This document contains responses to contractor questions regarding a federal construction contract opportunity to upgrade operating room utilities at the West Haven VA Medical Center in Connecticut.

The scope of work involves upgrading approximately 6,000 square feet of existing operating room space, including pre-op and post-surgery areas, to current VA standards. Upgrades are required for architectural, mechanical, electrical, medical gas, nurse call, and data/communications systems, including accommodations for a future hybrid operating room. Contractors must phase work to limit the surgical suite shutdown to 60 days or less. Responses clarify contractor duties regarding quality control management, superintendent roles, materials testing, firestopping qualifications, parking and laydown areas, inspection requirements, and other project details. The contracting agency will provide a laydown area and supports 24-hour work with advance coordination.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Project NameWest Haven - Upgrade OR Utilties
VA Project #689-21-111
Pre-Bid Contractor Questions (2/14/24)
Comment #CompanyCommentResponderResponse DateResponse
1Richard GroupPlease confirm the superintendent shall not have any shared duties as a QCM, SSHO or any other roles on the project.VAYes, confirmed
2RGPlease confirm the SSHO shall not have any shared duties as a QCM, superintendent or any other role on the project.VAYes, confirmed
3RGPlease confirm the QCM shall not have any shared duties as a SSHO, superintendent or any other role on the project.VAYes, confirmed
4RGPlease confirm that the contractor is to supply all materials testing for the project.ER2/16/24Contractor is to provide all materials testing outlined in Spec Sections 01 45 29 and 01 45 35
5RGPlease confirm that all firestopping must be either installed by an FM global approved contractor, or a UL qualified firestop contractor certified.TA2/15/24Yes
6RGPlease confirm that the contractor is to include the services of a third party independent firestopping inspector in their bid.TA2/15/24Yes
7RGPlease confirm that firestopping installers accredited by a firestopping product manufacturer will not be approved by the VA unless they meet the FM global or UL qualifications referenced in section 07 84 00.TA2/15/24Yes
8RGPlease confirm that contractor parking will be provided on site. This has a direct impact on pricing.VAVA will provide laydown area and all parking shall be within that area or off station. VA to provide map identifying laydown area.
9RGPlease clarify if an SIOR is required for this project. The information in the specifications, schedule of inspections and statement of inspections is conflicting.ER2/16/24Per the Statement of Special Inspections, 01 45 35.20 Attachment B, and SIOR is not required.
10RGPlease confirm the third-party inspections in the schedule of inspections is accurate and applicable for this project.ER2/16/24The Schedule of Inspections, 01 45 35.10 Attachment A, is accurate and applicable to this project. Additional tests in the field or in a laboratory may be required; refer to 01 45 29 for more information.
11RGPlease confirm this project must meet the buy American act requirements.VAYes
12RGPlease confirm level 4 finish for all finished gypsum board including patches.TA2/15/24Yes
13RGPlease confirm painting unless otherwise noted is to be (3) coats (prime, body, and finish) and will be from "seam to seam" or to a change of materials where walls are patched and refinished.TA2/15/24Yes
14RGPlease confirm work in common hallways requires use of the control cube method i.e. cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit.TA2/15/24Yes
15RGPlease provide the number of days the OR suites are allowed to be shut down during Phase 1.VAThe OR will be partial impacted during Phase 1 however there will not be a total shutdown during Phase 1. Any partial shutdowns require coordination in advance and performed after hours and on weekends.
16RGPlease confirm the VA will be working and scheduling with the existing subsystem vendors on scheduling network outages.VAContractor shall coordinate with subsystem vendors, and communicate scheduled outages to VA
17RGPlease provide floor to finish heights and floor to structure heights for all floors. If possible, please provide a building section of the for each floor.Tracy2/15/24Floor to floor is 11'-6" (field verify)
18RGIs there a current roof warranty for each building? If so, please confirm who has the roofing warranty and provide point of contact.VAContractor to reach out to Tremco for existing roof warranties.
19RGPlease confirm that the contractor is to furnish and install 3 gas anesthesia apparatus and boom.TA2/15/24Yes
20RGPlease confirm contractor is to furnish and install all surgical booms.TA2/15/24Yes
21RGPlease confirm that all penetrations in fire rated walls will need to be fire stopped.TA2/15/24Yes
22RGPlease confirm that steel fabricator must be AISC certified.TH2/15/24Yes
23RGPlease confirm if the AISC certified erector requirement will be waived as it is on most federal projects.TH2/15/24AISC certified erector requirement will not be waived
24RGAre we to assume that areas with existing data devices will not require new wall sleeves? If new sleeves are required, please provide a count.TH2/21/24Contractor shall provide back boxes and empty conduit for data jack where new walls and new data jacks are indicated. See dwg. E-603 Details #1 and #2.
25RGPlease consider more time for the 60 day shutdown of the OR suites in phase 2. While we understand this has a negative impact on the facility, the time provided is not sufficient.VAThe pricing schedule will be amended to add a deduct line item for a 90 day OR Suite shutdown
26RGPlease provide the work hours for both phase 1 and phase 2.VAVA will support 24 hours/day work hours when planned ahead.
27RGWill the VA allow the contractor to work two to three shifts in a day and weekends if needed?VAVA will support 24 hours/day work hours when planned ahead.
28RGIs this project tax exempt? If so, will the documentation be provided at the time of award?VAYes, and Yes
29JCIPlease provide a copy of sign in sheet for walk thru conducted Jan. 24, 2024 and Jan. 31, 2024 for Solicitation 36C24124B0027 / Project 689-21-111VAVA to post sign in sheets
30JCIFloor Plan EY131 show symbols for security intercom and push buttons only, per section 28 PACS and VMS should be included. Please advise if additional drawings are available to outline the Access Control and CCTV.RBPACS and VMS should not have been included in the specifications because it's not required.
31IroncladThe General Contractor shall provide unarmed security guards during the 60 day OR shutdown at the project site 24 hours a day, 7 days a week after construction hours.VAContractor shall be responsible to secure their work and layout areas. No security guards are required.
32IroncladPlease clarify the elevator usage per SPEC below:

