAB ON GRADE
REMOVE EXISTING CONCRETE SLAB ON GRADE
SUSPENSION SYSTEM
REMOVE EXISTING PLASTER CEILING AND
ELEC PANEL
FIRE EXTINGUISHER CABINET
PROVIDE SURFACE MOUNTED
/ CR102
PARTITION
EXG CMU
BENEATH THE CORRIDOR..
THE PURPOSE OF INSTALLING CONDUITS FROM THE PIPE CHASE
REMOVE THE CONCRETE SLAB IN THE CROSS HATCHED AREA FOR REINSTALL LOCKERS IN THE CONFIGURATION SHOWN.
CEILING SURFACE AND PAINT) IN WOMENS LOCKERS AND MENS LOUNGE
RESTORE FINISHES (FLOORING, WALL BASE, WALL SURFACE AND PAINT,
CONCRETE SLAB. ALIGN THE SURFACE WITH THE ADJACENT EXISTING SLAB.
AFTER INSTALLATION OF ELECTRIC CONDUIT, POUR AND FINISH NEW
CONSTRUCTION PARTITIONS
TEMPORARY DUST AND SMOKE
REMOVED (SALVAGED) LOCKERS SHALL BE TURNED OVER TO THE VA.
THE CONFIGURATIONS (TEMPORARY AND PERMANENT LOCATIONS AS SHOWN). EXCESS
CONTRACTOR SHALL REMOVE, SALVAGE, STORE AND REINSTALL EXISTING LOCKERS IN4.
WORK AREA.
DOOR WITH LOCKING HARDWARE, CLOSER AND BOTTOM SWEEP FOR ACCESS TO THE
PROVIDE POSITIVE SEAL AGAINST THE MIGRATION OF DUST. AND SMOKE. PROVIDE SOLID
FLOOR TO CEILING/STRUCTURE ABOVE AND START AND FINISH AT WALLS/PARTITIONS AND
TEMPORARY DUST AND SMOKE CONSTRUCTION PARTITIONS SHALL BE CONSTRUCTED FROM3.
PARTITION DIMENSIONS ARE FACE TO FACE OF FINISH WALL, UNLESS NOTED OTHERWISE.2.
REFER TO DRAWING E02-00-20-01 FOR PROPOSED CONSTRUCTION PHASING NOTES.1.
GENERAL NOTES:
3'-0"
"1'-8"
MATCH EXISTING FLOOR FINISH
RESINOUS FLOORING (RES-2) TO
LOCKER BASE. FINISH WITH
6" HIGH x 20" WIDE CONCRETE
ACM FLOOR TILE AND MASTIC
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
o n e e i g h t h i n c h o n e f o o t 1
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Management and Facilities
Construction
Office ofARCHITECT/ENGINEERS:
HA PROJECT NUMBER: 16457
523A5-12-305
VAMC BROCKTON- MA
ELECTRICAL UPGRADE
PHASE 2
207.784.5100
Auburn, ME
© 2021
617.426.5050
Boston, MA
207.775.0053
Portland, ME
603.626.1242
Portsmouth, NH
August 27, 2021
"AS-BUILT" CONSTRUCTION DOCUMENTS
JANUARY 05, 2018
UP
CORRIDOR
CR101
STORAGE
108A
FOOD STORAGE
REFRIGERATOR
109A
LOCKERS
WOMENS
108A
WIDGET STORAGE
STAIR HALL #2
ST2101
ROOM
MENS TOILET
105A
MENS LOUNGE
LOUNGE
COMPRESSOR
ROOM
COMP
POWER
CRITICAL
105B
AND WOMENS LOCKERS.
PERFORM PARTIAL PARTITION DEMO BETWEEN MENS LOUNGE
REMOVE LOCKERS AND LOCKER BASE FOR REUSE.
LOCKERS AS SHOWN
RECONFIGURE EXISTING
CONTRACTOR SHALL
THE CONTRACTOR
OF LOCKERS BY
TEMPORARY RELOCATION
CONTRACTOR
OF LOCKERS BY THE
TEMPORARY RELOCATION
DURING CONSTRUCTION
EXG DOOR TO BE LOCKED
W/ CONCRETE BASE
LOCKERS AS SHOWN
RECONFIGURE EXISTING
CONTRACTOR SHALL
REMOVE EXG CLG
20-01 A02-05-
BUILDING 20 UPGRADES
FIRST FLOOR DEMOLITION PLAN
SJDJLJ
REF:
A1
FIRST FLOOR DEMOLITION PLAN
1/8" = 1'-0" 0 4' 8' 12'
WOMEN'S LOCKER ROOM
CEILING REMOVAL IN EXISTING
AND TEMPORARY LOCKER LAYOUT
LOCKER ROOM LOCKER REMOVALS
These Record Documents have been prepared based on information provided by others. The Consultant has not verified the accuracy and / or completeness of this information and shall not be responsible for any errors or omissions that may be incorporated as a result of erroneous information provided by others.
