013323.01 - Submittal Register 689-21-111.xlsx
XLSX spreadsheet 67 KB Posted
- Solicitation number
- 36C24124B0027
About this file
This solicitation is for a construction contract to upgrade utilities in an operating room suite at the West Haven VA Medical Center in Connecticut. The selected contractor will replace and modernize utilities to current VA standards in approximately 6,000 square feet of operating room space, including pre-op, post-surgery, storage areas for sterile and reusable medical equipment. Upgrades are needed for architectural, civil/structural, mechanical, plumbing, steam HVAC, electrical power distribution, fire protection, medical gas, pneumatic tube, nurse call, and data/communications systems, including accommodations for a future hybrid operating room. The contractor must phase construction to limit the operating room shutdown to less than 60 days. The Department of Veterans Affairs Veterans Health Administration VISN 1 is seeking a general construction contractor to complete 100% design drawings and specifications. Records generated under the contract become the property of the government for unlimited use. The contractor must comply with federal and agency records management and safeguarding policies.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal Register
| OWNER: | Department of Veterans Affairs | SUBMITTAL REGISTER |
| PROJECT TITLE: | Upgrade OR Utilities | |
| LOCATION: | West Haven, CT | |
| CONTRACT NO: | 689-21-111 | |
| CONTRACTOR: |
| Line | Activity # | Transmittal # | Specification Section | Specification Name | Description | Item Submitted | Paragraph # | Classification: GOVT or A/E Reviewer |
| 1 | 01 00 00 | General Requirements | Pre-Construction | Construction Security Plan | 1.5 | GOVT | ||
| 2 | 01 00 00 | General Requirements | Pre-Construction | Electronic Security Memorandum | 1.5 | GOVT | ||
| 3 | 01 32 16.15 | Project Schedules | Pre-Construction | Project Schedule | 1.5 | GOVT | ||
| 4 | 01 35 26 | Safety Requirements | Pre-Construction | Accident Prevention Plan | 1.4 | GOVT | ||
| 5 | 01 35 26 | Safety Requirements | Pre-Construction | Activity Hazard Analysis | 1.5 | GOVT | ||
| 6 | 01 35 26 | Safety Requirements | Pre-Construction | Training Records | 1.8 | GOVT | ||
| 7 | 01 35 26 | Safety Requirements | Construction | Safety Inspections | 1.9 | GOVT | ||
| 8 | 01 35 26 | Safety Requirements | Construction | Accident Reports, OSHA-300 Logs, Man-Hour Reports | 1.10 | GOVT | ||
| 9 | 01 35 26 | Safety Requirements | Pre-Construction & Construction | ICRA & Permitting | 1.12 | GOVT | ||
| 10 | 01 35 26 | Safety Requirements | Pre-Construction | Tuberculosis Screening | 1.13 | GOVT | ||
| 11 | 01 35 26 | Safety Requirements | Pre-Construction | Fire Safety Plan | 1.14 | GOVT | ||
| 12 | 01 35 26 | Safety Requirements | Pre-Electrical Work | Activity Hazard Analysis | 1.15 | GOVT | ||
| 13 | 01 35 26 | Safety Requirements | Excavation and Trenching | Trenching and Excavation Permit | 1.18 | GOVT | ||
| 14 | 01 35 26 | Safety Requirements | Cranes | Crane - Lift Permit | 1.19 | GOVT | ||
| 15 | 01 35 26 | Safety Requirements | Confined Space Entry | Confined Space Entry Plan | 1.21 | GOVT | ||
| 16 | 01 35 26 | Safety Requirements | Welding and Cutting | Hot Work Permit | 1.22 | GOVT | ||
| 17 | 01 45 00 | Quality Control | Preconstruction Submittals | Preconstruction Submittals | 1.3.1 | A/E + GOVT | ||
| 18 | 01 45 00 | Quality Control | Design Data | Design Data | 1.3.2 | A/E + GOVT | ||
| 19 | 01 45 00 | Quality Control | Test Reports | Test Reports | 1.3.3 | A/E + GOVT | ||
| 20 | 01 45 29 | Testing Laboratory Services | Pre-Construction | Testing Lab Certificate of Accrediation | 1 & 3 | GOVT | ||
| 21 | 01 45 29 | Testing Laboratory Services | Pre-Construction | Written/Verbal Reports | 1 & 3 | GOVT | ||
| 22 | 01 45 35 | Special Inspections | Pre-Construction | Submittals | 1.5 | GOVT | ||
| 23 | 01 57 19 | Temporary Environmental Controls | Pre-Construction | Environmental Protection Plan | 1.4 | A/E + GOVT | ||
| 24 | 01 74 19 | Construction Waste Management | Waste Management Plan | Waste Management Plan | 1.5.B | A/E + GOVT | ||
| 25 | 01 74 19 | Construction Waste Management | Designated Manager | Designated Manager | 1.5.C | A/E + GOVT | ||
| 26 | 01 74 19 | Construction Waste Management | Monthly Summary | Monthly Summary | 1.5.D | A/E + GOVT | ||
| 27 | 01 74 19 | Construction Waste Management | Construction | Debris Disposal & Dispersion Report | 3.3 | GOVT | ||
| 28 | 01 81 13 | Sustainable Construction Requirements | Sustainability Action Plan | Sustainability Action Plan | 1.5.B | A/E + GOVT | ||
| 29 | 01 81 13 | Sustainable Construction Requirements | Spreadsheet | Low Pollutant-Emitting Materials Tracking Spreadsheet | 1.5.C | A/E + GOVT | ||
| 30 | 01 81 13 | Sustainable Construction Requirements | Management Plan | Construction Indoor Air Quality (IAQ) Management Plan | 1.5.D | A/E + GOVT | ||
| 31 | 01 81 13 | Sustainable Construction Requirements | Product Submittals | Product Submittals | 1.5.E | A/E + GOVT | ||
| 32 | 01 81 13 | Sustainable Construction Requirements | Progress Reports | Sustainable Construction Progress Reports | 1.5.F | A/E + GOVT | ||
| 33 | 01 81 13 | Sustainable Construction Requirements | Closeout Submittals | Closeout Submittals | 1.5.G | A/E + GOVT | ||
| 34 | 01 91 00 | General Commissioning Requirements | Preliminary Commissioning Plan | Preliminary Commissioning Plan Submittal | 1.13.A | GOVT | ||
| 35 | 01 91 00 | General Commissioning Requirements | Final Commissioning Plan | Final Commissioning Plan Submittal | 1.13.B | GOVT | ||
| 36 | 01 91 00 | General Commissioning Requirements | Test Procedure | Systems Functional Performance Test Procedure | 1.13.C | GOVT | ||
| 37 | 01 91 00 | General Commissioning Requirements | Pre-Functional Checklists | Pre-Functional Checklists | 1.13.D | GOVT | ||
| 38 | 01 91 00 | General Commissioning Requirements | Test and Inspection Reports | Test and Inspection Reports | 1.13.E | GOVT | ||
| 39 | 01 91 00 | General Commissioning Requirements | Corrective Action Documents | Corrective Action Documents | 1.13.F | GOVT | ||
| 40 | 01 91 00 | General Commissioning Requirements | Preliminary Commissioning Report | Preliminary Commissioning Report Submittal | 1.13.1G | GOVT | ||
| 41 | 01 91 00 | General Commissioning Requirements | Final Commissioning Report | Final Commissioning Report Submittal | 1.13.H | GOVT | ||
| 42 | 01 91 00 | General Commissioning Requirements | Data for Commissioning | Data for Commissioning | 1.13.I | GOVT | ||
| 43 | 02 41 00 | Demolition | Various | As required by the COR | GOVT | |||
| 44 | 02 82 11 | Traditional Asbestos Abatement | Informational Submittals | As requested in 1.7 | 1.7 | GOVT | ||
| 45 | 02 82 11 | Traditional Asbestos Abatement | Closeout Submittals | Inventory of salvaged items | 1.8 | GOVT | ||
| 46 | 02 82 33.13 | Lead-Based Paint Removal & Disposal | Various Submittals | As requested in 1.6 | 1.6 | GOVT | ||
| 47 | 03 30 53 | Cast in Place Concrete Short Form | Shop Drawings | Reinforcing Steel | 1.4.B | A/E | ||
| 48 | 03 30 53 | Cast in Place Concrete Short Form | Manufacturer's Literature & Data | Concrete Mix Design | 1.4.C | A/E | ||
| 49 | 03 30 53 | Cast in Place Concrete Short Form | Manufacturer's Literature & Data | Admixtures and Curing Compounds | 1.4.D | A/E | ||
| 50 | 03 30 53 | Cast in Place Concrete Short Form | Certificates | Each Ready Mix Batch | 1.4.D | A/E | ||