1.17 TEMPORARY USE OF EXISTING ELEVATORS

A. Contractor will not be allowed the use of existing elevators. Outside type hoist shall be used by Contractor for transporting materials and equipment.VAIn addition to safetety approved outside type hoist, Contractor may use service elevators off hours and with upfront coordination.
33IroncladCan the SSHO be prime contractor’s superintendent.VANo
34IroncladCan QC be prime contractor’s superintendent?VANo
35IroncladWho will be responsible for removing and storing the furniture and equipment? The VA or Contractor?VAVA
36IroncladSpec Section 11 73 00 Ceiling Mounted Patient Lift System Calls for--B. Periodic Inspection shall be provided by the manufacturer on a yearly basis in compliance with ISO 10535. Is this supposed to be carried in the bid pricing?TA2/15/24No, but the ceiling mounted patient lift system should come with a service contract that would be agreed upon between the lift manufacture and the VA for yearly inspection.
37IroncladSpec Section 14 21 10 MODERNIZATION OF TRACTION ELEVATOR. Please supply elevator make and model.TH2/15/24Elevator manufacturer is KONE Inc.
38IroncladSpec Section 14 21 10 MODERNIZATION OF TRACTION ELEVATOR. Please supply who has the current maintenance for the elevator to be modernized.TH2/15/24KONE Inc. provides maintenance for the current elevators.
39IroncladCan you please post the site visit sign in sheets?VAVA to post sign in sheets
40IroncladWill there be a laydown and trailer area adjacent to the site?VAVA to provide laydown area
41IroncladCan you please clarify on page 7 of the bid sheet 0006 And 0007 what type of asbestos containing material will be removed. Example: There is a significant difference in price between spray applied fireproofing vs. tile abatement.TH2/15/24Based on the RBM Survey Report (028211.10 Attachment A) included in the Specifications, the only possible ACM types identified are floor tile, cement-board heater panels, pipe and fitting insulation, and black rubber roof sealant.
42For the booms, will co2 be piped in?KB2/15/24Yes, booms will have piped CO2.
43For lights, booms and helion, is warranty pt first use or button up?TA2/15/24Substantial Completion
44Union labor expected to be bid?VAContractor shall follow prevailing wages - updated in amendment 0001
45White glove and trash removal?VAContractor shall be responsible for all trash removal in accordance with specifications.
46Do the booms need isolated power?RB2/15/24Yes, the booms need isolated power. Refer to drawing E-506 for boom circuiting.
47Booms articulating y/nTA2/15/24Yes
48Size of field monitors?TA2/15/24Monitors on booms are 32"
49Does this note here apply to our submission? 6 copies of the same attachments? a. “All submittals shall include six copies of adequate descriptive literature, catalog cuts, shop drawings, test reports, certifications, samples, and other data necessary for the Government to ascertain that the proposed materials and equipment comply with drawing and specification requirements. “VANo, electronic submissions in ProCore or equivalent are acceptable.
50Will only one vendor be awarded for both OR lights and booms in cognition with OR Integration? Or could these pieces go out separately?TA2/15/24Lights and booms can be priced out separate from OR integration
51We offer proprietary mounting structures to replace above ceiling steel supports. Our mounting solutions plus boom plate costs approximately 1/5th the cost of traditional red iron steel structures. Should we include pricing for our proprietary mounting structures? This solution is often overlooked during the RFP process and could lead to significant savings for the hospital based on the project's scope and size.TA2/15/24Yes, as long as it supports the equipment and integrates into the existing structure.
52Please confirm the patient lift capacity required for the OR area? The patient lift spec section 2.2B.1 states Lifting capacity: 1000lbs for bariatric lifts. Are the OR lifts considered bariatric lifts?TA2/15/24Yes
53The current system seems to be Fisher Berkeley Ektacom, not Hillrom. Is the intention to integrate with this legacy system?”TH2/22/24Yes, our intention is to integrate the new nurse call system devices into the existing system from the new terminal cabinet. See detail 10 on drawing E-502.