RECORD DRAWING
MDL
DN
DN
DN
STORAGE
116F
CORRIDOR
CR101
STORAGE
116B
STORAGE
108A
FOOD STORAGE
COOLER FREEZER A & B
MEAT REFRIGERATOR
110A
REFRIGERATOR
109A
LOCKERS
WOMENS
108A
TRANSFORMER ROOM
CLOSET
CORRIDOR
CR104
WIDGET STORAGE
CORRIDOR
CR103
REFRIGERATOR
116A
REFRIGERATOR
ELEVATOR
S-14
PIPE CHASE
ALCOVE
116G
REFRIGERATION MACHINE ROOM
116C
SERVICE ROOM
116D
SUPPLY REFRIGERATOR
102J
STAIR HALL #2
ST2101
ROOM
STORAGE
116E
WASH ROOM
MENS TOILET
105A
MENS LOUNGE
REFRIGERATION
MECHANICAL STORAGE
LOUNGE
CORRIDOR
WASH ROOM
VEGETABLE FREEZER
JANITOR
102A
VAULT
102E
VAULT
102F
MACHINE ROOM
101A
ELEVATOR #1
P-15
TOILET
102B
OFFICE
102C
ELEVATOR LOBBY
STAIRS #1
ST1101
LOADING DOCK
102G
REPRODUCTION
102K
TANK
102H
ALCOVE
102L
MEAT REFRIGERATOR
110B
CORRIDOR
GENERAL STORAGE
LOADING DOCK
ELEVATOR
COMPRESSOR
STORAGE/
STORAGE/
PASSENGER
SOLAR STORAGE
COMM ROOM
102 I
TELEPHONE ROOM
102M
COOLER FREEZER
110C
STAIRS #1
ST3101
OFFICE
102D
ROOM
COMP
ROOM
COMP
POWER
CRITICAL
105B
BACK-UP TO MATCH EXISTING
WITH BRICK VENEER AND CMU
IN-FILL LOUVER OPENING
3'-4" 3'-8"
9'-0"8'-6"
2'-0"
7'-0"8'-6"
8'-4"
ADJACENT EXISTING SLAB.
THE SURFACE WITH THE
CONCRETE SLAB, ALIGNING
POUR AND FINISH NEW
LEGEND
NEW CONCRETE SLAB ON GRADE
REMOVE EXISTING CONCRETE SLAB ON GRADE
SUSPENSION SYSTEM
REMOVE EXISTING PLASTER CEILING AND
ELEC PANEL
FIRE EXTINGUISHER CABINET
PROVIDE SURFACE MOUNTED
/ CR102
PARTITION
EXG CMU
AND 5/8" GYP. BD. CLG,, PAINTED
PROVIDE NEW METAL SUPPORT GRID
REINSTALL LOCKERS IN THE CONFIGURATION SHOWN.
CEILING SURFACE AND PAINT) IN WOMENS LOCKERS AND MENS LOUNGE
RESTORE FINISHES (FLOORING, WALL BASE, WALL SURFACE AND PAINT,
CONCRETE SLAB. ALIGN THE SURFACE WITH THE ADJACENT EXISTING SLAB.
AFTER INSTALLATION OF ELECTRIC CONDUIT, POUR AND FINISH NEW
FRAME AND DOOR DETAILS. HARDWARE SET: HW-SH-3D
3'-0"X7'-0" HOLLOW METAL B-LABEL DOOR, RE: B2/A02-40-20-01 FOR
CONSTRUCTION PARTITIONS
TEMPORARY DUST AND SMOKE
REMOVED (SALVAGED) LOCKERS SHALL BE TURNED OVER TO THE VA.
THE CONFIGURATIONS (TEMPORARY AND PERMANENT LOCATIONS AS SHOWN). EXCESS
CONTRACTOR SHALL REMOVE, SALVAGE, STORE AND REINSTALL EXISTING LOCKERS IN4.
WORK AREA.
DOOR WITH LOCKING HARDWARE, CLOSER AND BOTTOM SWEEP FOR ACCESS TO THE
PROVIDE POSITIVE SEAL AGAINST THE MIGRATION OF DUST. AND SMOKE. PROVIDE SOLID
FLOOR TO CEILING/STRUCTURE ABOVE AND START AND FINISH AT WALLS/PARTITIONS AND
TEMPORARY DUST AND SMOKE CONSTRUCTION PARTITIONS SHALL BE CONSTRUCTED FROM3.
PARTITION DIMENSIONS ARE FACE TO FACE OF FINISH WALL, UNLESS NOTED OTHERWISE.2.
REFER TO DRAWING E02-00-20-01 FOR PROPOSED CONSTRUCTION PHASING NOTES.1.