| 51 | 03 30 53 | Cast in Place Concrete Short Form | Manufacturer's Literature & Data | Concrete anchors | 1.4.E | A/E | ||
| 52 | 05 12 00 | Structural Steel Framing | Drawings | Showing fabrication/installation | 1.4 | A/E | ||
| 53 | 05 12 00 | Structural Steel Framing | Sustainable Construction | Identify recycled content | 1.4 | A/E | ||
| 54 | 05 12 00 | Structural Steel Framing | Rtest Reports | Welding | 1.4 | A/E | ||
| 55 | 05 12 00 | Structural Steel Framing | Certificates | Steel, welding, paint compliance | 1.4 | A/E | ||
| 56 | 05 12 00 | Structural Steel Framing | Qualifications | Fabricator, Installer, Welding | 1.4 | A/E | ||
| 57 | 05 12 00 | Structural Steel Framing | Calculations | Design and Connection calcs | 1.4 | A/E | ||
| 58 | 05 31 00 | Steel Decking | Drawings | Submittal Drawings | 1.4 | A/E | ||
| 59 | 05 31 00 | Steel Decking | Manufacturer's Literature and Data | Each product | 1.4 | A/E | ||
| 60 | 05 31 00 | Steel Decking | Certificates | Product compliance | 1.4 | A/E | ||
| 61 | 05 31 00 | Steel Decking | Qualifications | Welding | 1.4 | A/E | ||
| 62 | 05 31 00 | Steel Decking | Certifications | Roof installation insurance certification | 1.4 | A/E | ||
| 63 | 05 50 00 | Metal Fabrications | Manufacturer's Literature and Data | Each Item Specified | 1.3 | GOVT | ||
| 64 | 05 50 00 | Metal Fabrications | Shop Drawings | Each Item Specified | 1.3 | A/E | ||
| 65 | 05 50 00 | Metal Fabrications | Erection Drawings and Instructions | Erection Drawings and Instructions | 1.3 | A/E | ||
| 66 | 05 50 00 | Metal Fabrications | Manufacturer's Certificates | Live load design | 1.3 | A/E | ||
| 67 | 05 50 00 | Metal Fabrications | Design Calculations | Live loads and dead loads | 1.3 | A/E | ||
| 68 | 05 50 10 | Structural Metal Fabrications | Manufacturers Data Sheets | As Required in 1.3 | 1.3 | A/E | ||
| 69 | 05 50 10 | Structural Metal Fabrications | Drawings | Shop Drawings | 1.3 | A/E | ||
| 70 | 05 50 10 | Structural Metal Fabrications | Certifications | As specified in 1.3 | 1.3 | A/E | ||
| 71 | 05 51 00 | Metal Stairs | Shop Drawings | Design, Fabrication Details, installation connections, material and size | 1.3 | A/E | ||
| 72 | 05 51 00 | Metal Stairs | Qualifications | Fabrication qualifications | 1.3 | A/E | ||
| 73 | 05 51 00 | Metal Stairs | Qualifcations | Installer qualifications | 1.3 | A/E | ||
| 74 | 05 51 00 | Metal Stairs | Calculations | Calculations | 1.3 | A/E | ||
| 75 | 05 51 00 | Metal Stairs | Qualifications | Welding qualifications | 1.3 | A/E | ||
| 76 | 06 06 60 | Translucent Resin Panel System | Data | Manufacturer's Product Data | 1.3 | A/E | ||
| 77 | 06 06 60 | Translucent Resin Panel System | Reports | Test Reports | 1.3 | A/E | ||
| 78 | 06 06 60 | Translucent Resin Panel System | Shop Drawings | Shop Drawings | 1.3 | A/E | ||
| 79 | 06 06 60 | Translucent Resin Panel System | Samples | Panels | 1.3 | A/E | ||
| 80 | 06 06 60 | Translucent Resin Panel System | Samples | As Required in 1.3.F | 1.3 | A/E | ||
| 81 | 06 06 60 | Translucent Resin Panel System | Mockups | As Required in 1.3.G | 1.3 | A/E | ||
| 82 | 06 06 60 | Translucent Resin Panel System | Data | Maintenance Data | 1.3 | A/E | ||
| 83 | 07 08 00 | Commissioning of Fire Suppression System | List | Submittals to be reviewed by CxA | 1.6 | A/E | ||
| 84 | 07 08 00 | Commissioning of Fire Suppression System | Checklist | Pre-Functional Checklists | 1.6 | A/E | ||
| 85 | 07 08 00 | Commissioning of Fire Suppression System | Testing | Systems functional performance testing | 1.6 | A/E | ||
| 86 | 07 21 13 | Thermal Insulation | Drawings | Show insulation type, thickness & R-value ea. Location | 1.4.B | A/E | ||
| 87 | 07 21 13 | Thermal Insulation | Manufacturer's Literature & Data | Each product | 1.4.C | A/E | ||
| 88 | 07 21 13 | Thermal Insulation | Manufacturer's Literature and Data | Adhesive indicating manufacturer recommendation for each application | 1.4.D | A/E | ||
| 89 | 07 22 00 | Roof and Deck Insulation | Drawings | Size, Configuration, Installation Details | 1.3 | A/E | ||
| 90 | 07 22 00 | Roof and Deck Insulation | Manufacturer's Literature & Data | Description of each product | 1.3 | A/E | ||
| 91 | 07 22 00 | Roof and Deck Insulation | Samples | Roof insulation & Fasteners | 1.3 | A/E | ||
| 92 | 07 22 00 | Roof and Deck Insulation | Qualifications | Installer | 1.3 | A/E | ||
| 93 | 07 40 00 | Roofing and Siding Panels | Samples | Metal panel | 1.5 | A/E | ||
| 94 | 07 40 00 | Roofing and Siding Panels | Submittal Drawings | Wall panels | 1.5 | A/E | ||
| 95 | 07 40 00 | Roofing and Siding Panels | Manufacturer's Literature & Data | Wall panels | 1.5 | A/E | ||
| 96 | 07 40 00 | Roofing and Siding Panels | Test Reports | Fire Test | 1.5 | A/E | ||
| 97 | 07 40 00 | Roofing and Siding Panels | Certificates | Manufacturer Qualifications | 1.5 | A/E | ||
| 98 | 07 40 00 | Roofing and Siding Panels | Qualifications | Installer | 1.5 | A/E | ||
| 99 | 07 40 00 | Roofing and Siding Panels | Warranty | Manufacturer | 1.5 | A/E | ||
| 100 | 07 54 23 | Thermoplastic Polyolefin (TPO) Roofing | Drawings | As requested in 1.5 | 1.5 | A/E | ||
| 101 | 07 54 23 | Thermoplastic Polyolefin (TPO) Roofing | Manufacturer's Literature & Data | As requested in 1.5 | 1.5 | A/E | ||
| 102 | 07 54 23 | Thermoplastic Polyolefin (TPO) Roofing | Samples | As requested in 1.5 | 1.5 | A/E | ||
| 103 | 07 54 23 | Thermoplastic Polyolefin (TPO) Roofing | Certificates | As requested in 1.5 | 1.5 | A/E | ||
| 104 | 07 54 23 | Thermoplastic Polyolefin (TPO) Roofing | Qualifications | As requested in 1.5 | 1.5 | A/E | ||
| 105 | 07 54 23 | Thermoplastic Polyolefin (TPO) Roofing | Field QC Reports | Reports | 1.5 | GOVT | ||
| 106 | 07 54 23 | Thermoplastic Polyolefin (TPO) Roofing | Temp Protection Plan | List of Proposed Materials | 1.5 | GOVT | ||
| 107 | 07 54 23 | Thermoplastic Polyolefin (TPO) Roofing | Operation & Maintenance Data | Maintenance Instructions | 1.5 | A/E | ||
| 108 | 07 60 00 | Flashing and Sheet Metal | Shop Drawings | All specified items & flashings | 1.4 | A/E | ||
| 109 | 07 60 00 | Flashing and Sheet Metal | Manufacturer's Literature & Data | Two-piece counterflashing, thru-wall flashing | 1.4 | A/E | ||
| 110 | 07 60 00 | Flashing and Sheet Metal | Certificates | Compliance with specified finishing requirements | 1.5 | A/E | ||
| 111 | 07 71 00 | Roof Specialities | Sustainable Design Submittals | Post consumer recycled content | 1.5 | A/E | ||
| 112 | 07 71 00 | Roof Specialities | Samples | Color-anodized aluminum | 1.5 | A/E | ||
| 113 | 07 71 00 | Roof Specialities | Drawings | Shop Drawings | 1.5 | A/E | ||
| 114 | 07 71 00 | Roof Specialities | Manufacturer's Literature & Data | Each item specified | 1.5 | A/E | ||
| 115 | 07 71 00 | Roof Specialities | Certificates | Aluminum thickness | 1.5 | A/E | ||
| 116 | 07 72 00 | Roof Accessories | Samples | As requested in 1.4 | 1.4 | A/E | ||
| 117 | 07 72 00 | Roof Accessories | Shop Drawings | Construction, installation, fastenings | 1.4 | A/E | ||
| 118 | 07 72 00 | Roof Accessories | Manufacturer's Literature & Data | Each item specified | 1.4 | A/E | ||
| 119 | 07 72 00 | Roof Accessories | Certificates | Specified thickness of anodizing | 1.4 | A/E | ||
| 120 | 07 81 00 | Applied Fireproofing | Sustainable Design Submittals | Volatile organic compounds | 1.3 | A/E | ||
| 121 | 07 81 00 | Applied Fireproofing | Qualifications | Installer | 1.3 | A/E | ||
| 122 | 07 81 00 | Applied Fireproofing | Accreditations | Testing Laboratory | 1.3 | A/E | ||
