10-AS103A.pdf

PDF 301 KB Posted

Attached to
7230--JP Window Shades Federal contract opportunity
Solicitation number
36C24122Q0856
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

View the file

Other files for this federal contract opportunity

Other files attached to 7230--JP Window Shades, newest first.
File Type Posted
10-AS201.pdf PDF
10-AS100B.pdf PDF
36C24122Q0856_1.docx DOCX document
10-AS103B.pdf PDF
10-AS100A.pdf PDF
10-AS203.pdf PDF
10-AS101B.pdf PDF
10-AS101A.pdf PDF
10-AS202.pdf PDF
SOW Edited.pdf PDF
36C24122Q0856.docx DOCX document
Line Items.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

EF

FEC

GENERAL SHEET NOTES

FLOOR PLANS:

1. Work from given dimensions. In general, large-scale details take precedence over smaller scale plans, elevations and building sections. Notify the Architect of any dimensional discrepancies prior to commencing the Work, and do not begin work until such discrepancies are resolved by the Architect.

2. Do not scale the drawings.

3. Dimensions indicated as "clear" shall be maintained in cases of discrepancy.

4. Masonry Opening or Rough Opening dimensions indicated are nominal dimensions.

Coordinate all Masonry Openings or Rough Openings with actual window unit, doorframe, or curtain wall/storefront sizes and requirements.

5. Dimensional Control:

• Exterior dimensions are to:

• Centerline of column

• Face of concrete

• Masonry opening

• Rough Opening

• Interior dimensions are to:

• Face of stud

• Face of masonry

• Centerline column

• Face of existing finish material

• Existing dimensions shall be verified. Report any discrepancies to the Architect.

6. Unless noted otherwise, the location of door frames shall be:

• CMU partitions: 4" from the adjacent wall to the hinge side of the rough opening.

• Metal stud partitions: 4" from the adjacent wall studs to the hinge side of the rough opening.

7. Typical Detail Notes:

The following notes are typical throughout this project and apply in all cases unless specifically noted otherwise. These notes and associated details may not be directly referenced on the drawings:

• All columns adjacent to or integral with exterior wall construction shall be enclosed within the wall construction unless noted otherwise.

• All columns located adjacent to or integral with GWB partitions shall be enclosed within the wall construction unless noted otherwise.

• All freestanding columns shall be enclosed.

• All roof leaders, heat piping, sprinkler risers, plumbing vents, sanitary plumbing or miscellaneous piping shall be enclosed within the wall construction.

• All duct penetrations through floors shall be enclosed in a chase.

• Slabs at all floor drains shall be pitched toward the drain.

AS203

AS201

AS202 E-A

E-4

E-4.7

E-5

AS301

AS301

AS301

AS301

AS302

AS302

AS302

AS302

AS305

1 2 3 3.3 4

A

B

B.5

C

D

AS306

AS304

1.3 1.9

AS207 2

AS305

PATIENT

TOILET

3-03

ELEVATOR

G-30

STAIR 1

3S-11

TEAM

LEADER

OFFICE

3-07TEAM

LEADER

OFFICE

3-08

CONFERENCE

ROOM

3-09

COPY

CENTER

3-05

OPEN

OFFICE

3-04

ES6C8

ES6C6

ES8C6-1

ES6C8

ES6C8

ES6C6

S4A

S4A

S4A

S4A

S4A

S4A

S4A

S4S-2

S4A

S4S-2

S4S-1

ES8C6-1

ES6C6

ES6C8

ES6C6

S4A

3-10

3-09

3-08

3-

CORRIDOR

CR-3-06

CORRIDOR

CR-3-16

S4S-2S

S8B-2

ES6C8

ES6C6

S4A

S4A

S4A

S4A

3-

3-

3-

CORRIDOR

CR-3-01

CORRIDOR

CR-3-02

ES6

S4F

S4F

EL. 28' - 0"

6" 6"

R O

1'

5"

R O

6'

0" 7'

/2

C

LR

/2

1'

3"

1'

1/

2" R

O 3'

0"

RO

3' - 0" 1' - 3"1' - 3"

1'

4"

1' - 3"

1' - 2"

RO

3' - 0" 8' - 3 1/2"

RO

3' - 0" 8' - 3 1/2"

RO

3' - 0"

R O

3'

/2

6'

6"

R O

3'

0" 1'

2"

1'

3"

1'

0"

2' - 3" 23' - 10"

12' - 5 3/4" 5' - 4 1/2"

9"

9"

5' - 5" 10' - 1 1/2"

CLR

5' - 0"

14' - 3"

5'

3/

4"

CLR

8' - 9 1/2"

3S -1

S4B-2

S4S-2 S4S-2

S4B-2

CLR

9' - 6"

AS507

AS507

S4F

ES6C6

ES6C6

LAB

MODULE

3-10

CONSULT

3-28

OPEN

OFFICE

3-27

KITCHEN

3-26

CONSULT

3-25

3-25

3-28

3-

3-27 S4A

S2F

S4A

S4A S4A

S4A

S4A

S3F

AS103B

AS103B

AS505

6"

Wall paneling

Wall paneling

Wall paneling

Wall paneling

S4A

DRINKING

FOUNTAIN

CENTER IN ALCOVE /

SSURF BACK WALL

S2F

S6F

S2F S4F

EXISTING BLDG 1F

1.8

S3F

AS206

SIM

R

EV

AS205

SIM

AS407

(2) WALL HOOKS

5 1/2"

EQ

EQ

EQ

EQ

6"

1/

2"

S4F

3'

7"

10' - 2 1/2"

8'

5/

8" 9'

9'

AS207

THIS AREA DENOTES THE FOOTPRINT

OF EXISTING BUILDING 1F.

FLOOR PLAN LEGEND

49 DARTMOUTH STREET

PORTLAND, ME 04101

207-775-1059 www.pdtarchs.com

ARCHITECTURE

INTERIOR DESIGN

PLANNING

Project Number

Building Number

Drawing NumberLocation

Project Title

Date Checked Drawn

Drawing Title

Approved: Project Director

Dwg:

ARCHITECT/ENGINEERS:CONSULTANTS:

DateRevisions:

1 2 3 4 5 6 7 8

A

B

C

D

E

VA FORM 08-6231, OCT 1978

on e e ig ht h in ch o ne fo ot on e q ua rte r i nc on e h al f th re e e ig ht hs th re e q ua rte rs i

6" on e i

6" on e a nd on e h a lf i nc he s on e f oo t 6"

Denis McLaughlin Telephone: 857-364-5149

1 2 3 4 5 6 7 8

Jamaica Plain, MA

A

B

C

D

E

M.E.P.:

Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376

SPECIFICATIONS:

Lowell Specifications, Inc.

34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001

STRUCTURAL:

Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822

CIVIL/LANDSCAPE:

Stantec Consulting 141 Portland St.

Boston, MA 02114 T: (617) 523-8103

AE Research Addition 523-307

0%

S

UB

MI

TT

AL

- B

ID

D

OC

UM

EN

TS

3-31-2016

Third Floor Plan A

AS103A

PNDW

1/4" = 1'-0"3 3rd Floor Plan Area A

Sheets
AS103A - Third Floor Plan A

File details come from the government source that posted it. Updated .