GENERAL NOTES:
3'-0"
"1'-8"
MATCH EXISTING FLOOR FINISH
RESINOUS FLOORING (RES-2) TO
LOCKER BASE. FINISH WITH
6" HIGH x 20" WIDE CONCRETE
ACM FLOOR TILE AND MASTIC
SOFFIT
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
o n e e i g h t h i n c h o n e f o o t 1
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Management and Facilities
Construction
Office ofARCHITECT/ENGINEERS:
HA PROJECT NUMBER: 16457
523A5-12-305
VAMC BROCKTON- MA
ELECTRICAL UPGRADE
PHASE 2
207.784.5100
Auburn, ME
© 2021
617.426.5050
Boston, MA
207.775.0053
Portland, ME
603.626.1242
Portsmouth, NH
August 27, 2021
"AS-BUILT" CONSTRUCTION DOCUMENTS
JANUARY 05, 2018
UP
CORRIDOR
CR101
STORAGE
108A
FOOD STORAGE
REFRIGERATOR
109A
LOCKERS
WOMENS
108A
WIDGET STORAGE
STAIR HALL #2
ST2101
ROOM
MENS TOILET
105A
MENS LOUNGE
LOUNGE
COMPRESSOR
ROOM
COMP
POWER
CRITICAL
105B
3'-4" 3'-8"
AND 5/8" GYP. BD. CLG,, PAINTED
PROVIDE NEW METAL SUPPORT GRID
LOCKERS AS SHOWN
REINSTALL REMOVED
CONTRACTOR SHALL
W/ CONCRETE BASE
REMOVED LOCKERS AS SHOWN
CONTRACTOR SHALL REINSTALL
SOFFIT
REFRIGERATOR
109A
LOCKERS
WOMENS
108A
ROOM
COMP
POWER
CRITICAL
105B
3'-4" 3'-8"
AND 5/8" GYP. BD. CLG,, PAINTED
PROVIDE NEW METAL SUPPORT GRID
SOFFIT
SJD
BUILDING 20 UPGRADES
SJDJLJ
FIRST FLOOR PLAN
20-01 A02-10-
REF:
A1
FIRST FLOOR PLAN
1/8" = 1'-0" 0 4' 8' 12'
NEW CEILING IN WOMEN'S LOCKER ROOM
NEW LOCKER LAYOUT
on information provided by others. The Consultant has not verified the accuracy and / or completeness of this information and shall not be responsible for any errors or omissions that may be incorporated as a result of erroneous information provided by others.
RECORD DRAWING
DN
DN
DN
UP
FC201
Eng Service
223A
H.A.C.
Nutrition/Food
REFRIGERATOR
216A Nutrition/Food
REFRIGERATOR
Nutrition/Food
FOOD PREP.
Nu/Food
STORAGE
Nutrition/Food
STORAGE
CR202
Nutrition/Food
CORRIDOR
Nutrition/Food
MENS STAFF TOILET
Nutrition/Food
WOMENS STAFF TOILET
Nutrition/Food
COOKS STORAGE
204B Nutrition/Food
DEEP FREEZE
204A
Nu/Food
REFRIGERATOR
202H
Nu/Food
OFFICE
202A
Nu/Food
OFFICE
202D
Nu/Food
OFFICE
Nutrition/Food
OFFICE
Nu/Food
STORAGE
202I
Nu/Food
OFFICE
Nu/Food
OFFICE
Nutrition/Food
INGREDIENT CONTROL NUTRITION ROOM
CR203
Nutrition/Food
CORRIDOR
CR201
Nu/Food
CORRIDOR
Nutrition/Food
MAIN KITCHEN
Nutrition/Food
STORAGE
Nutrition/Food
SERVING KITCHEN
Nutrition/Food
STORAGE
202C Nutrition/Food
CART STORAGE
Nu/Food
TOILET
210C Nutrition/Food
ATTENDANTS DINING ROOM
202G
Nu/Food
OFFICE
Nutrition/Food
CENTRALIZED TRY PREP AREA
Nu/Food
ELEVATOR
TEL CLOSET
217A Nutrition/Food
POT WASHING
202B Nu/Food
STORAGE
203A
Nu/Food
OFFICE
203B
Nu/Food
OFFICE
211A Nutrition/Food
CHIEF OF DIETITIAN
210A Nutrition/Food
202E Nu/Food
ALCOVE
210B Nutrition/Food
STORAGE
209A Nutrition/Food
STORAGE
211B
Nutrition/Food
CONFERENCE ROOM
213A
TOILET
Nutrition/Food
WOMENS KITCHEN LOCKERS
STORAGE
Nutrition/Food
REFRIGERATOR
Nutrition/Food
OFFICE
211C
Nu/Food
OFFICE
ST1201
STAIRWAY #1
P-15
ELEVATOR
ST2201
STAIRWAY #2
S-14
PASSENGER
PH-20
STAIRS #3
Gross
Construction
ST3201
STAIRS
Nu/Food
= Environmental Management serviceEMs
LEGEND
= Information Resource ManagementIRM
SCALE: 1/16" = 1'-0"
BLDG 20 2ND FLOOR PLAN
= Nutrition/Food
LOBBY
IRM
IRM
TEL CLOSET
EMs
ELEVATOR
Nu/Food
Nu/Food
STORAGE
CLOSET
ELECT PANEL
FIRE EXTINGUISHER CABINET
PROVIDE SURFACE MOUNTED
8" ABOVE LANDING
CABINET AT APPROXIMATELY
FOR 64"X24" HEAT CONVECTOR
PROVIDE OPENING IN CMU WALL
A02-40-20-01
BOX FLASHING. RE: B1 & A3 ON
PROVIDE EQUIPMENT SUPPORT AND PIPE
COORDINATE EXACT LOCATION IN FIELD.
PIPING TO ROOF TOP CONDENSER.