| 123 | 07 81 00 | Applied Fireproofing | Certificates | Testing Laboratory/Manufacturer's Certificate | 1.3 | A/E | ||
| 124 | 07 81 00 | Applied Fireproofing | Miscellaneous | Manufacturer's Written Approvals | 1.3 | A/E | ||
| 125 | 07 84 00 | Firestopping | Qualifications | Installer Qualifications | 1.3 | A/E | ||
| 126 | 07 84 00 | Firestopping | Qualifications | Inspector Qualifications | 1.3 | A/E | ||
| 127 | 07 84 00 | Firestopping | Manufacturer's Literature and Data | For Firestopping and Smoke Stopping Types | 1.3.B | A/E | ||
| 128 | 07 84 00 | Firestopping | Manufacturer's Literature and Data | Product data and application/patching instructions | 1.3.C | A/E | ||
| 129 | 07 84 00 | Firestopping | List | FM, UL, or WH Classification Numbers of systems installed | 1.3.D | A/E | ||
| 130 | 07 84 00 | Firestopping | Certified Laboratory Test Reports | For systems proposed for use that are not listed by FM, UL, or WH | 1.3.E | A/E | ||
| 131 | 07 84 00 | Firestopping | Firestopping Material Certificates | Compliance with Specified Requirements | 1.3.F | A/E | ||
| 132 | 07 92 00 | Joint Sealants | Qualifications | Certification joints are proper size & design | 1.3 | A/E | ||
| 133 | 07 92 00 | Joint Sealants | Certifications | Contractor & Inataller Certification & Spec compliance | 1.3 | A/E | ||
| 134 | 07 92 00 | Joint Sealants | Product Information | Installation Instructions | 1.5.C | A/E | ||
| 135 | 07 92 00 | Joint Sealants | Samples | Cured Samples of Each Sealant | 1.5.D | A/E | ||
| 136 | 07 92 00 | Joint Sealants | Manufacturer's Literature and Data | Primers | 1.5.E | A/E | ||
| 137 | 07 92 00 | Joint Sealants | Manufacturer's Literature and Data | Sealing Compound, Each Type | 1.5 | A/E | ||
| 138 | 07 92 00 | Joint Sealants | Closeout Submittal | Manufacturer Warranty | 1.5.F | A/E | ||
| 139 | 07 92 00 | Joint Sealants | Warranty | Construction; manufacturer's | 1.9 | A/E | ||
| 140 | 08 11 13 | Hollow Metal Doors and Frames | Submittal Drawings | Size, Configuration, Fabrication, Installation Details | 1.4 | A/E | ||
| 141 | 08 11 13 | Hollow Metal Doors and Frames | Manufacturer's Literature & Data | Each product | 1.4 | A/E | ||
| 142 | 08 11 13 | Hollow Metal Doors and Frames | Manufacturer's Literature & Data | Schedule | 1.4 | A/E | ||
| 143 | 08 11 13 | Hollow Metal Doors and Frames | Manufacturer's Literature & Data | Installation Instructions | 1.4 | A/E | ||
| 144 | 08 11 13 | Hollow Metal Doors and Frames | Sustainable Construction | Recycled content | 1.4 | A/E | ||
| 145 | 08 11 13 | Hollow Metal Doors and Frames | Test Reports | Sound rated doors | 1.4 | A/E | ||
| 146 | 08 11 13 | Hollow Metal Doors and Frames | Qualifications | Manufacturer | 1.4 | A/E | ||
| 147 | 08 11 13 | Hollow Metal Doors and Frames | Warranty | Construction | 1.8 | A/E | ||
| 148 | 08 14 00 | Interior Wood Doors | Submittal Drawings | Size, Configuration, Fabrication, Installation Details | 1.4 | A/E | ||
| 149 | 08 14 00 | Interior Wood Doors | Submittal Drawings | Details of glazing | 1.4 | A/E | ||
| 150 | 08 14 00 | Interior Wood Doors | Submittal Drawings | Project specific requirements | 1.4 | A/E | ||
| 151 | 08 51 13 | Aluminum Windows | Drawings | Layout; Elevations; Sections; Hardware; Accessories; Glazing; Finishes | 1.5 | A/E | ||
| 152 | 08 51 13 | Aluminum Windows | Manufacturer's Literature & Data | Product Description; Installation Instructions; Warranty | 1.5 | A/E | ||
| 153 | 0 | 0 | 08 51 13 | Aluminum Windows | Reports | Test Reports - window spec compliance | 1.5 | A/E |
| 154 | 08 51 13 | Aluminum Windows | Certificates | Finish compliance with spec | 1.5 | A/E | ||
| 155 | 08 51 13 | Aluminum Windows | Operation & Maintenance Data | Care instructions | 1.5 | A/E | ||
| 156 | 08 71 00 | Door Hardware | Hardware Schedule | As specified in table | 1.6 | GOVT | ||
| 157 | 08 71 00 | Door Hardware | Samples and Manufacturer's Literature | Items not previously approved | 1.6 | A/E | ||
| 158 | 08 71 00 | Door Hardware | Certificate of Compliance; Test Reports | As described | 1.6 | A/E | ||
| 159 | 08 80 00 | Glazing | Certificates | As required in 1.4.B | 1.4 | A/E | ||
| 160 | 08 80 00 | Glazing | Warranty | Manufactures Warranty | 1.4 | A/E | ||
| 161 | 08 80 00 | Glazing | Manufacturer's Literature & Data | As required in 1.4.D | 1.4 | A/E | ||
| 162 | 08 80 00 | Glazing | Pre-Construction Report | Adhesion and Compatibility Test Report | 1.4 | A/E | ||
| 163 | 08 90 00 | Louver and Vents | Drawings | Louver and Vent types | 1.3 | A/E | ||
| 164 | 08 90 00 | Louver and Vents | Manufacturer's Literature and Data | Each type of Louver and Vent | 1.3 | A/E | ||
| 165 | 08 90 00 | Louver and Vents | Samples | Quadruplicate Samples for color approval | 1.3 | A/E | ||
| 166 | 09 05 16 | Subsurface Preparation for Floor Finishes | Written approval | Product Compatibility | 1.3 | A/E | ||
| 167 | 09 05 16 | Subsurface Preparation for Floor Finishes | Product Data | As required in 1.3.C | 1.3 | A/E | ||
| 168 | 09 05 16 | Subsurface Preparation for Floor Finishes | Test Data | Moisture / Ph | 1.3 | A/E | ||
| 169 | 09 22 16 | Non-Structural Metal Framing | Manufacturer's Literature & Data | Studs, runners and accessories | 1.4 | A/E | ||
| 170 | 09 22 16 | Non-Structural Metal Framing | Manufacturer's Literature & Data | Channels (rolled steel) | 1.4 | A/E | ||
| 171 | 09 22 16 | Non-Structural Metal Framing | Manufacturer's Literature & Data | Test reports | 1.4 | A/E | ||
| 172 | 09 22 16 | Non-Structural Metal Framing | Shop Drawings | Typical ceiling suspension system | 1.4 | A/E | ||
| 173 | 09 22 16 | Non-Structural Metal Framing | Shop Drawings | Typical metal stud construction system including details around openings and corner details | 1.4 | A/E | ||
| 174 | 09 22 16 | Non-Structural Metal Framing | Test Reports | Fire rating test designation each required assembly | 1.4 | A/E | ||
| 175 | 09 29 00 | Gypsum Board | Manufacturer's Literature and Data | Cornerbead and Edge Trim; Finishing materials; Laminating adhesive; Gypsum board, each type | 1.4. | A/E | ||
| 176 | 09 29 00 | Gypsum Board | Samples | Cornerbead, Edge Trim, Control Joints | 1.4 | A/E | ||
| 177 | 09 29 00 | Gypsum Board | Test Results | Fire rating tests; sound rating test | 1.4. | A/E | ||
| 178 | 09 29 00 | Gypsum Board | Certificates | Certification that products Do Not Contain Asbestos | 1.4 | A/E | ||
| 179 | 09 51 00 | Acoustical Ceilings | Submittal Drawings | Drawings | 1.5 | A/E | ||
| 180 | 09 51 00 | Acoustical Ceilings | Manufacturer's Literature and Data | Descriptions of each product | 1.5 | A/E | ||
| 181 | 09 51 00 | Acoustical Ceilings | Manufacturer's Literature and Data | Ceiling Suspension System | 1.5 | A/E | ||
| 182 | 09 51 00 | Acoustical Ceilings | Manufacturer's Literature and Data | Installation instructions | 1.5 | A/E | ||
| 183 | 09 51 00 | Acoustical Ceilings | Manufacturer's Literature and Data | Warranty | 1.5 | A/E | ||
| 184 | 09 51 00 | Acoustical Ceilings | Samples | Acoustical Units, Each Type | 1.5 | A/E | ||
| 185 | 09 51 00 | Acoustical Ceilings | Samples | Suspension system, trim, molding | 1.5 | A/E | ||
| 186 | 09 51 00 | Acoustical Ceilings | Samples | Colored markers | 1.5 | A/E | ||
| 187 | 09 51 00 | Acoustical Ceilings | Sustainable Construction | Recycled content; biobased content | 1.5 | A/E | ||
| 188 | 09 51 00 | Acoustical Ceilings | Certificates | Acoustical Units, Each Type | 1.5 | A/E | ||
| 189 | 09 51 00 | Acoustical Ceilings | Qualifications | Manufacturer | 1.5 | A/E | ||
