10-AS100A.pdf
PDF 388 KB Posted
- Attached to
- 7230--JP Window Shades Federal contract opportunity
- Solicitation number
- 36C24122Q0856
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 10-AS202.pdf | ||
| 10-AS201.pdf | ||
| 10-AS100B.pdf | ||
| 36C24122Q0856_1.docx | DOCX document | |
| 10-AS203.pdf | ||
| 10-AS103A.pdf | ||
| 10-AS101B.pdf | ||
| 10-AS101A.pdf | ||
| 10-AS103B.pdf | ||
| Line Items.pdf | ||
| SOW Edited.pdf | ||
| 36C24122Q0856.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEC
AS203
AS201
AS202
E-A E-B
E-4
E-4.7
E-5
AS303
AS303
AS301
AS301
AS301
AS301
AS302
AS302
AS302
AS302
AD201
AS305
1 2 3 3.3 4
A
B
B.5
C
D
AS303
AS303
AS306
AS304
AS204 2221AS204 18
AS205 2
AS2083
AS205
AS20416
AS20412
AS20827
AS204
AS20419 20
1.3 1.9
AS205
AS305
PATIENT
TLT
G-01ELEV.
G-30
STAIR 1
GS-11
OFFICE
G-07
OFFICE
G-08
OFFICE
G-09
TMS
G-12
MRI
WAIT
G-13
MRI
TOILET
G-15
GOWN 1
G-16
GOWN 2
G-17
OPEN
BENCH
LAB
G-06
EEG
CONTROL
RM
G-05
/1 AS100B
/1 AS100B
S4A
S4A
S4A
S4A
S4A
S4A
S4A
S4A
S4A
S4S-1
S4B-2 S8B-2
S4A
S4B-2
S4S-2 S4S-2
EC10C6
S3F
S3F
EC10A
S4A
S2F
G -0
G -0
G -0
G -0
G
-0
G -0
G-06
S3F
S3F
S4A
S4A
G -0
FDN
S3F
S3F
S6A
S4A
S2F
EXERCISE
ROOM
G-04
EEG
TEST
G-03
CORRIDOR
CR-G-10
CORRIDOR
CR-G-02
CORRIDOR
MRI
PREP
G-18
S2F
S2F
S2F
S2F
G -1
G -1
G -1
G -1
G
-1
S4F
EL. -14' - 0"
R O
3'
0" C
W
AL
L R
O T
O R
O 6'
6"
1' - 2"
RO
3' - 0"
1'
2"
S6A
2 1/2"
9' - 5"
7"
9' - 4"
S3F S3F
S3F
5'
5"
6'
6"
5'
1/
2"
6' - 8"
7' - 11"
11' - 1" 11' - 1 1/2" 5' - 8" 3"
C
LR
/8
G S-
RO
3' - 0"
EC10AEC10C6
8' - 3 1/2"
RO
3' - 0" 8' - 3 1/2"
UP
1' - 0"
1' - 5"
1' - 5"
3'
7/
8"
EQ
EQ
9'
1' - 2"
5' - 2 3/4"
7'
1/
2" G
W B
TO
G
W B
ALIGN
AS402
AS401
B1 paneling paneling paneling
1' - 6"
BENCH
BENCH
3' - 8 3/4"
1' - 6"
1/
4"
DRINKING
FOUNTAIN
CENTER IN
ALCOVE S4A
S4A
S4A
EXISTING BLDG 1F AREAWAY
1.8
2' - 1" 1' - 6"
S4F
BENCH
HOOKS
(H2) paneling paneling paneling paneling
HOOKS (H3)
AS401
E1
MIRROR
(M-2)
MIRROR
(M-2)
2 HOOKS
(H-1)
2 HOOKS
(H-1)
EXTEND WALL
TO ALIGN WITH
COUNTER AND
WRAP IN GWB
AS407
S4F
AS507
5' - 5"
9'
1/
2"
/2
3' - 2"
2' - 8 1/2"
GRAB BAR
GRAB BAR
O
PE
N
IN
G S
IN
F
N D
W
AL
L
SE
E
ST
R U
C T
FO
R
M
AS
O N
R Y
THESE RO'S ARE THE BLOCKED
OPENINGS FOR THE C-WALL -
OPENINGS IN FND WALL ARE
LARGER - SEE C-WALL DETAILS
AND STRUCT DRAWINGS
GENERAL SHEET NOTES
FLOOR PLANS:
1. Work from given dimensions. In general, large-scale details take precedence over smaller scale plans, elevations and building sections. Notify the Architect of any dimensional discrepancies prior to commencing the Work, and do not begin work until such discrepancies are resolved by the Architect.
2. Do not scale the drawings.
3. Dimensions indicated as "clear" shall be maintained in cases of discrepancy.
4. Masonry Opening or Rough Opening dimensions indicated are nominal dimensions.
Coordinate all Masonry Openings or Rough Openings with actual window unit, doorframe, or curtain wall/storefront sizes and requirements.
5. Dimensional Control:
• Exterior dimensions are to:
• Centerline of column
• Face of concrete
• Masonry opening
• Rough Opening
• Interior dimensions are to:
• Face of stud
• Face of masonry
• Centerline column
• Face of existing finish material
• Existing dimensions shall be verified. Report any discrepancies to the Architect.
6. Unless noted otherwise, the location of door frames shall be:
• CMU partitions: 4" from the adjacent wall to the hinge side of the rough opening.
• Metal stud partitions: 4" from the adjacent wall studs to the hinge side of the rough opening.
7. Typical Detail Notes:
The following notes are typical throughout this project and apply in all cases unless specifically noted otherwise. These notes and associated details may not be directly referenced on the drawings:
• All columns adjacent to or integral with exterior wall construction shall be enclosed within the wall construction unless noted otherwise.
• All columns located adjacent to or integral with GWB partitions shall be enclosed within the wall construction unless noted otherwise.
• All freestanding columns shall be enclosed.
• All roof leaders, heat piping, sprinkler risers, plumbing vents, sanitary plumbing or miscellaneous piping shall be enclosed within the wall construction.
• All duct penetrations through floors shall be enclosed in a chase.
• Slabs at all floor drains shall be pitched toward the drain.
THIS AREA DENOTES THE FOOTPRINT
OF EXISTING BUILDING 1F.
FLOOR PLAN LEGEND
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Approved: Project Director
Dwg:
ARCHITECT/ENGINEERS:CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig ht h in ch o ne fo ot on e q ua rte r i nc on e h al f th re e e ig ht hs th re e q ua rte rs i
6" on e i
6" on e a nd on e h a lf i nc he s on e f oo t 6"
Denis McLaughlin Telephone: 857-364-5149
1 2 3 4 5 6 7 8
Jamaica Plain, MA
A
B
C
D
E
M.E.P.:
Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376
SPECIFICATIONS:
Lowell Specifications, Inc.
34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001
STRUCTURAL:
Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822
CIVIL/LANDSCAPE:
Stantec Consulting 141 Portland St.
Boston, MA 02114 T: (617) 523-8103
AE Research Addition 523-307
0%
S
UB
MI
TT
AL
- B
ID
D
OC
UM
EN
TS
3-31-2016
Ground Floor Plan A
AS100A
PNDW
1/4" = 1'-0"1 Ground Floor Plan Area A
| Sheets |
| AS100A - Ground Floor Plan A |
File details come from the government source that posted it. Updated .