ELECTRIC CONDUITS AND REFRIGERANT
PROVIDE ROOF SLAB PENETRATIONS FOR
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
o n e e i g h t h i n c h o n e f o o t 1
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Management and Facilities
Construction
Office ofARCHITECT/ENGINEERS:
HA PROJECT NUMBER: 16457
523A5-12-305
VAMC BROCKTON- MA
ELECTRICAL UPGRADE
PHASE 2
207.784.5100
Auburn, ME
© 2021
617.426.5050
Boston, MA
207.775.0053
Portland, ME
603.626.1242
Portsmouth, NH
August 27, 2021
"AS-BUILT" CONSTRUCTION DOCUMENTS
JANUARY 05, 2018
NORTH
BUILDING 20 UPGRADES
SECOND FLOOR PLAN
SJDJLJ
20-02 A02-10-
REF:
A1
SECOND FLOOR PLAN
1/8" = 1'-0"
These Record Documents have been prepared based on information provided by others. The Consultant has not verified the accuracy and / or completeness of this information and shall not be responsible for any errors or omissions that may be incorporated as a result of erroneous information provided by others.
RECORD DRAWING
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
o n e e i g h t h i n c h o n e f o o t 1
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Management and Facilities
Construction
Office ofARCHITECT/ENGINEERS:
HA PROJECT NUMBER: 16457
523A5-12-305
VAMC BROCKTON- MA
ELECTRICAL UPGRADE
PHASE 2
207.784.5100
Auburn, ME
© 2021
617.426.5050
Boston, MA
207.775.0053
Portland, ME
603.626.1242
Portsmouth, NH
August 27, 2021
"AS-BUILT" CONSTRUCTION DOCUMENTS
JANUARY 05, 2018
REF:
A2
N.T.S. REF:
A1
PARTITION TYPES
N.T.S.
FLOOR SLAB
CONCRETE
STRUCTURE
PARTITION TO
STRUCTURE SCRIBE
EXG CONCRETE ROOF
2 HR.
UL DESIGN No. U906
MEET UL LISTING
6" CMU TO
EACH FACE
OF STRUCTURE
TOP CMU TO BOTTOM
FIRE SEALANT FROM
1.
NOTES:
NOTED OTHERWISE.
PARTITIONS DIMENSIONS ARE FACE TO FACE OF FINISH WALL, UNLESS
STANDARD DOOR FRAME
[6mm]
[64mm]
WELDED TO PLATE
PIPE SEPARATORS
AROUND
CAULK ALL
m m
GROUT
MASONRY
[13mm] [13mm]
IS REQUIRED
DRYWALL FINISH
FRAME WHERE
ADD RETURN ON
SPECIFIED
GAGE AS
m m
(DOOR SIDE)
[49mm] m m
FRAMES IN MASONRY PARTITION
m m
PLATE WELDED TO FRAME
BOLT
EXP.
F.H. CSK.
IS REQUIRED
WHERE PLASTER
CASING BEAD
8 3/4" w/ 8" CMU [210 / 200 mm]
6 3/4" w/ 6" CMU [160 / 150 mm]
4 3/4" w/ 4" CMU [100 / 100 mm]
*** FRAME WIDTH FOR NOMINAL MASONRY
.2 m
76.2m 1/
947.15m
2 1/2"MIN.
.5 m
227.83m
1/2"
227.83m
1/2"
827.41m
VARIES
924.35m
1 15/16"
963.51m
VARIES
.1 m
.3 m
WIDTH + 1/8" MIN [3mm]
THROAT OPNG = PARTITION
FRAME AT EXISTING CMU WALLS
REF:
B2
N.T.S.
INTERIOR DOORS AND FRAMES
JAMB DETAIL 1
CONSTRUCTION JOINT
(TYP.)
6" MASONRY PARTITION
W/ #5 VERT REBAR AT CORNERS
AND 48" O.C. MAX.
DRILL AND EPOXY DOWELS
INTO SLAB W/ 3 1/2" EMBED.
AND SPACING TO MATCH
WALL REINFORCING
NOTES:
1. IF EXISTING SLAB THICKNESS IS GREATER THAN 5", OMIT SLAB DEMO
AND DRILL DOWELS INTO SLAB.
2. REFER TO ARCH'L PLANS FOR WALL LOCATIONS.
EXISTING CONCRETE
SLAB TO REMAIN
O
R L
E S
S
2'-0" 2'-0"
EXISTING CONCRETE
SLAB TO REMAIN
4" 1'-0" 4"
3/8" DIA. x 16" LONG
SMOOTH GREASED DOWELS
AT 24" O.C. EMBED. 4" INTO
EXISTING CONCRETE SLAB
3/8" DIA. x 16" LONG
SMOOTH GREASED DOWELS
AT 24" O.C. EMBED. 4" INTO
EXISTING CONCRETE SLAB
(2) #4 CONT.
REF:
C1
THICKENED SLAB @ CMU PARTITIONS
N.T.S.
[6mm]
[64mm]
AROUND
CAULK ALL
m m
GROUT
MASONRY
m m
IS REQUIRED
WHERE PLASTER
CASING BEAD
.2 m
76.2m 1/
947.15m
2 1/2"MIN.
.5 m
FRAME AT EXISTING CMU WALLS
HEAD DETAIL
(2" TO 4")
OPENING
WITH NEW
FACE SIZE
COORDINATE
DOOR SHALL BE FLUSH - 1 3/4" [44mm] THICK UNLESS NOTED OTHERWISE.1.