| 190 | 09 51 00 | Acoustical Ceilings | Closeout Submittals | O&M Data | 1.5 | A/E | ||
| 191 | 09 65 13 | Resilient Base and Accessories | Manufacturer's Literature & Data | As required in 1.4.B | 1.4 | A/E | ||
| 192 | 09 65 13 | Resilient Base and Accessories | Samples | As required in 1.4.C | 1.4 | A/E | ||
| 193 | 09 65 13 | Resilient Base and Accessories | Sustainable Construction | Recycled content; biobased content | 1.4 | A/E | ||
| 194 | 09 65 13 | Resilient Base and Accessories | Operation & Maintenance Data | Care instructions | 1.4 | A/E | ||
| 195 | 09 65 16 | Resilient Sheet Flooring | Manufacturer's Literature & Data | Description. Instructions, Warranty | 1.4 | A/E | ||
| 196 | 09 65 16 | Resilient Sheet Flooring | Samples | As required in 1.4.C | 1.4 | A/E | ||
| 197 | 09 65 16 | Resilient Sheet Flooring | Sustainable Construction | Low Pollutant-Emitting Materials | 1.4 | A/E | ||
| 198 | 09 65 16 | Resilient Sheet Flooring | Certificates | Heat Welded seaming | 1.4 | A/E | ||
| 199 | 09 65 16 | Resilient Sheet Flooring | Qualifications | Manufacturer, Installer | 1.4 | A/E | ||
| 200 | 09 65 19 | Resilient Tile Flooring | Sustainable Design Submittals | Volatile organic compounds | 1.3 | A/E | ||
| 201 | 09 65 19 | Resilient Tile Flooring | Manufacturer's Literature & Data | Description, Manufacturer's Recommendations | 1.3 | A/E | ||
| 202 | 09 65 19 | Resilient Tile Flooring | Samples | As required in 1.3.D | 1.3 | A/E | ||
| 203 | 09 65 19 | Resilient Tile Flooring | Shop Drawings | Layout of patterns, Edge strip locations | 1.3 | A/E | ||
| 204 | 09 65 19 | Resilient Tile Flooring | Test Reports | As required in 1.3.F | 1.3 | A/E | ||
| 205 | 09 91 00 | Painting | Qualifications | For Painter | 1.3 | A/E | ||
| 206 | 09 91 00 | Painting | Manufacturer's Literature & Data | For each type of coating | 1.3 | A/E | ||
| 207 | 09 91 00 | Painting | Manufacturer's Literature & Data | Current MPI "Approved Product List" for each type of coating | 1.3 | A/E | ||
| 208 | 09 91 00 | Painting | Samples | Identity Markers (if used) | 1.3 | A/E | ||
| 209 | 09 91 00 | Painting | Manufacturer's Certificates | Various requirements | 1.3 | A/E | ||
| 210 | 10 21 23 | Cubicle Curtain Tracks | Samples | As required in 1.3.B | 1.3 | A/E | ||
| 211 | 10 21 23 | Cubicle Curtain Tracks | Drawings | Submittal Drawings | 1.3 | A/E | ||
| 212 | 10 21 23 | Cubicle Curtain Tracks | Manufacturer's Literature & Data | As required in 1.3.D | 1.3 | A/E | ||
| 213 | 10 21 23 | Cubicle Curtain Tracks | Data | Closeout Material | 1.3 | A/E | ||
| 214 | 10 44 13 | Fire Extinguisher Cabinets | Manufacturer's Literature & Data | Fire extinguisher cabinet including installation instructions and rough opening required | 1.2 | A/E | ||
| 215 | 11 73 00 | Ceiling Mounted Patient Lift System | Qualtiy Assurance | Certification for compliance | 1.3 | A/E | ||
| 216 | 11 73 00 | Ceiling Mounted Patient Lift System | Qualtiy Assurance | Inspection of equipment | 1.3 | A/E | ||
| 217 | 11 73 00 | Ceiling Mounted Patient Lift System | Qualtiy Assurance | Certification of compliance with VA requirements | 1.3 | A/E | ||
| 218 | 11 73 00 | Ceiling Mounted Patient Lift System | Shop Drawings | show structural supports to the underside of structure. Structural calculations for the support of the track and its attachment to ceiling structure shall be submitted. Shop drawings used in the quoting phase shall be PDFs, and either 2D CAD files or 3D BIM files showing structural support to underside of structure. Shop drawings shall also provide general room layout with bed position and all obstructions to ceiling lift | 1.4 | A/E | ||
| 219 | 11 73 00 | Ceiling Mounted Patient Lift System | Shop Drawings | Once the purchase order is accepted by the vendor, a set of stamped drawings shall be provided by the vendor. Shop drawings and structural calculations shall be signed and stamped by a registered structural engineer and shall meet all code requirements in the jurisdiction having authority. | 1.4 | A/E | ||
| 220 | 11 73 00 | Ceiling Mounted Patient Lift System | Shop Drawings | shall show obstructions such as lights and sprinklers and coordinate their relocation | 1.4 | A/E | ||
| 221 | 11 73 00 | Ceiling Mounted Patient Lift System | Shop Drawings | Manufacturer shall provide BIM (Building Information Model) for clash detection on the request of the Resident Engineer | 1.4 | A/E | ||
| 222 | 11 73 00 | Ceiling Mounted Patient Lift System | Certificate | Certificates of Compliance from Manufacturer | 1.4 | A/E | ||
| 223 | 11 73 00 | Ceiling Mounted Patient Lift System | Manufacturer Literature & Data | Lifting Capacity | 1.5 | A/E | ||
| 224 | 11 73 00 | Ceiling Mounted Patient Lift System | Manufacturer Literature & Data | Lifting Speed | 1.5 | A/E | ||
| 225 | 11 73 00 | Ceiling Mounted Patient Lift System | Manufacturer Literature & Data | Vertical Axis Motor | 1.5 | A/E | ||
| 226 | 11 73 00 | Ceiling Mounted Patient Lift System | Manufacturer Literature & Data | Emergency Brake | 1.5 | A/E | ||
| 227 | 11 73 00 | Ceiling Mounted Patient Lift System | Manufacturer Literature & Data | Emergency Lowering Device | 1.5 | A/E | ||
| 228 | 11 73 00 | Ceiling Mounted Patient Lift System | Manufacturer Literature & Data | Emergency Stopping Device | 1.5 | A/E | ||
| 229 | 11 73 00 | Ceiling Mounted Patient Lift System | Manufacturer Literature & Data | Electronic Soft-Start and Soft-Stop Motor Control | 1.5 | A/E | ||
| 230 | 11 73 00 | Ceiling Mounted Patient Lift System | Manufacturer Literature & Data | Current Limiter for Circuit Protection | 1.5 | A/E | ||
| 231 | 11 73 00 | Ceiling Mounted Patient Lift System | Manufacturer Literature & Data | Strap Length | 1.5 | A/E | ||
| 232 | 11 73 00 | Ceiling Mounted Patient Lift System | Manufacturer Literature & Data | All equipment anchors and supports | 1.5 | A/E | ||
| 233 | 11 73 00 | Ceiling Mounted Patient Lift System | Manufacturer Literature & Data | Individual Room layouts showing location of lift | 1.5 | A/E | ||
| 234 | 11 73 00 | Ceiling Mounted Patient Lift System | Manufacturer Literature & Data | Manufacturer’s Checklist | 1.5 | A/E | ||
| 235 | 11 76 00 | Hospital Operating Room Modular Filtered Diffuser System | Shop Drawings | Shop drawings to include: complete specifications, descriptive drawings, catalog cuts, and descriptive literature on all components used in the diffuser system, with make and model. | 1.5 | A/E | ||
| 236 | 11 76 00 | Hospital Operating Room Modular Filtered Diffuser System | Bid Requirements | Detailed information on structural, mechanical, electrical, and other services necessary to evaluate installation requirements. | 1.5 | A/E | ||
| 11 78 00 | Hospital or Surgical Lights and Booms | Shop Drawings | Product Data and complete drawings for Surgical Lighting System and Equipment Booms | Part 2 | A/E | |||
| 237 | 12 31 00 | Manufactured Metal Casework | Certificates | As specified in 1.4 | 1.4 | A/E | ||
| 238 | 12 31 00 | Manufactured Metal Casework | Manufacturer's Literature & Data | As specified in 1.4 | 1.4 | A/E | ||
| 239 | 12 31 00 | Manufactured Metal Casework | Shop Drawings | As specified in 1.4 | 1.4 | A/E | ||
| 240 | 12 34 00 | Manufacturered Plastic Casework | Quality Assurance | Approval by Contracting Officer Representative | 1.3 | A/E | ||
| 241 | 12 34 00 | Manufacturered Plastic Casework | Qualifications | manufacturer’s qualifications | 1.3 | A/E | ||
| 242 | 12 34 00 | Manufacturered Plastic Casework | Qualifications | Installer qualifications | 1.4 | A/E | ||
| 243 | 12 34 00 | Manufacturered Plastic Casework | Product Data | Manufacturer’s literature and other data showing compliance | 1.4 | A/E | ||
| 244 | 12 34 00 | Manufacturered Plastic Casework | Certification | Manufacturer’s qualifications specified | 1.4 | A/E | ||
| 245 | 12 34 00 | Manufacturered Plastic Casework | Certification | Installer’s qualifications specified | 1.4 | A/E | ||
| 246 | 12 34 00 | Manufacturered Plastic Casework | Shop Drawings | Drawings complete, accurate and to scale | 1.4 | A/E | ||
| 247 | 12 34 00 | Manufacturered Plastic Casework | Shop Drawings | Location of each component | 1.4 | A/E | ||
| 248 | 12 34 00 | Manufacturered Plastic Casework | Shop Drawings | Dimensions and clearance as required | 1.4 | A/E | ||
| 249 | 12 34 00 | Manufacturered Plastic Casework | Shop Drawings | Identify each component | 1.4 | A/E | ||
| 250 | 12 34 00 | Manufacturered Plastic Casework | Shop Drawings | Details including cuts, holes, scribes, attachments and specialized construction requirements | 1.4 | A/E | ||
| 251 | 12 34 00 | Manufacturered Plastic Casework | Shop Drawings | Installation procedures | 1.4 | A/E | ||
| 252 | 12 34 00 | Manufacturered Plastic Casework | Shop Drawings | Placement Listing | 1.4 | A/E | ||
| 253 | 12 34 00 | Manufacturered Plastic Casework | Shop Drawings | Complete listing of each component used | 1.4 | A/E | ||
| 254 | 12 34 00 | Manufacturered Plastic Casework | Shop Drawings | Include the weight of each component | 1.4 | A/E | ||
| 255 | 12 34 00 | Manufacturered Plastic Casework | Samples | Plastic laminate | 1.4 | A/E | ||
| 256 | 12 34 00 | Manufacturered Plastic Casework | O & M Manuals | Operational and maintenance manual | 1.4 | A/E | ||
| 257 | 12 34 00 | Manufacturered Plastic Casework | Warranty | Manufacturer's Warranty | 1.4 | A/E | ||
| 258 | 12 36 00 | Countertops | Shop Drawings | Show dimensions of section and method of assembly | 1.3 | GOVT | ||
| 259 | 12 36 00 | Countertops | Drawings | Show details of construction at a scale of 1/2 inch to a foot | 1.3 | A/E | ||
| 260 | 12 36 00 | Countertops | Samples | samples each top | 1.3 | A/E | ||
| 261 | 12 36 00 | Countertops | Samples | Front edge, back splash, end splash and core with surface material and backing | 1.3 | A/E | ||
| 262 | 13 05 41 | Seismic Restraint Requirements for Non Structural Components | Drawings | Equipment Anchorage Drawings | 1.3 | A/E | ||
| 263 | 13 05 41 | Seismic Restraint Requirements for Non Structural Components | Drawings | Bracing Drawings | 1.3 | A/E | ||
| 264 | 13 05 41 | Seismic Restraint Requirements for Non Structural Components | Calculations | Signed/sealed design calculations | 1.3 | A/E | ||
| 265 | 13 05 41 | Seismic Restraint Requirements for Non Structural Components | Certification/Approval | Compliance verification for concrete anchors | 1.3 | A/E | ||
| 266 | 13 49 00 | Radiation Protection | Drawings | Shop Drawings | 1.4.B | A/E | ||
| 267 | 13 49 00 | Radiation Protection | Manufacturer's Literature & Data | Description. Instructions, Warranty | 1.4.C | A/E | ||
| 268 | 13 49 00 | Radiation Protection | Reports | Test Reports | 1.4.D | A/E | ||
| 269 | 13 49 00 | Radiation Protection | Qualifications | Manufacturer | 1.4.E | A/E | ||
| 270 | 13 49 00 | Radiation Protection | Data | Design Drawings & Calculations | 1.4.F | A/E | ||
| 271 | 13 49 00 | Radiation Protection | Operation & Maintenance Data | Care/startup/maintenance, etc instructions | 1.4.G | A/E | ||
| 272 | 14 21 10 | Modernization of Traction Elevator | Pre-Construction | Compliance documentation | 1.5.B | A/E | ||
| 273 | 14 21 10 | Modernization of Traction Elevator | Shop Drawings | As required in 1.5.C | 1.5.C | A/E | ||
| 274 | 14 21 10 | Modernization of Traction Elevator | Samples | As required in 1.5.D | 1.5.D | A/E | ||
| 275 | 14 21 10 | Modernization of Traction Elevator | Data | As required in 1.5.E | 1.5.E | A/E | ||
| 276 | 14 21 10 | Modernization of Traction Elevator | Drawings | Construction Drawings | 1.5.F | A/E | ||
| 277 | 14 21 10 | Modernization of Traction Elevator | Detail Drawing | Dumbwaiter Enclosure | 1.5.G | A/E | ||
| 278 | 14 21 10 | Modernization of Traction Elevator | Detail Drawings | As required in 1.5.H | 1.5.H | A/E | ||
| 279 | 14 21 10 | Modernization of Traction Elevator | Data | Controller details | 1.5.I | A/E | ||
| 280 | 14 92 00 | Pneumatic Tube System | Shop Drawings | As required in 1.5 | 1.5 | A/E | ||
| 281 | 14 92 00 | Pneumatic Tube System | Product Data | Engineering Data and Descripton | 1.5 | A/E | ||
| 282 | 14 92 00 | Pneumatic Tube System | Manuals | Operation and Maintenance Manuals | 1.5 | A/E | ||
| 283 | 21 08 00 | Commissioning of Fire Suppression System | List | Submittals to be reviewed by CxA | 1.6 | A/E | ||
| 284 | 21 08 00 | Commissioning of Fire Suppression System | Checklist | Pre-Functional Checklists | 3.2 | A/E | ||
| 285 | 21 08 00 | Commissioning of Fire Suppression System | Testing | Systems functional performance testing | 3.4 | A/E | ||
| 286 | 21 13 13 | Wet-Pipe Sprinkler System | Certificates | Contractor Qualifications and License | 1.4 | A/E | ||
| 287 | 21 13 13 | Wet-Pipe Sprinkler System | Shop Drawings | Detail Drawings | 1.4 | A/E | ||
| 288 | 21 13 13 | Wet-Pipe Sprinkler System | Product Data | Manufacturer's Literature and Data | 1.4 | A/E | ||
| 289 | 21 13 13 | Wet-Pipe Sprinkler System | Shop Drawings | Hydraulic Calculations | 1.4 | A/E | ||
| 290 | 21 13 13 | Wet-Pipe Sprinkler System | Closeout Submittals | As Built Drawings | 1.4 | A/E | ||
| 291 | 21 13 13 | Wet-Pipe Sprinkler System | Closeout Submittals | Operation and Maintenance Manuals | 1.4 | A/E | ||
| 292 | 21 13 13 | Wet-Pipe Sprinkler System | Closeout Submittals | Maintenance Schedule | 1.4 | A/E | ||
| 293 | 21 13 13 | Wet-Pipe Sprinkler System | Certificates | Certified Test Data | 1.4 | A/E | ||
| 294 | 22 05 11 | Common Work Results for Plumbing | Certification | Contractor certification of coordination w/Mfg(s) of major equipment/items | 1.4 | A/E | ||
| 295 | 22 05 11 | Common Work Results for Plumbing | List | Installing contractor - List of previous installations/contacts | 1.4 | A/E | ||
| 296 | 22 05 11 | Common Work Results for Plumbing | Manufacturer's Literature & Data | Various requirements | 1.4 | A/E | ||
| 297 | 22 05 11 | Common Work Results for Plumbing | Submittals/Shop Drawings | Interdependent items | 1.4 | A/E | ||
| 298 | 22 05 11 | Common Work Results for Plumbing | Coordination Drawings | Drawings | 1.4 | A/E | ||
| 299 | 22 05 11 | Common Work Results for Plumbing | Maintenance & Operating Manuals | Manuals | 1.4 | A/E | ||
| 300 | 22 05 11 | Common Work Results for Plumbing | Maintenance & Operating Manuals | Manuals | 1.4; 3.1 | A/E | ||
| 301 | 22 05 11 | Common Work Results for Plumbing | Drawings | Arrangement and Installation of equipment and piping | 3.1 | A/E | ||
| 302 | 22 07 11 | Plumbing Insulation | Manufacturer's Literature and Data | Full description | 1.4 | A/E | ||
| 303 | 22 07 11 | Plumbing Insulation | Drawings | Shop Drawings | 1.4 | A/E | ||
| 304 | 22 08 00 | Commissioning of Plumbing Systems | Submittals | as required in 1.4 | 1.4 | A/E | ||
| 305 | 22 08 11 | Commissioning of Fire Suppression Systems | Submittals | Submittals | 1.6 | A/E | ||
| 306 | 22 11 00 | Facility Water Distribution | Manufacturer's Literature and Data | Full description | 1.4 | A/E | ||
| 307 | 22 13 00 | Facility Sanitary and Vent Piping | Manufacturer's Literature and Data | Full description | 1.4 | A/E | ||