NOTES:
FLUSH
'B' LABEL
A02-10-20-01
REF:
B1
N.T.S.
ANCHORED EQUIPMENT SUPPORT ROOF DETAIL
NEW 16 OZ. S.S. OR COPPER CAP - PITCH TO DRAIN
CRIMP AND SOLDERED JOINT BETWEEN
AND SOLDER ALL SEAMS WATERTIGHT (TYP)
CAP AND BASE FLASHING CONTINUOUS
FILL BOX-OUT TO HEIGHT OF ROOF INS. W/
LOW RISE FOAM INSULATION BY ROOFING CONTRACTOR
SEAL PENETRATION IN WATER
CUT-OFF MASTIC
M
IN
ECOLASTIC FLOODCOAT AND AGGREGATE (TYP)
- RE-DRESS WITH EMBEDDED IN ASPHALT MASTIC
2 PLYS (12" OVER 6") OF FIBERGLASS FLASHING MESH
REMAIN (TYP)
CONSTRUCTION TO
EXISTING ROOF SYSTEM
MEMBRANE PRIOR TO FLASHING (TYP)
NEW WORK BOX - CLEAN AND PRIME EXPOSED
SYSTEM MEMBRANE 12" MIN. FROM EDGE OF
SCARIFY AGGREGATE FROM EXIST. BUR ROOF
(TYP)BLOCKING @3" O.C.
SET OVER BASE PLYS IN ROOFING MASTIC - FASTEN INTO
LB. LEAD FLANGE (4" MIN. WIDE) - PRIME FLANGE AND
16 OZ. COPPER WORK BOX FLASHING WITH SOLDERED, 4
BLOCKING PER FM 1-49
WORK BOX - FASTEN & ANCHOR
TREATED WOOD BLOCKING FOR
*NEW 3-1/2" MIN. WIDE SOLID
RELATED BLOCKING (TYP)
INSTALLATION OF NEW WORK BOX AND
INSULATION TO CONCRETE DECK FOR
ROOFING SYSTEM, COVERBOARD AND
CAREFULLY REMOVE EXISTING BUR
MIN.
4"
SEAL PENETRATION IN WATER
CUT-OFF MASTIC
ALTERNATE 16 OZ. STAINLESS-STEEL OR
COPPER CAP FOR UPRIGHT PENETRATION
-SET FLANGE IN MASTIC
FOR WORK BOX 4"X4" OR SMALLER
*WOOD BLOCKING NOT REQUIRED
CONCRETE DECK
M
IN
WITH ECOLASTIC FLOODCOAT & AGGREGATE (TYP)
- RE-DRESS MESH EMBEDDED IN ASPHALT MASTIC
2 PLYS (12" OVER 6") OF FIBERGLASS FLASHING
MIN.
6"
(TYP)
CONSTRUCTION TO REMAIN
EXISTING ROOF SYSTEM
FM 1-49 (TYP)
FASTEN & ANCHOR BLOCKING PER
REQUIRED MOUNTING HEIGHT -
WOOD BLOCKING ASSEMBLY TO
NEW 5-1/2" WIDE SOLID TREATED
WASHERS @ 12" O.C. (TYP)
S.S. SCREWS AND NEOPRENE
CONNECTIONS. SECURE WITH
WITH WELDED FLAT-SEAM
NEW 16 OZ. COPPER CAP
SCREWS PER MFGR. (TYP)
SUPPORT -ANCHOR WITH GASKETED SS. WOOD
NEW NEOPRENE PAD BELOW EQUIPMENT/DUCT
& OVER SUPPORT BLOCKING
ADHERED IN POLYROOF SF MASTIC - RUN UP
TRA REINFORCED MEMBRANE FLASHING
ADHESIVE (TYP)
STRIP ADHERED IN INSULATION
NEW HD WOOD FIBRE CANT
STRIPPING IN NEW PLYS (TYP)
AND PRIME EXPOSED MEMBRANE PRIOR TO
NEW EQUIPMENT SUPPORT OPENING - CLEAN
SYSTEM MEMBRANE 12" MIN. FROM EDGE OF
SCARIFY AGGREGATE FROM EXIST. BUR ROOF
TO TOP OF NEW WOOD FIBRE CANT STRIP (TYP)
OVERLAY ON EXISTING MEMBRANE 6" MIN. AND RUN
4-PLY BURMASTIC COLD-PROCESS ROOFING SYSTEM
CONCRETE DECK
EQUIP. SUPPORT BLOCKING (TYP)
CONCRETE DECK FOR INSTALLATION OF
SYSTEM, COVERBOARD AND INSULATION TO
CAREFULLY REMOVE EXISTING BUR ROOFING
REF:
A3
N.T.S.
PIPE SUPPORT DETAILPIPE PENETRATION BOX FLASHING DETAIL
A02-10-20-02
A02-10-20-02
4"
" 8
STEEL BENT PLATE
5/16" THICK x 6" LONG
SIZE AS REQUIRED
CONDUIT CLAMP
(TYP. AT CENTER OF EACH CLIP)
HILTI HIT HY 200 ADHESIVE ANCHOR
(1) 5/8" DIA. X 3 1/2" MIN. EMBED.
EXISTING CONC DECK
CORE DRILL HOLE THRU
EXISTING STEEL REINFORCING
STEEL BENT PLATE
MOUNTING CHANNEL, WELD TO
INTEGRAL GALVANIZED LIPPED STEEL
PROPER METHODS & MATERIALS ARE USED TO MAINTAIN ROOF WARRANTY.
COORDINATE FLASHING INSTALLATION WITH ROOFING CONTRACTOR TO ENSURE4.
VERIFY ROOF AND STRUCTURAL SYSTEM WITH ARCHITECT.3.
FLANGES OF ADJACENT FLASHING SHALL NOT BE CUT OR OVERLAPPED.2.
PROPER FLASHING.
PENETRATION FROM WALLS, CURBS, AND OTHER PROJECTIONS TO FACILITATE
MAINTAIN A MINIMUM CLEARANCE OF 305mm (12") ON ALL SIDES OF ROOF1.
GENERAL NOTES:
2'-1"
VERIFY IN FIELD
SJDJLJ
20-01 A02-40-
BUILDING 20 UPGRADES
CONSTRUCTION DETAILS AND
DOOR SCHEDULE
These Record Documents have been prepared based on information provided by others. The Consultant has not verified the accuracy and / or completeness of this information and shall not be responsible for any errors or omissions that may be incorporated as a result of erroneous information provided by others.
RECORD DRAWING
AMS
TIGHT SHUT-OFF VALVE
FD (3 HR) FIRE DAMPER (3 HOUR RATED)
S2 4
SUPPLY DIFFUSER ( TYPE 2 )
400 CFM EA
DIFFUSER DESCRIPTION
QUANTITY
FIRE DAMPER (1 1/2 HOUR RATED)
( SEE REG., GRILLES & DIFF SCHEDULE )
BD
H
HS
V
DN
10'-0" FL
10.0 gpm
T
V
ACOUSTICALLY LINED DUCT
LENGTH, 10,000 BTU/HR) WITHOUT DAMPER
RADIATION I.D. ( TYPE A, 10'-0" FINNED
10'-0" FL/D
10.0 GPM LENGTH, 10,000 BTU/HR) WITH DAMPER
A
M10.1
ACV 2 - WAY
ACV 3 - WAY
BALANCE VALVE
BACKDRAFT DAMPER
CAP - PIPE
CHECK VALVE
COMBINATION BALANCING, FLOW MEASURING &
DUCT SECTION - SUPPLY/OUTDOOR AIR
DUCT SECTION - RETURN AIR
DUCT TURNING VANES
FLEXIBLE DUCT
FLOAT & THERMOSTATIC TRAP
ISOLATION VALVE
GLOBE VALVE
HUMIDISTAT
HUMIDITY SENSOR
LOCKSHIELD GATE VALVE
LOUVER
MANUAL AIR VENT
MOTORIZED DAMPER
OS&Y GATE VALVE
PETCOCK FOR GAUGE CONNECTION
PIPE ANCHOR
PIPE GUIDE
PITCH DOWN
PLUG VALVE
PRESSURE GAUGE
PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE
PRESSURE RELIEF DAMPER
RADIATION I.D. ( TYPE A, 10'-0" FINNED
REDUCER - CONCENTRIC
REDUCER - ECCENTRIC
RETURN AIR
SECTION I.D. ( SECTION A SHOWN ON DWG. M10.1)
SMOKE DAMPER
STRAINER
SUPPLY AIR
TAKE - OFF FROM BOTTOM OF PIPE
TAKE - OFF FROM TOP OF PIPE
TEMPERATURE SENSOR
THERMOMETER
THERMOMETER WELL
THERMOSTAT
THERMOSTAT COOLING
THERMOSTAT HEATING
THERMOSTAT - NIGHT
THERMOSTAT - HEATING/COOLING
THERMOSTATIC TRAP
UNION
VOLUME DAMPER
DUCT DIAMETER
CB COUNTERBALANCED DAMPER
S (SUPPLY) R (RETURN)
E (EXHAUST) T (TRANSFER)
DESCRIPTIONSYMBOL
S
PRD
M
F
AIRFLOW MEASURING STATION
DUCT MOUNTED SMOKE DETECTOR
T
TS
T C
H
N
H/C
T
T
T
DESCRIPTIONSYMBOL
EXISTING EQUIPMENT TO REMAIN
NEW EQUIPMENT
SD
EXISTING SUPPLY PIPING TO REMAIN
EXISTING RETURN PIPING TO REMAIN
NEW SUPPLY PIPING
NEW RETURN PIPING
EXISTING DUCTWORK TO REMAIN
NEW DUCTWORK
PIPE DOWN
PIPE UP
DUCT SECTION - EXHAUST AIR
DIFFERENTIAL PRESSURE SENSORDPS
INVERTED BUCKET TRAPIB
STATIC PRESSURE SENSORSPS
CONNECTION - NEW TO EXISTING
PITCH DN
PITCH DN
NEW CONVECTOR,
CONV-1 AND COIL
3/4" TT
LPS RUNOUT PITCH
AS SPECIFIED
LPS MAIN
CR
CR MAIN
DIRT
THERMOSTATIC
NON-ELECTRIC
CONTROL VALVE.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project No.