| 308 | 22 14 00 | Facility Storm Drainage | Manufacturer's Literature & Data | As specified in 1.4 | 1.4 | A/E | ||
| 309 | 22 14 00 | Facility Storm Drainage | Drawing | Detail of clamping device and extensions | 1.4 | A/E | ||
| 310 | 22 14 00 | Facility Storm Drainage | Signed Checklist | Completed System Readiness Checklist | 1.4 | A/E | ||
| 311 | 22 14 00 | Facility Storm Drainage | Plans & Qualifications | Training Plans; Instructor Qualifications | 1.4 | A/E | ||
| 312 | 22 40 00 | Plumbing Fixtures | Manufacturer's Literature and Data | As specified in 1.4 | 1.4 | A/E | ||
| 313 | 22 40 00 | Plumbing Fixtures | Instructions | Opersting Instructions | 1.4 | A/E | ||
| 314 | 22 40 00 | Plumbing Fixtures | Signed Checklist | Completed System Readiness Checklist | 1.4 | A/E | ||
| 315 | 22 40 00 | Plumbing Fixtures | Plans & Qualifications | Training Plans; Instructor Qualifications | 1.4 | A/E | ||
| 316 | 22 62 00 | Vacuum Systems for Laboratory and Healthcare Facilities | Manufacturer's Literature and Data | As specified in 1.4.C | 1.4 | A/E | ||
| 317 | 22 62 00 | Vacuum Systems for Laboratory and Healthcare Facilities | Manufacturer Letter | Station Inlets | 1.4 | A/E | ||
| 318 | 22 62 00 | Vacuum Systems for Laboratory and Healthcare Facilities | Certification | Vacuum Systems | 1.4 | A/E | ||
| 319 | 22 62 00 | Vacuum Systems for Laboratory and Healthcare Facilities | Affidavit | As required in 1.4.F | 1.4 | A/E | ||
| 320 | 22 62 00 | Vacuum Systems for Laboratory and Healthcare Facilities | Checklist | System Readiness Checklist | 1.4 | A/E | ||
| 321 | 22 62 00 | Vacuum Systems for Laboratory and Healthcare Facilities | Plans & Qualifications | Training Plans; Instructor Qualifications | 1.4 | A/E | ||
| 322 | 22 63 00 | Gas Systems for Laboratory and Healthcare Facilities | Manufacturer's Literature and Data | As specified in 1.4.C | 1.4 | A/E | ||
| 323 | 22 63 00 | Gas Systems for Laboratory and Healthcare Facilities | Manufacturer Letter | Station Inlets | 1.4 | A/E | ||
| 324 | 22 63 00 | Gas Systems for Laboratory and Healthcare Facilities | Certification | Gas Systems | 1.4 | A/E | ||
| 325 | 22 63 00 | Gas Systems for Laboratory and Healthcare Facilities | Checklist | System Readiness Checklist | 1.4 | A/E | ||
| 326 | 22 63 00 | Gas Systems for Laboratory and Healthcare Facilities | Plans & Qualifications | Training Plans; Instructor Qualifications | 1.4 | A/E | ||
| 327 | 22 67 19.16 | Reverse-Osmosis Water Equipment | Manufacturer's Literature and Data | As specified in 1.4.C | 1.4.C | A/E | ||
| 328 | 22 67 19.16 | Reverse-Osmosis Water Equipment | Drawing | Complete detailed layout | 1.4.D | A/E | ||
| 329 | 22 67 19.16 | Reverse-Osmosis Water Equipment | Checklist | System Readiness Checklist | 1.4.E | A/E | ||
| 330 | 22 67 19.16 | Reverse-Osmosis Water Equipment | Plans & Qualifications | Training Plans; Instructor Qualifications | 1.4.F | A/E | ||
| 331 | 23 05 11 | Common Work Results for HVAC | Certificates | Certification of Manufacturer's Coordination | 1.4 | A/E | ||
| 332 | 23 05 11 | Common Work Results for HVAC | Shop Drawings | Interdependent items | 1.4 | A/E | ||
| 333 | 23 05 11 | Common Work Results for HVAC | Shop Drawings | Coordinated Layout Drawings | 1.4 | A/E | ||
| 334 | 23 05 11 | Common Work Results for HVAC | Manufacturer's Literature & Data | Various requirements | 1.4 | A/E | ||
| 335 | 23 05 11 | Common Work Results for HVAC | Rigging Plan | Rigging Plan | 1.4 | A/E | ||
| 336 | 23 05 11 | Common Work Results for HVAC | HVAC Maintenance Data | Various requirements | 1.4 | A/E | ||
| 337 | 23 05 11 | Common Work Results for HVAC | Approved submittals | HVAC Equipment submittals | 1.4 | A/E | ||
| 338 | 23 05 11 | Common Work Results for HVAC | Checklist | Completed Readiness Checklist | 1.4 | A/E | ||
| 339 | 23 05 11 | Common Work Results for HVAC | Traing Plans/Qualifications | Instructor Traing Plans/Qualifications | 1.4 | A/E | ||
| 340 | 23 05 11 | Common Work Results for HVAC | Tests | Operating & Performance Tests | 1.4 | A/E | ||
| 341 | 23 05 11 | Common Work Results for HVAC | Training | Demonstration & Training | 1.4 | A/E | ||
| 342 | 23 05 12 | General Motor Requirements for HVAC | Shop Drawings | Shop Drawings | 1.4 | A/E | ||
| 343 | 23 05 12 | General Motor Requirements for HVAC | Manuals | IOM Manuals | 1.4 | A/E | ||
| 344 | 23 05 12 | General Motor Requirements for HVAC | Certificates | Certification | 1.4 | A/E | ||
| 345 | 23 05 12 | General Motor Requirements for HVAC | Test Reports | System Readiness Checklist | 1.4 | A/E | ||
| 346 | 23 05 41 | Noise and Vibration Control for HVAC and Piping Equipment | Manufacturer's Literature and Data | As required in 1.4.B | 1.4.B | A/E | ||
| 347 | 23 05 41 | Noise and Vibration Control for HVAC and Piping Equipment | Data | Load Calculations | 1.4.C | A/E | ||
| 348 | 23 05 41 | Noise and Vibration Control for HVAC and Piping Equipment | Submittals | Seismic requirements | 1.4.D | A/E | ||
| 349 | 23 05 93 | Testing, Adjusting, and Balancing for HVAC | Certificates | Names and Qualifications | 1.3, 1.4 | A/E | ||
| 350 | 23 05 93 | Testing, Adjusting, and Balancing for HVAC | Test Equipment Criteria | Calibration History | 1.3 | A/E | ||
| 351 | 23 05 93 | Testing, Adjusting, and Balancing for HVAC | Product Data | AABC or NEBB Publications | 1.4 | A/E | ||
| 352 | 23 05 93 | Testing, Adjusting, and Balancing for HVAC | Report | Various Reports | 1.4 | A/E | ||
| 353 | 23 05 93 | Testing, Adjusting, and Balancing for HVAC | Report | Test and Balance Reports | 1.4 | A/E | ||
| 354 | 23 07 11 | HVAC Insulation | Shop Drawings | Shop Drawings | 1.4 | A/E | ||
| 355 | 23 07 11 | HVAC Insulation | Samples | Samples | 1.4 | A/E | ||
| 356 | 23 08 00 | Commissioning of HVAC Systems | Closeout Submittals | List of Submittals | 1.6 | A/E | ||
| 357 | 23 08 00 | Commissioning of HVAC Systems | Pre-Functional Checklists | Pre-Functional Checklists | 3.2 | GOVT | ||
| 358 | 23 08 00 | Commissioning of HVAC Systems | Contractors Tests | As required by other sections | 3.3 | GOVT | ||
| 359 | 23 08 00 | Commissioning of HVAC Systems | Functional Tests | Signing of CxA produced and witnessed test | 3.4 | GOVT | ||
| 360 | 23 08 00 | Commissioning of HVAC Systems | Training | Training Plans | 3.5 | GOVT | ||
| 361 | 23 09 23 | Direct Digital Control System for HVAC | Contractor Qualifications | Letters | 1.4 | A/E | ||
| 362 | 23 09 23 | Direct Digital Control System for HVAC | Warranty | Warranty | 1.6 | A/E | ||
| 363 | 23 09 23 | Direct Digital Control System for HVAC | Product Data | Manufacturer's Literature and Data | 1.7 | A/E | ||
| 364 | 23 09 23 | Direct Digital Control System for HVAC | Certificates | Product Certificates | 1.7 | A/E | ||
| 365 | 23 09 23 | Direct Digital Control System for HVAC | Certificates | Product Licenses | 1.7 | A/E | ||
| 366 | 23 09 23 | Direct Digital Control System for HVAC | Closeout Submittals | As Built Control Drawings | 1.7 | A/E | ||
| 367 | 23 09 23 | Direct Digital Control System for HVAC | Closeout Submittals | Operation and Maintenance Manuals | 1.7 | A/E | ||
| 368 | 23 09 23 | Direct Digital Control System for HVAC | Closeout Submittals | Performance Report | 1.7 | GOVT | ||
| 369 | 23 21 13 | Hydronic Piping | Product Data | Manufacturer's Literature and Data | 1.4 | A/E | ||
| 370 | 23 21 13 | Hydronic Piping | Product Data | Manufacturer's Certified Data Report for Pressure Vessels | 1.4 | A/E | ||