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Auburn, ME
207.784.5100
Portland, ME
207.775.0053
Portsmouth, NH
603.626.1242
Boston, MA
617.426.5050
HA PROJECT NUMBER:
523A5-12-305
© 2021
"AS-BUILT" CONSTRUCTION DOCUMENTS
August 27, 2021
JANUARY 05, 2018
ELECTRICAL UPGRADE
PHASE 2
VAMC BROCKTON MA
16457
DWS DBR
M02-00-20-01
BUILDING 20 UPGRADES
LEGEND, GENERAL NOTES, DETAIL
AND SCHEDULES
20 94
ABBREV DESCRIPTION
LAT LEAVING AIR TEMPERATURE
LPCR LOW PRESSURE CONDENSATE
RETURN (LESS THAN 15 PSI)
LPS LOW PRESSURE STEAM(LESS THAN
15 PSI)
LRA LOCKED ROTOR AMPS
LSGV LOCK & SHIELD GATE VALVE
LWT LEAVING WATER TEMPERATURE
M MOTORIZED DAMPER
MAX MAXIMUM
MBH 1000 BRITISH THERMAL UNITS
MCA MINIMUM CIRCUIT AMPS
MIN MINIMUM
MOPD MAXIMUM OVERCURRENT
PROTECTIVE DEVICE
MPCR MEDIUM PRESSURE CONDENSATE
RETURN(16-30 PSIG)
MPS MEDIUM PRESSURE STEAM (16-30
PSIG)
NA NOT APPLICABLE
NC NOISE CRITERIA
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OC ON CENTER
OED OPEN END DUCT
OS&Y OUTSIDE SCREW & YOKE GATE
VALVE
PD PRESSURE DROP
PRD PRESSURE RELIEF DAMPER
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
RET RETURN
RET RETURN
RL RIFRIGERANT LIQUID
RLA RATED LOAD AMPERES
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
S SMOKE DAMPER
S/F SMOKE AND FIRE COMBINATION
DAMPER
SP STATIC PRESSURE
SS STAINLESS STEEL
SUP SUPPLY
TEMP TEMPERATURE
TT THERMOSTATIC TRAP
TYP TYPICAL
V VOLUME DAMPER
VFD VARIABLE FREQUENCY DRIVE
W/ WITH
W/O WITHOUT
WC WATER COLUMN
WG WATER GAUGE
WPD WATER PRESSURE DROP
WWMS WELDED WIRE MESH SCREEN
Z ZONE DAMPER
PREFIX OF X EXISTING
ABBREV DESCRIPTION
ACV AUTOMATIC CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
ALD ACOUSTICAL LINED DUCT
AMS AIRFLOW MEASURING STATION
APD AIR PRESSURE DROP
ATC AUTOMATIC TEMPERATURE
CONTROL
B BAROMETRIC DAMPER
BD BACKDRAFT DAMPER
BHP BRAKE HORSEPOWER
BPD BYPASS DAMPER
BTU BRITISH THERMAL UNITS
CBD COUNTERBALANCED BACKDRAFT
DAMPER
CFM CUBIC FEET PER MINUTE
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CO CLEANOUT
CTE CONNECT TO EXISTING
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
DCW DOMESTIC COLD WATER
DEG.F DEGREES FAHRENHEIT
DHW DOMESTIC HOT WATER
DIA DIAMETER
DN DOWN
EAT ENTERING AIR TEMPERATURE
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EXG EXISTING
EXH EXHAUST
F&T FLOAT & THERMOSTATIC TRAP
FD FIRE DAMPER
FL FINNED LENGTH OF RADIATION
FM FLOW METER
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FPF FINS PER FOOT
FPI FINS PER/INCH
FPM FEET PER MINUTE
FT FEET
FT-HD FEET OF HEAD
FT-WG FEET WATER GAUGE
FTR FIN TUBE RADIATOR
GAL GALLONS
GPM GALLONS PER MINUTE
HP HORSEPOWER
HPCR HIGH PRESSURE CONDENSATE
RETURN (OVER 30 PSIG)
HPS HIGH PRESSURE STEAM (OVER
30PSIG)
HRR HEAT RECOVERY RETURN
HRS HEAT RECOVERY SUPPLY
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
IN INCHES
GENERAL NOTES
1 VISIT THE BUILDING SITE PRIOR TO BIDDING TO BECOME FAMILIAR WITH EXISTING CONDITIONS, AND TO
TAKE MEASUREMENTS AS NECESSARY FOR COMPLETION OF THE WORK ASSOCIATED WITH THE DESIGN
INTENT OF THE CONTRACT DOCUMENTS.
2 COORDINATE WORK OF MECHANICAL SUBCONTRACTOR WITH WORK OF OTHER TRADES.
3 DUCTWORK, PIPING AND EQUIPMENT ARE INDICATED DIAGRAMMATICALLY. FIELD-VERIFY LOCATIONS.
4 PRIOR TO FABRICATING DUCTWORK, COORDINATE WITH OTHER TRADES TO ENSURE THAT THE DUCTWORK CAN BE INSTALLED WITH THE INDICATED SIZES AND LOCATIONS.FIELD-VERIFY EXISTING DUCT SIZES AND
CONDITIONS.SUBMIT ANY DISCREPANCIES OR PROPOSED CHANGES.