| 371 | 23 21 13 | Hydronic Piping | Certificates | Welder's Qualifications | 1.4 | A/E | ||
| 372 | 23 21 13 | Hydronic Piping | Shop Drawings | Coordination Drawings | 1.4 | A/E | ||
| 373 | 23 21 13 | Hydronic Piping | Closeout Submittals | As Built Piping Diagrams | 1.4 | A/E | ||
| 374 | 23 21 23 | Hydronic Pumps | Manufacturer's Literature and Data | As specified in 1.4.C | 1.4 | A/E | ||
| 375 | 23 21 23 | Hydronic Pumps | Chascteristic Curves | As specified in 1.4.D | 1.4 | A/E | ||
| 376 | 23 21 23 | Hydronic Pumps | Maintenance & Operating Manuals | Manuals, as required in 1.4.E | 1.4 | A/E | ||
| 377 | 23 21 23 | Hydronic Pumps | Checklist | Completed Readiness Checklist | 1.4 | A/E | ||
| 378 | 23 21 23 | Hydronic Pumps | Traing Plans/Qualifications | Instructor Traing Plans/Qualifications | 1.4 | A/E | ||
| 379 | 23 22 13 | Steam and Condensate Heating Piping | Product Data | Manufacturer's Literature and Data | 1.4 | A/E | ||
| 380 | 23 22 13 | Steam and Condensate Heating Piping | Manufacturer's Certified Data Report | ASME Papers | 1.4 | A/E | ||
| 381 | 23 22 13 | Steam and Condensate Heating Piping | Coordination Drawings | Coordination Drawings | 1.4 | A/E | ||
| 382 | 23 22 13 | Steam and Condensate Heating Piping | As-Built Drawings | As-Built Drawings | 1.4 | A/E | ||
| 383 | 23 22 23 | Steam Condensate Pumps | Product Data | Manufacturer's Literature and Data | 1.4 | A/E | ||
| 384 | 23 22 23 | Steam Condensate Pumps | Product Data | Pump Curves | 1.4 | A/E | ||
| 385 | 23 22 23 | Steam Condensate Pumps | O&M Data | Manuals | 1.4 | A/E | ||
| 386 | 23 22 23 | Steam Condensate Pumps | Checklist | Completed System Readiness Checklist | 1.4 | A/E | ||
| 387 | 23 22 23 | Steam Condensate Pumps | Training Plans/Qualifications | Instructor Traing Plans/Qualifications | 1.4 | A/E | ||
| 388 | 23 23 00 | Refrigerant Piping | Shop Drawings | As specified in 1.4 | 1.4 | A/E | ||
| 389 | 23 23 00 | Refrigerant Piping | Certification | As specified in 1.4 | 1.4 | A/E | ||
| 390 | 23 23 00 | Refrigerant Piping | Design Manual | As specified in 1.4 | 1.4 | A/E | ||
| 391 | 23 31 00 | HVAC Ducts and Casings | Product Data | Manufacturer's Literature and Data | 1.4 | A/E | ||
| 392 | 23 31 00 | HVAC Ducts and Casings | Shop Drawings | Coordination Drawings | 1.4 | A/E | ||
| 393 | 23 31 00 | HVAC Ducts and Casings | Duct Leakage Tests | Leak and Repair reports | 3.2 | GOVT | ||
| 394 | 23 34 00 | HVAC Fans | Product Data | Submittal | 1.4 | A/E | ||
| 395 | 23 34 00 | HVAC Fans | Sound Data | Submittal | 1.4 | A/E | ||
| 396 | 23 34 00 | HVAC Fans | Motor Data | Submittal | 1.4 | A/E | ||
| 397 | 23 34 00 | HVAC Fans | Roof Curbs | Submittal | 1.4 | A/E | ||
| 398 | 23 34 00 | HVAC Fans | Belt Guards | Submittal | 1.4 | A/E | ||
| 399 | 23 34 00 | HVAC Fans | Closeout Submittals | IO&M information | 1.4 | A/E | ||
| 400 | 23 34 00 | HVAC Fans | Certified curves | Submittal | 1.4 | A/E | ||
| 401 | 23 35 00 | Generator Exhaust | Shop Drawings | Drawings, Technical Data, Calculations | 1.4 | A/E | ||
| 402 | 23 36 00 | Air Terminal Units | Product Data | Submittal | 1.4 | A/E | ||
| 403 | 23 36 00 | Air Terminal Units | Samples | Sample | 1.4 | GOVT | ||
| 404 | 23 36 00 | Air Terminal Units | Certificates | Product Qualifications | 1.4 | A/E | ||
| 405 | 23 36 00 | Air Terminal Units | Closeout Submittals | O&M information | 1.4 | A/E | ||
| 406 | 23 37 00 | Air Outlets and Inlets | Product Data | Manufacturer's Literature and Data | 1.4 | A/E | ||
| 407 | 23 37 00 | Air Outlets and Inlets | Shop Drawings | Coordination Drawings | 1.4 | A/E | ||
| 408 | 23 40 00 | HVAC Air Cleaning Devices | Product Data | Submittal | 1.4 | A/E | ||
| 409 | 23 40 00 | HVAC Air Cleaning Devices | Performance Reports | Submittal | 1.4; 1.3 | A/E | ||
| 410 | 23 40 00 | HVAC Air Cleaning Devices | Certificates | Warranty | 1.4; 1.3 | A/E | ||
| 411 | 23 40 00 | HVAC Air Cleaning Devices | HEPA FilterTest Reports | Field Test Reports | 1.4 | A/E | ||
| 412 | 23 72 00 | Air-to-Air Energy Recovery Equipment | Product Data | Manufacturer's Literature and Data | 1.4 | A/E | ||
| 413 | 23 72 00 | Air-to-Air Energy Recovery Equipment | Certification | Certification of previous installations | 1.4 | A/E | ||
| 414 | 23 72 00 | Air-to-Air Energy Recovery Equipment | Performance Data | Performance details | 1.4 | A/E | ||
| 415 | 23 72 00 | Air-to-Air Energy Recovery Equipment | O&M Data | Manuals | 1.4 | A/E | ||
| 416 | 23 72 00 | Air-to-Air Energy Recovery Equipment | Checklist | Completed System Readiness Checklist | 1.4 | A/E | ||
| 417 | 23 73 00 | Indoor Central-Station Air-Handling Units | Certification | Manufacturer's Certification | 1.3 | A/E | ||
| 418 | 23 73 00 | Indoor Central-Station Air-Handling Units | AHU Certifications | AHRI | 1.3 | A/E | ||
| 419 | 23 73 00 | Indoor Central-Station Air-Handling Units | Proposal Requirements | Proposal | 1.4 | A/E | ||
| 420 | 23 73 00 | Indoor Central-Station Air-Handling Units | Shop Drawings | Submittal | 1.4 | A/E | ||
| 421 | 23 73 00 | Indoor Central-Station Air-Handling Units | Product Data | Manufacturer's Literature and Data | 1.4 | A/E | ||
| 422 | 23 73 00 | Indoor Central-Station Air-Handling Units | Calculations | Submittal | 1.4 | A/E | ||
| 423 | 23 73 00 | Indoor Central-Station Air-Handling Units | Certified AMCA ratings | Submittal | 1.4 | A/E | ||
| 424 | 23 73 00 | Indoor Central-Station Air-Handling Units | Test Procedures | Report | 1.4 | A/E | ||
| 425 | 23 73 00 | Indoor Central-Station Air-Handling Units | O&M Data | Manuals | 1.4 | A/E | ||
| 426 | 23 73 00 | Indoor Central-Station Air-Handling Units | Commissioning | System Readiness Checklist | 3.3 | GOVT | ||
| 427 | 23 73 00 | Indoor Central-Station Air-Handling Units | Shipping Information | As requested in 1.4 | 1.4 | A/E | ||
| 428 | 23 81 00 | Decentralized Unitary HVAC Equipment | Manufacturer's Literature and Data | As specified in 1.4 | 1.4 | A/E | ||
| 429 | 23 81 00 | Decentralized Unitary HVAC Equipment | Certification | As specified in 1.4 | 1.4 | A/E | ||
| 430 | 23 81 00 | Decentralized Unitary HVAC Equipment | Performance Rating | As specified in 1.4 | 1.4 | A/E | ||
| 431 | 23 81 00 | Decentralized Unitary HVAC Equipment | O&M Manual | As specified in 1.4 | 1.4 | A/E | ||
| 432 | 23 81 00 | Decentralized Unitary HVAC Equipment | System Readiness Checklist | As specified in 1.4 | 1.4 | A/E | ||
| 433 | 23 82 00 | Heating and Cooling Units | Product Data | Manufacturer's Literature and Data | 1.4 | A/E | ||
| 434 | 23 82 00 | Heating and Cooling Units | Certificates | Compliance certification | 1.4 | A/E | ||
| 435 | 23 82 00 | Heating and Cooling Units | O&M Data | Manuals | 1.4 | A/E | ||
| 436 | 23 82 00 | Heating and Cooling Units | Checklist | Completed System Readiness Checklist | 1.4 | A/E | ||
| 437 | 23 82 16 | Air Coils | Product Data | Manufacturer's Literature and Data | 1.4 | A/E | ||
| 438 | 23 82 16 | Air Coils | Instructions | Installation, Operation and Maintenance Manuals | 1.4 | A/E | ||
| 439 | 23 82 16 | Air Coils | Certificates | Certification Compliance | 1.4 | A/E | ||
| 440 | 23 82 16 | Air Coils | Commissioning | System Readiness Checklist | 1.4.F | GOVT | ||
| 441 | 26 05 11 | Requirements for Electrical Installations | Qualifications | Manufacturer, Products, and Services | 1.4 | A/E | ||
| 442 | 26 05 11 | Requirements for Electrical Installations | Submittals | Procedures | 1.12 | A/E | ||
| 443 | 26 05 11 | Requirements for Electrical Installations | O&M Manuals | O&M Manuals | 1.12 | A/E | ||
| 444 | 26 05 11 | Requirements for Electrical Installations | Acceptance Checks | Test Data and Report of Results, | 1.14 | A/E | ||
| 445 | 26 05 11 | Requirements for Electrical Installations | Warranty | Letter | 1.15 | A/E | ||
| 446 | 26 05 11 | Requirements for Electrical Installations | Instruction | Qualifications, Agendas, Schedules | 1.16 | A/E | ||
| 447 | 26 05 19 | Low Voltage Electrical Power Conductors and Cables | Product Data | Manufacturer's Literature and Data | 1.5 | A/E | ||
| 448 | 26 05 19 | Low Voltage Electrical Power Conductors and Cables | Certificates | Certifications | 1.5 | A/E | ||
| 449 | 26 05 19 | Low Voltage Electrical Power Conductors and Cables | Tests | Acceptance Checks and Tests | 3.5 | A/E | ||
| 450 | 26 05 26 | Grounding and Bonding for Electrical Systems | Product Data - Shop Drawings | Manufacturer's Literature and Data | 1.4 | A/E | ||
| 451 | 26 05 26 | Grounding and Bonding for Electrical Systems | Test Reports | Ground Resistance Test | 1.4 | A/E | ||
| 452 | 26 05 26 | Grounding and Bonding for Electrical Systems | Certificates | Certification of Installation | 1.4 | A/E | ||
| 453 | 26 05 33 | Raceway and Boxes for Electrical Systems | Product Data | Manufacturer's Literature and Data | 1.4 | A/E | ||
| 454 | 26 05 33 | Raceway and Boxes for Electrical Systems | Shop Drawings | Shop Drawings | 1.4 | A/E | ||
| 455 | 26 05 33 | Raceway and Boxes for Electrical Systems | Certificates | Certifications of Materials and Installation | 1.4 | A/E | ||
| 456 | 26 05 36 | Wireways for Radiology Equipment | Shop Drawings | Shop Drawings | 1.4 | A/E | ||
| 457 | 26 05 36 | Wireways for Radiology Equipment | Certificates | As specified in 1.4 | 1.4 | A/E | ||
| 458 | 26 05 73 | Overcurrent Protective Device Coordination Study | Product Data | Software program to be used for study. | 1.4 | A/E | ||
| 459 | 26 05 73 | Overcurrent Protective Device Coordination Study | Results | Complete study results | 1.4 | A/E | ||
| 460 | 26 05 73 | Overcurrent Protective Device Coordination Study | Certifications | Certification of Installation | 1.4 | A/E | ||
| 461 | 26 08 00 | Commissioning of Electrical Systems | Pre-Functional Checklists | Pre-Functional Checklists | 3.2 | A/E | ||
| 462 | 26 08 00 | Commissioning of Electrical Systems | Contractors Tests | As required by other sections | 3.3 | A/E | ||
| 463 | 26 08 00 | Commissioning of Electrical Systems | Functional Tests | Signing of CA produced and witnessed test | 3.4 | A/E | ||
| 464 | 26 08 00 | Commissioning of Electrical Systems | Training | Training Plans | 3.5 | A/E | ||
| 465 | 26 09 23 | Lighting Controls | Shop Drawings | Shop Drawings | 1.4 | A/E | ||
| 466 | 26 09 23 | Lighting Controls | O&M Data | Manuals | 1.4 | A/E | ||
| 467 | 26 09 23 | Lighting Controls | Certifications | Lighting Control Systems | 1.4 | A/E | ||
| 468 | 26 09 23 | Lighting Controls | Instructions | Instructions | 3.4 | A/E | ||
| 469 | 26 20 11 | Isolated Power Systems | Shop Drawings | Shop Drawings | 1.4 | A/E | ||
| 470 | 26 20 11 | Isolated Power Systems | Manuals | As required in 1.4.A.2 | 1.4 | A/E | ||
| 471 | 26 20 11 | Isolated Power Systems | Reports | Test Reports | 1.4 | A/E | ||
| 472 | 26 20 11 | Isolated Power Systems | Certifications | As required in 1.4.A.4 | 1.4 | A/E | ||
| 473 | 26 24 16 | Panelboards | Shop Drawings | Shop Drawings | 1.4 | A/E | ||
| 474 | 26 24 16 | Panelboards | Closeout Submittals | Operation and Maintenance Manuals | 1.4 | A/E | ||
| 475 | 26 24 16 | Panelboards | Certifications | Certifications of Installation | 1.4 | A/E | ||
| 476 | 26 24 16 | Panelboards | Tests | Acceptance Checks and Tests | 3.2 | A/E | ||
| 477 | 26 27 26 | Wiring Devices | Shop Drawings | Shop Drawings | 1.4 | A/E | ||
| 478 | 26 27 26 | Wiring Devices | Closeout Submittals | Operation and Maintenance Manuals | 1.4 | A/E | ||
| 479 | 26 27 26 | Wiring Devices | Certificates | Certifications of Materials and Installation | 1.4 | A/E | ||
| 480 | 26 27 26 | Wiring Devices | Tests | Acceptance Checks and Tests | 3.2 | A/E | ||
| 481 | 26 29 11 | Motor Controllers | Shop Drawings | Shop Drawings | 1.4 | A/E | ||
| 482 | 26 29 11 | Motor Controllers | Closeout Submittals | Operation and Maintenance Manuals | 1.4 | A/E | ||
| 483 | 26 29 11 | Motor Controllers | Certificates | Certifications of Materials and Installation | 1.4 | A/E | ||
| 484 | 26 29 11 | Motor Controllers | Tests | Acceptance Checks and Tests | 3.2 | A/E | ||
| 485 | 26 29 21 | Enclosed Switches and Circuit Breakers | Shop Drawings | Shop Drawings | 1.4 | A/E | ||
| 486 | 26 29 21 | Enclosed Switches and Circuit Breakers | Closeout Submittals | Operation and Maintenance Manuals | 1.4 | A/E | ||
| 487 | 26 29 21 | Enclosed Switches and Circuit Breakers | Certificates | Certifications of Materials and Installation | 1.4 | A/E | ||
| 488 | 26 29 21 | Enclosed Switches and Circuit Breakers | Tests | Acceptance Checks and Tests | 3.2 | A/E | ||
| 489 | 26 41 00 | Facility Lightning Protection | Shop Drawings | Shop Drawings | 1.4 | A/E | ||
| 490 | 26 41 00 | Facility Lightning Protection | Certifications | Lightening Protection System | 1.4 | A/E | ||
| 491 | 26 41 00 | Facility Lightning Protection | Tests | Acceptance Checks and Tests | 3.2 | A/E | ||
| 492 | 26 43 13 | Surge Protective Devices | Shop Drawings | Shop Drawings | 1.4 | A/E | ||
| 493 | 26 43 13 | Surge Protective Devices | Closeout Submittals | Operation and Maintenance Manuals | 1.4 | A/E | ||
| 494 | 26 43 13 | Surge Protective Devices | Certificates | Certifications of Materials and Installation | 1.4 | A/E | ||
| 495 | 26 43 13 | Surge Protective Devices | Tests | Acceptance Checks and Tests | 3.2 | A/E | ||
| 496 | 26 43 13 | Surge Protective Devices | Instructions | Instructions | 3.4 | A/E | ||
| 497 | 26 51 00 | Interior Lighting | Shop Drawings | Shop Drawings | 1.3 | A/E | ||
| 498 | 26 51 00 | Interior Lighting | Closeout Submittals | Operation and Maintenance Manuals | 1.3 | A/E | ||
| 499 | 26 51 00 | Interior Lighting | Certificates | Certifications of Materials and Installation | 1.3 | A/E | ||
| 500 | 26 51 00 | Interior Lighting | Tests | Acceptance Checks and Tests | 3.2 | A/E | ||
| 501 | 27 05 11 | Requirements for Communications Installations | List | List of Parts | 1.7 | A/E | ||
| 502 | 27 05 11 | Requirements for Communications Installations | Information | Product Information | 1.7 | A/E | ||
| 503 | 27 05 11 | Requirements for Communications Installations | Source Quality Control Submittal | As required in 1.7.D | 1.7 | A/E | ||
| 504 | 27 05 11 | Requirements for Communications Installations | Qualifications | Installer | 1.7 | A/E | ||
| 505 | 27 05 11 | Requirements for Communications Installations | Submittals | Delagated Design submittals - seismic | 1.7 | A/E | ||
| 506 | 27 05 11 | Requirements for Communications Installations | Submittals | Anchors and supports | 1.7 | A/E | ||
| 507 | 27 05 11 | Requirements for Communications Installations | Test Equipment List | As required in 1.7.H | 1.7 | A/E | ||
| 508 | 27 05 11 | Requirements for Communications Installations | Drawings | As required in 1.7.I | 1.7 | A/E | ||
| 509 | 27 05 11 | Requirements for Communications Installations | Submittals | Sustainable Design | 1.7 | A/E | ||
| 510 | 27 05 11 | Requirements for Communications Installations | Test Reports | Certified Test Reports | 1.7 | A/E | ||
| 511 | 27 05 26 | Grounding and Bonding for Communications Systems | Plans & Qualifications | Location /Routing | 1.3 | A/E |