5 REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR LOCATIONS OF CEILING DIFFUSERS AND REGISTERS.PROVIDE VOLUME DAMPERS SO THAT EVERY REGISTER, GRILLE AND DIFFUSER (SUPPLY, RETURN, AND EXHAUST) CAN BE INDIVIDUALLY BALANCED.
6 VERIFY INSTALLATION OF EXISTING VOLUME DAMPERS AT EACH BRANCH IN EXISTING SUPPLY DUCT.
PROVIDE ADDITIONAL VOLUME DAMPERS WHERE REQUIRED.
7 LOCATE VOLUME DAMPERS AS FAR AWAY FROM REGISTERS, GRILLES AND DIFFUSERS AS POSSIBLE TO MINIMIZE NOISE. LOCATE TO BE UNOBSTRUCTED AND EASILY ACCESSIBLE FOR TESTING AND BALANCING.
LOCATE POSSIBLE. WHERE VOLUME DAMPERS MUST BE LOCATED ABOVE HARD CEILINGS SUCH AS GYPSUM WALLBOARD, PROVIDE ACCESS PANELS AS SPECIFIED, AND NOTIFY THE ARCHITECT OF SUCH LOCATIONS VERBALLY AND IN WRITING. OBTAIN PERMISSION FROM THE ARCHITECT BEFORE INSTALLING
ACCESS PANELS.
8 DUCT ELBOWS SHALL BE LONG-RADIUS TYPE (THROAT RADIUS EQUAL TO OR GREATER THAN DUCT WIDTH IN THE PLANE OF THE TURN) WHEREVER SPACE ALLOWS. IF SPACE IS NOT ADEQUATE, PROVIDE MITERED
ELBOWS WITH TURNING VANES.
9 PROVIDE 16 GAUGE SINGLE-THICKNESS TURNING VANES AT MITERED DUCT ELBOWS. VANE EDGES
(LEADING AND TRAILING) SHALL BE TANGENTIAL TO AIRFLOW.
10 FLEXIBLE DUCT LENGTHS SHALL NOT EXCEED 5'-0"
11 PAINT DUCTWORK VISIBLE THRU CEILING OPENINGS, DUCT OPENINGS, AND REGISTERS, GRILLES, AND
DIFFUSERS WITH BLACK PAINT IN ACCORDANCE WITH DIVISION 09 SECTION "PAINTING."
12 MOUNT THERMOSTATS AND TEMPERATURE AND HUMIDITY SENSORS AT 48 INCHES AFF TO TOP OF ITEM.
PROVIDE ELECTRICAL WALL BOX ATTACHED TO FRAMING.
13 WHERE THERMOSTATS/TEMPERATURE SENSORS ARE LOCATED NEAR LIGHT SWITCHES, INSTALL SO THAT LIGHT SWITCHES ARE NEARER TO THE DOOR JAMBS. THE INTENT IS TO LOCATE THERMOSTATS/ TEMPERATURE SENSORS SO THEY WILL NOT INTERFERE WITH ACCESSIBILITY OF LIGHT SWITCHES.
14 PIPING INDICATED IN OUTSIDE WALLS SHALL BE RUN ON THE WARM SIDE OF BUILDING INSULATION AND VAPOR BARRIER. BUILDING INSULATION BEHIND SUCH PIPING SHALL BE CONTINUOUS, WITHOUT JOINTS OR
GAPS.
15 PIPING SHALL BE CONCEALED EXCEPT IN MECHANICAL ROOMS AND AS INDICATED. WHERE PIPES DROP IN
BLOCK WALLS, PROVIDE 1/2" THICK INSULATION MINIMUM.
16 SEAL DUCTWORK AND PIPING THRU MECHANICAL ROOM FLOORS AND PARTITIONS, AND THRU FIRE-RATED
ASSEMBLIES, WITH FIRESTOP MATERIAL AS SPECIFIED.
DUCTLESS AIR CONDITIONER SCHEDULE
TAGS MANUFACTURER MODEL SERVICE
COOLING
CAPACITY
(MBH) REFRIGERANT
INDOOR UNIT OUTDOOR UNIT PIPING SIZES ELECTRIC
EER
(BTUH PER WATT) NOTES
AIR FLOW
HIGH
(CFM)
NOISE
(HI SPEED dB(A))
HEIGHT
(IN)
WIDTH
(IN)
DEPTH
(IN)
WEIGHT
(LBS)
HEIGHT
(IN)
WIDTH
(IN)
DEPTH
(IN)
SUCTION
(IN)
LIQUID
(IN)
MAX
LENGTH
(FT)
MAX
HEIGHT
(FT) VOLTS PHASE
RLA
(AMPS)
MAX FUSE
(AMPS)
IU-1/OU-1 Daikin FHQ42MVJURZR42PVJU CRITICAL POWER ROOM - 105B 42 R-410A 850 47 0' - 7 11/16" 5' - 2 5/8" 2' - 2 3/4" 283.00 4' - 4 15/16" 2' - 11 7/16" 1'…